44000-P057857
World Bank
CR Equity and Efficiency of Education
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Marcelo Becerra
+1-202-473-1000mbecerra@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COSTA RICA
Cantón de Turrialba
9.8000 -83.5330
Cantón de San Carlos
10.5830 -84.4170
Puriscal
9.7500 -84.4170
Provincia de Puntarenas
9.3600 -84.0000
Cantón de PErez Zeledón
9.3550 -83.6350
Provincia de Limón
10.0000 -83.2170
Provincia de Guanacaste
10.5000 -85.2500
Cantón de Coto Brus
8.8830 -82.9670
Cantón de Cañas
10.4800 -85.1130
Cantón de Aguirre
9.4170 -84.1670
Secondary EducationPrimary EducationCentral Government (Central Agencies)TeachersEducationStandards, Curriculum and TextbooksScience and TechnologyEducation FinancingAccess to Education
0.00
0.00
0.00
0.00
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.63
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.63
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
150000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100000.00
100000.00
100000.00
0.00
0.00
0.00
0.00
0.00
0.00
113639.10
113639.10
113639.11
34318.85
34318.85
34318.86
192182.40
192182.40
192182.41
355819.24
355819.25
355819.25
0.00
0.00
0.00
177982.11
177982.12
177982.12
91562.78
91562.79
91562.79
0.00
0.00
0.00
425285.36
425285.37
425285.37
747490.44
747490.45
747490.45
692001.88
692001.88
692001.88
788897.35
788897.35
788897.35
862390.81
862390.81
862390.82
553002.80
553002.80
553002.80
228371.74
228371.74
228371.74
188039.71
188039.71
188039.72
0.00
0.00
0.00
1666666.66
1666666.67
1666666.67
2000000.00
2000000.00
2000000.00
366666.66
366666.67
366666.67
366666.66
366666.67
366666.67
0.00
0.00
0.00
0.00
0.00
0.00
30000000Total Commitment in First Quarter of 2005
International Bank for Reconstruction and Development150000Total Disbursement in Fourth Quarter of 2006
International Bank for Reconstruction and Development-150000Total Interest Repayment in Fourth Quarter of 2006
International Bank for Reconstruction and Development-169868Total Interest Repayment in First Quarter of 2007
International Bank for Reconstruction and Development-56648Total Interest Repayment in Third Quarter of 2007
International Bank for Reconstruction and Development300000Total Disbursement in First Quarter of 2008
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2008
International Bank for Reconstruction and Development-55926Total Interest Repayment in First Quarter of 2008
International Bank for Reconstruction and Development-63529Total Interest Repayment in Third Quarter of 2008
International Bank for Reconstruction and Development340917Total Disbursement in Fourth Quarter of 2008
International Bank for Reconstruction and Development102957Total Disbursement in First Quarter of 2009
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2009
International Bank for Reconstruction and Development-63548Total Interest Repayment in First Quarter of 2009
International Bank for Reconstruction and Development21131Total Disbursement in Second Quarter of 2009
International Bank for Reconstruction and Development427091Total Disbursement in Second Quarter of 2009
International Bank for Reconstruction and Development128325Total Disbursement in Second Quarter of 2009
International Bank for Reconstruction and Development512484Total Disbursement in Third Quarter of 2009
International Bank for Reconstruction and Development554974Total Disbursement in Third Quarter of 2009
International Bank for Reconstruction and Development0Total Disbursement in Third Quarter of 2009
International Bank for Reconstruction and Development-70885Total Interest Repayment in Third Quarter of 2009
International Bank for Reconstruction and Development-95549Total Loan Repayment in Third Quarter of 2009
International Bank for Reconstruction and Development247155Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development286791Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development-77095Total Interest Repayment in First Quarter of 2010
International Bank for Reconstruction and Development-128524Total Loan Repayment in First Quarter of 2010
International Bank for Reconstruction and Development274688Total Disbursement in Second Quarter of 2010
International Bank for Reconstruction and Development0Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development-83010Total Interest Repayment in Third Quarter of 2010
International Bank for Reconstruction and Development-173484Total Loan Repayment in Third Quarter of 2010
International Bank for Reconstruction and Development1000000Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development275856Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development2242471Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development-83930Total Interest Repayment in First Quarter of 2011
International Bank for Reconstruction and Development-248504Total Loan Repayment in First Quarter of 2011
International Bank for Reconstruction and Development2076006Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development1054300Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development1312392Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development-101494Total Interest Repayment in Third Quarter of 2011
International Bank for Reconstruction and Development-518409Total Loan Repayment in Third Quarter of 2011
International Bank for Reconstruction and Development2587172Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development1659008Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development-137907Total Interest Repayment in First Quarter of 2012
International Bank for Reconstruction and Development-848832Total Loan Repayment in First Quarter of 2012
International Bank for Reconstruction and Development685115Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development564119Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development0Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development-156218Total Interest Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development-1016202Total Loan Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development620082Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development538211Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development-150188Total Interest Repayment in First Quarter of 2013
International Bank for Reconstruction and Development-1107267Total Loan Repayment in First Quarter of 2013
