44000-P152096
World Bank
Supporting Education Reform in Targeted Circuits
International Bank for Reconstruction and Development
MINISTERIO DE EDUCACION
International Bank for Reconstruction and Development
MINISTERIO DE EDUCACIONPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Diego Angel-Urdinola
+1-202-473-1000dangelurdinola@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ECUADOR
Canton Vinces
-1.5500 -79.7330
Canton Ventanas
-1.4500 -79.4670
Santa Lucia
-1.7160 -79.9870
Canton Quito
-0.2170 -78.5000
Canton Quevedo
-1.0170 -79.4830
Provincia de Pichincha
-0.0830 -78.5000
Canton Pedro Moncayo
0.0220 -78.2730
Montalvo
-1.7900 -79.2880
Mocache
-1.1830 -79.4990
Canton Milagro
-2.1670 -79.6000
Provincia de Los Rios
-1.4170 -79.5830
Provincia del Guayas
-2.0000 -79.8330
Canton Guaranda
-1.6000 -79.0000
Canton Cayambe
0.0470 -78.0440
Provincia de Bolivar
-1.5830 -79.0830
Canton Babahoyo
-1.8170 -79.5170
Canton Baba
-1.7830 -79.6670
Canton Valencia
-0.7120 -79.3770
Secondary EducationPrimary EducationEarly Childhood EducationPublic Administration - EducationAccess to EducationEducationEducation Financing
0.00
0.00
0.00
0.00
0.00
0.00
666666.66
666666.67
666666.67
1666666.66
1666666.67
1666666.67
3333333.33
3333333.33
3333333.34
5000000.00
5000000.00
5000000.00
8333333.33
8333333.33
8333333.34
10000000.00
10000000.00
10000000.00
8333333.33
8333333.33
8333333.34
6666666.66
6666666.67
6666666.67
5000000.00
5000000.00
5000000.00
3333333.33
3333333.33
3333333.34
2333333.33
2333333.33
2333333.34
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1333333.33
1333333.33
1333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
477540.00
477540.00
477540.00
477540.00
477540.00
477540.00
477540.00
477540.00
477540.00
716666.67
716666.67
716666.67
716666.67
716666.67
716666.67
716666.67
716666.67
716666.67
716666.67
716666.67
716666.63
2033333.33
2033333.33
2033333.33
2033333.33
2033333.33
2033333.33
2033333.33
2033333.33
2033333.33
2033333.33
2033333.33
2033333.37
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.37
7058511.67
7058511.67
7058511.67
7058511.67
7058511.67
7058511.67
7058511.67
7058511.67
7058511.67
7058511.67
7058511.67
7058511.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
178000000Total Commitment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-445000Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-21885Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development4297860Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development-258023Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-277335Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development8600000Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development-281407Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-416057Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development16200000Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-602262Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development8200000Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-925048Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development11000000Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development-968877Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development-40000000Total Commitment Cancellations in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
Schedule 2, Section I.A (c) ensure that 7 key staff working full time in the Project team: (i) within GUEM (Coordinator/M&Especialist, procurement specialist, FM specialist, and social and environmental specialist(s), and infrastructure technician); and(ii) within INEVAL (procurement specialist and FM specialist) are assigned no later than 45 days the effective date of theAmendment.
Finance Agreement :School consolidation proposal including transportation arrangements | Description :Legal Agreement, Schedule 2,Section V.1, (a), (i)Furnish to the Bank: (i) a school consolidation proposal including transportation arrangements; (ii) theupdated Procurement Plan; (iii) the relevant SMP or IPP, as applicable; and (iv) the relevant RAP, if applicable, all in a mannerand with contents acceptable to the Bank. | Frequency :CONTINUOUS
Finance Agreement :Micro-Plan for transportation arrangements for each “School Hub” | Description :Legal Agreement, Schedule 2,Section V.2The Borrower, through MINEDUC, for the purposes of carrying out Part 1(a)(i) of the Project, shall prepare a micro-planfor transport arrangements for each School Hub following the criteria and methodology set forth in the MINEDUC's guidelines“Modelamiento del Transporte Escolar en Funcion del Reordenamiento de la Oferta Educativa” included in the OM. | Frequency:CONTINUOUS
Schedule 2, Section V.3 (a) Not later than 5 months after the Effective Date of the Amendment, select & contract an entity,independent from the Borrower w/experience and qualifications acceptable to the Bank for the carrying out of technical reviews ofthe implementation of the arrangements for school transportation for each School Hub built under the Project (TransportationReview).
Finance Agreement :Technical Reviews of implementation of school transportation arrangements | Description :Legal Agreement,Schedule 2, Section V.3 (b) Carry out at least three Transportation Reviews during Project implementation, and thereafter, eachtime, prepare a report of such scope and in such detail as the Bank shall reasonably request. | Frequency :CONTINUOUS
Schedule 2, Section V.4 Without limitation to the provision of Section 5.03 Gral Conditions, the Borrower shall provide thecounterpart funds required for Project implementation currently estimated in US$17,000, 000 (aprox) distributed in accordance tothe Loan Amendment (Annex), as such amount & table may be revised by mutual agreement (exchange of letter) & notice to theBorrower.
For purposes of Schedule 2, Section II.B.3 no later than 30 days after the Effective Date of the Amendment, the Borrower shallsubmit to the Bank for no-objection the terms of reference for the hiring of an independent auditor.
To carry out Part 2(b)(v) of the Project, the Borrower, through MINEDUC, shall enter into an agreement with INEVAL (“INEVALAgreement”) under terms and conditions acceptable to the Bank including : (a) the Borrower's obligation to transfer, on a grantbasis, part of the proceeds of the Loan to INEVAL; (b) INEVAL's obligations to carry out the activities of Parts 2(b)(v) of theProject
Withdrawal Condition: Under Category (3) Section IV.B.1 (c) of Schedule 2 -No withdrawal shall be made until the INEVAL Agreementhas been fully executed in accordance with Section I.C of Schedule 2 to the Loan Agreement.
INEVAL will maintain, until the completion of the Project, a dedicated Project team, responsible for monitoring the co-execution ofthe Project activities planned under its jurisdiction, with key staff with functions, experience, and qualifications acceptable tothe Bank, as described in the Operational Manual, including a procurement specialist and a financial management specialist.
Intermediate Results Indicator
Students benefiting from direct interventions to enhance learning - Female
Intermediate Results Indicator
Students benefiting from direct interventions to enhance learning
Intermediate Results Indicator
Number of surveys on beneficiary communities satisfaction in the targeted circuits regarding: (i) the process of social managementand (ii) the results of the implemented new school “hubs.” (Number)
Intermediate Results Indicator
Number of students with special education needs associated with disabilities enrolled in special education schools in the targeted circuits (Number)
Intermediate Results Indicator
Number of teachers that have completed graduate-level studies in selected subjects (of which % of female) (Number)
Intermediate Results Indicator
Number of public schools that benefit from technical assistance to prepare their school improvement plan (Number)
Intermediate Results Indicator
Number of teachers that have received in-service training (of which % female) (Number)
Intermediate Results Indicator
Number of public schools that offer adaptive computer assisted learning to their students (Number)
Intermediate Results Indicator
Number of studies financed with Project funds to study the Project's impact on equity, quality and coverage (Number)
Intermediate Results Indicator
Number of implementation phases completed of the new EMIS (Number)
PDO Indicator
Enrollment in early education in the targeted circuits
Intermediate Results Indicator
Percentage of the teachers in public schools who received the ICT kit and use it to register information (Percentage)
Intermediate Results Indicator
Share of evaluations conducted in a given time period
Intermediate Results Indicator
Percentage of students from the targeted circuits attending targeted public schools that receive infrastructure and equipment in compliance with MINEDUC's standards
PDO Indicator
Persistence rate from lower through upper secondary education
44000-P167416
World Bank
Social Safety Net Project
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Nelson Gutierrez
+1-202-473-1000ngutierrez1@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ECUADOR
Republic of Ecuador
-1.2500 -78.2500
Social ProtectionPublic Administration - Social ProtectionLabor Market Policy and ProgramsGenderData production, accessibility and useAdaptationSocial protection delivery systemsActive Labor Market ProgramsSocial ProtectionSocial Safety NetsClimate changeData Development and Capacity Building
37675000.00
37675000.00
37675000.00
37675000.00
12364166.67
12364166.67
12364166.67
12364166.67
12364166.67
12364166.67
12364166.67
12364166.67
12364166.67
12364166.67
12364166.67
12364166.63
3901666.67
3901666.67
3901666.67
3901666.67
3901666.67
3901666.67
3901666.67
3901666.67
3901666.67
3901666.67
3901666.67
3901666.63
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37675000.00
37675000.00
37675000.00
37675000.00
12364166.67
12364166.67
12364166.67
12364166.67
12364166.67
12364166.67
12364166.67
12364166.67
12364166.67
12364166.67
12364166.67
12364166.63
3901666.67
3901666.67
3901666.67
3901666.67
3901666.67
3901666.67
3901666.67
3901666.67
3901666.67
3901666.67
3901666.67
3901666.63
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
350000000Total Commitment in Second Quarter of 2019
International Bank for Reconstruction and Development-875000Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development24841744Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development10860684Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development6100000Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
INEC Inter-institutional Agreement - LA, Schedule 2, Section I. B.1. "To facilitate the carrying out Part 1.1. of the Project, theBorrower, through SENPLADES, shall enter into agreements with INEC (“Inter-Institutional Agreement”), under terms and conditionsacceptable to the Bank, which shall include, inter alia, the Borrower, INEC responsibilities under Part 1.1. of the Project."
