44000-P055383
World Bank
Social Services Delivery Project
International Development Association
MINISTRY OF LABOR AND SOCIAL AFFAIRS (GEN. ADM. OF SOC. SERV
International Development Association
MINISTRY OF LABOR AND SOCIAL AFFAIRS (GEN. ADM. OF SOC. SERVPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Lorena Kostallari
+1-202-473-1000lkostallari@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Durres County
41.4830 19.6170
Shkoder County
42.1830 19.7500
Tirana County
41.2670 19.7830
Vlores County
40.1670 19.8000
Other Public AdministrationCentral Government (Central Agencies)Social ProtectionPublic Administration - Social ProtectionSub-National GovernmentSocial Safety NetsSocial Insurance and PensionsJob CreationFragility, Conflict and ViolenceJobsSocial InclusionData production, accessibility and useData Development and Capacity BuildingForced DisplacementSocial ProtectionParticipation and Civic EngagementOther Excluded Groups
0.00
20000.00
20000.00
20000.00
20000.00
20000.00
20000.00
20000.00
20000.00
20000.00
6666.67
6666.67
6666.66
60000.00
60000.00
60000.00
60000.00
60000.00
60000.00
60000.00
60000.00
60000.00
53333.33
53333.33
53333.34
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
170000.00
170000.00
170000.00
170000.00
170000.00
170000.00
170000.00
170000.00
170000.00
156666.67
156666.67
156666.66
180000.00
180000.00
180000.00
180000.00
180000.00
180000.00
180000.00
180000.00
180000.00
193333.33
193333.33
193333.34
180000.00
180000.00
180000.00
180000.00
180000.00
180000.00
180000.00
180000.00
180000.00
193333.33
193333.33
193333.34
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
110000.00
110000.00
110000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
83333.33
83333.33
83333.34
15853.95
15853.95
15853.95
29451.33
29451.33
29451.34
0.00
0.00
0.00
0.00
0.00
0.00
72103.84
72103.84
72103.83
18640.78
18640.78
18640.79
8044.56
8044.56
8044.56
15721.61
15721.61
15721.60
9435.25
9435.25
9435.24
53187.08
53187.08
53187.08
0.00
0.00
0.00
40218.03
40218.03
40218.04
36074.08
36074.08
36074.07
61944.22
61944.22
61944.22
68194.90
68194.90
68194.90
102201.47
102201.47
102201.46
129996.52
129996.52
129996.53
54654.52
54654.52
54654.51
125461.80
125461.80
125461.80
209582.27
209582.27
209582.28
134758.78
134758.78
134758.78
297833.73
297833.73
297833.73
134531.13
134531.13
134531.14
360700.43
360700.43
360700.44
711715.43
711715.43
711715.42
378163.23
378163.23
378163.23
0.00
0.00
0.00
48870.93
48870.93
48870.94
11543.50
11543.50
11543.51
0.00
0.00
0.00
114070.03
114070.03
114070.02
173074.54
173074.54
173074.55
133333.33
133333.33
133333.34
100000.00
100000.00
100000.00
133333.33
133333.33
133333.34
166666.67
166666.67
166666.66
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
167305.39
167305.39
167305.38
0.00
0.00
0.00
0.00
0.00
10000000Total Commitment in Second Quarter of 2001
International Development Association
250000Total Disbursement in First Quarter of 2002
International Development Association
47562Total Disbursement in Second Quarter of 2002
International Development Association
88354Total Disbursement in Third Quarter of 2002
International Development Association
-890Total Interest Repayment in Third Quarter of 2002
International Development Association
-1530Total Interest Repayment in First Quarter of 2003
International Development Association
216312Total Disbursement in Second Quarter of 2003
International Development Association
55922Total Disbursement in Third Quarter of 2003
International Development Association
-2096Total Interest Repayment in Third Quarter of 2003
International Development Association
24134Total Disbursement in Fourth Quarter of 2003
International Development Association
47165Total Disbursement in First Quarter of 2004
International Development Association
-29124Total Interest Repayment in First Quarter of 2004
International Development Association
28306Total Disbursement in Second Quarter of 2004
International Development Association
159561Total Disbursement in Third Quarter of 2004
International Development Association
-30820Total Interest Repayment in Third Quarter of 2004
International Development Association
120654Total Disbursement in First Quarter of 2005
International Development Association
-23520Total Interest Repayment in First Quarter of 2005
International Development Association
108222Total Disbursement in Second Quarter of 2005
International Development Association
12492Total Disbursement in Third Quarter of 2005
International Development Association
173340Total Disbursement in Third Quarter of 2005
International Development Association
-22776Total Interest Repayment in Third Quarter of 2005
International Development Association
89122Total Disbursement in Fourth Quarter of 2005
International Development Association
162544Total Disbursement in Fourth Quarter of 2005
International Development Association
259523Total Disbursement in First Quarter of 2006
International Development Association
-19934Total Interest Repayment in First Quarter of 2006
International Development Association
179239Total Disbursement in Second Quarter of 2006
International Development Association
210751Total Disbursement in Second Quarter of 2006
International Development Association
163964Total Disbursement in Third Quarter of 2006
International Development Association
-22688Total Interest Repayment in Third Quarter of 2006
International Development Association
157364Total Disbursement in Fourth Quarter of 2006
International Development Association
219021Total Disbursement in Fourth Quarter of 2006
International Development Association
250000Total Disbursement in First Quarter of 2007
International Development Association
378747Total Disbursement in First Quarter of 2007
International Development Association
-18822Total Interest Repayment in First Quarter of 2007
International Development Association
326548Total Disbursement in Second Quarter of 2007
International Development Association
404276Total Disbursement in Second Quarter of 2007
International Development Association
68323Total Disbursement in Third Quarter of 2007
International Development Association
498630Total Disbursement in Third Quarter of 2007
International Development Association
-22570Total Interest Repayment in Third Quarter of 2007
International Development Association
81845Total Disbursement in Fourth Quarter of 2007
International Development Association
321749Total Disbursement in Fourth Quarter of 2007
International Development Association
214592Total Disbursement in First Quarter of 2008
International Development Association
257456Total Disbursement in First Quarter of 2008
International Development Association
610054Total Disbursement in First Quarter of 2008
International Development Association
-22680Total Interest Repayment in First Quarter of 2008
International Development Association
590644Total Disbursement in Second Quarter of 2008
International Development Association
769557Total Disbursement in Second Quarter of 2008
International Development Association
774945Total Disbursement in Second Quarter of 2008
International Development Association
38016Total Disbursement in Third Quarter of 2008
International Development Association
158481Total Disbursement in Third Quarter of 2008
International Development Association
937993Total Disbursement in Third Quarter of 2008
International Development Association
-29376Total Interest Repayment in Third Quarter of 2008
International Development Association
146613Total Disbursement in First Quarter of 2009
International Development Association
-34807Total Interest Repayment in First Quarter of 2009
International Development Association
5000000Total Commitment in First Quarter of 2009
International Bank for Reconstruction and Development
34631Total Disbursement in Second Quarter of 2009
International Development Association
-36660Total Interest Repayment in Third Quarter of 2009
International Development Association
42210Total Disbursement in Fourth Quarter of 2009
International Development Association
19224Total Disbursement in First Quarter of 2010
International Development Association
-37994Total Interest Repayment in First Quarter of 2010
International Development Association
212500Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development
-12500Total Interest Repayment in First Quarter of 2010
International Bank for Reconstruction and Development
32682Total Disbursement in Second Quarter of 2010
International Development Association
22679Total Disbursement in Second Quarter of 2010
International Bank for Reconstruction and Development
-34958Total Interest Repayment in Third Quarter of 2010
International Development Association
-719Total Interest Repayment in Third Quarter of 2010
International Bank for Reconstruction and Development
109472Total Disbursement in Fourth Quarter of 2010
International Development Association
31632Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development
435877Total Disbursement in First Quarter of 2011
International Development Association
-37849Total Interest Repayment in First Quarter of 2011
International Development Association
47976Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development
-747Total Interest Repayment in First Quarter of 2011
International Bank for Reconstruction and Development
202100Total Disbursement in Second Quarter of 2011
International Development Association
32026Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development
-40148Total Interest Repayment in Third Quarter of 2011
International Development Association
-125635Total Loan Repayment in Third Quarter of 2011
International Development Association
-928Total Interest Repayment in Third Quarter of 2011
International Bank for Reconstruction and Development
181473Total Disbursement in Fourth Quarter of 2011
International Development Association
90140Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development
80981Total Disbursement in First Quarter of 2012
International Development Association
-39053Total Interest Repayment in First Quarter of 2012
International Development Association
-120752Total Loan Repayment in First Quarter of 2012
International Development Association
95458Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development
169191Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development
388349Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development
-1315Total Interest Repayment in First Quarter of 2012
International Bank for Reconstruction and Development
103884Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development
119863Total Disbursement in Third Quarter of 2012
International Development Association
-38413Total Interest Repayment in Third Quarter of 2012
International Development Association
-118521Total Loan Repayment in Third Quarter of 2012
International Development Association
209176Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development
215828Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development
-5440Total Interest Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development
42873Total Disbursement in Fourth Quarter of 2012
International Development Association
82419Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development
683122Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development
332658Total Disbursement in First Quarter of 2013
International Development Association
368080Total Disbursement in First Quarter of 2013
International Development Association
-38012Total Interest Repayment in First Quarter of 2013
International Development Association
-121630Total Loan Repayment in First Quarter of 2013
International Development Association
75828Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development
102045Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development
1153327Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development
-8550Total Interest Repayment in First Quarter of 2013
International Bank for Reconstruction and Development
48642Total Disbursement in Second Quarter of 2013
International Development Association
214261Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development
814099Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development
-446688Total Commitment Cancellations in Third Quarter of 2013
International Development Association
1056Total Disbursement in Third Quarter of 2013
International Development Association
3630Total Disbursement in Third Quarter of 2013
International Development Association
-40569Total Interest Repayment in Third Quarter of 2013
International Development Association
-118409Total Loan Repayment in Third Quarter of 2013
International Development Association
1016Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development
29472Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development
-11284Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development
-225573Total Commitment Cancellations in Fourth Quarter of 2013
International Bank for Reconstruction and Development
-80316Total Interest Repayment in First Quarter of 2014
International Development Association
-116429Total Loan Repayment in First Quarter of 2014
International Development Association
-10828Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development
-80392Total Interest Repayment in Third Quarter of 2014
International Development Association
-117242Total Loan Repayment in Third Quarter of 2014
International Development Association
-9761Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development
-108619Total Interest Repayment in First Quarter of 2015
International Development Association
-108324Total Loan Repayment in First Quarter of 2015
International Development Association
-10322Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development
-104887Total Interest Repayment in Third Quarter of 2015
International Development Association
-106053Total Loan Repayment in Third Quarter of 2015
International Development Association
-12933Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development
-131363Total Interest Repayment in First Quarter of 2016
International Development Association
-104986Total Loan Repayment in First Quarter of 2016
International Development Association
-16655Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development
-130894Total Interest Repayment in Third Quarter of 2016
International Development Association
-105773Total Loan Repayment in Third Quarter of 2016
International Development Association
-26355Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development
-116351Total Interest Repayment in First Quarter of 2017
International Development Association
-102535Total Loan Repayment in First Quarter of 2017
International Development Association
-35047Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development
-115145Total Interest Repayment in Third Quarter of 2017
International Development Association
-105511Total Loan Repayment in Third Quarter of 2017
International Development Association
-40752Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development
-130029Total Interest Repayment in First Quarter of 2018
International Development Association
-108734Total Loan Repayment in First Quarter of 2018
International Development Association
-41048Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development
-129109Total Interest Repayment in Third Quarter of 2018
International Development Association
-106385Total Loan Repayment in Third Quarter of 2018
International Development Association
-62471Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development
-121500Total Interest Repayment in First Quarter of 2019
International Development Association
-105879Total Loan Repayment in First Quarter of 2019
International Development Association
-68414Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development
-123194Total Interest Repayment in Third Quarter of 2019
International Development Association
-105076Total Loan Repayment in Third Quarter of 2019
International Development Association
-72720Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development
-158988Total Loan Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development
-127557Total Interest Repayment in First Quarter of 2020
International Development Association
-104827Total Loan Repayment in First Quarter of 2020
International Development Association
-54601Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
-158988Total Loan Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
-123568Total Interest Repayment in Third Quarter of 2020
International Development Association
-105504Total Loan Repayment in Third Quarter of 2020
International Development Association
-23233Total Interest Repayment in Third Quarter of 2020
International Bank for Reconstruction and Development
-158988Total Loan Repayment in Third Quarter of 2020
International Bank for Reconstruction and Development
-132491Total Interest Repayment in First Quarter of 2021
International Development Association
-109300Total Loan Repayment in First Quarter of 2021
International Development Association
Project Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementCredit AgreementAgreementAgreementGrant or Trust Fund AgreementGrant or Trust Fund AgreementContract AwardsProject URLProcurement Notices
Secure adequate annual budget for each year
Establish an actuarial department in SII and maintain it during project duration
Agreement reached between SII and Tax department for the provision of contribution data in electronic format
SII establish and maintain an internal financial management system
Intermediate Results Indicator
Periodic Household surveys to inform policy decisions
Target met. Surveys in place and used as base for Gov. decisions
Target met
Intermediate Results Indicator
Increased capacity of Social Insurance Institute to detect and reduce fraud in the system, via securing all the historical contribution and work history records
target partially met
Partially achieved. When the central archive will be fully functional, it is expected that all records will be transferred.
Intermediate Results Indicator
Reduced number of documents required for applying for the pension benefit - "added w/AF"
target partially met
Partly achieved. When the central archive will be fully functional, it is expected that target will be fully achieved (to beconformed during the ICR preparation)
Intermediate Results Indicator
Number of days for providing formal response to pension applications (positive or negative)less than 30 days on average - "added w/AF"
target met
Achieved. The SII has reached an average no. of 25 days for the formal response to the applications
Intermediate Results Indicator
Increased number of contributors with accessible electronic individual records - "added w/AF"
target partially met
Partially achieved. Expected to be fully achieved following project closure (end of March) when the archive will be fullyfunctioning.
Intermediate Results Indicator
Increased number of beneficiaries with eligibility and benefit levels checked -"added w/AF"
target met
Achieved
Intermediate Results Indicator
Increased number of SII staff trained in undertaking actuarial projections - "added w/AF"
target partially met
Partly achieved. Although 3 other experts started to be trained on actuarial projections, due to staff changes there are only 2permanent SII staff fully trained.
Intermediate Results Indicator
Increased number of individuals who know their pension rights - "added w/AF"
Defined based on the results of the first public opinion survey
target met
Achieved. This is based on the second survey (just completed)
Intermediate Results Indicator
Increased number of individuals/companies who indicate they have improved access to information about their benefits and contributions - "added w/AF"
Defined based on the first public opinion survey results
target met
Achieved. As per the second survey (just completed)
PDO Indicator
Improved client services in pension administration -"added w/AF"
Value defined based on the results of the first public opinion survey
target met
The indicator is updated, based on the second survey, just completed.
PDO Indicator
Central registry of contributors and beneficiaries introduced and operating - "added w/AF"
target mostly met - to be confirmed during ICR preparation
Central Archive expected to be fully operational within April (following the completion of furniture delivery by end of March)
PDO Indicator
Improved capacity in SII for pension policy development with actuarial projections and impact of reform options undertaken by SII -"added w/AF"
target met
Achieved. The SII, through its unit, has drafted a number of projections, which are being used for the discussions on pensionpolicy development
PDO Indicator
Improved transparency and public understanding of the pension system - "added w/AF"
target met
Target achieved. This is based on the second survey, which is just completed. It is expected that after the archive will befunctioning, the indicator will be further improved
PDO Indicator
Increase access of vulnerable groups to daily social care services
There were only 26 daily centers with a total of 1300 clients
A total of 43 centers are in place, serving to 25,000 clients
PDO Indicator
Improve quality of care in residential services, by increasing the number of centers which provide these services in accordance with general standards
target met. 14 residential care centers meet the general social care services standards.
PDO Indicator
Improve quality of care in residential services, by increasing the number of centers which provide these services in accordance with service user specific standards
Target met. 8 residential care centers are assessed as meeting the relevant service user specific standards.
