44000-P167401
World Bank
Abidjan Urban Mobility Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Anne Cecile Sophie Souhaid
+1-202-473-1000asouhaid@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Treichville
5.2880 -4.0060
Port-Bouet
5.2570 -3.9630
Koumassi
5.2970 -3.9680
Jacqueville
5.2050 -4.4150
Grand-Bassam
5.2120 -3.7390
Dabou
5.3260 -4.3770
Cocody
5.3350 -4.0040
Bonoua
5.2720 -3.5960
Bingerville
5.3560 -3.8850
Azaguie
5.6300 -4.0820
Anyama Adjame
5.4800 -4.0450
Alepe
5.5000 -3.6630
Adjame
5.3510 -4.0250
Abobo
5.4160 -4.0160
Marcory
5.3120 -3.9940
Songon Gare
5.3210 -4.1940
Yopougon
5.3750 -4.0870
Public Administration - Social ProtectionSocial ProtectionUrban TransportSkills DevelopmentClimate changeLabor Market Policy and ProgramsAdaptationSocial ProtectionUrban DevelopmentDisaster Risk ManagementMitigationPublic TransportSocial Safety NetsGenderDisaster Risk Reduction
0.00
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.37
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.63
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.63
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.37
10000000.00
10000000.00
10000000.00
0.00
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.37
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.63
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.63
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.37
10000000.00
10000000.00
10000000.00
300000000Total Commitment in Second Quarter of 2019
International Development Association726400Total Disbursement in First Quarter of 2020
International Development Association-726400Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Schedule 2, Section I.A.1.d: The Recipient shall ensure that, throughout Project implementation, the PCU is maintained with staffin sufficient number, with experience and qualifications satisfactory to the Association, in carrying out its responsibilities,including through recruitment or appointment by the PCU, under terms of reference and with qualifications and experiencesatisfactory to the Association, of a coordinator, a deputy coordinator, a procurement specialist, a financial management officer,an accountant, an assistant accountant, an environmental management specialist and a social management specialist.
Schedule 2, Section I.A.1e: No later than two (2) months after the Effective Date, the PCU shall acquire an accounting software.
Schedule 2, Section I.A.1e: No later than five (5) months after the Effective date, the PCU shall recruit an external auditor.
Schedule 2, Section I.A.2.a: The Recipient shall establish and thereafter maintain, at all times during the implementation of theProject, a project steering committee with a composition, mandate, and resources satisfactory to the Association (“Project SteeringCommittee” or “PSC”).
Schedule 2, Section I.B.2.a: No later than three (3) months after the Effective Date, the Recipient shall prepare under terms ofreference acceptable to the Association, and furnishes to the Recipient and the Association, an implementation manual for theProject containing detailed arrangements and procedures.
Schedule 2, Section I.D.1.a: The Recipient shall not later than November 30 of each year of Project implementation, prepare andfurnish to the Association, an annual work plan and budget (“Annual Work Plan and Budget”), containing all activities proposed tobe included in the Project and a proposed financing plan for expenditures required for such activities for the following calendaryear, including the expenditures to be financed by the Association in accordance with this Agreement, the Co-financing Agreementand by the Recipient under each Part of the Project (for each such expenditures, with the source of funds and its correspondingpercentage of financing), as well as a cashflow and disbursement forecast.
Schedule 2, Section IV.A: No later than July 1st, 2020 , the Co-financing Agreement shall be executed and delivered respectivelyand all conditions precedent to its respective effectiveness or to the right of the Recipient to make withdrawals under it (otherthan the effectiveness of this Agreement) shall have been fulfilled.
Schedule 2, Section IV.B.1: The Recipient shall revise the concession agreement entered into between SOTRA and the Recipient datedNovember 11, 1998 in a manner satisfactory to the Association, no later than six (6) months after the Effective Date or before thelaunch of the call for bids for the selection of a BRT private operator (or such later date acceptable to the Association), inorder to define (i) the financial obligations of the Recipient and (ii) include indicators to measure SOTRA's performance.
Schedule 2, Section IV.B.2: The Recipient shall submit SOTRA’ audited financial statements no later than September 30 of each yearof Project implementation.
Schedule 2, Section IV.B.3: The Recipient shall take all necessary steps to put in place and maintain an overall legal, financialand institutional framework acceptable to the Association for the operational performance and maintenance of the BRT, and to thisend shall, without limitation to the foregoing, unless otherwise agreed with the Association, enter into a contract in a mannersatisfactory to the Association, no later than twelve (12) months after the Effective Date (or such later date acceptable to theAssociation), with a legal entity to serve as the BRT private operator selected through a transparent international competitivebidding process, including the acquisition of an electric bus fleet or any other type of bus fleet as agreed with the Association,for the purposes of Part A.1 of the Project (the “PPP Agreement”).
Schedule 2, Section IV.B.4: The Recipient shall exercise its rights under the PPP Agreement in such manner as to protect theinterests of the Recipient and the Association and to accomplish the purposes of the Financing.
Schedule 2, Section IV.B.5: Except as the Association shall otherwise agree, the Recipient shall not assign, amend, abrogate orwaive the PPP Agreement or any of its provisions.
Schedule 2, Section IV.C.1: The Recipient shall no later than three (3) months after the Effective Date hire (a) one (1) additionalstakeholder engagement specialist and (b) additional consultants in sufficient numbers and with qualifications acceptable to theAssociation to strengthen the capacity of the PTUA to handle sensitization and outreach activities with the PAPs and to facilitatethe implementation of the PTUARAP.
Schedule 2, Section IV.C.1: The Recipient shall no later than six (6) months after the Effective Date, (i) mobilize sufficientfunds in the budget law for the compensation of any additional PAPs identified in the complementary census and (ii) create two (2)additional offices staffed with qualified personnel in charge of the grievance redress mechanism to ensure a presence in all therelevant municipalities impacted by the PTUA.
PDO Indicator
Number of transport service providers trained through formal training programs
PDO Indicator
Number of formal transport sector workers trained through the training programs financed by the project
PDO Indicator
Number of female formal transport sector workers trained through the training programs financed by the project
PDO Indicator
Number of informal transport service providers trained through the training programs financed by the project
PDO Indicator
Number of female informal transport service providers trained through the training programs financed by the project
Intermediate Results Indicator
Number of facilities rehabilitated for the informal sector (stations, stops etc..)
Intermediate Results Indicator
Number of student graduated from the ENPC/INPHB Master
Intermediate Results Indicator
Number of SOTRA facilities rehabilitated
Intermediate Results Indicator
Number of operational BRT buses
Intermediate Results Indicator
Number of urban transport vehicles renewed
Intermediate Results Indicator
Number of informal operators benefitting from the social security coverage
Intermediate Results Indicator
Number of serious injuries and deaths involving a BRT bus
PDO Indicator
Percentage of the population of GAA able to access the Plateau within 60 minutes during rush hour by public transport
PDO Indicator
Satisfaction rating by public transport users of the BRT and its feeder lines
PDO Indicator
Percentage of the poor residents of Greater Abidjan with access to the city center (Place de la Republique) within 60 minutes commuting period using public transport
PDO Indicator
Satisfaction rating among women who use the BRT and its feeder lines
PDO Indicator
Percentage of the population of GAA able to access at least one additional hospital within 30 minutes during rush hour by public transport compared to baseline
PDO Indicator
Satisfaction rating by poor public transport users of the BRT and its feeder lines
PDO Indicator
Percentage of the poor population of GAA able to access at least one additional hospital within 30 minutes during rush hour by public transport compared to baseline
PDO Indicator
Percentage of population of GAA able to access at least one additional secondary school within 30 minutes during rush hour by public transport compared to baseline
PDO Indicator
Percentage of the poor population of GAA able to access at least one additional secondary school within 30 minutes during rush hourby public transport compared to baseline
Intermediate Results Indicator
Percentage of the BRT infrastructure constructed
Intermediate Results Indicator
Percentage of female staff in the BRT operator
Intermediate Results Indicator
A contract agreement with a private company to invest and operate in the BRT operations is signed
Intermediate Results Indicator
Restructuring Plan of the bus network is implemented
Intermediate Results Indicator
ITS and fare collection system is in use for SOTRA
Intermediate Results Indicator
A GRM (Grievance Redress Mechanism) is in use during construction
Intermediate Results Indicator
Annual disclosure by MoT of the audited annual financial statements and the operational results of the BRT
Intermediate Results Indicator
A GRM (Grievance Redress Mechanism) for the BRT operation is in use
Intermediate Results Indicator
A mirror system to monitor the fare collection system is in use at MoT
Intermediate Results Indicator
Road safety assessment carried out on the BRT corridor with focus on pedestrians
Intermediate Results Indicator
A road safety management plan is in place within the BRT operator
Intermediate Results Indicator
Pedestrian and cycle paths rehabilitated
Intermediate Results Indicator
Roads rehabilitated non-rural
44000-P166388
World Bank
CDI Third Fiscal Management, Education, Energy, and Cocoa Reforms DPF
International Development Association
MINISTRY OF ECONOMY AND FINANCE
International Development Association
MINISTRY OF ECONOMY AND FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Andrea Coppola
+1-202-473-1000acoppola@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Yamoussoukro
6.82055 -5.2767401
Central Government (Central Agencies)Secondary EducationAgricultural markets, commercialization and agri-businessPrimary EducationOther Energy and ExtractivesMitigationEducationPublic AdministrationE-Government, incl. e-servicesDomestic Revenue AdministrationEnergyPublic Expenditure ManagementTeachersClimate changeTradePublic Finance ManagementEnergy Policies & ReformTrade PolicyPrivate Sector Delivery of EducationTransparency, Accountability and Good Governance
0.00
0.00
100000000Total Commitment in Fourth Quarter of 2018
International Development Association99066240Total Disbursement in Fourth Quarter of 2018
International Development Association-814691Total Interest Repayment in Third Quarter of 2019
International Development Association-632043Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Appraisal DocumentProject Information DocumentFinancing AgreementContract AwardsProject URLProcurement Notices44000-P112573
World Bank
Urgent Electricity Rehabilitation Project
International Development Association
SOPIE/SOGEPE/CIE, MINISTRY OF MINE AND ENERGY
International Development Association
SOPIE/SOGEPE/CIE, MINISTRY OF MINE AND ENERGYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Sunil W. Mathrani
+1-202-473-1000smathrani@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Zagne
6.2100 -7.4830
Yamoussoukro
6.8210 -5.2770
Sous-prefecture de Tai
5.9170 -7.4170
Departement de Tabou
5.0000 -7.3330
Departement de Bondoukou
8.2500 -3.0000
Departement d' Agnibilekrou
7.1170 -3.3000
Departement d' Abidjan
5.4170 -4.0330
Departement d' Abidjan
5.4170 -4.0330
Soubre
5.7860 -6.6080
Public Administration - Energy and ExtractivesEnergy Transmission and DistributionOther Energy and ExtractivesUrban DevelopmentRural Infrastructure and service deliveryJobsJob CreationRural DevelopmentUrban Infrastructure and Service Delivery
166666.66
166666.67
166666.67
2666666.66
2666666.67
2666666.67
2666666.66
2666666.67
2666666.67
1166666.66
1166666.67
1166666.67
2333333.33
2333333.33
2333333.34
2333333.33
2333333.33
2333333.34
2000000.00
2000000.00
2000000.00
1666666.66
1666666.67
1666666.67
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
166666.66
166666.67
166666.67
2666666.66
2666666.67
2666666.67
2666666.66
2666666.67
2666666.67
1166666.66
1166666.67
1166666.67
2333333.33
2333333.33
2333333.34
2333333.33
2333333.33
2333333.34
2000000.00
2000000.00
2000000.00
1666666.66
1666666.67
1666666.67
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50000000Total Commitment in Second Quarter of 2009
International Development Association214465Total Disbursement in First Quarter of 2010
International Development Association149597Total Disbursement in Second Quarter of 2010
International Development Association220667Total Disbursement in Third Quarter of 2010
International Development Association495918Total Disbursement in Fourth Quarter of 2010
International Development Association113403Total Disbursement in Fourth Quarter of 2010
International Development Association300797Total Disbursement in Fourth Quarter of 2010
International Development Association432589Total Disbursement in Second Quarter of 2011
International Development Association420115Total Disbursement in Third Quarter of 2011
International Development Association337826Total Disbursement in Third Quarter of 2011
International Development Association750411Total Disbursement in Third Quarter of 2011
International Development Association290862Total Disbursement in Fourth Quarter of 2011
International Development Association442596Total Disbursement in Fourth Quarter of 2011
International Development Association148546Total Disbursement in First Quarter of 2012
International Development Association2985036Total Disbursement in First Quarter of 2012
International Development Association2066291Total Disbursement in Second Quarter of 2012
International Development Association456039Total Disbursement in Third Quarter of 2012
International Development Association1143975Total Disbursement in Third Quarter of 2012
International Development Association802430Total Disbursement in Third Quarter of 2012
International Development Association855228Total Disbursement in Fourth Quarter of 2012
International Development Association1733684Total Disbursement in Fourth Quarter of 2012
International Development Association901848Total Disbursement in Fourth Quarter of 2012
International Development Association2385845Total Disbursement in First Quarter of 2013
International Development Association1306237Total Disbursement in First Quarter of 2013
International Development Association725466Total Disbursement in First Quarter of 2013
International Development Association135309Total Disbursement in Second Quarter of 2013
International Development Association94812Total Disbursement in Second Quarter of 2013
International Development Association62844Total Disbursement in Second Quarter of 2013
International Development Association55162Total Disbursement in Third Quarter of 2013
International Development Association2327435Total Disbursement in Third Quarter of 2013
International Development Association616398Total Disbursement in Fourth Quarter of 2013
International Development Association418866Total Disbursement in Fourth Quarter of 2013
International Development Association536371Total Disbursement in Fourth Quarter of 2013
International Development Association980674Total Disbursement in First Quarter of 2014
International Development Association1011032Total Disbursement in First Quarter of 2014
International Development Association1778180Total Disbursement in Second Quarter of 2014
International Development Association888453Total Disbursement in Second Quarter of 2014
International Development Association3383007Total Disbursement in Second Quarter of 2014
International Development Association756772Total Disbursement in Third Quarter of 2014
International Development Association5155743Total Disbursement in Third Quarter of 2014
International Development Association1576106Total Disbursement in Fourth Quarter of 2014
International Development Association1202512Total Disbursement in Fourth Quarter of 2014
International Development Association631071Total Disbursement in Fourth Quarter of 2014
International Development Association726127Total Disbursement in First Quarter of 2015
International Development Association2598150Total Disbursement in First Quarter of 2015
International Development Association2037931Total Disbursement in Second Quarter of 2015
International Development Association570730Total Disbursement in Second Quarter of 2015
International Development Association-3100231Total Commitment Cancellations in Second Quarter of 2015
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
The Recipient shall contribute the equivalent of $1,000,000 to the revolving fund established under Part 3 (a) (iv) of the Project.
The Recipient shall complete the liquidation of EECI and transfer all remaining assets to the Project Implementing Entity.
The Recipient shall transfer to the Project Implementing Entity, all sectoral assets as set out in the sectoral asset register
The Recipient shall have completed implementation of the recommendations of the tariff study carried out under the Project.
reduction in payment arrears for electricity by public sector bodies
GoCI to seek cabinet approval of a revised electricity law
GoCI to eliminate operating subsidies to the sector
PDO Indicator
Direct project beneficiaries
Number of persons benefiting from new household connections
based on 22 403 new subsidized h/hold connections
PDO Indicator
Community electricity connections constructed under the project
PDO Indicator
Community electricity connections constructed –Grid
works are ongoing
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
Number of overloaded MV/LV substations
Intermediate Results Indicator
Number of overloaded MV feeders
Intermediate Results Indicator
Number of overloaded HV/MV tranformers replaced
progress measured only after completion of works and there has been insufficient time since the crisis ended for meaningfulprogress to take place
Intermediate Results Indicator
Number of outgoing circuit breakers in Abidjan Substations replaced
works are ongoing
Intermediate Results Indicator
Voltage drop on the eastern HV line at peak period
voltage drop is under the target
Intermediate Results Indicator
Electricity Law modified & Anare statutes modified
electricity law was promulgated
Intermediate Results Indicator
SOGEPE opening balance sheet accepted
Work completed and reflected in the CI-Energies opening balance sheet
PDO Indicator
Reduction of outages and average outage duration in the project area
the supply of electricity in 2013 was highly disturbed by major incidents on the transmission network which have a TMC generatesgreater than 2012- report CIE 2013
PDO Indicator
Reduction of energy losses in the Abidjan area
target reached
PDO Indicator
Amount of State subsidy to power sector
PDO Indicator
Reduction of arrears in payment of public bodies
44000-P158463
World Bank
CI-DPO on Fiscal Management, Education and Energy Reforms
International Development Association
MINISTRY OF ECONOMY AND FINANCE
International Development Association
MINISTRY OF ECONOMY AND FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Samba Ba
+1-202-473-1000sba3@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Yamoussoukro
6.82055 -5.2767401
Primary EducationOther Energy and ExtractivesCentral Government (Central Agencies)EducationAccess to EducationE-Government, incl. e-servicesDomestic Revenue AdministrationPublic Expenditure ManagementPublic AdministrationTeachersPublic Finance ManagementPublic Private Partnerships
0.00
0.00
75000000Total Commitment in Fourth Quarter of 2016
International Development Association72332575Total Disbursement in Fourth Quarter of 2016
International Development Association-246185Total Interest Repayment in Second Quarter of 2017
International Development Association-469847Total Interest Repayment in Fourth Quarter of 2017
International Development Association-489593Total Interest Repayment in Second Quarter of 2018
International Development Association-460673Total Interest Repayment in Fourth Quarter of 2018
International Development Association-81373Total Interest Repayment in Second Quarter of 2019
International Development Association-364579Total Interest Repayment in Second Quarter of 2019
International Development Association-438023Total Interest Repayment in Fourth Quarter of 2019
International Development AssociationProject Appraisal DocumentProject Information DocumentFinancing AgreementContract AwardsProject URLProcurement Notices44000-P119308
World Bank
Agriculture Sector Support Project
International Development Association
MINISTRY OF AGRICULTURE, MINISTRY OF ANIMAL PRODUCTION
International Development Association
MINISTRY OF AGRICULTURE, MINISTRY OF ANIMAL PRODUCTIONPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Jean-Philippe Tre
+1-202-473-1000jtre@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Nawa
9.6500 -5.0330
ME
5.3760 -3.8270
Sous-prEfecture de Daoukro-OuEllE
7.2500 -3.8670
REgion du Sud-ComoE
5.5000 -3.2500
BouakE
5.3500 -3.9790
Agricultural Extension, Research, and Other Support ActivitiesRural and Inter-Urban RoadsCropsPublic Administration - Agriculture, Fishing & ForestryAgricultural markets, commercialization and agri-businessFinance for DevelopmentAgriculture FinanceLand Administration and ManagementJobsRenewable Natural Resources Asset ManagementBiodiversityLandscape ManagementRural Infrastructure and service deliveryRural DevelopmentTradeRural MarketsTrade Facilitation
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23820000Total Commitment in Third Quarter of 2013
International Development Association26180000Total Commitment in Third Quarter of 2013
International Development Association335456Total Disbursement in Second Quarter of 2014
International Development Association-858Total Interest Repayment in Third Quarter of 2014
International Development Association2459395Total Disbursement in Fourth Quarter of 2014
International Development Association2286457Total Disbursement in Fourth Quarter of 2014
International Development Association1240581Total Disbursement in Fourth Quarter of 2014
International Development Association2790636Total Disbursement in Fourth Quarter of 2014
International Development Association510224Total Disbursement in First Quarter of 2015
International Development Association70754Total Disbursement in First Quarter of 2015
International Development Association-11433Total Interest Repayment in First Quarter of 2015
International Development Association17495Total Disbursement in Second Quarter of 2015
International Development Association-688861Total Disbursement in Second Quarter of 2015
International Development Association3035791Total Disbursement in Second Quarter of 2015
International Development Association102048Total Disbursement in Third Quarter of 2015
International Development Association2590101Total Disbursement in Third Quarter of 2015
International Development Association141156Total Disbursement in Third Quarter of 2015
International Development Association647612Total Disbursement in Third Quarter of 2015
International Development Association-20463Total Interest Repayment in Third Quarter of 2015
International Development Association524980Total Disbursement in Fourth Quarter of 2015
International Development Association349879Total Disbursement in Fourth Quarter of 2015
International Development Association578533Total Disbursement in Fourth Quarter of 2015
International Development Association964317Total Disbursement in First Quarter of 2016
International Development Association700649Total Disbursement in First Quarter of 2016
International Development Association486797Total Disbursement in First Quarter of 2016
International Development Association536239Total Disbursement in First Quarter of 2016
International Development Association-22754Total Interest Repayment in First Quarter of 2016
International Development Association639814Total Disbursement in Second Quarter of 2016
International Development Association2572227Total Disbursement in Second Quarter of 2016
International Development Association1714047Total Disbursement in Second Quarter of 2016
International Development Association1125178Total Disbursement in Third Quarter of 2016
International Development Association1715765Total Disbursement in Third Quarter of 2016
International Development Association262522Total Disbursement in Third Quarter of 2016
International Development Association1552218Total Disbursement in Third Quarter of 2016
International Development Association-35606Total Interest Repayment in Third Quarter of 2016
International Development Association969733Total Disbursement in Fourth Quarter of 2016
International Development Association623218Total Disbursement in Fourth Quarter of 2016
International Development Association1672015Total Disbursement in Fourth Quarter of 2016
International Development Association1087906Total Disbursement in Fourth Quarter of 2016
International Development Association546540Total Disbursement in First Quarter of 2017
International Development Association452498Total Disbursement in First Quarter of 2017
International Development Association177343Total Disbursement in First Quarter of 2017
International Development Association-48043Total Interest Repayment in First Quarter of 2017
International Development Association455287Total Disbursement in Second Quarter of 2017
International Development Association481759Total Disbursement in Second Quarter of 2017
International Development Association1712967Total Disbursement in Second Quarter of 2017
International Development Association442510Total Disbursement in Second Quarter of 2017
International Development Association213438Total Disbursement in Third Quarter of 2017
International Development Association339281Total Disbursement in Third Quarter of 2017
International Development Association405957Total Disbursement in Third Quarter of 2017
International Development Association-62674Total Interest Repayment in Third Quarter of 2017
International Development Association611600Total Disbursement in Fourth Quarter of 2017
International Development Association651649Total Disbursement in Fourth Quarter of 2017
International Development Association146777Total Disbursement in Fourth Quarter of 2017
International Development Association761486Total Disbursement in Fourth Quarter of 2017
International Development Association2264307Total Disbursement in First Quarter of 2018
International Development Association70419Total Disbursement in First Quarter of 2018
International Development Association-73442Total Interest Repayment in First Quarter of 2018
International Development Association363868Total Disbursement in Second Quarter of 2018
International Development Association234650Total Disbursement in Second Quarter of 2018
International Development Association1179444Total Disbursement in Second Quarter of 2018
International Development Association184995Total Disbursement in Second Quarter of 2018
International Development Association336792Total Disbursement in Second Quarter of 2018
International Development Association359754Total Disbursement in Third Quarter of 2018
International Development Association1091915Total Disbursement in Third Quarter of 2018
International Development Association-84573Total Interest Repayment in Third Quarter of 2018
International Development Association52847Total Disbursement in Fourth Quarter of 2018
International Development Association-6470Total Disbursement in First Quarter of 2019
International Development Association-23177Total Commitment Cancellations in First Quarter of 2019
International Development Association-2203Total Disbursement in First Quarter of 2019
International Development Association-2203Total Commitment Cancellations in First Quarter of 2019
International Development Association-82374Total Interest Repayment in First Quarter of 2019
International Development Association-81325Total Interest Repayment in Third Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Project Accounting Software | Description :No later than two months following effectiveness, the Recipient shallhave purchased and install a multi-site Project accounting software for the PCU and the Implementing agencies | Due Date:18-Jul-2014
Finance Agreement :Project Administrative, Accounting and Financial Manual of Procedures | Description :No Later than two monthsfollowing effectiveness the Recipient shall have adopted an administrative, accounting and financial procedures manual satisfactoryto the Association | Due Date :18-Jul-2014
PDO Indicator
Total amount in MCFAF of funding from inter-professions investments funds established or strengthened with project support
PDO Indicator
Direct project beneficiaries
Intermediate Results Indicator
Number of cocoa farmers trained in good agricultural practices (GAP)
Intermediate Results Indicator
Number of rubber and palm oil producers having benefited from a technology supported by the project
Intermediate Results Indicator
Number of cotton producers having adopted a technology supported by the project
Intermediate Results Indicator
Farmers who have partially or completedly replanted with improved plant material (Cocoa)
Intermediate Results Indicator
Number of rubber and oil palm cooperatives benefiting from project support in capacity building
Intermediate Results Indicator
Oil palm inter-professional association in compliance with ordinance No 473-2011
Intermediate Results Indicator
Cotton inter-professional association in compliance with ordinance No 473-2011
Intermediate Results Indicator
Cashew inter-professional associations in compliance with ordinance No 473-2011
Intermediate Results Indicator
Number of socio-economic subprojects co-financed with cocoa farmer cooperatives
Intermediate Results Indicator
Number of value chains in accordance with Ordinance N0. 473-2011 on interprofessional associations
Intermediate Results Indicator
Animal traction kits provided to cotton producers under the project
Intermediate Results Indicator
Number of cotton cooperatives benefiting of capacity building from the project
Intermediate Results Indicator
Rubber inter-professional association in compliance with ordinance No 473-2011
Intermediate Results Indicator
Number of value chains in compliance with ordinance No.473-2011 on inter-professional associations
PDO Indicator
Female beneficiaries
PDO Indicator
Share of processed cashew in total export of cashew nuts
PDO Indicator
Rural roads maintained or rehabilitated under the project
PDO Indicator
Areas of village plantations planted with improved planting material
PDO Indicator
hectares under cocoa planted with improved material
PDO Indicator
hectares under rubber planted with improved material
PDO Indicator
hectares under oil palm planted with improved material
Intermediate Results Indicator
Areas of cocoa farms renewed with improved planting material
Intermediate Results Indicator
Total cotton production
44000-P122546
World Bank
COTE D'IVOIRE - Emergency Youth Employment and Skills Development Project
International Development Association
MINISTRY OF STATE, OF EMPLOYMENT,SOCIAL AFFAIRS & SOLIDARITY
International Development Association
MINISTRY OF STATE, OF EMPLOYMENT,SOCIAL AFFAIRS & SOLIDARITYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Waly Wane
+1-202-473-1000wwane@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Korhogo
9.4580 -5.6300
DEpartement de BouakE
7.8330 -4.9170
Abidjan
5.3100 -4.0130
Adult, Basic and Continuing EducationPublic Administration - EducationWorkforce Development and Vocational EducationSocial ProtectionScience and TechnologyMSME DevelopmentActive Labor Market ProgramsSocial ProtectionAccess to EducationFinancial Infrastructure and AccessEducationMSME FinanceLabor Market InstitutionsSocial Safety NetsJobsLabor Market Policy and ProgramsTeachersStandards, Curriculum and TextbooksEnterprise Development
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.63
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.63
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
670445.37
670445.37
670445.37
0.00
0.00
0.00
332002.38
332002.38
332002.37
773265.31
773265.31
773265.30
1972986.88
1972986.88
1972986.88
477610.39
477610.39
477610.38
1050220.76
1050220.76
1050220.75
1576485.10
1576485.10
1576485.11
730195.14
730195.14
730195.13
2275726.99
2275726.99
2275726.98
672147.85
672147.85
672147.85
212320.56
212320.56
212320.57
798290.63
798290.63
798290.62
395103.67
395103.67
395103.66
363700.15
363700.15
363700.16
815440.40
815440.40
815440.40
86778.04
86778.04
86778.03
233776.19
233776.19
233776.19
74810.90
74810.90
74810.91
781466.09
781466.09
781466.08
567876.22
567876.22
567876.21
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
1989351.00
1989351.00
1989351.01
1900000.00
1900000.00
1900000.00
1833333.33
1833333.33
1833333.34
1833333.33
1833333.33
1833333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50000000Total Commitment in Third Quarter of 2011
International Development Association2011336Total Disbursement in First Quarter of 2012
International Development Association387994Total Disbursement in Third Quarter of 2012
International Development Association608013Total Disbursement in Third Quarter of 2012
International Development Association500351Total Disbursement in Fourth Quarter of 2012
International Development Association1157057Total Disbursement in Fourth Quarter of 2012
International Development Association662388Total Disbursement in Fourth Quarter of 2012
International Development Association5668271Total Disbursement in First Quarter of 2013
International Development Association250690Total Disbursement in First Quarter of 2013
International Development Association714838Total Disbursement in Second Quarter of 2013
International Development Association438814Total Disbursement in Second Quarter of 2013
International Development Association279179Total Disbursement in Second Quarter of 2013
International Development Association310497Total Disbursement in Third Quarter of 2013
International Development Association2840165Total Disbursement in Third Quarter of 2013
International Development Association1678261Total Disbursement in Fourth Quarter of 2013
International Development Association862058Total Disbursement in Fourth Quarter of 2013
International Development Association2189136Total Disbursement in Fourth Quarter of 2013
International Development Association1907851Total Disbursement in First Quarter of 2014
International Development Association282734Total Disbursement in First Quarter of 2014
International Development Association3546264Total Disbursement in Second Quarter of 2014
International Development Association3280917Total Disbursement in Second Quarter of 2014
International Development Association822767Total Disbursement in Third Quarter of 2014
International Development Association1193677Total Disbursement in Third Quarter of 2014
International Development Association636962Total Disbursement in Fourth Quarter of 2014
International Development Association1128611Total Disbursement in First Quarter of 2015
International Development Association1266261Total Disbursement in First Quarter of 2015
International Development Association50000000Total Commitment in First Quarter of 2015
International Development Association644599Total Disbursement in Second Quarter of 2015
International Development Association540712Total Disbursement in Second Quarter of 2015
International Development Association457410Total Disbursement in Third Quarter of 2015
International Development Association633690Total Disbursement in Third Quarter of 2015
International Development Association580952Total Disbursement in Fourth Quarter of 2015
International Development Association1865369Total Disbursement in Fourth Quarter of 2015
International Development Association260334Total Disbursement in First Quarter of 2016
International Development Association200375Total Disbursement in Second Quarter of 2016
International Development Association500953Total Disbursement in Second Quarter of 2016
International Development Association-6484Total Interest Repayment in Second Quarter of 2016
International Development Association42533Total Disbursement in Third Quarter of 2016
International Development Association128285Total Disbursement in Third Quarter of 2016
International Development Association53614Total Disbursement in Third Quarter of 2016
International Development Association917979Total Disbursement in Fourth Quarter of 2016
International Development Association690808Total Disbursement in Fourth Quarter of 2016
International Development Association185657Total Disbursement in Fourth Quarter of 2016
International Development Association310887Total Disbursement in Fourth Quarter of 2016
International Development Association-8590Total Interest Repayment in Fourth Quarter of 2016
International Development Association239067Total Disbursement in Fourth Quarter of 2016
International Development Association747396Total Disbursement in First Quarter of 2017
International Development Association956232Total Disbursement in First Quarter of 2017
International Development Association577981Total Disbursement in First Quarter of 2017
International Development Association941026Total Disbursement in Second Quarter of 2017
International Development Association256517Total Disbursement in Second Quarter of 2017
International Development Association611201Total Disbursement in Second Quarter of 2017
International Development Association400665Total Disbursement in Second Quarter of 2017
International Development Association599026Total Disbursement in Second Quarter of 2017
International Development Association-13270Total Interest Repayment in Second Quarter of 2017
International Development Association14810505Total Disbursement in Second Quarter of 2017
International Development Association1013512Total Disbursement in Third Quarter of 2017
International Development Association1074944Total Disbursement in Third Quarter of 2017
International Development Association1653305Total Disbursement in Fourth Quarter of 2017
International Development Association524531Total Disbursement in Fourth Quarter of 2017
International Development Association-197725Total Disbursement in Fourth Quarter of 2017
International Development Association4235303Total Disbursement in Fourth Quarter of 2017
International Development Association1428258Total Disbursement in Fourth Quarter of 2017
International Development Association-67605Total Interest Repayment in Fourth Quarter of 2017
International Development Association606745Total Disbursement in Fourth Quarter of 2017
International Development Association845757Total Disbursement in First Quarter of 2018
International Development Association1895614Total Disbursement in First Quarter of 2018
International Development Association62423Total Disbursement in First Quarter of 2018
International Development Association-204064Total Commitment Cancellations in Second Quarter of 2018
International Development Association620453Total Disbursement in Second Quarter of 2018
International Development Association2236928Total Disbursement in Second Quarter of 2018
International Development Association-108230Total Interest Repayment in Second Quarter of 2018
International Development Association1256319Total Disbursement in Third Quarter of 2018
International Development Association437591Total Disbursement in Third Quarter of 2018
International Development Association437832Total Disbursement in Fourth Quarter of 2018
International Development Association-124342Total Interest Repayment in Fourth Quarter of 2018
International Development Association1844763Total Disbursement in First Quarter of 2019
International Development Association1423677Total Disbursement in Second Quarter of 2019
International Development Association1088808Total Disbursement in Second Quarter of 2019
International Development Association-133142Total Interest Repayment in Second Quarter of 2019
International Development Association1565739Total Disbursement in Second Quarter of 2019
International Development Association1895013Total Disbursement in Fourth Quarter of 2019
International Development Association697581Total Disbursement in Fourth Quarter of 2019
International Development Association-149290Total Interest Repayment in Fourth Quarter of 2019
International Development Association1007707Total Disbursement in Fourth Quarter of 2019
International Development Association866166Total Disbursement in First Quarter of 2020
International Development AssociationProject Information DocumentImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2, Section I, C, 1 | Description :Prepare, submit for IDA's review and adopt a Financial andAdministrative Procedure Manual | Due Date :01-Feb-2012
Finance Agreement :Schedule 2, Section I, C, 2 | Description :Prepare, submit for IDA's review and adopt a Project ImplementationManual | Due Date :01-Apr-2012
Finance Agreement :Schedule 2, Section I, A, 2 | Description :Recurit an internal auditor | Due Date :01-Apr-2012
Finance Agreement :Schedule 2, Section II, B, 4 | Description :Procure and install accounting software | Due Date :01-Feb-2012
Finance Agreement :Schedule 2, Section 1, D, 1 | Description :Prepare, submit for review, disclose and adopt the ESMF and RPF | DueDate :01-Aug-2012
Finance Agreement :Schedule 2, Section I, A, 2 (c) | Description :A M&E Specialist and additional administrative support as neededto assume their duties in the PIU | Due Date :01-Aug-2012
Finance Agreement :Schedule 2, Section I, A, 3 (a) | Description :Engage a Delegated Contract Manager prior to commencement ofactivities under Part A of the project | Due Date :15-Jul-2012
Finance Agreement :Schedule 2, Section I, A, 4 (a) | Description :Engage a Service Provider prior to the commencement of anyactivities under each Parts B (i) through B (v) of the project | Due Date :15-Jul-2012
Finance Agreement :Schedule 2, Section I, E, 1 | Description :Prepare and furnish for IDA's review and approval an annual work planof activities proposed for inclusion in the project during the following calendar year no later than Sept. 30 each year. |Frequency :Yearly
Finance Agreement :Schedule 2, Section II, A | Description :Prepare and furnish to IDA project reports covering a 1 calendarsemester period no later than 45 days after the end of such period. | Frequency :Quarterly
Finance Agreement :Schedule 2, Section I, D, 1 | Description :Update the current financial management manual to reflect theadditional financing not later than 2 months after the Effective Date. | Due Date :15-Aug-2015
Finance Agreement :Schedule 2, Section II, B, 4 | Description :No later than 3 months after effective date recruit one additionalaccountant. | Due Date :15-Sep-2015
Finance Agreement :Schedule 2, Section II, B, 4 | Description :No later than 4 months after effective date engage an externalauditor. | Due Date :15-Oct-2015
Finance Agreement :Schedule 2, Section I, B, 1, a; Schedule 2, Section I, B, 1, b | Description :Employment of delegate contractmanagers and service providers for each sector covered by the public works program and for each skills development activity underpart B of the project, prior to commencement of the program in the sector or activity concerned.
