44000-P162454
World Bank
IQ: Basra Electricity Dissemination and Development Project (EDDP)
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Mohammed Wafaa Al-Ani
+1-202-473-1000malani@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
IRAQ
As Samawah
31.3320 45.2940
Nasiriyah
31.0580 46.2570
Basrah
30.5090 47.7800
Al 'Amarah
31.8360 47.1450
Energy Transmission and DistributionPublic Administration - Energy and ExtractivesAccess to EnergyMitigationClimate changeEnergy EfficiencyEnergy Policies & ReformEnergyAdaptation
0.00
0.00
0.00
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.37
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.63
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.37
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.37
0.00
0.00
0.00
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.37
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.63
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.37
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.37
200000000Total Commitment in Second Quarter of 2019
International Bank for Reconstruction and Development500000Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development-500000Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
The Project Implementing Entity shall appoint, not later than six (6) months after the Effective Date, and thereafter maintainthroughout Project implementation, an Owner's Engineer with qualifications, experience, and terms of reference satisfactory to theBank.
SETC and SEDC shall establish a Project Coordinating Committee, not later than three (3) months after the Effective Date, andmaintain at all times during Project implementation, said Committee, comprising representatives of SETC and SEDC and with aninstitutional framework, functions, and resources satisfactory to the Bank for such purpose.
SETC and SEDC shall each maintain, throughout Project implementation, Project Management Teams with an institutional framework,functions, and resources, including competent personnel in adequate numbers, satisfactory to the Bank for such purpose.
Intermediate Results Indicator
People provided with new or improved electricity service
Intermediate Results Indicator
People provided with new or improved electricity service - Female
PDO Indicator
Increased efficiency of Transmission and Distribution Network infrastructure
PDO Indicator
Increase in billed to supplied energy ratio
PDO Indicator
Reduction in Technical Losses
Intermediate Results Indicator
Women reported engaging in income-generating activities (IGA) due to improvements in electricity service
Intermediate Results Indicator
Women-owned businesses reporting increased income due to improved electricity services (percentage)
Intermediate Results Indicator
Increase in business enterprises reporting increased productivity as a result of improved electricty services reliability
Intermediate Results Indicator
Increase in jobs
Intermediate Results Indicator
Customers satisfied with service provided by SEDC
Intermediate Results Indicator
SEDC Business Improvement Plan Prepared and Adopted
Intermediate Results Indicator
SEDC publishes quarterly on its website, Quarterly Performance Reports including Energy Supplied, Billed and Revenue Collections
Intermediate Results Indicator
SEDC publishes on its websites the Electricity Consumers Satisfaction Survey Report
Intermediate Results Indicator
New 132KV Transmission line constructed
PDO Indicator
Percentage reduction in technical losses
PDO Indicator
Percentage increased efficiency of transmission and distribution network infrastructure
Intermediate Results Indicator
Capacity of new substations constructed
Intermediate Results Indicator
New Substation Capacity
44000-P162094
World Bank
Baghdad Water Supply and Sewerage Improvement Project
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Amal Talbi
+1-202-473-1000atalbi@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
IRAQ
Baghdad
33.3410 44.4010
Ḩayy al Karrādah
33.2940 44.4130
Karkh
33.2540 44.2770
Sadr
33.3830 44.4630
Sha'ab
33.4120 44.4320
SanitationWater SupplyPublic Administration - Water, Sanitation and Waste ManagementPublic Private PartnershipsFlood and Drought Risk ManagementAdaptationWater Institutions, Policies and ReformClimate changeMitigationWater Resource ManagementDisaster Risk ManagementUrban Water and SanitationUrban Infrastructure and Service DeliveryUrban Development
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
1385160.00
1423800.00
1435560.00
1405320.00
1382640.00
699300.00
1446900.00
1554840.00
1617000.00
1673280.00
1788360.00
1909320.00
1990170.00
2107350.00
2269890.00
1185870.00
2406810.00
2492280.00
2657550.00
2846970.00
2951550.00
3105270.00
3324090.00
3562020.00
3763620.00
3974040.00
2065770.00
4295970.00
4549650.00
4757970.00
4923660.00
5065620.00
5272890.00
5451390.00
5609520.00
2868600.00
5935440.00
6119400.00
6229230.00
6307560.00
6378540.00
6507480.00
6606180.00
6694800.00
6822060.00
3456180.00
6993630.00
7098210.00
9710430.00
9710430.00
9710430.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
1385160.00
1423800.00
1435560.00
1405320.00
1382640.00
699300.00
1446900.00
1554840.00
1617000.00
1673280.00
1788360.00
1909320.00
1990170.00
2107350.00
2269890.00
1185870.00
2406810.00
2492280.00
2657550.00
2846970.00
2951550.00
3105270.00
3324090.00
3562020.00
3763620.00
3974040.00
2065770.00
4295970.00
4549650.00
4757970.00
4923660.00
5065620.00
5272890.00
5451390.00
5609520.00
2868600.00
5935440.00
6119400.00
6229230.00
6307560.00
6378540.00
6507480.00
6606180.00
6694800.00
6822060.00
3456180.00
6993630.00
7098210.00
9710430.00
9710430.00
9710430.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
210000000Total Commitment in First Quarter of 2018
International Bank for Reconstruction and Development525000Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-525000Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development5000000Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-340808Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-368161Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-331508Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Schedule 2, Section I, B.6.a: the Borrower shall no later than ninety (90) days after the Effective Date, establish and thereaftermaintain throughout the period of implementation of the Project, a grievance redress mechanism, satisfactory to the Bank, formanagement of complaints related to the project.
PDO Indicator
People provided with access to improved water sources
PDO Indicator
People provided with access to improved water sources - Female (RMS requirement)
Intermediate Results Indicator
Number of female technical and managerial staff who have attended training
Intermediate Results Indicator
Share of female staff in managerial positions
Intermediate Results Indicator
Collection ratio
Intermediate Results Indicator
Users satisfied by quality of water and wastewater services
Intermediate Results Indicator
Female users satisfied by quality of water and wastewater services
PDO Indicator
Hours of water supply at a minimum pressure (10m) in Shaab and Rasheed municipalities
Intermediate Results Indicator
Water security plan including groundwater management plan for the city of Baghdad prepared and approved
Intermediate Results Indicator
Business plans for BSA and BWA developed under implementation and operationalized
Intermediate Results Indicator
Framework for private sector participation developed
Intermediate Results Indicator
Grievance Redress Mechanism established and operational
Intermediate Results Indicator
Non-revenue baseline assessed and strategy developed
Intermediate Results Indicator
Length of distribution network replaced
Intermediate Results Indicator
Capacity of the reservoir constructed
44000-P094650
World Bank
IQ-EMERGENCY WATER SUPPLY PROJECT
International Development Association
MINISTRY OF MUNICIPALITIES AND PUBLIC WORKS
International Development Association
MINISTRY OF MUNICIPALITIES AND PUBLIC WORKSPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Nafie Mohammed Mofid
+1-202-473-1000nmofid@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
IRAQ
Muhafazat Wasit
32.7500 45.4170
Muhafazat Dhi Qar
31.2500 46.2500
Nahiyat Ghammas
31.7430 44.6200
Water SupplySub-National GovernmentUrban Infrastructure and Service DeliveryUrban DevelopmentPost-conflict reconstructionFragility, Conflict and ViolenceConflict Prevention
0.00
0.00
0.00
0.00
544979.99
544979.99
544980.01
2179919.99
2179919.99
2179920.01
2724900.00
2724900.00
2724899.99
1634940.00
1634940.00
1634940.00
1634940.00
1634940.00
1634940.00
2179919.99
2179919.99
2179920.01
3814859.99
3814859.99
3814860.01
3814859.99
3814859.99
3814860.01
3814859.99
3814859.99
3814860.01
3269880.00
3269880.00
3269880.00
2724900.00
2724900.00
2724899.99
2179919.99
2179919.99
2179920.01
2179919.99
2179919.99
2179920.01
1907430.00
1907430.00
1907429.99
1634940.00
1634940.00
1634940.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4793365.88
4793365.88
4793365.89
105844.00
105844.00
105844.00
536165.67
536165.67
536165.66
618753.00
618753.00
618753.00
1455057.67
1455057.67
1455057.66
724701.30
724701.30
724701.30
890875.03
890875.03
890875.02
111992.77
111992.77
111992.77
1630157.53
1630157.53
1630157.54
2000000.00
2000000.00
2000000.00
3390977.44
3390977.44
3390977.45
3575442.92
3575442.92
3575442.93
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
4333333.33
4333333.33
4333333.34
5666666.79
5666666.79
5666666.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
109500000Total Commitment in Second Quarter of 2008
International Development Association14380098Total Disbursement in First Quarter of 2010
International Development Association-25741Total Interest Repayment in Second Quarter of 2010
International Development Association317532Total Disbursement in Second Quarter of 2010
International Development Association944765Total Disbursement in Third Quarter of 2010
International Development Association663732Total Disbursement in Third Quarter of 2010
International Development Association957836Total Disbursement in Fourth Quarter of 2010
International Development Association-55249Total Interest Repayment in Fourth Quarter of 2010
International Development Association898423Total Disbursement in Fourth Quarter of 2010
International Development Association12534Total Disbursement in First Quarter of 2011
International Development Association1355520Total Disbursement in First Quarter of 2011
International Development Association2997119Total Disbursement in First Quarter of 2011