GAD and NGO Inter-institutional Agreement - LA, Schedule 2, Section I. B.2. "To facilitate the carrying out Part 1.2. of theProject, the Borrower, through MIES, shall enter into an agreement with the selected GAD and NGO (“Inter-InstitutionalAgreements”), under terms and conditions acceptable to the Bank, which shall include, inter alia, the Borrower and the respectiveGAD and NGO responsibilities under Part 1.2. of the Project."
BanEcuador Inter-institutional Agreement - LA, Schedule 2, Section I. B.3. "To facilitate the carrying out Part 1.3. of theProject, the Borrower, through MIES, shall enter into an agreement with BanEcuador (“Inter-Institutional Agreement”), under termsand conditions acceptable to the Bank, which shall include, inter alia, the Borrower and BanEcuador responsibilities under Part1.3. of the Project."
Operational Manual - LA, Schedule 2, Section I. C.2. "Not later than thirty (30) days after Effective Date, the Borrower shalladopt the Operational Manual in a manner and with contents acceptable to the Bank."
Environmental and Social Standards - LA, Schedule 2, Section I. D.1. "The Borrower shall ensure that the Project is carried out inaccordance with the Environmental and Social Standards, in a manner acceptable to the Bank."
Project Report (MIES) - LA, Schedule 2, Section II. 1. "The Borrower, through MIES, shall furnish to the Bank each Project Reportnot later than forty-five (45) days after the end of each calendar semester, covering the calendar semester."
Independent Technical Review Entity (MIES) - LA, Schedule 2, Section II. 2. "The Borrower, through MIES, shall not later thanninety (90) days after Effective Date, select and contract an entity or, independent from the Borrower (Independent TechnicalReview Entity) with experience and qualifications acceptable to the Bank, and in accordance with terms of reference satisfactory tothe Bank. The Independent Technical Review Entity shall be responsible for the carrying out of technical audits of the Project atthe end of each semester, particularly focused on the achievement of the DLIs."
Independent Technical Review Entity (SENPLADES) - LA, Schedule 2, Section II. 3. "The Borrower, through SENPLADES, shall not laterthan ninety (90) days after Effective Date, select and contract an entity or, independent from the Borrower (Independent TechnicalReview Entity) with experience and qualifications acceptable to the Bank, and in accordance with terms of reference satisfactory tothe Bank. The Independent Technical Review Entity shall be responsible for the carrying out of technical audits of the Project atthe end of each semester, particularly focused on the achievement of the DLIs."
Hiring of a Procurement and a Financial Management specialist (MIES PIU) - LA, Schedule 2, Section I.A. (b) "Not later than ninety(90) days after Effective Date, ensure that a procurement and a financial management specialist are hired to work full time withinMIES PIU, all under terms of reference acceptable to the Bank."
Hiring of a Procurement and a Financial Management specialist (SENPLADES PIU) - LA, Schedule 2, Section I.A. (d) "not later than aninety (90) days after Effective Date, ensure that a procurement and a financial management specialist are hired to work full timewithin SENPLADES PIU, all under terms of reference acceptable to the Bank."
Intermediate Results Indicator
Average number of persons from moderate poor households that have a full time or part time job (either at the formal or informal sector) receiving the exit strategy package
Intermediate Results Indicator
Beneficiaries of social safety net programs
PDO Indicator
Percentage of extreme poor households with children under three years old receiving CCTs with corresponding early childhood development services nationwide
PDO Indicator
Percentage of elderly in extreme poor households receiving UCT and elderly care services nationwide
PDO Indicator
Percentage of moderate poor households who have received an economic inclusion package or lump sum to exit from the selected SSN programs
PDO Indicator
Percentage of non-poor households (as a share of the total of CCT beneficiaries) receiving CCTs
PDO Indicator
Percentage of extreme poor households with updated information in the Social Registry
Intermediate Results Indicator
Depth of the Social Registry Database
Intermediate Results Indicator
Extreme poor elderly receiving cash transfer PMMA
Intermediate Results Indicator
Extreme poor elderly receiving caring services
Intermediate Results Indicator
Extreme poor female children under three years old receiving CCTs with corresponding early childhood development services nationwide
Intermediate Results Indicator
Extreme poor indigenous infants with complete package (BDH-V and early childhood services- ECD)
Intermediate Results Indicator
Percentage of non-poor households enrolled in a twelve month CDH integrated service package
Intermediate Results Indicator
Extreme poor indigenous elderly with complete package (PMMA and elderly care services)
Intermediate Results Indicator
Number of health controls for extreme poor children according to age from 0 to 24 months
Intermediate Results Indicator
Children age 0 to 24 months with complete vaccination schedule
Intermediate Results Indicator
Percentage of necessary childcare time dedicated by father of extreme poor children
Intermediate Results Indicator
Average increase of per capita income for moderate poor households receiving the exit strategy package
Intermediate Results Indicator
Extreme poor infants receiving cash transfer Bono de Desarrollo Humano Variable (BDH-V)
Intermediate Results Indicator
Usage of the Social Registry database at the MIES' programs
Intermediate Results Indicator
Extreme poor infants attending early childhood development services
Intermediate Results Indicator
Usage of administrative records in the Social Registry database
Intermediate Results Indicator
Percentage of poor households enrolled in a twenty-four month CDH integrated service package program
Intermediate Results Indicator
Implementation of a Gender Plan
Intermediate Results Indicator
Strengthening of the GRM for BDH and BDH-V
44000-P143996
World Bank
EC Manta Public Services Improvement Project
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Iris Marmanillo
+1-202-473-1000imarmanillo@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ECUADOR
Manta
-0.9620 -80.7130
Urban TransportPublic Administration - TransportationPublic Administration - Water, Sanitation and Waste ManagementSanitationOther Water Supply, Sanitation and Waste ManagementWater Institutions, Policies and ReformUrban Infrastructure and Service DeliveryMitigationUrban DevelopmentAdaptationClimate changeWater Resource Management
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1666666.67
1666666.67
1666666.66
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
1666666.67
1666666.67
1666666.66
6666666.67
6666666.67
6666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2268284.58
2268284.58
2268284.58
2268284.58
2268284.58
2268284.58
2268284.58
2268284.58
2268284.58
2268284.58
2268284.58
2268284.62
2770823.92
2770823.92
2770823.92
2770823.92
2770823.92
2770823.92
2770823.92
2770823.92
2770823.92
2770823.92
2770823.92
2770823.88
2357186.00
2357186.00
2357186.00
2357186.00
2357186.00
2357186.00
2357186.00
2357186.00
2357186.00
2357186.00
2357186.00
2357186.00
520372.17
520372.17
520372.17
520372.17
520372.17
520372.17
520372.17
520372.17
520372.17
520372.17
520372.17
520372.13
100000000Total Commitment in Third Quarter of 2013
International Bank for Reconstruction and Development-250000Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development5000000Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development-17179Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-86250Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-86250Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development1652824Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development0Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development-86250Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development10076212Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-198748Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development15490380Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development0Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-371542Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development21922301Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-681317Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development11327586Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development0Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-1025059Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-947480Total Loan Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development10621708Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development17664523Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development-1388451Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-1338177Total Loan Repayment in First Quarter of 2019
International Bank for Reconstruction and Development0Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-1755223Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-1657905Total Loan Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-1650763Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development-1657905Total Loan Repayment in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Project Implementation Unit | Description :The Borrower shall establish and thereafter operate and maintainthroughout the implementation of the Project, a Project implementation unit (“UGP”), with functions, staffing and responsibilitiessatisfactory to the Bank, and set forth in the Operational Manual. | Due Date :19-Aug-2014
Finance Agreement :Specialists | Description :No later than two months after the Effective Date, the Borrower shall hire: (i) aprocurement specialist; (ii) an environmental specialist; (iii) a social specialist; and (iv) a financial management specialist,all under terms of reference approved by the Bank, to carry out the duties and responsibilities specified in the OperationalManual. | Due Date :17-Oct-2014
Finance Agreement :Operational Manual | Description :The Borrower shall carry out the Project in accordance with the provisions ofthe Operational Manual, which shall include, inter alia: (i) environmental guidelines for small works under Part III.1 (d) of theProject, including procedures for any potential environmental negative impact of the construction of a small laboratory; and (ii)the recommendations of the Poza Honda Dam Study. | Frequency :CONTINUOUS
Finance Agreement :Subsidiary Agreement | Description :For purposes of the carrying out of Parts I and III.1 of the Project, theBorrower shall enter into an agreement (“Subsidiary Agreement”) with EPAM, under terms and conditions satisfactory to the Bank. |Due Date :31-Jan-2014The restructuring requires an amendment.