Finance Agreement :Schedule 2, Section I, F, 1 | Description :Preparation and furnishing to the association of an annual work planof activities proposed for inclusion in the project the following calendar year (including budget, and all safeguard instrumentsforsuch activities) and a timetable for their implementation not later than September 30 of each year. | Frequency :Yearly
Finance Agreement :Schedule 2, Section II, B, 4 | Description :Reconfigure the existing accounting software to reflect theadditional financing not later than 2 months after the effective date. | Due Date :15-Aug-2015
Finance Agreement :Schedule 2, Section 1, E 5 | Description :If the Project develops into any geographical areas not covered by theexisting ESMF and/or RPF, the ESMF and/or RPF as the case may be, shall be updated not later than six motnhs after the Effectivedate and prior to commencement of LIPW.
Finance Agreement :Schedule 2, Section 2, A | Description :Six month progress report shall be prepared not later than 45 days afterthe period. | Frequency :SemiAnnual
Finance Agreement :Schedule 2, Section I, D, 2 | Description :Update Project Implementation Manual (PIM) not later than 3 monthsafter the effecitve date. | Due Date :15-Sep-2015
Finance Agreement :Schedule 2, Section I, E, 4 | Description :Adoption of ESMPs and RAPs prior to commencing activity.
Finance Agreement :Schedule 2, Section II, B, 2 | Description :Prepare and furnish not later than f45 days after the end of eachcalendar quarter, interim unaudited financial reports for the Project covering the quarter. | Frequency :Quarterly
Finance Agreement :Schedule 2, Section II, B, 3 | Description :Recipient shall have financial statements audited annually not laterthan 6 months after the period. | Frequency :Yearly
PDO Indicator
Direct project beneficiaries
PDO Indicator
Labor Intensive Public Work (LIPW)
PDO Indicator
Skills Development
PDO Indicator
Number of additional person days provided in LIPW (disaggregated by gender, district and type of sub-project)
Intermediate Results Indicator
Number of youth enrolled in apprenticeship/dual training program
Intermediate Results Indicator
Number of tracer survey
Intermediate Results Indicator
Number of staff trained in impact evaluation (IE) methods.
Intermediate Results Indicator
Number of public private joint management agreements signed in the centers supported by the project
Intermediate Results Indicator
Number of impact evaluation (IE) completed
Intermediate Results Indicator
Total number of internship/retooling weeks provided
Intermediate Results Indicator
Number of AGRs or micro projects supported by the project
Intermediate Results Indicator
Number of youth who receive entrepreneurship training program
PDO Indicator
Female beneficiaries
PDO Indicator
Completion rate of youth participating in apprenticeship and internship programs
PDO Indicator
Female beneficiaries
PDO Indicator
Percentage of youth who are employed or self employed within six months of completion (internship/retooling)
PDO Indicator
Female Beneficiaries
Intermediate Results Indicator
Percentage of LIPW participants' wages paid in a timely manner per 6 months cycle
Intermediate Results Indicator
Percentage of total costs going to wage bills (all sub-components)
Intermediate Results Indicator
Percentage of Youth who have completed apprenticeship/Dual training program
Intermediate Results Indicator
Percentage of youth who are employed or self employed within 6 months of completion (apprenticeship/dual training program)
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
Youth who have completed Internship/Retooling program
Intermediate Results Indicator
Roads rehabilitated/maintained (kilometers)
44000-P156900
World Bank
Transport Sector Modernization and Corridor Trade Facilitation Project
International Development Association
MINISTRY OF TRANSPORTS
International Development Association
MINISTRY OF TRANSPORTSPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Anne Cecile Sophie Souhaid
+1-202-473-1000asouhaid@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Yamoussoukro
6.8210 -5.2770
Ouassadougou
7.7050 -4.2320
Republic of Cote d'Ivoire
8.0000 -5.5000
Bouake
5.3500 -3.9790
Abidjan
5.3630 -3.9990
Other TransportationPublic Administration - TransportationTradeICT ServicesRural and Inter-Urban RoadsICT SolutionsRoad SafetyTrade FacilitationClimate changeTrade LogisticsTradeICTMitigation
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
30000000Total Commitment in Third Quarter of 2016
International Development Association2258075Total Disbursement in First Quarter of 2017
International Development Association-6282Total Interest Repayment in Second Quarter of 2017
International Development Association32251Total Disbursement in Third Quarter of 2017
International Development Association-17699Total Interest Repayment in Fourth Quarter of 2017
International Development Association16248Total Disbursement in Fourth Quarter of 2017
International Development Association604359Total Disbursement in First Quarter of 2018
International Development Association322569Total Disbursement in Second Quarter of 2018
International Development Association-20243Total Interest Repayment in Second Quarter of 2018
International Development Association360646Total Disbursement in Second Quarter of 2018
International Development Association185397Total Disbursement in Third Quarter of 2018
International Development Association319505Total Disbursement in Third Quarter of 2018
International Development Association149712Total Disbursement in Third Quarter of 2018
International Development Association516773Total Disbursement in Fourth Quarter of 2018
International Development Association-27108Total Interest Repayment in Fourth Quarter of 2018
International Development Association171901Total Disbursement in First Quarter of 2019
International Development Association312011Total Disbursement in Second Quarter of 2019
International Development Association-34113Total Interest Repayment in Second Quarter of 2019
International Development Association150683Total Disbursement in Second Quarter of 2019
International Development Association515509Total Disbursement in Third Quarter of 2019
International Development Association-39183Total Interest Repayment in Fourth Quarter of 2019
International Development Association785302Total Disbursement in Fourth Quarter of 2019
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2, Section I.A.1(a) Project Steering Committee (PSC) | Description :The Recipient shall establish andmaintain, throughout Project implementation, a PSC with Terms of Reference, composition and resources satisfactory to theassociation. | Due Date :
Finance Agreement :Schedule 2, Section I.A.2(a) Project Technical Committee (PTC) | Description :The Recipient shall establish andmaintain, throughout Project implementation, a PTC with TOR, composition and resources, satisfactory to the Association. | Due Date:
Finance Agreement :Project Coordination Unit (PCU). | Description :Schedule 2, Section I.A.3(a) The Recipient shall maintain,throughout Project implementation, within the Ministry of Economic Infrastructure, a PCU with TOR, composition and resources,satisfactory to the Association. | Due Date :
Finance Agreement :Schedule 2, Section V.A(1) PCU staffing | Description :The Recipient shall have recruited for the PCU a Projectcoordinator, a deputy Project coordinator, and accountant and a procurement specialist or assistant for the Project, with TOR,qualifications and experience satisfactory to the Association. | Due Date :
Finance Agreement :Schedule 2, Section I.D (a) Project Implementation Manual (PIM) availability. | Description :The Recipient shallensure that the Project is carried out in accordance with the provisions of the PIM and shall not amend or waive any provision ofsaid manual unless the Association otherwise agree in writing. | Due Date :
Finance Agreement :Schedule 2, Section V.A.2 PIM changes | Description :The recipient shall have updated the PIM to includespecific arrangements related to Schedule 1, Part 2, satisfactory to the Association. | Due Date :
Finance Agreement :Schedule 2, Section V.A.3 Recruitment of external auditor | Description :The Recipient shall have recruited anexternal auditor for the Project, for the purpose of completing the audit referred to in Section II, Paragraph B (3) of thisSchedule. | Due Date :
Finance Agreement :Schedule 2, Section V.C Counterpart funding | Description :The Recipient has agreed to contribute an amountequivalent to EUR 13.2 million to support activities under Part 2(a) or Part 2 of Schedule 1. These counterpart funds shall beincluded in the annual work plan and budgets for the Project and shall be made available to the Project in installments of: (a)EUR3.0 million equivalent in calendar 2017; (b) EUR 5.2 million equivalent in calendar 2018; and (c) EUR5.0 million equivalent incalendar 2019. | Due Date :
Finance Agreement :Schedule 2, Section I.D.2 Preparation and implementation of ESIA/ESMP | Description :Prior to the commencementof the truck scrapping activity under Part 2 of the Schedule 1, the Recipient shall: (a) prepare and furnish to the Association andESIA and ESMP for its review; (b) adopt and publicly disclose the ESIA and ESMP approved by the Association. During thetruck-scrapping activity, the Recipient shall: (a) implement all measures required pursuant to the ESIA and ESMP; and (b) ensurethat the implementation of such truck-scrapping activity is in accordance with the provisions of the ESIA and ESMP. | Due Date :
Finance Agreement :Schedule 2, Section V.B Mid-Term Review | Description :The Recipient and the Association shall carry out amid-term review (MTR) of the Project, covering the progress achieved in the implementation of the Project. The MTR will take placeno later than eighteen (18) months after the expected Effective Date or any other date agreed upon with the Association. TheRecipient shall prepare, under terms of reference satisfactory to the Association, and furnish to the Association three months (ordate agreed upon with the Association in writing) prior to the beginning of such mid-term review of the Project, a reportintegrating the results of the monitoring and evaluation activities performed pursuant to this Agreement, on the progress achievedin the carrying out of the Project. | Due Date :
PDO Indicator
Average cost of transporting a 40 foot container by road from Abidjan to Ouagadougou (US$)
PDO Indicator
Number of Casualties on the Ivorian portion of the Corridor(Number)
PDO Indicator
Direct project beneficiaries
Intermediate Results Indicator
Number of new long haul trucks put in service
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
Percentage of overloaded trucks on Corridor
PDO Indicator
Average transit time & variability after exiting the Port of Abidjan to the Border with BF (Hours)
Intermediate Results Indicator
Customs clearance time at destination (Abidjan)) (Hours)
Intermediate Results Indicator
Border Crossing at Ouengoloko ( CI/BF)
Intermediate Results Indicator
Enforcement of Authorized Economic Operators
Intermediate Results Indicator
Electronic transmission of transit document collected by Ivorian customs is provided in real-time to BF Customs(Yes/No)
PDO Indicator
CO2 emissions reduction per annum from scrapping 300 trucks and replacing them with an equivalent number of new trucks (t/C02)
44000-P157206
World Bank
Cote d'Ivoire Land Policy Improvement and Implementation Project
International Development Association
MINISTRY OF AGRICULTURE - DIRECTION DU FONCIER RURAL
International Development Association
MINISTRY OF AGRICULTURE - DIRECTION DU FONCIER RURALPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Andre Teyssier
+1-202-473-1000ateyssier@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Ouaninou
8.2380 -7.8660
Touba
8.2830 -7.6830
Sikensi
5.6680 -4.5740
Dimbokro
6.6470 -4.7050
Bocanda
7.0630 -4.4990
Agnibilekrou
7.1310 -3.2040
Adiake
5.2860 -3.3040
Aboisso
5.4680 -3.2070
Abengourou
6.7300 -3.4960
Tiapoum
5.1360 -3.0230
Bafing
8.5000 -7.5000
Indenie-Djuablin
6.7440 -3.4940
Sud-Comoe
5.5000 -3.2410
N'Zi
6.8280 -4.5810
Agneby-Tiassa
5.7950 -4.3720
Other Agriculture, Fishing and ForestryPublic Administration - Agriculture, Fishing & ForestryRural DevelopmentGeospatial ServicesLand Administration and ManagementMitigationICTLand Policy and TenureICT SolutionsGenderClimate change
0.00
0.00
196200.00
161500.00
286500.00
217050.00
368650.00
435750.00
311200.00
482400.00
335250.00
512000.00
334600.00
495700.00
344500.00
561600.00
390350.00
627450.00
454600.00
720500.00
520200.00
842850.00
881300.00
632750.00
1025850.00
718700.00
1166850.00
848100.00
1362900.00
971250.00
1557700.00
1109150.00
1744400.00
1827950.00
1277650.00
1317150.00
2055250.00
2170300.00
1483150.00
2257600.00
1533900.00
2351300.00
1594000.00
2447200.00
1665150.00
2544650.00
2602300.00
2254650.00
0.00
0.00
196200.00
161500.00
286500.00
217050.00
368650.00
435750.00
311200.00
482400.00
335250.00
512000.00
334600.00
495700.00
344500.00
561600.00
390350.00
627450.00
454600.00
720500.00
520200.00
842850.00
881300.00
632750.00
1025850.00
718700.00
1166850.00
848100.00
1362900.00
971250.00
1557700.00
1109150.00
1744400.00
1827950.00
1277650.00
1317150.00
2055250.00
2170300.00
1483150.00
2257600.00
1533900.00
2351300.00
1594000.00
2447200.00
1665150.00
2544650.00
2602300.00
2254650.00
50000000Total Commitment in First Quarter of 2018
International Development Association1078144Total Disbursement in Third Quarter of 2018
International Development Association-5496Total Interest Repayment in Fourth Quarter of 2018
International Development Association2279705Total Disbursement in First Quarter of 2019
International Development Association1768796Total Disbursement in Second Quarter of 2019
International Development Association-18185Total Interest Repayment in Second Quarter of 2019
International Development Association158263Total Disbursement in Third Quarter of 2019
International Development Association164252Total Disbursement in Fourth Quarter of 2019
International Development Association65546Total Disbursement in Fourth Quarter of 2019
International Development Association257499Total Disbursement in Fourth Quarter of 2019
International Development Association-34681Total Interest Repayment in Fourth Quarter of 2019
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
The Recipient shall have ensured the establishment of a procurement complaint handling mechanism acceptable to the Association nolater than three (3) months after the Effective Date.
The Recipient shall have ensured the recruitment: of a senior accountant, an audit and internal control manager, a procurementspecialist and a social and environmental specialist no later than three (3) months after the Effective Date.
The Recipient shall have ensured the appointment of an external auditor no later than five (5) months after the Effective Date.
The Recipient shall, not later than November 30 of each year of Project implementation, prepare and furnish to the Association anannual work plan and budget containing all activities proposed to be included in the Project and a proposed financing plan forexpenditures required for such activities, setting forth the proposed amounts and sources of financing. The Recipient shall affordthe Association a reasonable opportunity to exchange views with the Recipient on such proposed Annual Work Plan and Budget andthereafter ensure that the Project is implemented in accordance with such Annual Work Plan and Budget as shall have been approvedby the Association.
The Recipient shall have ensured the configuration of an accounting software no later than five (5) months after the Effective Date.
The Recipient shall have ensured the execution of a contract with the IGF to manage the internal audit function of the Project nolater than five (5) months after the Effective Date.
AFOR shall prepare and furnish to the Recipient and the Association no later than six (6) months after the Effective Date a FieldOperations Manual with the requirements described in Section I.D of Schedule 2 of the Financing Agreement.
AFOR shall prepare and furnish to the Recipient and the Association no later than one (1) year after the Effective Date a SocialAssessment with the requirements described in Section I.G of Schedule 2 of the Financing Agreement.
PDO Indicator
Number of Village Land Tenure Committees (ComitEs Villageois de Gestion FonciEre Rurale – CVGFR) established or reestablished by the project
PDO Indicator
Target population with use or ownership rights recorded as a result of the project
PDO Indicator
Land parcels with use or ownership rights recorded as a result of the project
Intermediate Results Indicator
Number of land contracts recorded in the Land Information System (SIF)
Intermediate Results Indicator
Number of master classes offered for land sector professionals supported by the project
Intermediate Results Indicator
Number of policy workshops on rural land tenure supported by the project
PDO Indicator
Land sector professionals trained by the project
PDO Indicator
Proportion of females among target population with use or ownership rights recorded as a result of the project
PDO Indicator
Proportion of land parcels with use or ownership rights recorded in the name of one or more females as a result of the project
Intermediate Results Indicator
AFOR staff recruited according to a strategic staffing plan
Intermediate Results Indicator
Proportion of field surveys completed by the project using Continuously Operating Reference Stations (CORS) installed by the project
Intermediate Results Indicator
Proportion of local land institutions supported by the project with physical land registry books
Intermediate Results Indicator
Proportion of land certificates that are recorded in the digital Land Information System (SystEme Information FonciEre – SIF)
PDO Indicator
Share of population in targeted villages with rating ‘Satisfied’ or above
PDO Indicator
Share of female population in targeted villages with rating 'Satisfied' or above
PDO Indicator
Proportion of females among land sector professionals trained by the project
44000-P155259
World Bank
CI -DPO-Poverty Reduct. Support Credit 3
International Development Association
MINISTRY OF ECONOMY AND FINANCE
International Development Association
MINISTRY OF ECONOMY AND FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Samba Ba
+1-202-473-1000sba3@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Yamoussoukro
6.82055 -5.2767401
Other Energy and ExtractivesCentral Government (Central Agencies)Other Industry, Trade and ServicesOther Agriculture, Fishing and ForestryCropsPublic AdministrationPublic Finance ManagementRegulation and Competition PolicyBusiness Enabling EnvironmentAgriculture FinanceFinance for DevelopmentPublic Expenditure ManagementRural MarketsJobsRural DevelopmentTransparency, Accountability and Good Governance
0.00
0.00
100000000Total Commitment in Third Quarter of 2015
International Development Association97998025Total Disbursement in Fourth Quarter of 2015
International Development Association-282660Total Interest Repayment in First Quarter of 2016
International Development Association-643748Total Interest Repayment in Third Quarter of 2016
International Development Association-608188Total Interest Repayment in First Quarter of 2017
International Development Association-687794Total Interest Repayment in Third Quarter of 2017
International Development Association-703381Total Interest Repayment in First Quarter of 2018
International Development Association-673332Total Interest Repayment in Third Quarter of 2018
International Development Association-657284Total Interest Repayment in First Quarter of 2019
International Development Association-637369Total Interest Repayment in Third Quarter of 2019
International Development AssociationProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Deficit of the electricity sector
Intermediate Results Indicator
Prosecuted cases involving corruption
Intermediate Results Indicator
Number of procurement audits
Intermediate Results Indicator
Number of days required to start a business
Intermediate Results Indicator
Number of days to receive a constrution permit
Intermediate Results Indicator
Number of PPP Investment projects
Intermediate Results Indicator
Percentage of agencies with procurement unit
Intermediate Results Indicator
Share of resource allocation transfered to local governments
Intermediate Results Indicator
Farm gate price as a percentage of the average forward price
Intermediate Results Indicator
Cost of property registration as a percentage of the value of property
Intermediate Results Indicator
Proportion of cashew production processed
Intermediate Results Indicator
% accredited cooperatives conforming with the Cooperatives Law
Intermediate Results Indicator
% of Interprofessions complying with applicable regulations on "Societe cooperative"
Intermediate Results Indicator
% of restructured cooperatives in cashew and cotton sectors complying with OHADA regulation
Intermediate Results Indicator
Country's rank in Transparency International's annual report
Intermediate Results Indicator
Time to settle commercial disputes
Intermediate Results Indicator
Rice production
44000-P159697
World Bank
GREATER ABIDJAN PORT - CITY INTEGRATION PROJECT
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Anne Cecile Sophie Souhaid
+1-202-473-1000asouhaid@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Treichville
5.2880 -4.0060
Songon-Agban
5.3080 -4.2310
Port-Bouet
5.2570 -3.9630
Niangon-Lokoa
5.3100 -4.1040
Koumassi
5.2970 -3.9680
Cocody
5.3350 -4.0040
Bingerville
5.3560 -3.8850
Anyama
5.4330 -3.9220
Adjame
5.3460 -3.8720
Abobo
5.4160 -4.0160
Marcory
5.3120 -3.9940
Vridi
5.2440 -4.0350
Niangon Adjame
5.3360 -4.1190
Yopougon
5.3750 -4.0870
Commune d'Attecoube
5.3330 -4.0330
Sub-National GovernmentTradeUrban TransportPorts/WaterwaysRural and Inter-Urban RoadsMitigationPublic TransportMunicipal Institution BuildingUrban Infrastructure and Service DeliveryTrade LogisticsPublic AdministrationUrban PlanningTradeUrban DevelopmentAdaptationClimate change
0.00
3769233.17
3769233.17
3769233.17
3769233.17
3769233.17
3769233.17
3769233.17
3769233.17
3769233.17
3769233.17
3769233.17
3769233.13
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
7426277.17
7426277.17
7426277.17
7426277.17
7426277.17
7426277.17
7426277.17
7426277.17
7426277.17
7426277.17
7426277.17
7426277.13
3101411.33
3101411.33
3101411.33
3101411.33
3101411.33
3101411.33
3101411.33
3101411.33
3101411.33
3101411.33
3101411.33
3101411.37
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
768825.17
768825.17
768825.17
768825.17
768825.17
768825.15
0.00
3769233.17
3769233.17
3769233.17
3769233.17
3769233.17
3769233.17
3769233.17
3769233.17
3769233.17
3769233.17
3769233.17
3769233.13
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
5326931.75
7426277.17
7426277.17
7426277.17
7426277.17
7426277.17
7426277.17
7426277.17
7426277.17
7426277.17
7426277.17
7426277.17
7426277.13
3101411.33
3101411.33
3101411.33
3101411.33
3101411.33
3101411.33
3101411.33
3101411.33
3101411.33
3101411.33
3101411.33
3101411.37
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
2080578.00
768825.17
768825.17
768825.17
768825.17
768825.17
768825.15
315000000Total Commitment in Second Quarter of 2018
International Development Association3339609Total Disbursement in Fourth Quarter of 2018
International Development Association-738485Total Interest Repayment in Fourth Quarter of 2018
International Development Association11966244Total Disbursement in First Quarter of 2019
International Development Association255352Total Disbursement in Second Quarter of 2019
International Development Association490604Total Disbursement in Second Quarter of 2019
International Development Association-479700Total Interest Repayment in Second Quarter of 2019
International Development Association564674Total Disbursement in Third Quarter of 2019
International Development Association1005674Total Disbursement in Fourth Quarter of 2019
International Development Association0Total Disbursement in Fourth Quarter of 2019
International Development Association-429958Total Interest Repayment in Fourth Quarter of 2019
International Development Association525356Total Disbursement in First Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
The Recipient shall ensure that, throughout Project implementation, (i) the PCU is maintained with staff in sufficient number, withexperience and qualifications satisfactory to the Association, in carrying out its responsibilities, including the throughrecruitment by the PCU, under terms of reference and with qualification and experience satisfactory to the Association, of (A) adeputy coordinator, a procurement specialist, an environmental management specialist, a social management specialist, anaccountant, an assistant accountant in charge of disbursement, and an administrative assistant in charge of finance no later thantwo(2) months after the Effective Date; (B) an external auditor no later than six (6) months after the Effective Date..
