44000-P163954
World Bank
Guinea-Bissau Strengthening Maternal and Child Health Service Delivery
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Edson Correia Araujo
+1-202-473-1000earaujo@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
GUINEA-BISSAU
Tombali
11.3000 -15.0000
Saba
12.1270 -15.2890
Oio Region
12.2500 -15.2500
Republic of Guinea-Bissau
12.0000 -15.0000
Gabu
12.1670 -14.1670
Farim
12.4840 -15.2220
Cacheu Region
12.0000 -16.1670
Bolama
11.1550 -16.0090
Bissau Region
11.8540 -15.5910
Biombo
11.8830 -15.8430
Bafata
12.1670 -14.7170
HealthSocial ProtectionHealth Facilities and ConstructionPublic Administration - HealthHealth Systems and PoliciesChild HealthNutritionHealth System StrengtheningReproductive and Maternal HealthHealth Service DeliveryHealth FinanceNutrition and Food Security
0.00
0.00
74900.00
119800.00
147550.00
174225.00
309025.00
241875.00
273425.00
298825.00
317775.00
337525.00
359800.00
376775.00
390950.00
406650.00
424100.00
442775.00
466075.00
489725.00
511725.00
527125.00
541475.00
569000.00
584700.00
583575.00
582475.00
598150.00
596775.00
581025.00
575900.00
574750.00
567725.00
555100.00
544375.00
537575.00
530275.00
520275.00
510050.00
500700.00
733200.00
479375.00
471575.00
461425.00
451075.00
442875.00
435125.00
426300.00
417000.00
405900.00
397125.00
393725.00
392425.00
387075.00
381750.00
377225.00
373275.00
369150.00
310250.00
149625.00
0.00
0.00
74900.00
119800.00
147550.00
174225.00
309025.00
241875.00
273425.00
298825.00
317775.00
337525.00
359800.00
376775.00
390950.00
406650.00
424100.00
442775.00
466075.00
489725.00
511725.00
527125.00
541475.00
569000.00
584700.00
583575.00
582475.00
598150.00
596775.00
581025.00
575900.00
574750.00
567725.00
555100.00
544375.00
537575.00
530275.00
520275.00
510050.00
500700.00
733200.00
479375.00
471575.00
461425.00
451075.00
442875.00
435125.00
426300.00
417000.00
405900.00
397125.00
393725.00
392425.00
387075.00
381750.00
377225.00
373275.00
369150.00
310250.00
149625.00
25000000Total Commitment in Second Quarter of 2018
International Development Association603043Total Disbursement in Second Quarter of 2019
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
1.Project Steering Committee (“PSC”)(a) Without limitation upon the provisions of Section I.A.1 of the Financing AgreementSchedule 2, the Recipient shall create not later than three months after the Effective Date and thereafter operate and maintain, atall times until the completion of the Project, a Project Steering Committee, chaired by MINSAP and with a composition, mandate andresources satisfactory to the Association, including representatives from, inter alia, the Recipient's Ministry of Economy andFinance, the Recipient's Ministry of Education, the Recipient's Ministry of Women, Family and Social Cohesion, and civilsociety..(Schedule 2, Section I.A 2(a) of the Financing Agreement)
1. The Recipient shall update not later than three months after the Effective Date and thereafter maintain the ProjectImplementation Manual (PIM) in form and substance satisfactory to the Association.(Schedule 2, Section I.B of the FinancingAgreement)
1. To facilitate the carrying out of Part 3.2 of the Project, the Recipient, through MINSAP, shall sign Performance Agreements withthe health facilities and Regional Health Directorates, under terms and conditions approved by the Association, as furtherdescribed in the PIM.2. In case of any conflict between the terms of the Performance Agreements and the terms of this Agreement,the terms of this Agreement shall prevail.3. The Recipient shall:(a) hire under a service contract with terms and conditions andin form and substance satisfactory to the Association (including the obligation to present regular Verification Reports, as furtherdescribed in the PIM) and thereafter maintain the Independent Verification Agency in charge of verifying quantity and quality ofservices provided under Part 3.2 of the Project.(b) exercise its rights under said service contract with the IndependentVerification Agency in such manner as to protect its interests and those of the Association to accomplish the purposes of theFinancing. Except as the Association shall otherwise agree, the Recipient shall not assign, amend, abrogate or waive the servicecontract with the Independent Verification - Agency or any of its provisions. (Schedule 2, Section I.D of the FinancingAgreement)
1. To facilitate the carrying out of selected activities under Part 4 of the Project, the Recipient shall, not later than threemonths after the Effective Date, enter into an agreement (the Agreement for the Provision of Technical Assistance) with UNICEF, andthereafter maintain said Agreement for the Provision of Technical Assistance during the implementation of the Project, on terms andconditions acceptable to the Association, including, inter alia: the Recipient's obligation to make part of the proceeds of theFinancing allocated to Category (1) available to UNICEF in order to assist the Recipient in the carrying out selected activitiesunder Part 4 of the Project in accordance with the Anti-Corruption Guidelines, the Procurement Regulations, the Safeguard Documentsand the Project Implementation Manual.(Schedule 2, Section I.G of the Financing Agreement)
The Recipient shall, not later than six (6) months after the Effective Date, hire the external auditors for the Project, withadequate qualification and terms of reference and in form and substance satisfactory to the Association.(Schedule 2, Section IV.2of the Financing Agreement)
The Recipient shall, not later than twenty-four (24) months after the Effective Date furnish to the Association the InstitutionalReform Action Plan for MINSAP, in form and substance satisfactory to the Association.(Schedule 2, Section IV.3 of the FinancingAgreement)
PDO Indicator
Pregnant women attending at least 4 prenatal care consultations during pregnancy
PDO Indicator
Institutional deliveries
PDO Indicator
Use of modern contraceptive methods among women of reproductive age
PDO Indicator
Number of children (0-11 months) fully vaccinated
Intermediate Results Indicator
Number of primary health workers trained in RMNCH competencies
Intermediate Results Indicator
People who have received essential health, nutrition, and population (HNP) services
Intermediate Results Indicator
Number of deliveries attended by skilled health personnel
Intermediate Results Indicator
Children 12-59 months of age attending at least one healthcare consultation
Intermediate Results Indicator
Number of health centers participating in the PBF scheme with a signed contract with the Independent Verification Agency
Intermediate Results Indicator
Facilities with beneficiaries reporting illegal charges from providers for essential maternal and child health services
Intermediate Results Indicator
Women referred to antenatal care, postnatal care, family planning, or delivery by community health workers
Intermediate Results Indicator
Women of reproductive age attending at least one family planning consultation
Intermediate Results Indicator
Number of children immunized
Intermediate Results Indicator
Number of pregnant women receiving folic acid and iron supplementation
Intermediate Results Indicator
Number of women and children who have received basic nutrition services
Intermediate Results Indicator
Project-supported organization publishing findings of citizen led monitoring
Intermediate Results Indicator
Percentage of healthcare workers that recommend the correct treatment for a basic case of childood malaria, pneumonia or diarrhea
Intermediate Results Indicator
Health Workers Absenteeism
Intermediate Results Indicator
Satisfaction of users with basic MCH services provided
Intermediate Results Indicator
Percentage of primary health care facilities (type A, B, and C) with all essential drugs available on the day of the visit
44000-P161923
World Bank
Guinea-Bissau - Rural Transport Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Vincent Vesin
+1-202-473-1000vvesin@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
GUINEA-BISSAU
Bissau
11.86357 -15.59767
Public Administration - TransportationRural and Inter-Urban RoadsPorts/WaterwaysRoad SafetyRural DevelopmentJobsClimate changeAdaptationTrade LogisticsTradeRural Infrastructure and service delivery
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11430.00
33435.00
18960.00
42495.00
48240.00
26115.00
55995.00
62460.00
34260.00
73185.00
77250.00
79425.00
40260.00
82125.00
85275.00
44160.00
88125.00
85890.00
44055.00
94695.00
108015.00
56655.00
116250.00
126120.00
143565.00
77205.00
161955.00
175545.00
94395.00
202785.00
216075.00
113310.00
238350.00
254550.00
133785.00
279195.00
294405.00
309015.00
160200.00
336420.00
354690.00
182310.00
369630.00
381390.00
198180.00
404835.00
406335.00
200880.00
405360.00
413910.00
207585.00
411690.00
409500.00
413745.00
206955.00
411855.00
407160.00
201495.00
401595.00
400230.00
199200.00
396495.00
395265.00
393690.00
196110.00
390630.00
388680.00
193635.00
385875.00
545460.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11430.00
33435.00
18960.00
42495.00
48240.00
26115.00
55995.00
62460.00
34260.00
73185.00
77250.00
79425.00
40260.00
82125.00
85275.00
44160.00
88125.00
85890.00
44055.00
94695.00
108015.00
56655.00
116250.00
126120.00
143565.00
77205.00
161955.00
175545.00
94395.00
202785.00
216075.00
113310.00
238350.00
254550.00
133785.00
279195.00
294405.00
309015.00
160200.00
336420.00
354690.00
182310.00
369630.00
381390.00
198180.00
404835.00
406335.00
200880.00
405360.00
413910.00
207585.00
411690.00
409500.00
413745.00
206955.00
411855.00
407160.00
201495.00
401595.00
400230.00
199200.00
396495.00
395265.00
393690.00
196110.00
390630.00
388680.00
193635.00
385875.00
545460.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15000000Total Commitment in Third Quarter of 2019
International Development Association848188Total Disbursement in Fourth Quarter of 2019
International Development AssociationProject Appraisal Document Implementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Section I.A.1 (a) of Schedule 2: The Borrower, through the Ministry of Public Works, Construction and Urbanism, shall […] (ii) nolater than three (3) months after the Effective Date, or such other date as agreed by the Association (but prior to making anypayment under Part 3(b) of the Project), select and hire/appoint and thereafter maintain an internal auditor, under terms ofreference acceptable to the Association and described in the PIM;
Section I.A.1 (a) of Schedule 2: The Borrower, through the Ministry of Public Works, Construction and Urbanism, shall […] (iii) nolater than six (6) months after the Effective Date, or such other date as agreed by the Association, select and hire an externalfinancial auditor under terms of reference acceptable to the Association and described in the PIM.