International Development Association626432Total Disbursement in Second Quarter of 2011
International Development Association827292Total Disbursement in Second Quarter of 2011
International Development Association-72823Total Interest Repayment in Second Quarter of 2011
International Development Association720380Total Disbursement in Second Quarter of 2011
International Development Association1144010Total Disbursement in Third Quarter of 2011
International Development Association1414424Total Disbursement in Third Quarter of 2011
International Development Association114191Total Disbursement in Third Quarter of 2011
International Development Association335978Total Disbursement in Fourth Quarter of 2011
International Development Association725037Total Disbursement in Fourth Quarter of 2011
International Development Association-101553Total Interest Repayment in Fourth Quarter of 2011
International Development Association481971Total Disbursement in Fourth Quarter of 2011
International Development Association944513Total Disbursement in First Quarter of 2012
International Development Association700151Total Disbursement in First Quarter of 2012
International Development Association472376Total Disbursement in First Quarter of 2012
International Development Association2086477Total Disbursement in Second Quarter of 2012
International Development Association1356784Total Disbursement in Second Quarter of 2012
International Development Association-110323Total Interest Repayment in Second Quarter of 2012
International Development Association2293359Total Disbursement in Second Quarter of 2012
International Development Association2616474Total Disbursement in Third Quarter of 2012
International Development Association2050143Total Disbursement in Third Quarter of 2012
International Development Association39500Total Disbursement in Fourth Quarter of 2012
International Development Association-137706Total Interest Repayment in Fourth Quarter of 2012
International Development Association3596434Total Disbursement in Fourth Quarter of 2012
International Development Association551686Total Disbursement in First Quarter of 2013
International Development Association17167Total Disbursement in First Quarter of 2013
International Development Association181002Total Disbursement in First Quarter of 2013
International Development Association777680Total Disbursement in Second Quarter of 2013
International Development Association84618Total Disbursement in Second Quarter of 2013
International Development Association-165549Total Interest Repayment in Second Quarter of 2013
International Development Association272956Total Disbursement in Second Quarter of 2013
International Development Association370949Total Disbursement in Third Quarter of 2013
International Development Association516555Total Disbursement in Third Quarter of 2013
International Development Association403442Total Disbursement in Third Quarter of 2013
International Development Association43210Total Disbursement in Fourth Quarter of 2013
International Development Association1036315Total Disbursement in Fourth Quarter of 2013
International Development Association-174991Total Interest Repayment in Fourth Quarter of 2013
International Development Association510702Total Disbursement in Fourth Quarter of 2013
International Development Association1552507Total Disbursement in First Quarter of 2014
International Development Association-4562790Total Commitment Cancellations in First Quarter of 2014
International Development Association770511Total Disbursement in First Quarter of 2014
International Development Association570304Total Disbursement in First Quarter of 2014
International Development Association491199Total Disbursement in Second Quarter of 2014
International Development Association26893Total Disbursement in Second Quarter of 2014
International Development Association-193239Total Interest Repayment in Second Quarter of 2014
International Development Association4764993Total Disbursement in Second Quarter of 2014
International Development Association17957Total Disbursement in Third Quarter of 2014
International Development Association70550Total Disbursement in Third Quarter of 2014
International Development Association-918805Total Disbursement in Third Quarter of 2014
International Development Association152520Total Disbursement in Fourth Quarter of 2014
International Development Association-200401Total Interest Repayment in Fourth Quarter of 2014
International Development Association9637Total Disbursement in Fourth Quarter of 2014
International Development Association3418866Total Disbursement in First Quarter of 2015
International Development Association1107924Total Disbursement in First Quarter of 2015
International Development Association1228429Total Disbursement in First Quarter of 2015
International Development Association1518121Total Disbursement in Second Quarter of 2015
International Development Association2814964Total Disbursement in Second Quarter of 2015
International Development Association-205295Total Interest Repayment in Second Quarter of 2015
International Development Association3704788Total Disbursement in Second Quarter of 2015
International Development Association1221126Total Disbursement in Third Quarter of 2015
International Development Association1289776Total Disbursement in Third Quarter of 2015
International Development Association5034769Total Disbursement in Third Quarter of 2015
International Development Association502759Total Disbursement in Fourth Quarter of 2015
International Development Association991098Total Disbursement in Fourth Quarter of 2015
International Development Association-249756Total Interest Repayment in Fourth Quarter of 2015
International Development Association1816567Total Disbursement in Fourth Quarter of 2015
International Development Association953528Total Disbursement in First Quarter of 2016
International Development Association1463956Total Disbursement in First Quarter of 2016
International Development Association-5557733Total Commitment Cancellations in First Quarter of 2016
International Development Association4188559Total Disbursement in First Quarter of 2016
International Development Association-288512Total Interest Repayment in Second Quarter of 2016
International Development Association-319653Total Interest Repayment in Fourth Quarter of 2016
International Development Association-300768Total Interest Repayment in Second Quarter of 2017
International Development Association-318203Total Interest Repayment in Fourth Quarter of 2017
International Development Association-319988Total Interest Repayment in Second Quarter of 2018
International Development Association-309172Total Interest Repayment in Fourth Quarter of 2018
International Development Association-2061150Total Loan Repayment in Fourth Quarter of 2018
International Development Association-301735Total Interest Repayment in Second Quarter of 2019
International Development Association-2063142Total Loan Repayment in Second Quarter of 2019
International Development Association-272574Total Interest Repayment in Fourth Quarter of 2019
International Development Association-2052050Total Loan Repayment in Fourth Quarter of 2019
International Development AssociationProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
New piped household water connections that are resulting from the project intervention
Intermediate Results Indicator
Piped household water connections that are benefiting from rehabilitation works undertaken by the project
PDO Indicator
Direct project beneficiaries
PDO Indicator
OLD Version of Indicator: People in project areas with access to Improved Water Sources
PDO Indicator
Number of people benefiting from improvements in the quality of water services provided
Intermediate Results Indicator
Number of staff trained
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
Components 1 through 4: Capital Investment
Intermediate Results Indicator
Physical Progress works in Ghammas
Intermediate Results Indicator
Physical Progress works in Al-Nasr
Intermediate Results Indicator
Physical Progress of works in Wasit
Intermediate Results Indicator
Audits of project accounts timely submitted and unqualified
Intermediate Results Indicator
Length of network
Intermediate Results Indicator
increase in the quantity of properly treated water supplied to Ghammas, Al-Nasr and Wasit (cubic meter per hour)
44000-P155962
World Bank
IRAQ EMERGENCY FISCAL STABILIZATION, ENERGY SUSTAINABILITY, & SOEs DPF
International Bank for Reconstruction and Development
MINISTRY OF FINANCE
International Bank for Reconstruction and Development
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Luca Bandiera
+1-202-473-1000lbandiera@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
IRAQ
Baghdad
33.34058 44.400879
Other Non-bank Financial InstitutionsOther Public AdministrationOther Energy and ExtractivesCentral Government (Central Agencies)MitigationPublic Finance ManagementTransparency, Accountability and Good GovernanceState-owned Enterprise Reform and PrivatizationPublic AdministrationPublic Expenditure ManagementClimate change
0.00
0.00
1200000000Total Commitment in Fourth Quarter of 2015
International Bank for Reconstruction and Development1200000000Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development-3000000Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-4376992Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-8967000Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-11223333Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-12566000Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-13164667Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-18971000Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-19959333Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-20374000Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Ratio of state deposits in private banks to state deposits in all banks
Intermediate Results Indicator
Percentage of capital projects valued at over US$500 million for which a feasibility study with cost-benefit analysis is done
Intermediate Results Indicator
Improved financial sustainability of the State Pension Fund through better governance as measured by a 5 percent nominal reduction of the cash benefit spending of the National Board of Pension
Intermediate Results Indicator
Reduction in the basic annual salary of top public sector employees as a ratio of annual GDP per capita
Intermediate Results Indicator
Progress in implementing FATF action plan