PDO Indicator
Prepare policy options for improving targeting of cash social assistance
Target met. Options for improved targeting of cash social assistance are identified and implemented
Intermediate Results Indicator
A comprehensive social service strategy is adopted by the Government and is being implemented
Target met. The strategy is approved and implemented as per the action plan
Intermediate Results Indicator
Necessary legal framework introduced
Target met. The legal framework enacted
Intermediate Results Indicator
Design and implementation of local social care plans
Target met. 8 regions have completed and are implementing the local social care plans
44000-P078933
World Bank
Education Excellence and Equity Project
International Development Association
MINISTRY OF EDUCATION AND SCIENCE
International Development Association
MINISTRY OF EDUCATION AND SCIENCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Keiko Inoue
+1-202-473-1000kinoue@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Zall-Mner
41.4530 19.8980
Frakulla e Vogel
40.6240 19.5410
Peshkopi
41.6850 20.4290
Kukes
42.0770 20.4220
Korce
40.6190 20.7810
Shkoder
42.0680 19.5130
Lezhe
41.7840 19.6440
Fier
40.7240 19.5560
Durres
41.3230 19.4410
Pogradec
40.9030 20.6530
Permet
40.2340 20.3520
Krume
42.1970 20.4130
Kruje
41.5090 19.7930
Ballsh
40.5990 19.7350
Bajram Curri
42.3570 20.0770
Lazarat
40.0470 20.1470
Lukove
39.9920 19.9140
Xhafzotaj
41.3440 19.5480
Ura Vajgurore
40.7690 19.8780
Kamez
41.3820 19.7600
Tirana
41.3270 19.8190
Secondary EducationPrimary EducationSub-National GovernmentCentral Government (Central Agencies)Tertiary EducationEducation FinancingAdministrative and Civil Service ReformSocial ProtectionStandards, Curriculum and TextbooksMunicipal Institution BuildingAccess to EducationEducationScience and TechnologyTeachersSocial protection delivery systemsPublic Administration
0.00
119047.61
119047.61
119047.63
119047.61
119047.61
119047.63
119047.61
119047.61
119047.63
119047.61
119047.61
119047.63
238095.24
238095.24
238095.23
238095.24
238095.24
238095.23
476190.47
476190.47
476190.49
476190.47
476190.47
476190.49
476190.47
476190.47
476190.49
476190.47
476190.47
476190.49
476190.47
476190.47
476190.49
476190.47
476190.47
476190.49
595238.10
595238.10
595238.09
595238.10
595238.10
595238.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44228.33
44228.33
44228.34
0.00
0.00
0.00
416972.55
416972.55
416972.56
0.00
0.00
0.00
909019.03
909019.03
909019.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
810781.34
810781.34
810781.34
0.00
0.00
0.00
1666666.66
1666666.67
1666666.67
0.00
0.00
0.00
1080000.00
1080000.00
1080000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15000000Total Commitment in Second Quarter of 2006
International Development Association
132685Total Disbursement in Fourth Quarter of 2006
International Development Association
-15697Total Interest Repayment in First Quarter of 2007
International Development Association
1250918Total Disbursement in Second Quarter of 2007
International Development Association
-17935Total Interest Repayment in Third Quarter of 2007
International Development Association
2727057Total Disbursement in Fourth Quarter of 2007
International Development Association
-16404Total Interest Repayment in First Quarter of 2008
International Development Association
-21257Total Interest Repayment in Third Quarter of 2008
International Development Association
-14381Total Interest Repayment in First Quarter of 2009
International Development Association
2432344Total Disbursement in Second Quarter of 2009
International Development Association
-19979Total Interest Repayment in Third Quarter of 2009
International Development Association
-23502Total Interest Repayment in First Quarter of 2010
International Development Association
1776468Total Disbursement in Second Quarter of 2010
International Development Association
-27650Total Interest Repayment in Third Quarter of 2010
International Development Association
-32082Total Interest Repayment in First Quarter of 2011
International Development Association
1767879Total Disbursement in Second Quarter of 2011
International Development Association
-36175Total Interest Repayment in Third Quarter of 2011
International Development Association
827520Total Disbursement in Fourth Quarter of 2011
International Development Association
3289875Total Disbursement in First Quarter of 2012
International Development Association
-40882Total Interest Repayment in First Quarter of 2012
International Development Association
-50984Total Interest Repayment in Third Quarter of 2012
International Development Association
-52198Total Interest Repayment in First Quarter of 2013
International Development Association
939320Total Disbursement in Second Quarter of 2013
International Development Association
-53908Total Interest Repayment in Third Quarter of 2013
International Development Association
-524444Total Disbursement in First Quarter of 2014
International Development Association
-56799Total Interest Repayment in First Quarter of 2014
International Development Association
-1562335Total Commitment Cancellations in Second Quarter of 2014
International Development Association
-2674Total Disbursement in Second Quarter of 2014
International Development Association
-52859Total Interest Repayment in Third Quarter of 2014
International Development Association
-48830Total Interest Repayment in First Quarter of 2015
International Development Association
-52377Total Interest Repayment in Third Quarter of 2015
International Development Association
-49161Total Interest Repayment in First Quarter of 2016
International Development Association
-49634Total Interest Repayment in Third Quarter of 2016
International Development Association
-661790Total Loan Repayment in Third Quarter of 2016
International Development Association
-41915Total Interest Repayment in First Quarter of 2017
International Development Association
-639519Total Loan Repayment in First Quarter of 2017
International Development Association
-49211Total Interest Repayment in Third Quarter of 2017
International Development Association
-672200Total Loan Repayment in Third Quarter of 2017
International Development Association
-43646Total Interest Repayment in First Quarter of 2018
International Development Association
-684640Total Loan Repayment in First Quarter of 2018
International Development Association
-39877Total Interest Repayment in Third Quarter of 2018
International Development Association
-664621Total Loan Repayment in Third Quarter of 2018
International Development Association
-28985Total Interest Repayment in First Quarter of 2019
International Development Association
-661344Total Loan Repayment in First Quarter of 2019
International Development Association
-33832Total Interest Repayment in Third Quarter of 2019
International Development Association
-648947Total Loan Repayment in Third Quarter of 2019
International Development Association
-30926Total Interest Repayment in First Quarter of 2020
International Development Association
-651290Total Loan Repayment in First Quarter of 2020
International Development Association
-39869Total Interest Repayment in Third Quarter of 2020
International Development Association
-675126Total Loan Repayment in Third Quarter of 2020
International Development Association
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementContract AwardsProject URLProcurement Notices
The Project Operational Manual (POM) has been adopted.
The Director of Internal Audit Dept of MoES and a full-time Financial Management Specialist for the Annual Reform Program in theEconomics Dept. of MoES have been appointed.
The Fiduciary Capacity Building Plan is in place.
Full application of RPF and ARAP to construction site in Shkodra on which demolition occurred in 2008, including full provision ofany compensation or assistance to affected party as required.
Intermediate Results Indicator
% of school principals trained in management and education leadership
target surpassed by 2008
target surpassed
Intermediate Results Indicator
Standard deviation of per student expenditure in basic education by regions
(2007 data as baseline data was not available at time of preparation)
target not met
Not achieved. Data shows an increasing trend and MoES explains that is the result of higher teacher salaries, plus bonus fortransport for rural areas. In most cases, the data shows greater expenditures in rural areas, than urban areas.
Intermediate Results Indicator
Number of schools and clusters of schools engaged in school improvement activities
target not metActivity dropped in August 2010 as part of prioritization of activities.
target not met
Intermediate Results Indicator
% of teachers who participate in continuous professional development
target not met
target not met. Data not cumulative. MoES claims that all teachers participate in training every year, as required by law.However, only 2% of those were financed with project money.
Intermediate Results Indicator
% of students in schools with mutiple shifts (basic/secondary)
target exceeded by 2009
target surpassed
Intermediate Results Indicator
Student-computer ratio in secondary education disaggregated by regions
2005/2006 data provided during November 2009 supervision mission
target exceeded by 2009
target surpassed
Intermediate Results Indicator
% of universities which develop strategic plans
target met by 2009
target met.(2011-12 school year data)
Intermediate Results Indicator
% of universities with external governing boards
target exceeded by 2009
target surpassed.(2011-12 school year data)
PDO Indicator
Increase in level of teachers' satisfaction in their working conditions
2006 data
target met in 2012.
Achieved.
PDO Indicator
Improvement in secondary education enrollment rate, disaggregated by region and income groups
2005/2006 data provided by MOES on November 2009 show: 53% overall (25% in rural and 85% in urban)
target exceeded.
2009 data based on old census. MoES has not provided official new data; unofficial data shows target has been met but MoES hasnot authorized their use. (PAD doesn't specify whether the target was for NER or GER but given the baseline data, the team assumesthetarget is for NER. As such, the target hasn't been met.)
PDO Indicator
Progression rate from basic to secondary education
2005/2006 data provided on November 2009
target exceeded by 2010
Achieved.(2011 data)
Intermediate Results Indicator
% of schools with functioning board
target surpassed
target surpassed
Intermediate Results Indicator
% of primary schools using new curriculum and textbooks
target surpassed by 2007
target surpassed.
Intermediate Results Indicator
Progress on the decentralization pilot
target not met
target not met.
Intermediate Results Indicator
Progress on the revision of higher education law
target met
PDO Indicator
Reduction in basic education dropout rate
2005-2006 data provided by MOES in Nov. 2009 as no baseline data was available during appraisal.
Target set before baseline was available based on acceptable int'l standards. Once baseline data was available, it was lower thantarget.
Achieved.(2010-11 school year data). Official MoES data but, as stated earlier, we believe it to be incorrect.
Intermediate Results Indicator
Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions.
Indicator revised in August 2010 at the request of the Bank's Education Board - replaces "decline in short fall of classrooms inprimary education."
No baseline in original design but established at 30 new or rehabilitated schools during implementation.
revised target not met. 22 schools completed, compared to 30 schools established during implementation
Intermediate Results Indicator
Number of additional qualified primary teachers resulting from project interventions.
Core indicator added after approval and revised in August 2010 at the request of the Bank's Education Board -- to replace "declinein shortfall of qualified teachers at the primary level."
target not met.Project target is 70% cumulatively.
target not met
Intermediate Results Indicator
Revised secondary education curriculum implemented in schools
New indicator added by team for record keeping
All secondary schools have implemented a new curriculum.
44000-P086807
World Bank
Integrated Coastal Zone Management & Clean-Up Project (APL #1)
International Development Association
MINISTRY OF URBAN AND TOURISM DEVELOPMENT
International Development Association
MINISTRY OF URBAN AND TOURISM DEVELOPMENTPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Adriana Jordanova Damianova
+1-202-473-1000adamianova@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Qarku i Vlores
40.1670 19.8000
Sarande District
39.8330 20.0830
Vlore District
40.3330 19.5500
Orikum Municipality
40.3330 19.4670
Bajkaj
39.9490 20.0390
Vuno
40.1400 19.6940
Qeparo
40.0570 19.8220
Piqeras
40.0140 19.8910
Palase
40.1670 19.6240
Xarrë
39.7280 20.0540
Lukovë
39.9920 19.9140
Himare
40.1020 19.7450
Ports/WaterwaysSocial ProtectionOther Water Supply, Sanitation and Waste ManagementWaste ManagementOther Public AdministrationPublic AdministrationRural DevelopmentJobsSoil PollutionMunicipal Institution BuildingAir quality managementEnvironmental policies and institutionsWater PollutionLand Administration and ManagementAdministrative and Civil Service ReformEnvironmental Health and Pollution Management
200000.00
133333.33
133333.33
133333.34
166666.67
166666.67
166666.66
233333.33
233333.33
233333.34
333333.33
333333.33
333333.34
400000.00
400000.00
400000.00
433333.33
433333.33
433333.34
433333.33
433333.33
433333.34
433333.33
433333.33
433333.34
433333.33
433333.33
433333.34
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
300000.00
300000.00
300000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
438745.39
438745.39
438745.37
0.00
0.00
0.00
0.00
0.00
0.00
141027.12
141027.12
141027.13
0.00
0.00
0.00
171832.05
171832.05
171832.04
59701.86
59701.86
59701.88
280192.04
280192.04
280192.05
0.00
0.00
0.00
0.00
0.00
0.00
121396.80
121396.80
121396.81
0.00
0.00
0.00
133104.73
133104.73
133104.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
333333.33
333333.33
333333.34
0.00
0.00
0.00
133333.33
133333.33
133333.34
0.00
0.00
0.00
0.00
0.00
0.00
120666.66
120666.67
120666.67
0.00
0.00
0.00
1333333.33
1333333.33
1333333.34
0.00
0.00
0.00
0.00
0.00
0.00
500000.00
500000.00
500000.00
733333.33
733333.33
733333.34
233333.33
233333.33
233333.34
0.00
0.00
0.00
433333.33
433333.33
433333.34
0.00
0.00
0.00
0.00
0.00
0.00
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
333333.33
333333.33
333333.34
0.00
17500000Total Commitment in Second Quarter of 2005
International Development Association
304370Total Disbursement in First Quarter of 2006
International Development Association
952378Total Disbursement in First Quarter of 2006
International Development Association
-28180Total Interest Repayment in First Quarter of 2006
International Development Association
-28861Total Interest Repayment in Third Quarter of 2006
International Development Association
418644Total Disbursement in Fourth Quarter of 2006
International Development Association
-21919Total Interest Repayment in First Quarter of 2007
International Development Association
519392Total Disbursement in Second Quarter of 2007
International Development Association
183545Total Disbursement in Third Quarter of 2007
International Development Association
-23730Total Interest Repayment in Third Quarter of 2007
International Development Association
80627Total Disbursement in Fourth Quarter of 2007
International Development Association
809745Total Disbursement in Fourth Quarter of 2007
International Development Association
-19560Total Interest Repayment in First Quarter of 2008
International Development Association
383590Total Disbursement in Third Quarter of 2008
International Development Association
-20517Total Interest Repayment in Third Quarter of 2008
International Development Association
345457Total Disbursement in First Quarter of 2009
International Development Association
-13854Total Interest Repayment in First Quarter of 2009
International Development Association
-15514Total Interest Repayment in Third Quarter of 2009
International Development Association
-15574Total Interest Repayment in First Quarter of 2010
International Development Association
908793Total Disbursement in Second Quarter of 2010
International Development Association
-16491Total Interest Repayment in Third Quarter of 2010
International Development Association
383923Total Disbursement in Fourth Quarter of 2010
International Development Association
257808Total Disbursement in First Quarter of 2011
International Development Association
-20252Total Interest Repayment in First Quarter of 2011
International Development Association
103839Total Disbursement in Second Quarter of 2011
International Development Association
192538Total Disbursement in Second Quarter of 2011
International Development Association
119870Total Disbursement in Third Quarter of 2011
International Development Association
-23084Total Interest Repayment in Third Quarter of 2011
International Development Association
112941Total Disbursement in First Quarter of 2012
International Development Association
417755Total Disbursement in First Quarter of 2012
International Development Association
-22638Total Interest Repayment in First Quarter of 2012
International Development Association
416741Total Disbursement in Second Quarter of 2012
International Development Association
42166Total Disbursement in Third Quarter of 2012
International Development Association
-25987Total Interest Repayment in Third Quarter of 2012
International Development Association
97560Total Disbursement in Fourth Quarter of 2012
International Development Association
301581Total Disbursement in Fourth Quarter of 2012
International Development Association
375840Total Disbursement in First Quarter of 2013
International Development Association
-27954Total Interest Repayment in First Quarter of 2013
International Development Association
362746Total Disbursement in Second Quarter of 2013
International Development Association
586272Total Disbursement in Second Quarter of 2013
International Development Association
133546Total Disbursement in Third Quarter of 2013
International Development Association
524345Total Disbursement in Third Quarter of 2013
International Development Association
-31263Total Interest Repayment in Third Quarter of 2013
International Development Association
386611Total Disbursement in Fourth Quarter of 2013
International Development Association
401223Total Disbursement in First Quarter of 2014
International Development Association
-37410Total Interest Repayment in First Quarter of 2014
International Development Association
497765Total Disbursement in Second Quarter of 2014
International Development Association
1338912Total Disbursement in Second Quarter of 2014
International Development Association
189121Total Disbursement in Third Quarter of 2014
International Development Association
367445Total Disbursement in Third Quarter of 2014
International Development Association
-43809Total Interest Repayment in Third Quarter of 2014
International Development Association
103603Total Disbursement in Fourth Quarter of 2014
International Development Association
1131085Total Disbursement in Fourth Quarter of 2014
International Development Association
1288026Total Disbursement in Fourth Quarter of 2014
International Development Association
56400Total Disbursement in First Quarter of 2015
International Development Association
107135Total Disbursement in First Quarter of 2015
International Development Association
411324Total Disbursement in First Quarter of 2015
International Development Association
-47840Total Interest Repayment in First Quarter of 2015
International Development Association
57087Total Disbursement in Second Quarter of 2015
International Development Association
152879Total Disbursement in Third Quarter of 2015
International Development Association
-46961Total Interest Repayment in Third Quarter of 2015
International Development Association
-825143Total Loan Repayment in Third Quarter of 2015
International Development Association
-1651849Total Commitment Cancellations in Fourth Quarter of 2015
International Development Association
-54213Total Interest Repayment in First Quarter of 2016
International Development Association
-728245Total Loan Repayment in First Quarter of 2016
International Development Association
-51588Total Interest Repayment in Third Quarter of 2016
International Development Association
-731678Total Loan Repayment in Third Quarter of 2016
International Development Association
-48416Total Interest Repayment in First Quarter of 2017
International Development Association
-705181Total Loan Repayment in First Quarter of 2017
International Development Association
-26172Total Interest Repayment in Third Quarter of 2017
International Development Association
-743957Total Loan Repayment in Third Quarter of 2017
International Development Association
-50073Total Interest Repayment in First Quarter of 2018
International Development Association
-759360Total Loan Repayment in First Quarter of 2018
International Development Association
-49172Total Interest Repayment in Third Quarter of 2018
International Development Association
-732926Total Loan Repayment in Third Quarter of 2018
International Development Association
-35860Total Interest Repayment in First Quarter of 2019
International Development Association
-727524Total Loan Repayment in First Quarter of 2019
International Development Association
-32287Total Interest Repayment in Third Quarter of 2019
International Development Association
-717497Total Loan Repayment in Third Quarter of 2019
International Development Association
-29704Total Interest Repayment in First Quarter of 2020
International Development Association
-720104Total Loan Repayment in First Quarter of 2020
International Development Association
-13522Total Interest Repayment in Third Quarter of 2020
International Development Association
-740210Total Loan Repayment in Third Quarter of 2020
International Development Association
Project Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportCredit AgreementAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 4, para 4. | Description :Appoint members of Project Steering Committee | Due Date :30-Jun-2010
Finance Agreement :Schedule 4, para 5. | Description :Have an operational and adequately staffed PCU | Due Date :30-Jun-2010
Finance Agreement :Schedule 4, para 5. | Description :Appoint staff in charge of CVCD Program and environmental activities | DueDate :30-Jun-2010
Finance Agreement :Schedule 4, para. 7 (b) | Description :Submit MTR Report | Due Date :30-Nov-2012
Finance Agreement :Schedule 4, para. 7 (c) | Description :Conduct with the Association the MTR | Due Date :30-Nov-2012
Finance Agreement :Schedule 4, para. 7 (c) | Description :Submit annual budgets | Frequency :Yearly
Finance Agreement :Schedule 4, para 16 | Description :Carry out Social and Vulnerability Assessment | Due Date :31-Dec-2010
Finance Agreement :Schedule 4, para 5, (b) | Description :Hire PCU staff with terms of reference acceptable to the Association |Due Date :30-Jun-2010
Finance Agreement :Schedule 4, para 2, (b) (i) | Description :Shall complete transfer of ownership and registration of titles ofnew apartments of four families relocated according to provisions of RAP | Due Date :30-Jun-2013
PDO Indicator
Newly built waste landfill and transfer station capacity to service the population of the Southern Coast
Intermediate Results Indicator
Reconstruction of the water supply and sewer networks in Saranda.
PDO Indicator
Improvement of the water supply and sewerage system in Saranda
Intermediate Results Indicator
Service contract signed with participating municipalities and communes for waste disposal.