No later than two (2) months after the Effective Date, the PCU shall update the configuration of its accounting software.
The Recipient shall ensure that the Project is implemented in accordance with the provisions, guidelines, procedures, timetablesand other specifications set forth in the ESMF, the ESIAs and the RPF and any Safeguards Document to be prepared under the Project.
If any Project activity would, pursuant to the RPF, require the preparation of a RAP, no such activity shall be implemented,unless: (i) a RAP for such activity has been: (A) prepared in accordance with the requirements of the RPF andfurnished to the Association; (B) approved by the Association; and (C) publicly disclosed as required by the RPF; and (ii) (A)all measures required to be taken under said RAP prior to the initiation of said activity have been taken, including, withoutlimitation to the above, providing funds for resettlement compensation when and if required under a RAP; (B) a report, in form andsubstance satisfactory to the Association, on the status of compliance with the requirements of said RAP has been prepared andfurnished to the Association; and (C) the Association has confirmed that the implementation of said activity may be commenced.
Without limitation upon its other reporting obligations under this Agreement, the Association shall regularly collect, compile andsubmit to the Association, on a semi-annual basis, reports on the status of compliance with the Safeguard Documents, giving detailsof: (i) measures taken in furtherance of the Safeguard Documents; (ii) conditions, if any, which interfere or threaten to interferewith the smooth implementation of the Safeguard Documents; and (iii) remedial measures taken or required to be taken to addresssuch conditions.
Without limitation upon its other obligations under Section 5.03 of the General Conditions, the Recipient shall open and maintainin a commercial bank acceptable to the Association, a counterpart funds account (“Counterpart Funds Account”) to be maintained andoperated on terms and conditions satisfactory to the Association, and managed by the PCU, into which it shall deposit itscounterpart contribution corresponding to its share of the cost of the Project;
Without limitation upon its other obligations under Section 5.03 of the General Conditions, the Recipient shall deposit into theCounterpart Funds Account an amount corresponding to the Recipient's share of the cost of the Annual Work Plan and Budget for thatFiscal Year as set forth in the following table or in accordance with such other schedule as may be agreed from time to timebetween the Recipient and the Association: EUR 7,563,000 by 28th of October 2018; EUR 1,677,000 by 28th of October 2019; EUR 0 in2020; EUR 4,193,000 by 28th of June 2021.
Without limitation upon its other obligations under Section 5.03 of the General Conditions, the Recipient shall ensure that fundsdeposited into the Counterpart Funds Account shall be used only for the purposes of implementing any RAP that would be preparedunder the RPF.
PDO Indicator
Number of trucks stationed in informal parking in the PAA area
PDO Indicator
Number of trucks coming from hinterland that access the port
Intermediate Results Indicator
Number of DUPs adopted
Intermediate Results Indicator
Number of agreed priority activities to improve the lagoon waterway transport are done
Intermediate Results Indicator
Number of persons trained under the logistics program
Intermediate Results Indicator
Number of facilities that specifically address women's identified mobility and security constraints
Intermediate Results Indicator
Number of footbridges
PDO Indicator
Percentage of urban authorizations/construction permits compliant to DUPs
PDO Indicator
Reduced average access time to PAA
Intermediate Results Indicator
Share of grievances registered related to delivery of project that are addressed
Intermediate Results Indicator
Traffic managed by terminals connected to the TAS
Intermediate Results Indicator
Percentage of streets labeled
Intermediate Results Indicator
Percentage of agreed priority activities for the development of the Green Zone are done
PDO Indicator
Reduced average travel time on the VGE (between Solibra intersection and Akwaba intersection)
Intermediate Results Indicator
Logistics platform developed
Intermediate Results Indicator
Adoption of legal and institutional framework for logistics platform
Intermediate Results Indicator
Curriculum of logistics training programs adopted
Intermediate Results Indicator
Akwaba intersection works done
Intermediate Results Indicator
Green Zone development plan adopted
Intermediate Results Indicator
Urban Transport Master Plan Developed
Intermediate Results Indicator
Identification of MGS
Intermediate Results Indicator
Technical assistance for the SDUGA implementing agencies
Intermediate Results Indicator
Roads constructed
Intermediate Results Indicator
Roads constructed - non-rural
Intermediate Results Indicator
Roads rehablitated
Intermediate Results Indicator
Roads rehabilitated - non-rural
Intermediate Results Indicator
Improvement of Road Safety for Pedestrians and Cyclists
44000-P160418
World Bank
CI: Cote d'Ivoire E-Agriculture Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Maria Isabel A. S. Neto
+1-202-473-1000ineto@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Odienne
9.5050 -7.5640
Minignan
9.9970 -7.8360
Korhogo
9.4580 -5.6300
Gagnoa
6.1320 -5.9510
Divo
5.8370 -5.3570
Daloa
6.8770 -6.4500
Boundiali
9.5220 -6.4870
Bouna
9.2690 -2.9950
Goh-Djiboua
6.1320 -5.9490
Sassandra-Marahoue
6.9660 -6.5070
Savanes
9.4880 -5.4940
Folon
9.8120 -7.5190
Kabadougou
9.6060 -7.4380
Abidjan
5.3630 -3.9990
Haut-Sassandra
6.6700 -6.5010
Bagoue
9.9360 -6.4080
Poro
9.3050 -5.7180
Bounkani
9.4780 -3.3120
Tchologo
9.5270 -4.8970
Rural and Inter-Urban RoadsAgricultural Extension, Research, and Other Support ActivitiesPublic Administration - Agriculture, Fishing & ForestryICT InfrastructureICT ServicesPublic Private PartnershipsFlood and Drought Risk ManagementClimate changeGenderDisaster Risk ManagementRural Infrastructure and service deliveryICTRural DevelopmentRural MarketsAdaptationICT Solutions
0.00
0.00
0.00
0.00
0.00
174300.00
209090.00
243250.00
275240.00
303870.00
332850.00
378000.00
415310.00
435680.00
446670.00
461720.00
474600.00
478520.00
468440.00
460880.00
470960.00
498890.00
531790.00
546490.00
574210.00
619080.00
649390.00
680890.00
728280.00
780780.00
802270.00
830760.00
885850.00
948990.00
1493380.00
1069390.00
564200.00
1806070.00
1289330.00
1359750.00
1431990.00
1516550.00
1585990.00
1641220.00
1688540.00
1757630.00
1817130.00
1869840.00
1936060.00
2012500.00
2060660.00
2091250.00
2111060.00
2147460.00
2187640.00
2215010.00
2252390.00
2294460.00
2331210.00
2366070.00
2401770.00
2437890.00
3156510.00
0.00
0.00
0.00
0.00
0.00
174300.00
209090.00
243250.00
275240.00
303870.00
332850.00
378000.00
415310.00
435680.00
446670.00
461720.00
474600.00
478520.00
468440.00
460880.00
470960.00
498890.00
531790.00
546490.00
574210.00
619080.00
649390.00
680890.00
728280.00
780780.00
802270.00
830760.00
885850.00
948990.00
1493380.00
1069390.00
564200.00
1806070.00
1289330.00
1359750.00
1431990.00
1516550.00
1585990.00
1641220.00
1688540.00
1757630.00
1817130.00
1869840.00
1936060.00
2012500.00
2060660.00
2091250.00
2111060.00
2147460.00
2187640.00
2215010.00
2252390.00
2294460.00
2331210.00
2366070.00
2401770.00
2437890.00
3156510.00
70000000Total Commitment in Second Quarter of 2018
International Development Association4369761Total Disbursement in Fourth Quarter of 2018
International Development Association2100655Total Disbursement in First Quarter of 2019
International Development Association-14464Total Interest Repayment in First Quarter of 2019
International Development Association104300Total Disbursement in Second Quarter of 2019
International Development Association5542590Total Disbursement in Second Quarter of 2019
International Development Association39364Total Disbursement in Third Quarter of 2019
International Development Association222229Total Disbursement in Third Quarter of 2019
International Development Association40244Total Disbursement in Third Quarter of 2019
International Development Association-73122Total Interest Repayment in Third Quarter of 2019
International Development Association310080Total Disbursement in Fourth Quarter of 2019
International Development Association767956Total Disbursement in Fourth Quarter of 2019
International Development Association67624Total Disbursement in First Quarter of 2020
International Development Association330663Total Disbursement in First Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
For the purpose of carrying out Component 3 of the Project, the PIU shall, no later than three months after the Effective Date,enter into a delegated management contract (“Delegation Agreement”) with AGEROUTE.
No later than one (1) month after the Effective Date, the Recipient shall prepare under terms of reference acceptable to theAssociation, and furnish to the Association, an implementation manual for the Project.
For the purposed of carrying out Sub-component 1.2 of the Project, the Recipient shall, following the completion of the necessarystudy on the economic and demographic profile, no later than two (2) months after the Effective Date, prepare under terms ofreference acceptable to the Association, and furnish to the Association, an operations manual for the Project.
Intermediate Results Indicator
Beneficiaries of job-focused interventions - Female
Intermediate Results Indicator
Beneficiaries of job-focused interventions
PDO Indicator
People provided with access to the Internet - Female
PDO Indicator
Number of people that benefitted from the improved Internet service.
PDO Indicator
Farmers reached with agricultural assets or services - Female
PDO Indicator
Number of people that benefitted from new access to Internet service.
PDO Indicator
Farmers reached with agricultural assets or services
PDO Indicator
People provided with access to the Internet
Intermediate Results Indicator
Increase in share of women in leadership roles (among the targeted beneficiaries)
Intermediate Results Indicator
Share of women within the newly established cooperatives/producers organizations (led by women)
PDO Indicator
Percentage increase in revenues of the targeted beneficiaires
PDO Indicator
Beneficiaries that feel project investments reflected their needs (%)
Intermediate Results Indicator
Roads rehabilitated - rural
Intermediate Results Indicator
Roads rehablitated
44000-P124715
World Bank
Cote d'Ivoire - Emergency Infrastructure Renewal Project
International Development Association
MINISTRY OF ECONOMIC INFRASTRUCTURE
International Development Association
MINISTRY OF ECONOMIC INFRASTRUCTUREPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Anne Cecile Sophie Souhaid
+1-202-473-1000asouhaid@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Yamoussoukro
6.8210 -5.2770
Treichville
5.2880 -4.0060
San-PEdro
4.7490 -6.6360
Port-Boue
5.7900 -7.3950
Man
7.4130 -7.5540
Koumassi
5.2970 -3.9680
Korhogo
9.4580 -5.6300
Gagnoa
6.1320 -5.9510
Divo
5.8370 -5.3570
Daloa
6.8770 -6.4500
Dabou
5.3260 -4.3770
Bouna
9.2690 -2.9950
Bouake
7.6940 -5.0300
Bondoukou
8.0400 -2.8000
Bingerville
5.3560 -3.8850
Adzope
6.1070 -3.8620
Abobo
5.4160 -4.0160
Abobo
5.4160 -4.0160
Abidjan
5.3100 -4.0130
Abengourou
6.7300 -3.4960
Marcory
5.3120 -3.9940
Seguela
7.9610 -6.6730
District des Montagnes
6.9500 -7.6170
Bas-Sassandra
5.5000 -6.6670
Soubre
5.7860 -6.6080
Yopougon
5.3460 -4.0660
Urban TransportOther TransportationOther Public AdministrationOther Water Supply, Sanitation and Waste ManagementWater SupplyRural and Inter-Urban RoadsEnergy Transmission and DistributionFragility, Conflict and ViolencePost-conflict reconstructionConflict PreventionPublic Private Partnerships
0.00
0.00
666666.67
666666.67
666666.66
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
2916666.67
2916666.67
2916666.66
2916666.67
2916666.67
2916666.66
2916666.67
2916666.67
2916666.66
2916666.67
2916666.67
2916666.66
2166666.67
2166666.67
2166666.66
2166666.67
2166666.67
2166666.66
2166666.67
2166666.67
2166666.66
1833333.33
1833333.33
1833333.34
1166666.67
1166666.67
1166666.66
1166666.67
1166666.67
1166666.66
1000000.00
1000000.00
1000000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
666666.67
666666.67
666666.66
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
2916666.67
2916666.67
2916666.66
2916666.67
2916666.67
2916666.66
2916666.67
2916666.67
2916666.66
2916666.67
2916666.67
2916666.66
2166666.67
2166666.67
2166666.66
2166666.67
2166666.67
2166666.66
2166666.67
2166666.67
2166666.66
1833333.33
1833333.33
1833333.34
1166666.67
1166666.67
1166666.66
1166666.67
1166666.67
1166666.66
1000000.00
1000000.00
1000000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100000000Total Commitment in Second Quarter of 2012
International Development Association7427602Total Disbursement in Fourth Quarter of 2012
International Development Association294674Total Disbursement in Second Quarter of 2013
International Development Association100863Total Disbursement in Second Quarter of 2013
International Development Association103739Total Disbursement in Third Quarter of 2013
International Development Association1690769Total Disbursement in Third Quarter of 2013
International Development Association3351980Total Disbursement in Fourth Quarter of 2013
International Development Association2885392Total Disbursement in Fourth Quarter of 2013
International Development Association4857276Total Disbursement in First Quarter of 2014
International Development Association1560950Total Disbursement in First Quarter of 2014
International Development Association1379076Total Disbursement in Second Quarter of 2014
International Development Association6338916Total Disbursement in Second Quarter of 2014
International Development Association3199649Total Disbursement in Second Quarter of 2014
International Development Association7444877Total Disbursement in Third Quarter of 2014
International Development Association3909652Total Disbursement in Third Quarter of 2014
International Development Association4913122Total Disbursement in Third Quarter of 2014
International Development Association4183965Total Disbursement in Fourth Quarter of 2014
International Development Association5172688Total Disbursement in Fourth Quarter of 2014
International Development Association5102399Total Disbursement in Fourth Quarter of 2014
International Development Association4910235Total Disbursement in First Quarter of 2015
International Development Association2460110Total Disbursement in First Quarter of 2015
International Development Association5795710Total Disbursement in Second Quarter of 2015
International Development Association1441002Total Disbursement in Second Quarter of 2015
International Development Association1874412Total Disbursement in Second Quarter of 2015
International Development Association961792Total Disbursement in Third Quarter of 2015
International Development Association4098980Total Disbursement in Third Quarter of 2015
International Development Association853686Total Disbursement in Third Quarter of 2015
International Development Association1913839Total Disbursement in Fourth Quarter of 2015
International Development Association2492984Total Disbursement in Fourth Quarter of 2015
International Development Association1480198Total Disbursement in Fourth Quarter of 2015
International Development Association1907025Total Disbursement in First Quarter of 2016
International Development Association763605Total Disbursement in First Quarter of 2016
International Development Association395084Total Disbursement in Second Quarter of 2016
International Development Association60000000Total Commitment in Third Quarter of 2016
International Development Association6465668Total Disbursement in First Quarter of 2017
International Development Association-16283Total Interest Repayment in Second Quarter of 2017
International Development Association1283786Total Disbursement in Third Quarter of 2017
International Development Association748230Total Disbursement in Third Quarter of 2017
International Development Association1875562Total Disbursement in Fourth Quarter of 2017
International Development Association-56319Total Interest Repayment in Fourth Quarter of 2017
International Development Association485096Total Disbursement in Fourth Quarter of 2017
International Development Association782530Total Disbursement in First Quarter of 2018
International Development Association1389275Total Disbursement in First Quarter of 2018
International Development Association2507850Total Disbursement in Second Quarter of 2018
International Development Association-84244Total Interest Repayment in Second Quarter of 2018
International Development Association15444050Total Disbursement in Second Quarter of 2018
International Development Association735788Total Disbursement in Third Quarter of 2018
International Development Association925706Total Disbursement in Third Quarter of 2018
International Development Association2504316Total Disbursement in Fourth Quarter of 2018
International Development Association1627225Total Disbursement in Fourth Quarter of 2018
International Development Association-192714Total Interest Repayment in Fourth Quarter of 2018
International Development Association416139Total Disbursement in Fourth Quarter of 2018
International Development Association286518Total Disbursement in First Quarter of 2019
International Development Association768536Total Disbursement in First Quarter of 2019
International Development Association1555445Total Disbursement in First Quarter of 2019
International Development Association3941112Total Disbursement in Second Quarter of 2019
International Development Association1493420Total Disbursement in Second Quarter of 2019
International Development Association-259643Total Interest Repayment in Second Quarter of 2019
International Development Association2903173Total Disbursement in Second Quarter of 2019
International Development Association353077Total Disbursement in Third Quarter of 2019
International Development Association935091Total Disbursement in Third Quarter of 2019
International Development Association1166829Total Disbursement in Fourth Quarter of 2019
International Development Association1324826Total Disbursement in Fourth Quarter of 2019
International Development Association-328799Total Interest Repayment in Fourth Quarter of 2019
International Development Association775412Total Disbursement in Fourth Quarter of 2019
International Development Association240302Total Disbursement in First Quarter of 2020
International Development AssociationProject Information DocumentImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Article V.5.01. (a) | Description :The Project Management Contract has been duly executed, on terms andconditions acceptable to the Association, between the Recipient and the Project Coordination Unit of the Emergency InfrastructureRenewal Project (PCU-EIRP). | Due Date :15-Oct-2012
Finance Agreement :Schedule 2 / Section I / D. 1 (a) | Description :The Recipient shall, prepare and adopt an Environmental andSocial Management Framework (ESMF) and a Resettlement Policy Framework (RPF), both of which shall be acceptable to the Associationand fully compliant with the Association's social and environmental policies, taking steps as needed to ensure that they are bothduly disclosed and made publicly available for public consultations. | Due Date :15-Jan-2013
Finance Agreement :Schedule 2 / Section I / B. 3(a) | Description :Not later than eighteen (18) months after the Effective Date,undertake, in conjunction with the Association, a mid-term review of the Project (the “Mid-term Review”), covering the progressachieved in the implementation of the Project | Due Date :30-Apr-2014
Finance Agreement :Schedule 2 / Section I / B. 3(b) | Description :Not less than three (3) months prior to the beginning of theMid-term Review, prepare under terms of reference satisfactory to the Association, and furnish to the Association, a reportintegrating the results of the monitoring and evaluation activities performed pursuant to this Agreement on the progress achieved |Due Date :31-Jan-2014
Finance Agreement :Finance Agreement :Schedule 2 / Section I / A. 2 (b) | Description :For the duration of the Project, thePCU-PRICI shall maintain a team including a financial management assistant, an environmental safeguards specialist, a socialsafeguard specialist, a coordinator, and a municipal development specialist, all of whom shall have qualifications and experienceacceptable to the Association. | Due Date :27-Jan-2017
Finance Agreement :Finance Agreement :Schedule 2 / Section V / B. (b) | Description :The Recipient shall deposit, into theCounterpart Funds Account an amount corresponding to one fourth of the Recipient's share of the cost of the Annual Work Plan andBudget for each Fiscal Year as set forth in the Financing Agreement or in accordance with such other schedule as may be agreed fromtime to time between the Recipient and the Association. | Frequency :Quarterly
Finance Agreement :Schedule 2 / Section I / A. 3 | Description :The Recipient shall, no later than two (2) months after theEffective Date, recruit a municipal development specialist, an environmental safeguards specialist and a social safeguardsspecialist under terms of reference and with the qualification and experience satisfactory to the Association. | Due Date:28-Dec-2016
Finance Agreement :Schedule 2 / Section V / A. 1 (b) | Description :The Recipient shall not later than the last day of everyquarter, beginning in the 1st quarter of FY17, deposit into the Counterpart Funds Account an amount corresponding to one fourth ofthe Recipient's share of the cost of the Annual Work Plan and Budget for that Fiscal Year as set forth in the Financing Agreementor in accordance with such other schedule as may be agreed | Frequency :Quarterly
Finance Agreement :Schedule 2 / Section I / C. 1 | Description :The Recipient shall, not later than two (2) months after theEffective Date, update the Project Implementation Manual in a manner satisfactory to the Association, to reflect the specificcontent and design of the Project and ensure consistency with its objective. | Due Date :28-Dec-2016
Finance Agreement :Schedule 2 / Section I / B. 2 | Description :The Recipient shall, throughout Project implementation, maintain orconclude, not later than one month after the Effective Date, as the case may be, Delegated Management Contracts on terms andconditions acceptable to the Association, with each of the Implementing Agencies. | Due Date :28-Nov-2016
Finance Agreement :Schedule 2 / Section I / A. 3 | Description :The Recipient shall, no later than two (2) months after theEffective Date, recruit a municipal development specialist, an environmental safeguards specialist and a social safeguardsspecialist under terms of reference and with the qualification and experience satisfactory to the Association. | Due Date:28-Dec-2016
Finance Agreement :Schedule 2/ Section I.B.1 | Description :To facilitate the carrying out of the Project, the Recipient shall, notlater than one month after the Effective Date, revise the Project Management Contract with the PCU (âProject ManagementContractâ?) concluded for purposes of the Original Project | Due Date :28-Nov-2016
Finance Agreement :Schedule 2/ Section I.B.2 | Description :To facilitate the carrying out of the Project, the Recipient shall,throughout Project implementation, maintain or conclude, not later than one month after the Effective Date, as the case may be,Delegated Management Contracts on terms and conditions acceptable to the Association, with each of the Implementing Agencies | DueDate :28-Nov-2016
Finance Agreement :Schedule 2 / Section V / A. 1 (b) | Description :The Recipient shall not later than the last day of everyquarter, beginning in the 1st quarter of FY17, deposit into the Counterpart Funds Account an amount corresponding to one fourth ofthe Recipient's share of the cost of the Annual Work Plan and Budget for that Fiscal Year | Frequency :Quarterly
Finance Agreement :Schedule 2 /C.1 | Description :The Recipient shall, not later than two (2) months after the Effective Date,update the Project Implementation Manual in a manner satisfactory to the Association, to reflect the specific content and design ofthe Project and ensure consistency with its objective. | Due Date :28-Dec-2016
PDO Indicator
Direct Project Beneficiaries, Of which female
PDO Indicator
Direct project beneficiaries
PDO Indicator
Number of people in urban areas provided with access to all-season roads within a 500 meter range under the project
PDO Indicator
Additional population in the targeted urban areas protected against periodic flooding
PDO Indicator
People provided with access to Improved Water Sources under the project.
PDO Indicator
People in the targeted urban areas (Yamoussoukro and Korhogo) provided with access to electricity by household connections
Intermediate Results Indicator
Schools renovated at Secondary level
Intermediate Results Indicator
New piped household water connections that are resulting from the project intervention
Intermediate Results Indicator
Master plans completed and/or updated (drainage, sewer, urban)
Intermediate Results Indicator
Number of public lighting fixtures rehabilitated
Intermediate Results Indicator
Number of illegal household electricity connections dismantled
Intermediate Results Indicator
Number of public lighting fixtures converted into more efficient lighting
Intermediate Results Indicator
Number of people in urban areas provided with access to electricity under the project by household connections
Intermediate Results Indicator
Number of economic and basic social infrastructure constructed or rehabilitated
Intermediate Results Indicator
Number of cities that have adopted citizen participation through a consultative approach for their budgeting process
Intermediate Results Indicator
Improved community water points constructed or rehabilitated under the project
Intermediate Results Indicator
Health facilities constructed, renovated, and/or equipped
Intermediate Results Indicator
Schools renovated at Primary level
PDO Indicator
People with access to rehabilitated health centers
PDO Indicator
People with access to rehabilitated schools at primary level
PDO Indicator
Number of municipalities that reach their target objectives as specified in their performance contracts
Intermediate Results Indicator
People with access to rehabilitated health centers
Intermediate Results Indicator
Number of people in rural areas provided with access to an all-season road under the project
Intermediate Results Indicator
People with access to rehabilitated schools at primary level
PDO Indicator
Female beneficiaries
PDO Indicator
Share of population in targeted rural areas with access to an all-season road [Supplemental information:Number of rural people withaccess to an all-season road]
Intermediate Results Indicator
Percentage of municipal budget allocated to maintenance in the Municipal Maintenance Account (municipalities of Abidjan)
Intermediate Results Indicator
Percentage of municipal budget allocated to maintenance in the Municipal Maintenance Account (municipalities outside of Abidjan)
Intermediate Results Indicator
Time taken to disburse project funds requested by the Government for an eligible crisis or emergency
Intermediate Results Indicator
CERC established and ready to provide access to financial resources to the Government in case of an eligible crisis or emergency
Intermediate Results Indicator
Roads rehabilitated, Rural
Intermediate Results Indicator
Roads rehabilitated, Non-rural
44000-P160642
World Bank
Cote d'Ivoire Higher Education Development Support Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Patrick Philippe Ramanantoanina
+1-202-473-1000pramanantoanina@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Republic of Cote d'Ivoire
8.0000 -5.5000
Workforce Development and Vocational EducationTertiary EducationEducation FacilitiesActive Labor Market ProgramsEducation Governance, School-Based ManagementLabor Market Policy and ProgramsJobsGenderStandards, Curriculum and TextbooksSkills DevelopmentYouth EmploymentEducation
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
506100.00
569600.00
610700.00
630900.00
320800.00
659600.00
678000.00
683600.00
669200.00
658400.00
672800.00
712700.00
1621141.67
1621141.67
1621141.67
1621141.67
1621141.67
1621141.67
1621141.67
1621141.67
1621141.67
1621141.67
1621141.67
1621141.63
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.37
2412200.00
2510900.00
2595900.00
2671200.00
2765800.00
2875000.00
2943800.00
2987500.00
1504200.00
3037400.00
3098800.00
3145800.00
1390675.00
1390675.00
1390675.00
1390675.00
1390675.00
1390675.00
1390675.00
1390675.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
506100.00
569600.00
610700.00
630900.00
320800.00
659600.00
678000.00
683600.00
669200.00
658400.00
672800.00
712700.00
1621141.67
1621141.67
1621141.67
1621141.67
1621141.67
1621141.67
1621141.67
1621141.67
1621141.67
1621141.67
1621141.67
1621141.63
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.37
2412200.00
2510900.00
2595900.00
2671200.00
2765800.00
2875000.00
2943800.00
2987500.00
1504200.00
3037400.00
3098800.00
3145800.00
1390675.00
1390675.00
1390675.00
1390675.00
1390675.00
1390675.00
1390675.00
1390675.00
100000000Total Commitment in First Quarter of 2019
International Development Association7681372Total Disbursement in Third Quarter of 2019
International Development Association-49887Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Section I.A.3 (d) (i). The Recipient shall, through the PIU no later than one (1) month after the Effective Date: appoint afinancial controller, a public accountant, a procurement specialist, and a monitoring and evaluation specialist.