Intermediate Results Indicator
Gas-to-Power Inter-ministerial Committee in place and an Action Plan developed
Intermediate Results Indicator
Publication of a consolidated annual report on financial and employment metrics of non-financial SOEs
Intermediate Results Indicator
Increased tariffs for energy-intensive consumers—measured by the retail price of electricity sold (in ID per kWh)
Intermediate Results Indicator
Reduced gas flaring—measured by the amount of additional (associated) gas processed (average MMscf per day)
Intermediate Results Indicator
Fuel switching to generate power from petroleum products to gas—measured as total gas volume supplied to gas turbine power production
Intermediate Results Indicator
Approval and publication on the Ministry of Finance website of a public debt management strategy in line with international best practice
Intermediate Results Indicator
Improved service delivery—measured by total electricity sold
44000-P087734
World Bank
IQ - Emergency Electricity Reconstruction Project (EERP)
International Development Association
MINISTRY OF ELECTRICITY
International Development Association
MINISTRY OF ELECTRICITYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Mohammed Wafaa Al-Ani
+1-202-473-1000malani@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
IRAQ
Al Harithah
30.5850 47.7610
Al Hartha Power Station
30.6780 47.7550
Central Government (Central Agencies)Non-Renewable Energy GenerationPost-conflict reconstructionConflict PreventionFragility, Conflict and Violence
0.00
833333.33
833333.33
833333.34
2333333.33
2333333.33
2333333.34
2333333.33
2333333.33
2333333.34
3333333.33
3333333.33
3333333.34
3500000.00
3500000.00
3500000.00
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
5333333.33
5333333.33
5333333.34
5333333.33
5333333.33
5333333.34
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
3000000.00
3000000.00
3000000.00
3333333.33
3333333.33
3333333.34
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1333333.33
1333333.33
1333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
557029.51
557029.51
557029.51
557029.51
557029.51
557029.51
557029.51
557029.51
557029.51
557029.51
557029.51
557029.54
360.24
360.24
360.24
360.24
360.24
360.24
360.24
360.24
360.24
360.24
360.24
360.26
69050.87
69050.87
69050.87
69050.87
69050.87
69050.87
69050.87
69050.87
69050.87
69050.87
69050.87
69050.81
1987265.34
1987265.34
1987265.34
1987265.34
1987265.34
1987265.34
1987265.34
1987265.34
1987265.34
1987265.34
1987265.34
1987265.33
2242394.64
2242394.64
2242394.64
2242394.64
2242394.64
2242394.64
2242394.64
2242394.64
2242394.64
2242394.64
2242394.64
2242394.61
5977232.74
5977232.74
5977232.74
5977232.74
5977232.74
5977232.74
5977232.74
5977232.74
5977232.74
5977232.74
5977232.74
5977232.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
124000000Total Commitment in First Quarter of 2007
International Development Association-190714Total Interest Repayment in Third Quarter of 2008
International Development Association6389694Total Disbursement in First Quarter of 2010
International Development Association294660Total Disbursement in Second Quarter of 2010
International Development Association-24862Total Interest Repayment in Third Quarter of 2010
International Development Association3250Total Disbursement in First Quarter of 2011
International Development Association-25666Total Interest Repayment in Second Quarter of 2011
International Development Association1073Total Disbursement in Second Quarter of 2011
International Development Association11533Total Disbursement in Third Quarter of 2011
International Development Association-26507Total Interest Repayment in Third Quarter of 2011
International Development Association148809Total Disbursement in Fourth Quarter of 2011
International Development Association11675Total Disbursement in First Quarter of 2012
International Development Association-25491Total Interest Repayment in First Quarter of 2012
International Development Association309236Total Disbursement in Second Quarter of 2012
International Development Association169141Total Disbursement in Second Quarter of 2012
International Development Association178216Total Disbursement in Second Quarter of 2012
International Development Association3013379Total Disbursement in Third Quarter of 2012
International Development Association3478937Total Disbursement in Third Quarter of 2012
International Development Association3981232Total Disbursement in Third Quarter of 2012
International Development Association-26975Total Interest Repayment in Third Quarter of 2012
International Development Association211964Total Disbursement in Fourth Quarter of 2012
International Development Association9890153Total Disbursement in First Quarter of 2013
International Development Association121292Total Disbursement in First Quarter of 2013
International Development Association-74610Total Interest Repayment in First Quarter of 2013
International Development Association130054Total Disbursement in Second Quarter of 2013
International Development Association121916Total Disbursement in Second Quarter of 2013
International Development Association2898256Total Disbursement in Second Quarter of 2013
International Development Association2032424Total Disbursement in Third Quarter of 2013
International Development Association2210197Total Disbursement in Third Quarter of 2013
International Development Association148715Total Disbursement in Third Quarter of 2013
International Development Association-118439Total Interest Repayment in Third Quarter of 2013
International Development Association377363Total Disbursement in Fourth Quarter of 2013
International Development Association609602Total Disbursement in Fourth Quarter of 2013
International Development Association34938Total Disbursement in Fourth Quarter of 2013
International Development Association1031396Total Disbursement in First Quarter of 2014
International Development Association4421734Total Disbursement in First Quarter of 2014
International Development Association318380Total Disbursement in First Quarter of 2014
International Development Association-142876Total Interest Repayment in First Quarter of 2014
International Development Association14699878Total Disbursement in Second Quarter of 2014
International Development Association903321Total Disbursement in Second Quarter of 2014
International Development Association120787Total Disbursement in Second Quarter of 2014
International Development Association133087Total Disbursement in Third Quarter of 2014
International Development Association205422Total Disbursement in Third Quarter of 2014
International Development Association212677Total Disbursement in Third Quarter of 2014
International Development Association-205834Total Interest Repayment in Third Quarter of 2014
International Development Association168755Total Disbursement in Fourth Quarter of 2014
International Development Association185156Total Disbursement in Fourth Quarter of 2014
International Development Association959970Total Disbursement in Fourth Quarter of 2014
International Development Association777351Total Disbursement in First Quarter of 2015
International Development Association1255533Total Disbursement in First Quarter of 2015
International Development Association-200711Total Interest Repayment in First Quarter of 2015
International Development Association-213484Total Interest Repayment in Third Quarter of 2015
International Development Association50876Total Disbursement in Fourth Quarter of 2015
International Development Association933544Total Disbursement in Fourth Quarter of 2015
International Development Association551181Total Disbursement in First Quarter of 2016
International Development Association-215884Total Interest Repayment in First Quarter of 2016
International Development Association-557059Total Disbursement in Third Quarter of 2016
International Development Association-57155413Total Commitment Cancellations in Third Quarter of 2016
International Development Association-219566Total Interest Repayment in Third Quarter of 2016
International Development Association-210688Total Interest Repayment in First Quarter of 2017
International Development Association-258Total Loan Repayment in Third Quarter of 2017
International Development Association-196518Total Interest Repayment in Fourth Quarter of 2017
International Development Association-1459751Total Loan Repayment in Fourth Quarter of 2017
International Development Association-219912Total Interest Repayment in First Quarter of 2018
International Development Association-1505536Total Loan Repayment in First Quarter of 2018
International Development Association-229858Total Interest Repayment in Third Quarter of 2018
International Development Association-1453127Total Loan Repayment in Third Quarter of 2018
International Development Association-200981Total Interest Repayment in First Quarter of 2019
International Development Association-1442416Total Loan Repayment in First Quarter of 2019
International Development Association-192042Total Interest Repayment in Third Quarter of 2019
International Development Association-1422536Total Loan Repayment in Third Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :4289-IQ | Description :Completion of ESIA as a disbursement condition | Due Date :31-May-2010
Intermediate Results Indicator
Qualified contractor appointed and rehabilitation works completed
Intermediate Results Indicator
Supply of Goods and Equipment completion rate
Intermediate Results Indicator
Refurbishment Works completion rate
Intermediate Results Indicator
Procurement and Installation of DCS
Intermediate Results Indicator
Erection, testing and commissioning of mechanical works for two units completion rate
Intermediate Results Indicator
Civil Works completion rate
Intermediate Results Indicator
Supervision Consultant Hired, and supervision activities being undertaken
Intermediate Results Indicator
Unit 3 Boiler Erection
Intermediate Results Indicator
Unit 2 Boiler Erection
Intermediate Results Indicator
Electrical System Installation completion rate
Intermediate Results Indicator
Fuel Oil Tanks Erection
PDO Indicator
Capacity Development - Project Planning Software being utilized
PDO Indicator
Capacity Building - Standard Environmental and Social Management Approach adopted and under implementation for EERP Project, and disseminated to other Projects within MoE management
PDO Indicator
Capacity Building - Training in Project Management and Contract Management delivered and Project and Contract Management practice on the Hartha project improved.