PDO Indicator
Increased access for international tourists and access of cruise liners to the Southern Coast
Intermediate Results Indicator
Coastal communities and Local Government Units participate in Coastal Vilage Conservation Development (CVCD) Program identification
PDO Indicator
Remediation of contaminated sites through removal and containment of hazardous materials in Porto Romano to reduce human health hazards
Intermediate Results Indicator
Technical assistance for operation and maintenance of community waste supply systems and roads and Roof & Facade (R&F) and small scale tourism provided to participating villages
PDO Indicator
Community-based investments in coastal villages have improved environmental infrastructure enabling sustainable tourism developmentin the Southern Coast
Intermediate Results Indicator
Risk assessment undertaken for the Porto Romano hot-spot.
Intermediate Results Indicator
Rehabilitation of Port of Saranda facilities to facilitate tourism access to the Southern Coast.
PDO Indicator
Protection and promotion of vernacular architecture of the South Coast
Intermediate Results Indicator
Resettlement of the families on the former site completed in accordance with the agreed Resettlement Action Plan and legal titles provided.
Intermediate Results Indicator
Landfilling and encapsulation of 45,000 m3 of hazardous waste on one of the sites.
Intermediate Results Indicator
Social & Vulnerability Assessment carried out in accordance with agreed Terms of Reference
Intermediate Results Indicator
Improved waste disposal infrastructure for the Southern Coast built in Saranda area with capacity of 25,000 m3 per year and the accompanying transfer station in Himare.
44000-P096263
World Bank
Land Administration and Management Project (LAMP)
International Bank for Reconstruction and Development
THE MINISTRY OF TERRITORIAL ADJUSTMENT
International Bank for Reconstruction and Development
International Development Association
International Development Association
THE MINISTRY OF TERRITORIAL ADJUSTMENTPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Kathrine M. Kelm
+1-202-473-1000kkelm@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Korce
40.6190 20.7810
Shkoder
42.0680 19.5130
Lezhe
41.7840 19.6440
Durres
41.3230 19.4410
Lushnje
40.9420 19.7050
Central Government (Central Agencies)Law and JusticeSub-National GovernmentHousing FinanceJobsJob CreationFinance for DevelopmentRule of LawLand Administration and ManagementRural DevelopmentUrban PlanningUrban DevelopmentUrban Infrastructure and Service DeliveryLegal Institutions for a Market EconomyRural Infrastructure and service deliveryPersonal and Property Rights
0.00
0.00
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
333333.33
333333.33
333333.34
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
833333.33
833333.33
833333.34
1000000.00
1000000.00
1000000.00
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
820000.00
820000.00
820000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
333333.33
333333.33
333333.34
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
833333.33
833333.33
833333.34
1000000.00
1000000.00
1000000.00
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
820000.00
820000.00
820000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15000000Total Commitment in First Quarter of 2007
International Development Association
19960000Total Commitment in First Quarter of 2007
International Bank for Reconstruction and Development
283015Total Disbursement in Third Quarter of 2007
International Development Association
1340553Total Disbursement in Third Quarter of 2007
International Development Association
353338Total Disbursement in Third Quarter of 2007
International Bank for Reconstruction and Development
0Total Disbursement in Fourth Quarter of 2007
International Development Association
-16535Total Interest Repayment in Fourth Quarter of 2007
International Development Association
-27077Total Interest Repayment in Fourth Quarter of 2007
International Bank for Reconstruction and Development
1861Total Disbursement in Second Quarter of 2008
International Development Association
18533Total Disbursement in Second Quarter of 2008
International Development Association
-14019Total Interest Repayment in Second Quarter of 2008
International Development Association
-40334Total Interest Repayment in Second Quarter of 2008
International Bank for Reconstruction and Development
14545Total Disbursement in Third Quarter of 2008
International Bank for Reconstruction and Development
1864600Total Disbursement in Third Quarter of 2008
International Bank for Reconstruction and Development
65400Total Disbursement in Fourth Quarter of 2008
International Development Association
-11681Total Interest Repayment in Fourth Quarter of 2008
International Development Association
8121Total Disbursement in Fourth Quarter of 2008
International Bank for Reconstruction and Development
-51230Total Interest Repayment in Fourth Quarter of 2008
International Bank for Reconstruction and Development
557668Total Disbursement in Second Quarter of 2009
International Development Association
-7040Total Interest Repayment in Second Quarter of 2009
International Development Association
-69649Total Interest Repayment in Second Quarter of 2009
International Bank for Reconstruction and Development
140255Total Disbursement in Fourth Quarter of 2009
International Development Association
-8303Total Interest Repayment in Fourth Quarter of 2009
International Development Association
-44382Total Interest Repayment in Fourth Quarter of 2009
International Bank for Reconstruction and Development
264034Total Disbursement in First Quarter of 2010
International Development Association
354852Total Disbursement in Second Quarter of 2010
International Development Association
791860Total Disbursement in Second Quarter of 2010
International Development Association
-8330Total Interest Repayment in Second Quarter of 2010
International Development Association
-31984Total Interest Repayment in Second Quarter of 2010
International Bank for Reconstruction and Development
666927Total Disbursement in Third Quarter of 2010
International Development Association
186602Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development
101200Total Disbursement in Fourth Quarter of 2010
International Development Association
-17213Total Interest Repayment in Fourth Quarter of 2010
International Development Association
-35680Total Interest Repayment in Fourth Quarter of 2010
International Bank for Reconstruction and Development
220576Total Disbursement in First Quarter of 2011
International Development Association
334958Total Disbursement in First Quarter of 2011
International Development Association
85005Total Disbursement in Second Quarter of 2011
International Development Association
225620Total Disbursement in Second Quarter of 2011
International Development Association
-18626Total Interest Repayment in Second Quarter of 2011
International Development Association
20912Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development
1447550Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development
-42113Total Interest Repayment in Second Quarter of 2011
International Bank for Reconstruction and Development
289557Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development
462495Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development
-89130Total Disbursement in Fourth Quarter of 2011
International Development Association
61506Total Disbursement in Fourth Quarter of 2011
International Development Association
-20567Total Interest Repayment in Fourth Quarter of 2011
International Development Association
240076Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development
433100Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development
-57530Total Interest Repayment in Fourth Quarter of 2011
International Bank for Reconstruction and Development
-615865Total Loan Repayment in Fourth Quarter of 2011
International Bank for Reconstruction and Development
126103Total Disbursement in First Quarter of 2012
International Development Association
187453Total Disbursement in First Quarter of 2012
International Development Association
1239626Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development
227920Total Disbursement in Second Quarter of 2012
International Development Association
1270061Total Disbursement in Second Quarter of 2012
International Development Association
-20878Total Interest Repayment in Second Quarter of 2012
International Development Association
975744Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development
986224Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development
-64405Total Interest Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development
-597595Total Loan Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development
236348Total Disbursement in Third Quarter of 2012
International Development Association
166322Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development
284915Total Disbursement in Fourth Quarter of 2012
International Development Association
504913Total Disbursement in Fourth Quarter of 2012
International Development Association
-26754Total Interest Repayment in Fourth Quarter of 2012
International Development Association
88926Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development
717015Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development
-54902Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development
-606290Total Loan Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development
185296Total Disbursement in First Quarter of 2013
International Development Association
684338Total Disbursement in First Quarter of 2013
International Development Association
767050Total Disbursement in First Quarter of 2013
International Development Association
407936Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development
129994Total Disbursement in Second Quarter of 2013
International Development Association
-33665Total Interest Repayment in Second Quarter of 2013
International Development Association
-670828Total Commitment Cancellations in Second Quarter of 2013
International Bank for Reconstruction and Development
2851901Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development
-32173Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development
-623613Total Loan Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development
261365Total Disbursement in Third Quarter of 2013
International Development Association
382746Total Disbursement in Third Quarter of 2013
International Development Association
781157Total Disbursement in Third Quarter of 2013
International Development Association
-60387Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development
190715Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development
333124Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development
546276Total Disbursement in Fourth Quarter of 2013
International Development Association
-40622Total Interest Repayment in Fourth Quarter of 2013
International Development Association
-48348Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development
-32316Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development
-640162Total Loan Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development
236745Total Disbursement in First Quarter of 2014
International Development Association
817748Total Disbursement in First Quarter of 2014
International Development Association
98203Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development
135512Total Disbursement in Second Quarter of 2014
International Development Association
367367Total Disbursement in Second Quarter of 2014
International Development Association
540908Total Disbursement in Second Quarter of 2014
International Development Association
-45846Total Interest Repayment in Second Quarter of 2014
International Development Association
58506Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development
506501Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development
508187Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development
-34801Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development
-656677Total Loan Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development
1231495Total Disbursement in Third Quarter of 2014
International Development Association
2476631Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development
-16612Total Disbursement in Fourth Quarter of 2014
International Development Association
-53580Total Interest Repayment in Fourth Quarter of 2014
International Development Association
-20124Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development
200376Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development
1208593Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development
-41091Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development
-610370Total Loan Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development
-89950Total Disbursement in First Quarter of 2015
International Development Association
-216610Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development
-24055Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development
-105888Total Commitment Cancellations in Second Quarter of 2015
International Development Association
-53622Total Interest Repayment in Second Quarter of 2015
International Development Association
-1678082Total Commitment Cancellations in Second Quarter of 2015
International Bank for Reconstruction and Development
-162818Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development
-27339Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development
-568033Total Loan Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development
-50103Total Interest Repayment in Fourth Quarter of 2015
International Development Association
-19045Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development
-473741Total Loan Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development
-53947Total Interest Repayment in Second Quarter of 2016
International Development Association
-16369Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development
-507552Total Loan Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development
-49919Total Interest Repayment in Fourth Quarter of 2016
International Development Association
-9322Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development
-490524Total Loan Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development
-51832Total Interest Repayment in Second Quarter of 2017
International Development Association
-680006Total Loan Repayment in Second Quarter of 2017
International Development Association
-8399Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development
-513451Total Loan Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development
-49148Total Interest Repayment in Fourth Quarter of 2017
International Development Association
-701135Total Loan Repayment in Fourth Quarter of 2017
International Development Association
-7769Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development
-564338Total Loan Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development
-34240Total Interest Repayment in Second Quarter of 2018
International Development Association
-708717Total Loan Repayment in Second Quarter of 2018
International Development Association
-5932Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development
-577594Total Loan Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development
-43946Total Interest Repayment in Fourth Quarter of 2018
International Development Association
-685618Total Loan Repayment in Fourth Quarter of 2018
International Development Association
-5332Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-557670Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-52105Total Interest Repayment in Second Quarter of 2019
International Development Association
-685945Total Loan Repayment in Second Quarter of 2019
International Development Association
-5145Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development
-561153Total Loan Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development
-36568Total Interest Repayment in Fourth Quarter of 2019
International Development Association
-682065Total Loan Repayment in Fourth Quarter of 2019
International Development Association
-5676Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-566668Total Loan Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-27092Total Interest Repayment in Second Quarter of 2020
International Development Association
-674562Total Loan Repayment in Second Quarter of 2020
International Development Association
-2220Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
-564169Total Loan Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
-40912Total Interest Repayment in Fourth Quarter of 2020
International Development Association
-704549Total Loan Repayment in Fourth Quarter of 2020
International Development Association
-9908Total Interest Repayment in Fourth Quarter of 2020
International Bank for Reconstruction and Development
-626596Total Loan Repayment in Fourth Quarter of 2020
International Bank for Reconstruction and Development
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementAgreementAgreementGrant or Trust Fund AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Submission to Parliament a revised law on urban management.
Develop a policy and take proper regulatory and other actions for the protection of registered property rights, in a manneracceptable to the Association.
PDO Indicator
Reduction in time to register property transaction
This is data from the IT-enabled offices.
PDO Indicator
Customer satisfation of the IPRO is improved (on a scale from "Very Poor, Poor, Average, Good, Very Good, and Excellent") to the level of "Very Good"
2014 customer survey is underway
Based on the 2012 customer satisfaction survey.The 2014 customer service is planned to for March and April, and its results willbe available by the end of May 2014.
Intermediate Results Indicator
Number of titles issued in urban and rural areas.
Expect to reach 330,000 by end June and full target shortly after project closure.
507274 in progress, of which 402503 up to stage of public viewing, 343856 completed and 273582 kartela printed and handed over toIPRO.
Intermediate Results Indicator
Number of automated offices
Intermediate Results Indicator
Number of local offices that received training.
Training coincides with the roll-out of the IT system.
Intermediate Results Indicator
Number of municipalities that complete the regulatory plans.
All 8 Territorial Plans have been completed.
All 8 Territorial Plans prepared under the project have been completed and accepted by the National Territorial Planning Agency.
Intermediate Results Indicator
Investment in priority infrastructure and services completed
Baseline as of project restructuring.
Assumes completion of 4 subprojects at $800,000 equivalent of which 50% financed by IBRD.
All four municipal investment projects have been completed and handed over and have satisfactorily completed their performanceperiod.
Intermediate Results Indicator
Cities in which New Street Addressing & Building Numbering System Implemented
As of restructuring
Bidding documents for additional street addressing were submitted on December 10, leaving insufficient time to proceed. Projecttarget has already been met.
Intermediate Results Indicator
Flood Drainage Pumping Stations Rehabilitated
Baseline as of project restructuring.
The Cas DPS is will not be completed by the closing date. Contractor has performed repair works to the existing pumps and increasedthe station capacity to 50%.
Intermediate Results Indicator
Water Supply Pumping Stations Rehabilitated
Baseline as of project restructuring.
PDO Indicator
Direct project beneficiaries
Baseline is project restructuring date.
Residents in Shkodra benefitting from flood protection services.
Completed.
PDO Indicator
Agricultural land protected by rehabilitated drainage pumps
Baseline begins at date of restructuring
Target date revised. (Value is in hectares of agricultural land).
All stations except Cas DPS completed, but some repairs have been performed and the station is working at about 50% of capacity(700 ha).
Intermediate Results Indicator
Number of municipalities that completed interim reforms and qualified for the first phase of investments
Target achieved.
Intermediate Results Indicator
Water testing equipment installed and in use in Shkodra
Baseline as of project restructuring.
This activity has not started, due to the lack of interest from the Shkodra Water Supply Utility.
Intermediate Results Indicator
Number of municipalities that received training in procurement and financial management
Target achieved.