Section I.A.1(b) of Schedule 2: The Borrower, through the Ministry of Public Works, Construction and Urbanism, shall […] no laterthan three (3) months after the Effective Date, or such other date as agreed by the Association, establish, and thereafter maintainthroughout Project implementation, the Project Steering Committee with composition acceptable to the Association and defined in thePIM, to provide strategic guidance and oversight of the Project.
Section I.A.4 of Schedule 2:The Recipient shall no later than six (6) months after the Effective Date, or such later date asagreed by the Association, establish and thereafter maintain, throughout Project implementation, a grievance redress mechanismacceptable to the Association so as to enable an adequate monitoring of the issues arising as a result of the implementation of theProject activities.
Section I.C.1 of Schedule 2:The Recipient shall ensure that the Project is implemented in accordance with the Environmental andSocial Management Framework (ESMF), the Resettlement Policy Framework (RPF), the ESIA/ESMP and the RAP. Except as otherwise agreedby the Association, the Recipient shall not amend, abrogate, waive, or fail to enforce the ESMF, the RPF, the ESIA/ESMP, the RAP,or any of their provisions.
PDO Indicator
Number of markets accessible all year by road
PDO Indicator
Number of schools and health centers accessible all year by road
PDO Indicator
Number of direct beneficiaries
Intermediate Results Indicator
Grievances responded and/or resolved within the stipulated service standards for response time
Intermediate Results Indicator
Percentage of workers that have signed the GBV code of conduct
Intermediate Results Indicator
Percentage of sensitive areas benefiting from physical measures of speed reduction
Intermediate Results Indicator
Share of women employed in rehabilitation and routine maintenance road works
Intermediate Results Indicator
Travel time on National Road 3 connecting with regional transport corridor
Intermediate Results Indicator
Preparation of a national strategy for road maintenance
Intermediate Results Indicator
Preparation of a national plan for transport and logistics
Intermediate Results Indicator
Roads rehablitated
Intermediate Results Indicator
Roads rehabilitated - rural
Intermediate Results Indicator
Rural roads benefiting from routine maintenance in the project area
44000-P150827
World Bank
Guinea-Bissau Public Sector Strengthening Project
International Development Association
MINISTERIO DAS FINANCAS
International Development Association
MINISTERIO DAS FINANCASPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Fatou Fall Samba
+1-202-473-1000fsamba@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
GUINEA-BISSAU
Bissau
11.8640 -15.5980
Central Government (Central Agencies)Other Public AdministrationPublic AdministrationTax policyTransparency, Accountability and Good GovernanceFragility, Conflict and ViolencePublic Finance ManagementFiscal PolicyPublic Expenditure ManagementDomestic Revenue Administration
175000.00
175000.00
175000.00
175000.00
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
116666.67
116666.67
116666.67
116666.67
116666.67
116666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
175000.00
175000.00
175000.00
175000.00
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
116666.67
116666.67
116666.67
116666.67
116666.67
116666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2750000Total Commitment in First Quarter of 2015
International Development Association2250000Total Commitment in First Quarter of 2015
International Development Association244449Total Disbursement in Third Quarter of 2015
International Development Association-859Total Interest Repayment in Fourth Quarter of 2015
International Development Association237812Total Disbursement in First Quarter of 2016
International Development Association175046Total Disbursement in Second Quarter of 2016
International Development Association169312Total Disbursement in Second Quarter of 2016
International Development Association-897Total Interest Repayment in Second Quarter of 2016
International Development Association186446Total Disbursement in Third Quarter of 2016
International Development Association99937Total Disbursement in Fourth Quarter of 2016
International Development Association64799Total Disbursement in Fourth Quarter of 2016
International Development Association155157Total Disbursement in Fourth Quarter of 2016
International Development Association-893Total Interest Repayment in Fourth Quarter of 2016
International Development Association90956Total Disbursement in First Quarter of 2017
International Development Association51955Total Disbursement in First Quarter of 2017
International Development Association55460Total Disbursement in Second Quarter of 2017
International Development Association792171Total Disbursement in Second Quarter of 2017
International Development Association98776Total Disbursement in Second Quarter of 2017
International Development Association-1Total Interest Repayment in Second Quarter of 2017
International Development Association-864Total Interest Repayment in Third Quarter of 2017
International Development Association272124Total Disbursement in Third Quarter of 2017
International Development Association15907Total Disbursement in Third Quarter of 2017
International Development Association340572Total Disbursement in Fourth Quarter of 2017
International Development Association220670Total Disbursement in Fourth Quarter of 2017
International Development Association209697Total Disbursement in Fourth Quarter of 2017
International Development Association-2165Total Interest Repayment in Fourth Quarter of 2017
International Development Association179187Total Disbursement in First Quarter of 2018
International Development Association218459Total Disbursement in Second Quarter of 2018
International Development Association-5585Total Interest Repayment in Second Quarter of 2018
International Development Association143727Total Disbursement in Fourth Quarter of 2018
International Development Association-6149Total Interest Repayment in Fourth Quarter of 2018
International Development Association94238Total Disbursement in Second Quarter of 2019
International Development Association84443Total Disbursement in Second Quarter of 2019
International Development Association-6822Total Interest Repayment in Second Quarter of 2019
International Development Association8959Total Disbursement in Second Quarter of 2019
International Development Association110417Total Disbursement in Third Quarter of 2019
International Development Association73232Total Disbursement in Third Quarter of 2019
International Development Association90714Total Disbursement in Third Quarter of 2019
International Development Association63025Total Disbursement in Fourth Quarter of 2019
International Development Association66683Total Disbursement in Fourth Quarter of 2019
International Development Association18648Total Disbursement in Fourth Quarter of 2019
International Development Association-8012Total Interest Repayment in Fourth Quarter of 2019
International Development AssociationProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Creation and Maintenance of Steering Committee and Reform Coordination Unit(RCU) | Description :Create not laterthan one month after effectiveness and thereafter maintain the Project Steering Committee and the Reform Coordination Unit duringthe duration of the Project | Frequency :CONTINUOUS
Finance Agreement :Adoption of Project Operations Manual and thereafter implementation of the Proje | Description :Carry out theProject or cause the Project to be carried out in accordance with the Project Operations Manual and refrain from amending theProject Operations Manual or any of its provisions without the prior written approval of the Association. | Frequency :CONTINUOUS
Finance Agreement :Preparation, adoption and implementation of an Annual Work Program | Description :Not later than November 30 ineach calendar year during Project implementation, prepare and furnish to the Association, a program of activities proposed forinclusion in the Project during the following calendar year, including: (a) a detailed timetable for the sequencing andimplementation of said activities, (b) the types of expenditures required for such activities; and (c) the planned procurem |Frequency :Yearly
PDO Indicator
Increased tax and customs revenue by 15%
Intermediate Results Indicator
Number of tax payers (number of NIFs issued)
Intermediate Results Indicator
Number of Steps for import and export
Intermediate Results Indicator
Customs declarations submitted through Sydonia++
Intermediate Results Indicator
Increase in tax and customs audits and inspections
Intermediate Results Indicator
Delays in external debt payment
Intermediate Results Indicator
Dwell-time for imported and exported goods
PDO Indicator
Timely reporting of budget execution
Intermediate Results Indicator
Quarterly then monthly budget execution statements are published out of SIGFIP (Months, Custom)
Intermediate Results Indicator
Database with reference prices for high volume import/export products
44000-P090712
World Bank
Rural Community-Driven Development Project
International Development Association
MINISTRY OF FINANCE
International Development Association
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Philippe Auffret
+1-202-473-1000pauffret@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
GUINEA-BISSAU
Tombali
11.3000 -15.0000
Quinara
11.6670 -15.0830
Oio Region
12.2500 -15.2500
Gabu
12.1670 -14.1670
Cacheu Region
12.0000 -16.1670
Bolama
11.1550 -16.0090
Bissau Region
11.8540 -15.5910
Biombo
11.8830 -15.8430
Bafata
12.1670 -14.7170
Social ProtectionWater SupplyOther Agriculture, Fishing and ForestryOther EducationFragility, Conflict and ViolenceSocial InclusionSocial ProtectionSocial Safety NetsForced DisplacementPost-conflict reconstructionConflict PreventionParticipation and Civic EngagementOther Excluded GroupsIndigenous People and Ethnic Minorities
0.00
0.00
0.00
0.00
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
100000.00
100000.00
100000.00
33333.33
33333.33
33333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
168194.15
168194.16
168194.16
159275.47
159275.48
159275.48
9104.92
9104.92
9104.92
8501.48
8501.49
8501.49
112637.20
112637.20
112637.20
119311.56
119311.56
119311.57
16715.56
16715.56
16715.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
109525.76
109525.76
109525.77
73927.55
73927.56
73927.56
143971.36
143971.37
143971.37
127969.05
127969.06
127969.06
157314.58
157314.59
157314.59
1561798.99
1561799.00
1561799.00
1501882.38
1501882.38
1501882.39
1211351.18
1211351.19
1211351.19
166666.66
166666.67
166666.67
0.00
0.00
0.00
0.00
0.00
0.00
211063.89
211063.90
211063.90
8599.70
8599.70
8599.71
580417.43
580417.44
580417.44
57401.98
57401.99
57401.99
179578.55
179578.55
179578.56
442164.65
442164.66
442164.66
673814.47
673814.47
673814.48
372874.04
372874.04
372874.05
194335.38
194335.39
194335.39
437659.41
437659.41
437659.41
635918.79
635918.79
635918.79
413085.82
413085.83
413085.83
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
311604.57
311604.57
311604.58
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5000000Total Commitment in Third Quarter of 2009
International Development Association504582Total Disbursement in Third Quarter of 2010
International Development Association477826Total Disbursement in Fourth Quarter of 2010
International Development Association27315Total Disbursement in First Quarter of 2011
International Development Association8522Total Disbursement in Second Quarter of 2011
International Development Association16982Total Disbursement in Second Quarter of 2011