International Bank for Reconstruction and Development1867217Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development1558916Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development1263249Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development1182927Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development714483Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development-148087Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development-1542726Total Loan Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development58755Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development205156Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development150891Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development-177824Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development-1739190Total Loan Repayment in First Quarter of 2014
International Bank for Reconstruction and Development-5720290Total Commitment Cancellations in Second Quarter of 2014
International Bank for Reconstruction and Development-683132Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development-158274Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development-1685972Total Loan Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development-139716Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-1685972Total Loan Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-124193Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-1685972Total Loan Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-108671Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-1685972Total Loan Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-93148Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-1685972Total Loan Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-77626Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-1685972Total Loan Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-62103Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-1685972Total Loan Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-46580Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-1685972Total Loan Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-31057Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-1685972Total Loan Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-15535Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-1687251Total Loan Repayment in First Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Indicator 7-- Value of transfers of funds through the Equity Programs and Transfers Programs to beneficiaries and School Councils--B)
MILLIONS OF CR COLONES-Scholarships
2012
Intermediate Results Indicator
Indicator 7--Value of transfers of funds through the Equity Programs and Transfers Programs to beneficiaries and School Councils--A)
MILLIONS OF CR COLONES--Transfer to Schools Councils (include maintenance, and Equity Programs of transportation and Food Program
2012
PDO Indicator
PDO 3. Improving Efficiency: Reduce administrative costs per beneficiary of MEP’s Equity Programs (scholarships, transportation, food).
In Costa Rican Colones
In Costa Rican Colones
Year 2011 (In Costa Rican Colones)
Intermediate Results Indicator
Indicator 13-- Number of education materials produced with an intercultural perspective.
Intermediate Results Indicator
Indicator 9-- Number of studies and workshops financed by Component 2.
Intermediate Results Indicator
Indicator 8-- Number of staff that have been trained under MEP institutional reform program.
Intermediate Results Indicator
Indicator 6--Number of beneficiaries by the educational demand programs (Scholarships, transportation, food program)--FOOD PROGRAM
Target not cumulative.
Intermediate Results Indicator
Indicator 6--Number of beneficiaries by the educational demand programs (Scholarships, transportation, food program)--TRANSPORTATION
Target not cumulative.
Intermediate Results Indicator
Indicator 6--Number of beneficiaries by the educational demand programs (Scholarships, transportation, food program)--SCHOLARSHIP
Target not cumulative.
Intermediate Results Indicator
Indicator 5--Number of staff, in MEP Technical Units that administer the Equity and Transfers Programs, that have trained to improve supervision and evaluation of these programs.
Intermediate Results Indicator
Indicator 3 -- Number of Common School Network facilities constructed and equipped (technology centers; cultural, arts and physicaleducation facilities.
14 Common school network facilities have been already built and furnished but still to be equipped.
Intermediate Results Indicator
Indicator 2--Number of school building facilities constructed and provided with equipment, including kitchens, teachers lounges, student dormitories and restrooms in the School Networks.
75 schools with facilities have been already built and furnished but yet not equipped
Intermediate Results Indicator
Indicator 1--Number of classrooms built and renovated, and provided with furniture and equipment, in the School Networks.
230 classrooms have been built and furnished. Equipment has not been provided yet
Intermediate Results Indicator
Indicator 15-- Percentage of MEP staff and teachers trained on the standard methodology to analyze student learning assessments.
Intermediate Results Indicator
Indicator 12-- Percentage of rural secondary teachers trained in the Liceos Rurales modality and intercultural education.
3561 teachers have been trained out of total 12.854
Intermediate Results Indicator
Indicator 10-- Percentage of national advisers and regional trainers trained in intercultural.
National: 45 out of 347regional: 312 out of 364
Intermediate Results Indicator
Indicator 4-- Percentage of schools and Liceos Rurales equipped with an education sector information system in the 15 Administrative Circuits targeted by the Project.
Purchase and distribution of equipment is yet due.
PDO Indicator
PDO 2. Improving Equity: Reduce gaps in graduation rates in targeted areas (graduation rate measured as the ratio between 11th grade enrollment and 7th grade enrollment). GAP
Graduation Rate/Targeted areas/Graduation Rate National level
2012
PDO Indicator
PDO 2. Improving Equity: Reduce gaps in graduation rates in targeted areas (graduation rate measured as the ratio between 11th grade enrollment and 7th grade enrollment). TARGETED AREAS
2012
PDO Indicator
PDO 2. Improving Equity: Reduce gaps in graduation rates in targeted areas (graduation rate measured as the ratio between 11th grade enrollment and 7th grade enrollment). NATIONAL LEVEL
Graduation Rate Secondary (11th-7th)
2012
PDO Indicator
PDO 1. Reducing Quality Gaps; Reduce education quality gaps in targeted areas (percentage of students that pass -bachillerato- exams). TARGETED AREAS
2012 Exam
PDO Indicator
PDO 1. Reducing Quality Gaps; Reduce education quality gaps in targeted areas (percentage of students that pass -bachillerato- exams). NATIONAL LEVEL
2012 Exam
Intermediate Results Indicator
Indicator 14-- Development of a standard methodology to analyze student assessment and complementary training modules.