44000-P102733
World Bank
Water Sector Investment Project
International Bank for Reconstruction and Development
MINISTRY OF PUBLIC WORKS AND TRANSPORT
International Bank for Reconstruction and Development
MINISTRY OF PUBLIC WORKS AND TRANSPORTPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Patricia Lopez Martinez
+1-202-473-1000plopez@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Qarku i Durrësit
41.4830 19.6170
Water SupplySub-National GovernmentSanitationRural DevelopmentUrban DevelopmentRural Infrastructure and service deliveryUrban Infrastructure and Service Delivery
0.00
226591.66
226591.67
226591.67
226591.66
226591.67
226591.67
1019662.50
1019662.50
1019662.50
1019662.50
1019662.50
1019662.50
1019662.50
1019662.50
1019662.50
1019662.50
1019662.50
1019662.50
2152620.83
2152620.83
2152620.84
2152620.83
2152620.83
2152620.84
2152620.83
2152620.83
2152620.84
2152620.83
2152620.83
2152620.84
2039325.00
2039325.00
2039325.00
2039325.00
2039325.00
2039325.00
2039325.00
2039325.00
2039325.00
2039325.00
2039325.00
2039325.00
1246254.16
1246254.17
1246254.17
1246254.16
1246254.17
1246254.17
1246254.16
1246254.17
1246254.17
1246254.16
1246254.17
1246254.17
537175.00
537175.00
537175.00
537175.00
537175.00
537175.00
537175.00
537175.00
537175.00
537175.00
537175.00
537175.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1169828.57
1169828.57
1169828.57
1169828.57
1169828.57
1169828.57
1169828.58
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
505026.67
505026.67
505026.67
505026.67
505026.67
505026.67
505026.67
505026.67
505026.67
505026.67
505026.67
505026.63
739266.67
739266.67
739266.67
739266.67
739266.67
739266.67
739266.67
739266.67
739266.67
739266.67
739266.67
739266.63
2548267.50
2548267.50
2548267.50
2548267.50
2548267.50
2548267.50
2548267.50
2548267.50
2548267.50
2548267.50
2548267.50
2548267.50
2633372.50
2633372.50
2633372.50
2633372.50
2633372.50
2633372.50
2633372.50
2633372.50
2633372.50
2633372.50
2633372.50
2633372.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
85300000Total Commitment in Fourth Quarter of 2013
International Bank for Reconstruction and Development
214172Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development
8162100Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development
-214172Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development
-33735Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development
-37220Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development
-36854Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development
5058363Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development
-34589Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development
2226581Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development
-45168Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development
1660691Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development
4468167Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development
-48529Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development
6815025Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development
-75903Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development
6408300Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development
-95698Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development
1470413Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
2593475Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
4769817Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
4198247Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-130424Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development
6481831Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development
1707611Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development
5903916Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development
-171614Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development
2083727Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development
2086906Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development
2807551Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development
-215897Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
3408953Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development
-201620Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
-1137684Total Disbursement in Third Quarter of 2020
International Bank for Reconstruction and Development
-62380Total Disbursement in Fourth Quarter of 2020
International Bank for Reconstruction and Development
-322Total Disbursement in Fourth Quarter of 2020
International Bank for Reconstruction and Development
-286256Total Interest Repayment in Fourth Quarter of 2020
International Bank for Reconstruction and Development
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2, Section I, E.1 LA | Description :A Project Implementation Agreement, satisfactory to the Bank, hasbeen duly executed between DWU and MTI by April 2014, but no later before start of implementation of Component 3 (c). | Due Date:30-Apr-2014
Finance Agreement :Schedule 2, Section I, C.1. LA | Description :The Borrower, through MTI, shall no later than April 30, 2014,establish a Project Committee, with a composition, terms of reference, and resources satisfactory to the Bank. | Due Date:30-Apr-2014
Finance Agreement :Article IV, 4.01 LA | Description :Borrower shall prepare and adopt Project Operations Manual satisfactory tothe Bank as a condition of effectiveness | Due Date :14-Mar-2014
PDO Indicator
Beneficiaries from improved wastewater collection and transportation facilities
PDO Indicator
Financial Working Ratio
PDO Indicator
Direct project beneficiaries
PDO Indicator
Female beneficiaries
PDO Indicator
Additional annual volume of wastewater that is appropriately collected, treated and disposed
PDO Indicator
New household sewer connections constructed under the project
PDO Indicator
Piped household water connections that are benefiting from rehabilitation works undertaken by the project
Intermediate Results Indicator
Length of water supply network rehabilitated
Intermediate Results Indicator
Length of sewerage network rehabilitated or constructed
Intermediate Results Indicator
Collection ratio
Intermediate Results Indicator
Length of bulk water pipeline constructed
Intermediate Results Indicator
Billing ratio
Intermediate Results Indicator
Total Annual Billed Volume by DWU
Intermediate Results Indicator
Households with individual metered connection in the Durres Service Area
Intermediate Results Indicator
Duration of water supplied to households in project affected areas
44000-P107833
World Bank
SECONDARY AND LOCAL ROADS
International Development Association
ALBANIAN DEVELOPMENT FUND
International Development Association
ALBANIAN DEVELOPMENT FUNDPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Artan Guxho
+1-202-473-1000aguxho@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Berat County
40.6330 20.0830
Elbasan District
41.0830 20.0000
Diber District
41.7500 20.3330
Tirana District
41.3330 19.9170
Fier District
40.7170 19.5830
Lunxheri
40.1330 20.1670
Pllake
39.8090 20.0810
Ciuci
39.8430 20.0340
Podgorie
40.8150 20.7970
Malqene
41.9400 20.3870
Kuben
41.6930 20.3600
Korite
40.5480 20.2650
Erind
40.1570 20.1640
Domaj
42.1380 20.4920
Renz
41.7520 20.3880
Valare
40.1260 20.1340
Nenshat
41.9310 19.6500
Mbreshtan
40.7160 19.8720
Marinez
40.7410 19.6730
Shkoder District
42.0680 19.5130
Lezhe
41.7840 19.6440
Xarre
39.7280 20.0540
Velabisht
40.7020 19.9320
Strum
40.7510 19.7370
Kallmeti i Madh
41.8490 19.6870
Vau i Dejes
42.0100 19.6250
Belsh
40.9750 19.8820
Fierze
40.9210 19.8470
Ura e Gorices
40.7000 19.9330
Central Government (Central Agencies)Rural and Inter-Urban RoadsUrban DevelopmentRural DevelopmentTransparency, Accountability and Good GovernanceJobsPublic AdministrationRural Infrastructure and service deliveryJob CreationUrban Infrastructure and Service Delivery
0.00
0.00
0.00
166666.67
166666.67
166666.66
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
666666.67
666666.67
666666.66
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
166666.67
166666.67
166666.66
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
666666.67
666666.67
666666.66
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20000000Total Commitment in Second Quarter of 2008
International Development Association
126996Total Disbursement in Fourth Quarter of 2008
International Development Association
1882580Total Disbursement in Fourth Quarter of 2008
International Development Association
495865Total Disbursement in First Quarter of 2009
International Development Association
1198500Total Disbursement in First Quarter of 2009
International Development Association
934192Total Disbursement in Second Quarter of 2009
International Development Association
-8108Total Interest Repayment in Second Quarter of 2009
International Development Association
272871Total Disbursement in Third Quarter of 2009
International Development Association
701387Total Disbursement in Third Quarter of 2009
International Development Association
430212Total Disbursement in Fourth Quarter of 2009
International Development Association
1074892Total Disbursement in Fourth Quarter of 2009
International Development Association
-19257Total Interest Repayment in Fourth Quarter of 2009
International Development Association
409784Total Disbursement in First Quarter of 2010
International Development Association
1047627Total Disbursement in First Quarter of 2010
International Development Association
292321Total Disbursement in Second Quarter of 2010
International Development Association
480991Total Disbursement in Second Quarter of 2010
International Development Association
-28209Total Interest Repayment in Second Quarter of 2010
International Development Association
221299Total Disbursement in Third Quarter of 2010
International Development Association
721776Total Disbursement in Third Quarter of 2010
International Development Association
-37101Total Interest Repayment in Fourth Quarter of 2010
International Development Association
648606Total Disbursement in First Quarter of 2011
International Development Association
770357Total Disbursement in First Quarter of 2011
International Development Association
421798Total Disbursement in Second Quarter of 2011
International Development Association
557397Total Disbursement in Second Quarter of 2011
International Development Association
-42285Total Interest Repayment in Second Quarter of 2011
International Development Association
648912Total Disbursement in Third Quarter of 2011
International Development Association
-46927Total Interest Repayment in Fourth Quarter of 2011
International Development Association
161795Total Disbursement in First Quarter of 2012
International Development Association
1434374Total Disbursement in First Quarter of 2012
International Development Association
792891Total Disbursement in Second Quarter of 2012
International Development Association
-53961Total Interest Repayment in Second Quarter of 2012
International Development Association
529409Total Disbursement in Third Quarter of 2012
International Development Association
1037432Total Disbursement in Fourth Quarter of 2012
International Development Association
-58699Total Interest Repayment in Fourth Quarter of 2012
International Development Association
608339Total Disbursement in First Quarter of 2013
International Development Association
139101Total Disbursement in Second Quarter of 2013
International Development Association
-62072Total Interest Repayment in Second Quarter of 2013
International Development Association
463523Total Disbursement in Third Quarter of 2013
International Development Association
-136577Total Commitment Cancellations in Fourth Quarter of 2013
International Development Association
71394Total Disbursement in Fourth Quarter of 2013
International Development Association
78740Total Disbursement in Fourth Quarter of 2013
International Development Association
-68238Total Interest Repayment in Fourth Quarter of 2013
International Development Association
-70268Total Interest Repayment in Second Quarter of 2014
International Development Association
-65637Total Interest Repayment in Fourth Quarter of 2014
International Development Association
-61161Total Interest Repayment in Second Quarter of 2015
International Development Association
-67306Total Interest Repayment in Fourth Quarter of 2015
International Development Association
-63835Total Interest Repayment in Second Quarter of 2016
International Development Association
-62478Total Interest Repayment in Fourth Quarter of 2016
International Development Association
-61821Total Interest Repayment in Second Quarter of 2017
International Development Association
-64263Total Interest Repayment in Fourth Quarter of 2017
International Development Association
-65448Total Interest Repayment in Second Quarter of 2018
International Development Association
-64065Total Interest Repayment in Fourth Quarter of 2018
International Development Association
-846447Total Loan Repayment in Fourth Quarter of 2018
International Development Association
-59993Total Interest Repayment in Second Quarter of 2019
International Development Association
-842002Total Loan Repayment in Second Quarter of 2019
International Development Association
-47401Total Interest Repayment in Fourth Quarter of 2019
International Development Association
-830025Total Loan Repayment in Fourth Quarter of 2019
International Development Association
-61355Total Interest Repayment in Second Quarter of 2020
International Development Association
-827530Total Loan Repayment in Second Quarter of 2020
International Development Association
-43092Total Interest Repayment in Fourth Quarter of 2020
International Development Association
-854724Total Loan Repayment in Fourth Quarter of 2020
International Development Association
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementProject Performance Assessment ReportContract AwardsProject URLProcurement Notices
The Borrower, shall prepare a COM decision to be passed not later than December 31 2008 to transfer all secondary roads from theregional councils to GRD
The Recipient will ensure that no sub-project is located in the area covered by the Southern Coastal Zone Development Plan, untilsuch plan has been approved by the Territorial Council
The Recipient will ensure that no sub-project is located elsewhere on the Albanian coast, unless a development plan has beenapproved by the Territorial Council
PDO Indicator
Number of communities that have improved access to markets, social services and administrative centers by project end
This number has been used to define the share and no. of population with access to all season roads
This reflects that all 109.9 km of road has been substantially completed. This number has been used to define the share and no. ofpopulation with access to all season roads
PDO Indicator
Proportional increase in traffic volumes on project roads - one year after scheme complettion
Target was met and exceeded as reported in previous ISR, and updated with ADF during April 2013 mission.
PDO Indicator
Roads in good and fair condition as a share of total classified roads
suppl. value is for rural roads in Albania, of which project roads are a part.
Actual 34%
PDO Indicator
Share of rural population with access to an all-season road
The introduced baseline derives from the % against total population of 11 regions with access to all season roads, before theproject - data source ADF surveys and INSTAT
target is introduced by adding to the baseline the % that population of 50 communities (see the respective indicator below),planned to benefit from the project, represents, against the total population of 11 regions - data source ADF surveys and INSTAT
actual figure results by adding to the baseline the % that population of actual 81 benefiting communities (see the respectiveindicator below) represent, against the total population of 11 regions - data source ADF surveys and INSTAT
PDO Indicator
Proportional reduction in travel time on project roads in free flowing conditions
Targets met and exceeded as according to the updated information from ADF during April 2013 mission
Intermediate Results Indicator
Roads rehabilitated, Non-rural
the length of the road is slightly increased to accommodate community needs, and is expected to by the introduction of two newsections
PDO Indicator
Change in road user perception of road quality
Results exceed the target. The ADF Beneficiary Assessment survey, showed that 97% of the interviewees asserted that the roadsafterinvestment were in good or very good condition, whereas previously 94% of interviewees asserted that the roads before theinvestmentwere in bad or very bad conditions. The difference between the two positions, on the 1 to 10 Likert scale correspond tolevel 6 (or60% change).
Intermediate Results Indicator
Management Information System in place and functioning
ADF reported during April 2013 mission on the use of ROMAPS, inventory and prioritization system for the whole secondary and localroads network
Intermediate Results Indicator
Number of people trained to undertake maintenance
Target is established based on the original plan of extending training, to the respective Units (2-4 staff) in all 11regions/qarksof the project.
ADF has provided detailed reports on the number of people trained and the communities they belong to; the target is introduced in2012 ISR
Intermediate Results Indicator
Number of people in the communities trained to procure contractors to undertake maintenance
Target is established based on the original plan of extending training, to the respective Units (2-4 staff) in all 11regions/qarksof the project.
ADF has provided detailed reports on the number of people trained and the communities they belong to; the target is introduced in2012 ISR
Intermediate Results Indicator
Increase in annual recurrent maintenance budget for National roads
The cumulative figure of increase is calculated based on a 5% target annual increase, which on the other hand has been previously(projects and CPS) agreed with the government as a good initiative to cover the maintenance needs
The ADF has collected this information from MPWT/ARA and MoF.
Intermediate Results Indicator
Increase in annual recurrent maintenance budget for Local roads
The cumulative figure of increase is calculated based on a 5% target annual increase, which on the other hand has been previously(projects and CPS) agreed with the government as a good initiative to cover the maintenance needs
The ADF has collected this information from MPWT/ARA and MoF.
PDO Indicator
Size of the total classified network
suppl. value is for rural roads in Albania, of which project roads are a part.
Actual 32.5%
PDO Indicator
Number of rural people with access to an all-season road
No robust data available for this indicator. TTL will investigate data options during next supervision mission.
44000-P110481
World Bank
Energy Community of South East Europe APL Program - APL 5 for Albania DAM SAFETY
International Development Association
ALBANIA POWER CORPORATION
International Development Association
ALBANIA POWER CORPORATIONPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Gazmend Daci
+1-202-473-1000gdaci@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Lumi i Matit
41.6430 19.5760
Shkopet
41.7060 19.8250
Ulez
41.6830 19.8930
Vau i Dejes Hydroelectric Power Station
42.0140 19.6360
Fierze Hydroelectric Power Station
42.2510 20.0430
Komani Hydroelectric Power Station
42.1030 19.8220
Renewable Energy HydroWater Institutions, Policies and ReformDisaster Risk ManagementDisaster Risk FinanceFinance for DevelopmentUrban DevelopmentWater Resource ManagementRural DevelopmentWater PollutionDisaster Risk ReductionSoil PollutionAir quality managementJobsDisaster Response and RecoveryJob CreationUrban Infrastructure and Service DeliveryRural Infrastructure and service deliveryDisaster PreparednessEnvironmental Health and Pollution Management
0.00
0.00
41477.50
97039.70
114019.00
130963.00
146177.30
159979.60
178653.30
201068.80
215577.10
110700.80
225249.30
232838.80
239334.00
241310.80
236227.60
232415.20
237498.40
251583.10
268174.10
136681.60
281270.40
300614.80
320947.60
334538.10
354235.50
381557.70
400655.00
410080.10
431260.10
463842.00
242299.20
496141.50
521981.10
558763.70
598758.60
632646.60
668017.20
703317.20
743665.10
783059.90
403902.60
827643.80
851506.60
886347.70
916352.70
942933.60
976327.40
1014875.00
1039161.40
1054587.50
1064577.40
538607.40
1093876.40
1110467.40
1125364.00
1146755.80
1166523.80
1184420.90
1202141.50
1220215.10
1238677.00
970114.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10975.00
10975.00
10975.00
10975.00
10975.00
10975.00
10975.00
10975.00
10975.00
10975.00
10975.00
10975.00
122899.83
122899.83
122899.83
122899.83
122899.83
122899.83
122899.83
122899.83
122899.83
122899.83
122899.83
122899.88
60469.88
60469.88
60469.88
60469.88
60469.88
60469.88
60469.88
60469.88
60469.88
60469.88
60469.88
60469.86
74037.86
74037.86
74037.86
74037.86
74037.86
74037.86
74037.86
74037.86
74037.86
74037.86
74037.86
74037.83
301748.22
301748.22
301748.22
301748.22
301748.22
301748.22
301748.22
301748.22
301748.22
301748.22
301748.22
301748.20
885226.89
885226.89
885226.89
885226.89
885226.89
885226.89
885226.89
885226.89
885226.89
885226.89
885226.89
885226.94
436875.65
436875.65
436875.65
436875.65
436875.65
436875.65
436875.65
436875.65
436875.65
436875.65
436875.65
436875.70
488645.49
488645.49
488645.49
488645.49
488645.49
488645.49
488645.49
488645.49
488645.49
488645.49
488645.49
488645.49
376856.73
376856.73
376856.73
376856.73
376856.73
376856.73
376856.73
376856.73
376856.73
376856.73
376856.73
376856.69
845000.00
845000.00
845000.00
845000.00
845000.00
845000.00
845000.00
845000.00
845000.00
845000.00
845000.00
845000.00
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.63
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.37
683333.33
683333.33
683333.33
683333.33
683333.33
683333.33
683333.33
683333.33
683333.36
35300000Total Commitment in Second Quarter of 2008
International Development Association
131700Total Disbursement in Second Quarter of 2009
International Development Association
86976Total Disbursement in Third Quarter of 2009
International Development Association
424285Total Disbursement in Third Quarter of 2009
International Development Association
-1468Total Interest Repayment in Fourth Quarter of 2009
International Development Association
143935Total Disbursement in First Quarter of 2010
International Development Association
633527Total Disbursement in First Quarter of 2010
International Development Association
186075Total Disbursement in Second Quarter of 2010
International Development Association
-3636Total Interest Repayment in Second Quarter of 2010
International Development Association
83706Total Disbursement in Fourth Quarter of 2010
International Development Association
-6069Total Interest Repayment in Fourth Quarter of 2010
International Development Association
84963Total Disbursement in First Quarter of 2011
International Development Association
556970Total Disbursement in Second Quarter of 2011
International Development Association
-6582Total Interest Repayment in Second Quarter of 2011
International Development Association
89321Total Disbursement in Third Quarter of 2011
International Development Association
80106Total Disbursement in Fourth Quarter of 2011
International Development Association
-8134Total Interest Repayment in Fourth Quarter of 2011
International Development Association
21600000Total Commitment in Fourth Quarter of 2011
International Bank for Reconstruction and Development
86751Total Disbursement in First Quarter of 2012
International Development Association
163191Total Disbursement in First Quarter of 2012
International Development Association
177457Total Disbursement in First Quarter of 2012
International Development Association
99676Total Disbursement in Second Quarter of 2012
International Development Association
191951Total Disbursement in Second Quarter of 2012
International Development Association
-9753Total Interest Repayment in Second Quarter of 2012
International Development Association
48064Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development
-48064Total Interest Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development
102407Total Disbursement in Third Quarter of 2012
International Development Association
2178648Total Disbursement in Third Quarter of 2012
International Development Association
941926Total Disbursement in Fourth Quarter of 2012
International Development Association
-15190Total Interest Repayment in Fourth Quarter of 2012
International Development Association
196817Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development
-291Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development
201180Total Disbursement in First Quarter of 2013
International Development Association
-23454Total Interest Repayment in Second Quarter of 2013
International Development Association
-681Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development
305636Total Disbursement in Third Quarter of 2013
International Development Association
1024992Total Disbursement in Fourth Quarter of 2013
International Development Association
1498199Total Disbursement in Fourth Quarter of 2013
International Development Association
-25757Total Interest Repayment in Fourth Quarter of 2013
International Development Association
-731Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development
206895Total Disbursement in First Quarter of 2014
International Development Association
1569023Total Disbursement in Second Quarter of 2014
International Development Association
1824472Total Disbursement in Second Quarter of 2014
International Development Association
4193505Total Disbursement in Second Quarter of 2014
International Development Association
-34493Total Interest Repayment in Second Quarter of 2014
International Development Association
-769Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development
256560Total Disbursement in Third Quarter of 2014
International Development Association
801053Total Disbursement in Third Quarter of 2014
International Development Association
225062Total Disbursement in Fourth Quarter of 2014
International Development Association
731404Total Disbursement in Fourth Quarter of 2014
International Development Association
1273010Total Disbursement in Fourth Quarter of 2014
International Development Association
-55233Total Interest Repayment in Fourth Quarter of 2014
International Development Association
-845Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development
399817Total Disbursement in First Quarter of 2015
International Development Association
780531Total Disbursement in First Quarter of 2015
International Development Association
691428Total Disbursement in Second Quarter of 2015
International Development Association
-68324Total Interest Repayment in Second Quarter of 2015
International Development Association
83642Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development
-520Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development
556965Total Disbursement in Third Quarter of 2015
International Development Association
2077744Total Disbursement in Third Quarter of 2015
International Development Association
49430Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development
512608Total Disbursement in Fourth Quarter of 2015
International Development Association
-86242Total Interest Repayment in Fourth Quarter of 2015
International Development Association
-682Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development
281614Total Disbursement in First Quarter of 2016
International Development Association
307303Total Disbursement in First Quarter of 2016
International Development Association
701414Total Disbursement in Second Quarter of 2016
International Development Association
1072025Total Disbursement in Second Quarter of 2016
International Development Association
-90101Total Interest Repayment in Second Quarter of 2016
International Development Association
304642Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development
-608Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development
68798Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development
154619Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development
251829Total Disbursement in Fourth Quarter of 2016
International Development Association
-95310Total Interest Repayment in Fourth Quarter of 2016
International Development Association
975881Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development
1240454Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development
-898Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development
464957Total Disbursement in First Quarter of 2017
International Development Association
7730Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development
490372Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development
242945Total Disbursement in Second Quarter of 2017
International Development Association
-96876Total Interest Repayment in Second Quarter of 2017
International Development Association
300217Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development
324479Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development
-3227Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development
103553Total Disbursement in Third Quarter of 2017
International Development Association
141070Total Disbursement in Third Quarter of 2017
International Development Association
381939Total Disbursement in Third Quarter of 2017
International Development Association
910639Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development
2510276Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development
176730Total Disbursement in Fourth Quarter of 2017
International Development Association
353380Total Disbursement in Fourth Quarter of 2017
International Development Association
-103840Total Interest Repayment in Fourth Quarter of 2017
International Development Association
1155410Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development
1287633Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development
-6495Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development
94424Total Disbursement in First Quarter of 2018
International Development Association
602313Total Disbursement in First Quarter of 2018
International Development Association
123266Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development
2319175Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development
175800Total Disbursement in Second Quarter of 2018
International Development Association
-109934Total Interest Repayment in Second Quarter of 2018
International Development Association
140106Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development
-11080Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development
-567362Total Loan Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development
14900000Total Commitment in Second Quarter of 2018
International Bank for Reconstruction and Development
531636Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
949741Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
482892Total Disbursement in Fourth Quarter of 2018
International Development Association
-110151Total Interest Repayment in Fourth Quarter of 2018
International Development Association
-1516667Total Loan Repayment in Fourth Quarter of 2018
International Development Association
979894Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-13101Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-610272Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development
34097Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-34097Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development
451896Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development
686807Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development
257794Total Disbursement in Second Quarter of 2019
International Development Association
-104522Total Interest Repayment in Second Quarter of 2019
International Development Association
-1508703Total Loan Repayment in Second Quarter of 2019
International Development Association
236974Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development
238409Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development
-16074Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development
-670779Total Loan Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development
339892Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development
-25948Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development
1683034Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development
1389066Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development
101871Total Disbursement in Fourth Quarter of 2019
International Development Association
-83121Total Interest Repayment in Fourth Quarter of 2019
International Development Association
-1487242Total Loan Repayment in Fourth Quarter of 2019
International Development Association
-20531Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-766304Total Loan Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
298108Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development
528160Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-22418Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
1129817Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development
300658Total Disbursement in Second Quarter of 2020
International Development Association
-108610Total Interest Repayment in Second Quarter of 2020
International Development Association
-1482772Total Loan Repayment in Second Quarter of 2020
International Development Association
-10813Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
-750815Total Loan Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
473277Total Disbursement in Second Quarter of 2020
International Bank for Reconstruction and Development
885742Total Disbursement in Second Quarter of 2020
International Bank for Reconstruction and Development
-24465Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
426780Total Disbursement in Third Quarter of 2020
International Bank for Reconstruction and Development
18009Total Disbursement in Fourth Quarter of 2020
International Development Association
-76941Total Interest Repayment in Fourth Quarter of 2020
International Development Association
-1531499Total Loan Repayment in Fourth Quarter of 2020
International Development Association
-26418Total Interest Repayment in Fourth Quarter of 2020
International Bank for Reconstruction and Development
-820864Total Loan Repayment in Fourth Quarter of 2020
International Bank for Reconstruction and Development
306993Total Disbursement in Fourth Quarter of 2020
International Bank for Reconstruction and Development
1144067Total Disbursement in Fourth Quarter of 2020
International Bank for Reconstruction and Development
-38619Total Interest Repayment in Fourth Quarter of 2020
International Bank for Reconstruction and Development
14498Total Disbursement in First Quarter of 2021
International Development Association
1060890Total Disbursement in First Quarter of 2021
International Bank for Reconstruction and Development
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule Section I.C.1 | Description :Adoption of Dam Safety Institutional Plan | Due Date :15-Nov-2012
Finance Agreement :Schedule Section I.C.2 | Description :Preparation of Emergency Preparedness plan | Due Date :15-Nov-2012
Finance Agreement :Schedule Section I.C.3 | Description :Financial Covenants | Frequency :Yearly
To facilitate the carrying out the Project, the Borrower shall make the proceeds of the Loan available to the Project ImplementingEntity under a subsidiary agreement between the Borrower and the Project Implementing Entity (“Subsidiary Agreement”), under termsand conditions approved by the Bank.