Section I.A.3 (d) (ii). The Recipient shall, through the PIU no later than two (2) months after the Effective Date recruit anaccountant and an assistant accountant, acquire and install an accounting software.
Section I.A.3 (d) (iii). The Recipient shall, through the PIU no later than five (5) months after the Effective Date appoint anexternal auditor.
Section I.F (2). The Recipient shall ensure that the obligation to comply with the relevant Safeguard Instruments is incorporated:(a) in all Performance-based Contracts; (b) in the contracts between the Recipient and its contractors and any entity supervisingthe Project's civil works; and (c) in the contracts between the contractors and any of their subcontractors.
Section I.F (3). The Recipient shall ensure that all bidding documents and contracts for civil works include the obligation of therelevant contractors and subcontractors to adopt and implement measures to assess and manage the risks and impacts of labor influxand workers camps.
Section I.F (4). The Recipient shall ensure that all contracts for civil works under the Project obligate the applicablecontractors and subcontractors to: (a) adopt and enforce a code of conduct that applies to and is signed by all personnel workingon any Project activities, in form and substance acceptable to the Association, detailing measures on environmental, health andsafety as well as measures to prevent and respond to GBV; (b) report promptly to the PIU any allegations of GBV against any oftheir personnel; and (c) investigate promptly and thoroughly any allegations of violations of said code of conduct.
Section I.F (8). The Recipient shall ensure that: (a) all consultancies related to technical assistance, design and capacitybuilding under the Project, the application of whose results could have environmental, social and health and safety implications,shall only be undertaken pursuant to terms of reference reviewed and found satisfactory by the Association; and (b) such terms ofreference shall require the technical assistance, design and capacity building activities to take into account the requirements ofthe applicable Safeguards Policies and EHS Guidelines.
PDO Indicator
Number of tertiary institutions supported by the project that achieve at least 80% of the annual targets set in the performance-based contracts
PDO Indicator
Number of students enrolled in professional programs (short term and degrees) supported by the project
Intermediate Results Indicator
Number of students enroled in ISFPT
Intermediate Results Indicator
Number of tertiary institutions supported by the project with new management bodies as set by the revised law on tertiary education
Intermediate Results Indicator
Students benefiting from direct interventions to enhance learning
Intermediate Results Indicator
Students benefiting from direct interventions to enhance learning - Female
PDO Indicator
Percentage of existing programs in public universities and INPHB supported by the project with at least an increase of 10 points ofpercentage in graduates employment rates
PDO Indicator
of which female
PDO Indicator
Percentage of INPHB programs supported by the project which meet international accreditation standards
Intermediate Results Indicator
Percentage of public universities supported by the project having an internal QA unit
Intermediate Results Indicator
Percentage of institutions supported by the project with interface structures for the acquisition of professional skills
Intermediate Results Indicator
of wich female
Intermediate Results Indicator
Percentage of programs in public universities supported by the project that meet minimum standards as set by the National Quality Assurance Authority
Intermediate Results Indicator
Percentage of girls enrolled in STEM
Intermediate Results Indicator
Percentage of grievances received (including on GBV) addressed in line with time stipulations in the operations manual
Intermediate Results Indicator
Tertiary education statistical yearbook published
Intermediate Results Indicator
National QA Authority is functioning
Intermediate Results Indicator
Tertiary education graduates tracking report published
44000-P143332
World Bank
CI- Productive Social Safety Net
International Development Association
NONE YET
International Development Association
NONE YETPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Solene Marie Paule Rougeaux
+1-202-473-1000srougeaux@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Vallee du Bandama
8.2500 -4.8330
Zanzan
8.5000 -3.2500
Worodougou
8.5000 -6.3330
Denguele
9.5000 -7.3830
Bafing
8.5000 -7.5000
Social ProtectionPublic Administration - Social ProtectionJobsLabor Market Policy and ProgramsLabor Market InstitutionsSocial ProtectionActive Labor Market ProgramsSocial Safety Nets
0.00
0.00
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.37
783333.33
783333.33
783333.33
783333.33
783333.33
783333.33
783333.33
783333.33
783333.33
783333.33
783333.33
783333.37
933333.33
933333.33
933333.33
933333.33
933333.33
933333.33
933333.33
933333.33
933333.33
933333.33
933333.33
933333.37
933333.33
933333.33
933333.33
933333.33
933333.33
933333.33
933333.33
933333.33
933333.33
933333.33
933333.33
933333.37
1033333.33
1033333.33
1033333.33
1033333.33
1033333.33
1033333.33
1033333.33
1033333.33
1033333.33
1033333.33
1033333.33
1033333.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.37
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.63
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.37
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.63
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.63
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
0.00
0.00
0.00
0.00
50000000Total Commitment in Second Quarter of 2015
International Development Association479641Total Disbursement in Fourth Quarter of 2015
International Development Association2165278Total Disbursement in First Quarter of 2016
International Development Association287143Total Disbursement in First Quarter of 2016
International Development Association-6895Total Interest Repayment in Second Quarter of 2016
International Development Association95977Total Disbursement in Second Quarter of 2016
International Development Association-11153Total Interest Repayment in Fourth Quarter of 2016
International Development Association740997Total Disbursement in First Quarter of 2017
International Development Association26854Total Disbursement in First Quarter of 2017
International Development Association47199Total Disbursement in Second Quarter of 2017
International Development Association108070Total Disbursement in Second Quarter of 2017
International Development Association-13233Total Interest Repayment in Second Quarter of 2017
International Development Association559427Total Disbursement in Second Quarter of 2017
International Development Association21576Total Disbursement in Third Quarter of 2017
International Development Association73247Total Disbursement in Third Quarter of 2017
International Development Association412428Total Disbursement in Third Quarter of 2017
International Development Association60859Total Disbursement in Fourth Quarter of 2017
International Development Association737228Total Disbursement in Fourth Quarter of 2017
International Development Association-17050Total Interest Repayment in Fourth Quarter of 2017
International Development Association170338Total Disbursement in Fourth Quarter of 2017
International Development Association948408Total Disbursement in First Quarter of 2018
International Development Association1085767Total Disbursement in First Quarter of 2018
International Development Association1377488Total Disbursement in First Quarter of 2018
International Development Association226933Total Disbursement in Second Quarter of 2018
International Development Association2486587Total Disbursement in Second Quarter of 2018
International Development Association-26697Total Interest Repayment in Second Quarter of 2018
International Development Association3477336Total Disbursement in Second Quarter of 2018
International Development Association232925Total Disbursement in Third Quarter of 2018
International Development Association222262Total Disbursement in Third Quarter of 2018
International Development Association2468269Total Disbursement in Fourth Quarter of 2018
International Development Association366339Total Disbursement in Fourth Quarter of 2018
International Development Association-56232Total Interest Repayment in Fourth Quarter of 2018
International Development Association2910633Total Disbursement in Fourth Quarter of 2018
International Development Association302154Total Disbursement in First Quarter of 2019
International Development Association3015365Total Disbursement in First Quarter of 2019
International Development Association167302Total Disbursement in First Quarter of 2019
International Development Association3479069Total Disbursement in Second Quarter of 2019
International Development Association346984Total Disbursement in Second Quarter of 2019
International Development Association-86822Total Interest Repayment in Second Quarter of 2019
International Development Association3835038Total Disbursement in Second Quarter of 2019
International Development Association100000000Total Commitment in Second Quarter of 2019
International Development Association217757Total Disbursement in Third Quarter of 2019
International Development Association225423Total Disbursement in Third Quarter of 2019
International Development Association3317298Total Disbursement in Fourth Quarter of 2019
International Development Association1004821Total Disbursement in Fourth Quarter of 2019
International Development Association-123673Total Interest Repayment in Fourth Quarter of 2019
International Development Association7192239Total Disbursement in Fourth Quarter of 2019
International Development Association4988774Total Disbursement in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Steering Committee | Description :In order to ensure the proper oversight of the Project and coordination amongthe Recipient's Ministries and agencies responsible for the Project, the Recipient shall, not later than September 30, 2015,establish and maintain, throughout the period of implementation of the Project, with membership, functions and resourcessatisfactory to the Association, the Project Steering Committee, which shall | Due Date :30-Sep-2015
Finance Agreement :Project Implementation Unit | Description :The Recipient shall, not later than September 30, 2015, establish andmaintain, throughout the period of implementation of the Project, within the ME-MEASFP, the Project Implementation Unit, to beresponsible for (i) day-to-day implementation of the Project; (ii) managing all Project activities; (iii) coordinating Projectactivities, including with existing ME-MEASFP district and community structure| Due Date :30-Sep-2015
Finance Agreement: Appoint Financial and Technical Staff | Description: Without limitation upon the foregoing, the Recipient shall(i) not later than September 30, 2015, a Project coordinator, a financial management specialist, a procurement specialist, and anaccountant; (ii) as soon as possible thereafter, an internal auditor, a monitoring and evaluation specialist, and a communicationsspecialist; and (iii) such other technical specialists and functions as needed | Due Date :30-Sep-2015
Finance Agreement: Mid Term Review | Description :not later than three (3) years after Effectiveness, and if possible prior to thesecond phase of Cash Transfers, undertake, through an independently recruited entity acceptable to the Association, as well as theAssociation's Project team, a comprehensive mid-term review and evaluation of the Project to assess and exchange views on allmatters relating to the progress of the Project, the Recipien | Due Date :01-Oct-2018
Finance Agreement: Mid Term Review | Description: following the mid-term review, promptly and diligently take any and allcorrective measures necessary to remedy any shortcoming noted in the implementation of the Project, or to implement such othermeasures as may be required in furtherance of the Project's objective. | Due Date: 01-Oct-2018
Finance Agreement: Accounting Software | Description: within two (2) months following the Effective Date, acquire and installaccounting software for the Project and provide training for its users | Due Date: 01-Dec-2015
Finance Agreement: Public Accountant and Financial controller appointment | Description: within three (3) months following theEffective Date, cause the Ministry of Finance to assign one public accountant and one financial controller to the Project incompliance with Instruction 192; | Due Date :01-Jan-2016
Finance Agreement: Internal Audit Function | Description: within three (3) months following the Effective Date, cause the ME-MEASFPto enter into a written agreement with the Inspection General des Finances (IGF) to manage the internal audit function of theProject and conduct periodic reviews of Project transactions | Due Date :01-Jan-2016
Finance Agreement: External Auditor | Description: within five (5) months following the Effective Date, appoint an external auditorfor the Project. | Due Date: 01-Mar-2016
Financing Agreement: Mid Term Review | Description: not later than three (3) years after Effectiveness, undertake, through anindependently recruited entity acceptable to the Association, as well as the Association's Project team, a comprehensive mid-termreview and evaluation of the Project to assess and exchange views on all matters relating to the progress of the Project, theRecipient's performance of its obligations under this Agreement, and the performance of the various implementation bodies at thecentral, district and community levels.
Financing Agreement: Mid Term Review | Description: following the mid-term review, promptly and diligently take any and allcorrective measures necessary to remedy any shortcoming noted in the implementation of the Project, or to implement such othermeasures as may be required in furtherance of the Project's objective.
PDO Indicator
Beneficiaries of Safety Nets programs (number)
PDO Indicator
Number of households registered in social registry
PDO Indicator
Designated recipients of Safety Nets programs - Female
PDO Indicator
Number of beneficiary households of cash transfers, Total
PDO Indicator
Number of beneficiary households of cash transfers, of which headed by female
Intermediate Results Indicator
Number of beneficiary households participating in economic inclusion activities
PDO Indicator
Share of payments using the project's digital payment delivery system that are made on time, as specified in PIM
PDO Indicator
Share of households reporting an increase in earnings
PDO Indicator
Share of households reporting an increase in earnings (female)
Intermediate Results Indicator
GRM receiving and responding to complaints within the timeframe specified in the PIM
Intermediate Results Indicator
Share of female beneficiaries participating in economic inclusion activities (female)
Intermediate Results Indicator
Digital cash transfer payment system developed, including quality assurance (QA)
Intermediate Results Indicator
Communication platform and grievance redress mechanism designed and implemented, including quality assurance (QA) spot checks
Intermediate Results Indicator
Social registry developed, including Quality Assurance (QA)
Intermediate Results Indicator
Targeting system for the cash transfer program developed, including Quality Assurance (QA)
Intermediate Results Indicator
Management information system (MIS) developed, including quality assurance (QA)
Intermediate Results Indicator
Impact evaluation survey data collection completed
Intermediate Results Indicator
Project financial audits and monitoring and evaluation (M&E) reports are disclosed on time
44000-P167959
World Bank
Strategic Purchasing and Alignment of Resources & Knowledge in Health Project (SPARK-Health)
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Montserrat Meiro-Lorenzo
+1-202-473-1000mmeirolorenzo@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Yamoussoukro Autonomous District
6.8170 -5.2830
Bas-Sassandra
5.4990 -6.6610
Comoe
5.5040 -3.2510
Denguele
9.4970 -7.3760
Goh-Djiboua
6.1320 -5.9490
Lacs
7.0310 -4.4480
Lagunes
5.8710 -4.2990
Montagnes
6.9540 -7.6290
Sassandra-Marahoue
6.9660 -6.5070
Savanes
9.4880 -5.4940
Vallee du Bandama
8.2500 -4.8550
Woroba
7.9900 -6.6250
Zanzan
8.5000 -3.2140
Abidjan
5.3630 -3.9990
HealthPublic Administration - HealthHealth Facilities and ConstructionNutritionNutrition and Food SecurityChild HealthHealth FinanceReproductive and Maternal HealthClimate changeICTMitigationHealth Systems and PoliciesAdaptationHealth Service DeliveryICT SolutionsHealth System Strengthening
0.00
0.00
0.00
0.00
6266803.67
6266803.67
6266803.67
6266803.67
6266803.67
6266803.67
6266803.67
6266803.67
6266803.67
6266803.67
6266803.67
6266803.63
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
2524857.58
2524857.58
2524857.58
2524857.58
2524857.58
2524857.58
2524857.58
2524857.58
2524857.58
2524857.58
2524857.58
2524857.62
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
4670593.00
4670593.00
4670593.00
0.00
0.00
0.00
0.00
6266803.67
6266803.67
6266803.67
6266803.67
6266803.67
6266803.67
6266803.67
6266803.67
6266803.67
6266803.67
6266803.67
6266803.63
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
5495012.50
2524857.58
2524857.58
2524857.58
2524857.58
2524857.58
2524857.58
2524857.58
2524857.58
2524857.58
2524857.58
2524857.58
2524857.62
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1524301.25
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
1354710.00
4670593.00
4670593.00
4670593.00
200000000Total Commitment in First Quarter of 2019
International Development Association12825284Total Disbursement in Fourth Quarter of 2019
International Development Association-45079Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
The Recipient shall establish no later than three (3) months after the Effective Date, and thereafter maintain throughout theperiod of Project implementation, with terms of reference, mandate, composition and resources satisfactory to the Association, asteering committee, as further detailed in the Project Implementation Manual (“Steering Committee”).
PDO Indicator
People who have received essential health, nutrition, and population (HNP) services
PDO Indicator
Direct Project Beneficiaries (% Female)
PDO Indicator
Number of children immunized
PDO Indicator
Number of deliveries attended by skilled health personnel
Intermediate Results Indicator
Number of Health Districts Covered
Intermediate Results Indicator
Number of emergency response beneficiaries
Intermediate Results Indicator
Number of Women completing at least 3 CPoN visits
Intermediate Results Indicator
Health Facilities rehabilitated and / or equipped
Intermediate Results Indicator
Number of Poor and vulnerable supported by the CMU
Intermediate Results Indicator
Number of Women completing at least 4 prenatal visits
Intermediate Results Indicator
Number of Women of reproductive age who are new users of modern contraceptive methods
Intermediate Results Indicator
Number of "Healthy" children 12-59 months seen for Nutritional consultation visit
Intermediate Results Indicator
Number of people trained
PDO Indicator
Utilization of Health Services
PDO Indicator
Average Health Facility Quality Score
Intermediate Results Indicator
Availability of last year's RASS in the first half of the following year
Intermediate Results Indicator
Citizens and/or communities involved in planning/implementation/evaluation of development programs (Yes/No)
44000-P157055
World Bank
Cote d'Ivoire - Electricity Transmission and Access Project
International Development Association
CI-ENERGIES
International Development Association
CI-ENERGIESPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Thierno Bah
+1-202-473-1000tbah@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Zagne
6.2100 -7.4830
Yamoussoukro
6.8210 -5.2770
Vavoua
7.3820 -6.4780
Treichville
5.2880 -4.0060
Toulepleu
6.5800 -8.4110
Touba
8.2830 -7.6830
Tengrela
10.4810 -6.4070
Tiebissou
7.1580 -5.2250
Tiboto
4.8510 -7.5910
Tabo
6.2360 -5.1370
Serebou
7.9410 -3.9430
Attakro
7.4370 -5.1100
Sassandra
7.7000 -7.0670
San-Pedro
4.7490 -6.6360
Odienne
9.5050 -7.5640
Man
7.4130 -7.5540
Mafere
5.4150 -3.0300
Laboua
6.5130 -6.6940
Kossou
6.9590 -4.9690
Korhogo
9.4580 -5.6300
Kongromati
7.0170 -4.2330
Katiola
8.1370 -5.1010
Jacqueville
5.2050 -4.4150
Issia
6.4920 -6.5860
Hire
6.1890 -5.2950
Ferkessedougou
9.5930 -5.1940
Ferke
9.5830 -4.3000
Duekoue
6.7420 -7.3490
Divo
5.8370 -5.3570
Dimbokro
6.6470 -4.7050
Digba
6.7590 -6.4100
Danane
7.2600 -8.1550
Daloa
6.8770 -6.4500
Dabou
5.3260 -4.3770
Dabakala
8.3630 -4.4290
Buyo
6.2750 -6.9970
Boundiali
9.5220 -6.4870
Bouake
7.6940 -5.0300
Bondoukou
8.0400 -2.8000
Azito
5.3010 -4.0790
Ayame II
5.5440 -3.1640
AyamE
5.6050 -3.1570
Anyama
5.4330 -3.9220
Agnibilekrou
7.1310 -3.2040
Agboville
5.9280 -4.2130
Adzope
6.1070 -3.8620
Abobo
5.4160 -4.0160
Abengourou
6.7300 -3.4960
Guiglo
6.9240 -7.5290
Abata
5.3230 -3.9140
Vridi
5.2440 -4.0350
Gagnoa
6.5830 -6.2500
Seguela
7.9610 -6.6730
Soubre
5.7840 -6.5940
Anani
5.2360 -3.8730
Soubre
5.9330 -3.1810
Bongo
7.0070 -5.0240
Yopougon
5.3750 -4.0870
Songon
5.3200 -4.2540
Gbokle
4.9570 -6.0940
Nawa
5.8010 -6.6030
Abidjan
5.3630 -3.9990
Haut-Sassandra
6.6700 -6.5010
Public Administration - Energy and ExtractivesEnergy Transmission and DistributionMitigationEnergyRural Infrastructure and service deliveryAccess to EnergyGenderClimate changeRural DevelopmentEnergy Efficiency
0.00
0.00
0.00
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
0.00
0.00
0.00
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
6833333.33
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
9479166.67
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
4062500.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
325000000Total Commitment in First Quarter of 2017
International Development Association862651Total Disbursement in Fourth Quarter of 2017
International Development Association-862651Total Interest Repayment in Fourth Quarter of 2017
International Development Association9277142Total Disbursement in Fourth Quarter of 2017
International Development Association-404105Total Interest Repayment in Fourth Quarter of 2017
International Development Association246615Total Disbursement in First Quarter of 2018
International Development Association534099Total Disbursement in First Quarter of 2018
International Development Association3287736Total Disbursement in Second Quarter of 2018
International Development Association-577231Total Interest Repayment in Second Quarter of 2018
International Development Association164540Total Disbursement in Third Quarter of 2018
International Development Association566104Total Disbursement in Fourth Quarter of 2018
International Development Association7118429Total Disbursement in Fourth Quarter of 2018
International Development Association-600387Total Interest Repayment in Fourth Quarter of 2018
International Development Association477061Total Disbursement in First Quarter of 2019
International Development Association13226311Total Disbursement in First Quarter of 2019
International Development Association870093Total Disbursement in First Quarter of 2019
International Development Association2586806Total Disbursement in Second Quarter of 2019
International Development Association18274330Total Disbursement in Second Quarter of 2019
International Development Association12306470Total Disbursement in Second Quarter of 2019
International Development Association-767766Total Interest Repayment in Second Quarter of 2019
International Development Association106023Total Disbursement in Third Quarter of 2019
International Development Association2433996Total Disbursement in Third Quarter of 2019
International Development Association3083926Total Disbursement in Third Quarter of 2019
International Development Association1505879Total Disbursement in Fourth Quarter of 2019
International Development Association3072030Total Disbursement in Fourth Quarter of 2019
International Development Association8662787Total Disbursement in Fourth Quarter of 2019
International Development Association-1289748Total Interest Repayment in Fourth Quarter of 2019
International Development Association7356148Total Disbursement in First Quarter of 2020
International Development Association6223101Total Disbursement in First Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Recruitment of Project Implementation Unit (PIU) Staff | Description :The Recipient shall cause the ProjectImplementing Entity to ensure that, throughout Project implementation, the PIU is maintained with staff in sufficient number, withexperience and qualifications satisfactory to the Association, in carrying out its responsibilities [including a procurementspecialist, a Project accountant] and not later than two (2) months after the Effective Date the hiring by the Project ImplementingEntity of [a procurement specialist, a Project accountant and] a social and gender safeguards specialist, all under terms ofreference and with qualification and experience satisfactory to the Association. [pending hiring prior to signing] (Schedule 2,Section I.A.5 of Financing Agreement FA and Section I.a.5 of Project Agreement) | Due Date :01-Dec-2017
Finance Agreement :Recruitment of Owner's Engineer | Description :The Recipient shall cause the Project Implementing Entity, notlater than six (6) months after the Effective Date, to hire the Owner's Engineer in accordance with terms of reference andqualifications acceptable to the Association. (Schedule 2, Section I.A.7 of FA and Section I.7 of Project Agreement). | Due Date:01-Apr-2018
Finance Agreement :Transfer of assets from the Government to CI-Energies | Description :The Recipient shall complete the transferof Assets to the Project Implementing Entity not later than six (6) months after the Effective Date. (Schedule 2, Section I.H.1 ofthe FA). | Due Date :01-Apr-2018
PDO Indicator
People provided with new or improved electricity service - People provided with access to electricity under the project by household connections (grid or off grid)
Intermediate Results Indicator
Number of reinforced high voltage substations
Intermediate Results Indicator
Households provided with an electricity connection in urban areas under the project
Intermediate Results Indicator
Villages electrified (number)
Intermediate Results Indicator
Beneficiary Satisfaction Survey Completed
Intermediate Results Indicator
Number of new high voltage substations constructed
Intermediate Results Indicator
Households provided with an electricity connection in rural areas under the project
Intermediate Results Indicator
Staff trained under the project (number)
Intermediate Results Indicator
of which female-headed households
Intermediate Results Indicator
of which female-headed households
PDO Indicator
Electricity losses per year in the project area
Intermediate Results Indicator
Project-related grievances registered under the project GRM and addressed
PDO Indicator
Cumulative duration of power outages per year in substations rehabilitated by the project
Intermediate Results Indicator
Average power outage duration in reinforced substations
Intermediate Results Indicator
Average time of outages in Abidjan
Intermediate Results Indicator
Average time of outages in 10 capital cities
Intermediate Results Indicator
Distribution MV lines constructed under the project in urban areas
Intermediate Results Indicator
Distribution LV lines constructed under the project in urban areas
Intermediate Results Indicator
Distribution MV lines constructed under the project in rural areas
Intermediate Results Indicator
Distribution MV lines rehabilitated under the project in urban areas
Intermediate Results Indicator
Distribution LV lines constructed under the project in rural areas
Intermediate Results Indicator
Distribution LV lines rehabilitated under the project in urban areas
Intermediate Results Indicator
Increased bulk supply capacity in the project area
44000-P164302
World Bank
Enhancing Government Effectiveness for Improved Public Services
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Keith W. McLean
+1-202-473-1000kmclean@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Yamoussoukro
6.82055 -5.2767401
Public Administration - Financial SectorRural and Inter-Urban RoadsCentral Government (Central Agencies)Public Administration - EducationPublic Administration - Information and Communications TechnologiesPayment & markets infrastructureStandards, Curriculum and TextbooksFinancial Infrastructure and AccessEducationRural DevelopmentRural Infrastructure and service deliveryE-Government, incl. e-servicesPublic AdministrationPublic Expenditure ManagementFinancial inclusionPrivate Sector Delivery of EducationPublic Finance Management
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1419841.67
1419841.67
1419841.67
1419841.67
1419841.67
1419841.67
1419841.67
1419841.67
1419841.67
1419841.67
1419841.67
1419841.63
1908716.67
1908716.67
1908716.67
1908716.67
1908716.67
1908716.65
0.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1171300.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1357100.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1347400.00
1419841.67
1419841.67
1419841.67
1419841.67
1419841.67
1419841.67
1419841.67
1419841.67
1419841.67
1419841.67
1419841.67
1419841.63
1908716.67
1908716.67
1908716.67
1908716.67
1908716.67
1908716.65
0.00
100000000Total Commitment in Second Quarter of 2019
International Development Association15684922Total Disbursement in Fourth Quarter of 2019
International Development Association-47671Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
The Recipient shall carry out the Program Action Plan or cause the Program Action Plan to be carried out, in accordance with theschedule set out in the said Program Action Plan in a manner satisfactory to the Association (see FA Schedule 2 Section 1 B.1)
1. No later than three (3) months after the Effective Date, the Recipient shall prepare an implementation manual, in form andsubstance acceptable to the Association, containing detailed: (a) administrative, procurement, financial management and monitoringand evaluation procedures; (b) environmental and social management systems and complaints and grievance redress mechanism; (c) theProgram Action Plan; (d) detailed arrangements for verification of achievement of the DLRs (including the Verification Protocol);(e) the institutions and entities involved in the implementation of the Program; and (f) coordination and oversight arrangementsfor the Operation (“Operations Manual”). (See FA Schedule 2, Section 1 C1)
2. The Recipient shall: (a) furnish the Operations Manual to the Association for its review; (b) afford the Association areasonable opportunity to exchange views with the Recipient on said Manual; and (c) thereafter adopt the Operations Manual as shallhave been approved by the Association.(See FA Schedule 2, Section 1 C2)
3. The Recipient: (a) shall ensure that the Program is carried out in accordance with the Operations Manual; and (b) shall notassign, amend, abrogate, or waive, or permit to be assigned, amended, abrogated, or waived, any of its provisions without the priorwritten agreement of the Association.(See FA Schedule 2, Section 1 C3)
The Recipient shall, no later than three (3) months after the Effective Date: 1. appoint and thereafter maintain, at all timesduring the implementation of the Program, an independent Verification Agent under terms of reference acceptable to the Associationand ensure that the Verification Agent prepares and provides verification reports certifying the achievement of the DLRs set out inSchedule 4 to this Agreement; and2. ensure that the Verification Agent carries out verification and process(es) in accordancewith the Verification Protocol; and (b) submit to the Association the corresponding verification reports in a timely manner and inform and substance satisfactory to the Association.(See FA Schedule 2, Section 3 B 1& 2)
Intermediate Results Indicator
Consumers provided access to online financial education materials and training
Intermediate Results Indicator
Monthly users of the online comparator tool for consumers to evaluate financial services (Observatory)
Intermediate Results Indicator
Production of monthly performance report of the procurement system
PDO Indicator
Production of annual performance reports for all ministries publicly accessible within 6 months after the end of the fiscal year
Intermediate Results Indicator
Users of Financial Observatory services reporting satisfaction with the available financial tools, information, and services
Intermediate Results Indicator
Cummulative deployment of the recipient's e-procurement system to all ministries for electronic review of bidding documents and award of public procurement contracts
Intermediate Results Indicator
Non-performaning contractors provided capacity building to improve
Intermediate Results Indicator
Students assigned places in private secondary schools who are effectively placed and electronically monitored
Intermediate Results Indicator
Digitization and integration of Records of RCCM with Commercial Court/Tribunals
Intermediate Results Indicator
Roads contracts monitored through on-line performance monitoring tool for works contracts, and publication of data including classification of all service providers
Intermediate Results Indicator
Students in secondary school in subsidized private placements who are registered online by their parents
PDO Indicator
Primary students in CP1 and CP2 that receive the required reading and mathematics textbooks at the beginning of the school year
PDO Indicator
Increase in digitization of selected government to person (G2P) and person to government (P2G) payment streams
PDO Indicator
Reduction in roads contracts that are implemented with time and/or cost overruns
PDO Indicator
Reduction in the average time to complete the procurement process through contract award stage
PDO Indicator
Reduction in the time required to confirm student attendance in private schools
Intermediate Results Indicator
Annual Finance Law executed through execution module of Budgetary Information System (SIB) and quarterly budget execution reports generated.