Finance Agreement :Safeguards | Description :The Borrower shall carry out the Project in accordance with the EMPs, the RAP, andRPF. | Frequency :CONTINUOUS
Finance Agreement: Safeguards for Technical Assistance | Description :For technical assistance for the preparation of a waterresources integrated management plan under Part III.1 (e) of the Project, the Borrower, through the UGP, shall ensure that the ToRsshall duly incorporate the requirements of the applicable Safeguard Policies, then in force, as applied to the advice conveyedthrough such technical assistance. | Due Date :30-Jun-2018
PDO Indicator
Household sewerage connections that are benefiting from rehabilitation works undertaken by the project
Intermediate Results Indicator
Number of water connections activated under the Project
Intermediate Results Indicator
New household sewer connections constructed under the project
Intermediate Results Indicator
Piped household water connections that are benefiting from rehabilitation works undertaken by the project
Intermediate Results Indicator
Number of water utilities that the project is supporting
Intermediate Results Indicator
New piped household water connections that are resulting from the project intervention
PDO Indicator
Number of people provided with paved access to their houses in lower-income neighborhoods
Intermediate Results Indicator
Water production macro-metering
Intermediate Results Indicator
EPAM's Billing collection efficiency
PDO Indicator
Walkability of upgraded streets
PDO Indicator
Working ratio
PDO Indicator
Travel time in public transport along Par Vial
PDO Indicator
Continuity of water supply service
Intermediate Results Indicator
Two replaced pumping systems for the Caza Lagarto and Ceibal water treatment plants operational
Intermediate Results Indicator
Preparation of an Urban Mobility Plan
Intermediate Results Indicator
Emergency repair works, including the hydraulic isolation of Tarqui Zone carried out
Intermediate Results Indicator
Commercial system in EPAM updated and operational
PDO Indicator
Implementation and adoption of a road data management system
Intermediate Results Indicator
Km of upgraded streets
Intermediate Results Indicator
Km streets paved and repaved
Intermediate Results Indicator
Number of km of quality cycle infrastructure implemented
44000-P157425
World Bank
Transformation of the Tertiary Technical and Technological Institutes Project
International Bank for Reconstruction and Development
SENESCYT
International Bank for Reconstruction and Development
SENESCYTPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Diego Angel-Urdinola
+1-202-473-1000dangelurdinola@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ECUADOR
Provincia del Tungurahua
-1.2500 -78.5000
San Jose de Chimbo
-1.6830 -79.0260
Manta
-0.9620 -80.7130
Provincia de Manabi
-0.6670 -80.0830
Machala
-3.2590 -79.9610
Provincia de El Oro
-3.5000 -79.8330
Provincia de Bolivar
-1.5830 -79.0830
Ambato
-1.2490 -78.6170
Lago Agrio
0.0860 -76.8720
Provincia de Sucumbios
0.1000 -76.8670
Duran
-2.2260 -79.7750
Quito
-0.2120 -78.5230
Public Administration - EducationTertiary EducationEducationEducation FacilitiesActive Labor Market ProgramsScience and TechnologyEducation Governance, School-Based ManagementStandards, Curriculum and TextbooksLabor Market Policy and ProgramsJobsTeachers
1875000.00
1875000.00
1875000.00
1875000.00
1875000.00
1875000.00
1875000.00
1875000.00
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
74508.65
74508.65
74508.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
428559.22
428559.23
428559.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
276176.28
276176.29
276176.29
557333.33
557333.33
557333.34
1123422.50
1123422.50
1123422.50
1000000.00
1000000.00
1000000.00
3771666.66
3771666.67
3771666.67
3771666.66
3771666.67
3771666.67
3141666.66
3141666.67
3141666.67
3141666.66
3141666.67
3141666.67
3440000.00
3440000.00
3440000.00
3440000.00
3440000.00
3440000.00
0.00
0.00
90500000Total Commitment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-226250Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development223526Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-168242Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-115593Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development1285678Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-118106Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-18000000Total Commitment Cancellations in Second Quarter of 2019
International Bank for Reconstruction and Development-123487Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development828529Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-128883Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development1580004Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
SCHEDULE 2, Section I, A (i) Operate and maintain the EOD-PRETT, until the completion of the Project, comprised of key staff withfunctions, experience, and qualifications acceptable to the Bank, as described in the Operational Manual (OM) including a Projectcoordinator, and specialists for the monitoring and evaluation, procurement, financial management, social, environment, andinfrastructure.
SCHEDULE 2, Section I, A (ii) INEC until the completion of the Project will maintain a separate Project team comprised of key staffwith functions, experience, and qualifications acceptable to the Bank, as set in the OM, including: a Technical Coordinator, aFinancial Management Specialist (FM), and a Labor Market & Statistical Specialist.
SCHEDULE 2: Section I, A (iii), not later than thirty (30) days after the effective date of this Amendment Letter, ensure thatEOD-PRETT key staff have been assigned to work full time; Section I, A (iv), not later than ninety (90) days after the effectivedate of this Amendment Letter, ensure that INEC key staff have been assigned to work full time.
SCHEDULE 2, Section I, A (ii) Not later than thirty (30) days after the effective date of the Amendment Letter, ensure that theTechnical Coordinator, Financial Management and Labor Market & Statistical Specialist in (ii) above, in respect of INEC have beenassigned to work full time.
SCHEDULE 2, Section I, A (v) Not later than one hundred twenty (120) days after the effective date of the Amendment Letter, ensurethat a complementary financial management system has been established in SENESCYT and is operational, all in a manner acceptable tothe Bank.
SCHEDULE 2, Section 1, C (1) -INEC AGREEMENTTo facilitate the carrying out of Subcomponent 3.2 of the Project, the Borrower,through SENESCYT shall enter into an agreement with INEC (the INEC Agreement) under terms and conditions acceptable to the Bankincluding, among other things: (a) the Borrower's obligation to transfer, on a non-reimbursable basis, part of the proceeds of theLoan to INEC and; (b) INEC's obligations to carry out the activities of Subcomponent 3.2 of the Project in accordance with therelevant provisions of this Schedule, including the provisions of Sections I.D, I.E, I.F and Section III of the Loan Agreement.
SCHEDULE 2, Section I, D (1)The Borrower shall adopt and carry out the Project in accordance with the provisions of a manual (theOperational Manual), acceptable to the Bank, which shall include, inter alia: (a) a detailed description of Project activities andinstitutional arrangements for the Project; (b) the Project administrative, budgeting, accounting, auditing, reporting, financial(including cash flow aspects), procurement and disbursement procedures; (c) the monitoring indicators for the Project; (d) theinstitutional and administrative mechanisms established to ensure inter-institutional coordination; (e) the regulations concerningthe design and micro-planning for IST consolidation ; and (f) the ESMF, IPPF and RPF [and the Existing EMPs, the Existing IPPs andthe Existing SMP.
SCHEDULE 2, Section I, F (6)The Borrower, through SENESCYT shall, not later than ninety (90) days after the Effective Date,develop, in form and substance acceptable to the Bank, and following the guidelines set forth in the Operational Manual, agrievance redress mechanism that encompasses transparent, timely and fair procedures, for the purposes of ensuring that allcomplaints received from beneficiaries and other interested stakeholders related to any activity under the Project are properly andtimely addressed in a manner acceptable.
SCHEDULE 2, Section II, B (1) The Borrower, through SENESCYT, shall, and shall cause INEC to maintain or cause to be maintained afinancial management system in accordance with the provisions of Section 5.09 of the General Conditions.
SCHEDULE 2, Section II, B (2)The Borrower, through SENESCYT, shall prepare and furnish to the Bank not later than forty five (45)days after the end of each calendar semester, interim unaudited financial reports for the Project covering the pertinent calendarsemester, in form and substance satisfactory to the Bank.
SCHEDULE 2, Section II, B (3)The Borrower, through SENESCYT, shall have its Financial Statements audited in accordance with theprovisions of Section 5.09 (b) of the General Conditions. Each audit of the Financial Statements shall cover the period of onefiscal year of the Borrower, or any other period acceptable to the Bank. The audited Financial Statements for each such periodshall be furnished to the Bank not later than six months after the end of such period.
SCHEDULE 2, Section II, B (4) The Borrower, through EOD PRETT under SENESCYT, shall, not later than 120 days before the end of: (i)the first calendar year of Project implementation or (ii) the period subject to audits, (whichever occurs first), submit to theBank for its no-objection the terms of reference for the hiring of an independent auditor.
SCHEDULE 2, Section V (1) Without limitation to the provision of Section 5.03 of the General Conditions, the Borrower shall providethe counterpart funds required for Project implementation estimated in nine million six hundred thousand million Dollars (US$9,600,000), detailed in the OM and distributed in accordance with the table set forth in the Agreement.
SCHEDULE 2, Section V (2) the Borrower through EOD-PRETT not later than 16 months after the effective date of the AmendmentLetter, select and contract an entity, independent from the Borrower with experience& qualifications acceptable to the Bank, inaccordance with TORs satisfactory to the Bank, to carry out the technical reviews referred in the Subcomponent 2.1 of the Project.
SCHEDULE 2: Section I, A (vi), Not later than sixty (60) days after the effective date of this Amendment Letter, ensure that onlyISTs that have a legalized land title will be included in the Project implementation plan, as set forth in the activities describedunder Schedule 1 to the Loan Agreement.
PDO Indicator
PDO Indicator 1: Enrollment in public technical and technological programs designed and implemented in collaboration with employers.
Intermediate Results Indicator
IRI 4: Number of teachers and management staff trained.
Intermediate Results Indicator
IRI 2: Number of ISTs built or rehabilitated in the targeted provinces.
Intermediate Results Indicator
IRI 3: Number of ISTs fully equipped in the targeted provinces.
PDO Indicator
PDO Indicator 2: Persistence rate in technical and technological programs designed and implemented in collaboration with employers.
Intermediate Results Indicator
IRI 1: Percentage of students enrolled in the transformed public ISTs in the Targeted Provinces related to the total capacity of the intervened IST
Intermediate Results Indicator
IRI 5: Percentage of programs designed and implemented in collaboration with employers.
Intermediate Results Indicator
IRI 8: Percentage of programs designed and implemented that have been continuously reviewed by the consultive councils.
Intermediate Results Indicator
IRI 9: Percentage of graduates tracked out of total graduates.
Intermediate Results Indicator
IRI 13: Percentage of public ISTs where management standards have been implemented
Intermediate Results Indicator
IRI 10: Implementation of Gender Plan.