The Borrower shall exercise its rights under the Subsidiary Agreement in such manner as to protect the interests of the Borrowerand the Bank and to accomplish the purposes of the Loan. Except as the Bank shall otherwise agree, the Borrower shall not assign,amend, abrogate or waive the Subsidiary Agreement or any of its provisions.
The Borrower, through the Ministry of Infrastructure and Energy, shall cause the Project Implementing Entity to: carry out theProject in accordance with the Environmental Management Plan which the Borrower shall not amend, suspend, abrogate, repeal or waiveany provision thereof without prior approval of the Bank; and ensure that all technical assistance under the Project shall only beundertaken pursuant to terms of reference reviewed and found satisfactory by the Bank, such terms of reference to ensure that thetechnical assistance takes into account, and calls for application of the Bank's Safeguard Policies.
PDO Indicator
Regional Market Liberalization
PDO Indicator
Safeguarded dams and generation capacities
PDO Indicator
Improve the dams operation efficiency
Intermediate Results Indicator
The rehabilitated spillways are tested and functional for very high priority investments
Intermediate Results Indicator
High priority remedial measures completed
Intermediate Results Indicator
Remedial measures of medium priority and operational improvements completed
Intermediate Results Indicator
Safety of Dams Expert Panel
Intermediate Results Indicator
Hydrology analysis and water management
Intermediate Results Indicator
Emergency preparedness plan
Intermediate Results Indicator
Strengthen the capacities of KESH's dam safety department and AlbCOLD
Intermediate Results Indicator
Prepare a new structure and organization for KESH Generation
Intermediate Results Indicator
Financial management capacity building
Intermediate Results Indicator
Percentage of grievance received and addresses within agreed timeframe
44000-P110845
World Bank
Disaster Risk Mitigation and Adaptation Project
International Bank for Reconstruction and Development
MINISTRY OF INTERIOR
International Bank for Reconstruction and Development
International Development Association
International Development Association
MINISTRY OF INTERIORPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Drite Dade
+1-202-473-1000ddade@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Tirana
41.3270 19.8190
Other TransportationOther Public AdministrationInsurance and PensionCentral Government (Central Agencies)Other Water Supply, Sanitation and Waste ManagementDisaster Risk FinanceSocial Insurance and PensionsDisaster Risk ManagementDisaster Risk ReductionSocial ProtectionFinance for DevelopmentDisaster Response and RecoveryDisaster Preparedness
0.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
116666.67
116666.67
116666.66
100000.00
100000.00
100000.00
36666.67
36666.67
36666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
806666.66
806666.67
806666.67
45166.66
45166.67
45166.67
45166.66
45166.67
45166.67
45166.66
45166.67
45166.67
45166.66
45166.67
45166.67
301500.00
301500.00
301500.00
301500.00
301500.00
301500.00
301500.00
301500.00
301500.00
301500.00
301500.00
301500.00
215000.00
215000.00
215000.00
215000.00
215000.00
215000.00
215000.00
215000.00
215000.00
215000.00
215000.00
215000.00
0.00
0.00
0.00
0.00
6160000Total Commitment in Second Quarter of 2008
International Development Association
3000000Total Commitment in Second Quarter of 2008
International Bank for Reconstruction and Development
-7150Total Interest Repayment in First Quarter of 2010
International Bank for Reconstruction and Development
399420Total Disbursement in Second Quarter of 2010
International Development Association
248100Total Disbursement in Second Quarter of 2010
International Bank for Reconstruction and Development
1769100Total Disbursement in Second Quarter of 2010
International Bank for Reconstruction and Development
-1312Total Interest Repayment in Third Quarter of 2010
International Development Association
-7417Total Interest Repayment in Third Quarter of 2010
International Bank for Reconstruction and Development
-1558Total Interest Repayment in First Quarter of 2011
International Development Association
-12702Total Interest Repayment in First Quarter of 2011
International Bank for Reconstruction and Development
95792Total Disbursement in Second Quarter of 2011
International Development Association
186214Total Disbursement in Second Quarter of 2011
International Development Association
259661Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development
-2156Total Interest Repayment in Third Quarter of 2011
International Development Association
-17519Total Interest Repayment in Third Quarter of 2011
International Bank for Reconstruction and Development
101269Total Disbursement in Fourth Quarter of 2011
International Development Association
374977Total Disbursement in First Quarter of 2012
International Development Association
-3206Total Interest Repayment in First Quarter of 2012
International Development Association
-20063Total Interest Repayment in First Quarter of 2012
International Bank for Reconstruction and Development
289983Total Disbursement in Second Quarter of 2012
International Development Association
423595Total Disbursement in Second Quarter of 2012
International Development Association
367357Total Disbursement in Third Quarter of 2012
International Development Association
-6652Total Interest Repayment in Third Quarter of 2012
International Development Association
89107Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development
-13960Total Interest Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development
533059Total Disbursement in Fourth Quarter of 2012
International Development Association
222571Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development
643125Total Disbursement in First Quarter of 2013
International Development Association
1462803Total Disbursement in First Quarter of 2013
International Development Association
-11313Total Interest Repayment in First Quarter of 2013
International Development Association
-6154Total Interest Repayment in First Quarter of 2013
International Bank for Reconstruction and Development
695421Total Disbursement in Second Quarter of 2013
International Development Association
41021Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development
53124Total Disbursement in Third Quarter of 2013
International Development Association
-20665Total Interest Repayment in Third Quarter of 2013
International Development Association
-21996Total Commitment Cancellations in Third Quarter of 2013
International Bank for Reconstruction and Development
-3871Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development
-92246Total Commitment Cancellations in Fourth Quarter of 2013
International Development Association
94290Total Disbursement in Fourth Quarter of 2013
International Development Association
-21701Total Interest Repayment in First Quarter of 2014
International Development Association
-4709Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development
-20581Total Interest Repayment in Third Quarter of 2014
International Development Association
-5632Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development
-18508Total Interest Repayment in First Quarter of 2015
International Development Association
-2532Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development
-20949Total Interest Repayment in Third Quarter of 2015
International Development Association
-2292Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development
-19547Total Interest Repayment in First Quarter of 2016
International Development Association
-2000Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development
-19639Total Interest Repayment in Third Quarter of 2016
International Development Association
-570Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development
-18912Total Interest Repayment in First Quarter of 2017
International Development Association
-19986Total Interest Repayment in Third Quarter of 2017
International Development Association
-20274Total Interest Repayment in First Quarter of 2018
International Development Association
-19778Total Interest Repayment in Third Quarter of 2018
International Development Association
-262307Total Loan Repayment in Third Quarter of 2018
International Development Association
-16382Total Interest Repayment in First Quarter of 2019
International Development Association
-260373Total Loan Repayment in First Quarter of 2019
International Development Association
-57693Total Loan Repayment in First Quarter of 2019
International Bank for Reconstruction and Development
-17194Total Interest Repayment in Third Quarter of 2019
International Development Association
-256784Total Loan Repayment in Third Quarter of 2019
International Development Association
-58510Total Loan Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development
-18717Total Interest Repayment in First Quarter of 2020
International Development Association
-257718Total Loan Repayment in First Quarter of 2020
International Development Association
-60858Total Loan Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
-15895Total Interest Repayment in Third Quarter of 2020
International Development Association
-264913Total Loan Repayment in Third Quarter of 2020
International Development Association
-67256Total Loan Repayment in Third Quarter of 2020
International Bank for Reconstruction and Development
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
The Execution Agreement has been signed on behalf of the Recipient and the IEWE
Establishment of the Project Management Team under TORs and with a composition satisfactory to IDA.
Execution Agreement authorized by Recipient and IEWE and legally binding upon them.
Establish Project Steering Committee.
Establishment of Implementation Teams.
Establishment of DRM Strategy Working Group.
Recipient to provide adequate budget to IEWE to enable sustainable operation of existing and new equipment supplied under project.
Memorandum of Understanding among Military Meteorological Service, IEWE and Air Traffic Agency enabling IEWE to provide data andforecasts on its website and setting forth data sharing arrangements.
Intermediate Results Indicator
Disaster risk action plan and the prioritized investment program formulated
Target will likely be met by June 28, 2013 or shortly thereafter.
Intermediate Results Indicator
EU-compatible building codes, including seismic compliance developed
Target has been met.
Intermediate Results Indicator
(Revised Jan 2012) Training for engineers program developed
Target has been met.
PDO Indicator
(Revised Jan 2012) Newly produced hydrometeorological products meet WMO standards
PDO Indicator
(Revised Jan 2012) Revisions to Building Code, bringing them to EU standards (Eurocode 8) are ready for legal adoption
Target has been met.
PDO Indicator
(Revised Jan 2012) Catastrophic risk insurance is available to businesses, households and government
The DRMAP supported the membership fee of Albania in CRIF and development of three main modules of an Interactive ConsumerAwareness and Education Website were successfully prepared and integrated into the consumers web application hosted by South EastEuropean Countries - SEEC CRIF (Europa RE) server.
Intermediate Results Indicator
Increased availability of weather alerts (for floods and wild fires), real time data and historical data to multiple users
Target has been met.
Intermediate Results Indicator
Emergency response equipment provided to the response units
Target has been met.
Intermediate Results Indicator
(New Jan 2012) Institutional capacity of hydromet service strengthened through training
Intermediate Results Indicator
(New Jan 2012) Hydromet monitoring network modernized
Intermediate Results Indicator
(Revised Jan 2012) All systems (products, distribution system, infraastructure, regulatory framework and public awareness mechanism) ready for the launch of the catastrophe insurance
Target has largely been met. All products have been developed, national draft laws on insurance prepared but they need theapprovalof all CRIF participating countries. It is expected that products and systems will be made available by 2014.
44000-P121186
World Bank
Water Resources and Irrigation Project
International Bank for Reconstruction and Development
MINISTRY OF ENVIRONMENT, MINISTRY OF AGRICULTURE
International Bank for Reconstruction and Development
MINISTRY OF ENVIRONMENT, MINISTRY OF AGRICULTUREPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Regassa Ensermu Namara
+1-202-473-1000rnamara@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Qarku i Beratit
40.6330 20.0830
Qarku i Korces
40.6170 20.6670
Qarku i Kukesit
42.2000 20.3670
Qarku i Fierit
40.7670 19.6170
Qarku i Shkodres
42.1830 19.7500
Qarku i Vlores
40.1670 19.8000
Irrigation and DrainageOther Public AdministrationPublic Administration - Water, Sanitation and Waste ManagementSocial ProtectionOther TransportationPublic Administration - Agriculture, Fishing & ForestryOther Water Supply, Sanitation and Waste ManagementOther Excluded GroupsForced DisplacementFragility, Conflict and ViolenceAdaptationSocial InclusionWater Resource ManagementWater Institutions, Policies and ReformRural Infrastructure and service deliveryRural DevelopmentClimate changePublic Private Partnerships
0.00
660230.00
660230.00
660230.00
0.00
990345.00
990345.00
694006.33
694006.33
694006.34
694006.33
694006.33
694006.34
694006.33
694006.33
694006.34
694006.33
694006.33
694006.34
820189.33
820189.33
820189.34
820189.33
820189.33
820189.34
820189.33
820189.33
820189.34
820189.33
820189.33
820189.34
874677.33
874677.33
874677.34
874677.33
874677.33
874677.34
874677.33
874677.33
874677.34
874677.33
874677.33
874677.34
449288.00
449288.00
449288.00
449288.00
449288.00
449288.00
449287.66
449287.67
449287.67
449287.66
449287.67
449287.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
269738.45
269738.44
222721.95
222721.95
222721.95
0.00
0.00
0.00
114220.36
114220.36
114220.36
0.00
0.00
0.00
424766.66
424766.67
424766.67
98385.50
98385.50
98385.50
294183.37
294183.37
294183.37
0.00
0.00
0.00
483462.58
483462.58
483462.58
927079.13
927079.14
927079.14
254973.45
254973.45
254973.45
677126.53
677126.53
677126.53
0.00
0.00
0.00
273049.70
273049.70
273049.71
673345.45
673345.45
673345.45
1000000.00
1000000.00
1000000.00
1666666.66
1666666.67
1666666.67
2166666.66
2166666.67
2166666.67
1033333.33
1033333.33
1033333.34
450000.00
450000.00
450000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40000000Total Commitment in Fourth Quarter of 2012
International Bank for Reconstruction and Development
640099Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development
-100622Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development
668166Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development
-1727Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development
342661Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development
-6796Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development
1274300Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development
-8684Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development
107799Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development
187358Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development
882550Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development
-11924Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development
1450388Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development
-14384Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development
661612Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development
927453Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development
1192173Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development
764920Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development
-23645Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development
761625Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development
1269754Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development
-26565Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development
819149Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development
2020036Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development
-24850Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development
1217054Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development
1340152Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development
775358Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development
1535994Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development
2367511Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development
-31736Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development
2362145Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development
1351881Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development
2196853Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development
-45381Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development
27200000Total Commitment in First Quarter of 2018
International Bank for Reconstruction and Development
675675Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development
2388331Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development
1790993Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
-54972Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development
66585Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
-66585Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development
1161831Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-30032Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development
1362872Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development
-61095Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development
-32282Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development
1393199Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development
-70301Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development
2214600Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-32567Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-42853Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
-1051563Total Loan Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
2258639Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development
6239672Total Disbursement in Second Quarter of 2020
International Bank for Reconstruction and Development
-41381Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
-88514Total Disbursement in Third Quarter of 2020
International Bank for Reconstruction and Development
-51994Total Interest Repayment in Third Quarter of 2020
International Bank for Reconstruction and Development
-1145876Total Loan Repayment in Third Quarter of 2020
International Bank for Reconstruction and Development
2111924Total Disbursement in Third Quarter of 2020
International Bank for Reconstruction and Development
-89019Total Commitment Cancellations in Fourth Quarter of 2020
International Bank for Reconstruction and Development
4467119Total Disbursement in Fourth Quarter of 2020
International Bank for Reconstruction and Development
-72019Total Interest Repayment in Fourth Quarter of 2020
International Bank for Reconstruction and Development
4448834Total Disbursement in First Quarter of 2021
International Bank for Reconstruction and Development
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementAgreementAgreementAgreementAgreementAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Procurement and financial management | Description :Recruitment by MEFWA and MAFCP of one procurement and onefinancial management specialisteach, with TORs and CVs satisfactory to the Bank. | Due Date :13-May-2013
Finance Agreement :Project Governance | Description :Establishment and maintenance by MEFWA and MAFCP of a Project Management Team(alreadyestablished), Project Steering Committee andTechnical Committee | Due Date :13-May-2013
Finance Agreement :Project Operations Manual | Description :Adoption of a Project Operations Manual prepared to the satisfaction ofthe Bank | Due Date :13-May-2013
Finance Agreement :Signed Grant Agreement for Sida co-financing | Description :Signed Grant Agreement between Sida and GOA. Thisdisbursement condition applies to investmentsmade under component 3. | Due Date :13-May-2013
Finance Agreement :Legal Opinion | Description :a Legal Opinion stating that the project is authorized | Due Date :13-May-2013
Finance Agreement :Schedule 2. Section I.A.1 | Description :The Borrower shall maintain, for purposes of carrying out the Project,the following organizations throughout the period of implementation of the Project:(a) The Project Steering Committee, (b) TheProject Management Team, established within MARD | Frequency :CONTINUOUS
Finance Agreement :Schedule 2. Section I.C.1 (and further) | Description :Carry out the following actions: (a) implementation ofthe ESFD; (b) preparation and furnishing to the Bank for approval of, site-specific ESMPs in accordance with the ESFD; and (c)implementation of said site-specific ESMPs that have been approved by the Bank, all in a manner satisfactory to the Bank. |Frequency :CONTINUOUS
Finance Agreement :Schedule 2. Section I.C.3 | Description :Take all necessary actions to minimize (...) any involuntary loss bypersons of shelter, productive assets or access to productive assets or income or means of livelihood (...); and wheneverimplementation of the Project (...) gives rise to Displaced Persons, and prior to commencement of any works related to suchimplementation (...) provide to the Bank a site-specific resettlement action plan. | Frequency :Monthly
Finance Agreement :Schedule 2. Section I.C.6a | Description :To ensure the safety of the dams to be rehabilitated under the Projectand/or included in the Selected Irrigation Systems, the Borrower, through MARD, shall maintain the Panel of Dam Safety Experts,with qualifications, resources and experience, satisfactory to the Bank and which Panel of Dam Safety Experts is responsible foradvising MARD on matters related to safety of said dams (...) | Frequency :CONTINUOUS
Finance Agreement :Schedule 2. Section I.C.6b | Description :Prior to commencement of tendering for works to be carried out underthe Project: (i) prepare (...) detailed and time-bound plans, relating to said dams, for: (A) construction supervision and qualityassurance; (B) instrumentation; (C) operation and maintenance; and (D) emergency preparedness; and (ii) finalize said plans (...).Thereafter, implement such plans. | Frequency :SemiAnnual
Finance Agreement :Schedule 2. Section I.C.6c | Description :After completion of construction works at said dams, have independentqualified professionals carry out periodic safety inspections of said dams. | Frequency :Yearly
Finance Agreement :Schedule 2. Section II. | Description :The Borrower, through MARD, shall furnish to the Bank each Project Reportnot later than forty five days after the end of each calendar semester, covering the calendar semester | Frequency :SemiAnnual
PDO Indicator
Preparation of an agreed IWRM strategy
PDO Indicator
Water users provided with new/improved irrigation and drainage services
PDO Indicator
Water users provided with irrigation and drainage services - Female
PDO Indicator
Preparation of two agreed RBM plans for Drini-Buna and Semani basins
PDO Indicator
Direct Project beneficiaries
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
Number of dams rehabilitated in compliance with international dam safety standards.