International Development Association79139Total Disbursement in Third Quarter of 2011
International Development Association222138Total Disbursement in Third Quarter of 2011
International Development Association36634Total Disbursement in Third Quarter of 2011
International Development Association296787Total Disbursement in Fourth Quarter of 2011
International Development Association61148Total Disbursement in Fourth Quarter of 2011
International Development Association17298Total Disbursement in First Quarter of 2012
International Development Association32849Total Disbursement in First Quarter of 2012
International Development Association49084Total Disbursement in First Quarter of 2013
International Development Association279493Total Disbursement in First Quarter of 2013
International Development Association88596Total Disbursement in Second Quarter of 2013
International Development Association77945Total Disbursement in Second Quarter of 2013
International Development Association55242Total Disbursement in Second Quarter of 2013
International Development Association60717Total Disbursement in Third Quarter of 2013
International Development Association251304Total Disbursement in Third Quarter of 2013
International Development Association119893Total Disbursement in Third Quarter of 2013
International Development Association68431Total Disbursement in Fourth Quarter of 2013
International Development Association315476Total Disbursement in Fourth Quarter of 2013
International Development Association471944Total Disbursement in First Quarter of 2014
International Development Association15000000Total Commitment in First Quarter of 2014
International Development Association2113096Total Disbursement in Second Quarter of 2014
International Development Association2076279Total Disbursement in Second Quarter of 2014
International Development Association248806Total Disbursement in Second Quarter of 2014
International Development Association247216Total Disbursement in Second Quarter of 2014
International Development Association428719Total Disbursement in Third Quarter of 2014
International Development Association138602Total Disbursement in Third Quarter of 2014
International Development Association142823Total Disbursement in Third Quarter of 2014
International Development Association2325611Total Disbursement in Third Quarter of 2014
International Development Association1469893Total Disbursement in Third Quarter of 2014
International Development Association3488486Total Disbursement in Fourth Quarter of 2014
International Development Association145568Total Disbursement in Fourth Quarter of 2014
International Development Association500000Total Disbursement in First Quarter of 2015
International Development Association576815Total Disbursement in Fourth Quarter of 2015
International Development Association30664Total Disbursement in Fourth Quarter of 2015
International Development Association25712Total Disbursement in Fourth Quarter of 2015
International Development Association25799Total Disbursement in First Quarter of 2016
International Development Association2118Total Disbursement in Second Quarter of 2016
International Development Association10000000Total Commitment in Second Quarter of 2016
International Development Association1739130Total Disbursement in Second Quarter of 2016
International Development Association172206Total Disbursement in Third Quarter of 2016
International Development Association-85462Total Disbursement in First Quarter of 2017
International Development Association799667Total Disbursement in First Quarter of 2017
International Development Association50952Total Disbursement in First Quarter of 2017
International Development Association210873Total Disbursement in Second Quarter of 2017
International Development Association158430Total Disbursement in Second Quarter of 2017
International Development Association137878Total Disbursement in Second Quarter of 2017
International Development Association30984Total Disbursement in Second Quarter of 2017
International Development Association23308Total Disbursement in Third Quarter of 2017
International Development Association116175Total Disbursement in Third Quarter of 2017
International Development Association131700Total Disbursement in Third Quarter of 2017
International Development Association90413Total Disbursement in Fourth Quarter of 2017
International Development Association173621Total Disbursement in Fourth Quarter of 2017
International Development Association207544Total Disbursement in Fourth Quarter of 2017
International Development Association26735Total Disbursement in Fourth Quarter of 2017
International Development Association25585Total Disbursement in Fourth Quarter of 2017
International Development Association473217Total Disbursement in First Quarter of 2018
International Development Association393403Total Disbursement in First Quarter of 2018
International Development Association446358Total Disbursement in First Quarter of 2018
International Development Association450501Total Disbursement in Second Quarter of 2018
International Development Association670399Total Disbursement in Second Quarter of 2018
International Development Association786856Total Disbursement in Second Quarter of 2018
International Development Association-33158Total Commitment Cancellations in Second Quarter of 2018
International Development Association637931Total Disbursement in Third Quarter of 2018
International Development Association601326Total Disbursement in Third Quarter of 2018
International Development Association717007Total Disbursement in Third Quarter of 2018
International Development Association193058Total Disbursement in Fourth Quarter of 2018
International Development Association309036Total Disbursement in Fourth Quarter of 2018
International Development Association246835Total Disbursement in Fourth Quarter of 2018
International Development Association679684Total Disbursement in First Quarter of 2019
International Development Association484481Total Disbursement in First Quarter of 2019
International Development Association491393Total Disbursement in First Quarter of 2019
International Development Association553034Total Disbursement in Second Quarter of 2019
International Development Association140878Total Disbursement in Second Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementFinancing AgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :I.A.2.a. | Description :The Recipientshall maintain, at all times until the completion of the Project, aNationalSteering Committee, with a composition, mandate and resourcessatisfactory to the Association | Frequency :Yearly
Finance Agreement :I.A.3.a. | Description :The Recipient shall maintain at all times until the completion of the Projecta PCUwithin the MEPRI, with staff, terms ofreference, mandate and resources satisfactory to IDA | Frequency :Yearly
Finance Agreement :I.A.4. | Description :The Recipient shall maintain at all times until the completion of the ProjectRegionalAdvisors and Facilitators with terms of reference and mandate satisfactory to IDA | Frequency :Yearly
Finance Agreement :II.A.1.a. | Description :The Recipient shall prepare Project Reports to cover the period of six calendar months,and shall be furnished to IDA not later than one month after the end of the period coveredby such report | Frequency :Quarterly
Finance Agreement :II.B.2. | Description :The Recipient shall prepare quarterly Interim unaudited Financial Reports fortheProject and furnish them to IDA not later than 45 days afterthe end of each quarter | Frequency :Quarterly
Finance Agreement :II.B.3. | Description :The Recipient shall have its Financial Statements audited during every Fiscal Year. Theaudits shall be furnished to the Association not later than six months after theend of such period. | Frequency :Yearly
Hire external auditors for the project, in accordance with the provisions of Section III of Schedule 2 to the Original FinancingAgreement.
PDO Indicator
Direct project beneficiaries
PDO Indicator
Number of people in rural areas provided with access to Improved Water Sources under the project
PDO Indicator
Students enrolled in classrooms built/rehabilitated by the Project
PDO Indicator
People with access to an all-season road build/rehabilitated by the Project
PDO Indicator
Beneficiaries from hydro-agricultural systems improved by the Project
Intermediate Results Indicator
Community-Development Plans completed
Intermediate Results Indicator
Beneficiaries of Safety Nets programs - Female (number)
Intermediate Results Indicator
Population with a Community-Development Plans completed
Intermediate Results Indicator
Beneficiaries of Safety Nets programs - Unconditional cash transfers (number)
Intermediate Results Indicator
Improved community water points constructed or rehabilitated under the project
Intermediate Results Indicator
Additional classrooms built or rehabilitated at the primary level resulting from project interventions
Intermediate Results Indicator
Number of community health agents who receive training on Ebola prevention
Intermediate Results Indicator
Community-based sub-projects initiated
Intermediate Results Indicator
Beneficiaries of Safety Nets programs (number)
Intermediate Results Indicator
Tabancas with a Community-Development Plans completed
Intermediate Results Indicator
Community-based sub-projects completed
Intermediate Results Indicator
Technical audit of community-based sub-projects completed
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
Operating ratio
Intermediate Results Indicator
Percentage of teachers on the Folha Única whose salary has been paid by the Project
Intermediate Results Indicator
Percentage of health workers on the Folha Única whose salary has been paid by the Project
Intermediate Results Indicator
Community-based sub-projects functional and properly maintained two years after completion
PDO Indicator
No interruption of the 2013/14 or 2014/15 school year due to the non payment of current salaries from Project effectiveness until the end of the 2014/15 school year with gradations
Intermediate Results Indicator
Roads rehabilitated, Rural
Intermediate Results Indicator
Land benefiting from hydro-agricultural systems improved by the Project
44000-P148797
World Bank
Emergency Water and Electricity Services Upgrading Project
International Development Association
MINISTRY IN CHARGE OF WATER
International Development Association
MINISTRY IN CHARGE OF WATERPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Oumar Diallo
+1-202-473-1000odiallo@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
GUINEA-BISSAU
Bissau
11.8640 -15.5980
Energy Transmission and DistributionWater SupplyCentral Government (Central Agencies)Urban Infrastructure and Service DeliveryUrban Development
0.00
0.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
500000.00
500000.00
500000.00
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
833333.33
833333.33
833333.34
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
500000.00
500000.00
500000.00
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
265833.33
265833.33
265833.33
265833.33
265833.33
265833.33
265833.33
265833.33
265833.33
265833.33
265833.33
265833.37
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
342500.00
516666.67
516666.67
516666.67
516666.67
516666.67
516666.67
516666.67
516666.67
516666.67
516666.67
516666.67
516666.63
625000.00
625000.00
625000.00
625000.00
625000.00
625000.00
625000.00
625000.00
625000.00
625000.00
625000.00
625000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
700000.00
700000.00
700000.00
700000.00
700000.00
17156502Total Commitment in Second Quarter of 2014