Intermediate Results Indicator
Indicator 11-- Completion of an assessment of the needs and profile of rural teachers.
End of Evaluation
Not carried out yet
44000-P085539
World Bank
Port-City of Limon Integrated Infrastructure Project
International Bank for Reconstruction and Development
MINISTERIO DE OBRAS PUBLICAS Y TRANSPORTE
International Bank for Reconstruction and Development
MINISTERIO DE OBRAS PUBLICAS Y TRANSPORTEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Oscar E. Alvarado
+1-202-473-1000oalvarado@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COSTA RICA
Isla Uvita
9.9930 -83.0110
Puerto Limón
9.9910 -83.0360
Bahia de Moin
10.0010 -83.0870
Rio Chirripó
10.7500 -83.7000
Rio Banano
9.9240 -82.9950
Cariari, Heredia
10.3570 -83.7360
Other Industry, Trade and ServicesPorts/WaterwaysSocial ProtectionOther Water Supply, Sanitation and Waste ManagementSub-National GovernmentUrban DevelopmentCultural HeritageMunicipal Institution BuildingUrban Infrastructure and Service DeliveryAdministrative and Civil Service ReformJobsServices and Housing for the PoorSocial InclusionPublic Private PartnershipsPublic AdministrationParticipation and Civic Engagement
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
200000.00
200000.00
200000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
666666.67
666666.67
666666.66
1366666.67
1366666.67
1366666.66
1333333.33
1333333.33
1333333.34
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1733333.33
1733333.33
1733333.34
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1700000.00
1700000.00
1700000.00
1666666.67
1666666.67
1666666.66
1366666.67
1366666.67
1366666.66
1333333.33
1333333.33
1333333.34
1000000.00
1000000.00
1000000.00
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
666666.67
666666.67
666666.66
466666.67
466666.67
466666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
200000.00
200000.00
200000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
666666.66
666666.67
666666.67
1366666.66
1366666.67
1366666.67
1333333.33
1333333.33
1333333.34
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1733333.33
1733333.33
1733333.34
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1700000.00
1700000.00
1700000.00
1666666.66
1666666.67
1666666.67
1366666.66
1366666.67
1366666.67
1333333.33
1333333.33
1333333.34
1000000.00
1000000.00
1000000.00
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
800000.00
800000.00
800000.00
0.00
0.00
0.00
0.00
0.00
0.00
72500000Total Commitment in First Quarter of 2008
International Bank for Reconstruction and Development-181250Total Interest Repayment in Fourth Quarter of 2009
International Bank for Reconstruction and Development2500000Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development-8106Total Interest Repayment in Fourth Quarter of 2010
International Bank for Reconstruction and Development-6446Total Interest Repayment in Second Quarter of 2011
International Bank for Reconstruction and Development-6227Total Interest Repayment in Fourth Quarter of 2011
International Bank for Reconstruction and Development-8133Total Interest Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development-9913Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development1063824Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development1110044Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development-9560Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development-178191Total Loan Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development-11960Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development-236580Total Loan Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development4221742Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development-8828Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-236580Total Loan Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-17574Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-484818Total Loan Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-1526748Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development-65131137Total Commitment Cancellations in First Quarter of 2015
International Bank for Reconstruction and Development-12726Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-389425Total Loan Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-13664Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-389425Total Loan Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-15803Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-389425Total Loan Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-24457Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-389425Total Loan Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-30961Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-389425Total Loan Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-31588Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-389425Total Loan Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-31339Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-389425Total Loan Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-45099Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-389425Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-42393Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-389405Total Loan Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-37163Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development-389445Total Loan Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
Effectiveness: Signing of the agreement for the implementation of the flood control works, or of the sewerage works.
Effectiveness: The PCU and Advisory Committee will be established under terms of reference agreed with the Bank.
Disbursement: Signing of the other implementation agreements for the respective subcomponents.
Disbursement:Approval by the Bank of the Manual for the Local Economic Development Component.
Intermediate Results Indicator
Rehabilitation of emblematic buildings/sites in the city to achieve a more adequate patrimonial protection and appealing urban environment.