Intermediate Results Indicator
Signature of Framework Contracts for Emergency Road Infrastructure
Intermediate Results Indicator
Signature of Multi-annual contracts validated for school kits and textbooks
Intermediate Results Indicator
Adoption of a new procurement code incorporating provisions for the use of an electronic system of procurement and multi-year and framework contracts
44000-P151324
World Bank
CI-Infrastructure for Urban Development and Competitiveness of second cities
International Development Association
MINISTRY OF ECONOMIC INFRASTRUCTURE
International Development Association
MINISTRY OF ECONOMIC INFRASTRUCTUREPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Maria Deborah Kim
+1-202-473-1000mkim1@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
San-PEdro
4.7490 -6.6360
BouakE
7.6940 -5.0300
San Pedro
4.7470 -6.6610
Public Administration - Industry, Trade and ServicesUrban TransportAgricultural markets, commercialization and agri-businessSub-National GovernmentMitigationUrban PlanningGenderJob CreationRoad SafetyTrade FacilitationUrban DevelopmentUrban Infrastructure and Service DeliveryMSME DevelopmentClimate changeTradeEnterprise DevelopmentJobs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2333333.33
2333333.33
2333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2000000.00
2000000.00
2000000.00
3333333.33
3333333.33
3333333.34
0.00
0.00
0.00
0.00
0.00
0.00
12000000.00
12000000.00
12000000.00
0.00
0.00
0.00
6666666.66
6666666.67
6666666.67
0.00
0.00
0.00
6666666.66
6666666.67
6666666.67
0.00
0.00
0.00
3333333.33
3333333.33
3333333.34
0.00
0.00
0.00
3666666.66
3666666.67
3666666.67
120000000Total Commitment in Second Quarter of 2017
International Development Association337523Total Disbursement in Fourth Quarter of 2017
International Development Association-337523Total Interest Repayment in Fourth Quarter of 2017
International Development Association8223329Total Disbursement in Fourth Quarter of 2017
International Development Association43665Total Disbursement in Second Quarter of 2018
International Development Association83456Total Disbursement in Second Quarter of 2018
International Development Association-343002Total Interest Repayment in Second Quarter of 2018
International Development Association1022886Total Disbursement in Third Quarter of 2018
International Development Association375574Total Disbursement in Fourth Quarter of 2018
International Development Association-249116Total Interest Repayment in Fourth Quarter of 2018
International Development Association1581759Total Disbursement in First Quarter of 2019
International Development Association473852Total Disbursement in First Quarter of 2019
International Development Association781662Total Disbursement in Second Quarter of 2019
International Development Association-271878Total Interest Repayment in Second Quarter of 2019
International Development Association1382350Total Disbursement in Third Quarter of 2019
International Development Association106540Total Disbursement in Third Quarter of 2019
International Development Association1187043Total Disbursement in Fourth Quarter of 2019
International Development Association205757Total Disbursement in Fourth Quarter of 2019
International Development Association-296339Total Interest Repayment in Fourth Quarter of 2019
International Development Association2805226Total Disbursement in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Procurement Specialist | Description :Schedule 2, Section I, A. 7. (i) The Recipient shall ensure that,throughout Project implementation, the PCU is maintained with staff in sufficient number, with experience and qualificationssatisfactory to the Association, in carrying out its responsibilities, including the hiring by the PCU, all under terms ofreference and with qualification and experience satisfactory to the Association, of a procurement specialist not later than one (1)month after the Effective Date. | Due Date :26-Oct-2017
Finance Agreement :Deputy Project Coordinator | Description :Schedule 2, Section I, A. 7. (ii) The Recipient shall ensure that,throughout Project implementation, the PCU is maintained with staff in sufficient number, with experience and qualificationssatisfactory to the Association, in carrying out its responsibilities, including the hiring by the PCU, all under terms ofreference and with qualification and experience satisfactory to the Association, of a full-time Deputy Project Coordinator (inaddition to an existing overall coordinator for multiple projects supported by the PCU) not later than two (2) months after theEffective Date. | Due Date :27-Nov-2017
Finance Agreement :Environmental and Social safeguard Specialists | Description :Schedule 2, Section I, A. 7. (ii) The Recipientshall ensure that, throughout Project implementation, the PCU is maintained with staff in sufficient number, with experience andqualifications satisfactory to the Association, in carrying out its responsibilities, including the hiring by the PCU, all underterms of reference and with qualification and experience satisfactory to the Association, of an environmental safeguard specialistand a social safeguard specialist, all not later than two (2) months after the Effective Date. | Due Date :27-Nov-2017
Finance Agreement :Recruitment of an Accountant and an Assistant Accountant | Description :Schedule 2, Section I, A. 7 (iii) TheRecipient shall ensure that, throughout Project implementation, the PCU is maintained with staff in sufficient number, withexperience and qualifications satisfactory to the Association, in carrying out its responsibilities, including the hiring by thePCU, all under terms of reference and with qualification and experience satisfactory to the Association, of an accountant and anassistant accountant not later than three (3) months after the Effective Date. | Due Date :26-Dec-2017
Finance Agreement :PCU operating cost | Description :Schedule 2, Section I, A. 8. Not later than two (2) months after the EffectiveDate, the PCU shall have specified to the Recipient the operating cost of the PCU for the Project relative to all other projects itis supporting, in a manner satisfactory to the Association. | Due Date :27-Nov-2017
Finance Agreement :Project Implementation Manual | Description :Schedule 2, Section I, B. 4. The Recipient shall cause the PCU toprepare a Project Implementation Manual on terms and conditions acceptable to the Association not later than three (3) months afterthe Effective Date. | Due Date :26-Dec-2017
Finance Agreement :Entrepreneurship program implementation manu | Description :Schedule 2, Section I, B. 7. The Recipient shallcause the PCU to prepare an Entrepreneurship Program Implementation Manual on terms and conditions acceptable to the Associationnot later than twelve (12) months after the Effective Date. | Expected date of completion: March 1, 2020.
Finance Agreement :MGB debt settlement | Description :Schedule 2, Section I, B. 13. Not later than three (3) months after theEffective Date, the Recipient shall have taken all measures to ensure that any outstanding matters regarding the previousmanagement company of the MGB, Societé dâexploitation du Marche de Gros de Bouaké, will have been addressed, so as to allowimplementation of activities under Sub-component 1.1(a) of the Project in Schedule 1, in a manner satisfactory to the Association,as confirmed by an independent auditor where relevant. | Due Date :26-Dec-2017
Finance Agreement :Inspection Generale des Finances (IGF) | Description :Schedule 2, Section II, B. 4. (a) The Recipient shallcause the PCU to undertake the following:not later than two (2) months after the Effective Date, enter into a protocol between thePCU and IGF that allows IGF, as the government institution for internal controls, to include the Project within its scope of workand oversee the internal audit function of the Project. | Due Date :27-Nov-2017
Finance Agreement :Customization of accounting software | Description :Schedule 2, Section II, B. 4. (b) The Recipient shall causethe PCU to undertake the following:not later than three (3) months after the Effective Date, complete customization of accountingsoftware for the Project. | Due Date :26-Dec-2017
Finance Agreement :Independent external auditor | Description :Schedule 2, Section II, B. 4. (c) The Recipient shall cause the PCUto undertake the following:not later than six (6) months after the Effective Date, appoint a qualified independent externalauditorto audit the Financial Statements of the Project, with terms of reference and qualifications acceptable to the Association.| Due Date :26-Mar-2018
Intermediate Results Indicator
Number of MSMEs supported
Intermediate Results Indicator
Number of trucks using rehabilitated or newly built parking and rest stop areas
Intermediate Results Indicator
Number of new business registrations
Intermediate Results Indicator
Number of people trained
Intermediate Results Indicator
Number of users of Bouake's website
Intermediate Results Indicator
Number of users of San Pedro's website
PDO Indicator
Average reduction in travel time on rehabilitated/upgraded roads
PDO Indicator
Land for which the usage and ownership rights are recognized
PDO Indicator
Increase in annual sales revenue of firms directly supported through the project
Intermediate Results Indicator
Percentage of citizens consulted who consider that their views have been taken into account in detailed urban plan elaboration process in Bouake
Intermediate Results Indicator
Of which are still in operation at project end
Intermediate Results Indicator
Of which are women
Intermediate Results Indicator
Of which are women
Intermediate Results Indicator
Percentage of citizens consulted who consider their views have been taken into account in detailed urban plan elaboration process in San Pedro
Intermediate Results Indicator
Of which are led by women
Intermediate Results Indicator
Reduction in the number of accidents on the rehabilitated roads
Intermediate Results Indicator
Of which are women
Intermediate Results Indicator
Of which still in operation at project end
Intermediate Results Indicator
Of which are owned by women
Intermediate Results Indicator
Kilometers of roads upgraded or rehabilitated
Intermediate Results Indicator
Area of parking or rest stops built or rehabilitated
44000-P110020
World Bank
RCI- Emergency Urban Infrastructure (FY08)
International Development Association
MINISTRY OF URBAN DEVELOPMENT
International Development Association
MINISTRY OF URBAN DEVELOPMENTPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Madio Fall
+1-202-473-1000mfall2@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Yopougon-Sante
5.3110 -4.0360
Yopougon-Attie
5.3530 -4.0700
Williamsville
5.3640 -4.0250
Treichville
5.2880 -4.0060
San-Pedro
4.7490 -6.6360
Port-Bouet
5.2570 -3.9630
Koumassi
5.2970 -3.9680
Korhogo
9.4580 -5.6300
Divo
5.8370 -5.3570
Daloa
6.8770 -6.4500
Cocody
5.3350 -4.0040
Bouake
7.6940 -5.0300
Adjame
5.3460 -3.8720
Adjame
5.3510 -4.0250
Abobo
5.4160 -4.0160
Abidjan
5.3100 -4.0130
Marcory
5.3120 -3.9940
Water SupplyUrban TransportSub-National GovernmentSanitationWaste ManagementServices and Housing for the PoorUrban Infrastructure and Service DeliveryUrban DevelopmentMunicipal Institution BuildingAdministrative and Civil Service ReformPublic Administration
1646234.67
1646234.67
1646234.67
1920607.13
1920607.13
1920607.11
1920607.13
1920607.13
1920607.11
2194979.56
2194979.56
2194979.58
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4389959.14
4389959.14
4389959.12
4389959.14
4389959.14
4389959.12
4389959.14
4389959.14
4389959.12
4389959.14
4389959.14
4389959.12
2057793.34
2057793.34
2057793.34
2057793.34
2057793.34
2057793.34
2057793.34
2057793.34
2057793.34
1646234.67
1646234.67
1646234.67
411558.67
411558.67
411558.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1646234.67
1646234.67
1646234.67
1920607.13
1920607.13
1920607.11
1920607.13
1920607.13
1920607.11
2194979.56
2194979.56
2194979.58
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4527145.36
4389959.14
4389959.14
4389959.12
4389959.14
4389959.14
4389959.12
4389959.14
4389959.14
4389959.12
4389959.14
4389959.14
4389959.12
2057793.34
2057793.34
2057793.34
2057793.34
2057793.34
2057793.34
2057793.34
2057793.34
2057793.34
1646234.67
1646234.67
1646234.67
411558.67
411558.67
411558.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
94000000Total Commitment in Second Quarter of 2008
International Development Association7251786Total Disbursement in Fourth Quarter of 2008
International Development Association92518Total Disbursement in First Quarter of 2009
International Development Association540472Total Disbursement in First Quarter of 2009
International Development Association2132464Total Disbursement in Second Quarter of 2009
International Development Association806516Total Disbursement in Second Quarter of 2009
International Development Association585339Total Disbursement in Third Quarter of 2009
International Development Association1520458Total Disbursement in Third Quarter of 2009
International Development Association5334335Total Disbursement in Third Quarter of 2009
International Development Association5605448Total Disbursement in Fourth Quarter of 2009
International Development Association2767672Total Disbursement in Fourth Quarter of 2009
International Development Association476876Total Disbursement in Fourth Quarter of 2009
International Development Association4192248Total Disbursement in First Quarter of 2010
International Development Association4338840Total Disbursement in First Quarter of 2010
International Development Association2982373Total Disbursement in First Quarter of 2010
International Development Association2922288Total Disbursement in Second Quarter of 2010
International Development Association2078410Total Disbursement in Second Quarter of 2010
International Development Association2035449Total Disbursement in Second Quarter of 2010
International Development Association50000000Total Commitment in Second Quarter of 2010
International Development Association4743232Total Disbursement in Third Quarter of 2010
International Development Association2015159Total Disbursement in Third Quarter of 2010
International Development Association3852693Total Disbursement in Third Quarter of 2010
International Development Association2661850Total Disbursement in Fourth Quarter of 2010
International Development Association1209206Total Disbursement in Fourth Quarter of 2010
International Development Association3178014Total Disbursement in Fourth Quarter of 2010
International Development Association4012915Total Disbursement in Fourth Quarter of 2010
International Development Association54568Total Disbursement in Second Quarter of 2011
International Development Association6496512Total Disbursement in Third Quarter of 2011
International Development Association808070Total Disbursement in Third Quarter of 2011
International Development Association5339977Total Disbursement in Third Quarter of 2011
International Development Association496756Total Disbursement in Third Quarter of 2011
International Development Association3624433Total Disbursement in Fourth Quarter of 2011
International Development Association409116Total Disbursement in Fourth Quarter of 2011
International Development Association1462787Total Disbursement in Fourth Quarter of 2011
International Development Association-513545Total Disbursement in Fourth Quarter of 2011
International Development Association624416Total Disbursement in Fourth Quarter of 2011
International Development Association893232Total Disbursement in First Quarter of 2012
International Development Association610027Total Disbursement in First Quarter of 2012
International Development Association2550699Total Disbursement in First Quarter of 2012
International Development Association4329037Total Disbursement in First Quarter of 2012
International Development Association2065675Total Disbursement in First Quarter of 2012
International Development Association4135030Total Disbursement in Second Quarter of 2012
International Development Association3712664Total Disbursement in Second Quarter of 2012
International Development Association5433287Total Disbursement in Second Quarter of 2012
International Development Association833552Total Disbursement in Second Quarter of 2012
International Development Association715694Total Disbursement in Second Quarter of 2012
International Development Association239423Total Disbursement in Third Quarter of 2012
International Development Association1337936Total Disbursement in Third Quarter of 2012
International Development Association2753669Total Disbursement in Third Quarter of 2012
International Development Association1602651Total Disbursement in Third Quarter of 2012
International Development Association996448Total Disbursement in Third Quarter of 2012
International Development Association1791495Total Disbursement in Fourth Quarter of 2012
International Development Association261383Total Disbursement in Fourth Quarter of 2012
International Development Association1593731Total Disbursement in Fourth Quarter of 2012
International Development Association1260192Total Disbursement in Fourth Quarter of 2012
International Development Association2723539Total Disbursement in Fourth Quarter of 2012
International Development Association235106Total Disbursement in First Quarter of 2013
International Development Association450503Total Disbursement in First Quarter of 2013
International Development Association895733Total Disbursement in First Quarter of 2013
International Development Association882984Total Disbursement in First Quarter of 2013
International Development Association1646657Total Disbursement in Second Quarter of 2013
International Development Association189780Total Disbursement in Second Quarter of 2013
International Development Association608064Total Disbursement in Second Quarter of 2013
International Development Association1239252Total Disbursement in Second Quarter of 2013
International Development Association837950Total Disbursement in Third Quarter of 2013
International Development Association41601Total Disbursement in Third Quarter of 2013
International Development Association51524Total Disbursement in Third Quarter of 2013
International Development Association774141Total Disbursement in Third Quarter of 2013
International Development Association449091Total Disbursement in Third Quarter of 2013
International Development Association526866Total Disbursement in Third Quarter of 2013
International Development Association1152629Total Disbursement in Fourth Quarter of 2013
International Development Association711066Total Disbursement in First Quarter of 2014
International Development Association473028Total Disbursement in First Quarter of 2014
International Development Association786503Total Disbursement in Second Quarter of 2014
International Development Association706888Total Disbursement in Second Quarter of 2014
International Development Association296715Total Disbursement in Second Quarter of 2014
International Development Association-11950Total Disbursement in Fourth Quarter of 2014
International Development Association-11950Total Commitment Cancellations in Fourth Quarter of 2014
International Development Association-1845Total Disbursement in Fourth Quarter of 2014
International Development Association-1845Total Commitment Cancellations in Fourth Quarter of 2014
International Development AssociationProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
The ESMF and the RPF, both in form and substance satisfactory to the Association, have been adopted and disclosed by the Recipientin manner satisfactory to the Association
PDO Indicator
Direct project beneficiaries
PDO Indicator
Number of people in urban areas provided with access to all-season roads within a 500 meter range under the project
No data available
PDO Indicator
Number of people in urban areas provided with access to regular solid waste collection under the project
No data available
25 collection centers are cancelled due to unavailability of sites
PDO Indicator
Number of people in urban areas provided with access to Improved Water Sources under the project
PDO Indicator
Number of people in urban areas provided with access to Improved Sanitation under the project
Intermediate Results Indicator
New piped household water connections that are resulting from the project intervention
Intermediate Results Indicator
Improved community water points constructed or rehabilitated under the project
132 water points + 38 schools connected
132 water points + 38 schools newly connected
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
Component V: Municipal ContractsNumber of municipal audits and municipal contracts prepared
Intermediate Results Indicator
Component III: Solid Waste Management Percentage of waste collected and dumped to the disposal site compared to total waste produced
Intermediate Results Indicator
Reduced waste water flow being discharged into the lagoon
Previous data should be 1,400 instead of 4,500
Intermediate Results Indicator
Number of rehabilited pumping stations
Intermediate Results Indicator
Component II: Urban Sanitation (Sewerage)Number of additional people connected to the interceptor
Previous data should be 1,220,102 instead of 153,890
Intermediate Results Indicator
Roads rehabilitated, Non-rural
More roads are rehabilitated using remaining funds from component 3.
44000-P158810
World Bank
Cashew Value Chain Competitiveness Project
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Jean-Philippe Tre
+1-202-473-1000jtre@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Zuenoula
7.4300 -6.0510
Yamoussoukro
6.8210 -5.2770
Toumodi
6.5580 -5.0180
Toubako
8.2330 -7.7350
Tengrela
10.4810 -6.4070
Tiebissou
7.1580 -5.2250
Tanda
7.8030 -3.1680
Sinfla
6.8440 -5.7160
Sakassou
7.7480 -5.0140
Odienne-Sienso
9.4120 -7.5100
M'Bahiakro
7.4570 -4.3400
Mankono
8.4480 -6.8600
Korhogo
9.4580 -5.6300
Katiola
8.1370 -5.1010
Ferke
9.5830 -4.3000
Dimbokro
6.6470 -4.7050
Daoukro
7.0590 -3.9630
Dabakalakoro
8.3690 -4.4180
Boundiali
9.5220 -6.4870
Bouna
9.2690 -2.9950
Bouake
7.6940 -5.0300
Bouafla
7.2520 -5.8500
Bongouanou
6.6520 -4.2040
Bondoukou
8.0400 -2.8000
Bocanda
7.0630 -4.4990
Agnibilekrou
7.1310 -3.2040
Seguela
7.9610 -6.6730
San Pedro Airport
4.7470 -6.6610
Bafingdala
7.8490 -7.6690
Beoumi
7.7640 -5.5300
Gbeke
7.7030 -5.2850
Hambol
8.3040 -5.1540
Gontougo
7.8710 -3.0710
Agricultural Extension, Research, and Other Support ActivitiesRural and Inter-Urban RoadsPublic Administration - Industry, Trade and ServicesAgricultural markets, commercialization and agri-businessRegional IntegrationMitigationFinance for DevelopmentAdaptationRural Infrastructure and service deliveryEnergyBusiness Enabling EnvironmentAgriculture FinanceRural DevelopmentInvestment and Business ClimateRural MarketsEnergy EfficiencyClimate change
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
363636.36
363636.37
363636.37
545454.55
545454.55
545454.55
545454.55
545454.55
545454.55
545454.53
545454.53
545454.54
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.65
2916666.66
2916666.66
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.34
5833333.34
5833333.35
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
3181818.18
3181818.18
3181818.18
3181818.18
3181818.18
3181818.18
3181818.18
3181818.18
3181818.18
2121212.12
2121212.13
2121212.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
363636.36
363636.37
363636.37
545454.55
545454.55
545454.55
545454.55
545454.55
545454.55
545454.53
545454.53
545454.54
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.65
2916666.66
2916666.66
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.33
5833333.34
5833333.34
5833333.35
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
4500000.00
3181818.18
3181818.18
3181818.18
3181818.18
3181818.18
3181818.18
3181818.18
3181818.18
3181818.18
2121212.12
2121212.13
2121212.13
200000000Total Commitment in Second Quarter of 2018
International Bank for Reconstruction and Development466913Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-466913Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development16731303Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development-314978Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development6161315Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development6749528Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-418777Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development10936769Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development-503915Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Prior to any modification of the Levy that may adversely affect the ability of the Borrower to meet its periodic Loan repaymentobligations from funds held in the Repayment Account, including, but not limited to, any change in the collection procedure or anyreduction in the Levy to less than 20 FCFA/kg at any time during the Loan, the Borrower and the Guarantor shall consult with theBank and implement alternative credit enhancement measures for the Project satisfactory to the Bank.
At all times during the life of the Loan, except as the Bank shall otherwise agree, the Borrower shall not permit the ratio of (i)the total amount that has transited into the Repayment Account during the period of the calendar year immediately preceding thedateof any calculation to (ii) the projected maximum debt service requirements under the Loan for the immediately succeedingcalendar year, to be less than one and one-half (1.5) (the “Minimum Ratio”).
The Bank, on the basis of the statements of account of the Repayment Account provided monthly by the Repayment Account Bank asdescribed in Section III.2 above, shall calculate the Minimum Ratio annually and shall promptly notify the Borrower in the eventthat the Minimum Ratio is less than one and one-half (1.5) at any time.
No later than 6 months after effectiveness, strengthen the capacity and performance of the oversight function of FIRCA through therevision of “the internal audit chapter” and the creation of an effective Audit Committee.
As transitional measures, the implementation unit for the West Africa Agriculture Productivity Program, established within FIRCA,shall initially be responsible for managing and coordinating Project activities, including procurement and financial management andthe daily management of the Designated Account. No later than three (3) months after the Effective Date the PCU will take over allfunctions, apart from the fiduciary function, which will remain entrusted to FIRCA.
For the purpose of carrying out Project activities, the Borrower shall no later than three (3) months after the Effective Date,enter into Subproject Agreements with project implementation agencies, each under their respective mandates: (i) FIRCA and CNRA foragriculture research activities and production of seedlings, (ii) ANADER for extension of cashew good agricultural practices, (iii)DOPA for support to professional organizations, (iv) AGEDI for promotion of the processing platforms dedicated to cashew, (v) BNETDfor preparation of technical studies, and (vi) AGEROUTE for the rehabilitation of feeder roads.
The Borrower shall ensure that FIRCA appoints: (A) a financial management specialist, (B) a procurement specialist, (C) a principalaccountant, and (D) an external auditor, all with qualifications and experience satisfactory to the Bank and no later than three(3) months after the Effective Date.
The Borrower shall ensure that FIRCA updates the accounting software and its fiduciary procedures manual no later than two (2)months after the Effective Date.
The Borrower shall ensure that FIRCA signs a protocol with the Inspection General des Finances (IGF) and Ministry of Economy andFinance (MEF) which will allow IGF to include the Project in the scope of its work no later than two (2) months after the EffectiveDate.
The Borrower shall ensure that FIRCA creates an audit committee to strengthen its capacity and performance regarding its oversightfunction for the Project, no later than six (6) months after the Effective Date.
The Borrower shall furnish to the Bank, not later than December 15 of each year, the annual work plans and budgets approved by theSteering Committee for the Bankss review and approval; except for the annual work plan and budget for the Project for the firstyear of Project implementation, which shall be furnished no later than one (1) month after the Effective Date. Only the activitiesincluded in an annual work plan and budget expressly approved by the Bank (each an “Annual Work Plan and Budget”) are eligible tobe financed from the proceeds of the Financing.