International Development Association5255145Total Commitment in Second Quarter of 2014
International Development Association1876266Total Disbursement in Fourth Quarter of 2014
International Development Association396944Total Disbursement in First Quarter of 2015
International Development Association293389Total Disbursement in First Quarter of 2015
International Development Association158697Total Disbursement in Second Quarter of 2015
International Development Association-5502Total Interest Repayment in Second Quarter of 2015
International Development Association381338Total Disbursement in Second Quarter of 2015
International Development Association86026Total Disbursement in Second Quarter of 2015
International Development Association2685Total Disbursement in Third Quarter of 2015
International Development Association29061Total Disbursement in Third Quarter of 2015
International Development Association115174Total Disbursement in Fourth Quarter of 2015
International Development Association-10026Total Interest Repayment in Fourth Quarter of 2015
International Development Association619380Total Disbursement in Fourth Quarter of 2015
International Development Association715269Total Disbursement in Fourth Quarter of 2015
International Development Association34988Total Disbursement in Fourth Quarter of 2015
International Development Association188156Total Disbursement in Fourth Quarter of 2015
International Development Association223296Total Disbursement in Fourth Quarter of 2015
International Development Association59380Total Disbursement in First Quarter of 2016
International Development Association179482Total Disbursement in First Quarter of 2016
International Development Association188798Total Disbursement in First Quarter of 2016
International Development Association570654Total Disbursement in First Quarter of 2016
International Development Association849535Total Disbursement in Second Quarter of 2016
International Development Association-6524Total Interest Repayment in Second Quarter of 2016
International Development Association-8333Total Interest Repayment in Second Quarter of 2016
International Development Association263725Total Disbursement in Second Quarter of 2016
International Development Association115972Total Disbursement in Second Quarter of 2016
International Development Association221070Total Disbursement in Second Quarter of 2016
International Development Association96620Total Disbursement in Third Quarter of 2016
International Development Association318058Total Disbursement in Third Quarter of 2016
International Development Association101715Total Disbursement in Fourth Quarter of 2016
International Development Association164333Total Disbursement in Fourth Quarter of 2016
International Development Association-22939Total Interest Repayment in Fourth Quarter of 2016
International Development Association301331Total Disbursement in Fourth Quarter of 2016
International Development Association30899Total Disbursement in Fourth Quarter of 2016
International Development Association49921Total Disbursement in Fourth Quarter of 2016
International Development Association91539Total Disbursement in Fourth Quarter of 2016
International Development Association45288Total Disbursement in First Quarter of 2017
International Development Association43516Total Disbursement in First Quarter of 2017
International Development Association149081Total Disbursement in First Quarter of 2017
International Development Association143249Total Disbursement in First Quarter of 2017
International Development Association-152Total Interest Repayment in Second Quarter of 2017
International Development Association154197Total Disbursement in Second Quarter of 2017
International Development Association-24359Total Interest Repayment in Second Quarter of 2017
International Development Association1567913Total Disbursement in Second Quarter of 2017
International Development Association31163Total Disbursement in Second Quarter of 2017
International Development Association491562Total Disbursement in Second Quarter of 2017
International Development Association18000000Total Commitment in Second Quarter of 2017
International Development Association7000000Total Commitment in Second Quarter of 2017
International Development Association33371Total Disbursement in Third Quarter of 2017
International Development Association44113Total Disbursement in Third Quarter of 2017
International Development Association109851Total Disbursement in Third Quarter of 2017
International Development Association145212Total Disbursement in Third Quarter of 2017
International Development Association190208Total Disbursement in Fourth Quarter of 2017
International Development Association48571Total Disbursement in Fourth Quarter of 2017
International Development Association-32791Total Interest Repayment in Fourth Quarter of 2017
International Development Association157572Total Disbursement in Fourth Quarter of 2017
International Development Association48485Total Disbursement in Fourth Quarter of 2017
International Development Association24160Total Disbursement in Fourth Quarter of 2017
International Development Association47867Total Disbursement in Fourth Quarter of 2017
International Development Association507274Total Disbursement in Fourth Quarter of 2017
International Development Association14Total Disbursement in First Quarter of 2018
International Development Association31220Total Disbursement in First Quarter of 2018
International Development Association12756Total Disbursement in First Quarter of 2018
International Development Association17723Total Disbursement in First Quarter of 2018
International Development Association41991Total Disbursement in First Quarter of 2018
International Development Association51797Total Disbursement in First Quarter of 2018
International Development Association1325162Total Disbursement in First Quarter of 2018
International Development Association35Total Disbursement in First Quarter of 2018
International Development Association81279Total Disbursement in Second Quarter of 2018
International Development Association11020Total Disbursement in Second Quarter of 2018
International Development Association-2687Total Interest Repayment in Second Quarter of 2018
International Development Association60113Total Disbursement in Second Quarter of 2018
International Development Association-37593Total Interest Repayment in Second Quarter of 2018
International Development Association982200Total Disbursement in Second Quarter of 2018
International Development Association546564Total Disbursement in Second Quarter of 2018
International Development Association18348Total Disbursement in Second Quarter of 2018
International Development Association298419Total Disbursement in Second Quarter of 2018
International Development Association166231Total Disbursement in Second Quarter of 2018
International Development Association3348Total Disbursement in Second Quarter of 2018
International Development Association14297Total Disbursement in Fourth Quarter of 2018
International Development Association6728Total Disbursement in Fourth Quarter of 2018
International Development Association42071Total Disbursement in Fourth Quarter of 2018
International Development Association11060Total Disbursement in Fourth Quarter of 2018
International Development Association317113Total Disbursement in Fourth Quarter of 2018
International Development Association138284Total Disbursement in Fourth Quarter of 2018
International Development Association-40224Total Interest Repayment in Fourth Quarter of 2018
International Development Association425814Total Disbursement in Fourth Quarter of 2018
International Development Association267343Total Disbursement in Fourth Quarter of 2018
International Development Association47062Total Disbursement in Fourth Quarter of 2018
International Development Association-2Total Interest Repayment in Fourth Quarter of 2018
International Development Association-5193Total Interest Repayment in Fourth Quarter of 2018
International Development Association17347Total Disbursement in Fourth Quarter of 2018
International Development Association80426Total Disbursement in First Quarter of 2019
International Development Association19791Total Disbursement in First Quarter of 2019
International Development Association479049Total Disbursement in First Quarter of 2019
International Development Association44128Total Disbursement in First Quarter of 2019
International Development Association27043Total Disbursement in First Quarter of 2019
International Development Association13405Total Disbursement in First Quarter of 2019
International Development Association12776Total Disbursement in First Quarter of 2019
International Development Association7696Total Disbursement in First Quarter of 2019
International Development Association250493Total Disbursement in Second Quarter of 2019
International Development Association29673Total Disbursement in Second Quarter of 2019
International Development Association19271Total Disbursement in Second Quarter of 2019
International Development Association327579Total Disbursement in Second Quarter of 2019
International Development Association368860Total Disbursement in Second Quarter of 2019
International Development Association69298Total Disbursement in Second Quarter of 2019
International Development Association1078338Total Disbursement in Second Quarter of 2019
International Development Association-45830Total Interest Repayment in Second Quarter of 2019
International Development Association1214028Total Disbursement in Second Quarter of 2019
International Development Association228118Total Disbursement in Second Quarter of 2019
International Development Association597367Total Disbursement in Second Quarter of 2019
International Development Association-118Total Interest Repayment in Second Quarter of 2019
International Development Association76302Total Disbursement in Second Quarter of 2019
International Development Association-5437Total Interest Repayment in Second Quarter of 2019
International Development Association49553Total Disbursement in Second Quarter of 2019
International Development Association3405Total Disbursement in Third Quarter of 2019
International Development Association327194Total Disbursement in Third Quarter of 2019
International Development Association73046Total Disbursement in Third Quarter of 2019
International Development Association22190Total Disbursement in Third Quarter of 2019
International Development Association84990Total Disbursement in Third Quarter of 2019
International Development Association1320Total Disbursement in Third Quarter of 2019
International Development Association49299Total Disbursement in Fourth Quarter of 2019
International Development Association21087Total Disbursement in Fourth Quarter of 2019
International Development Association7243Total Disbursement in Fourth Quarter of 2019
International Development Association11502Total Disbursement in Fourth Quarter of 2019
International Development Association-54716Total Interest Repayment in Fourth Quarter of 2019
International Development Association48716Total Disbursement in Fourth Quarter of 2019
International Development Association-8296Total Interest Repayment in Fourth Quarter of 2019
International Development Association54223Total Disbursement in Fourth Quarter of 2019
International Development Association18624Total Disbursement in Fourth Quarter of 2019
International Development Association260921Total Disbursement in First Quarter of 2020
International Development Association101469Total Disbursement in First Quarter of 2020