Not applicable due to lack of implementation
Intermediate Results Indicator
Extending the sewage (Limoncito & Playa Los Banos) and drainage system to increase access to sanitation, reduce urban flooding in the area of Limoncito, and decrease contamination in Playa Los Banos
Not applicable due to lack of implementation
Intermediate Results Indicator
Rehabilitation of Parque Cariari and Uvita Island
Not applicable due to lack of implementation
Intermediate Results Indicator
Bankable business plans of SME yearly submitted to credit institutions in Limon
Basline value would have to be established.
Not applicable due to lack of implementation
Intermediate Results Indicator
% increase in property tax collection
Not applicable due to lack of project implementation.
PDO Indicator
Score in city's image perception from citizens and tourists [Municipal Tourism Bureau]
Baseline value should be updated
Not applicable due to lack of implementation
PDO Indicator
Current/Capital Expenditures ratio[Municipality of Limon]
Baseline value should be confirmed.
Not applicable due to lack of implementation
PDO Indicator
Reduction in handling costs per ton in Moin dock [JAPDEVA]
Baseline value should be reviewed.
Not applicable due to lack of implementation
PDO Indicator
No. of containers reaching the dock of Moin via railway [INCOFER]
Baseline value should be reviewed.
Not applicable due to lack of implementation
PDO Indicator
No. of investments aligned with strategic development plan [COREDES and Municipality of Limon]
Not applicable due to lack of implementation
PDO Indicator
Citizen perception of credibility and accountability of the municipality [Municipality of Limon]
Baseline value would have to be established.
Not applicable due to lack of implementation
PDO Indicator
Fiscal Revenues [Municipality of Limon]
Baseline value would have to be established.
Not applicable due to lack of implementation
PDO Indicator
Perception regarding cultural activities in Limon [Ministry of Culture]
Baseline value should be updated
Not applicable due to lack of implementation
PDO Indicator
% of population with access to sewage system in Limoncito. [AyA]
Baseline value should be confirmed/ updated.
Not applicable due to lack of implementation
PDO Indicator
Number of Flood Events [SENARA]
Not applicable due to lack of implementation
PDO Indicator
A series of geometric averages of monthly fecal coliforms in sea water samples at 3 sampling points located in front of Playa Los Banos, each at 100m from the shore [AyA]
Baseline value should be confirmed/ updated.
Not applicable due to lack of implementation
PDO Indicator
No. of new SME in the tourism and cultural heritage sectors [MEIC]
Not applicable due to lack of implementation
PDO Indicator
Tourist perception of quality of SMEs products [Municipality of Limon]
Baseline value should be confirmed/ updated.
Not applicable due to lack of implementation
44000-P148435
World Bank
Strengthening Universal Health Insurance in Costa Rica
International Bank for Reconstruction and Development
MINISTRY OF FINANCE
International Bank for Reconstruction and Development
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Eleonora Del Valle Cavagnero
+1-202-473-1000ecavagnero@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COSTA RICA
San Jose
9.9333296 -84.083328
HealthHealth System StrengtheningHealth Systems and Policies
0.00
0.00
0.00
0.00
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.63
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.63
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.63
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
0.00
0.00
0.00
0.00
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.63
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.63
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.67
9166666.63
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
420000000Total Commitment in First Quarter of 2016
International Bank for Reconstruction and Development-1050000Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development105000000Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development-649343Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-2426172Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-2066020Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-2349085Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development30000000Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development90000000Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-2857922Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development60000000Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-5804970Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-5640307Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
PDO Indicator
Percentage of major surgeries from priority list conducted in outpatient settings according to CCSS institutional guidelines
PDO Indicator
Percentage of total number of primary health care units (Areas de Salud) with the Unique Digital Health Record e-health package (EDUS)
PDO Indicator
Cumulative percentage of target population personally invited to undergo colon cancer screening in five priority counties.
Intermediate Results Indicator
Percentage of households covered by the Family Socio-Economic & Health Risks Information File.
Intermediate Results Indicator
Percentage of individuals diagnosed with hypertension that are under optimal clinical control.
Intermediate Results Indicator
Percentage of households with Family Socio-Economic & Health Risks Information File digital geo-referencing data available online.
PDO Indicator
Development and execution of a comprehensive medium-and long-term plan to ensure the financial sustainability of the CCSS
Intermediate Results Indicator
Cumulative percentage reduction in average waiting days for selected procedures (tracers): hip and knee replacement.
Intermediate Results Indicator
Financial statements produced using new international public accounting standards, streamlined and digital automated processes.
Intermediate Results Indicator
Shadow budget constructed based on gender and age risk adjusted capitations.
Intermediate Results Indicator
Use of institutional strategic intelligence system data to publish and disseminate two annual reports measuring progress of SASHI
Intermediate Results Indicator
Institutional Review of core institutional management functions, and operational plan for progressive implementation of streamlining central level management.