Intermediate Results Indicator
Consulting contracts to provide support in project planning, documentation, implementation and operations
PDO Indicator
Capacity Building - Improvement of Environmental and Social Safeguards Management during ongoing operations.
PDO Indicator
Capacity Development - Improved technical and contractual documentation adopted and being used as standard for generation and transmission projects
PDO Indicator
Restore original capacity of Unit 2 and 3.
PDO Indicator
Shortfall in electricity supply alleviated - demand/supply gap reduced and Hartha power station contributing.
44000-P131550
World Bank
Transport Corridors Project
International Bank for Reconstruction and Development
MINISTRY OF CONSTRUCTION AND HOUSING
International Bank for Reconstruction and Development
MINISTRY OF CONSTRUCTION AND HOUSINGPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Ibrahim Khalil Zaki Dajani
+1-202-473-1000idajani@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
IRAQ
Ţulayḩah
33.0000 40.9830
Ţraybīl
32.7490 39.0230
Sumayl
36.8580 42.8480
Suhayl
33.4620 45.1940
Şafwān
30.1120 47.7180
Qaryat Ibrāhīm al Khalīl
36.0340 43.4360
Hīt
33.6370 42.8280
Girshīn
37.0060 42.6290
Maḩaţţat Gharbī Baghdād
33.3170 44.3830
Bātil
36.9660 42.6810
Ar Ruţbah
33.0370 40.2860
Ar Rumaylah
30.5770 47.3550
An Nāşirīyah
31.0580 46.2570
Al Ḩillah
32.4640 44.4200
Madīnat al Ḩabbānīyah
33.3840 43.5850
Al Başrah
30.5090 47.7800
Ad Dīwānīyah
31.9930 44.9260
Rural and Inter-Urban RoadsPublic Administration - TransportationOther Public AdministrationICT InfrastructureTransparency, Accountability and Good GovernanceRural DevelopmentPublic AdministrationTradeRural Infrastructure and service deliveryTrade Facilitation
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.63
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.63
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.63
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.63
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.63
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
883950.00
509070.00
551315.00
1233625.00
678760.00
717100.00
752955.00
1608860.00
867265.00
929390.00
2022080.00
1071745.00
1096240.00
1113280.00
2265255.00
1159785.00
2400068.75
2400068.75
2400068.75
2400068.75
2400068.75
2400068.75
2400068.75
2400068.75
2400068.75
2400068.75
2400068.75
2400068.75
1763028.94
1763028.94
1763028.94
1763028.94
1763028.94
1763028.94
1763028.94
1763028.94
1763028.94
1763028.94
1763028.94
1763028.96
5311201.83
5311201.83
5311201.83
5311201.83
5311201.83
5311201.83
5311201.83
5311201.83
5311201.83
5311201.83
5311201.83
5311201.87
3504980.86
3504980.86
3504980.86
3504980.86
3504980.86
3504980.86
3504980.86
3504980.86
3504980.86
3504980.86
3504980.86
3504980.87
4498560.00
4572755.00
4642690.00
9482760.00
4849300.00
4969290.00
10206250.00
5202880.00
5247610.00
5282755.00
10662780.00
5366180.00
6026650.45
6026650.45
6026650.45
6026650.45
6026650.45
6026650.45
6026650.45
6026650.45
6026650.45
6026650.45
6026650.45
6026650.42
6112745.00
12363585.00
6251905.00
9756110.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
355000000Total Commitment in Fourth Quarter of 2013
International Bank for Reconstruction and Development887500Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development-887500Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development5000000Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development45625Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development-2713Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development11015Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development22475Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development11501Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development9571588Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development166117Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development-27595Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development8598347Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development502721Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development4871436Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development15659Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development2962750Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development-152552Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development2497135Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development98453Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development105120Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development138508Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development2851766Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development112872Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-285701Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development1889348Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development3328Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development10481408Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development3959019Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development1682987Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development5411623Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-404551Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development6811053Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development4508569Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development10069453Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development3314321Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development6413782Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development3254993Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-704266Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development6975410Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development4112732Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development7220479Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development9278442Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development2029979Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-1465656Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development1794988Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development8523223Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development7220555Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development3770248Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development687916Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development-2056264Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-6196015Total Loan Repayment in First Quarter of 2019
International Bank for Reconstruction and Development3865181Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development4889240Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development9389245Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development1185828Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development2380039Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development7335195Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-2482961Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-7317235Total Loan Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development5273763Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development8923303Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development11031555Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development4555647Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development4035376Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Application of World Bank Safeguards Policies triggered by the Project | Description :The Borrower, through theState Commission for Roads and Bridges and the General Directorate for Roads and Bridges shall carry out the Project in accordancewith the Environmental and Social Impact Assessment, the Resettlement Action Plan, the Environmental and Social Impact AssessmentFramework and the Resettlement Policy Framework. | Frequency :CONTINUOUS
Finance Agreement :Recruitment of Independent auditors | Description :The Borrower shall cause the State Commission for Roads andBridges and the General Directorate for Roads and Bridges to recruit independent auditors to be responsible for conductingfinancial and technical audits of the Project. | Frequency :Yearly
PDO Indicator
Direct project beneficiaries
PDO Indicator
Traffic Fatalities
PDO Indicator
Traffic Fatalities between Semel and Ibrahim El Khalil along the North-South transport corridor
PDO Indicator
Traffic Fatalities between Nasiriya-Rumaila along Expressway 1
PDO Indicator
Traffic Fatalities between Rumaila and Basra/Safwan along Expressway 1
Intermediate Results Indicator
Number of SCRB and GDRB Staff trained on the usage of the Operations Manual and on Bank procurement guidelines and safeguard policies and other technical training
Intermediate Results Indicator
Number of service lay-bys fitted with disability ramps (R6, R7, and R8 )
PDO Indicator
Female beneficiaries
PDO Indicator
Roads in good and fair condition as a share of total classified roads
PDO Indicator
Travel Time
PDO Indicator
Travel time between Semel and Ibrahim El Khalil along the North-South transport corridor
PDO Indicator
Travel time between Nasiriya-Rumalia along Expressway 1
PDO Indicator
Travel time between Rumalia and Safwan along Expressway 1
PDO Indicator
Travel time between Basra Junction and Basra along Expressway 1
Intermediate Results Indicator
Person-days of employment created
Intermediate Results Indicator
New public access Citizens' Roadway Reporting System established and operational
Intermediate Results Indicator
Road sector organizational structure with clear mandates and responsibilities developed and implemented
Intermediate Results Indicator
A road asset management system in the GDRB updated and implemented
PDO Indicator
Size of the total classified network
Intermediate Results Indicator
Roads constructed, non-rural
Intermediate Results Indicator
Roads rehabilitated, Non-rural
Intermediate Results Indicator
Fiber optics ducts installed underground