Intermediate Results Indicator
IRI 12: Survey on beneficiary communities satisfaction in the targeted provinces regarding: (a) the process of social management and (b) the results of the implemented new ISTs (Text).
PDO Indicator
PDO Indicator 3: Availability of reliable data produced by the new integrated administrative and academic management system, is used for decision making by main stakeholders.
Intermediate Results Indicator
IRI 7: Development and implementation of the module to track graduates.
Intermediate Results Indicator
IRI 6: Development and implementation of the administrative and academic management system of ISTs.
44000-P151963
World Bank
Ecuador - Sustainable Family Farming Modernization Project
International Bank for Reconstruction and Development
MAGAP
International Bank for Reconstruction and Development
MAGAPPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Remi Charles Andre Trier
+1-202-473-1000rtrier@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ECUADOR
Provincia del Tungurahua
-1.2500 -78.5000
Sierra
-2.0000 -78.5000
Provincia de Pichincha
-0.0830 -78.5000
Provincia del Pastaza
-1.6670 -76.8330
Provincia de Napo
-0.6290 -77.8320
Provincia de Morona-Santiago
-2.5000 -77.9170
Provincia de Manabi
-0.6670 -80.0830
Provincia de Los Rios
-1.4170 -79.5830
Provincia de Loja
-4.1670 -79.5000
Provincia de Imbabura
0.3760 -78.3240
Provincia del Guayas
-2.0000 -79.8330
Provincia de Esmeraldas
0.8330 -79.2500
Provincia de El Oro
-3.5000 -79.8330
Provincia de Cotopaxi
-0.8330 -78.8330
Costa
-1.0000 -80.0000
Provincia del Chimborazo
-1.9170 -78.7500
Provincia del Carchi
0.7500 -78.0830
Provincia del Canar
-2.5000 -79.0000
Provincia de Bolivar
-1.5830 -79.0830
Provincia del Azuay
-3.0830 -79.3330
Provincia de Sucumbios
0.1000 -76.8670
Provincia de Francisco de Orellana
-0.7500 -76.4170
Provincia de Santo Domingo de los Tsachilas
-0.2890 -79.1860
Provincia de Santa Elena
-2.0830 -80.5830
Agricultural Extension, Research, and Other Support ActivitiesAgricultural markets, commercialization and agri-businessIrrigation and DrainageOther Agriculture, Fishing and ForestryPublic Administration - Agriculture, Fishing & ForestryRural Infrastructure and service deliveryBiodiversityRural MarketsLandscape ManagementMitigationRural DevelopmentAdaptationJobsClimate changeLand Administration and ManagementRenewable Natural Resources Asset Management
0.00
0.00
0.00
0.00
0.00
0.00
666666.66
666666.67
666666.67
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.63
93765.80
93765.80
93765.80
93765.80
93765.80
93765.80
93765.80
93765.80
93765.80
93765.80
93765.80
93765.80
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1364567.53
1364567.53
1364567.53
1364567.53
1364567.53
1364567.53
1364567.53
1364567.53
1364567.53
1364567.53
1364567.53
1364567.57
80000000Total Commitment in Third Quarter of 2015
International Bank for Reconstruction and Development-200000Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development500000Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development-103830Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-105591Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development1125190Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-112497Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development2505813Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development-120521Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-172153Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development4728751Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-207706Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-15000000Total Commitment Cancellations in First Quarter of 2019
International Bank for Reconstruction and Development-254468Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development4256527Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-282408Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementAgreementAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Effectiveness of the Co-financing Agreement AECID/GoE (Article IV, Section 4.01) | Description :The Co-financingDeadline for the effectiveness of the Co-financing Agreement for the US$ 20 million loan between the Spanish Cooperation (AECID)and the Republic of Ecuador is June 1, 2016 | Due Date :01-Jun-2016
Finance Agreement :Implementation of Project according operation manual (Schedule 2, Section I.A.2) | Description :The Borrowershall carry out the Project in accordance with a manual (the Operational Manual), satisfactory to the Bank, which shall include therules, methods, guidelines, standard documents and procedures for the carrying out of the relevant Parts of the Project. |Frequency :CONTINUOUS
Finance Agreement :Creation of Provincial Articulation Roundtables (Schedule 2, Section I.A.3.) | Description :Creation ofProvincial Articulation Roundtables to screen requests of subprojects, evaluate eligibility and guarantee coordination betweenlocal stakeholders. The Provincial Articulation Roundtables should have participation of local stakeholders including the GADPs,NGOs, other MAGAP's Project and program representatives. | Frequency :CONTINUOUS
Finance Agreement :Ministerial Accord for internal MAGAP's coordination (Sch. 2, Section I. I.A.4.) | Description :The Borrower,through MAGAP shall issue a Ministerial Accord in a manner acceptable to the Bank, for the purposes of articulating andcomplementing actions among the different MAGAP's Agricultural Programs and the Project, and maximizing the impacts andsustainability of the different activities derived from said Programs | Due Date :07-Jun-2016
PDO Indicator
Increase of Annual Net Income on area benefited by project
PDO Indicator
Water users provided with new/improved irrigation and drainage services (number)
PDO Indicator
Water users provided with irrigation and drainage services - female (number)
Intermediate Results Indicator
Clients who have adopted an improved agr. technology promoted by the project
Intermediate Results Indicator
Clients who adopted an improved agr. technology promoted by project – female
Intermediate Results Indicator
Operational water user associations created and/or strengthened (number)
Intermediate Results Indicator
Sub-projects that are expected to have a mechanism for post-completion operation
Intermediate Results Indicator
Number of beneficiaries organizations that received support from another MAG's or GAD's Project or Program
Intermediate Results Indicator
Client days of training provided (number)
Intermediate Results Indicator
Client days of training provided - Female (number)
Intermediate Results Indicator
Number of organizations implementing proces of value addition
Intermediate Results Indicator
Increase of Land use intensity
Intermediate Results Indicator
Sub-projects with post-project community engagement or O&M arrangements (%)
Intermediate Results Indicator
Percentage of beneficiaries who attended at least 70% of the training on business management for organizations
Intermediate Results Indicator
Number of training days provided to MAG's or GAD's staff
Intermediate Results Indicator
Area provided with irrigation and drainage services (ha)
Intermediate Results Indicator
Area provided with irrigation and drainage services - New (ha)
Intermediate Results Indicator
Area provided with irrigation and drainage services - Improved (ha)
44000-P147280
World Bank
EC Ibarra Transport Infrastructure Improvement Project
International Bank for Reconstruction and Development
MUNICIPALITY OF IBARRA
International Bank for Reconstruction and Development
MUNICIPALITY OF IBARRAPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Roger Gorham
+1-202-473-1000rgorham@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ECUADOR
Ibarra
0.3520 -78.1220
Urban TransportOther Industry, Trade and ServicesSub-National GovernmentClimate changeUrban DevelopmentMitigationCultural HeritageUrban Infrastructure and Service Delivery
0.00
0.00
0.00
733333.33
733333.33
733333.34
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
1208333.33
1208333.33
1208333.34
1208333.33
1208333.33
1208333.34
1208333.33
1208333.33
1208333.34
1208333.33
1208333.33
1208333.34
941666.66
941666.67
941666.67
941666.66
941666.67
941666.67
941666.66
941666.67
941666.67
941666.66
941666.67
941666.67
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
733333.33
733333.33
733333.34
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
1208333.33
1208333.33
1208333.34
1208333.33
1208333.33
1208333.34
1208333.33
1208333.33
1208333.34
1208333.33
1208333.33
1208333.34
941666.66
941666.67
941666.67
941666.66
941666.67
941666.67
941666.66
941666.67
941666.67
941666.66
941666.67
941666.67
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
52500000Total Commitment in First Quarter of 2016
International Bank for Reconstruction and Development-131250Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development77725Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development938106Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-63603Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-212Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development6415486Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-81272Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development2490346Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development-165058Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development7643914Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-255355Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development7385906Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-512186Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-459370Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Project Management Unit | Description :The borrower shall maintain throughout implementation of the project theProject Management Unit (PMU) within the Ibarra Department of Public Works (DPW) with terms of reference (ToR), resources, andstaffin numbers and with experience, qualifications, and functions as provided in the Project Operational Manual (POM) andsatisfactory to the Bank. | Frequency :CONTINUOUS
Finance Agreement :Optimize Public Transport | Description :The borrower shall carry out the project in accordance with the POM,which shall include the rules, methods, guidelines, standard documents, and procedures for the carrying out of the project,including, among others, measures to ensure proper land use in the terrains adjacent to the Ring Boulevard and measures to ensurethe inclusion of new bus routes through the Ring Boulevard. | Due Date :30-Jun-2019
Finance Agreement :Financial Audit | Description :The borrower shall select and contract, by no later than one (1) month before thefirst audit period or year-end (as applicable), and thereafter maintain, throughout the implementation, the services of a qualifiedand experienced auditor, acceptable to the Bank, under ToR satisfactory to the Bank, to serve as independent external auditor for aperiod of at least three (3) consecutive years. | Frequency :CONTINUOUS
Intermediate Results Indicator
Number of yearly visitors to Yahuarcocha
Intermediate Results Indicator
Direct project beneficiaries
PDO Indicator
Change in travel time across the city / Phase 1
PDO Indicator
Share of project beneficiaries expressing satisfaction with the Ring Boulevard infrastructure and mobility options (disaggregated by gender)
Intermediate Results Indicator
Progress of construction and restoration of tourist spaces works on Yahuarcocha Boulevard
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
Optimized bus route network implemented
Intermediate Results Indicator
Road asset management tools implemented
Intermediate Results Indicator
Proposed organization chart adopted
Intermediate Results Indicator
Non-motorized and Road safety plan adopted
Intermediate Results Indicator
Preparation of multi-annual maintenance plan
PDO Indicator
Change in the percentage of visitors cycling and walking in Yahuarcocha (disaggregated by gender)
Intermediate Results Indicator
Number of road kms. constructed (ring boulevard)
44000-P151439
World Bank
EC Guayaquil Wastewater Management Project
International Bank for Reconstruction and Development
EMAPAG EP
International Bank for Reconstruction and Development
EMAPAG EPPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Jean-Martin Brault
+1-202-473-1000jbrault@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ECUADOR
Hacienda La Pradera
-0.2830 -78.5330
Guayaquil
-2.2060 -79.9080
Guasmo
-2.2430 -79.8930
SanitationAir quality managementUrban Infrastructure and Service DeliveryWater PollutionSoil PollutionEnvironmental Health and Pollution ManagementUrban DevelopmentPublic Private Partnerships