PDO Indicator
Farmers reached with agricultural assets or services
PDO Indicator
Farmers reached with agricultural assets or services - Female
Intermediate Results Indicator
Technicians and managers trained in cashew processing
Intermediate Results Indicator
Farmers trained in GAPs
Intermediate Results Indicator
Cashew entreprises obtained financing from banks faciliated by the project
Intermediate Results Indicator
Jobs created within the cashew processing industrial platforms
Intermediate Results Indicator
Jobs created within the cashew processing industrial platforms - female
Intermediate Results Indicator
Increase in membership of cashew producers organizations
Intermediate Results Indicator
Beneficiary satisfaction rate with quality of services provided by the project
Intermediate Results Indicator
Incentives for promoting domestic processing implemented efficiently
PDO Indicator
Improved quality of RCN exported and received by processors in Cote d’Ivoire
Intermediate Results Indicator
Improved rural roads and access to markets
PDO Indicator
Increased cashew productivity in the project area
Intermediate Results Indicator
Storage capacity of warehouses built and/or rehabilitated
Intermediate Results Indicator
Installed RCN processing capacity in the dedicated industrial platforms
Intermediate Results Indicator
Area of village plantations planted with improved grafting material
44000-P161770
World Bank
Multisectoral Nutrition and Child Development Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Menno Mulder-Sibanda
+1-202-473-1000mmuldersibanda@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Bafing
8.5000 -7.5000
Folon
9.8120 -7.5190
Kabadougou
9.6060 -7.4380
Belier
7.0260 -5.0670
Iffou
7.1150 -3.9500
Haut-Sassandra
6.6700 -6.5010
Marahoue
7.0330 -5.8020
Bagoue
9.9360 -6.4080
Poro
9.3050 -5.7180
Bere
8.1900 -6.1720
Worodougou
8.1650 -6.6660
Bounkani
9.4780 -3.3120
Gontougo
7.8710 -3.0710
Tchologo
9.5270 -4.8970
HealthPublic Administration - HealthHealth System StrengtheningGenderNutritionHealth Systems and PoliciesNutrition and Food SecurityChild Health
0.00
0.00
196200.00
161500.00
185500.00
207050.00
226600.00
392150.00
296650.00
311200.00
319050.00
329800.00
509850.00
339250.00
330850.00
331150.00
344500.00
370200.00
385000.00
606900.00
442200.00
463850.00
486350.00
520200.00
842850.00
580850.00
610850.00
657000.00
691200.00
718700.00
1166850.00
848100.00
896100.00
946200.00
996200.00
1601750.00
1132850.00
1172300.00
1206100.00
1255450.00
1297950.00
1335600.00
2096200.00
1457000.00
1483150.00
1501800.00
1518700.00
2333600.00
1582150.00
1608850.00
1638900.00
1665150.00
1690050.00
2582950.00
1754500.00
1374100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
196200.00
161500.00
185500.00
207050.00
226600.00
392150.00
296650.00
311200.00
319050.00
329800.00
509850.00
339250.00
330850.00
331150.00
344500.00
370200.00
385000.00
606900.00
442200.00
463850.00
486350.00
520200.00
842850.00
580850.00
610850.00
657000.00
691200.00
718700.00
1166850.00
848100.00
896100.00
946200.00
996200.00
1601750.00
1132850.00
1172300.00
1206100.00
1255450.00
1297950.00
1335600.00
2096200.00
1457000.00
1483150.00
1501800.00
1518700.00
2333600.00
1582150.00
1608850.00
1638900.00
1665150.00
1690050.00
2582950.00
1754500.00
1374100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50000000Total Commitment in First Quarter of 2018
International Development Association183835Total Disbursement in Third Quarter of 2018
International Development Association2612481Total Disbursement in Fourth Quarter of 2018
International Development Association-1287Total Interest Repayment in Fourth Quarter of 2018
International Development Association-18279Total Interest Repayment in Second Quarter of 2019
International Development Association780843Total Disbursement in Third Quarter of 2019
International Development Association507335Total Disbursement in Third Quarter of 2019
International Development Association1695301Total Disbursement in Fourth Quarter of 2019
International Development Association709091Total Disbursement in Fourth Quarter of 2019
International Development Association-24699Total Interest Repayment in Fourth Quarter of 2019
International Development Association1211639Total Disbursement in First Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Schedule 2, Section 1.A.3(a): The Recipient shall establish, no later than three (3) months after the Effective Date, and maintainat all times until the completion of the Project, a Project implementation unit with terms of reference and resources satisfactoryto the Association (“Project Implementation Unit” or “PIU”).
Schedule 2, Section 1.C.1: No later than three (3) months after the Effective Date, the Recipient shall prepare or cause to beprepared, in accordance with terms of reference acceptable to the Association, a manual for the RBF component of the Project (“RBFOperations Manual”).
Schedule 2, Section 1.E.3: The Recipient shall furnish to the Association, the annual work plan and budget for the Project for thefirst year of Project implementation, which shall be furnished no later than one (1) month after the Effective Date.
PDO Indicator
Caregivers educated on parenting practices on the basis of parenting module in last 3 months
PDO Indicator
Mothers of children under 5 years of age and pregnant women who have been trained by the project and engage in the production or processing of diversified and micronutrient-rich foods
PDO Indicator
Households with handwashing facilities/stations
Intermediate Results Indicator
Sub-Prefectures with joint work plan implementation rate of 50% or more
Intermediate Results Indicator
Sector-wide progress reviews of the nutrition program
Intermediate Results Indicator
Children diagnosed with severe acute malnutrition recuperated in the context of the project
Intermediate Results Indicator
Number of women and children who have received basic nutrition services
Intermediate Results Indicator
Number of deliveries attended by skilled health personnel
Intermediate Results Indicator
Women aged 15 to 49 years having benefitted from functional literacy training with a focus on nutrition and stimulation through theproject
Intermediate Results Indicator
Community food banks for the management of moderate acute malnutrition at community level in the intervention areas
Intermediate Results Indicator
Household latrines installed within the context of the project
Intermediate Results Indicator
Vulnerable pregnant women or mothers of children under five having received cash transfer through the safety net program in the intervention areas
Intermediate Results Indicator
People who have received essential health, nutrition, and population (HNP) services
Intermediate Results Indicator
People who have received essential health, nutrition, and population (HNP) services - Female (RMS requirement)
PDO Indicator
Children 6–23 months of age who receive a minimum acceptable diet
PDO Indicator
Pregnant women attending four prenatal care visits
Intermediate Results Indicator
Children 0-5 months of age exclusively breastfed
Intermediate Results Indicator
Pregnant women making first prenatal care consultation in first trimester of pregnancy in the intervention areas
Intermediate Results Indicator
Beneficiaries who feel that project investments (package of interventions) reflected their needs
Intermediate Results Indicator
Married women of reproductive age who usually make their own decision regarding health care
44000-P035655
World Bank
Education & Training Support
International Development Association
MENFB, MESRIT, METFP
International Development Association
MENFB, MESRIT, METFPPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Hamoud Abdel Wedoud Kamil
+1-202-473-1000hkamil@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Yamoussoukro
6.82055 -5.2767401
Secondary EducationSub-National GovernmentPrimary EducationTertiary EducationCentral Government (Central Agencies)Rural DevelopmentPublic AdministrationGenderEducation FinancingParticipation and Civic EngagementAccess to EducationRural Infrastructure and service deliveryEducationMunicipal Institution BuildingSocial Inclusion
0.00
0.00
0.00
510000.00
500000.00
500000.00
940000.00
940000.00
930000.00
1040000.00
1030000.00
1030000.00
1130000.00
1120000.00
1120000.00
1130000.00
1120000.00
1120000.00
1350000.00
1350000.00
1350000.00
1350000.00
1350000.00
1350000.00
1080000.00
1080000.00
1080000.00
1080000.00
1080000.00
1080000.00
1080000.00
1080000.00
1080000.00
1080000.00
1080000.00
1080000.00
1040000.00
1030000.00
1030000.00
1040000.00
1030000.00
1030000.00
1040000.00
1030000.00
1030000.00
1040000.00
1030000.00
1030000.00
1040000.00
1030000.00
1030000.00
900000.00
900000.00
900000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
503713.22
503713.22
503713.24
174368.68
174368.68
174368.66
1089.00
1089.00
1089.02
40166.13
40166.13
40166.14
34690.48
34690.48
34690.49
73844.83
73844.83
73844.83
0.00
0.00
0.00
57748.92
57748.92
57748.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-13219.01
-13219.01
-13219.01
55608.89
55608.89
55608.87
0.00
0.00
0.00
64687.14
64687.14
64687.14
449313.56
449313.56
449313.56
0.00
0.00
0.00
41890.89
41890.89
41890.89
15940.39
15940.39
15940.37
280509.47
280509.47
280509.49
119360.53
119360.53
119360.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-60433.65
-60433.65
-60433.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-177646.41
-177646.41
-177646.40
0.00
0.00
0.00
1077786.99
1077786.99
1077786.99
2220833.33
2220833.33
2220833.33
2220833.33
2220833.33
2220833.33
2220833.33
2220833.33
2220833.33
2220833.33
2220833.33
2220833.33
2220833.33
2220833.33
2220833.33
2220833.33
2220833.33
2220833.33
1345959.60
1345959.60
1345959.60
356287.00
356287.00
356287.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
53300000Total Commitment in Second Quarter of 1998
International Development Association1558957Total Disbursement in Fourth Quarter of 1998
International Development Association547259Total Disbursement in First Quarter of 1999
International Development Association-2488Total Interest Repayment in First Quarter of 1999
International Development Association14315Total Disbursement in Second Quarter of 1999
International Development Association27742Total Disbursement in Second Quarter of 1999
International Development Association-8922Total Disbursement in Second Quarter of 1999
International Development Association48056Total Disbursement in Third Quarter of 1999
International Development Association22385Total Disbursement in Third Quarter of 1999
International Development Association-16140Total Interest Repayment in Third Quarter of 1999
International Development Association50630Total Disbursement in Third Quarter of 1999
International Development Association55565Total Disbursement in Fourth Quarter of 1999
International Development Association51055Total Disbursement in Fourth Quarter of 1999
International Development Association-16736Total Interest Repayment in First Quarter of 2000
International Development Association220970Total Disbursement in First Quarter of 2000
International Development Association76863Total Disbursement in Third Quarter of 2000
International Development Association75182Total Disbursement in Third Quarter of 2000
International Development Association17520Total Disbursement in Third Quarter of 2000
International Development Association-17188Total Interest Repayment in Third Quarter of 2000
International Development Association0Total Disbursement in Fourth Quarter of 2000
International Development Association-9664Total Interest Repayment in Third Quarter of 2001
International Development Association-9403Total Interest Repayment in First Quarter of 2002
International Development Association-38238Total Disbursement in First Quarter of 2002
International Development Association-9312Total Interest Repayment in First Quarter of 2002
International Development Association155222Total Disbursement in Second Quarter of 2002
International Development Association-9823Total Interest Repayment in Third Quarter of 2002
International Development Association192771Total Disbursement in Fourth Quarter of 2002
International Development Association-11054Total Interest Repayment in First Quarter of 2003
International Development Association1371696Total Disbursement in First Quarter of 2003
International Development Association128956Total Disbursement in Third Quarter of 2003
International Development Association-606Total Interest Repayment in Third Quarter of 2003
International Development Association-14000Total Interest Repayment in Third Quarter of 2003
International Development Association50799Total Disbursement in Fourth Quarter of 2003
International Development Association918595Total Disbursement in First Quarter of 2004
International Development Association-152184Total Interest Repayment in First Quarter of 2004
International Development Association341707Total Disbursement in Second Quarter of 2004
International Development Association47028Total Disbursement in Second Quarter of 2004
International Development Association-1487Total Interest Repayment in Third Quarter of 2004
International Development Association-205411Total Disbursement in Second Quarter of 2005
International Development Association-77970Total Interest Repayment in Third Quarter of 2007
International Development Association-285820Total Interest Repayment in First Quarter of 2008
International Development Association-282201Total Interest Repayment in First Quarter of 2008
International Development Association-196697Total Interest Repayment in Second Quarter of 2008
International Development Association-651148Total Disbursement in Second Quarter of 2008
International Development Association-793Total Interest Repayment in Third Quarter of 2008
International Development Association-751Total Loan Repayment in Third Quarter of 2008
International Development Association-35000Total Interest Repayment in Third Quarter of 2008
International Development Association-621740Total Loan Repayment in Third Quarter of 2008
International Development Association3625893Total Disbursement in Fourth Quarter of 2008
International Development Association468053Total Disbursement in First Quarter of 2009
International Development Association-40260Total Interest Repayment in First Quarter of 2009
International Development Association-582025Total Loan Repayment in First Quarter of 2009
International Development Association317348Total Disbursement in Second Quarter of 2009
International Development Association737551Total Disbursement in Third Quarter of 2009
International Development Association-33771Total Interest Repayment in Third Quarter of 2009
International Development Association-619312Total Loan Repayment in Third Quarter of 2009
International Development Association653725Total Disbursement in Fourth Quarter of 2009
International Development Association2704082Total Disbursement in Fourth Quarter of 2009
International Development Association1152404Total Disbursement in Fourth Quarter of 2009
International Development Association568219Total Disbursement in First Quarter of 2010
International Development Association5601633Total Disbursement in First Quarter of 2010
International Development Association-8861Total Interest Repayment in First Quarter of 2010
International Development Association-610557Total Loan Repayment in First Quarter of 2010
International Development Association882074Total Disbursement in First Quarter of 2010
International Development Association1471918Total Disbursement in Second Quarter of 2010
International Development Association2581591Total Disbursement in Second Quarter of 2010
International Development Association3906853Total Disbursement in Second Quarter of 2010
International Development Association1382558Total Disbursement in Third Quarter of 2010
International Development Association2403054Total Disbursement in Third Quarter of 2010
International Development Association-114425Total Interest Repayment in Third Quarter of 2010
International Development Association-597615Total Loan Repayment in Third Quarter of 2010
International Development Association577986Total Disbursement in Third Quarter of 2010
International Development Association1223285Total Disbursement in Fourth Quarter of 2010
International Development Association5678549Total Disbursement in Fourth Quarter of 2010
International Development Association-6728Total Loan Repayment in First Quarter of 2011
International Development Association-135039Total Interest Repayment in Second Quarter of 2011
International Development Association-623990Total Loan Repayment in Second Quarter of 2011
International Development Association707056Total Disbursement in Second Quarter of 2011
International Development Association594253Total Disbursement in Third Quarter of 2011
International Development Association1332235Total Disbursement in Third Quarter of 2011
International Development Association-148326Total Interest Repayment in Third Quarter of 2011
International Development Association-637437Total Loan Repayment in Third Quarter of 2011
International Development Association518822Total Disbursement in Third Quarter of 2011
International Development Association2278558Total Disbursement in Fourth Quarter of 2011
International Development Association468009Total Disbursement in Fourth Quarter of 2011
International Development Association533214Total Disbursement in Fourth Quarter of 2011
International Development Association0Offsetting entry for interest written off under the HIPC Initiative
International Development AssociationInternational Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund0Retraction of earlier cancellations
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund0Charges written off under the HIPC Initiative
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund941387Total Disbursement in First Quarter of 2012
International Development Association687816Total Disbursement in First Quarter of 2012
International Development Association-146803Total Interest Repayment in First Quarter of 2012
International Development Association-613598Total Loan Repayment in First Quarter of 2012
International Development Association900393Total Disbursement in First Quarter of 2012
International Development Association972250Total Disbursement in Second Quarter of 2012
International Development Association-3952471Total Disbursement in Second Quarter of 2012
International Development Association4797182Total Disbursement in Second Quarter of 2012
International Development Association-283292Offsetting entry for principal written off under the HIPC Initiative
International Development AssociationInternational Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund-4415004Offsetting entry for principal written off under the MDRI Initiative
International Development AssociationInternational Development Association - Multilateral Debt Relief Initiative283292Principal written off under the HIPC Initiative
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund4415004Principal written off under the MDRI Initiative
International Development Association - Multilateral Debt Relief Initiative-8042Offsetting entry for interest written off under the HIPC Initiative
International Development AssociationInternational Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund8042Retraction of earlier cancellations
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund8042Charges written off under the HIPC Initiative
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund1454015Total Disbursement in Third Quarter of 2012
International Development Association1570173Total Disbursement in Third Quarter of 2012
International Development Association-159695Total Interest Repayment in Third Quarter of 2012
International Development Association-546762Total Loan Repayment in Third Quarter of 2012
International Development Association2896440Total Disbursement in Fourth Quarter of 2012
International Development Association501400Total Disbursement in Fourth Quarter of 2012
International Development Association248477Total Disbursement in Fourth Quarter of 2012
International Development Association-8020Offsetting entry for principal written off under the HIPC Initiative
International Development AssociationInternational Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund8020Principal written off under the HIPC Initiative
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund875445Total Disbursement in First Quarter of 2013
International Development Association760144Total Disbursement in First Quarter of 2013
International Development Association-177035Total Interest Repayment in First Quarter of 2013
International Development Association-551478Total Loan Repayment in First Quarter of 2013
International Development Association105685Total Disbursement in First Quarter of 2013
International Development Association-16353Total Disbursement in Second Quarter of 2013
International Development Association-7997Offsetting entry for principal written off under the HIPC Initiative
International Development AssociationInternational Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund7997Principal written off under the HIPC Initiative
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund-184275Total Interest Repayment in Third Quarter of 2013
International Development Association-539333Total Loan Repayment in Third Quarter of 2013
International Development Association-350787Total Disbursement in Third Quarter of 2013
International Development Association-396311Total Commitment Cancellations in Fourth Quarter of 2013
International Development Association-7975Offsetting entry for principal written off under the HIPC Initiative
International Development AssociationInternational Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund7975Principal written off under the HIPC Initiative
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund-181513Total Interest Repayment in First Quarter of 2014
International Development Association-543421Total Loan Repayment in First Quarter of 2014
International Development Association-5205Offsetting entry for principal written off under the HIPC Initiative
International Development AssociationInternational Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund-2747Offsetting entry for interest written off under the HIPC Initiative
International Development AssociationInternational Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund5205Principal written off under the HIPC Initiative
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund2747Retraction of earlier cancellations
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund2747Charges written off under the HIPC Initiative
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund-174527Total Interest Repayment in Third Quarter of 2014
International Development Association-545062Total Loan Repayment in Third Quarter of 2014
International Development Association-7930Offsetting entry for interest written off under the HIPC Initiative
International Development AssociationInternational Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund7930Retraction of earlier cancellations
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund7930Charges written off under the HIPC Initiative
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund-127149Total Interest Repayment in First Quarter of 2015
International Development Association-506686Total Loan Repayment in First Quarter of 2015
International Development Association-7908Offsetting entry for interest written off under the HIPC Initiative
International Development AssociationInternational Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund7908Retraction of earlier cancellations
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund7908Charges written off under the HIPC Initiative
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund-190202Total Interest Repayment in Third Quarter of 2015
International Development Association-501259Total Loan Repayment in Third Quarter of 2015
International Development Association-7885Offsetting entry for principal written off under the HIPC Initiative
International Development AssociationInternational Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund7885Principal written off under the HIPC Initiative
International Development Association - Heavily Indebted Poor Countries Debt Initiative Trust Fund-158353Total Interest Repayment in First Quarter of 2016
International Development Association-488883Total Loan Repayment in First Quarter of 2016
International Development Association-158159Total Interest Repayment in Third Quarter of 2016
International Development Association-502060Total Loan Repayment in Third Quarter of 2016
International Development Association-152470Total Interest Repayment in First Quarter of 2017
International Development Association-489862Total Loan Repayment in First Quarter of 2017
International Development Association-156040Total Interest Repayment in Third Quarter of 2017
International Development Association-507448Total Loan Repayment in Third Quarter of 2017
International Development Association-158894Total Interest Repayment in First Quarter of 2018
International Development Association-523107Total Loan Repayment in First Quarter of 2018
International Development Association-151283Total Interest Repayment in Third Quarter of 2018
International Development Association-1008556Total Loan Repayment in Third Quarter of 2018
International Development Association-144144Total Interest Repayment in First Quarter of 2019
International Development Association-1005213Total Loan Repayment in First Quarter of 2019
International Development Association-138231Total Interest Repayment in Third Quarter of 2019
International Development Association-984497Total Loan Repayment in Third Quarter of 2019
International Development Association-138305Total Interest Repayment in First Quarter of 2020
International Development Association-985525Total Loan Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportContract AwardsProject URLProcurement Notices
Deposit into the Project Account for the counterpart funds, on the first day of each quarter, an amount equivalent to CFAF500,000,000.
The Borrower shall update the Procurement Plan and furnish such update to the Association not later than 12 months after the dateof the preceding Procurement Plan.
Acquire, by not later than September 30 of each year, a stock of textbooks and pedagogical guides in adequate numbers for basicsubject matters.
The Recipient shall prepare and furnish to the Association not later than 45 days after the end of each calendar quarter, interimun-audited financial reports
The Recipient shall have its Financial Statements periodically audited by independent auditors.
Re-establish, no later than October 1, 2008, the Education and Training Sector Inter-ministerial Committee. (CICSE)
The Borrower shall by October 31 of each year, prepare draft work plans and related budgets and submit them to the Association.
44000-P143781
World Bank
Côte d'Ivoire: Poverty Reduction Support Credit 2
International Development Association
MINISTRY OF ECONOMY AND FINANCE
International Development Association
MINISTRY OF ECONOMY AND FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Samba Ba
+1-202-473-1000sba3@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Yamoussoukro
6.82055 -5.2767401
Other Industry, Trade and ServicesOther Energy and ExtractivesCentral Government (Central Agencies)Other Agriculture, Fishing and ForestryCropsTradeFinance for DevelopmentRegulation and Competition PolicyBusiness Enabling EnvironmentTransparency, Accountability and Good GovernanceRural DevelopmentPublic Finance ManagementPublic AdministrationAgriculture FinancePublic Expenditure ManagementTrade FacilitationRural Markets
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70000000Total Commitment in Fourth Quarter of 2014
International Development Association68349261Total Disbursement in Fourth Quarter of 2014
International Development Association-81909Total Interest Repayment in First Quarter of 2015
International Development Association169038Total Disbursement in Second Quarter of 2015
International Development Association-155Total Commitment Cancellations in Third Quarter of 2015
International Development Association-253173Total Interest Repayment in Third Quarter of 2015
International Development Association-245153Total Interest Repayment in First Quarter of 2016
International Development Association-247512Total Interest Repayment in Third Quarter of 2016
International Development Association-237908Total Interest Repayment in First Quarter of 2017
International Development Association-252745Total Interest Repayment in Third Quarter of 2017
International Development Association-256058Total Interest Repayment in First Quarter of 2018
International Development Association-248571Total Interest Repayment in Third Quarter of 2018
International Development Association-244436Total Interest Repayment in First Quarter of 2019
International Development Association-242614Total Interest Repayment in Third Quarter of 2019
International Development AssociationProject Appraisal DocumentProject Information DocumentFinancing AgreementContract AwardsProject URLProcurement Notices44000-P127449
World Bank
Cote d'Ivoire PRSC 1
International Development Association
MINISTRY OF ECONOMY AND FINANCE
International Development Association
MINISTRY OF ECONOMY AND FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Volker Treichel
+1-202-473-1000vtreichel@ifc.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Yamoussoukro
6.82055 -5.2767401
Other Energy and ExtractivesOther Agriculture, Fishing and ForestryOther Industry, Trade and ServicesCropsCentral Government (Central Agencies)Rural DevelopmentPublic Finance ManagementRural MarketsJob CreationAgriculture FinancePublic AdministrationRural Infrastructure and service deliveryTransparency, Accountability and Good GovernanceRule of LawPublic Expenditure ManagementFinance for DevelopmentJobsBusiness Enabling EnvironmentLegal Institutions for a Market EconomyInvestment and Business ClimateUrban DevelopmentUrban Infrastructure and Service Delivery
0.00
0.00
50000000Total Commitment in Third Quarter of 2013
International Development Association51455493Total Disbursement in Fourth Quarter of 2013
International Development Association-83920Total Interest Repayment in First Quarter of 2014
International Development Association-183248Total Interest Repayment in Third Quarter of 2014
International Development Association-164786Total Interest Repayment in First Quarter of 2015
International Development Association-186519Total Interest Repayment in Third Quarter of 2015
International Development Association-174043Total Interest Repayment in First Quarter of 2016
International Development Association-174864Total Interest Repayment in Third Quarter of 2016
International Development Association-168389Total Interest Repayment in First Quarter of 2017
International Development Association-177949Total Interest Repayment in Third Quarter of 2017
International Development Association-180509Total Interest Repayment in First Quarter of 2018
International Development Association-176099Total Interest Repayment in Third Quarter of 2018
International Development Association-172518Total Interest Repayment in First Quarter of 2019
International Development Association-170348Total Interest Repayment in Third Quarter of 2019
International Development AssociationProject Appraisal DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Deficit of the electricity sector
Intermediate Results Indicator
Prosecuted cases involving corruption
Intermediate Results Indicator
Number of procurement audits
In August 2013, the National Public Procurements Authority published on its web site (www.anrmp.ci) the summary report of theaudits conducted in 2013.
Intermediate Results Indicator
Number of days required to start a business
Doing Business 2012
Doing Business 2016
Doing Business 2014
Intermediate Results Indicator
Number of days to receive a constrution permit
Doing Business 2012
Doing Business 2016
Doing Business 2014
Intermediate Results Indicator
Number of PPP Investment projects
Cote d'Ivoire made the strategic choice of PPPs as the main mean to finance the the country's major infrastructure.
The Port Authority and the Ministry of Transport has concluded an agreement with a major private operator for the extension ofAbidjan's Port
Intermediate Results Indicator
Percentage of agencies with procurement unit
Intermediate Results Indicator
Share of resource allocation transfered to local governments
Intermediate Results Indicator
Farm gate price as a percentage of the average forward price
The Government has adopted a new coffee-cocoa sector strategy in December 2011. The Government stated this commitment for theprice to farmers in this strategy. The Coffee-Cocoa council is implementing this measure along with a Forward sales pricingmechanism
Intermediate Results Indicator
Cost of property registration as a percentage of the value of property
Doing Business 2012
Doing Business 2016
Doing Business 2014
Intermediate Results Indicator
Proportion of cashew production processed
In its 2013 Activity report, the Cotton-cashew authority indicated this annual transformation rate for 2012.