Intermediate Results Indicator
Preparation of an agreed Irrigation Strategy
Intermediate Results Indicator
Establishment of a functional water resources database.
Intermediate Results Indicator
Area provided with new/improved irrigation or drainage services
Intermediate Results Indicator
Project-supported RBMPs and investments informed by citizien feedback through consultations.
Intermediate Results Indicator
Area provided with new irrigation or drainage services
Intermediate Results Indicator
Area provided with improved irrigation or drainage services
Intermediate Results Indicator
Grievances responded to and resolved in relation to delivery of project benefits
Intermediate Results Indicator
Percentage of female participation - Records disaggregated by gender
Intermediate Results Indicator
Share of area served withirrgation and drainage service, where sustainable cost-sharing and operation and maintainance arrangementsare introduced
44000-P122233
World Bank
Social Assistance Modernization Project
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Vlad Alexandru Grigoras
+1-202-473-1000vgrigoras@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Qarku i Tiranes
41.2670 19.7830
Social ProtectionPublic Administration - Social ProtectionSocial Safety NetsSocial Protection
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
589912.33
589912.33
589912.34
842105.21
842105.21
842105.21
842105.26
842105.26
842105.27
842105.26
842105.26
842105.27
842105.26
842105.26
842105.27
958333.33
958333.33
958333.34
958333.33
958333.33
958333.34
958333.33
958333.33
958333.34
958333.33
958333.33
958333.34
1041666.66
1041666.67
1041666.67
1041666.66
1041666.67
1041666.67
1041666.66
1041666.67
1041666.67
1041666.66
1041666.67
1041666.67
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
666666.66
666666.67
666666.67
1000000.00
1000000.00
1000000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
589912.33
589912.33
589912.34
842105.21
842105.21
842105.21
842105.26
842105.26
842105.27
842105.26
842105.26
842105.27
842105.26
842105.26
842105.27
958333.33
958333.33
958333.34
958333.33
958333.33
958333.34
958333.33
958333.33
958333.34
958333.33
958333.33
958333.34
1041666.66
1041666.67
1041666.67
1041666.66
1041666.67
1041666.67
1041666.66
1041666.67
1041666.67
1041666.66
1041666.67
1041666.67
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
666666.66
666666.67
666666.67
1000000.00
1000000.00
1000000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50000000Total Commitment in Second Quarter of 2012
International Bank for Reconstruction and Development
123557Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development
-123557Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development
-447Total Interest Repayment in First Quarter of 2013
International Bank for Reconstruction and Development
326788Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development
-1552Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development
85489Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development
1411377Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development
-2083Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development
6727045Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development
115635Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development
-27604Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development
5815760Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development
-30561Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development
123014Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development
-41489Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development
4128510Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development
251695Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development
-44011Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development
4548002Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development
-43875Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development
145545Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development
-42765Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development
6502030Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development
-48046Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development
-63718Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development
11000000Total Commitment in Second Quarter of 2018
International Bank for Reconstruction and Development
256524Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
-59070Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development
27500Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-27500Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development
118453Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development
401778Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development
12811402Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development
-59524Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development
-13941Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development
-869201Total Commitment Cancellations in Second Quarter of 2019
International Bank for Reconstruction and Development
-3397Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development
300000Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development
-102182Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development
-982625Total Loan Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development
-17290Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development
31706Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-57400Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
-988605Total Loan Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
-19733Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
97468Total Disbursement in Second Quarter of 2020
International Bank for Reconstruction and Development
2202500Total Disbursement in Second Quarter of 2020
International Bank for Reconstruction and Development
-49592Total Interest Repayment in Third Quarter of 2020
International Bank for Reconstruction and Development
-1054208Total Loan Repayment in Third Quarter of 2020
International Bank for Reconstruction and Development
-37676Total Interest Repayment in Third Quarter of 2020
International Bank for Reconstruction and Development
114139Total Disbursement in Fourth Quarter of 2020
International Bank for Reconstruction and Development
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
Finance Agreement: Maintain the Project's Coordination Working Group | Description: Maintain, throughout the period of Projectimplementation, the Coordination Working Group, chaired by the Deputy Minister of MOLSA and including representatives from MOLSA,State Social Services and National Agency for Information Society, which is responsible for leading implementation of reforms insocial assistance programs and ensuring coordination of activities. | Frequency: Yearly
Finance Agreement: Hire additional staff for MOLSA | Description: Within three (3) month from the effectiveness, the Borrower shallhave additional staff in the Department of Social Services Policy of MOLSA, with TOR acceptable to the Bank and with the projectmanagement, monitoring and evaluation expertise, and maintain thorough the project implementation period. | Due Date: 31-Jan-2013
Finance Agreement: Appropriate budget allocations | Description: The Borrower shall ensure that, throughout the period of Projectimplementation, appropriate budget allocations' are made available yearly for Project implementation purposes. | Frequency: Yearly
Completion of DA program in the Tirana Region by December 31, 2019.
Establishment of an inter-ministerial Coordination Working Group for decision making on implementation of reforms in socialassistance programs.
PDO Indicator
Percentage of households in the poorest 10% that are covered by the Ndihma Ekonomike (NE) Program.
PDO Indicator
Percentage of NE benefits received by the poorest 10% households.
PDO Indicator
Share of disability assistance beneficiaries that report no functional disability
PDO Indicator
The average time (days) needed to determine eligibility status of applicants
PDO Indicator
MHSP has access to real-time data on DA applicants and beneficiaries in pilot areas
Intermediate Results Indicator
Beneficiaries of Safety Nets programs (number)
Intermediate Results Indicator
Percentage of social administrators trained in implementation of the Unified Scoring Formula
Intermediate Results Indicator
Strategy and action plan developed to guide the NE exit
Intermediate Results Indicator
Beneficiaries of Safety Nets programs - Other cash transfers programs (number)
Intermediate Results Indicator
Share of DA beneficiaries in the three pilot regions satisfied with the access, quality of facilities, quality of services, and responsiveness to needs
Intermediate Results Indicator
Beneficiaries of Safety Nets programs - Female (number)
Intermediate Results Indicator
Grievances registered related to delivery of DA benefits that are actually addressed
Intermediate Results Indicator
Beneficiaries of Safety Nets programs - Unconditional cash transfers (number)
Intermediate Results Indicator
Percentage of households receiving benefits for the NE program that have been screened for eligibility using the Unified Scoring Formula agreed with the World Bank
Intermediate Results Indicator
Percentage of NE applicants case files that are complete and consistent with the USF application and intake processes
Intermediate Results Indicator
Adoption of Social Model for DA eligibility assessment
Intermediate Results Indicator
Percentage of new DA applications and recertification requests in Tirana, Elbasan and Durres that have been reassessed using revised criteria and processes based on the Social Model
Intermediate Results Indicator
Percentage of local government units that use the automated MIS to process DA applicants registration, beneficiary selection, program enrollment, and payment orders
Intermediate Results Indicator
Percentage of new applications and recertification requests received in Tirana, Elbasan and Durres that have been processed using the automated DA MIS
Intermediate Results Indicator
Percentage of suspected fraud and error cases in the DA program that are investigated by social inspectors in accordance with revised sanctions policy and legislation
Intermediate Results Indicator
Average number of weekly visits by PWD
Intermediate Results Indicator
Number of SSS Regional Offices rehabilitated
44000-P130492
World Bank
ENVIRONMENTAL SERVICES
International Bank for Reconstruction and Development
MINISTRY OF ENVIRONMENT,FORESTRY & WATER ADMINISTRATION
International Bank for Reconstruction and Development
MINISTRY OF ENVIRONMENT,FORESTRY & WATER ADMINISTRATIONPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Drite Dade
+1-202-473-1000ddade@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIAForestryRural DevelopmentEnvironmental Health and Pollution ManagementClimate changeAir quality managementJobsWater PollutionLand Administration and ManagementMitigationSoil Pollution
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2350.00
2630.00
5974.00
6950.00
7864.00
8682.00
4624.00
10122.00
11392.00
12214.00
12618.00
6416.00
13192.00
13560.00
13672.00
13384.00
6582.00
13246.00
13780.00
14808.00
7656.00
15614.00
16406.00
17688.00
18554.00
9588.00
20070.00
21618.00
22700.00
23234.00
12018.00
25310.00
27114.00
28110.00
29574.00
15538.00
32844.00
34878.00
36838.00
38850.00
20174.00
42134.00
44366.00
46162.00
23614.00
48244.00
50218.00
51918.00
53424.00
27320.00
56528.00
58280.00
59326.00
60072.00
30232.00
61356.00
62504.00
63286.00
32022.00
64972.00
66092.00
67106.00
68110.00
34438.00
69654.00
90186.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10000000Total Commitment in Third Quarter of 2014
International Bank for Reconstruction and Development
20643Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development
-20643Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development
442220Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development
-115Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development
-2305Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development
196563Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development
288317Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development
334110Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development
-2474Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development
-3998Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development
26666Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development
-3921Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development
-3834Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development
233661Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development
235985Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development
181975Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
557313Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
743920Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
-4404Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development
567602Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
50678Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development
-9892Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development
230720Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development
68492Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development
-11161Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development
144998Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development
371230Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development
1569465Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development
-7825Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
84871Total Disbursement in Second Quarter of 2020
International Bank for Reconstruction and Development
148483Total Disbursement in Second Quarter of 2020
International Bank for Reconstruction and Development
-15511Total Interest Repayment in Third Quarter of 2020
International Bank for Reconstruction and Development
149179Total Disbursement in Fourth Quarter of 2020
International Bank for Reconstruction and Development
756104Total Disbursement in First Quarter of 2021
International Bank for Reconstruction and Development
Project Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementGrant or Trust Fund AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Project Steering Committee | Description :The Borrower shall not later than September 30, 2014 establish andthereafter maintain at all times during the implementation of the Project, a Project Steering Committee with composition, mandate,and terms of reference satisfactory to the Bank. | Due Date :30-Sep-2014
Finance Agreement :Project Technical Committee | Description :The Borrower shall not later than September 30, 2014 establish andthereafter maintain at all times during the implementation of the Project, a Technical Committee chaired by the Project Directorand comprising a Project Coordinator, component coordinators, technical staff from MOE and other agencies involved in projectimplementation; with functions and responsibilities satisfactory to the Bank. | Due Date :30-Sep-2014
Finance Agreement :Audit of Financial Statements | Description :The Borrower shall have its Financial Statements audited inaccordance with the provisions of Section 5.09 (b) of the General Conditions. Each audit of the Financial Statements shall coverthe period of on fiscal year of the Borrower. The audited statements shallbe furnished to the Bank not later than six months afterthe end of such a period. | Frequency :Yearly
PDO Indicator
Land area where sustainable land mgt. practices were adopted as a result of proj
PDO Indicator
People in forest&adjacent community with monetary/non-monetary benefit from forest
PDO Indicator
People in forest and adjacent community with benefits from forest-female
PDO Indicator
People in forest&adj. commy with benefit from forest-Ethnic minority/indigenous
Intermediate Results Indicator
Forest and Pasture Areas Registered
Intermediate Results Indicator
% of grant applications fulfill the requirements
Intermediate Results Indicator
Percentage of estimated sediment delivery to reservoirs in pilot areas covered by PES
Intermediate Results Indicator
Land management specialists and users trained
Intermediate Results Indicator
% of the grant budget disbursed
Intermediate Results Indicator
Members of Forest Pasture Users' Associations trained
Intermediate Results Indicator
% of grants budget disbursed to female applicants
Intermediate Results Indicator
Female members of Forest and Pasture Users's Associations trained
Intermediate Results Indicator
% of grants budget disbursed to farmers
Intermediate Results Indicator
Individual famers trained
Intermediate Results Indicator
% of grants disbursed to Forest and Pasture Users' Associations
Intermediate Results Indicator
Pasture area brought under management plans
Intermediate Results Indicator
Female farmers trained
Intermediate Results Indicator
Forest area brought under management plans
Intermediate Results Indicator
Ministry staff trained
Intermediate Results Indicator
% of forest and pasture users associations reporting that forest and pastures management plans represented the views of the community
Intermediate Results Indicator
Female land management specialists and users trained
Intermediate Results Indicator
Beneficiaries participating in project consultation activities during implementation
Intermediate Results Indicator
Female benficiaries participating in project consultation activities during implementation
44000-P132982
World Bank
Results-based Road Maintenance and Safety Project
International Bank for Reconstruction and Development
MINISTRY OF TRANSPORT AND INFRASTRUCTURE
International Bank for Reconstruction and Development
MINISTRY OF TRANSPORT AND INFRASTRUCTUREPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Artan Guxho
+1-202-473-1000aguxho@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Muzine
39.9320 20.2060
Tushemisht
40.9000 20.7190
Qafe
40.9440 20.0370
Perrenjas
40.8570 20.0630
Pretushe
40.8190 20.7260
Polican
40.1300 20.3500
Mbrakull
40.6290 20.0670
Kapshtice
40.6030 21.0100
Kalimash
42.0810 20.3080
Bllate
42.3420 20.0710
Plepa
41.3970 20.3540
Thane
41.0370 20.0130
Korce
40.7480 20.0410
Vidhas
41.0790 19.9890
Vermosh
42.5930 19.6810
Uznove
40.6970 19.9800
Tamare
42.4630 19.5630
Skuraj
41.6890 19.7960
Shkozet
41.1010 19.5730
Shengjin
41.8140 19.5940
Selenice
40.6510 19.9780
Rinas
41.4310 19.7090
Muriqan
42.0150 19.4030
Mjede
41.9970 19.6130
Melgushe
41.9890 19.5200
Levan
40.4400 19.8070
Levan
40.4400 19.8070
Lac
42.0110 19.6400
Kafarraj
40.6380 19.5100
Hani Hotit
42.3370 19.4340
Hamallaj
41.4740 19.5490
Bushat
41.9600 19.5340
Arrez
41.9140 19.9090
Shemri
41.4640 19.7200
Peshkopi
41.6850 20.4290
Kukes
42.0770 20.4220
Elbasan
41.1130 20.0820
Vlore
40.4670 19.4900
Shkoder
42.0680 19.5130
Lezhe
41.7840 19.6440
Durres
41.3230 19.4410
Berat
40.7060 19.9520
Sarande
39.8760 20.0050
Tepelene
40.2960 20.0190
Pogradec
40.9030 20.6530
Corovode
40.5040 20.2270
Burrel
41.6100 20.0090
Puke
42.0440 19.9000
Peqin
41.0460 19.7510
Lushnje
40.9420 19.7050
Koplik
42.2140 19.4360
Kavaje
41.1860 19.5570
Konispol
39.6590 20.1810
Kakavije
39.9080 20.3580
Maliq
40.7060 20.7000
Kolsh
42.0780 20.3420
Bogove
40.5710 20.1500
Vore
41.3910 19.6550
Ulez
41.6830 19.8930
Shijak
41.3460 19.5670
Rrogozhine
41.0760 19.6650
Milot
41.6840 19.7160
Mamurras
41.5780 19.6920
Maminas
41.3790 19.6080
Krrabe
41.2160 19.9710
Krahes
40.4390 19.8440
Fushe-Kruje
41.4780 19.7180
Tirana
41.3280 19.8190
Fier-Cifci
40.7170 19.5670
Public Administration - TransportationRural and Inter-Urban RoadsJob CreationUrban DevelopmentRural Infrastructure and service deliveryRural DevelopmentJobsUrban Infrastructure and Service Delivery
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5000000.00
5000000.00
5000000.00
0.00
0.00
0.00
6333333.33
6333333.33
6333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
80000000Total Commitment in First Quarter of 2015
International Bank for Reconstruction and Development
184026Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development
-184026Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development
9000794Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development
-200878Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development
-117581Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development
-114767Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development
-124027Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development
-121224Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development
11391183Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-115767Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-147534Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development
19798177Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-145907Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-169612Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
9245193Total Disbursement in Fourth Quarter of 2020
International Bank for Reconstruction and Development
-231497Total Interest Repayment in Fourth Quarter of 2020
International Bank for Reconstruction and Development
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementGrant or Trust Fund AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Technical Steering Committee | Description :In order to implement Part 2 of the Project, the Borrower shall, notlater than five months after the Effective Date, establish and thereafter maintain throughout the implementation of the Project, aTechnical Steering Committee responsible for providing quality assurance on the technical aspects of road safety, with acompositionand mandate satisfactory to the Bank. | Due Date :28-Dec-2015
Finance Agreement :Social Transparency System | Description :The Borrower shall, through MOTI, ensure that ARA establishes, andthereafter maintains throughout implementation of the Project, the Social Transparency System to enable stakeholders in thetransport sector to participate and provide feedback in the monitoring of the Project, under terms of reference in a manneracceptable to the Bank. | Frequency :CONTINUOUS
Finance Agreement :Mid-Term Review report | Description :The Borrower shall, through MOTI, ensure that the ARA, not later than onemonth prior to the mid-term review referred to in paragraph 4 of this Section, furnishes to the Bank for comments, a report, insuchdetail as the Bank shall reasonably request, on the progress of the Project, and giving details of the various matters to bediscussed at such review. | Due Date :28-Oct-2018
Finance Agreement :Mid-Term Review | Description :The Borrower shall, through MOTI, ensure that the ARA, not later than 40 monthsafter the Effective Date, undertake in conjunction with all agencies involved in the Project, a comprehensive mid-term review ofthe Project. | Due Date :28-Nov-2018
Finance Agreement :Disbursement Linked Indicators Audit | Description :The Borrower, through MOTI, shall ensure that ARA: (a) nolater than three months prior to the end of each Year or by such later date as agreed with the Bank, carries out an independentDLI Audit and (b) no later than three months after the end of each Year, or by such later date as agreed with the Bank, furnishesto the Bank a complete DLI Audit Report satisfactory to the Bank. | Frequency :Yearly
Finance Agreement :Technical Audit | Description :The Borrower, through MOTI, shall ensure that the ARA: (a) carries out, no laterthan three months prior to the end of each Year or by such later date as agreed with the Bank, an independent Technical Audit, and(b) Furnishes, no later than three months after the end of each Year, or by such later date as agreed with the Bank, a completeTechnical Audit report satisfactory to the Bank. | Frequency :Yearly
Finance Agreement :Borrower's Project Completion Report | Description :For purposes of Section 5.08 (c) of the General Conditions,the Borrower shall through MOTI ensure that the ARA prepares the report on the execution of the Project and related plan requiredpursuant to that Section, and furnishes said report to the Bank not later than the Closing Date. | Due Date :31-Dec-2021
PDO Indicator
Road Condition, as a function of the average IRI of the project road network, does not deteriorate (IRI measured as m/km)
PDO Indicator
Preparation and implementation of fully-costed multi-year maintenance plans, on an annual basis
PDO Indicator
Fatalities on an annual basis across the National road network.