44000-P093384
World Bank
Mainstreaming Market-Based Instruments for Environmental Management Project
International Bank for Reconstruction and Development
MINISTRY OF ENVIRONMENT AND ENERGY
International Bank for Reconstruction and Development
MINISTRY OF ENVIRONMENT AND ENERGYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Christian Albert Peter
+1-202-473-1000cpeter@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COSTA RICA
San Jose
9.9330 -84.0830
Provincia de Puntarenas
9.3600 -84.0000
Provincia de Limón
10.0000 -83.2170
Provincia de Heredia
10.3330 -84.0000
Provincia de Guanacaste
10.5000 -85.2500
Provincia de Cartago
9.8330 -83.7500
Provincia de Alajuela
10.5000 -84.5000
ForestryOther Water Supply, Sanitation and Waste ManagementJobsClimate changeEnvironmental policies and institutionsWater Institutions, Policies and ReformRenewable Natural Resources Asset ManagementMitigationRule of LawLegal Institutions for a Market EconomyBiodiversityWater Resource Management
0.00
0.00
0.00
0.00
0.00
0.00
0.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
950000.00
950000.00
950000.00
333333.33
333333.33
333333.34
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
473333.33
473333.33
473333.34
333333.33
333333.33
333333.34
640000.00
640000.00
640000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
333333.33
333333.33
333333.34
306666.67
306666.67
306666.66
626666.67
626666.67
626666.66
333333.33
333333.33
333333.34
666666.67
666666.67
666666.66
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
950000.00
950000.00
950000.00
333333.33
333333.33
333333.34
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
473333.33
473333.33
473333.34
333333.33
333333.33
333333.34
640000.00
640000.00
640000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
333333.33
333333.33
333333.34
306666.67
306666.67
306666.66
626666.67
626666.67
626666.66
333333.33
333333.33
333333.34
666666.67
666666.67
666666.66
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30000000Total Commitment in Second Quarter of 2006
International Bank for Reconstruction and Development-214110Total Interest Repayment in Second Quarter of 2009
International Bank for Reconstruction and Development3000000Total Disbursement in Third Quarter of 2009
International Bank for Reconstruction and Development-52178Total Interest Repayment in Fourth Quarter of 2009
International Bank for Reconstruction and Development2064488Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development-44380Total Interest Repayment in Second Quarter of 2010
International Bank for Reconstruction and Development2187037Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development-55255Total Interest Repayment in Fourth Quarter of 2010
International Bank for Reconstruction and Development2999940Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development-56407Total Interest Repayment in Second Quarter of 2011
International Bank for Reconstruction and Development-60339Total Interest Repayment in Fourth Quarter of 2011
International Bank for Reconstruction and Development-512573Total Loan Repayment in Fourth Quarter of 2011
International Bank for Reconstruction and Development2925248Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development2998840Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development-78031Total Interest Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development-666441Total Loan Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development-92794Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development-833177Total Loan Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development2994841Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development-70769Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development-833177Total Loan Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development5619554Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development2991047Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development-82759Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development-1371576Total Loan Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development2219005Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development-81308Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-1719087Total Loan Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-70106Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-1719087Total Loan Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-65160Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-1719087Total Loan Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-69578Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-1719087Total Loan Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-81246Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-1719087Total Loan Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-101904Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-1719087Total Loan Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-117436Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-1719087Total Loan Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-118765Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-1719087Total Loan Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-113109Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-1719087Total Loan Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-145985Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-1719087Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-134351Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-1719087Total Loan Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-99767Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development-1719087Total Loan Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Cause to be executed the implementation memoranda of understanding satisfactory to the Bank among MINAE, SINAC and FONAFIFO; and(ii) enter into an agreement with each of the Service Entities
The Borrower shall carry out the Project in accordance with the OM.
FONAFIFO to amend the OM only in consultation with, and after approval, of the Bank, including the parts drawn from the operationsmanual of the Beneficiary of January 19, 2005
Not later than March 30, 2007, establish Fundac#on Banco Ambiental, satisfactory to the Bank, which shall be responsible foradministering the proceeds of the GEF Grant made available to FBS
The Borrower shall authorize FONAFIFO, through Fideicomiso 544, to appoint and/or maintain, personnel required for theimplementation of the Project.
Initiate the implementation of a plan that assigns different levels of payment for environmental services to different regions ofthe Borrower#s territory
Initiate the the implementation of a monitoring and evaluation plan measuring the impact of the Project on biodiversity, carbonsequestration and socio-economic conditions.
Adopt specific rules and procedures for the disbursement of FBS funds.
No withdrawal shall be made for [GEF]payments made for capitalization of the FBS until and unless Beneficiary#s counterpart fundsand/or other Donors# funds have been paid into FBS
Intermediate Results Indicator
Revenues achieved
Intermediate Results Indicator
Female landholders in the program will be maintained at least to the current level.
Intermediate Results Indicator
% of annual net returns from the FBS invested in PES at productive landscape projects located in buffer zones of protected areas and biological corridors
Given the low returns on the investment following the financial crisis, FONAFIFO was not able to invest any of the FBS return byproject closing.