0.00
0.00
78105.00
228472.50
129560.00
290382.50
329640.00
178452.50
382632.50
206127.50
454792.50
500097.50
261375.00
536690.00
272547.50
553500.00
570925.00
294585.00
605570.00
298377.50
586915.00
615205.00
332920.00
738102.50
387142.50
794375.00
861820.00
474472.50
1034122.50
543865.00
1148922.50
1258495.00
678550.00
1434795.00
748865.00
1575117.50
1683050.00
884267.50
1855045.00
966985.00
2011767.50
2111602.50
1094700.00
2298870.00
2423715.00
1245785.00
2525805.00
1284530.00
2675865.00
1376780.00
2781747.50
2757147.50
1375755.00
2804502.50
2836585.00
1412860.00
2793740.00
1404865.00
2827257.50
2824592.50
1403942.50
2782260.00
1376882.50
2744232.50
2734905.00
1361200.00
2709382.50
1351462.50
2696262.50
2683552.50
1336395.00
2662540.00
1326350.00
2643167.50
5044127.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.37
2533333.33
2533333.33
2533333.33
2533333.33
2533333.33
2533333.33
2533333.33
2533333.33
2533333.33
2533333.33
2533333.33
2533333.37
2016666.67
2016666.67
2016666.67
2016666.67
2016666.67
2016666.67
2016666.67
2016666.67
2016666.67
2016666.67
2016666.67
2016666.63
3066666.67
3066666.67
3066666.67
3066666.67
3066666.67
3066666.67
3066666.67
3066666.67
3066666.67
3066666.67
3066666.67
3066666.63
6662500.00
6662500.00
6662500.00
6662500.00
6662500.00
6662500.00
6662500.00
6662500.00
6662500.00
6662500.00
6662500.00
6662500.00
7870833.33
7870833.33
7870833.33
7870833.33
7870833.33
7870833.33
7870833.33
7870833.33
7870833.33
7870833.33
7870833.33
7870833.37
5225000.00
5225000.00
5225000.00
5225000.00
5225000.00
5225000.00
5225000.00
5225000.00
5225000.00
5225000.00
5225000.00
5225000.00
825000.00
825000.00
825000.00
825000.00
825000.00
825000.00
825000.00
825000.00
102500000Total Commitment in Second Quarter of 2015
International Bank for Reconstruction and Development-256250Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development1000000Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development-132892Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-136513Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development804310Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development670000Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development6532823Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development810870Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-142135Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development18476385Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development490682Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development2605333Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development-390111Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development968596Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development2760061Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development2430797Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development2149990Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-485691Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development2224675Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development326443Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development9498195Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development233600000Total Commitment in Second Quarter of 2018
International Bank for Reconstruction and Development1363715Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development601728Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development1454712Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-814129Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development17712150Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development2543515Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development2937978Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development554632Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development-1256603Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development1811818Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development963951Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development1124274Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-584000Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-345600Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development2456833Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development1625059Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-1560656Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development1444650Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development937964Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development643675Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development2667343Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Loan Agreement, Schedule 2, Section I. A. 3. | Description :The Borrower shall on a date to be agreed with theBank, but in no case later than twenty-four (24) months after the Effective Date, carry out a review with the Bank on the overallprogress and implementation arrangements in the execution of the Project and set out the measures and take any remedial action as aresult of such review, as agreed with the Bank. | Due Date :30-Sep-2017
New Definition of Transfer Agreement included: "Transfer Agreement” means Convenio modificatorio al contrato de concesion, theagreement referred to in Section I.A.4 of Schedule 2 of this Agreement, that establishes the conditions under which Interagua shallbe remunerated for the operation and maintenance of the infrastructure developed under the project.
PDO Indicator
Direct project beneficiaries
PDO Indicator
People in urban areas provided with access to improved sanitation services under the project
Intermediate Results Indicator
New household sewer connections constructed under the project
Intermediate Results Indicator
Citizen Engagement: Number of beneficiary households that sign a certification that they are satisfied with the works conducted in their houses.
PDO Indicator
Female beneficiaries
PDO Indicator
Share of poor people in urban areas provided with access to improved sanitation services under the project
PDO Indicator
Water & sanitation utility operating ratio
Intermediate Results Indicator
Reduction of the annually reported repair tickets in the La Chala sector sewer main system
Intermediate Results Indicator
Percentage of Component 1 social mobilization team members that are women
Intermediate Results Indicator
Share of the monthly average effluent from Las Esclusas WWTP outlet discharged into the Guayas River is compliant with regulatory quality standard for BDO, TSS and total coliforms
Intermediate Results Indicator
Share of surveyed beneficiaries (gender disaggregated) that feel project investments reflect their needs
Intermediate Results Indicator
Share of the monthly average effluent from Los Merinos WWTP outlet discharged into the Daule River is compliant with regulatory quality standard for BDO, TSS and total coliforms
Intermediate Results Indicator
Start of Construction of Las Esclusas WWTP
Intermediate Results Indicator
Water Quality Monitoring System for the Estero Salado Estuary
Intermediate Results Indicator
Water quality Monitoring System for the Daule and Guayas River finalized and system operational
Intermediate Results Indicator
Commissioning of Las Esclusas WWTP
Intermediate Results Indicator
Start of Construction of Los Merinos WWTP
Intermediate Results Indicator
Commissioning of Los Merinos WWTP
Intermediate Results Indicator
The Los Merinos WWTP Forest Compensation Plan has being developed and approved by National Environmental Authorities
Intermediate Results Indicator
Meters of sewers mains rehabilitated under the project
PDO Indicator
Volume(mass) of BOD pollution load removed by treatment plant under the project
44000-P157324
World Bank
Ecuador Risk Mitigation and Emergency Recovery Project
International Bank for Reconstruction and Development
MINISTERIO COORDINADOR DE SEGURIDAD
International Bank for Reconstruction and Development
MINISTERIO COORDINADOR DE SEGURIDADPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Diana Marcela Rubiano Vargas
+1-202-473-1000drubianovargas@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ECUADOR
Provincia de Zamora-Chinchipe
-4.2500 -78.8330
Provincia del Tungurahua
-1.2500 -78.5000
Sierra
-2.0000 -78.5000
Saquisili
-0.8350 -78.6660
San Miguel de Salcedo
-1.0450 -78.5910
Ruminahui
-0.6330 -78.5330
Quito
-0.2300 -78.5250
Provincia de Pichincha
-0.0830 -78.5000
Provincia del Pastaza
-1.6670 -76.8330
Provincia de Napo
-0.6290 -77.8320
Provincia de Morona-Santiago
-2.5000 -77.9170
Provincia de Manabi
-0.6670 -80.0830
Machachi
-0.5100 -78.5670
Provincia de Los Rios
-1.4170 -79.5830
Los Lojas
-2.0140 -79.9440
Provincia de Loja
-4.1670 -79.5000
Latacunga
-0.9350 -78.6160
Provincia de Imbabura
0.3760 -78.3240
Provincia del Guayas
-2.0000 -79.8330
Provincia de Galapagos
-0.6700 -90.8730
Provincia de Esmeraldas
0.8330 -79.2500
Provincia de El Oro
-3.5000 -79.8330
Provincia de Cotopaxi
-0.8330 -78.8330
Cotopaxi
-0.6810 -78.4380
Provincia del Chimborazo
-1.9170 -78.7500
Provincia del Carchi
0.7500 -78.0830
Provincia del Canar
-2.5000 -79.0000
Provincia de Bolivar
-1.5830 -79.0830
Provincia del Azuay
-3.0830 -79.3330
Provincia de Sucumbios
0.1000 -76.8670
Provincia de Francisco de Orellana
-0.7500 -76.4170
Provincia de Santo Domingo de los Tsachilas
-0.2890 -79.1860
Provincia de Santa Elena
-2.0830 -80.5830
Other TransportationHealthOther Agriculture, Fishing and ForestryOther Public AdministrationOther Water Supply, Sanitation and Waste ManagementDisaster PreparednessDisaster Risk ReductionFinance for DevelopmentClimate changeDisaster Response and RecoveryDisaster Risk ManagementAdaptationDisaster Risk Finance
0.00
6666666.67
6666666.67
6666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8500000.00
8500000.00
8500000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100000.00
100000.00
100000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100000.00
100000.00
100000.00
0.00
0.00
0.00
0.00
0.00
0.00
34633333.33
34633333.33
34633333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
82872.08
82872.08
82872.08
82872.08
82872.08
82872.08
82872.08
82872.08
82872.08
82872.08
82872.08
82872.12
421011.75
421011.75
421011.75
421011.75
421011.75
421011.75
421011.75
421011.75
421011.75
421011.75
421011.75
421011.75
37983.33
37983.33
37983.33
37983.33
37983.33
37983.33
37983.33
37983.33
37983.33
37983.33
37983.33
37983.37
2344166.67
2344166.67
2344166.67
2344166.67
2344166.67
2344166.67
2344166.67
2344166.67
2344166.67
2344166.67
2344166.67
2344166.63
2079428.80
2079428.80
2079428.80
2079428.80
2079428.80
2079428.80
2079428.80
2079428.80
2079428.80
2079428.80
2079428.80
2079428.79
150000000Total Commitment in First Quarter of 2016
International Bank for Reconstruction and Development-375000Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development29000Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development102000Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-245404Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development863465Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development3776367Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-187249Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development769400Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development506374Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-266428Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-294639Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development121100Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-311565Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development334700Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-58210000Total Commitment Cancellations in Second Quarter of 2019
International Bank for Reconstruction and Development71000Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-189098Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-32204448Total Commitment Cancellations in Third Quarter of 2019
International Bank for Reconstruction and Development-148888Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Appointment of Auditor. Schedule 2. Section II.B.4 | Description :The Borrower shall select and contract, by nolater than six months after the Effective Date, and thereafter maintain, throughout the implementation of the Project, the servicesof a qualified and experienced auditor acceptable to the Bank, under terms of reference satisfactory to the Bank, to serve asindependent external auditor for a period of at least three consecutive years.