International Development AssociationProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreement Financing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :1. Mandate and staffing of the PIU | Description :The Recipient shall modify the mandate of the ProjectImplementation Unit no later than one month after the Effective Date and thereafter maintain at all times during the implementationof the Project, a Project Implementation Unit within the administrative structure of MERI, with terms of reference and resourcessatisfactory to the Association and supported by qualified and experienced personnel. | Due Date :30-Sep-2014
Finance Agreement :2. Partnership Agreement with EAGB | Description :To facilitate the carrying out of Components 1.2, 2.1 and 3.3of the Project, the Recipient through MERI shall, no later than one month after the Effective Date, enter into (and thereaftermaintain) a partnership agreement with EAGB, under terms and conditions approved by the Association. | Due Date :30-Sep-2014
Finance Agreement :3. Preparation of Safeguards Documents | Description :On or before three months after the Effective Date, theProject Implementing Unit shall adopt in form and substance satisfactory to the Association, and shall furnish to the Association,the Environmental and Social Management Framework and the Resettlement Policy Framework. | Due Date :30-Nov-2014
Finance Agreement :Schedule 2 Section I.A.1 (a) | Description :The Recipient shall modify the mandate of the Project ImplementationUnit no later than one month after the Effective Date, and thereafter maintain at all times during the implementation of theProject, a Project implementation unit within the administrative structure of MEF, with terms of reference and resourcessatisfactory to the Association, and supported by qualified and experienced personnel | Due Date :30-Oct-2017
Finance Agreement :Schedule 2 Section I.A.3 (a) | Description :The Recipient shall establish, not later than two months after theEffective Date and thereafter maintain at all times during Project implementation, a Project Steering Committee with a mandate,composition and resources satisfactory to the Association (âProject Steering Committeeâ?). | Due Date :30-Nov-2017
Finance Agreement :Schedule 2 Section I.C.1 (c) | Description :EAGB shall: (i) no later than nine (9) months after the EffectiveDate, establish, and thereafter maintain throughout Project implementation, a financial management system and prepare financialstatements in accordance with consistently applied accounting standards acceptable to the Association; (ii) have said financialstatements audited by independent auditors for each fiscal year of EAGB in ac | Due Date :30-Jun-2018
Finance Agreement :Schedule 2 Section I.D.1 | Description :Not later than four months after the Effective Date, the Recipient shallapprove, and shall cause EAGB to adopt and thereafter maintain throughout Project implementation, a Management Improvement Plan |Due Date :30-Jan-2018
Finance Agreement :Schedule 2 Section I.D.2 | Description :Not later than six months after the Recipientâs approval of theManagement Improvement Plan, the Recipient shall: (a) with support of the Project Implementation Unit execute a Services Contractwith the Services Provider in accordance with the provisions of Section III of Schedule 2 to this Agreement; and (b) thereaftercause the Project Implementation Unit to maintain at all times during the impl | Due Date :30-Jul-2018
Finance Agreement :Schedule 2 Section I.D.3 | Description :Within two months from the date of signing of the Services Contract, theRecipient shall cause EAGB to: (i) proceed with any corporate nominations prescribed by the applicable laws, including, anyrepresentative from the Services Provider pursuant to the Services Contract; and (ii) submit to the Association an opinion oropinions satisfactory to the Association of counsel acceptable to the Associa | Due Date :30-Sep-2018
Finance Agreement :Schedule 2 Section I.D.4 | Description :The Recipient shall no later than six months after the Effective Dateenter into a Performance Contract with EAGB under terms and conditions satisfactory to the Association and thereafter maintain atall times during the implementation of the Project said Performance Contract | Due Date :30-Mar-2018
Finance Agreement :Schedule 2 Section I.D.5 | Description :The Recipient, with the support of the PIU, shall have a semi-annualtechnical and financial review of the implementation of Services Contract and Performance Contract carried out by the ContractAuditors and submit its report no later than two months after the end of the relevant semester to the Services Provider, theProject Steering Committee and to the Association. | Frequency :SemiAnnual
Finance Agreement :Schedule 2 Section V.1 | Description :Not later than two months after the Effective Date, the Recipient shallcause EAGB to amend the company by-laws, in form and substance satisfactory to the Association, to comply with OHADA Legislation |Due Date :30-Nov-2017
Finance Agreement :Schedule 2 Section V.2 | Description :Not later than three months after the Effective Date, the Recipient shallappoint and thereafter maintain, at all times during Project implementation, the board of directors of EAGB, with terms ofreferenceand composition satisfactory to the Association | Due Date :30-Dec-2017
Finance Agreement :Schedule 2 Section V.3 | Description :The Recipient shall cause EAGB to adopt and thereafter implement aMaintenance, Repair and Rehabilitation Plan, in form and substance satisfactory to the Association | Frequency :CONTINUOUS
Finance Agreement :Schedule 2 Section V.4 | Description :The Recipient shall: (a) not later than twenty-four months from theEffective Date, cause EAGB to carry out an inventory of EAGBâs assets and liabilities, and prepare and submit to the Associationfor its review and written approval the financial restructuring plan; and (b) within six months from its review by the Association,adopt the financial restructuring plan and take and, as the case may be | Due Date :30-Sep-2019
Finance Agreement :Schedule 2 Section V.5 | Description :Not later than six months after the Effective Date, the Recipient shalladopt the Generation Plan, in form and substance satisfactory to the Association. | Due Date :30-Mar-2018
PDO Indicator
Number of people in urban areas provided with access to Improved Water Sources under the project
PDO Indicator
Number of people benefiting from enhanced water services under the project
PDO Indicator
Number of people benefitting from enhanced electricity services under the project
PDO Indicator
Direct project beneficiaries
Intermediate Results Indicator
New piped household water connections that are resulting from the project intervention
Intermediate Results Indicator
Prepayment meters installed under the project
Intermediate Results Indicator
Piped household water connections that are benefiting from rehabilitation works undertaken by the project
Intermediate Results Indicator
Improved community water points constructed or rehabilitated under the project
PDO Indicator
Non-revenue water
PDO Indicator
Network transmission and distribution losses
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
Citizen engagement: percentage of complaints to the call center that are satisfactorily addressed
Intermediate Results Indicator
Collection rate of electricity and water bills (private customers)
Intermediate Results Indicator
Percentage of water service connections equipped with meters
Intermediate Results Indicator
Percentage of electricity connections equipped with pre-payment meters
Intermediate Results Indicator
Services Contract executed and implemented
Intermediate Results Indicator
Distribution lines constructed or rehabilitated under the project
44000-P163901
World Bank
Guinea Bissau: Safety Nets and Basic Services Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Philippe Auffret
+1-202-473-1000pauffret@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
GUINEA-BISSAU
Tombali
11.3000 -15.0000
Quinara
11.6670 -15.0830
Pitche
12.3330 -13.9500
Oio Region
12.2500 -15.2500
Republic of Guinea-Bissau
12.0000 -15.0000
Gabú
12.1670 -14.1670
Fulacunda
11.7670 -15.1670
Cacheu Region
12.0000 -16.1670
Biombo
11.8830 -15.8430
Bafatá
12.1670 -14.7170
Sao Domingos
12.4020 -16.2010
Gabu Sector
12.1220 -14.2410
Public Administration - Social ProtectionSocial ProtectionParticipation and Civic EngagementSocial Safety NetsSocial InclusionSocial ProtectionGenderRural DevelopmentRural Infrastructure and service delivery
0.00
0.00
45840.00
68550.00
83040.00
96840.00
109695.00
123285.00
140805.00
155940.00
166260.00
173895.00
184395.00
195015.00
201375.00
205470.00
211125.00
219810.00
231300.00
244290.00
253935.00
263340.00
273810.00
288330.00
300750.00
307230.00
310080.00
321780.00
330255.00
329370.00
491055.00
333450.00
332850.00
327090.00
322260.00
321945.00
319635.00
314580.00
309120.00
305880.00
303855.00
303930.00
302700.00
298920.00
294510.00
291825.00
289665.00
287880.00
285480.00
281670.00
277605.00
277290.00
280185.00
280995.00
280635.00
280875.00
281595.00
282495.00
283050.00
321165.00
0.00
0.00
45840.00
68550.00
83040.00
96840.00
109695.00
123285.00
140805.00
155940.00
166260.00
173895.00
184395.00
195015.00
201375.00
205470.00
211125.00
219810.00
231300.00
244290.00
253935.00
263340.00
273810.00
288330.00
300750.00
307230.00
310080.00
321780.00
330255.00
329370.00
491055.00
333450.00
332850.00
327090.00
322260.00
321945.00
319635.00
314580.00
309120.00
305880.00
303855.00
303930.00
302700.00
298920.00
294510.00
291825.00
289665.00
287880.00
285480.00
281670.00
277605.00
277290.00
280185.00
280995.00
280635.00
280875.00
281595.00
282495.00
283050.00
321165.00
15000000Total Commitment in Second Quarter of 2018
International Development Association1717328Total Disbursement in First Quarter of 2019
International Development Association29575Total Disbursement in Second Quarter of 2019
International Development Association132533Total Disbursement in Second Quarter of 2019
International Development Association116733Total Disbursement in Third Quarter of 2019
International Development Association509178Total Disbursement in Third Quarter of 2019
International Development Association487502Total Disbursement in Third Quarter of 2019
International Development Association71111Total Disbursement in Fourth Quarter of 2019
International Development Association224603Total Disbursement in Fourth Quarter of 2019
International Development Association466369Total Disbursement in Fourth Quarter of 2019
International Development Association1268346Total Disbursement in First Quarter of 2020
International Development Association60252Total Disbursement in First Quarter of 2020
International Development AssociationImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
To carry out the audit of the Cash Transfer Program, the Recipient shall recruit, not later than three (3) months after theEffective Date, and thereafter maintain, at all times during CTP implementation, independent auditors with qualifications,experience and terms of reference acceptable to the Association.
To carry out the audit of the Financial Statements, the Recipient shall recruit, not later than six (6) months after the EffectiveDate, and thereafter maintain, at all times during Project implementation, an external auditor with qualifications, experience andterms of reference acceptable to the Association.
Not later than three (3) months after the Effective Date, the Recipient shall update its accounting software to carry out theProject's accounting and financial reporting.
To facilitate the carrying out of Part C of the Project, the Recipient could execute and thereafter maintain a cooperationagreement with INE, under terms and conditions approved by the Association (“Cooperation Agreement”).