PDO Indicator
By the end of the project, at least 288,000 hectares of land with environmental service contracts generating environmental servicesof local, national and/or global importance.
The unit of measure is hectares (ha) and not text as indicated to the side
Costa Rica's National Development Plan has a target of conserving a total of 310,000 ha a year using PSA.
Earlier high enrollment rates in the PSA program (340,000 ha in 2012), due to the availability of additional funding provided bythe World Bank loan and by contributions from other donors, has led to an overhang of obligations, which has limited enrollmentsover the past two years. As a result, the target of 310,000 ha (revised in the 2012 restructuring) could not been reached.
GEO Indicator
At least 190,000 ha (2,000 contracts) in productive landscapes in the buffer zones of protected areas and biological corridors in the MBC are maintained annually under PSA contracts of 20 years.
Because of the annual nature of most of FONAFIFO's budget and the five-year length of most of its conservation contracts, CostaRica's PSA program is subject to wide fluctuations in the areas under conservation.
GEO Indicator
Effective biodiversity conservation in globally significant areas measured by vegetation cover and indicator species of conservation interest (method under preparation, baseline to be ready by 12/07).
This indicator has proven difficult to measure and has been dropped as part of the June 2012 restructuring.
PDO Indicator
Improved efficiency of the environmental services program, as measured by indices of services generated per dollar spent.(Index under preparation)
Dropped-tracking this indicator has been found extremely difficult. This is primarily due to the technical difficulty ofquantifying the changes in the level of environmental service provision.
Dropped-tracking this indicator has been found extremely difficult. This is primarily due to the technical difficulty ofquantifying the changes in the level of environmental service provision.
PDO Indicator
By the end of the project 50% increase (from current 1,900 to 2,850) of the number of small- and medium-sized landholders (less than 100-hectare farms) participating in the PSA Program.
This indicator was increased to 3,500 in the 2012 Restructuring.
PDO Indicator
By the end of the project, at least half of the newly-contracted area is financed by funding from service users.
Target was revised in June 2012 from its original target of 50%, in part because generating financing from service users hasproven much more challenging than expected (particularly so in the case of carbon financing and biodiversity payments), butprimarily because fuel tax revenues have increased dramatically due to the increase in traffic, resulting in an automatic increasein government funding to the PSA program.
Intermediate Results Indicator
3.5% from fuel-tax revenues and 25% water-resource-usage tariffs to finance PSA.
% of fuel-tax revenues and % of tax used from water-resource tariff and colones (₡) of revenue received from tax
3.5% fuel 25% water
3.5% fuel (₡12.831m)25% water (₡982m)
Intermediate Results Indicator
FBS with capital participation of at least US$15 million, of which US$7.5 million contributed by GEF.
The indicator is US$ and not text as indicated to the side
The Fund has been capitalized with the GEF and KfW contribution. Its capitalization exceeds the target of US$15 million. However,current returns (at 2%) are below expectation and addressing this will be a priority over the next 6 months. The FBS board hasinitiated a number of steps to address this issue, including (i) negotiating a lower management fee for the investment institution(Banco Nacional de CR); (ii) consolidating all funding received in one account to improve the effectiveness of applying theinvestment strategy; and (iii) introduce the possibility of using an international fund manager.
Intermediate Results Indicator
At least 75% of PSA Program resources are placed in PSA contracts.
The unit of measure is percent and not text as indicated to the side
Intermediate Results Indicator
Contract system for payments of environmental services with differentiated payments applied.
Intermediate Results Indicator
PSA activities are integrated through participatory planning on land use in at least 3 (micro-watershed) communities.
2 land-use plans for additional micro-watersheds are under preparation
Intermediate Results Indicator
tons of CO2 from forestry activities will be certified and sold at the global carbon markets
At the end of the project 23,084 tons of CO2 from forestry activities were certified sold at the global carbon markets, forUS$95.798.Following appraisal of the project (and the two year delay in becoming effective), the annual emission reductiongeneration proved to be significantly lower. The primary causes for the shortage of CertifiedEmission Reductions (CERs) are twofold: (i) requirements for verification and certification of emission reductions are more stringent and take longer thananticipated at appraisal tocarry out, and (ii) a decline in CER prices, more or less coinciding with the financial crisis, affectedthe proper functioning of theactivity.
PDO Indicator
By the end of the project, conservation of at least 35,000 ha is financed annually by funding from service users
This is the revised version of the indicator: By the end of the project, at least half of the newly-contracted area is financed byfunding from service users.
During the project life the EOP target had been overachieved (e.g. 41,000 ha in 2010), but because of the annual nature of most ofFONAFIFO's budget and the five-year length of most of its conservation contracts, Costa Rica's PSA program is subject to widefluctuations in the areas under conservation.