Intermediate Results Indicator
% accredited cooperatives conforming with the Cooperatives Law
Audit in process
Intermediate Results Indicator
% of Interprofessions complying with applicable regulations on "Societe cooperative"
Intermediate Results Indicator
% of restructured cooperatives in cashew and cotton sectors complying with OHADA regulation
Intermediate Results Indicator
Country's rank in Transparency International's annual report
Intermediate Results Indicator
Time to settle commercial disputes
Doing Business 2012
Doing Business 2016
Doing Business 2013. The Commercial Court of Abidjan started operations in October 2012. According to the DB2014 report, the timeto settle a commercialdispute has been reduced in 2012/2013 from 770 to 585 days. The time of Trial and Judgment is reduced from365to 210 days, while Enforcement of Judgment (which is beyond the scope of the Commercial Court) has improved from 380 to 350days. Filing and service timeis constant at 25 days
Intermediate Results Indicator
Rice production
Last data available when the PRSC-1 was approved
As reported by the National Rice Development Office
44000-P156739
World Bank
Cote d'Ivoire Urban Water Supply and Sanitation Project
International Development Association
CELLULE DE COORDINATION DU PRICI (CC-PRICI)
International Development Association
CELLULE DE COORDINATION DU PRICI (CC-PRICI)Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Mouhamed Fadel Ndaw
+1-202-473-1000mndaw2@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Tiassale
5.8980 -4.8230
Ndouci
5.8640 -4.7610
Korhogo
9.4580 -5.6300
Ferkessedougou
9.5930 -5.1940
Bingerville
5.3560 -3.8850
Agboville
5.9280 -4.2130
Nzianouan
6.0120 -4.8210
Beoumi
7.7640 -5.5300
Public Administration - Water, Sanitation and Waste ManagementWater SupplyUrban DevelopmentPublic Private PartnershipsUrban Water and Sanitation
857142.86
857142.86
857142.86
857142.86
857142.86
857142.86
857142.86
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
730546.58
730546.58
730546.58
730546.58
730546.58
730546.58
730546.58
1270798.39
1270798.39
1270798.39
1270798.39
1270798.39
1270798.39
1270798.39
1270798.39
1270798.39
1270798.39
1270798.39
1270798.42
1053688.69
1053688.69
1053688.69
1053688.69
1053688.69
1053688.69
1053688.69
1053688.69
1053688.69
1053688.69
1053688.69
1053688.71
2750000.00
2750000.00
2750000.00
2750000.00
2750000.00
2750000.00
2750000.00
2750000.00
2750000.00
2750000.00
2750000.00
2750000.00
3500000.00
3500000.00
3500000.00
3500000.00
3500000.00
3500000.00
3500000.00
3500000.00
3500000.00
3500000.00
3500000.00
3500000.00
3833333.33
3833333.33
3833333.33
3833333.33
3833333.33
3833333.33
3833333.33
3833333.33
3833333.33
3833333.33
3833333.33
3833333.37
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.37
1999147.66
1999147.66
1999147.66
1999147.66
1999147.66
1999147.66
1999147.66
1999147.66
1999147.65
0.00
0.00
0.00
50000000Total Commitment in Fourth Quarter of 2016
International Development Association5113826Total Disbursement in Second Quarter of 2017
International Development Association110417Total Disbursement in Fourth Quarter of 2017
International Development Association209477Total Disbursement in Fourth Quarter of 2017
International Development Association-30164Total Interest Repayment in Fourth Quarter of 2017
International Development Association1915322Total Disbursement in First Quarter of 2018
International Development Association4667645Total Disbursement in First Quarter of 2018
International Development Association141397Total Disbursement in Second Quarter of 2018
International Development Association3806716Total Disbursement in Second Quarter of 2018
International Development Association4398607Total Disbursement in Second Quarter of 2018
International Development Association-56924Total Interest Repayment in Second Quarter of 2018
International Development Association553659Total Disbursement in Third Quarter of 2018
International Development Association1776204Total Disbursement in Fourth Quarter of 2018
International Development Association866531Total Disbursement in Fourth Quarter of 2018
International Development Association1210776Total Disbursement in Fourth Quarter of 2018
International Development Association-114026Total Interest Repayment in Fourth Quarter of 2018
International Development Association155491Total Disbursement in First Quarter of 2019
International Development Association4560256Total Disbursement in First Quarter of 2019
International Development Association1743180Total Disbursement in Second Quarter of 2019
International Development Association1778168Total Disbursement in Second Quarter of 2019
International Development Association865136Total Disbursement in Second Quarter of 2019
International Development Association-154692Total Interest Repayment in Second Quarter of 2019
International Development Association150000000Total Commitment in Second Quarter of 2019
International Development Association2689151Total Disbursement in Third Quarter of 2019
International Development Association850772Total Disbursement in Third Quarter of 2019
International Development Association1083593Total Disbursement in Fourth Quarter of 2019
International Development Association1885839Total Disbursement in Fourth Quarter of 2019
International Development Association-203158Total Interest Repayment in Fourth Quarter of 2019
International Development Association229957Total Disbursement in First Quarter of 2020
International Development Association8425857Total Disbursement in First Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2 Section I.A.3 - PCU Staffing | Description :The recipient shall ensure that, throughout projectimplementation, the PCU is maintained with staff in sufficient number, with experience and qualifications satisfactory to theAssociation, in carrying out the day-to-day coordination of the project. To this end, the recipient shall, no later than three (3)months after the effective date, have hired a project manager, a procurement specialist, a procurement assistant, an accountant, adisbursement assistant, and a social specialist, under terms of reference and with qualification and experience satisfactory to theAssociation. | Due Date :09-Jul-2017
Finance Agreement :Schedule 2 Section I.B.1 - Project Management Contract | Description :To facilitate the carrying out of theproject, the recipient shall, not later than one month after the effective date, conclude with the PCU a project managementcontract, vesting responsibility in the PCU for the overall management, monitoring, and supervision of the project and setting outdetails of the roles and responsibilities of the PCU under the project. | Due Date :09-May-2017
Finance Agreement :Schedule 2 Section I.B.2 â Implementation Support Contract | Description :To facilitate the carrying out ofthe project, the recipient shall conclude with ONEP and the PCU, not later than one month after the effective date, animplementation support contract acceptable to the Association, vesting responsibility in ONEP for the technical management of PartA of the project, and specifying its roles and responsibilities. | Due Date :09-May-2017
Finance Agreement :Schedule 2 Section II.B.4 - Recruitment of External Financial Auditor | Description :The recipient shall, notlater than six months after the effective date, appoint an external auditor, whose qualifications and experience and terms ofreference shall be acceptable to the Association. | Due Date :09-Oct-2017
PDO Indicator
Direct project beneficiaries
PDO Indicator
Number of students with access to improved sanitation facilities in schools under the project
PDO Indicator
Number of people in urban areas provided with access to improved water sources under the project
PDO Indicator
People with access to enhanced water supply services due to the project
Intermediate Results Indicator
New piped household water connections resulting from the project intervention
Intermediate Results Indicator
Number of schools benefiting from new/rehabilitated WASH facilities
Intermediate Results Indicator
Inactive household connections re-activated in centers targeted by the Project
Intermediate Results Indicator
Number of health centers benefiting from new and/or rehabilitated WASH facilities
Intermediate Results Indicator
Number of female students who gain access to menstrual hygiene management (MHM)-equipped WASH facilities at school
Intermediate Results Indicator
Number of hydrologic information collection and monitoring stations installed and operational
Intermediate Results Indicator
Number of sanitation and drainage master plans approved
Intermediate Results Indicator
Number of people reached by local communication campaigns for the social connection program
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
Improvement in beneficiaries' satisfaction
PDO Indicator
Sector financial model used for financial planning and decision making
PDO Indicator
Strategic Sector Plan towards SDG6 approved
Intermediate Results Indicator
Completion of the audit of contracts between Government, ONEP and SODECI
Intermediate Results Indicator
Completion of financial model
Intermediate Results Indicator
Completion of assets inventory
Intermediate Results Indicator
National Sanitation Sector Strategy Approved
Intermediate Results Indicator
Report on sector asset management monitoring available
Intermediate Results Indicator
A web-based sector M&E platform that uses digital technology is operationalized
Intermediate Results Indicator
District Meter Areas (DMAs) established in a pilot area in Abidjan water distribution network
Intermediate Results Indicator
Water transmission and distribution pipes constructed under the project
Intermediate Results Indicator
Production capacity constructed under the project
Intermediate Results Indicator
Water storage capacity constructed under the project
44000-P147740
World Bank
Health Systems Strengthening and Ebola Preparedness Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Montserrat Meiro-Lorenzo
+1-202-473-1000mmeirolorenzo@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Departement de Zuenoula
7.5000 -6.0000
Departement de Yamoussoukro
6.8330 -5.2500
Departement de Yamoussoukro
6.8330 -5.2500
Departement de Vavoua
7.4170 -6.7500
Departement de Toumodi
6.5000 -5.0000
Departement de Tanda
7.6670 -3.3330
Departement de Sinfra
6.6670 -5.7500
Port-Bouet
5.2570 -3.9630
Departement de M'bahiakro
7.5830 -4.1670
Departement de M'bahiakro
7.5830 -4.1670
Koumassi
5.2970 -3.9680
Departement de Katiola
8.5000 -5.1670
Departement de Issia
6.5000 -6.5000
Departement de Issia
6.5000 -6.5000
Departement de Duekoue
6.6670 -7.2500
Departement de Daoukro
7.2500 -4.0000
Departement de Daloa
6.9170 -6.5000
Departement de Dabakala
8.3330 -4.4170
Departement de Boundiali
9.7500 -6.5000
Departement de Bouna
9.2500 -3.5000
Departement de Bouafle
7.1670 -5.8330
Departement de Bongouanou
6.5000 -4.3330
Departement de Bondoukou
8.2500 -3.0000
Sous-prefecture de Bingerville
5.3670 -4.0330
Sous-prefecture d' Anyama
5.5170 -4.0170
Marcory
5.3120 -3.9940
Vridi
5.2440 -4.0350
Departement de Bocanda
7.0830 -4.4170
Departement de Tiebissou
7.1670 -5.0830
Abobo
5.4180 -4.0200
Cocody
5.3500 -3.9820
Treichville
5.3010 -4.0050
Departement d'Arrah
6.6690 -3.9720
Departement de Didievi
7.1320 -4.8950
Departement de Nassian
8.4500 -3.4700
Departement de Nassian
8.4500 -3.4700
Departement de Prikro
7.2790 -5.2330
Departement de Prikro
7.2790 -5.2330
Departement de Sandegue
7.9540 -3.5840
Public Administration - HealthHealthFood SecurityNutrition and Food SecurityReproductive and Maternal HealthHealth Systems and PoliciesDisease ControlNutritionHealth System StrengtheningChild Health
0.00
0.00
0.00
3333333.33
3333333.33
3333333.34
908333.33
908333.33
908333.34
908333.33
908333.33
908333.34
908333.33
908333.33
908333.34
908333.33
908333.33
908333.34
1216666.67
1216666.67
1216666.66
1216666.67
1216666.67
1216666.66
1216666.67
1216666.67
1216666.66
1216666.67
1216666.67
1216666.66
1341666.67
1341666.67
1341666.66
1341666.67
1341666.67
1341666.66
1341666.67
1341666.67
1341666.66
1341666.67
1341666.67
1341666.66
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
500000.00
500000.00
500000.00
666666.67
666666.67
666666.66
500000.00
500000.00
500000.00
966666.67
966666.67
966666.66
0.00
0.00
0.00
3333333.33
3333333.33
3333333.34
908333.33
908333.33
908333.34
908333.33
908333.33
908333.34
908333.33
908333.33
908333.34
908333.33
908333.33
908333.34
1216666.67
1216666.67
1216666.66
1216666.67
1216666.67
1216666.66
1216666.67
1216666.67
1216666.66
1216666.67
1216666.67
1216666.66
1341666.67
1341666.67
1341666.66
1341666.67
1341666.67
1341666.66
1341666.67
1341666.67
1341666.66
1341666.67
1341666.67
1341666.66
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
500000.00
500000.00
500000.00
666666.67
666666.67
666666.66
500000.00
500000.00
500000.00
966666.67
966666.67
966666.66
119525Total Disbursement in Fourth Quarter of 1992
International Development Association48379Total Disbursement in Fourth Quarter of 1992
International Development Association-167904Total Disbursement in First Quarter of 1993
International Development Association-336630Total Commitment Cancellations in Second Quarter of 1993
International Development Association35000000Total Commitment in Fourth Quarter of 2014
International Development Association35000000Total Commitment in Fourth Quarter of 2014
International Development Association10000000Total Disbursement in Third Quarter of 2015
International Development Association820789Total Disbursement in Fourth Quarter of 2015
International Development Association924247Total Disbursement in Fourth Quarter of 2015
International Development Association191348Total Disbursement in Fourth Quarter of 2015
International Development Association142981Total Disbursement in First Quarter of 2016
International Development Association102801Total Disbursement in First Quarter of 2016
International Development Association228216Total Disbursement in First Quarter of 2016
International Development Association75757Total Disbursement in First Quarter of 2016
International Development Association269262Total Disbursement in Second Quarter of 2016
International Development Association263254Total Disbursement in Second Quarter of 2016
International Development Association364295Total Disbursement in Second Quarter of 2016
International Development Association-4474Total Interest Repayment in Second Quarter of 2016
International Development Association366341Total Disbursement in Second Quarter of 2016
International Development Association214926Total Disbursement in Third Quarter of 2016
International Development Association63758Total Disbursement in Third Quarter of 2016
International Development Association158858Total Disbursement in Third Quarter of 2016
International Development Association47126Total Disbursement in Third Quarter of 2016
International Development Association502083Total Disbursement in Fourth Quarter of 2016
International Development Association13557Total Disbursement in Fourth Quarter of 2016
International Development Association560060Total Disbursement in Fourth Quarter of 2016
International Development Association-7949Total Interest Repayment in Fourth Quarter of 2016
International Development Association14687Total Disbursement in Fourth Quarter of 2016
International Development Association309482Total Disbursement in First Quarter of 2017
International Development Association195129Total Disbursement in First Quarter of 2017
International Development Association237624Total Disbursement in First Quarter of 2017
International Development Association148700Total Disbursement in First Quarter of 2017
International Development Association358996Total Disbursement in Second Quarter of 2017
International Development Association1035853Total Disbursement in Second Quarter of 2017
International Development Association597264Total Disbursement in Second Quarter of 2017
International Development Association639208Total Disbursement in Second Quarter of 2017
International Development Association1002152Total Disbursement in Second Quarter of 2017
International Development Association-12507Total Interest Repayment in Second Quarter of 2017
International Development Association724904Total Disbursement in Second Quarter of 2017
International Development Association670351Total Disbursement in Third Quarter of 2017
International Development Association543073Total Disbursement in Third Quarter of 2017
International Development Association391436Total Disbursement in Fourth Quarter of 2017
International Development Association587894Total Disbursement in Fourth Quarter of 2017
International Development Association1428491Total Disbursement in Fourth Quarter of 2017
International Development Association491474Total Disbursement in Fourth Quarter of 2017
International Development Association773863Total Disbursement in Fourth Quarter of 2017
International Development Association-22416Total Interest Repayment in Fourth Quarter of 2017
International Development Association1657488Total Disbursement in Fourth Quarter of 2017
International Development Association252714Total Disbursement in First Quarter of 2018
International Development Association302211Total Disbursement in First Quarter of 2018
International Development Association773121Total Disbursement in First Quarter of 2018
International Development Association216459Total Disbursement in First Quarter of 2018
International Development Association223373Total Disbursement in First Quarter of 2018
International Development Association698788Total Disbursement in First Quarter of 2018
International Development Association322056Total Disbursement in Second Quarter of 2018
International Development Association818537Total Disbursement in Second Quarter of 2018
International Development Association1992877Total Disbursement in Second Quarter of 2018
International Development Association380673Total Disbursement in Second Quarter of 2018
International Development Association1098852Total Disbursement in Second Quarter of 2018
International Development Association-35714Total Interest Repayment in Second Quarter of 2018
International Development Association2498470Total Disbursement in Second Quarter of 2018
International Development Association757517Total Disbursement in Third Quarter of 2018
International Development Association489169Total Disbursement in Third Quarter of 2018
International Development Association431131Total Disbursement in Fourth Quarter of 2018
International Development Association1331960Total Disbursement in Fourth Quarter of 2018
International Development Association343523Total Disbursement in Fourth Quarter of 2018
International Development Association372150Total Disbursement in Fourth Quarter of 2018
International Development Association1630043Total Disbursement in Fourth Quarter of 2018
International Development Association-53364Total Interest Repayment in Fourth Quarter of 2018
International Development Association372150Total Disbursement in Fourth Quarter of 2018
International Development Association977516Total Disbursement in First Quarter of 2019
International Development Association1675017Total Disbursement in First Quarter of 2019
International Development Association722512Total Disbursement in First Quarter of 2019
International Development Association1393404Total Disbursement in First Quarter of 2019
International Development Association343523Total Disbursement in Second Quarter of 2019
International Development Association931478Total Disbursement in Second Quarter of 2019
International Development Association1995828Total Disbursement in Second Quarter of 2019
International Development Association372150Total Disbursement in Second Quarter of 2019
International Development Association1503934Total Disbursement in Second Quarter of 2019
International Development Association-71834Total Interest Repayment in Second Quarter of 2019
International Development Association2534673Total Disbursement in Second Quarter of 2019
International Development Association893394Total Disbursement in Fourth Quarter of 2019
International Development Association593150Total Disbursement in Fourth Quarter of 2019
International Development Association-90867Total Interest Repayment in Fourth Quarter of 2019
International Development Association1729042Total Disbursement in Fourth Quarter of 2019
International Development Association871350Total Disbursement in Fourth Quarter of 2019
International Development Association547523Total Disbursement in Fourth Quarter of 2019
International Development Association1415881Total Disbursement in Fourth Quarter of 2019
International Development Association158269Total Disbursement in First Quarter of 2020
International Development Association841095Total Disbursement in First Quarter of 2020
International Development AssociationProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Establish PIU | Description :The Recipient shall establish, no later than March 31, 2015, and thereaftermaintain at all times until the completion of the Project, a PIU within the MSLS, with a mandate, composition and resourcessatisfactory to the Association. | Due Date :31-Mar-2015
Finance Agreement :Annual Work Plan and Budget | Description :The Recipient shall prepare, in accordance with terms of referenceacceptable to the Association, and furnish to the Association no later than November 30 of each Fiscal Year throughout theimplementation of the Project, a work plan of proposed activities for inclusion in the Project for the next calendar year, togetherwith a budget for such activities and a timetable for their implementation. | Frequency :Yearly
Finance Agreement :PBF Steering Committee | Description :The Recipient shall establish, no later than March 31, 2015, andthereafter maintain, at all times during the implementation of the Project, the PBF Steering Committee, with a mandate, compositionand resources satisfactory to the Association | Due Date :31-Mar-2015
Finance Agreement :CT-PBF | Description :The Recipient shall establish, no later than March 31, 2015, and thereafter maintain atall times until the completion of the Project, the CT-PBF within the MSLS, with a mandate, composition and resources satisfactoryto the Association. | Due Date :31-Mar-2015
Finance Agreement :Annual PBF Work Plan and Budget | Description :The Recipient shall prepare, in accordance with terms ofreference acceptable to the Association, and furnish to the Association no later than November 30 of each Fiscal Year throughoutthe implementation of the Project, a work plan of proposed PBF Activities for inclusion in the Project for the next calendar year,together with a budget for such activities and a timetable for their implementation | Frequency :Yearly
Finance Agreement :Safeguards Documents | Description :Recipient shall: (a) prepare, adopt and disclose, in form and substancesatisfactory to the Association, the Safeguard Documents no later than February 27, 2015 | Due Date :27-Feb-2015
Finance Agreement :Counterpart Funds | Description :The Recipient has agreed to contribute an amount equivalent to US$7,000,000 asadditional financing to support the PBF Activities | Frequency :CONTINUOUS
PDO Indicator
Deliveries in health facilities by trained health personnel
PDO Indicator
Severely malnourished children detected and treated
PDO Indicator
Average quality score improvement for facilities covered by RBF
PDO Indicator
Per capita utilization of services
Intermediate Results Indicator
Children under 5 who received Vitamin A supplementation
Intermediate Results Indicator
Pregnant women receiving antenatal care during a visit to a health provider (number)
Intermediate Results Indicator
People who have received essential health, nutrition, and population (HNP) services - Female (RMS requirement)
Intermediate Results Indicator
Number of children immunized
Intermediate Results Indicator
Number of women and children who have received basic nutrition services
Intermediate Results Indicator
Number of deliveries attended by skilled health personnel
Intermediate Results Indicator
People with access to a basic package of health, nutrition, or reproductive health services (number)
Intermediate Results Indicator
Health personnel receiving training (number)
Intermediate Results Indicator
Direct project beneficiaries
Intermediate Results Indicator
Indigents that remain enrolled in health insurance
Intermediate Results Indicator
Health facilities constructed/ renovated (number)
Intermediate Results Indicator
People who have received essential health, nutrition, and population (HNP) services
PDO Indicator
Vaccination coverage: DTC
Intermediate Results Indicator
Women using modern family-planning methods
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
Service readiness of health facilities
Intermediate Results Indicator
Equip./supplies available in the National Institure for Public Hygiene (INHP)
Intermediate Results Indicator
Annual RASS produced
44000-P071631
World Bank
Emergency Multi-Sector HIV/AIDS Project
International Development Association
MINISTRY IN CHARGE OF HIV/AIDS
International Development Association
MINISTRY IN CHARGE OF HIV/AIDSPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Ibrahim Magazi
+1-202-473-1000imagazi@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Yamoussoukro
6.82055 -5.2767401
Central Government (Central Agencies)Waste ManagementSocial ProtectionSub-National GovernmentHealthChild HealthSocial InclusionParticipation and Civic EngagementDisease ControlReproductive and Maternal HealthHIV/AIDSHealth Systems and PoliciesOther Excluded GroupsIndigenous People and Ethnic Minorities
0.00
0.00
0.00
333333.33
333333.33
333333.34
533333.33
533333.33
533333.34
800000.00
800000.00
800000.00
458333.33
458333.33
458333.34
458333.33
458333.33
458333.34
458333.33
458333.33
458333.34
458333.33
458333.33
458333.34
458333.33
458333.33
458333.34
458333.33
458333.33
458333.34
458333.33
458333.33
458333.34
458333.33
458333.33
458333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
333333.33
333333.33
333333.34
533333.33
533333.33
533333.34
800000.00
800000.00
800000.00
458333.33
458333.33
458333.34
458333.33
458333.33
458333.34
458333.33
458333.33
458333.34
458333.33
458333.33
458333.34
458333.33
458333.33
458333.34
458333.33
458333.33
458333.34
458333.33
458333.33
458333.34
458333.33
458333.33
458333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20000000Total Commitment in Second Quarter of 2008
International Development Association1469513Total Disbursement in Fourth Quarter of 2008
International Development Association309126Total Disbursement in Second Quarter of 2009
International Development Association149201Total Disbursement in Second Quarter of 2009
International Development Association758488Total Disbursement in Third Quarter of 2009
International Development Association362252Total Disbursement in Third Quarter of 2009
International Development Association1021795Total Disbursement in Fourth Quarter of 2009
International Development Association695491Total Disbursement in Fourth Quarter of 2009
International Development Association598058Total Disbursement in Fourth Quarter of 2009
International Development Association298216Total Disbursement in First Quarter of 2010
International Development Association677510Total Disbursement in First Quarter of 2010
International Development Association478686Total Disbursement in First Quarter of 2010
International Development Association524496Total Disbursement in Second Quarter of 2010
International Development Association170557Total Disbursement in Second Quarter of 2010
International Development Association791338Total Disbursement in Second Quarter of 2010
International Development Association510453Total Disbursement in Third Quarter of 2010
International Development Association753310Total Disbursement in Third Quarter of 2010
International Development Association351742Total Disbursement in Third Quarter of 2010
International Development Association673079Total Disbursement in Fourth Quarter of 2010
International Development Association316178Total Disbursement in Fourth Quarter of 2010
International Development Association367477Total Disbursement in Fourth Quarter of 2010
International Development Association263147Total Disbursement in Second Quarter of 2011
International Development Association1116135Total Disbursement in Third Quarter of 2011
International Development Association472191Total Disbursement in Third Quarter of 2011
International Development Association605633Total Disbursement in Third Quarter of 2011
International Development Association507076Total Disbursement in Fourth Quarter of 2011
International Development Association209315Total Disbursement in Fourth Quarter of 2011
International Development Association884321Total Disbursement in Fourth Quarter of 2011
International Development Association995988Total Disbursement in First Quarter of 2012
International Development Association583058Total Disbursement in First Quarter of 2012
International Development Association1793683Total Disbursement in Second Quarter of 2012
International Development Association200739Total Disbursement in Third Quarter of 2012
International Development Association108259Total Disbursement in Third Quarter of 2012
International Development Association-20688Total Disbursement in Third Quarter of 2013
International Development Association-26957Total Commitment Cancellations in Third Quarter of 2013
International Development AssociationProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Recruitment of financial auditors within 4 months of effectiveness
Recruitment of technical auditors within 4 months of effectiveness
Financial audit during 1st year of Project carried out semi-annually and to be furnished to IDA within 3 months of each such period
Carry out 2 technical audits, of the Project and any Subprojects, respectively, each covering 1 fiscal year of the Recipient
copies of the technical audit reports shall be made available to the Association no later than three (3) months after the end ofeac h such period; and
Intermediate Results Indicator
Health personnel receiving training (number)
Souce project: No new training has taken placeIDA 15 indicators
Intermediate Results Indicator
Percentage and number of high risk groups (FSW) who received an HIV test in the last 12 months and who came back for their test results
FHI 2007 Report in the 4 regions
Source: Project. The percentage is 99.68%; 12151 FSWs have been tested.
Intermediate Results Indicator
Joint annual report of the Multisectoral HIV/AIDS Program, disseminated during the annual Meeting of the CNLS.
Source: Project. The annual report has been prepared each year but the national council met only once. The fourth reports isunderpreparation.
Intermediate Results Indicator
Percentage of people from at risk-groups who both correctly identify ways of preventing sexual transmission of HIV and who reject major misconceptions about HIV transmission .
Source: Behavioral Survey in the project Zone-National Institute for statistics (INS).The project surpassed its target and thisindicator will not change because no new data is expected.
Intermediate Results Indicator
Percentage of executing agencies (public sector and civil society) that submit programmatic and financial three-monthly reports completed and on schedule
Source: Project.This indicator is progressing may change at project closing with an achievement rate estimated at 84%.
Intermediate Results Indicator
Percentage of women and men aged 15-49 who received an HIV test in the last 12 months and who came back for their test results.
Source : projectThis indicator is above its target.
Intermediate Results Indicator
Number of condoms distributed (male & female) among the CSW in the 4 target Project regions.
Source: Project. The project purchased in total 4,936,800 condoms (male and female) because PEPFAR and UNFPA also are distributingcondoms amongst the same Group. The project distributed 3,244,193 to NGOs and the distribution to CSW is in process. The indicatorwill beimproved at closing but the target will not be achieved.
Intermediate Results Indicator
Number of sub-contracts awarded and implemented for HRG and vulnerable populations
Source: ProjectThis indicator surpassed its target and will not change.First year 74 contracts were signed and each additionalyear 81 contracts were signed
Intermediate Results Indicator
Number of decentralized ( department) plans developed and implemented in the four regions for Health and Education
Source: Project. This indicator will not change because all the 24 departments are covered, 16 by the project and 8 byPEPFAR&Global FUND.
Intermediate Results Indicator
Percentage and number of CTAIL put in place and operational
The CTAILs have been suppressed from the Ministry of Health new institutional arrangement. Before the suppression, out 19 CTAIL tobe installed by the Government, 13 have been installed and out them the project has supported 6 while others have been supportedbythe Government and PEPFAR
PDO Indicator
% of female sex workers reporting the use of a condom with their most recent client (disaggregated by age (<25, 25+>) (UNGASS, AAP)
National survey on female sex workers behavior. ENSEA
PDO Indicator
% of women and men from 15-49 years of age having had more than 1 sexual partner in the preceding 12 months reporting condom use during their last sexual intercourse;
Source: Behavioral Survey in the project Zone-National Institute for statistics (INS)
PDO Indicator
Percentage and number of HIV-infected pregnant women who received a completed antiretroviral treatment to reduce the risk of mother-to-child transmission (UNGASS, UA, AAP)
Source: Programme National de Prise En Charge (PNPEC).This indicator will not be achieved due to the quality of health services,the project being a partner of last resort working on difficult sites and the political crisis with most of health centers being inthe conflict zone .
PDO Indicator
Percentage and number of adults and children with advanced HIV infection receiving antiretroviral therapy [disaggregated by sex andage (<15, 15+)] - (UNGASS, UA, AAP)
Source: PNPEC (Programme National Prise En Charge).This indicator surpassed its target.
44000-P115398
World Bank
Cote d'Ivoire - SME Revitalization and Governance Project
International Development Association
MINISTRY OF FINANCE
International Development Association
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Lorenzo Bertolini
+1-202-473-1000lbertolini@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Abidjan
5.3100 -4.0130
Banking InstitutionsPublic Administration - Financial SectorOther Non-bank Financial InstitutionsPublic AdministrationEnterprise DevelopmentLegal Institutions for a Market EconomyFinancial Infrastructure and AccessMSME FinanceInvestment and Business ClimateRule of LawMSME DevelopmentPublic Private PartnershipsBusiness Enabling EnvironmentRegulation and Competition PolicyTransparency, Accountability and Good Governance
0.00
0.00
0.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
561667.91
561667.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75897.00
75897.00
75897.00
52621.20
52621.21
52621.21
0.00
0.00
0.00
231852.77
231852.77
231852.78
471014.06
471014.06
471014.06
675567.64
675567.65
675567.65
459028.67
459028.67
459028.68
357879.63
357879.63
357879.63
386965.40
386965.40
386965.41
332672.67
332672.67
332672.67
177707.26
177707.26
177707.26
269609.48
269609.49
269609.49
155388.45
155388.45
155388.46
500000.00
500000.00
500000.00
479350.46
479350.46
479350.47
0.00
0.00
0.00
0.00
0.00
0.00
15000000Total Commitment in Fourth Quarter of 2009
International Development Association1123336Total Disbursement in Second Quarter of 2010
International Development Association227691Total Disbursement in Second Quarter of 2011
International Development Association157864Total Disbursement in Third Quarter of 2011
International Development Association308971Total Disbursement in First Quarter of 2012
International Development Association386587Total Disbursement in First Quarter of 2012
International Development Association884338Total Disbursement in Second Quarter of 2012
International Development Association219289Total Disbursement in Second Quarter of 2012
International Development Association309416Total Disbursement in Second Quarter of 2012
International Development Association723024Total Disbursement in Third Quarter of 2012
International Development Association745962Total Disbursement in Third Quarter of 2012
International Development Association557717Total Disbursement in Third Quarter of 2012
International Development Association538582Total Disbursement in Fourth Quarter of 2012
International Development Association513580Total Disbursement in Fourth Quarter of 2012
International Development Association324924Total Disbursement in Fourth Quarter of 2012
International Development Association336875Total Disbursement in First Quarter of 2013
International Development Association357851Total Disbursement in First Quarter of 2013
International Development Association378913Total Disbursement in First Quarter of 2013
International Development Association340286Total Disbursement in Second Quarter of 2013
International Development Association626701Total Disbursement in Second Quarter of 2013
International Development Association193909Total Disbursement in Second Quarter of 2013
International Development Association93411Total Disbursement in Third Quarter of 2013
International Development Association591402Total Disbursement in Third Quarter of 2013
International Development Association313205Total Disbursement in Third Quarter of 2013
International Development Association185784Total Disbursement in Fourth Quarter of 2013
International Development Association309185Total Disbursement in Fourth Quarter of 2013
International Development Association38153Total Disbursement in Fourth Quarter of 2013
International Development Association395523Total Disbursement in First Quarter of 2014
International Development Association36960Total Disbursement in First Quarter of 2014
International Development Association376346Total Disbursement in First Quarter of 2014
International Development Association466165Total Disbursement in Second Quarter of 2014
International Development Association101098Total Disbursement in Second Quarter of 2014
International Development Association196180Total Disbursement in Third Quarter of 2014
International Development Association491132Total Disbursement in Third Quarter of 2014
International Development Association140354Total Disbursement in Fourth Quarter of 2014
International Development Association153639Total Disbursement in Fourth Quarter of 2014
International Development Association563634Total Disbursement in Fourth Quarter of 2014
International Development Association342625Total Disbursement in First Quarter of 2015
International Development Association138509Total Disbursement in First Quarter of 2015
International Development Association-331626Total Commitment Cancellations in Second Quarter of 2015
International Development Association-6943Total Disbursement in Second Quarter of 2015
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Investment made by SMEs beneficiaries of the Matching Grant
At end October, investments generated under this sub component correspond to 1,787,647,210 FCFA against a target of 1,877,058,656.This is equivalent to 95% of the project objective.