Intermediate Results Indicator
Total amount of cash transferred to households
Intermediate Results Indicator
Percentage of individuals satisfied with the participation process (Voice and Accountability)
PDO Indicator
People provided with access to improved water sources
PDO Indicator
Direct project beneficiaries
PDO Indicator
People with access to an all-season road rehabilitated by the Project
PDO Indicator
Beneficiaries of social safety net programs
PDO Indicator
Beneficiaries of social safety net programs - Female
Intermediate Results Indicator
Community-based micro-projects completed
PDO Indicator
of which female beneficiaries
PDO Indicator
Improvement in stunting in children <2 years in households benefitting from the cash transfer program
Intermediate Results Indicator
Percentage of individuals participating in their community development plan on average (Voice and Accountability)
Intermediate Results Indicator
Operating ratio
Intermediate Results Indicator
Percentage of women participating in their community development plan on average (Voice and Accountability)
Intermediate Results Indicator
Cash transfer payments received within 10 days of scheduled date
Intermediate Results Indicator
Improvement in school enrollment in children 6-14 in households benefiting from the cash transfer program
Intermediate Results Indicator
Community-based micro-projects functional and properly maintained two years after completion (percentage of micro-projects completed)
44000-P097975
World Bank
Multi-sector Infrastructure Rehabilitation Project
International Development Association
MINISTRY OF ENERGY / EAGB / MINISTRY OF PUBLIC WORKS
International Development Association
MINISTRY OF ENERGY / EAGB / MINISTRY OF PUBLIC WORKSPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Leopold Sedogo
+1-202-473-1000lsedogo@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
GUINEA-BISSAU
Tombali
11.3000 -15.4170
Quinara
11.6670 -15.0830
Oio
12.2500 -15.2500
Republic of Guinea-Bissau
12.0000 -15.0000
Gabu
12.1670 -14.1670
Canchungo
12.0670 -16.0330
Cacheu
12.0000 -16.1670
Ilha de Bolama
11.5670 -15.5500
Bolama
11.1550 -16.0090
Bissau
11.8640 -15.5980
Arquipelago dos Bijagos
11.2500 -16.0830
Bafata
12.1670 -14.7170
Central Government (Central Agencies)Rural and Inter-Urban RoadsOther Energy and ExtractivesWater SupplyUrban DevelopmentWater Resource ManagementUrban Infrastructure and Service DeliveryFragility, Conflict and ViolencePublic AdministrationPublic Private PartnershipsState-owned Enterprise Reform and PrivatizationPost-conflict reconstructionRegulation and Competition PolicyBusiness Enabling EnvironmentConflict PreventionWater Institutions, Policies and Reform
350000.00
516666.67
516666.67
516666.66
433333.33
433333.33
433333.34
433333.33
433333.33
433333.34
416666.67
416666.67
416666.66
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
416666.67
416666.67
416666.66
333333.33
333333.33
333333.34
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
200000.00
200000.00
200000.00
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
116666.67
116666.67
116666.66
66666.67
66666.67
66666.66
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
350000.00
516666.67
516666.67
516666.66
433333.33
433333.33
433333.34
433333.33
433333.33
433333.34
416666.67
416666.67
416666.66
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
416666.67
416666.67
416666.66
333333.33
333333.33
333333.34
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
200000.00
200000.00
200000.00
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
116666.67
116666.67
116666.66
66666.67
66666.67
66666.66
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15000000Total Commitment in Second Quarter of 2006
International Development Association1083036Total Disbursement in Fourth Quarter of 2007
International Development Association738Total Disbursement in Fourth Quarter of 2007
International Development Association745159Total Disbursement in First Quarter of 2008
International Development Association541826Total Disbursement in Second Quarter of 2008
International Development Association304769Total Disbursement in Second Quarter of 2008
International Development Association943279Total Disbursement in Third Quarter of 2008
International Development Association833198Total Disbursement in Third Quarter of 2008
International Development Association38008Total Disbursement in Fourth Quarter of 2008
International Development Association228550Total Disbursement in First Quarter of 2009
International Development Association603073Total Disbursement in Second Quarter of 2009
International Development Association357201Total Disbursement in Second Quarter of 2009
International Development Association610709Total Disbursement in Third Quarter of 2009
International Development Association1118792Total Disbursement in Third Quarter of 2009
International Development Association335087Total Disbursement in Fourth Quarter of 2009
International Development Association78914Total Disbursement in Fourth Quarter of 2009
International Development Association258072Total Disbursement in First Quarter of 2010
International Development Association311437Total Disbursement in Third Quarter of 2010
International Development Association809704Total Disbursement in Third Quarter of 2010
International Development Association442192Total Disbursement in Fourth Quarter of 2010
International Development Association284341Total Disbursement in Fourth Quarter of 2010
International Development Association61943Total Disbursement in First Quarter of 2011
International Development Association76075Total Disbursement in First Quarter of 2011
International Development Association56409Total Disbursement in Second Quarter of 2011
International Development Association225196Total Disbursement in Second Quarter of 2011
International Development Association381110Total Disbursement in Second Quarter of 2011
International Development Association398734Total Disbursement in Third Quarter of 2011
International Development Association146142Total Disbursement in Third Quarter of 2011
International Development Association181672Total Disbursement in Fourth Quarter of 2011
International Development Association56163Total Disbursement in Fourth Quarter of 2011
International Development Association354331Total Disbursement in First Quarter of 2012
International Development Association170457Total Disbursement in First Quarter of 2012
International Development Association88217Total Disbursement in First Quarter of 2012
International Development Association637167Total Disbursement in First Quarter of 2013
International Development Association2510Total Disbursement in First Quarter of 2013
International Development Association306038Total Disbursement in Second Quarter of 2013
International Development Association258189Total Disbursement in Second Quarter of 2013
International Development Association344669Total Disbursement in Second Quarter of 2013
International Development Association1014454Total Disbursement in Third Quarter of 2013
International Development Association312867Total Disbursement in Fourth Quarter of 2013
International Development Association145144Total Disbursement in Fourth Quarter of 2013
International Development Association10368Total Disbursement in First Quarter of 2014
International Development Association125996Total Disbursement in Second Quarter of 2014
International Development Association132187Total Disbursement in Third Quarter of 2014
International Development Association-631774Total Commitment Cancellations in Third Quarter of 2014
International Development Association-3470Total Disbursement in Third Quarter of 2014
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Co-financing Agreement has been executed and delivered and all conditions precedent to its effectiveness or to the right of theRecipient to make withdrawals under it have been fulfilled.
PDO Indicator
Direct/indirect beneficiaries to electricity supply services (number, female (percent))
PDO Indicator
Number of people provided with access to #improved water sources# under the project through new piped household water connections that are resulting from the project intervention (number)
PDO Indicator
Direct/indirect beneficiaries to water supply services (number, female ( percent))
Intermediate Results Indicator
Number of prepayment meters installed
PDO Indicator
People provided with access to electricity by household connections
PDO Indicator
Of which female (%)
PDO Indicator
Of which female (%)
PDO Indicator
Ppl pvd wth elec. by hhold conn.–Offgrid/minigrid–Any source except only renewable
PDO Indicator
People provided with access to electricity by hhold connections-Grid
PDO Indicator
Ppl provided wth elec. by hhold conn.–Offgrid/minigrid–Only renewable sources
PDO Indicator
Level of electricity losses (percent)
PDO Indicator
Level of water losses ( percent)
PDO Indicator
Collection rate of electricity bills
PDO Indicator
Electricity losses per year in the project area
PDO Indicator
Electricity losses per year in the project area- Technical
PDO Indicator
Electricity losses per year in the project area- Non-Technical
Intermediate Results Indicator
Increase electricity generation capacity owned by EAGB from 3 MW to 5.5 MW through the project
Intermediate Results Indicator
Generation Capacity of Renewable Energy (other than hydropower) rehabilitated
Intermediate Results Indicator
Generation Capacity of Hydropower constructed or rehabilitated under the project
Intermediate Results Indicator
Generation Capacity of Renewable Energy rehabilitated -Geo-thermal
Intermediate Results Indicator
Generation Capacity of Renewable Energy rehabilitated -Solar
Intermediate Results Indicator
Generation Capacity of Renewable Energy rehabilitated - Other
Intermediate Results Indicator
Generation Capacity of Renewable Energy rehabilitated - Wind
Intermediate Results Indicator
Generation Capacity of Hydropower constructed under the project
Intermediate Results Indicator
Generation Capacity of Hydropower rehabilitated under the project
PDO Indicator
Annual electricity distribution to end-users (GWh) in Bissau
PDO Indicator
Total net injected generation
44000-P160678
World Bank
Guinea Bissau: The Quality Education for All Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Emily Elaine Gardner
+1-202-473-1000egardner@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
GUINEA-BISSAU
Tombali
11.3000 -15.0000
Quinara
11.6670 -15.0830
Oio Region
12.2500 -15.2500
Gabu
12.1670 -14.1670
Cacheu Region
12.0000 -16.1670
Bolama
11.1550 -16.0090
Bissau Region
11.8540 -15.5910
Biombo
11.8830 -15.8430
Bafata
12.1670 -14.7170
Public Administration - EducationPrimary EducationClimate changeEducationMitigationEducation FinancingTeachersStandards, Curriculum and TextbooksEducation Governance, School-Based Management
0.00
0.00
23935.90
33619.40
39953.80
45967.20
51520.50
57266.40
65130.90
71882.60
76269.60
79115.80
82368.60
86102.90
89387.80
90768.10
91035.60
95080.20
103105.20
111461.90
115667.00
122589.90
133375.50
143123.20
151469.20
160639.10
170162.10
179267.80
188148.80
195446.20
307400.30
106882.30
219382.10
225566.70
351430.80
245222.60
250305.10
252370.20
259731.80
265242.30
265488.40
263541.00
267157.60
268484.40
265809.40
264118.80
265638.20
265028.30
262802.70
259207.50
256981.90
256275.70
255719.30
255045.20
254381.80
253536.50
252723.30
252006.40
251257.40
427400.80
0.00
0.00
23935.90
33619.40
39953.80
45967.20
51520.50
57266.40
65130.90
71882.60
76269.60
79115.80
82368.60
86102.90
89387.80
90768.10
91035.60
95080.20
103105.20
111461.90
115667.00
122589.90
133375.50
143123.20
151469.20
160639.10
170162.10
179267.80
188148.80
195446.20
307400.30
106882.30
219382.10
225566.70
351430.80
245222.60
250305.10
252370.20
259731.80
265242.30
265488.40
263541.00
267157.60
268484.40
265809.40
264118.80
265638.20
265028.30
262802.70
259207.50
256981.90
256275.70
255719.30
255045.20
254381.80
253536.50
252723.30
252006.40
251257.40
427400.80
10700000Total Commitment in Third Quarter of 2018
International Development Association201299Total Disbursement in First Quarter of 2019