PDO Indicator
Areas brought under enhanced biodiversity protection (ha)
This CSI has been introduced to address the fact that the original indicator was selected at a time when there were no CSIs. Thevalues are similar to the previous indicators.
Intermediate Results Indicator
Indigenous community owned lands in the program will be maintained at least to the current level.
44000-P123146
World Bank
Costa Rica Higher Education
International Bank for Reconstruction and Development
MINISTRY OF EDUCATION
International Bank for Reconstruction and Development
MINISTRY OF EDUCATIONPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Marcelo Becerra
+1-202-473-1000mbecerra@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COSTA RICA
Provincia de San JosE
9.6670 -84.0000
Provincia de Puntarenas
9.3600 -84.0000
Provincia de Limón
10.0000 -83.2170
Provincia de Heredia
10.3330 -84.0000
Provincia de Guanacaste
10.5000 -85.2500
Provincia de Cartago
9.8330 -83.7500
Provincia de Alajuela
10.5000 -84.5000
Tertiary EducationScience and TechnologyClimate changeAccess to EducationJobsMitigationStandards, Curriculum and TextbooksTeachersEducation
0.00
0.00
0.00
0.00
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
1666666.66
1666666.67
1666666.67
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
4166666.66
4166666.67
4166666.67
4166666.66
4166666.67
4166666.67
4166666.66
4166666.67
4166666.67
4166666.66
4166666.67
4166666.67
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
3333333.33
3333333.33
3333333.34
2666666.66
2666666.67
2666666.67
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
105833.33
105833.33
105833.33
105833.33
105833.33
105833.33
105833.33
105833.33
105833.33
105833.33
105833.33
105833.37
1001268.59
1001268.59
1001268.59
1001268.59
1001268.59
1001268.59
1001268.59
1001268.59
1001268.59
1001268.59
1001268.59
1001268.60
3091824.58
3091824.58
3091824.58
3091824.58
3091824.58
3091824.58
3091824.58
3091824.58
3091824.58
3091824.58
3091824.58
3091824.62
5560559.82
5560559.82
5560559.82
5560559.82
5560559.82
5560559.82
5560559.82
5560559.82
5560559.82
5560559.82
5560559.82
5560559.86
6907180.34
6907180.34
6907180.34
6907180.34
6907180.34
6907180.34
6907180.34
6907180.34
6907180.34
6907180.34
6907180.34
6907180.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
200000000Total Commitment in Third Quarter of 2012
International Bank for Reconstruction and Development-500000Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development20000Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development500000Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development500000Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development250000Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development2441000Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development5136592Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development-8810Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development2439631Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development-74708Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development1998000Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development726000Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development533000Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development963000Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development-91436Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development5927000Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development4300000Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development1700000Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development1095900Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development4500000Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development-186362Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development8556995Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development8800000Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development2000000Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development7000000Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development-445930Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development2000000Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development26126718Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development3000000Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-921609Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development5100000Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development21500000Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development5100000Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development4500000Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development-1317355Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-2342277Total Loan Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development16000000Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development6750000Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development13800000Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-1795937Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-3002217Total Loan Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development4500000Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development3500000Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development2100000Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-2937651Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-3455657Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development6000000Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development-3079904Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-3628167Total Loan Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development3300000Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development11967807Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development3810000Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development315000Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-3323462Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development-4049031Total Loan Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development922005Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development297000Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Effectiveness Conditions | Description :(a) The Institutional Improvement Agreements (AMIs) have been executedon behalf of the Borrower and each of the Participating Universities; (b) the CONARE Agreement has been executed on behalf of theBorrower and CONARE; and (c) the SINAES Agreement has been executed on behalf of the Borrower and SINAES. | Due Date :06-Feb-2013