Intermediate Results Indicator
Number of schools constructed
Intermediate Results Indicator
Number of students with improved school infrastructure
Intermediate Results Indicator
Number of preventive works
Intermediate Results Indicator
Grievances related to delivery of project benefits that are addressed-(number)
Intermediate Results Indicator
Number of hectares of crops protected against flooding
Intermediate Results Indicator
Health facilities equipped (number)
PDO Indicator
Number of people benefiting from new equipment in the health sector, rehabilitated infrastructure and restored basic services afteran Eligible Disaster occurs
PDO Indicator
Number of people protected through flood mitigation works
PDO Indicator
Direct project beneficiaries
Intermediate Results Indicator
Grievances registered related to delivery of project benefits addressed (%)
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
Preparation of a strategy to strengthen public financial management: including improvements to budget preparation, execution and control.
PDO Indicator
Drafting of a program of fiscal and structural reforms to improve macroeconomic resilience
Intermediate Results Indicator
Roads rehabilitated, Rural
Intermediate Results Indicator
Fishing vessel dock reconstructed
44000-P144489
World Bank
Quito Metro Line One
International Bank for Reconstruction and Development
EMPRESA PUBLICA METROPOLITANA METRO DE QUITO (EPMMQ)
International Bank for Reconstruction and Development
EMPRESA PUBLICA METROPOLITANA METRO DE QUITO (EPMMQ)Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Alejandro Hoyos Guerrero
+1-202-473-1000ahoyos@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ECUADOR
Quito
-0.2300 -78.5250
Urban TransportPublic Administration - TransportationClimate changeMitigationUrban Infrastructure and Service DeliveryUrban DevelopmentGender
0.00
0.00
0.00
0.00
10066666.67
10066666.67
10066666.66
10066666.67
10066666.67
10066666.66
6402666.67
6402666.67
6402666.66
6402666.67
6402666.67
6402666.66
6402666.67
6402666.67
6402666.66
6402666.67
6402666.67
6402666.66
4898333.33
4898333.33
4898333.34
4898333.33
4898333.33
4898333.34
4898333.33
4898333.33
4898333.34
4898333.33
4898333.33
4898333.34
749333.33
749333.33
749333.34
749333.33
749333.33
749333.34
749333.33
749333.33
749333.34
748000.00
748000.00
748000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18979260.16
18979260.17
18979260.17
18979260.16
18979260.17
18979260.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5511034.04
5511034.04
5511034.05
5511034.04
5511034.04
5511034.05
8868039.12
8868039.13
8868039.13
8868039.12
8868039.13
8868039.13
0.00
0.00
0.00
0.00
0.00
0.00
20989514.33
20989514.34
20989514.34
20989514.33
20989514.34
20989514.34
0.00
0.00
0.00
0.00
0.00
100000000.00
534866.80
534866.80
534866.80
534866.80
534866.80
534866.80
950618.86
950618.87
950618.87
950618.86
950618.87
950618.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
205000000Total Commitment in Third Quarter of 2013
International Bank for Reconstruction and Development113875561Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development-512500Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-260617Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-823257Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-1053475Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development33066204Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development-1133631Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development53208235Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development-2062060Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development230000000Total Commitment in Second Quarter of 2018
International Bank for Reconstruction and Development-2737162Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development1640799Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development124296287Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-575000Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-1112679Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-3273076Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-3490084Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-2598149Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development60000000Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development-2805341Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Institutional Arrangements | Description :Schedule 2. Section I. A. The Borrower shall cause the EPMMQ tomaintain, throughout the implementation of the Project, key staff for the Project including without limitation, a Projectcoordinator, a procurement specialist, a financial management specialist, an environmental specialist, a social specialist, aphysical cultural resources specialist and a health and safety specialist. | Frequency :Yearly
Finance Agreement :Operational Manual | Description :Schedule 2. Section I. B. The Borrower shall, and shall cause the EPMMQ to,carry out the Project in accordance with the provisions of the ROP, which sets forth the rules and procedures for the carrying outof the Project | Frequency :Yearly
Finance Agreement :Subsidiary Agreement | Description :Schedule 2. Section I. C. The Borrower shall enter into an agreement withthe EPMMQ, under terms and conditions satisfactory to theBank. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I. B.1 | Description :The Borrower shall, and shall cause the EPMMQ to: (a) update the ROPto include the arrangements for the process and procedures for control, approve and monitor cash and in-kind compensations forResettlement Expenditures, under terms and conditions satisfactory to the Bank; and (b) immediately thereafter carry out theProject in accordance with the provisions of the ROP. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I. D. 1 | Description :The Borrower shall, and shall cause EPMMQ to, ensure that the Projectis carried out in accordance with the provisions of the Environmental Impact Assessment (including the EMP), the PGASS-H (includingthe PAC and the PAC Health and Safety), the RPF, the RAPs, the IPPF and any applicable IPPs. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I.A.1 | Description :The Borrower shall cause the EPMMQ to maintain, throughout theimplementation of the Project, key staff for the Project, including without limitation, a Project coordinator, a procurementspecialist, a financial management specialist, an environmental specialist, a social specialist, a physical cultural resourcesspecialist and a health and safety specialist, all with terms of reference, and quali | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I. D. 2 (b) | Description :For each activity under the Project for which the IPPF providesfor the preparation of an IPP: (i) prior to the carry out of any said activity, such IPP is prepared and disclosed in accordancewith the IPPF, adequately consulted upon and furnished to the Bank for review and approval; and (ii) thereafter the IPP is adoptedand implemented in accordance with its terms and in a manner satisfactory... | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I. D. 3 | Description :The Borrower shall cause the EPMMQ to establish and maintainthroughout Project implementation an adequate institutional capacity, including staffing, and systems acceptable to the Bank, asshall be necessary to fully implement, manage, coordinate, and monitor the implementation of the Safeguard Instruments. | Frequency:CONTINUOUS
Finance Agreement :Schedule 2, Section I. D. 4 | Description :thThe Borrower shall, and shall cause EPMMQ to: (a) maintain andpublicize the availability of the grievance redress mechanism set forth in the PGASS-H for purposes of listening to complaintsraised in relation with the implementation of the Project; and (b) thereafter take all measures necessary to implement thedecisions made by the Borrower and EPMMQ under such grievance redress mechanism, a... | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I. D. 5 | Description :The Borrower shall ensure, and cause EPMMQ to ensure, that allcontractors and subcontractors (which contracts were awarded pursuant to the terms of Original Loan Agreement): (i) comply with theobligations under the applicable Safeguard Instruments; and (ii) comply with the Code of Conduct that should be provided to andsigned by all workers; all in a manner satisfactory to the Bank and as app... | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I. D. 6 (i) | Description :The Borrower shall ensure, and cause EPMMQ to ensure, that allbidding documents and contracts for civil works to be awarded pursuant to the terms of this Agreement shall include the obligationof the relevant contractors and subcontractors to: (i) comply with the obligations under the applicable Safeguard Instruments. |Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I. D. 2 (a) | Description :For each activity which involves works under the Project forwhich the RPF provides for the preparation of a RAP, (i) prior to the carry out of any said works, such RAP is prepared anddisclosed in accordance with the RPF, adequately consulted with Affected Persons as per the RPF, and furnished to the Bank forreview and approval; and (ii) thereafter the RAP is adopted and implemented in accord... | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I. D. 6 (ii) | Description :The Borrower shall ensure, and cause EPMMQ to ensure, that allbidding documents and contracts for civil works to be awarded pursuant to the terms of this Agreement shall include the obligationof the relevant contractors and subcontractors to: ii) adopt and enforce code of conducts that should be provided to and signed byall workers. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I. D. 7 | Description :The Borrower shall provide, and/or cause to be provided, all thefunds necessary or appropriate to perform its obligations under the Project, including, as applicable, all the funds required toimplement the pertinent RAPs, in a manner satisfactory to the Bank. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I. D. 8 (a) | Description :For purposes of carrying out a land acquisition review of theproperties identified in the PAC, the Borrower shall: (a) cause EPMMQ to not later than forty-five (45) business days after theEffective Date, prepare and furnish to the Bank, a time-bound action plan, acceptable to the Bank. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I. D. 8 (b) | Description :The Borrower shall implement, and cause EPMMQ to implement (asthe case may be), said time-bound action plan (including any corrective action, as determined and approved by the Bank), all inaccordance with its terms and in a manner acceptable to the Bank. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section II | Description :The Borrower shall cause EPMMQ to furnish to the Bank each Project Reportnot later than forty-five days after the end of each calendar semester, covering the calendar semester. | Frequency :SemiAnnual
Finance Agreement :Schedule 2 Section I. E.2(b) | Description :2. Without limitation to paragraph 1 above, the Borrower shall, andshall cause EPMMQ to, ensure that: (...)(b) for each activity under the Project for which the IPPF provides for the preparationofan IPP: (i) prior to the carryout out of any said activity, such IPP is prepared in accordance with the IPPF, adequatelyconsulted upon and furnished to the Bank for review and approval; (ii) the... | Frequency :CONTINUOUS