International Development Association97351Total Disbursement in First Quarter of 2019
International Development Association685222Total Disbursement in Second Quarter of 2019
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
The Recipient shall establish and thereafter maintain a Project Steering Committee (PSC), whose mandate, terms of reference andcomposition shall be acceptable to the Association, to be chaired by a representative of MEESJCD, and consisting of representativesof agencies and directorates involved in the implementation of the Project, to be responsible for strategic guidance and oversightof the Project, and coordination with other ongoing programs, including: (i) review and approval of AWPBs; (ii) review of progressreports, including quarterly budget execution reports; and (iii) monitoring and assessment of implementation progress and results.(IDA and GPE: Schedule 2.I.A.1(a))
The Recipient shall establish and thereafter maintain a Project Implementation Unit (PIU), whose mandate, terms of reference andcomposition shall be acceptable to the Association, to be responsible for the day-to-day implementation of the Project, including:(i) responsibility for the fiduciary obligations under the Project; (ii) provision of technical support for implementation ofProject activities; (iii) preparation and management of bidding processes; (iv) management of project resources and ensuring thatdisbursements are made in accordance with the agreed procedures and practices; (v) preparation of quarterly and annual financialstatements; and (vi) provision of support to MEESJCD in overall M&E, including the collection and analysis of relevant data fortracking progress. (IDA and GPE Schedule 2.I.A.1(b))
Beginning in the Fiscal Year during which the Financing becomes effective, the Recipient shall, not later than November 15 in eachFiscal Year, prepare and furnish to the Association, a proposed annual work program and budget (“Annual Work Program and Budget”)for the next following Fiscal Year, giving details of: (a) a time table of programs and activities scheduled for implementation inthe course of that next following Fiscal Year; and (b) the estimated cost of each such program or activity, along with the budgetline item and source of funding corresponding to each program or activity. (IDA: Schedule 2.IV.B.1; GPE: Schedule 2.IV.A.1)
The Recipient shall, not later than six (6) months after the Effective Date, recruit, on terms and conditions acceptable to theAssociation, an external auditor having qualifications and experience acceptable to the Association. (IDA: Schedule 2.IV.A; GPE:Schedule 2.II.B.4)
PDO Indicator
Number of Direct Project Beneficiaries
Intermediate Results Indicator
Number of school management committees established (disaggregated by region)
Intermediate Results Indicator
Number of in-service teachers in grades 1-4 trained in the new curriculum and IAI
Intermediate Results Indicator
Number of school management committees in Oio
Intermediate Results Indicator
Number of IAI lessons in grades 1 and 2 in Portuguese and Math developed
Intermediate Results Indicator
Number of school management committees in Bafata
Intermediate Results Indicator
Number of primary schools with grades 1-4 using the new curriculum and IAI
Intermediate Results Indicator
Number of schools with approved school improvement plans
Intermediate Results Indicator
Number of schools receiving school grants (annually)
Intermediate Results Indicator
Number of school inspectors' visits to targeted schools in Bafata and Oio
Intermediate Results Indicator
Number of textbooks purchased and distributed to targeted schools
PDO Indicator
Percentage of recipient schools executing school grants according to school improvement plans (annually)
PDO Indicator
Percentage of teachers who received in-service training under the project with improved content knowledge in Portuguese and Mathematics
PDO Indicator
Percentage of grade 2 students in targeted schools with improved content knowledge in Portuguese and Mathematics
PDO Indicator
Net enrollment rate in grade 1 in targeted regions
PDO Indicator
Net enrollment rate in grade 1 in targeted regions (female)
PDO Indicator
Percentage of which are female
Intermediate Results Indicator
Percentage of school management committees supported by the Project where 30 percent of the members are female
Intermediate Results Indicator
Percentage of total grievances received through the GRM established under the project which are addressed
Intermediate Results Indicator
Development and adoption of school management committee policy and manual
Intermediate Results Indicator
National teacher certification processes/procedures established
Intermediate Results Indicator
Completion of school mapping and costed plan for expansion of primary schools
Intermediate Results Indicator
Evaluation of teachers using the new school curriculum in grades 1-4 in the pilot completed
Intermediate Results Indicator
PASEC II learning assessment in grades 2 and 5 conducted and results disseminated
Intermediate Results Indicator
Implementation of adapted Service Delivery Indicators (SDI) survey during the Project
Intermediate Results Indicator
Establishment of online portal and key education information (i.e., national policies, laws, statistics, etc.) publically available
Intermediate Results Indicator
National textbook policy and dissemination plan adopted
Intermediate Results Indicator
Learning materials for the new curriculum delivered to all public primary schools with grades 1-4 in targeted regions
44000-P120910
World Bank
Guinea-Bissau: Emergency Electricity and Water Rehabilitation Project
International Development Association
PROJECT IMPLEMENTING UNIT (MINISTRY OF ECONOMY)
International Development Association
PROJECT IMPLEMENTING UNIT (MINISTRY OF ECONOMY)Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Leopold Sedogo
+1-202-473-1000lsedogo@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
GUINEA-BISSAU
Bissau
11.8640 -15.5980
Public Administration - Energy and ExtractivesRenewable Energy GeothermalOther Energy and ExtractivesConflict PreventionPublic AdministrationRural Infrastructure and service deliveryUrban DevelopmentPost-conflict reconstructionRural DevelopmentUrban Infrastructure and Service DeliveryJob CreationServices and Housing for the PoorState-owned Enterprise Reform and PrivatizationJobsFragility, Conflict and ViolencePublic Private Partnerships
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
650000.00
650000.00
650000.00
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
650000.00
650000.00
650000.00
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12700000Total Commitment in Third Quarter of 2010
International Development Association846888Total Disbursement in Second Quarter of 2011
International Development Association2200000Total Commitment in Second Quarter of 2011
International Development Association1932941Total Disbursement in Third Quarter of 2011
International Development Association158058Total Disbursement in Third Quarter of 2011
International Development Association808544Total Disbursement in First Quarter of 2012
International Development Association4240478Total Disbursement in First Quarter of 2012
International Development Association2190380Total Disbursement in First Quarter of 2012
International Development Association132806Total Disbursement in Second Quarter of 2012
International Development Association1300656Total Disbursement in Second Quarter of 2012
International Development Association296698Total Disbursement in Second Quarter of 2012
International Development Association145014Total Disbursement in Third Quarter of 2012
International Development Association412753Total Disbursement in First Quarter of 2013
International Development Association506331Total Disbursement in First Quarter of 2013
International Development Association450051Total Disbursement in First Quarter of 2013
International Development Association230156Total Disbursement in First Quarter of 2013
International Development Association28096Total Disbursement in Second Quarter of 2013
International Development Association115280Total Disbursement in Second Quarter of 2013
International Development Association92195Total Disbursement in Second Quarter of 2013
International Development Association191Total Disbursement in Third Quarter of 2013
International Development Association19537Total Disbursement in Fourth Quarter of 2013
International Development Association24072Total Disbursement in First Quarter of 2014
International Development Association27146Total Disbursement in First Quarter of 2014
International Development Association200869Total Disbursement in Second Quarter of 2014
International Development Association317640Total Disbursement in Second Quarter of 2014
International Development Association67513Total Disbursement in Third Quarter of 2014
International Development Association97410Total Disbursement in Third Quarter of 2014
International Development Association58987Total Disbursement in Fourth Quarter of 2014
International Development Association412735Total Disbursement in Fourth Quarter of 2014
International Development Association191673Total Disbursement in First Quarter of 2015
International Development Association162200Total Disbursement in Third Quarter of 2015
International Development Association-95894Total Disbursement in First Quarter of 2016
International Development Association-209478Total Commitment Cancellations in First Quarter of 2016
International Development Association-32Total Commitment Cancellations in Second Quarter of 2016
International Development Association-32Total Disbursement in Second Quarter of 2016
International Development AssociationProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Article IV, 4.01 | Description :Additional condition of effectiveness: the Project Operations Manual shall havebeen updated in form, content and substance satisfactory to IDA | Due Date :15-Dec-2010
Finance Agreement :Schedule II, Section V (a) | Description :No later than 60 days after Effectiveneness Date, hire an externalauditing firm to prepare statements for the project | Due Date :15-Feb-2011
Finance Agreement :Schedule II, Section V (b) | Description :Hire a social and environmental specialist for the PIU | Due Date:31-Dec-2010
Finance Agreement :Schedule II, Section V (c) | Description :Disclose the ESMP at locations satisfactory to IDA | Due Date:31-Jan-2011
PDO Indicator
Annual public electricity supply to end-users
PDO Indicator
% of female beneficiaries
PDO Indicator
% of female beneficiaries
Intermediate Results Indicator
Volume of water storage capacity
Intermediate Results Indicator
Power generation capacity owned by EAGB through the project
PDO Indicator
Direct project beneficiaries
PDO Indicator
Direct project beneficiaries
Intermediate Results Indicator
Collection rate of electricity bills
Intermediate Results Indicator
Percentage of EAGB operating cost covered by EAGB's cashflow
44000-P127209
World Bank
Private Sector Rehabilitation & Agribusiness Development
International Development Association
GOVERNMENT OF GUINEA BISSAU
International Development Association
GOVERNMENT OF GUINEA BISSAUPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Francisco Moraes Leitao Campos
+1-202-473-1000fcampos@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
GUINEA-BISSAU
Tombali
11.3000 -15.0000
Quinara
11.6670 -15.0830
Oio Region
12.2500 -15.2500
Gabú
12.1670 -14.1670
Cacheu Region
12.0000 -16.1670
Bolama
11.1550 -16.0090
Bissau Region
11.8540 -15.5910
Biombo
11.8830 -15.8430
Bafatá
12.1670 -14.7170
Other Industry, Trade and ServicesCentral Government (Central Agencies)Agricultural markets, commercialization and agri-businessRural MarketsJobsRural Infrastructure and service deliveryEnterprise DevelopmentMSME DevelopmentRegulation and Competition PolicyAgriculture FinanceBusiness Enabling EnvironmentFinance for DevelopmentRural DevelopmentMSME FinanceFinancial Infrastructure and Access
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
0.00
0.00
0.00
0.00
102162.73
102162.73
102162.74
0.00
0.00
0.00
138090.18