PDO Indicator
Travel time to Um Qasr - Safwan - Expressway No. 1 / Highway 8 towards Basra
44000-P099059
World Bank
Dokan and Derbandikhan Emergency Hydro Power Project
International Development Association
MINISTRY OF ELECTRICITY/ KURDISTAN REGIONAL GOVERNMENT
International Development Association
MINISTRY OF ELECTRICITY/ KURDISTAN REGIONAL GOVERNMENTPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Ferhat Esen
+1-202-473-1000fesen@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
IRAQ
Sadd Dukan
35.9540 44.9530
Derbandikhan Dam
35.1130 45.7060
Renewable Energy HydroTransparency, Accountability and Good GovernancePublic Administration
0.00
0.00
0.00
0.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
833333.33
833333.33
833333.34
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
45333.33
45333.33
45333.34
0.00
0.00
0.00
90666.66
90666.67
90666.67
145478.75
145478.75
145478.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
686918.60
686918.60
686918.59
414488.25
414488.25
414488.25
1431800.03
1431800.03
1431800.03
318671.76
318671.76
318671.77
627894.61
627894.61
627894.59
1195825.91
1195825.91
1195825.89
2463333.33
2463333.33
2463333.34
1430000.00
1430000.00
1430000.00
1570000.00
1570000.00
1570000.00
1440000.00
1440000.00
1440000.00
1150833.33
1150833.33
1150833.34
601255.40
601255.40
601255.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40000000Total Commitment in Fourth Quarter of 2006
International Development Association136000Total Disbursement in First Quarter of 2008
International Development Association-46250Total Interest Repayment in Second Quarter of 2008
International Development Association272000Total Disbursement in Third Quarter of 2008
International Development Association-22300Total Interest Repayment in Third Quarter of 2008
International Development Association170000Total Disbursement in Fourth Quarter of 2008
International Development Association272000Total Disbursement in Fourth Quarter of 2008
International Development Association-2398Total Interest Repayment in First Quarter of 2009
International Development Association-3194Total Interest Repayment in Third Quarter of 2009
International Development Association2173881Total Disbursement in Fourth Quarter of 2009
International Development Association1268367Total Disbursement in First Quarter of 2010
International Development Association1766240Total Disbursement in Second Quarter of 2010
International Development Association-9746Total Interest Repayment in Second Quarter of 2010
International Development Association1695647Total Disbursement in Second Quarter of 2010
International Development Association787199Total Disbursement in Second Quarter of 2010
International Development Association492163Total Disbursement in Third Quarter of 2010
International Development Association472228Total Disbursement in Third Quarter of 2010
International Development Association-28265Total Interest Repayment in Third Quarter of 2010
International Development Association1114735Total Disbursement in Fourth Quarter of 2010
International Development Association820470Total Disbursement in Fourth Quarter of 2010
International Development Association810425Total Disbursement in First Quarter of 2011
International Development Association684128Total Disbursement in First Quarter of 2011
International Development Association2806973Total Disbursement in First Quarter of 2011
International Development Association-105Total Interest Repayment in First Quarter of 2011
International Development Association434318Total Disbursement in Second Quarter of 2011
International Development Association-40659Total Interest Repayment in Second Quarter of 2011
International Development Association749591Total Disbursement in Second Quarter of 2011
International Development Association1550479Total Disbursement in Third Quarter of 2011
International Development Association643328Total Disbursement in Third Quarter of 2011
International Development Association-65187Total Interest Repayment in Third Quarter of 2011
International Development Association204760Total Disbursement in Fourth Quarter of 2011
International Development Association800477Total Disbursement in Fourth Quarter of 2011
International Development Association1668875Total Disbursement in Fourth Quarter of 2011
International Development Association434071Total Disbursement in First Quarter of 2012
International Development Association2117236Total Disbursement in First Quarter of 2012
International Development Association-75839Total Interest Repayment in First Quarter of 2012
International Development Association2264127Total Disbursement in Second Quarter of 2012
International Development Association306514Total Disbursement in Second Quarter of 2012
International Development Association610954Total Disbursement in Second Quarter of 2012
International Development Association242806Total Disbursement in Third Quarter of 2012
International Development Association916751Total Disbursement in Third Quarter of 2012
International Development Association-96679Total Interest Repayment in Third Quarter of 2012
International Development Association160628Total Disbursement in Fourth Quarter of 2012
International Development Association159081Total Disbursement in Fourth Quarter of 2012
International Development Association322941Total Disbursement in Fourth Quarter of 2012
International Development Association728246Total Disbursement in First Quarter of 2013
International Development Association543706Total Disbursement in First Quarter of 2013
International Development Association-110140Total Interest Repayment in First Quarter of 2013
International Development Association2431450Total Disbursement in Second Quarter of 2013
International Development Association150000Total Disbursement in Second Quarter of 2013
International Development Association820042Total Disbursement in Second Quarter of 2013
International Development Association1112269Total Disbursement in Third Quarter of 2013
International Development Association533761Total Disbursement in Third Quarter of 2013
International Development Association863236Total Disbursement in Third Quarter of 2013
International Development Association-121697Total Interest Repayment in Third Quarter of 2013
International Development Association419710Total Disbursement in Fourth Quarter of 2013
International Development Association782494Total Disbursement in Fourth Quarter of 2013
International Development Association300000Total Disbursement in First Quarter of 2014
International Development Association1094986Total Disbursement in First Quarter of 2014
International Development Association715497Total Disbursement in First Quarter of 2014
International Development Association-140711Total Interest Repayment in First Quarter of 2014
International Development Association1535253Total Disbursement in Second Quarter of 2014
International Development Association-312185Total Commitment Cancellations in Second Quarter of 2014
International Development Association-152538Total Interest Repayment in Third Quarter of 2014
International Development Association-137769Total Interest Repayment in First Quarter of 2015
International Development Association-140453Total Interest Repayment in Third Quarter of 2015
International Development Association-140309Total Interest Repayment in First Quarter of 2016
International Development Association-141115Total Interest Repayment in Third Quarter of 2016
International Development Association-136251Total Interest Repayment in First Quarter of 2017
International Development Association-904183Total Loan Repayment in First Quarter of 2017
International Development Association-1272Total Loan Repayment in Third Quarter of 2017
International Development Association-123586Total Interest Repayment in Fourth Quarter of 2017
International Development Association-942948Total Loan Repayment in Fourth Quarter of 2017
International Development Association-138583Total Interest Repayment in First Quarter of 2018
International Development Association-973652Total Loan Repayment in First Quarter of 2018
International Development Association-145080Total Interest Repayment in Third Quarter of 2018
International Development Association-939758Total Loan Repayment in Third Quarter of 2018
International Development Association-126477Total Interest Repayment in First Quarter of 2019
International Development Association-932831Total Loan Repayment in First Quarter of 2019
International Development Association-120747Total Interest Repayment in Third Quarter of 2019
International Development Association-919974Total Loan Repayment in Third Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Information DocumentImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Rehabilitation needs assessment completed
completed
Completed
Intermediate Results Indicator
Staff fully and effectively trained on the various operations, maintenance and rehabilitation aspects.
This indicator has been revised to ensure that progress is better able to be monitored.
New training plan being prepared.
Intermediate Results Indicator
Excitation and control systems replaced; switchgear, dam intake structures, Derbandikhan dam slippage area, hydro-mechanical and substation equipment repaired.
This indicator is revised to better reflect intermediate targets necessary for PDOs to be met.
Works being done.***Actual (previous) section is blank as this indicator has been revised to better reflect the originalPDOs/indicators and implementation progress. Next ISR will reflect Actual (previous) progress indicator.***
Intermediate Results Indicator
Derbandikhan hydraulic system redesign reviewed and approved.
This indicator is revised to better reflect intermediate targets necessary for PDOs to be met.
Works being done.***Actual (previous) section is blank as this indicator has been revised to better reflect the originalPDOs/indicators and implementation progress. Next ISR will reflect Actual (previous) progress indicator.***
PDO Indicator
Derbandikhan power capacity increased.
Capacity availability increase will be officially confirmed upon completion of full rehabilitation, especially in switchyard.
To be officially confirmed in October 2013.