Finance Agreement :Schedule 2 Section I. E.5 | Description :The Borrower shall ensure, and cause EPMMQ to ensure, that allcontractors and subcontractors (which contracts were awarded pursuant to the terms of this Agreement): (i) comply with theobligations under the applicable Safeguard Instruments; and (ii) comply with the Code of Conduct that should be provided to andsigned by all workers; all in a manner satisfactory to the Bank and as applicable t... | Frequency :CONTINUOUS
Finance Agreement :Schedule 2 Section I. E.6 | Description :The Borrower shall ensure, and cause EPMMQ to ensure, that all biddingdocuments and contracts for civil works to be awarded pursuant to the terms of this Agreement shall include the obligation of therelevant contractors and subcontractors to: (i) comply with the obligations under the applicable Safeguard Instruments; and (ii)adopt and enforce code of conducts that should be provided to an... | Frequency :CONTINUOUS
Finance Agreement :Schedule 2 Section I. E.7 | Description :The Borrower shall provide, and/or cause to be provided, all the fundsnecessary or appropriate to perform its obligations under the Project, including, as applicable, all the funds required toimplementthe pertinent RAPs, in a manner satisfactory to the Bank. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2. Section III. 3 | Description :Goods, Works, Non-consulting Services and Consulting Services for PartV. All goods, works, and services required for Part V of the Project and to be financed out of the proceeds of the Loan shall beprocured in accordance with the requirements set forth or referred to in the Procurement Regulations and the provisions of theProcurement Plan | Frequency :CONTINUOUS
Finance Agreement :Schedule 2 Section I. E.1 | Description :The Borrower shall, and shall cause EPMMQ to, ensure that the Projectis carried out in accordance with the provisions of the Environmental Impact Assessment (including the EMP), the PGASS-H (includingthe PAC and the PAC Health and Safety), the RPF, the RAPs, the IPPF and any applicable IPPs. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2 Section I. E.2(a) | Description :The Borrower shall, and shall cause EPMMQ to, ensure that: (a) foreach activity which involves works under the Project for which the RPF provides for the preparation of a RAP, (i) prior to thecarry out of any said works, such RAP is prepared and disclosed in accordance with the RPF, adequately consulted with AffectedPersons as per the RPF, and furnished to the Bank for review and approval;... | Frequency :CONTINUOUS
Finance Agreement :Schedule 2 Section III. 1 | Description :The Borrower shall, and shall cause EPMMQ to, ensure that all goods,works and services required for the Project, and to be financed out of the proceeds of the Loan are procured under proceduresconsistent with the Bankâs Core Procurement Principles set forth in the Procurement Regulations. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2. Section III. 2 | Description :Goods, Works and Non-consulting Services. all goods, works andnon-consulting services required for Part II of the Project and to be financed out of the proceeds of the Loan shall be procured bythe Borrower: (a) in accordance with the provisions set forth in paragraphs 3.21, 3.23 (e), 3.24, 3.25, 3.32 of the ProcurementRegulations; and (b) otherwise also in accordance with the IADB Procuremen... | Frequency :CONTINUOUS
Finance Agreement :Schedule 2 Section I. E. 3 | Description :The Borrower shall cause the EPMMQ to establish and maintainthroughout Project implementation an adequate institutional capacity, including staffing, and systems acceptable to the Bank, asshall be necessary to fully implement, manage, coordinate, and monitor the implementation of the Safeguard Instruments.
Finance Agreement :Schedule 2 Section I. E.4 | Description :1. Without limitation to the provisions of this Section, the Borrowershall, and shall cause EPMMQ to: (a) maintain and publicize the availability of the grievance redress mechanism set forth in thePGASS-H for purposes of listening to complaints raised in relation with the implementation of the Project; and (b) thereafter takeall measures necessary to implement the decisions made by the Borro... | Frequency :CONTINUOUS
PDO Indicator
Operating costs of Quito's vehicle fleet
PDO Indicator
Passengers per day in PLMQ
PDO Indicator
Percentage of users satisfied with overall metro service, its security and comfort (differentiated by gender and income)
PDO Indicator
Percentage of female users satisfied with overall metro service, its security and comfort
PDO Indicator
Percentage of low-income users satisfied with overall metro service, its security and comfort
PDO Indicator
Percentage of jobs accessible in 60 minutes of travel time
Intermediate Results Indicator
Percentage of physical work progress in civil works other than stations
Intermediate Results Indicator
Percentage of rolling stock completed
Intermediate Results Indicator
Percentage of fare-collection system installed
Intermediate Results Indicator
Percentage of progress in installation of permament way
Intermediate Results Indicator
Percentage of metro feeder routes in operation
Intermediate Results Indicator
Percentage of physical work progress in stations and universal access
Intermediate Results Indicator
Percentage of bus fleet under unified fare-collection system
Intermediate Results Indicator
Percentage of physical work progress in rail yard
Intermediate Results Indicator
Percentage of progress in installation of power supply, auxiliary, signaling and telecom systems
Intermediate Results Indicator
Percentage of technical and professional staff, directly empoyed by the operator of PLMQ, that is female
PDO Indicator
Travel time for public transportation users
PDO Indicator
Adequate passenger capacity provided by PLMQ
Intermediate Results Indicator
Implementation of a reporting mechanism for cases of violence against women and girls in the PLMQ
44000-P169822
World Bank
First Inclusive and Sustainable Growth DPF
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Barbara Cunha
+1-202-473-1000bcunha@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ECUADOR
Quito
-0.22984999 -78.524948
Central Government (Central Agencies)Banking InstitutionsSocial ProtectionOther Industry, Trade and ServicesOther Energy and ExtractivesInvestment and Business ClimateJobsSocial protection delivery systemsMacro-financial policiesEnergyMitigationFiscal PolicyAdaptationBusiness Enabling EnvironmentClimate changeMonetary and Credit PoliciesEnergy Policies & ReformFiscal sustainabilitySocial ProtectionYouth EmploymentGender
0.00
1056000.00
6874500.00
3729500.00
8046500.00
4301500.00
9100500.00
4773500.00
10018000.00
5296000.00
11442500.00
6059500.00
12492500.00
6328500.00
12638000.00
6538000.00
13343500.00
6609500.00
12897000.00
12419500.00
6150000.00
6097000.00
12017000.00
11713000.00
5734000.00
11315500.00
5586500.00
11141500.00
5546000.00
10975000.00
5498500.00
10950500.00
5423000.00
10694000.00
5292500.00
10567000.00
5266500.00
10322500.00
5018000.00
9784500.00
4812500.00
9447000.00
4616000.00
8945000.00
4303500.00
8321000.00
4025000.00
7828000.00
7600500.00
3718000.00
7210000.00
3495500.00
6801000.00
3323500.00
6515000.00
3157000.00
6141500.00
3025500.00
6126500.00
3080500.00
5995500.00
2949500.00
5863500.00
2919500.00
5825500.00
2878500.00
5619500.00
5467500.00
2716500.00
5443000.00
2708500.00
5365000.00
2659500.00
5120000.00
1394000.00
2717000.00
1323000.00
1485000.00
0.00
0.00
1056000.00
6874500.00
3729500.00
8046500.00
4301500.00
9100500.00
4773500.00
10018000.00
5296000.00
11442500.00
6059500.00
12492500.00
6328500.00
12638000.00
6538000.00
13343500.00
6609500.00
12897000.00
12419500.00
6150000.00
6097000.00
12017000.00
11713000.00
5734000.00
11315500.00
5586500.00
11141500.00
5546000.00
10975000.00
5498500.00
10950500.00
5423000.00
10694000.00
5292500.00
10567000.00
5266500.00
10322500.00
5018000.00
9784500.00
4812500.00
9447000.00
4616000.00
8945000.00
4303500.00
8321000.00
4025000.00
7828000.00
7600500.00
3718000.00
7210000.00
3495500.00
6801000.00
3323500.00
6515000.00
3157000.00
6141500.00
3025500.00
6126500.00
3080500.00
5995500.00
2949500.00
5863500.00
2919500.00
5825500.00
2878500.00
5619500.00
5467500.00
2716500.00
5443000.00
2708500.00
5365000.00
2659500.00
5120000.00
1394000.00
2717000.00
1323000.00
1485000.00
0.00
500000000Total Commitment in Second Quarter of 2019
International Bank for Reconstruction and Development500000000Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-1250000Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-8928889Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentLoan AgreementContract AwardsProject URLProcurement Notices44000-P094784
World Bank
EC Chimborazo Development Investment Project (PIDD)
International Bank for Reconstruction and Development
CHIMBO. PROV. COUNCIL WITH GUARANTEE OF REPUBLIC OF ECUADOR
International Bank for Reconstruction and Development
CHIMBO. PROV. COUNCIL WITH GUARANTEE OF REPUBLIC OF ECUADORPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Remi Charles Andre Trier
+1-202-473-1000rtrier@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ECUADOR
San Luis
-1.7100 -78.6450
Cantón Riobamba
-1.6670 -78.6330
Punin
-1.7650 -78.6550
Pallatanga
-1.9990 -78.9660
Licto
-1.8050 -78.6040
Cantón Guamote
-1.9330 -78.7170
Flores
-1.8150 -78.6450
Cantón Colta
-1.7000 -78.7500
Provincia del Chimborazo
-1.9170 -78.7500
Rio Chimbo
-2.0300 -79.7410
Hoya del Chimbo
-1.8330 -79.0000
Rio Chanchán
-2.2050 -79.4210
Hoya del Chanchán
-2.2830 -78.9170
Rio Chambo
-1.4050 -78.4730
Hoya del Chambo
-1.6670 -78.6670
Cebadas
-1.9110 -78.6430
Rural and Inter-Urban RoadsIrrigation and DrainageSub-National GovernmentRural DevelopmentEnvironmental Health and Pollution ManagementSoil PollutionRenewable Natural Resources Asset ManagementWater PollutionLand Administration and ManagementLandscape ManagementBiodiversityRural Infrastructure and service deliveryAir quality management
0.00
0.00
0.00
0.00
166666.67
166666.67
166666.66
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
500000.00
500000.00
500000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
366666.67
366666.67
366666.66
266666.67
266666.67
266666.66
266666.67
266666.67
266666.66
266666.67
266666.67
266666.66
266666.67
266666.67
266666.66
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
133333.33
133333.33
133333.34
66666.67
66666.67
66666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
166666.67
166666.67
166666.66
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
500000.00
500000.00
500000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
366666.67
366666.67
366666.66
266666.67
266666.67
266666.66
266666.67
266666.67
266666.66
266666.67
266666.67
266666.66
266666.67
266666.67
266666.66
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
133333.33
133333.33
133333.34
66666.67
66666.67
66666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15300000Total Commitment in Fourth Quarter of 2007
International Bank for Reconstruction and Development300000Total Disbursement in Third Quarter of 2008