138090.19
138090.19
0.00
0.00
0.00
93011.23
93011.23
93011.24
22811.52
22811.52
22811.52
85076.04
85076.05
85076.05
79699.97
79699.98
79699.98
131718.88
131718.89
131718.89
98679.96
98679.96
98679.97
266960.88
266960.88
266960.89
50452.91
50452.91
50452.91
250361.53
250361.53
250361.54
147579.11
147579.11
147579.11
80031.51
80031.52
80031.52
123986.09
123986.09
123986.09
266974.46
266974.46
266974.47
33330.80
33330.80
33330.80
152481.09
152481.09
152481.10
152481.09
152481.09
152481.10
152481.09
152481.09
152481.10
152481.09
152481.09
152481.10
152481.10
152481.10
152481.10
0.00
8200000Total Commitment in Second Quarter of 2014
International Development Association306488Total Disbursement in Fourth Quarter of 2014
International Development Association165728Total Disbursement in Second Quarter of 2015
International Development Association-1100Total Interest Repayment in Second Quarter of 2015
International Development Association248543Total Disbursement in Second Quarter of 2015
International Development Association-2076Total Interest Repayment in Third Quarter of 2015
International Development Association111838Total Disbursement in Fourth Quarter of 2015
International Development Association167196Total Disbursement in Fourth Quarter of 2015
International Development Association68435Total Disbursement in First Quarter of 2016
International Development Association-3250Total Interest Repayment in First Quarter of 2016
International Development Association138136Total Disbursement in Second Quarter of 2016
International Development Association117092Total Disbursement in Second Quarter of 2016
International Development Association127166Total Disbursement in Third Quarter of 2016
International Development Association111934Total Disbursement in Third Quarter of 2016
International Development Association-4450Total Interest Repayment in Third Quarter of 2016
International Development Association257398Total Disbursement in Fourth Quarter of 2016
International Development Association137759Total Disbursement in Fourth Quarter of 2016
International Development Association147982Total Disbursement in First Quarter of 2017
International Development Association148058Total Disbursement in First Quarter of 2017
International Development Association-6782Total Interest Repayment in First Quarter of 2017
International Development Association480255Total Disbursement in Second Quarter of 2017
International Development Association320628Total Disbursement in Second Quarter of 2017
International Development Association151359Total Disbursement in Third Quarter of 2017
International Development Association-10787Total Interest Repayment in Third Quarter of 2017
International Development Association528535Total Disbursement in Fourth Quarter of 2017
International Development Association222550Total Disbursement in Fourth Quarter of 2017
International Development Association38882Total Disbursement in First Quarter of 2018
International Development Association403856Total Disbursement in First Quarter of 2018
International Development Association-14736Total Interest Repayment in First Quarter of 2018
International Development Association240095Total Disbursement in Second Quarter of 2018
International Development Association112107Total Disbursement in Third Quarter of 2018
International Development Association259851Total Disbursement in Third Quarter of 2018
International Development Association-17299Total Interest Repayment in Third Quarter of 2018
International Development Association408369Total Disbursement in Fourth Quarter of 2018
International Development Association131623Total Disbursement in Fourth Quarter of 2018
International Development Association260931Total Disbursement in Fourth Quarter of 2018
International Development Association99992Total Disbursement in First Quarter of 2019
International Development Association-21019Total Interest Repayment in First Quarter of 2019
International Development Association148206Total Disbursement in Second Quarter of 2019
International Development Association140580Total Disbursement in Second Quarter of 2019
International Development Association409657Total Disbursement in Third Quarter of 2019
International Development Association183417Total Disbursement in Third Quarter of 2019
International Development Association-23244Total Interest Repayment in Third Quarter of 2019
International Development Association508261Total Disbursement in Fourth Quarter of 2019
International Development Association86166Total Disbursement in First Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Creation and Maintenance of Steering Committee and Project Coordination Unit | Description :Create within onemonth of the Effective Date, and thereafter maintain (1) the Steering Committee to provide oversight for the Project; and (2) theProject Coordination Unit in charge of the day-to-day fiduciary management and coordination of the Project. | Frequency :CONTINUOUS
Finance Agreement :Business Development Agreements | Description :To carry out Component 2.1 of the Project, the Recipient, throughthe Project Coordination Unit, shall make In-Kind Capital Grants to eligible Entrepreneurs under a Business Development Agreementon terms and conditions approved by the Association, in accordance with eligibility criteria and procedures acceptable to theAssociation as further described in the Project Implementation Manual. | Frequency :CONTINUOUS
PDO Indicator
Number of jobs created by the cashew agro-processing units directly supported by the project
PDO Indicator
Number of female jobs created by the cashew agro-processing units directly supported by the project
Intermediate Results Indicator
Number of smalholder cashew farmers receiving extension services and price information system
Intermediate Results Indicator
Number of entrepreneurs receiving in-kind grants following business plan competition
Intermediate Results Indicator
Number of female entrepreneurs receiving in-kind grants following business plan competition
Intermediate Results Indicator
Number of cashew communal storage facilities installed
Intermediate Results Indicator
Number of customs-related procedures it takes to clear goods
Intermediate Results Indicator
Number of cashew nuts community processing plants installed with direct project support
PDO Indicator
Farm-gate price of cashew farmers supported by project relative to price of similar farmers identified at the beginning of project (control group)
PDO Indicator
Percentage of firms (supported by BPC) in operation relative to control group
Intermediate Results Indicator
OHADA entreprenant status for MSMEs created
Intermediate Results Indicator
Area of rice production (ha) cultivated with improved seed and adequate dosage of fertilizer
44000-P122047
World Bank
Guinea-Bissau Biodiversity Conservation Project
International Development Association
INSTITUTE FOR BIODIVERSITY AND PROTECTED AREAS (IBAP)
International Development Association
INSTITUTE FOR BIODIVERSITY AND PROTECTED AREAS (IBAP)Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Maman-Sani Issa
+1-202-473-1000missa1@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
GUINEA-BISSAU
Rio Cacheu Mangroves Natural Park
12.2960 -16.1850
Cantanhez Forest National Park
11.2040 -15.0300
Lagoas Cufada Natural Park
11.7090 -15.0480
Joao Vieira And Poilao Marine National Park
10.9510 -15.7150
Orango National Marine Park
11.0660 -16.1380
Sao Domingos
12.4020 -16.2010
Cacheu
12.1670 -16.1670
Bedanda
11.3500 -15.1170
Fulacunda
11.8000 -15.1670
Buba
11.5760 -15.0000
Bubaque
11.2830 -15.8330
Quebo
11.5450 -14.8000
Other Agriculture, Fishing and ForestryRenewable Natural Resources Asset ManagementMitigationJobsBiodiversityClimate change
65000.00
21666.66
21666.67
21666.67
46666.66
46666.67
46666.67
46666.66
46666.67
46666.67
46666.66
46666.67
46666.67
46666.66
46666.67
46666.67
43333.33
43333.33
43333.34
43333.33
43333.33
43333.34
43333.33
43333.33
43333.34
43333.33
43333.33
43333.34
38333.33
38333.33
38333.34
38333.33
38333.33
38333.34
38333.33
38333.33
38333.34
38333.33
38333.33
38333.34
23333.33
23333.33
23333.34
23333.33
23333.33
23333.34
23333.33
23333.33
23333.34
23333.33
23333.33
23333.34
0.00
0.00
0.00
0.00
0.00
65000.00
21666.66
21666.67
21666.67
46666.66
46666.67
46666.67
46666.66
46666.67
46666.67
46666.66
46666.67
46666.67
46666.66
46666.67
46666.67
43333.33
43333.33
43333.34
43333.33
43333.33
43333.34
43333.33
43333.33
43333.34
43333.33
43333.33
43333.34
38333.33
38333.33
38333.34
38333.33
38333.33
38333.34
38333.33
38333.33
38333.34
38333.33
38333.33
38333.34
23333.33
23333.33
23333.34
23333.33
23333.33
23333.34
23333.33
23333.33
23333.34
23333.33
23333.33
23333.34
0.00
0.00
0.00
0.00
0.00
1950000Total Commitment in First Quarter of 2011
International Development Association432391Total Disbursement in Third Quarter of 2011
International Development Association1332Total Disbursement in Fourth Quarter of 2011
International Development Association3237Total Disbursement in Fourth Quarter of 2011
International Development Association1584Total Disbursement in First Quarter of 2012
International Development Association811Total Disbursement in First Quarter of 2012
International Development Association2820Total Disbursement in Second Quarter of 2012
International Development Association68133Total Disbursement in First Quarter of 2013
International Development Association52Total Disbursement in First Quarter of 2013
International Development Association118714Total Disbursement in Second Quarter of 2013
International Development Association105198Total Disbursement in Third Quarter of 2013
International Development Association96681Total Disbursement in Third Quarter of 2013
International Development Association45530Total Disbursement in Fourth Quarter of 2013
International Development Association94088Total Disbursement in Fourth Quarter of 2013
International Development Association25772Total Disbursement in First Quarter of 2014
International Development Association88362Total Disbursement in First Quarter of 2014
International Development Association43108Total Disbursement in Second Quarter of 2014
International Development Association72844Total Disbursement in Second Quarter of 2014
International Development Association94038Total Disbursement in Fourth Quarter of 2014
International Development Association268434Total Disbursement in First Quarter of 2015
International Development Association135429Total Disbursement in Second Quarter of 2015
International Development Association113631Total Disbursement in Second Quarter of 2015
International Development Association96222Total Disbursement in Third Quarter of 2015
International Development Association37020Total Disbursement in Third Quarter of 2015
International Development Association272Total Disbursement in Fourth Quarter of 2015
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
IR3 Component 1: Number of PA staff and community co-managers trained in key species, protected areas field monitoring and ecotourism guide skills
Intermediate Results Indicator
IR2 Component one: Internal regulations and park specific business plans developed/updated
Intermediate Results Indicator
IR1 Component 1: Number of surveillance and control missions covering the five parks conducted per year
PDO Indicator
Indicator 1: Aggregated Management Effectiveness Tracking Tool scores for the 5 existing parks
Intermediate Results Indicator
IR1 Component 3: Monitoring systems in place and operational, producing satisfactory annual and quarterly reports
Intermediate Results Indicator
IR2 Component 2: Comprehensive capitalization Strategy under implementation
Intermediate Results Indicator
IR3 Component 2: Management Systems (including fiduciary systems) in place and operational, producing satisfactory annual and quartely reports
Intermediate Results Indicator
IR1 Component 2: FBG Board and Executive Secretariat established and meeting in accordance with ToRs and timetable defined in the statutes
PDO Indicator
Indicator 2: BioGuinea Foundation legally established and operational in accordance with the minimum requirements for receiving GEFfunds in the endowment