PDO Indicator
Percentage of relevant staff trained in operation, maintenance and rehabilitation who pass the end program assessment.
This is new a new indicator included through second restructuring approved in August 2012.
PMT is preparing a new training/ capacity building plan to accelerate the activity.***Actual (previous) section is blank as thisindicator has been revised to better reflect the original PDOs/indicators and implementation progress. Next ISR will reflect Actual(previous) progress indicator.***
PDO Indicator
Design and costing for assessed subsequent rehabilitation completed along with bidding documents.
No rehabilitation plans in place.
This is new indicator included through second restructuring approved in August 2012.
Intermediate Results Indicator
Operational problems at Derbandikhan and Dokan resolved (resulting in reliable unit availability)
This indicator is revised to better reflect intermediate targets necessary for PDOs to be met
Works been done.***Actual (previous) section is blank as this indicator has been revised to better reflect the originalPDOs/indicators and implementation progress. Next ISR will reflect Actual (previous) progress indicator.***
PDO Indicator
Dokan HP availability increased.
Capacity availability increase will be realized upon completion of full rehabilitation, especially through vibration & overheatingprevention works.
Based on on-going vibration assessment and prevention works, PMT has preliminarily announced that it is highly likely to achieveend-target by end-December 2013.***Actual (previous) section is blank as this indicator has been revised to better reflect theoriginal PDOs/indicators and implementation progress. Next ISR will reflect Actual (previous) progress indicator.***
PDO Indicator
Generation Capacity of Hydropower constructed or rehabilitated under the project
PDO Indicator
Generation Capacity of Hydropower rehabilitated under the project
44000-P151357
World Bank
Modernization of Public Financial Management Systems Project
International Bank for Reconstruction and Development
MINISTRY OF FINANCE
International Bank for Reconstruction and Development
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Paul Welton
+1-202-473-1000pwelton@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
IRAQ
Erbil
36.1930 44.0110
Baghdad
33.3410 44.4010
Muḩāfaz̧at Bābil
32.5330 44.6170
Republic of Iraq
33.0000 44.0000
Kurdistan
36.2270 44.7610
Sub-National GovernmentCentral Government (Central Agencies)Public Finance ManagementMunicipal Institution BuildingPublic Expenditure ManagementPublic AdministrationPublic Assets and Investment Management
264285.71
264285.71
264285.71
264285.71
264285.71
264285.71
264285.71
865000.00
865000.00
865000.00
865000.00
865000.00
865000.00
865000.00
865000.00
865000.00
865000.00
865000.00
865000.00
882500.00
882500.00
882500.00
882500.00
882500.00
882500.00
882500.00
882500.00
882500.00
882500.00
882500.00
882500.00
790833.33
790833.33
790833.33
790833.33
790833.33
790833.33
790833.33
790833.33
790833.33
790833.33
790833.33
790833.33
765833.33
765833.33
765833.33
765833.33
765833.33
765833.33
765833.33
765833.33
765833.33
765833.33
765833.33
765833.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
264285.71
264285.71
264285.71
264285.71
264285.71
264285.71
264285.71
865000.00
865000.00
865000.00
865000.00
865000.00
865000.00
865000.00
865000.00
865000.00
865000.00
865000.00
865000.00
882500.00
882500.00
882500.00
882500.00
882500.00
882500.00
882500.00
882500.00
882500.00
882500.00
882500.00
882500.00
790833.33
790833.33
790833.33
790833.33
790833.33
790833.33
790833.33
790833.33
790833.33
790833.33
790833.33
790833.33
765833.33
765833.33
765833.33
765833.33
765833.33
765833.33
765833.33
765833.33
765833.33
765833.33
765833.33
765833.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41500000Total Commitment in Fourth Quarter of 2016
International Bank for Reconstruction and Development103750Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development-103750Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development280000Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-60630Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development500000Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development250000Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development89147Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-58366Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development4950Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development68428Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development15941Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development136504Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development93132Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-68677Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development92993Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development181580Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development30557Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development81914Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development23437Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development225362Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development-76420Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development148192Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development6587Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development55103Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development107012Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development304345Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-87037Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development6172Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development104919Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development436243Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development7500Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
PDO Indicator
Citizen's budgets posted on the MoF website
PDO Indicator
IFMIS end users proficient in IFMIS operations in pilot federal ministries anf governorates
PDO Indicator
Share of public investment projects in pilot ministries at the federal level subject to appraisal
PDO Indicator
Share of tenders and awards publicly available through the federal procurement single e-portal
PDO Indicator
Share of Federal Government bank account balances consolidated under the new TSA.
Intermediate Results Indicator
Citizens budget feedback mechanism operational
44000-P155732
World Bank
Emergency Operation for Development
International Bank for Reconstruction and Development
MINISTRY OF CONSTRUCTION AND HOUSING
International Bank for Reconstruction and Development
MINISTRY OF CONSTRUCTION AND HOUSINGPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Ibrahim Khalil Zaki Dajani
+1-202-473-1000idajani@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
IRAQ
Tikrīt
34.6160 43.6790
Salah ad Din
34.5000 43.6500
Muhafazat Ninawa
36.0830 42.5000
Jalawlā’
34.2740 45.1690
DiyÄ?lá
34.0000 45.0000
Muhafazat Kirkuk
35.3670 44.1330
Al `Azim
34.2750 44.5390
Muḩāfaz̧at al Anbār
33.0000 41.7500
Al ‘Alam
34.6450 43.7000
As Sa`diyah
33.8210 44.4110
Al-Daur District
34.4620 43.8080
Other Public AdministrationOther Water Supply, Sanitation and Waste ManagementEnergy Transmission and DistributionHealthRural and Inter-Urban RoadsHealth System StrengtheningServices and Housing for the PoorAir quality managementSoil PollutionUrban DevelopmentUrban Infrastructure and Service DeliveryEnvironmental Health and Pollution ManagementWater PollutionHealth Systems and PoliciesFragility, Conflict and Violence
0.00
0.00
875000.00
1666666.66
1666666.67
1666666.67
3666666.66
3666666.67
3666666.67
6666666.66
6666666.67
6666666.67
6666666.66
6666666.67
6666666.67
8333333.33
8333333.33
8333333.34
8333333.33
8333333.33
8333333.34
6666666.66
6666666.67
6666666.67
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
8333333.33
8333333.33
8333333.34
8333333.33
8333333.33
8333333.34
7708333.33
7708333.33
7708333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3072916.67
3072916.67
3072916.67
3072916.67
3072916.67
3072916.67
3072916.67
3072916.67
3072916.67
3072916.67
3072916.67
3072916.63
7500000.00
7500000.00
7500000.00
7500000.00
7500000.00
7500000.00
7500000.00
7500000.00
7500000.00
7500000.00
7500000.00
7500000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.67
6666666.63
1927083.33
1927083.33
1927083.33
1927083.33
1927083.33
1927083.33
1927083.33
1927083.33
1927083.33
1927083.33
1927083.33
1927083.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
350000000Total Commitment in Third Quarter of 2015
International Bank for Reconstruction and Development875000Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development-875000Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development1000000Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development4400Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development5605Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development21185Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development500000Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development7344174Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development-569035Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development14576128Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development2135400Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development3055928Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development1920503Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development-564585Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development7074640Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development1813805Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development2467504Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development3024305Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development5242299Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development12229221Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development-755330Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development5240840Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development4364824Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development12153059Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development5129321Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development12998109Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development6124094Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development-1143959Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development9541057Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development400000000Total Commitment in Fourth Quarter of 2017