Intermediate Results Indicator
Length of project roads under routine maintenance through Performance Based Contracts
Intermediate Results Indicator
Road Safety Media Campaign developed and in use.
Intermediate Results Indicator
Preparation of Transport Sector Strategy
Intermediate Results Indicator
Accident Information Database enhanced and in use by end of Year 2
Intermediate Results Indicator
Length of national road network for which condition survey data obtained and entered into RMS database.
Intermediate Results Indicator
Social Transparency System being used to monitor feedback trends, with issues being closed out and monthly reports being prepared.
Intermediate Results Indicator
iRAP surveys completed showing an improvement in Safety Star ratings across the project roads.
Intermediate Results Indicator
Finalize Beneficiary Impact Assessments and Completion Reports
44000-P144029
World Bank
The Power Recovery Project
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Rome Chavapricha
+1-202-473-1000rome@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIAPublic Administration - Energy and ExtractivesOther Energy and ExtractivesFinance for DevelopmentDisaster Risk ReductionRural Infrastructure and service deliveryUrban DevelopmentDisaster PreparednessRural DevelopmentDisaster Risk FinanceUrban Infrastructure and Service DeliveryDisaster Risk ManagementClimate changeMitigationRule of LawLegal Institutions for a Market EconomyDisaster Response and RecoveryJob CreationJobs
5000000.00
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
2666666.66
2666666.67
2666666.67
2666666.66
2666666.67
2666666.67
2666666.66
2666666.67
2666666.67
2000000.00
2000000.00
2000000.00
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
4333333.33
4333333.33
4333333.34
4333333.33
4333333.33
4333333.34
4666666.66
4666666.67
4666666.67
6666666.66
6666666.67
6666666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
8750000.00
8750000.00
8750000.00
8750000.00
8750000.00
8750000.00
8750000.00
8750000.00
8750000.00
8750000.00
8750000.00
8750000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
150000000Total Commitment in Third Quarter of 2014
International Bank for Reconstruction and Development
162983Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development
317677Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development
-317677Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development
-910Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development
66225Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development
219420Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development
5564733Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development
-2453Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development
217997Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development
-26899Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development
215583Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development
2464175Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development
-21792Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development
524687Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development
1167344Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development
870618Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development
2365940Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development
-27595Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development
855957Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development
1859483Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development
2071173Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development
9688094Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development
11075794Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development
12452699Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development
-52849Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development
836284Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development
1394586Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development
3113289Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development
1090692Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development
1539903Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development
4605900Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development
-149001Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development
1018769Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
1881401Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
4744912Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
846259Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
1596958Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-181898Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development
172985Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development
331533Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development
167051Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development
489347Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development
-197199Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development
322137Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development
554112Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development
310158Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development
1302396Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-212381Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
477340Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development
1325131Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development
-19049407Total Commitment Cancellations in Second Quarter of 2020
International Bank for Reconstruction and Development
333138Total Disbursement in Second Quarter of 2020
International Bank for Reconstruction and Development
-173404Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
815438Total Disbursement in Third Quarter of 2020
International Bank for Reconstruction and Development
367999Total Disbursement in Fourth Quarter of 2020
International Bank for Reconstruction and Development
1008468Total Disbursement in Fourth Quarter of 2020
International Bank for Reconstruction and Development
-279270Total Interest Repayment in Fourth Quarter of 2020
International Bank for Reconstruction and Development
904256Total Disbursement in First Quarter of 2021
International Bank for Reconstruction and Development
Project Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
LA Section IV C1.Debt Service Coverage. Borrower to ensure: (a) OST/KESh not to incur any debt unless a reasonable forecast ofrevenues and expenditures show estimated net revenues for each FY during term of debt to be incurred shall be at least 1.0 forfirst 36 months and thereafter one and six tenths (1.6) times the estimated debt service requirements of the relevant PIE in suchyear on all debt of the OST and KESh, including debt to be incurred. (b) that a reasonable forecast of OSHEE's net revenues andexpenditures demonstrate that the ratio of estimated net revenue to debt service requirements is (i) within 36 months of theEffective Date, six tenths (0.6); and (ii) with the subsequent 36 months,one (1.0); and thereafter, one and six tenths (1.6).
LA Section IV B1. Debt Equity Ratio. Borrower to ensure that OST and KESh do not incur any debt if, after the incurrence of suchdebt, the ratio of debt to equity shall be greater than sixty (60) to forty (40).
“(iv) thereafter pay one hundred percent (100%) of the monthly energy purchase fees invoice to KESh and one hundred and fivepercent (105%) of the monthly transmission fees invoice to OST until such time as the revenue arrears of each Project ImplementingEntity are fully amortized."
LA :Schedule 2 A3: Power Service Contracts. Borrower to ensure that the PIEs enter into agreements, satisfactory to the Bank,comprising (i) the PSC between KESh and OShEE (the KESh/OShEE PSC) setting out OShEE's obligation to purchase power generated byKESh; (ii) the PSC between KESh and OST (the KESh/OST PSC) setting out OST's obligations to transmit the power generated by KEShand (iii) the PSC between OShEE (the OShEE/OST PSC) setting out OST's obligations to transmit power purchased by OShEE. (b)Borrower to ensure that the PSCs contain information on: (i) daily scheduling, deviations and accounting; (ii) monthly energybalance; (iii) monthly energy and financial settlement based on methodology monitored and established by the market operator andOST; and (iv) the monthly payments and guarantees through commercial banks. (c) Borrower to ensure that the Power Service Cotractsare not assigned, amended, abrogated or waived without the Bank's prior approval in writing. Due Date :31-Oct-2014
LA Section IV D:Five year Business Plan. Borrower shall cause each Project Implementing Entity to prepare and submit to the Bankand the Borrower no later than December 31 of each year, a 5 year business plan including associated financial projections in formand substance satisfactory to the Bank.
LA Schedule 2 Section 1B 2(iv) :OShEE to contribute 10% of the contract value under Category 2 and OST 20% of the contract valueunder Category 3 respectively as set forth in the table Section V of Schedule 2 to this Agreement; and ensure that all the relevantcontracts are procured in accordance with the applicable World Bank procurement guidelines.
LA Schedule 2 Section 1A1: Project Management Unit Borrower through MoEI to establish and maintain throughout the implementation ofthe Project, a PMU, which will be managed by a Project Coordinator appointed by MoEI with key staff with functions andresponsibilities acceptable to the Bank, including the following additional responsibilities: (a) preparing the POM,together to beapproved by the MoEI; (b) assisting PIUs in developing BDs; (c) assisting the Borrower through the MoEi in estiblishment of BECs,comprising staff from PMU and PIUs according to the POM; (d) supporting coordination in the design and monitoring of socialoutreach programs; (e) carrying out implementation oversight including supervision; (f) providing periodic monitoring andevaluation of Project implementation.
PDO Indicator
Electricity losses per year in the project area
PDO Indicator
Collection rate of distribution company
PDO Indicator
Capacity of medium-voltage network
PDO Indicator
Total amount of intercompany arrears
Intermediate Results Indicator
Complementary Power Purchased
Intermediate Results Indicator
Implementation of a new billing and collection management system
Intermediate Results Indicator
Number of medium voltage customers in deregulated market
Intermediate Results Indicator
Direct project beneficiaries
Intermediate Results Indicator
Number of OST meters installed
Intermediate Results Indicator
Debt to Equity Ratio of OShEE (shown), KESh and OST
Intermediate Results Indicator
OShEE monthly revenues used to pay for energy purchases to KESh and transmission fees to OST
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
Impact of citizen engagement on project activities reported and disseminated (Yes/No)
Intermediate Results Indicator
Technical assistance initiated to support power sector reform
44000-P144688
World Bank
Health System Improvement Project
]]>
International Bank for Reconstruction and Development
MINISTRY OF HEALTH ALBANIA
International Bank for Reconstruction and Development
MINISTRY OF HEALTH ALBANIAPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Lorena Kostallari
+1-202-473-1000lkostallari@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Qarku i Beratit
40.6330 20.0830
Qarku i Elbasanit
41.0670 20.2000
Qarku i Gjirokastres
40.2170 20.2000
Qarku i Korces
40.6170 20.6670
Qarku i Kukesit
42.2000 20.3670
Qarku i Durresit
41.4830 19.6170
Qarku i Fierit
40.7670 19.6170
Qarku i Lezhes
41.8000 19.8670
Qarku i Shkodres
42.1830 19.7500
Qarku i Tiranes
41.2670 19.7830
Qarku i Vlores
40.1670 19.8000
Rrethi i Mirdites
41.8330 20.0000
Rrethi i Hasit
42.1670 20.3330
Tropoje
42.4040 20.1670
Skrapar
40.5000 20.2500
Devoll
40.6170 20.9500
Mallakaster
40.5830 19.7500
Perrenjas
40.8570 20.0630
Kurbnesh
41.7800 20.0840
Kalimash
42.0810 20.3080
Vidhas
41.0790 19.9890
Shkopet
41.7060 19.8250
Shengjin
41.8140 19.5940
Mavrove
40.4090 19.5910
Marinez
40.7410 19.6730
Koman
42.0900 19.8120
Kafarraj
40.6380 19.5100
Hani Hotit
42.3370 19.4340
Sarande
39.8760 20.0050
Delvine
39.9510 20.0980
Tepelene
40.2960 20.0190
Pogradec
40.9030 20.6530
Permet
40.2340 20.3520
Librazhd
41.1790 20.3150
Gramsh
40.8700 20.1840
Puke
42.0440 19.9000
Peqin
41.0460 19.7510
Lushnje
40.9420 19.7050
Lac
41.6360 19.7130
Kucove
40.8000 19.9170
Kruje
41.5090 19.7930
Koplik
42.2140 19.4360
Kakavije
39.9080 20.3580
Zall-Rec
41.8760 20.3200
Maliq
40.7060 20.7000
Kelcyre
40.3130 20.1890
Fushe-Arrez
42.0620 20.0170
Fierze
42.2610 20.0170
Vore
41.3910 19.6550
Ulez
41.6830 19.8930
Shijak
41.3460 19.5670
Valbone
42.4510 19.8920
Selenice
40.5310 19.6360
Rubik
41.7740 19.7860
Patos
40.6830 19.6190
Mamurras
41.5780 19.6920
Krahes
40.4390 19.8440
Kolonje
40.8240 19.6040
Fushekuqe
41.6500 19.6200
Fushe-Kruje
41.4780 19.7180
Cerrik
41.0320 19.9760
HealthPublic Administration - EducationHealth Systems and PoliciesHealth System Strengthening
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
250000.00
250000.00
250000.00
233333.33
233333.33
233333.34
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
420000.00
420000.00
420000.00
1000000.00
1000000.00
1000000.00
900000.00
900000.00
900000.00
900000.00
900000.00
900000.00
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
1000000.00
1000000.00
1000000.00
966666.67
966666.67
966666.66
766666.67
766666.67
766666.66
766666.67
766666.67
766666.66
766666.67
766666.67
766666.66
1023333.33
1023333.33
1023333.34
433333.33
433333.33
433333.34
440000.00
440000.00
440000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
139331.67
139331.67
139331.67
139331.67
139331.67
139331.67
139331.67
139331.67
139331.67
139331.67
139331.67
139331.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
101633.75
101633.75
101633.75
101633.75
101633.75
101633.75
101633.75
101633.75
101633.75
101633.75
101633.75
101633.75
289862.50
289862.50
289862.50
289862.50
289862.50
289862.50
289862.50
289862.50
289862.50
289862.50
289862.50
289862.50
132145.67
132145.67
132145.67
132145.67
132145.67
132145.67
132145.67
132145.67
132145.67
132145.67
132145.67
132145.63
2459556.67
2459556.67
2459556.67
2459556.67
2459556.67
2459556.67
2459556.67
2459556.67
2459556.67
2459556.67
2459556.67
2459556.63
40000000Total Commitment in First Quarter of 2015
International Bank for Reconstruction and Development
90518Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development
-90518Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development
1581975Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development
-95482Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development
-48772Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development
-48360Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development
-52744Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development
1219606Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development
-51811Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development
1013056Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
282923Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
768970Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
1413402Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-54604Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-60148Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development
922102Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development
-60928Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
663645Total Disbursement in Second Quarter of 2020
International Bank for Reconstruction and Development
-58680Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
327708Total Disbursement in Third Quarter of 2020
International Bank for Reconstruction and Development
556682Total Disbursement in Fourth Quarter of 2020
International Bank for Reconstruction and Development
1482658Total Disbursement in Fourth Quarter of 2020
International Bank for Reconstruction and Development
2013370Total Disbursement in Fourth Quarter of 2020
International Bank for Reconstruction and Development
-74327Total Interest Repayment in Fourth Quarter of 2020
International Bank for Reconstruction and Development
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Retroactive Financing | Description :No withdrawal shall be made for payments made prior to the date of the LoanAgreement except that withdrawals up to an aggregate amount not to exceed a hundred thousand Euros (€100,000) may be made forpayments made prior to this date but on or after January 1, 2015 for Eligible Expenditures.
PDO Indicator
Total number of hospitals in the selected region that have launched the implementation of the hospital master plan recommendations
PDO Indicator
Number of regional hospitals with Hospital Information System (HIS) established and functional
PDO Indicator
Number of regional hospitals meeting the minimum requirements of the accreditaton agency (cumulative)
Intermediate Results Indicator
Master Plan for eHealth/HMIS activities developed
Intermediate Results Indicator
Number of regional hospitals with social accountability mechanisms in place
Intermediate Results Indicator
Medical equipment management and maintenance revised strategy and plans adopted
Intermediate Results Indicator
Number of clinical protocols and guidelines updated and implemented for management of five main chronic diseases
Intermediate Results Indicator
Number of essential registries that are consolidated and available online (cumulative)
Intermediate Results Indicator
HIF experts and selected health personnel receiving training (disaggregated by gender)
Intermediate Results Indicator
Roadmap for hospital payment reforms adopted by HIF
Intermediate Results Indicator
Number of service payment packages (10 in total) using new platform processed
Intermediate Results Indicator
Number of facilities renovated and/or equipped (cumulative)
44000-P146280
World Bank
AL Financial Sector DPL
International Bank for Reconstruction and Development
BANK OF ALBANIA, FINANCIAL SUPERVISORY AUTHORITY AND MOF.