International Bank for Reconstruction and Development-38250Total Interest Repayment in Third Quarter of 2008
International Bank for Reconstruction and Development0Total Disbursement in Fourth Quarter of 2008
International Bank for Reconstruction and Development-2306Total Interest Repayment in First Quarter of 2009
International Bank for Reconstruction and Development300000Total Disbursement in Second Quarter of 2009
International Bank for Reconstruction and Development0Total Disbursement in Second Quarter of 2009
International Bank for Reconstruction and Development-4470Total Interest Repayment in Second Quarter of 2009
International Bank for Reconstruction and Development-11741Total Interest Repayment in Fourth Quarter of 2009
International Bank for Reconstruction and Development-11070Total Interest Repayment in Second Quarter of 2010
International Bank for Reconstruction and Development-17640Total Loan Repayment in Second Quarter of 2010
International Bank for Reconstruction and Development2088649Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development1104991Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development-16736Total Interest Repayment in Fourth Quarter of 2010
International Bank for Reconstruction and Development-80926Total Loan Repayment in Fourth Quarter of 2010
International Bank for Reconstruction and Development648743Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development517142Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development222672Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development243086Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development-49421Total Interest Repayment in Second Quarter of 2011
International Bank for Reconstruction and Development-151777Total Loan Repayment in Second Quarter of 2011
International Bank for Reconstruction and Development260192Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development1091429Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development1234829Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development-85703Total Interest Repayment in Fourth Quarter of 2011
International Bank for Reconstruction and Development-210297Total Loan Repayment in Fourth Quarter of 2011
International Bank for Reconstruction and Development628335Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development298400Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development495976Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development0Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development-103833Total Interest Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development-282277Total Loan Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development471667Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development656147Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development-119661Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development-315661Total Loan Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development0Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development-119420Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development-339085Total Loan Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development902125Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development442503Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development766416Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development-122234Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development-372464Total Loan Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development1336353Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development503662Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development-145833Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-470202Total Loan Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development391919Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development127783Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development-262045Total Commitment Cancellations in Fourth Quarter of 2014
International Bank for Reconstruction and Development4938Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development-156452Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-511137Total Loan Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development0Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development-159576Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-511342Total Loan Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-152982Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-511342Total Loan Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-146338Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-511342Total Loan Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-139695Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-511342Total Loan Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-133052Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-511342Total Loan Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-126409Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-511342Total Loan Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-119766Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-511342Total Loan Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-113122Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-511342Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-106479Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-511342Total Loan Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-99836Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development-511342Total Loan Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
By December 14, 2007, the Borrower has strengthened and updated the financial management system in a manner satisfactory to the Bank
Within 2 weeks after the Effective Date, the Borrower shall ensure that thefinancial management specialist (FM), the FM assistantand the treasury have been appointed
Within 3 months after the Effective Date, the external financial audit firm will be contracted
Within 3 months after Effective Date, the Borrower has appointed the senior staff of the procurement unit, submitted to the Bankthe revised budding documents and standard formats for bid evaluation
Borrower has entered into a trust agreement with the Central Bank of Ecuador and entered into a restitution agreement with theGuarantor
Intermediate Results Indicator
Number of families who benefit from irrigation infrastructure
Target achieved.For 55 irrigation schemes.Source: Final impact evaluation assessment (June 2014)
Intermediate Results Indicator
Number of families who benefit from improved roads
This indicator added on June 2012, was designed to show the improved access to roads in the Project area
Target overachieved.Source: Final impact evaluation assessment (June 2014)
Intermediate Results Indicator
Number of jobs generated as a result of the creation of road maintenance microenterprises
No changes
Intermediate Results Indicator
Share of rural population with access to an all-season road
Share of rural population is in relation to the Chimborazo Province total population.
Share of rural population is reported in relation to the Chimborazo Province total population.
Intermediate Results Indicator
Increase in the cultivation of high-value crops in selected irrigation systems
There are no improved irrigation systems
Target partially achieved (in progress).The project improved existing irrigation schemes (with more reliable irrigation servicesand increased efficiency) in 4,123 ha and increased the irrigated area (command area) of 562ha. Changes in cultivation is expectedto take some time as the farmers will rely on irrigation services and take risk to invest in high value crops.
Intermediate Results Indicator
Participating WUAs employ irrigation fee that fully covers O&M
Determine for every subproject request
Target not fully achieved (under progress).For 55 irrigation schemes.Source: Final impact evaluation assessment (June 2014)
Intermediate Results Indicator
Increase in yield among the beneficiaries of demostrative plots
Target overachieved (37.5% of yield increase for the 55 irrigation schemes). the increase for the last 17 rehabilitated irrigationschemes was 45%.Source: Final impact evaluation assessment (June 2014)
PDO Indicator
Beneficiaries' annual agricultural production value has increased at least by 10% on average in constant prices(Base production value is US$1,560/year/family)
The initial baseline value (US$ 1,560) has been reviewed after a real analysis was conducted.
Indicator was changed during restructuring in June 2012.
Target overachieved.Source: Final impact evaluation assessment (June 2014)Final number of beneficiaries is 7,900 families
PDO Indicator
30% average travel time reduction along 50.4 km of roads that are rehabilitated and turned into all-weather roads allowing interconection with main roads.
Transit on the 50.4km of roads in only seasonal. 60 min. in C-D road, 2h, 40m in Charicando road; 26m in Cujibies road; 34m inFlores-Y de Achullay road.
Target overachieved.Source: Final impact evaluation assessment (June 2014)Charicando – Cocán – La Dolorosa (from 160 mn to104mn)Quimiag – Cubijies (from 26 to 16mn) and Flores – Y de Achullay (from 34 to 20 mn)
Intermediate Results Indicator
Number of maintenance microenterprises strengthened in techinical and administrative aspects.
It was decided that the impact would be greater if resources were used to strengthen DAGCHP so that they can directly provide thetining. This allows for longer term results and thus increases sustainability.
cf. Annex 4-Restructuring June 2012.
Target met.Source: Final impact evaluation assessment (June 2014)
Intermediate Results Indicator
Km of improved road regularly maintained and in good condition
Target achieved. ACV are fully operational and in charge of maintenance.No change.
Intermediate Results Indicator
Decrease in O&M costs (%) (base value is cost of light vehicles: US$0.23/km in R-C road and US$0.17/km in C-D roads)
US$ 0.7/km in Cocán-La Dolorosa road; US$ 0.9/km Cubijies-Quimiag road; US$ 0.6/km Flores-Y de Achullay road
Target overachieved.1.05 US4/km with project instead of 2.33 US4/km without project.Source: Final impact evaluation assessment(June 2014)
Intermediate Results Indicator
Participating WUAs employing an effective irrigation calendar (%)
Determined for every subproject request
Target not fully achieved (under progress).For 55 irrigation schemes.Source: Final impact evaluation assessment (June 2014)
Intermediate Results Indicator
Participating WUAs with a basic team for administration and management of their irrigation systems (%)
Determined for every subproject request
Target overachieved.For 55 irrigation schemes.Source: Final impact evaluation assessment (June 2014)
Intermediate Results Indicator
Average increase in water distribution efficiency on the main distribution line of improved irrigation systems
Determined for every sub-project
Target overachieved.Efficiency with project is 74%. Efficiency without project was 48.5%. Increase in % is (74-48.5)/48.5 =53%For 55 irrigation schemes.Source: Final impact evaluation assessment (June 2014)
Intermediate Results Indicator
Roads rehabilitated, Rural
cf. Annex 4-Restructuring June 2012.
no changes