International Bank for Reconstruction and Development7591210Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development11831729Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development18827942Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development2287954Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development2658561Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development-1703852Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development20218532Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development2991692Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development5782811Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development7279946Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development1000000Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-1000000Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-206858Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development2319219Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development4648796Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-3229961Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development4784165Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development1634443Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development2509953Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development8776317Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development1500000Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development100000Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development3817401Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-522108Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development1349510Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development11231574Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-3896025Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development4872733Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development5020731Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development364452Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development3254485Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development1214901Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development225941Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development1035744Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development1067155Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development3430655Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development-616702Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development62535Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development1237538Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development2975167Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development-4253183Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development1222846Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development3581223Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development1011913Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development3904155Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development512541Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementAgreementAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Project Coordinating Unit (Loan Agreement, Schedule 2, Section I.A.1) | Description :The Borrower shallmaintain, throughout the period of implementation of the Project, a Project Coordination Unit under the Reconstruction Fundreporting to the Council of Ministers, to be responsible for, inter alia: coordination and facilitation of Project implementation(including among the PMTs), and providing overall strategy, guidance, and monitoring and evaluation for the Project. | Frequency:CONTINUOUS
Finance Agreement :Project Management Teams (Loan Agreement, Schedule 2, Section I.A.2 (a) and (b)) | Description :The Borrowershall establish, by no later than July 30, 2015, and thereafter maintain within each of MoE, MoMPW, RBD of MoCH, and MoH throughoutthe period of implementation of the Project, a Project Management Team, staffed with competent technical and other personnel. |Frequency :CONTINUOUS
Finance Agreement :Housing Reconstruction Subsidy Scheme (Loan Agreement, Schedule 2, Section I.E) | Description :The Borrowershall: (a) by no later than eighteen (18) months after the Effective Date, prepare and furnish to the Bank, for its review andcomment, a draft of the Housing Reconstruction Subsidy Scheme, and afford the Bank a reasonable opportunity to exchange views withthe Bank on said draft Scheme; and (b) thereafter, by no later than twenty four (24) months after. | Due Date :28-Dec-2017
Finance Agreement :Safeguards (Loan Agreement, Schedule 2, Section I.F.2) | Description :The Borrower shall, no later than three(3) months after the Effective Date, prepare and disclose in a manner satisfactory to the Bank an Environmental and SocialManagement Framework and a Resettlement Policy Framework, in form and substance satisfactory to the Bank. | Due Date :21-Oct-2015
Finance Agreement :Safeguards (Loan Agreement, Schedule 2, Section I.F.5(a) (i)) | Description :The Borrower shall, prior tocommencing Minor Civil Works for any activity under the Project to be carried out prior to the preparation of the ESMF: whenrequired under the ESAP, prepare, adopt and disclose appropriate Simplified ESMP(s) in accordance with the ESAP, such SimplifiedESMP(s) to be in form and substance satisfactory to the Bank; | Frequency :CONTINUOUS
Finance Agreement :Safeguards (Loan Agreement, Schedule 2, Section I.F.5(a) (ii)) | Description :The Borrower shall, prior tocommencing Minor Civil Works for any activity under the Project to be carried out prior to the preparation of the ESMF: whenrequired under the Simplified ESMPs, carry out specific public consultation in form and in substance satisfactory to the Bank. |Frequency :CONTINUOUS
Finance Agreement :Safeguards (Loan Agreement, Schedule 2, Section I.F.7(a)) | Description :The Borrower shall: by no later thanthree (3) months after the Effective Date, establish and thereafter maintain throughout the period of implementation of theProject, a grievance redress mechanism, satisfactory to the Bank, for the management of complaints related to the Project; | DueDate :21-Oct-2015
Finance Agreement :Safeguards (Loan Agreement, Schedule 2, Section I.F.7(b)) | Description :The Borrower shall: ensure thatadequate measures, satisfactory to the Bank, are put in place to ensure that all aspects of Project implementation are carried outin an inclusive, non-discriminatory and participatory manner. | Frequency :CONTINUOUS
Finance Agreement :Project Implementation Manual (Loan Agreement, Schedule 2, Section I.B.1) | Description :The Borrower shall, byno later than October 31, 2017, update and adopt the Project Implementation Manual, in form and substance satisfactory to the Bank.| Due Date :31-Oct-2017
Finance Agreement :Safeguards (Loan Agreement, Schedule 2, Section I.F.9) | Description :The Borrower shall ensure that any area inwhich civil works under the Project will be implemented has been cleared of Explosive Remnants of War, and to that end, prior tocommencing civil works for any activity under the Project; | Frequency :CONTINUOUS
Finance Agreement :Safeguards (Loan Agreement, Schedule 2, Section I.F.9) | Description :The Borrower shall provide a confirmation,in form and substance satisfactory to the Bank, that the area in which such civil works will be implemented has been declared safeand clear of Explosive Remnants of War. | Frequency :CONTINUOUS
Finance Agreement :Withdrawal of Loan Proceeds (Loan Agreement, Schedule 2, Section IV.B.1) | Description :No withdrawal shall bemade for payments made prior to the date of the Loan Agreement, except that withdrawals up to an aggregate amount not to exceed USD15 million may be made for payments made prior to this date but on or after January 1, 2015, for Eligible Expenditures. | Frequency:CONTINUOUS
Finance Agreement: Project Management Teams (Loan Agreement, Schedule 2, Section A.2 (a))| Description: The Borrower shallestablish, by no later than October 31, 2017, a Project Management Team within each Participating Ministry that was not involved inthe Original Project.
Finance Agreement: Participating Governorates (Loan Agreement, Schedule 2, Section A.3 (a))| Description: the Borrower shall causeeach Participating Governorate to establish, by no later than October 31, 2017, and thereafter maintain throughout the period ofimplementation of the Project, a Project Management Team, staffed with competent technical and other personnel.
Intermediate Results Indicator
Health facilities constructed and/renovated and equipped
Intermediate Results Indicator
Health facilities constructed and/renovated and equipped
Intermediate Results Indicator
Teachers recruited or trained
PDO Indicator
Direct project beneficiaries
Intermediate Results Indicator
Ambulances purchased and equipped
Intermediate Results Indicator
The number of households involved in agriculture who have accessing one or more agricultural support services
PDO Indicator
Number of people in urban areas provided with access to all-season roads within a 500 meter range under the project
PDO Indicator
Number of people receiving primary health services through mobile primary health units supported by the project
PDO Indicator
Number of farmers with access to irrigated land
PDO Indicator
Students benefiting from direct interventions to enhance learning
Intermediate Results Indicator
Grievances related to delivery of project benefits that are addressed-(number)
Intermediate Results Indicator
Bridges rehabilitated
PDO Indicator
Number of youth with access to services under the project
PDO Indicator
Number of people in urban areas provided with access to Improved Water Sources under the project
PDO Indicator
Number of people in urban areas provided with access to Improved Sanitation under the project
PDO Indicator
Number of people in urban areas provided with access to regular solid waste collection under the project
PDO Indicator
Number of people in urban areas provided with access to electricity under the project by household connections
Intermediate Results Indicator
Beneficiaries that feel project investments reflected their needs (percentage)
Intermediate Results Indicator
Piped household water reconnections that are benefiting from rehabilitation works undertaken by the project
Intermediate Results Indicator
Grievances registered related to delivery of project benefits addressed (%)
PDO Indicator