International Bank for Reconstruction and Development
BANK OF ALBANIA, FINANCIAL SUPERVISORY AUTHORITY AND MOF.Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Michael Brent Edwards
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Tirana
41.3275 19.8189
Other Non-bank Financial InstitutionsBanking InstitutionsFinancial Sector oversight and policy/banking regulation & restructuringRule of LawFinancial StabilityLegal Institutions for a Market Economy
0.00
0.00
100000000Total Commitment in Second Quarter of 2014
International Bank for Reconstruction and Development
96279915Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development
-242121Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development
-469040Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development
-380606Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development
-335285Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development
-277243Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development
-234584Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development
-247580Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development
-235720Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development
-229430Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development
-220234Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development
-233526Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development
-153343Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
-186823Total Interest Repayment in Third Quarter of 2020
International Bank for Reconstruction and Development
Project Appraisal DocumentProject Appraisal DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewContract AwardsProject URLProcurement Notices 44000-P147226
World Bank
Albania - Public Finance DPL
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Doerte Doemeland
+1-202-473-1000ddoemeland@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Tirana
41.3275 19.8189
Other Energy and ExtractivesOther Public AdministrationSocial ProtectionSocial Insurance and PensionsPublic Finance ManagementPublic Expenditure ManagementFiscal PolicyTax policyTransparency, Accountability and Good GovernanceFiscal sustainabilityDebt ManagementDomestic Revenue AdministrationPublic Administration
0.00
0.00
120000000Total Commitment in Second Quarter of 2014
International Bank for Reconstruction and Development
115511270Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development
-290145Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development
-565393Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development
-456098Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development
-401788Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development
-332233Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development
-281113Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development
-296687Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development
-282474Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development
-274937Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development
-263916Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development
-279845Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development
-183758Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
-223879Total Interest Repayment in Third Quarter of 2020
International Bank for Reconstruction and Development
Project Appraisal DocumentProject Appraisal DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewLoan AgreementContract AwardsProject URLProcurement Notices 44000-P151972
World Bank
Citizen-Centric Service Delivery Project
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Simon Carl O'Meally
+1-202-473-1000someally@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Tirana
41.3270 19.8190
Other Public AdministrationParticipation and Civic EngagementIndigenous People and Ethnic MinoritiesOther Excluded GroupsE-Government, incl. e-servicesPublic AdministrationTransparency, Accountability and Good GovernanceSocial InclusionAdministrative and Civil Service Reform
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32000000Total Commitment in Third Quarter of 2015
International Bank for Reconstruction and Development
82132Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development
986118Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development
4631295Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development
-82132Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development
337944Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development
-54323Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development
278540Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development
304804Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development
1395095Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development
-58128Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development
327820Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development
353628Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development
-63414Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development
308020Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development
4248600Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development
396346Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development
-73546Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development
-76252Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development
351069Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
8380820Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
383523Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development
-77559Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development
171036Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development
2211000Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development
-104854Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development
313903Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development
280211Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development
-92707Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
539600Total Disbursement in Second Quarter of 2020
International Bank for Reconstruction and Development
302183Total Disbursement in Third Quarter of 2020
International Bank for Reconstruction and Development
-99141Total Interest Repayment in Third Quarter of 2020
International Bank for Reconstruction and Development
4899474Total Disbursement in Fourth Quarter of 2020
International Bank for Reconstruction and Development
-105713Total Interest Repayment in First Quarter of 2021
International Bank for Reconstruction and Development
Project Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :No activity will be undertaken which will result in involuntary resettlement | Description :
PDO Indicator
Time taken to obtain motor vehicle registration
PDO Indicator
Access to services for the poor and vulnerable: Percentage of the poor who stated that receiving services from institutions contacted was "easy" or "very easy"
PDO Indicator
Time taken to process old age pension application
PDO Indicator
Access to the poor and vulnerable: Percentage of the Roma who stated that receiving services from institutions contacted was "easy"or "very easy"
PDO Indicator
Time taken to obtain health insurance card
PDO Indicator
Access to services for the poor and vulnerable: Percentage of females who stated that receiving services from institutions contacted was "easy" or "very easy"
Intermediate Results Indicator
Agencies with new or enhanced backend IT systems to improve service delivery
Intermediate Results Indicator
Services offered with improved customer service front office interface
Intermediate Results Indicator
Number of institutions with proactive citizen feedback mechanisms implemented
Intermediate Results Indicator
Priority services with business process reengineered
Intermediate Results Indicator
Services with information available on multiple platforms
Intermediate Results Indicator
Institutional pre-requisites of Citizen Centric Service Delivery Program
Intermediate Results Indicator
New services with level 3 automation
Intermediate Results Indicator
Institutions with key performance indicators reported and quarterly performance reports circulated
Intermediate Results Indicator
Number of registered users accessing e-government services (as percentage of adult population)
Intermediate Results Indicator
The amount of data prefilled in public services' online forms
44000-P152064
World Bank
Albania Financial Sector DPL
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Isfandyar Zaman Khan
+1-202-473-1000ikhan2@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Tirana
41.3275 19.8189
Banking InstitutionsOther Non-bank Financial InstitutionsFinancial Infrastructure and AccessFinancial Sector oversight and policy/banking regulation & restructuringFinancial StabilityCredit Infrastructure
0.00
0.00
100000000Total Commitment in First Quarter of 2017
International Bank for Reconstruction and Development
250000Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development
-250000Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development
99750000Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development
-1319610Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development
-2018889Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development
-2121722Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development
-2213111Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development
-1870556Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
-1221556Total Interest Repayment in Third Quarter of 2020
International Bank for Reconstruction and Development
Project Information DocumentImplementation Completion Report ReviewLoan AgreementContract AwardsProject URLProcurement Notices 44000-P155605
World Bank
Albania Competitiveness Development Policy Loan
International Bank for Reconstruction and Development
MINISTRY OF ECONOMY
International Bank for Reconstruction and Development
MINISTRY OF ECONOMYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Feyifolu Adeyosola Boroffice
+1-202-473-1000fboroffice@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Tirana
41.3275 19.8189
Other Industry, Trade and ServicesTradeICT ServicesPorts/WaterwaysEnergy Transmission and DistributionBusiness Enabling EnvironmentRegulation and Competition PolicyJobsTrade LogisticsTrade FacilitationPublic AdministrationAccess to EnergyUrban PlanningE-Government, incl. e-servicesTrade PolicyTradeUrban DevelopmentInvestment and Business ClimateEnergyRegional Integration
0.00
0.00
70000000Total Commitment in First Quarter of 2017
International Bank for Reconstruction and Development
184536Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development
77531934Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development
-184536Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development
-394188Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development
-345260Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development
-331421Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development
-341615Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development
-266989Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
-310428Total Interest Repayment in Third Quarter of 2020
International Bank for Reconstruction and Development
Implementation Completion Report ReviewLoan AgreementContract AwardsProject URLProcurement Notices 44000-P155875
World Bank
Project for Integrated Urban and Tourism Development (PIUTD)
International Bank for Reconstruction and Development
MINISTRY OF ECONOMY
International Bank for Reconstruction and Development
MINISTRY OF ECONOMYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Tuo Shi
+1-202-473-1000tshi@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Rrethi i Sarandes
39.8330 20.0830
Rrethi i Gjirokastres
40.0330 20.1670
Bashkia Berat
40.7000 19.9500
Bashkia Permet
40.2320 20.4110
Labova e Madhe
40.2070 20.1360
Ksamil
39.7690 20.0000
Orikum
40.3250 19.4710
Berat Castle
40.7080 19.9460
Porto Palermo Beach
40.0620 19.7940
Ishulli i Zvernecit
40.5110 19.4020
Urban TransportSub-National GovernmentWaste ManagementTourismMunicipal Institution BuildingJobsJob CreationMitigationMunicipal FinanceUrban Infrastructure and Service DeliveryClimate changeUrban DevelopmentCultural HeritagePublic Administration
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
71000000Total Commitment in Fourth Quarter of 2016
International Bank for Reconstruction and Development
174461Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development
-174461Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development
1772325Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development
-119837Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development
612123Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development
-110388Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development
821611Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
635265Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
728781Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-103375Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development
3970925Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development
1742759Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development
-114269Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development
2255650Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-130101Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
776930Total Disbursement in Second Quarter of 2020
International Bank for Reconstruction and Development
-133395Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
595077Total Disbursement in Third Quarter of 2020
International Bank for Reconstruction and Development
-154856Total Interest Repayment in Fourth Quarter of 2020
International Bank for Reconstruction and Development
Project Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Urban Design Studies Satisfactory to the Bank | Description :The Borrower through MoUD shall cause the ProjectImplementing Entity (the Albanian Development Fund ADF) to ensure that any urban designs studies undertake under Component 1 aresatisfactory to the Bank. | Frequency :CONTINUOUS
PDO Indicator
Direct project beneficiaries
PDO Indicator
New or rehabilitated urban public spaces in selected municipalities
PDO Indicator
Increased number of tourists satisfied by selected touristic sites
PDO Indicator
Number of municipalities with functioning destination management partnerships in the project area
PDO Indicator
Increased number of tourists visiting selected touristic sites
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
(Component 1) Urban roads rehabilitated in selected municipalities
Intermediate Results Indicator
(Component 2) Number of Site Management Plans developed and endorsed
Intermediate Results Indicator
(Component 3) Market Development Strategy for the South of Albania developed
Intermediate Results Indicator
(Component 4) Project website maintained with up-to date information on project activities
Intermediate Results Indicator
(Component 1) Streets with improved street lighting in selected municipalities
Intermediate Results Indicator
(Component 2) Integrated touristic sites designs developed
Intermediate Results Indicator
(Component 3) Destination Management Business Plans Developed
Intermediate Results Indicator
Grievances registered related to delivery of project benefits addressed (%)
Intermediate Results Indicator
(Component 1) New or rehabilitated pedestrian walkways in selected municipalities
Intermediate Results Indicator
(Component 3) Number of touristic products developed with destination management partnership support
Intermediate Results Indicator
Grievances related to delivery of project benefits that are addressed-(number)
Intermediate Results Indicator
(Component 3) Number of municipalities with improved management systems
Intermediate Results Indicator
(Component 3) Capacity of local governments improved through technical and managerial trainings
44000-P160594
World Bank
Albania Gender Equality in Access to Economic Opportunities DPF
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Ana Maria Oviedo Silva
+1-202-473-1000aoviedo@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Tirana
41.3275 19.8189
Primary EducationSocial ProtectionOther Public AdministrationEarly Childhood EducationCentral Government (Central Agencies)Access to EducationEducation Governance, School-Based ManagementEducationLand Administration and ManagementPublic Finance ManagementRural DevelopmentPublic Expenditure ManagementActive Labor Market ProgramsGenderLabor Market Policy and Programs
0.00
0.00
41880.00
42430.00
50780.00
58700.00
66410.00
75390.00
130730.00
95960.00
101220.00
107060.00
112950.00
179510.00
124850.00
129700.00
137200.00
147610.00
155620.00
163300.00
261180.00
186830.00
196720.00
203440.00
207660.00
326320.00
224350.00
224280.00
228140.00
232830.00
234640.00
351600.00
238440.00
240070.00
238060.00
236610.00
238420.00
352090.00
227070.00
225570.00
222420.00
215530.00
208950.00
306030.00
197840.00
192040.00
185860.00
180830.00
265260.00
172660.00
168580.00
164700.00
161000.00
157390.00
214570.00
190720.00
0.00
0.00
41880.00
42430.00
50780.00
58700.00
66410.00
75390.00
130730.00
95960.00
101220.00
107060.00
112950.00
179510.00
124850.00
129700.00
137200.00
147610.00
155620.00
163300.00
261180.00
186830.00
196720.00
203440.00
207660.00
326320.00
224350.00
224280.00
228140.00
232830.00
234640.00
351600.00
238440.00
240070.00
238060.00
236610.00
238420.00
352090.00
227070.00
225570.00
222420.00
215530.00
208950.00
306030.00
197840.00
192040.00
185860.00
180830.00
265260.00
172660.00
168580.00
164700.00
161000.00
157390.00
214570.00
190720.00
10000000Total Commitment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
25064Total Disbursement in Second Quarter of 2020
International Bank for Reconstruction and Development
10171059Total Disbursement in Second Quarter of 2020
International Bank for Reconstruction and Development
-25064Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
-50537Total Interest Repayment in Fourth Quarter of 2020
International Bank for Reconstruction and Development
Project Appraisal DocumentLoan AgreementContract AwardsProject URLProcurement Notices 44000-P163239
World Bank
Regional and Local Roads Connectivity
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Artan Guxho
+1-202-473-1000aguxho@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
Fier
40.7170 19.5830
Bashkia Pogradec
40.9240 20.5960
Komuna e Bucimasit
40.8830 20.6830
Tushemisht
40.9000 20.7190
Theth
42.3960 19.7740
Hoxhare
40.7500 19.4790
Gryke
40.7700 19.4200
Gjelaj
42.2180 19.5820
Topoje
40.7630 19.4330
Dermenas
40.7460 19.4940
Qafa e Tethores
42.4000 19.7330
Public Administration - TransportationRural and Inter-Urban RoadsAgricultural Extension, Research, and Other Support ActivitiesTourismAdaptationDisaster Risk ManagementUrban DevelopmentFlood and Drought Risk ManagementUrban Infrastructure and Service DeliveryClimate changeMunicipal FinanceRural MarketsUrban PlanningRural DevelopmentGenderMitigationRoad Safety
0.00
0.00
0.00
0.00
430375.00
430375.00
430375.00
430375.00
430375.00
430375.00
430375.00
430375.00
430375.00
430375.00
430375.00
430375.00
859991.67
859991.67
859991.67
859991.67
859991.67
859991.67
859991.67
859991.67
859991.67
859991.67
859991.67
859991.63
1244220.83
1244220.83
1244220.83
1244220.83
1244220.83
1244220.83
1244220.83
1244220.83
1244220.83
1244220.83
1244220.83
1244220.87
1206583.33
1206583.33
1206583.33
1206583.33
1206583.33
1206583.33
1206583.33
1206583.33
1206583.33
1206583.33
1206583.33
1206583.37
464177.27
464177.27
464177.27
464177.27
464177.27
464177.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
430375.00
430375.00
430375.00
430375.00
430375.00
430375.00
430375.00
430375.00
430375.00
430375.00
430375.00
430375.00
859991.67
859991.67
859991.67
859991.67
859991.67
859991.67
859991.67
859991.67
859991.67
859991.67
859991.67
859991.63
1244220.83
1244220.83
1244220.83
1244220.83
1244220.83
1244220.83
1244220.83
1244220.83
1244220.83
1244220.83
1244220.83
1244220.87
1206583.33
1206583.33
1206583.33
1206583.33
1206583.33
1206583.33
1206583.33
1206583.33
1206583.33
1206583.33
1206583.33
1206583.37
464177.27
464177.27
464177.27
464177.27
464177.27
464177.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50000000Total Commitment in Second Quarter of 2018
International Bank for Reconstruction and Development
125000Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development
-125000Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development
-73915Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development
1136250Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development
1365293Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development
-73615Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development
13796136Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-240466Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
-288140Total Interest Repayment in Third Quarter of 2020
International Bank for Reconstruction and Development
Project Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementContract AwardsProject URLProcurement Notices
PDO Indicator
Reduced travel time on project roads
PDO Indicator
Improved municipalities road asset management capacity as demonstrated through the adoption of Municipal Rehabilitation and Maintenance Plan
PDO Indicator
Number of agricultural and tourism centers connected by improved project roads
Intermediate Results Indicator
Design stage road safety audits passed
Intermediate Results Indicator
Standard service level agreement contract prepared and training provided
Intermediate Results Indicator
Geo-spatial data tool enhanced to show road condition and access to agricultural and tourism centers
Intermediate Results Indicator
Design stage technical audits including climate resilient aspects passed
Intermediate Results Indicator
Development of recommendations for linking agricultural producers to local demand
Intermediate Results Indicator
Percentage of community consultations in target locations that influence decision-making over the road rehabilitation design
Intermediate Results Indicator
Policies and practices with respect to women's employment in roads construction and maintenance
Intermediate Results Indicator
Project related grievances addressed within the required terms, disaggregated by gender
Intermediate Results Indicator
Asset management system of selected municipalities enhanced through incorporation of prioritization database
Intermediate Results Indicator
Roads rehablitated
Intermediate Results Indicator
Capacity building trainings to municipalities on how to recruit and retain women in roads sector.
Intermediate Results Indicator
Share of women employed in high skilled jobs in the workforce of the contractors and road departments of the municipalities participating in the project
Intermediate Results Indicator
Roads rehabilitated - rural
Intermediate Results Indicator
Development of tourism development concept plan
44000-P174101
World Bank
Albania Emergency COVID-19 Response Project
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Lorena Kostallari
+1-202-473-1000lkostallari@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ALBANIA
0.00
20000.00
70000.00
140000.00
70000.00
70000.00
140000.00
70000.00
70000.00
140000.00
70000.00
70000.00
140000.00
70000.00
70000.00
140000.00
70000.00
70000.00
140000.00
70000.00
70000.00
140000.00
70000.00
70000.00
150000.00
70000.00
70000.00
160000.00
100000.00
100000.00
200000.00
100000.00
100000.00
200000.00
90000.00
100000.00
200000.00
100000.00
110000.00
240000.00
130000.00
150000.00
340000.00
140000.00
150000.00
330000.00
180000.00
190000.00
420000.00
400000.00
430000.00
750000.00
320000.00
300000.00
580000.00
280000.00
280000.00
560000.00
280000.00
280000.00
560000.00
280000.00
280000.00
560000.00
280000.00
280000.00
850000.00
280000.00
0.00
850000.00
290000.00
570000.00
290000.00
290000.00
540000.00
0.00
0.00
0.00
20000.00
70000.00
140000.00
70000.00
70000.00
140000.00
70000.00
70000.00
140000.00
70000.00
70000.00
140000.00
70000.00
70000.00
140000.00
70000.00
70000.00
140000.00
70000.00
70000.00
140000.00
70000.00
70000.00
150000.00
70000.00
70000.00
160000.00
100000.00
100000.00
200000.00
100000.00
100000.00
200000.00
90000.00
100000.00
200000.00
100000.00
110000.00
240000.00
130000.00
150000.00
340000.00
140000.00
150000.00
330000.00
180000.00
190000.00
420000.00
400000.00
430000.00
750000.00
320000.00
300000.00
580000.00
280000.00
280000.00
560000.00
280000.00
280000.00
560000.00
280000.00
280000.00
560000.00
280000.00
280000.00
850000.00
280000.00
0.00
850000.00
290000.00
570000.00
290000.00
290000.00
540000.00
0.00
0.00
Project Information DocumentProject Appraisal Document Implementation Status and Results ReportContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Number of ICU beds supplied for the Infectious Disease Hospital
Intermediate Results Indicator
Number of green zones, in a given month, in which the number of new cases on any day exceeds 12
PDO Indicator
Number of designated laboratories with diagnostic equipment, test kits, and reagents, as per MoHSP guidelines
PDO Indicator
Percentage of COVID-19 cases that are health care workers
Intermediate Results Indicator
Upgraded infrastructure of the Infectious Disease Clinic in Mother Teresa Hospital completed
Intermediate Results Indicator
Number of volunteer healthcare staff covered with salaries for at least 3 months
Intermediate Results Indicator
Number of medical ambulances provided to Tirana tertiary hospital, regional hospitals and IPH
Intermediate Results Indicator
Establishment of an information system among key laboratories and training of lab specialists
Intermediate Results Indicator
Number of medical staff in public health laboratories, trained to undertake field epidemiology