Finance Agreement :Additional Legal Matters | Description :The AMIs have been duly authorized or ratified by the Borrower and therespective Participating University, and are legally bindingupon the Borrower and the respective Participating University inaccordance with the terms of the respective AMI. | Due Date :06-Feb-2013
Finance Agreement :Implementation Arrangements | Description :(A) The Borrower, through the Ministry of Public Education, shallenter into the following subsidiary agreements: (i) with CONARE; (ii) an Institutional Improvement Agreement (“AMI”) with each ofthe Participating Universities, (iii) with SINAES. | Due Date :06-Nov-2012
Finance Agreement :Implementation Arrangements | Description :(B) For purposes of the carrying out of the Project, the LiaisonCommission (“CE”) shall be operated and maintained during the execution of the Project by the Borrower and the ParticipatingUniversities. | Due Date :10-Jul-2012
Finance Agreement :Implementation Arrangements | Description :(C) No later than 10 months after effectiveness, a Monitoring andEvaluation Committee (“CSE”) shall be established and thereafter maintained by the Borrower and the Participating Universitiesthrough the CE, during the execution of the Project, for the purposes of providing an external and impartial evaluation of theProject. | Due Date :31-May-2014
Finance Agreement :Implementation Arrangements | Description :(D) A Project Coordinating Unit (“UCP”) shall be created andthereafter operated and maintained during the execution of the Projectwithin CONARE. | Due Date :10-Oct-2012
Finance Agreement :Environmental Safeguard | Description :Part I of the Project shall be carried out in accordance with theEnvironmental and Social Management Framework. The Participating Universities shall prepare and furnish to the Bank any neededEnvironmental Management Plan acceptable to the Bank and, immediately thereafter, implement it in accordance with its terms, and ina manner acceptable to the Bank. | Frequency :Yearly
Finance Agreement :Indigenous Peoples Safeguard | Description :(A) Part I of the Project shall be carried out in accordance withthe Indigenous Peoples Planning Framework (IPPF) setting forth procedures for preparation of the Multiannual Indigenous PeoplesPlan. | Frequency :Yearly
Finance Agreement :Indigenous Peoples Safeguard | Description :(B) No later than November 30, 2013, an indigenous peoples planshall be prepared and furnished to the Bank, adopted by all the Participating Universities and acceptable to the Bank (MultiannualIndigenous Peoples Plan), which plan shall be consistent with the provisions of the Indigenous Peoples Planning Framework. | DueDate :30-Nov-2013
Finance Agreement :Indigenous Peoples Safeguard | Description :Immediately thereafter, the Multiannual Indigenous Peoples Planshall be implemented in accordance with its terms, and in a manner acceptable to the Bank. | Frequency :Yearly
Finance Agreement :Indigenous Peoples Safeguard | Description :No Subproject involving Indigenous Peoples shall be carried outprior to the adoption of the Multiannual Indigenous Peoples Plan. | Frequency :Yearly
Finance Agreement :Indigenous Peoples Safeguard | Description :If, after the Multiannual Indigenous Peoples Plan has been adopted,new Subprojects are approved or amended in a manner that could affect Indigenous Peoples,prior to the carrying out of any saidSubproject, the Multiannual Indigenous Peoples Plan shall be amended, in accordance with the provisions of the IPPF and in a manneracceptable to the Bank. | Frequency :Yearly
Finance Agreement :Resettlement | Description :The Borrower and the Participating Universities shall ensure that no resettlementoccurs under the Project, including Subprojects. | Frequency :Yearly
Intermediate Results Indicator
18. Total number of indigenous students enrolled in the four participating public universities.
PDO Indicator
1. Improve Access. Total Number of under-graduate, on-site students enrolled in the four universities participating in the Project.
PDO Indicator
3. Improve Quality. Total number of officially accredited programs in the four universities participating in the Project.
PDO Indicator
4. Increase Investments in innovation and scientific and technological development. Resources invested in research and development(R&D) in the four universities participating in the Project.
PDO Indicator
2. Improve Access. Total number of post-graduate, on-site students enrolled in the four universities participating in the Project.
Intermediate Results Indicator
1. Total number of first-year students enrolled in undergraduate degrees in the four universities participating in the Project.
Intermediate Results Indicator
13. Total number of undergraduate programs that undergo external evaluation.
Intermediate Results Indicator
6. Full-time equivalent faculty members who undertake research activities in the four universities participating in the Project.
Intermediate Results Indicator
7. Staff who receive a scholarship to do postgraduate studies abroad from the four universities participating in the Project.
Intermediate Results Indicator
8. Number of published articles in indexed journals.
Intermediate Results Indicator
9.Number of graduates from the four universities participating in the Project.
Intermediate Results Indicator
12. Direct Project Beneficiaries
Intermediate Results Indicator
2. Total number of undergraduate students enrolled in priority areas in the four universities participating in the Project.
Intermediate Results Indicator
14. Total number of graduate programs that undergo external evaluation.
Intermediate Results Indicator
3. Total number of postgraduate students enrolled in priority areas in the four universities participating in the Project.
Intermediate Results Indicator
15. Number of professionals trained to carry out self-evaluation on behalf of HEIs and external evaluation on behalf of SINAES.
Intermediate Results Indicator
4. Total number of full-time equivalent faculty members who hold a masters degree in the four universities participating in Project.
Intermediate Results Indicator
5. Total number of full-time equivalent faculty members who hold a doctoral degree in the four universities participating in the Project.
Intermediate Results Indicator
11. Percentage of budget allocated to infrastructure and equipment in the four universities participating in the Project.
Intermediate Results Indicator
16. Comparable studies for monitoring graduates' insertion in the labor market carried out using representative samples by OLaP.
Intermediate Results Indicator
17. Progress in the consolidation of the Information System of the Public University Higher Education
PDO Indicator
5. Upgrade institutional management. Yearly publication of the self-evaluation of the "Annual Operational Plan" on the websites ofthe four universities participating in the Project.
Intermediate Results Indicator