PDO Indicator
P2-Number of New Jobs Generated by Registered SMEs
25K jobs are already estimated to have been created so far, with the potential of reaching 40-50K, well beyond the the 10K target.
PDO Indicator
P1-Number of New SME Registered at the One Stop Shop
Business registration at the newly launched CFE (one stop shop) have progressed rapidly. Project target of 1000 is largelysurpassed with around 7500 firms already registered by October 2014 as opposed to 2200 as of November 2013.
Intermediate Results Indicator
Decrease in cost of roadside racketeering
The cost based on 2008 survey was estimated to be 21.88 FCFA/tonne/Km
Based on the ENSEA study completed in 2012-2014, racketeering cost was reassessed and reduced from 21.8 FCFA/metric ton / km in2008 to 12,64FCFA/metric ton/km in 2012 and 10.2 FCFA in 2014. The overall decrease in racketeering costs registered between2010-2014 is therefore 50%, surpassing the 25% reduction target.
Intermediate Results Indicator
Decisions published by the Commercial Court on its website
100% of the Commercial Court decisions are published
Intermediate Results Indicator
A1.1 Average percentage change in MFC/PME lending to SME members
Project Report MFC/PME Financial Statement
By project closing in October 2014, 26 credits were awarded, equivalent to an annual increase of 14.3%, surpassing the 10% targetincrease
Intermediate Results Indicator
Number of Days to Establish a Business
The One-Stop-Shop for Business Formalities was inaugurated in December 2012. According to the DB2014 report, the number of daysrequired to register a business in Cote d’ Ivoire has decreased from 32 to 5 days. Within the 5 days, the One-Stop-Shop processesits formalities in about 48-24h. The remaining time is due to other requirements (publication in newspaper, deposit of minimumcapital inaBank, notary formalities), which bring the total to 5 days. The DB15 shows that time to register a firm at the One stopshop was further decreased to 3 days, and procedures in total equal to 7 days.
Intermediate Results Indicator
Number of days to make a decisions by the Commercial Court
The Commercial Court of Abidjan started operations in October 2012. According to the DB2014 report, the time to settle acommercialdispute has been reduced in 2012/2013 from 770 to 585 days. The time of Trial and Judgment is reduced from 365 to 210days (within the remit of the Commercial Court), while Enforcement of Judgment (which is beyond the scope of the Commercial Court)has improved from 380 to 350 days. Filing and service time is constant at 25 days. In the latest DB report (2015) the number ofdays decreased to 525 days, with 175 days required file and judgement at the Commercial Court level, and 350 days for enforcement(outside the remit ofthe Commercial Court)
44000-P122800
World Bank
CI: Post-conflict Reconstruction and Recovery Grant (PCRRG)
International Development Association
MINISTRY OF ECONOMY AND FINANCE
International Development Association
MINISTRY OF ECONOMY AND FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Volker Treichel
+1-202-473-1000vtreichel@ifc.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Yamoussoukro
6.82055 -5.2767401
Central Government (Central Agencies)MiningAgricultural markets, commercialization and agri-businessBanking InstitutionsOil and GasEnvironmental Health and Pollution ManagementRural MarketsTrade FacilitationAir quality managementState-owned Enterprise Reform and PrivatizationRural DevelopmentAgriculture FinancePublic Finance ManagementSoil PollutionPublic AdministrationTransparency, Accountability and Good GovernanceWater PollutionTradeFinance for DevelopmentPublic Expenditure Management
0.00
0.00
150000000Total Commitment in Third Quarter of 2011
International Development Association146179085Total Disbursement in Fourth Quarter of 2011
International Development Association-49027Total Commitment Cancellations in Fourth Quarter of 2012
International Development AssociationProject Appraisal DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
UNACOOPEC losses in billion CFA francs
Intermediate Results Indicator
Health and education expenditure share
Estimate
Intermediate Results Indicator
Average cocoa taxation as share of world price
Intermediate Results Indicator
Complaint investigation
Estimate
Intermediate Results Indicator
Public discussion of budget
Côte d’Ivoire has prepared a first report which is judgedinadequate (end-2010).
Intermediate Results Indicator
Cocoa institutional structure set up
Audits of the 4 cocoa entities have been completed but remain confidential; a temporary institutional structure is in placependingfinalization of a new strategy.
Intermediate Results Indicator
EITI conformity
Côte d’Ivoire has prepared a first report which is judged inadequate (end-2010).
Await certification from EITI International Secretariat.
Reports for 2006, 2007, 2008/09, 2010 submitted.
44000-P163284
World Bank
Cote d'Ivoire - Second Fiscal Management, Education, Energy and Cocoa Reforms Development Policy Operation
International Development Association
MINISTRY OF ECONOMY AND FINANCE
International Development Association
MINISTRY OF ECONOMY AND FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Jacques Morisset
+1-202-473-1000jmorisset@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Yamoussoukro
6.82055 -5.2767401
Central Government (Central Agencies)ICT ServicesSecondary EducationAgricultural markets, commercialization and agri-businessPrimary EducationOther Energy and ExtractivesDomestic Revenue AdministrationEducationPublic AdministrationTeachersStudent AssessmentEnergyClimate changeEnergy Policies & ReformMitigationRural MarketsPublic Finance ManagementRural DevelopmentEducation Governance, School-Based ManagementE-Government, incl. e-services
0.00
0.00
125000000Total Commitment in Fourth Quarter of 2017
International Development Association126942330Total Disbursement in Fourth Quarter of 2017
International Development Association-843606Total Interest Repayment in Second Quarter of 2018
International Development Association-890375Total Interest Repayment in Fourth Quarter of 2018
International Development Association-884182Total Interest Repayment in Second Quarter of 2019
International Development Association-873649Total Interest Repayment in Fourth Quarter of 2019
International Development AssociationProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentFinancing AgreementContract AwardsProject URLProcurement Notices44000-P107355
World Bank
Governance and Institutional Dev.
International Development Association
MINISTRY OF FINANCE
International Development Association
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Robert A. Yungu
+1-202-473-1000ryungu@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Abidjan
5.3100 -4.0130
Central Government (Central Agencies)Public Expenditure ManagementRural DevelopmentAgriculture FinanceTransparency, Accountability and Good GovernancePublic Finance ManagementPublic AdministrationSoil PollutionRural MarketsWater PollutionAir quality managementFinance for DevelopmentEnvironmental Health and Pollution Management
0.00
225000.00
225000.00
225000.00
225000.00
225000.00
225000.00
225000.00
225000.00
225000.00
225000.00
225000.00
225000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
308333.33
308333.33
308333.34
308333.33
308333.33
308333.34
308333.33
308333.33
308333.34
308333.33
308333.33
308333.34
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
385177.68
385177.69
385177.69
0.00
0.00
0.00
41638.73
41638.73
41638.73
147727.09
147727.09
147727.09
201810.79
201810.79
201810.79
313435.74
313435.74
313435.74
518792.82
518792.82
518792.82
427970.57
427970.58
427970.58
195209.57
195209.58
195209.58
0.00
0.00
0.00
0.00
0.00
0.00
574154.00
574154.00
574154.01
268606.30
268606.31
268606.31
205065.80
205065.81
205065.81
328427.81
328427.81
328427.82
0.00
0.00
0.00
160482.61
160482.62
160482.62
143874.11
143874.12
143874.12
170849.30
170849.30
170849.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13000000Total Commitment in Second Quarter of 2008
International Development Association1155533Total Disbursement in Fourth Quarter of 2008
International Development Association124916Total Disbursement in Second Quarter of 2009
International Development Association74452Total Disbursement in Third Quarter of 2009
International Development Association368729Total Disbursement in Third Quarter of 2009
International Development Association301079Total Disbursement in Fourth Quarter of 2009
International Development Association186415Total Disbursement in Fourth Quarter of 2009
International Development Association117939Total Disbursement in Fourth Quarter of 2009
International Development Association236589Total Disbursement in First Quarter of 2010
International Development Association592621Total Disbursement in First Quarter of 2010
International Development Association111097Total Disbursement in First Quarter of 2010
International Development Association273427Total Disbursement in Second Quarter of 2010
International Development Association592024Total Disbursement in Second Quarter of 2010
International Development Association690928Total Disbursement in Second Quarter of 2010
International Development Association340917Total Disbursement in Third Quarter of 2010
International Development Association656000Total Disbursement in Third Quarter of 2010
International Development Association286995Total Disbursement in Third Quarter of 2010
International Development Association236186Total Disbursement in Fourth Quarter of 2010
International Development Association162137Total Disbursement in Fourth Quarter of 2010
International Development Association187306Total Disbursement in Fourth Quarter of 2010
International Development Association713108Total Disbursement in Third Quarter of 2011
International Development Association516158Total Disbursement in Third Quarter of 2011
International Development Association493197Total Disbursement in Third Quarter of 2011
International Development Association252043Total Disbursement in Fourth Quarter of 2011
International Development Association553776Total Disbursement in Fourth Quarter of 2011
International Development Association615197Total Disbursement in First Quarter of 2012
International Development Association985283Total Disbursement in Second Quarter of 2012
International Development Association481448Total Disbursement in Fourth Quarter of 2012
International Development Association431622Total Disbursement in First Quarter of 2013
International Development Association512548Total Disbursement in Second Quarter of 2013
International Development Association4655Total Disbursement in Fourth Quarter of 2013
International Development Association5000000Total Commitment in Second Quarter of 2014
International Development Association473602Total Disbursement in Fourth Quarter of 2014
International Development Association69685Total Disbursement in First Quarter of 2015
International Development Association146803Total Disbursement in Second Quarter of 2015
International Development Association214535Total Disbursement in Second Quarter of 2015
International Development Association44381Total Disbursement in Second Quarter of 2015
International Development Association-575Total Disbursement in Second Quarter of 2015
International Development Association-2605Total Interest Repayment in Third Quarter of 2015
International Development Association87036Total Disbursement in Third Quarter of 2015
International Development Association218245Total Disbursement in Third Quarter of 2015
International Development Association382570Total Disbursement in Fourth Quarter of 2015
International Development Association38495Total Disbursement in Fourth Quarter of 2015
International Development Association374157Total Disbursement in First Quarter of 2016
International Development Association-5358Total Interest Repayment in First Quarter of 2016
International Development Association108257Total Disbursement in First Quarter of 2016
International Development Association299337Total Disbursement in Second Quarter of 2016
International Development Association105806Total Disbursement in Second Quarter of 2016
International Development Association209466Total Disbursement in Second Quarter of 2016
International Development Association82074Total Disbursement in Third Quarter of 2016
International Development Association-8323Total Interest Repayment in Third Quarter of 2016
International Development Association318744Total Disbursement in Third Quarter of 2016
International Development Association282731Total Disbursement in Third Quarter of 2016
International Development Association425420Total Disbursement in Fourth Quarter of 2016
International Development Association117722Total Disbursement in Fourth Quarter of 2016
International Development Association319874Total Disbursement in Fourth Quarter of 2016
International Development Association222812Total Disbursement in First Quarter of 2017
International Development Association-12921Total Interest Repayment in First Quarter of 2017
International Development Association43520Total Disbursement in First Quarter of 2017
International Development Association19245Total Disbursement in Second Quarter of 2017
International Development Association-1674Total Disbursement in Third Quarter of 2017
International Development Association-17531Total Interest Repayment in Third Quarter of 2017
International Development Association-1875Total Commitment Cancellations in Third Quarter of 2017
International Development Association-568Total Commitment Cancellations in Third Quarter of 2017
International Development Association-17724Total Interest Repayment in First Quarter of 2018
International Development Association-17174Total Interest Repayment in Third Quarter of 2018
International Development Association-17428Total Interest Repayment in First Quarter of 2019
International Development Association-17129Total Interest Repayment in Third Quarter of 2019
International Development Association-16991Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Section V | Description :Set up an upgraded Project Financial Management Information System to replace thecurrent system (SUCCESS) which has limited functionalities with regard to reporting, monitoring, and procurement. | Due Date:01-Oct-2014
Finance Agreement :Section V | Description :Update the Procedure Manual particularly regarding the sections on missions and bankarrangements | Due Date :01-Oct-2014
Intermediate Results Indicator
Cocoa cooperatives registered by CCC
Intermediate Results Indicator
Internal audits carried out by harmonized core team
Intermediate Results Indicator
New SIGFIP sites connected
Intermediate Results Indicator
Internal controls carried out by harmonized core team
PDO Indicator
Direct project beneficiaries
PDO Indicator
Cocoa Cooperatives registered with CCC that obtain buyer or selling certificate by CCC
PDO Indicator
Cocoa Cooperatives registered with CCC that publish their accounts
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
Share of Government transfers to EPNs and internally generated funds executed though RICI-EPN
Intermediate Results Indicator
Average decentralized budget execution through SIGESCOD
PDO Indicator
PI-21 Effectiveness of internal audit
PDO Indicator
PI-20 Effectiveness of internal controls for non-salary expenditure
PDO Indicator
Percentage of parafiscal levies executed in the budget
PDO Indicator
Côte d'Ivoire obtains EITI validation
PDO Indicator
New contracts are subject to new terms and conditions of the new regulatory framework
PDO Indicator
Composition of real expenditure accordingly to the initial approved budget
Intermediate Results Indicator
Rate of integrated plan execution (% of budget expenditures captured by SIGFIP
Intermediate Results Indicator
Organized and participatory process of budget preparation
Intermediate Results Indicator
Competition, value for money and controls in procurement
Intermediate Results Indicator
The number of communes connected to the SIGFIP
Intermediate Results Indicator
Rate of transposition of WAEMU guidelines and international standards in the national procurement regulatory framework (%)
Intermediate Results Indicator
The MEF website is operational
Intermediate Results Indicator
Rate of integrated capacity building plan execution (%)
Intermediate Results Indicator
Multi-year perspective in the budget planning and public expenditure policy
Intermediate Results Indicator
The first EITI report is published
Intermediate Results Indicator
Procedures for the transparent licensing of petroleum rights in line with good industry practice are in place
Intermediate Results Indicator
Petroleum revenue forecast and variance analysis are carried out periodically (monthly, quarterly, and yearly)
Intermediate Results Indicator
Flexible and efficient fiscal system for upstream petroleum sector is adopted
Intermediate Results Indicator
Amended/new legal, regulatory and contractual framework is updated and adopted
Intermediate Results Indicator
Integrity and transparency of the procurement process (OECD/DAC methodology)
PDO Indicator
Access of public to principal budget information
Intermediate Results Indicator
Standard deviation of data provided by the One-Stop shop, the Bourse du cafE et du cacao (BCC) and the Customs
Intermediate Results Indicator
Value of parafiscal levies in the cocoa sector
Intermediate Results Indicator
Percentage of non-complaince cases resolved in a reasonable timeframe is measured and used as benchmark for monitoring regulatory efficiency.
Intermediate Results Indicator
Environmental management information system is in place
Intermediate Results Indicator
Updated environmental regulations are adopted
Intermediate Results Indicator
Average transfer time for transfer of DGD documents received at the registry to the Treasury
Intermediate Results Indicator
Average transfer time for DGI documents received at the registry to the Treasury
44000-P082817
World Bank
Emergency Post-Conflict Assistance Project
International Development Association
PRIME MINISTER OFFICE
International Development Association
PRIME MINISTER OFFICEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Nicolas Perrin
+1-202-473-1000nperrin@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
CÔTE D'IVOIRE
Zouan-Hounien
6.9190 -8.2070
Toumodi
6.5580 -5.0180
ToulEpleu
6.5800 -8.4110
Man
7.4130 -7.5540
Korhogo
9.4580 -5.6300
Guiglo
6.5440 -7.4940
FerkessEdougou
9.5930 -5.1940
DuekouE
6.7420 -7.3490
Bouna
9.2690 -2.9950
Bouake
7.6940 -5.0300
Blolequin
6.5690 -8.0030
Abidjan
5.3100 -4.0130
HealthWorkforce Development and Vocational EducationCentral Government (Central Agencies)Other EducationSocial ProtectionLabor Market Policy and ProgramsFragility, Conflict and ViolencePost-conflict reconstructionActive Labor Market ProgramsLabor Market InstitutionsConflict PreventionJobsSocial ProtectionSocial Insurance and Pensions
0.00
47272.36
47272.36
757575.76
757575.76
757575.76
3282828.29
3282828.29
3282828.27
2525252.53
2525252.53
2525252.52
2525252.53
2525252.53
2525252.52
5050505.05
5050505.05
5050505.06
5050505.05
5050505.05
5050505.06
4040404.05
4040404.05
4040404.03
4040404.05
4040404.05
4040404.03
2525252.53
2525252.53
2525252.52
2525252.53
2525252.53
2525252.52
1515151.52
1515151.52
1515151.52
1515151.52
1515151.52
1515151.52
1010101.02
1010101.02
1010101.00
1010101.02
1010101.02
1010101.00
1010101.02
1010101.02
1010101.00
1010101.02
1010101.02
1010101.00
574545.70
574545.70
574545.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
47272.36
47272.36
757575.76
757575.76
757575.76
3282828.29
3282828.29
3282828.27
2525252.53
2525252.53
2525252.52
2525252.53
2525252.53
2525252.52
5050505.05
5050505.05
5050505.06
5050505.05
5050505.05
5050505.06
4040404.05
4040404.05
4040404.03
4040404.05
4040404.05
4040404.03
2525252.53
2525252.53
2525252.52
2525252.53
2525252.53
2525252.52
1515151.52
1515151.52
1515151.52
1515151.52
1515151.52
1515151.52
1010101.02
1010101.02
1010101.00
1010101.02
1010101.02
1010101.00
1010101.02
1010101.02
1010101.00
1010101.02
1010101.02
1010101.00
574545.70
574545.70
574545.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120000000Total Commitment in Third Quarter of 2007
International Development Association95574Total Disbursement in Third Quarter of 2007
International Development Association4394335Total Disbursement in First Quarter of 2008
International Development Association5848421Total Disbursement in Second Quarter of 2008
International Development Association1765413Total Disbursement in Third Quarter of 2008
International Development Association8255578Total Disbursement in Fourth Quarter of 2008
International Development Association501570Total Disbursement in Second Quarter of 2009
International Development Association3320107Total Disbursement in Second Quarter of 2009
International Development Association756768Total Disbursement in Third Quarter of 2009
International Development Association187588Total Disbursement in Third Quarter of 2009
International Development Association3272504Total Disbursement in Fourth Quarter of 2009
International Development Association1820992Total Disbursement in First Quarter of 2010
International Development Association4111760Total Disbursement in Second Quarter of 2010
International Development Association2455095Total Disbursement in Second Quarter of 2010
International Development Association8707488Total Disbursement in Third Quarter of 2010
International Development Association699066Total Disbursement in Third Quarter of 2010
International Development Association10618148Total Disbursement in Third Quarter of 2010
International Development Association3094021Total Disbursement in Fourth Quarter of 2010
International Development Association3479902Total Disbursement in Fourth Quarter of 2010
International Development Association3556135Total Disbursement in Second Quarter of 2011
International Development Association3151513Total Disbursement in Third Quarter of 2011
International Development Association1805365Total Disbursement in Third Quarter of 2011
International Development Association5738085Total Disbursement in Fourth Quarter of 2011
International Development Association2382067Total Disbursement in Fourth Quarter of 2011
International Development Association6262557Total Disbursement in First Quarter of 2012
International Development Association1057354Total Disbursement in First Quarter of 2012
International Development Association3716990Total Disbursement in Second Quarter of 2012
International Development Association1878442Total Disbursement in Second Quarter of 2012
International Development Association2432871Total Disbursement in Third Quarter of 2012
International Development Association2195803Total Disbursement in Third Quarter of 2012
International Development Association2852373Total Disbursement in Fourth Quarter of 2012
International Development Association1928245Total Disbursement in Fourth Quarter of 2012
International Development Association2669576Total Disbursement in First Quarter of 2013
International Development Association3123456Total Disbursement in First Quarter of 2013
International Development Association3112878Total Disbursement in Second Quarter of 2013
International Development Association3012000Total Disbursement in Second Quarter of 2013
International Development Association1661089Total Disbursement in Third Quarter of 2013
International Development Association1541423Total Disbursement in Third Quarter of 2013
International Development Association1359934Total Disbursement in Fourth Quarter of 2013
International Development Association2513157Total Disbursement in Fourth Quarter of 2013
International Development Association451902Total Disbursement in Fourth Quarter of 2013
International Development Association30000000Total Commitment in Fourth Quarter of 2013
International Development Association2949050Total Disbursement in First Quarter of 2014
International Development Association525611Total Disbursement in Second Quarter of 2014
International Development Association393747Total Disbursement in Second Quarter of 2014
International Development Association469975Total Disbursement in Third Quarter of 2014
International Development Association-11649Total Interest Repayment in Third Quarter of 2014
International Development Association-121569Total Commitment Cancellations in Third Quarter of 2014
International Development Association-121522Total Disbursement in Third Quarter of 2014
International Development Association1035116Total Disbursement in Fourth Quarter of 2014
International Development Association2639741Total Disbursement in Fourth Quarter of 2014
International Development Association2456033Total Disbursement in Fourth Quarter of 2014
International Development Association574912Total Disbursement in First Quarter of 2015
International Development Association387674Total Disbursement in First Quarter of 2015
International Development Association-26864Total Interest Repayment in First Quarter of 2015
International Development Association-131717Total Disbursement in First Quarter of 2015
International Development Association-395593Total Commitment Cancellations in First Quarter of 2015
International Development Association-267829Total Disbursement in First Quarter of 2015
International Development Association2968904Total Disbursement in Second Quarter of 2015
International Development Association1717753Total Disbursement in Second Quarter of 2015
International Development Association3551155Total Disbursement in Second Quarter of 2015
International Development Association413775Total Disbursement in Third Quarter of 2015
International Development Association2571275Total Disbursement in Third Quarter of 2015
International Development Association1071793Total Disbursement in Third Quarter of 2015
International Development Association-63616Total Interest Repayment in Third Quarter of 2015
International Development Association477794Total Disbursement in Fourth Quarter of 2015
International Development Association2365202Total Disbursement in First Quarter of 2016
International Development Association877661Total Disbursement in First Quarter of 2016
International Development Association148222Total Disbursement in First Quarter of 2016
International Development Association-88773Total Interest Repayment in First Quarter of 2016
International Development Association499512Total Disbursement in Second Quarter of 2016
International Development Association-105112Total Interest Repayment in Third Quarter of 2016
International Development Association-63488Total Disbursement in First Quarter of 2017
International Development Association-67205Total Commitment Cancellations in First Quarter of 2017
International Development Association-98922Total Interest Repayment in First Quarter of 2017
International Development Association-53542Total Disbursement in Third Quarter of 2017
International Development Association-104227Total Interest Repayment in Third Quarter of 2017
International Development Association-53542Total Commitment Cancellations in First Quarter of 2018
International Development Association-105768Total Interest Repayment in First Quarter of 2018
International Development Association-103184Total Interest Repayment in Third Quarter of 2018
International Development Association-101086Total Interest Repayment in First Quarter of 2019
International Development Association-99814Total Interest Repayment in Third Quarter of 2019
International Development AssociationProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :H323-IVC (Schedule 2, Section I, Part A, para 3.) | Description :One month after Effectiveness, recruit aproject Coordinator | Due Date :07-Sep-2007
Finance Agreement :H323-IVC (Schedule 2, Section I, Part A, para 4.) | Description :One month after effectiveness, set outoperating modalities for Community Rehabilitation | Due Date :07-Sep-2007
Finance Agreement :H323-IVC (Schedule 2, Section I, Part A, para 5.) | Description :Maintain personnel and resources responsiblefor Regional coordination | Frequency :Quarterly
Finance Agreement :H323-IVC (Schedule 2, Section I, Part A, para 5.) | Description :Maintain the Steering Committee | Due Date:31-Dec-2013
Finance Agreement :H323-IVC (Schedule 2, Section I, Part A, para 6.) | Description :One month after effectiveness, reruit animplementing agency for parts 1(a)(i) and (ii) of the project | Due Date :07-Sep-2007
Finance Agreement :H323-IVC (Schedule 2, Section I, Part A, para 7.) | Description :Maintain Community Rehabilitation Unit | DueDate :31-Dec-2013
Finance Agreement :H323-IVC (Schedule 2, Section I, Part A, para 8.) | Description :One month after effectiveness, recruit to theIdentification Unit 4 specialists | Due Date :07-Sep-2007
Finance Agreement :H323-IVC (Schedule 2, Section I, Part A, para 11.) | Description :By July 31, 2007, recruit a FiduciaryManagement Agency | Due Date :31-Jul-2007
Finance Agreement :H323-IVC (Schedule 2, Section I, Part C, para 1) | Description :One month after effectiveness, adopt projectmanuals | Due Date :07-Sep-2007
Finance Agreement :H323-IVC (Schedule 2, Section I, Part D, para 1) | Description :No later than 6 months after Effectiveness,prepare Environmental and Social Framework | Due Date :07-Feb-2008
PDO Indicator
Direct project beneficiaries
Intermediate Results Indicator
1.b. Number of vulnerable youth participating in income-generating activities including on-the-job training (conseil assistance et chantier-Ecole)
Intermediate Results Indicator
2.a. Number of civil registration offices rehabilitated/constructed in targeted areas
PDO Indicator
Number of communities with improved social and economic infrastructure
Intermediate Results Indicator
1.a. Number of vulnerable youth participating in labor intensive public works
PDO Indicator
Number of vulnerable youth who participated in socio-economic reintegration activities
Intermediate Results Indicator
2.b. Number of civil registry officers/agents/community leaders trained in targeted communities
Intermediate Results Indicator
3.d. Number of social cohesion projects realized
Intermediate Results Indicator
3.a. Number of Development Committees created
Intermediate Results Indicator
3.c. Number of economic associations supported in targeted communities
Intermediate Results Indicator
1.c. Percentage of females among vulnerable youth participating in socio-economic reintegration activities
PDO Indicator
Percentage of the population of the 10 departments benefiting from improved access to civil registration
Intermediate Results Indicator
3.b. Percentage of females amongst Committee members
Intermediate Results Indicator
2.c. Percentage of school children with a birth certificate in targeted communities
Intermediate Results Indicator
2.d. Percentage of infants registered within legally required time (90 days after birth)