Sub-projects with a satisfactory outcome
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
Percentage of Female Beneficiaries
Intermediate Results Indicator
Percentage of Female headed households
Intermediate Results Indicator
Transmission lines reconstructed or rehabilitated under the project
Intermediate Results Indicator
Roads rehabilitated, Non-rural
Intermediate Results Indicator
Railway track rehabilitated
Intermediate Results Indicator
Irrigated Areas Improved
Intermediate Results Indicator
Areas improved
44000-P087735
World Bank
IQ - Emergency Road Rehabilitation
International Development Association
MINISTRY OF CONSTRUCTION AND HOUSING
International Development Association
MINISTRY OF CONSTRUCTION AND HOUSINGPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Ibrahim Khalil Zaki Dajani
+1-202-473-1000idajani@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
IRAQ
Muhafazat al Basrah
30.4170 47.4170
Muhafazat Wasit
32.7500 45.4170
Umm Salim
32.7030 45.2300
Muhafazat Salah ad Din
34.5000 43.6500
Muhafazat Ninawa
36.0830 42.5000
Muhafazat Maysan
31.9000 47.0670
Qada' Kirkuk
35.5000 44.3000
Muhafazat Karbala’
32.5000 43.8330
Qada' Arbil
36.1910 44.0090
Muhafazat Arbil
36.3330 44.2000
Erbil
36.1930 44.0110
Muhafazat Diyala
34.0000 45.0000
Muhafazat Dhi Qar
31.2500 46.2500
Muhafazat Dahuk
37.0670 43.1330
Qaryat ach Chamchah ash Sharqiyah
31.4220 45.1140
Muhafazat Baghdad
33.3170 44.3670
Muhafazat Babil
32.5330 44.6170
Az Zubaydiyah
32.7590 45.1770
Muhafazat Kirkuk
35.3670 44.1330
Muhafazat as Sulaymaniyah
35.5830 45.3330
Muhafazat an Najaf
31.2500 43.8330
Altun Kubri
35.7540 44.1440
Muhafazat al Qadisiyah
31.9170 45.0830
Muhafazat al Muthanna
30.2500 45.3330
Al Musharrah
31.8220 47.4380
Muhafazat al Anbar
33.0000 41.7500
Ad Darrajiyah
31.1760 45.7200
Central Government (Central Agencies)Rural and Inter-Urban RoadsRural DevelopmentPost-conflict reconstructionConflict PreventionActive Labor Market ProgramsDisease ControlLabor Market InstitutionsFragility, Conflict and ViolenceRural Infrastructure and service deliveryNon-communicable diseasesLabor Market Policy and Programs
0.00
0.00
0.00
0.00
333333.33
333333.33
333333.34
713333.33
713333.33
713333.34
1233333.33
1233333.33
1233333.34
1333333.33
1333333.33
1333333.34
2000000.00
2000000.00
2000000.00
2666666.67
2666666.67
2666666.66
3433333.33
3433333.33
3433333.34
3333333.33
3333333.33
3333333.34
3666666.67
3666666.67
3666666.66
4833333.33
4833333.33
4833333.34
5750000.00
5750000.00
5750000.00
5833333.33
5833333.33
5833333.34
5833333.33
5833333.33
5833333.34
2870000.00
2870000.00
2870000.00
1166666.67
1166666.67
1166666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2211984.91
2211984.91
2211984.91
1361578.22
1361578.22
1361578.22
2236568.87
2236568.87
2236568.87
1711604.82
1711604.82
1711604.82
3165912.15
3165912.15
3165912.16
2114544.69
2114544.69
2114544.68
2651212.86
2651212.86
2651212.86
2927530.23
2927530.23
2927530.22
1523096.25
1523096.25
1523096.26
1011683.60
1011683.60
1011683.60
1175436.27
1175436.27
1175436.28
584490.95
584490.95
584490.93
436875.57
436875.57
436875.56
2104221.58
2104221.58
2104221.58
494909.45
494909.45
494909.46
1576382.50
1576382.50
1576382.51
482832.61
482832.61
482832.63
1448497.85
1448497.85
1448497.85
2414163.10
2414163.10
2414163.08
2414163.10
2414163.10
2414163.08
1931330.47
1931330.47
1931330.48
2896995.71
2896995.71
2896995.71
2896995.71
2896995.71
2896995.71
3191523.60
3191523.60
3191523.62
0.00
0.00
0.00
0.00
0.00
135000000Total Commitment in Second Quarter of 2006
International Development Association-159070Total Interest Repayment in Second Quarter of 2008
International Development Association182509Total Disbursement in Third Quarter of 2008
International Development Association78985Total Disbursement in Third Quarter of 2008
International Development Association6852576Total Disbursement in Third Quarter of 2008
International Development Association-76099Total Interest Repayment in Third Quarter of 2008
International Development Association2137549Total Disbursement in Fourth Quarter of 2008
International Development Association2157993Total Disbursement in Fourth Quarter of 2008
International Development Association5083491Total Disbursement in First Quarter of 2009
International Development Association693135Total Disbursement in First Quarter of 2009
International Development Association1220166Total Disbursement in First Quarter of 2009
International Development Association-35998Total Interest Repayment in First Quarter of 2009
International Development Association612202Total Disbursement in Second Quarter of 2009
International Development Association716538Total Disbursement in Second Quarter of 2009
International Development Association4088781Total Disbursement in Second Quarter of 2009
International Development Association3832884Total Disbursement in Third Quarter of 2009
International Development Association4597227Total Disbursement in Third Quarter of 2009
International Development Association1792528Total Disbursement in Third Quarter of 2009
International Development Association-90248Total Interest Repayment in Third Quarter of 2009
International Development Association2276382Total Disbursement in Fourth Quarter of 2009
International Development Association4536361Total Disbursement in Fourth Quarter of 2009
International Development Association168073Total Disbursement in Fourth Quarter of 2009
International Development Association5436807Total Disbursement in First Quarter of 2010
International Development Association499016Total Disbursement in First Quarter of 2010
International Development Association2570397Total Disbursement in First Quarter of 2010
International Development Association1755975Total Disbursement in Second Quarter of 2010
International Development Association-156789Total Interest Repayment in Second Quarter of 2010
International Development Association5106616Total Disbursement in Second Quarter of 2010
International Development Association2116981Total Disbursement in Second Quarter of 2010
International Development Association2540624Total Disbursement in Third Quarter of 2010
International Development Association1633519Total Disbursement in Third Quarter of 2010
International Development Association613052Total Disbursement in Third Quarter of 2010
International Development Association-202074Total Interest Repayment in Third Quarter of 2010
International Development Association1152581Total Disbursement in Fourth Quarter of 2010
International Development Association1578422Total Disbursement in Fourth Quarter of 2010
International Development Association519967Total Disbursement in Fourth Quarter of 2010
International Development Association2035699Total Disbursement in First Quarter of 2011
International Development Association866257Total Disbursement in First Quarter of 2011
International Development Association868702Total Disbursement in First Quarter of 2011
International Development Association147951Total Disbursement in Second Quarter of 2011
International Development Association-256284Total Interest Repayment in Second Quarter of 2011
International Development Association1346078Total Disbursement in Second Quarter of 2011
International Development Association425742Total Disbursement in Second Quarter of 2011
International Development Association702517Total Disbursement in Third Quarter of 2011
International Development Association729179Total Disbursement in Third Quarter of 2011
International Development Association-281689Total Interest Repayment in Third Quarter of 2011
International Development Association807522Total Disbursement in Fourth Quarter of 2011
International Development Association1179877Total Disbursement in Fourth Quarter of 2011
International Development Association4750939Total Disbursement in Fourth Quarter of 2011
International Development Association424000Total Disbursement in First Quarter of 2012
International Development Association114641Total Disbursement in First Quarter of 2012
International Development Association1040518Total Disbursement in First Quarter of 2012
International Development Association-288280Total Interest Repayment in First Quarter of 2012
International Development Association2056303Total Disbursement in Second Quarter of 2012
International Development Association1976779Total Disbursement in Second Quarter of 2012
International Development Association974286Total Disbursement in Second Quarter of 2012
International Development Association774632Total Disbursement in Third Quarter of 2012
International Development Association569812Total Disbursement in Third Quarter of 2012
International Development Association282228Total Disbursement in Third Quarter of 2012
International Development Association-313761Total Interest Repayment in Third Quarter of 2012
International Development Association847564Total Disbursement in Fourth Quarter of 2012
International Development Association136410Total Disbursement in Fourth Quarter of 2012
International Development Association340475Total Disbursement in Fourth Quarter of 2012
International Development Association135485Total Disbursement in First Quarter of 2013
International Development Association1244685Total Disbursement in First Quarter of 2013
International Development Association1421261Total Disbursement in First Quarter of 2013
International Development Association-340960Total Interest Repayment in First Quarter of 2013
International Development Association423840Total Disbursement in Second Quarter of 2013
International Development Association2282318Total Disbursement in Second Quarter of 2013
International Development Association59146Total Disbursement in Second Quarter of 2013
International Development Association878037Total Disbursement in Third Quarter of 2013
International Development Association27666Total Disbursement in Third Quarter of 2013
International Development Association2266526Total Disbursement in Third Quarter of 2013
International Development Association-344185Total Interest Repayment in Third Quarter of 2013
International Development Association846535Total Disbursement in Fourth Quarter of 2013
International Development Association640214Total Disbursement in Fourth Quarter of 2013
International Development Association1230886Total Disbursement in Fourth Quarter of 2013
International Development Association1980883Total Disbursement in First Quarter of 2014
International Development Association129323Total Disbursement in First Quarter of 2014
International Development Association899604Total Disbursement in First Quarter of 2014
International Development Association-382830Total Interest Repayment in First Quarter of 2014
International Development Association436000Total Disbursement in Second Quarter of 2014
International Development Association833311Total Disbursement in Second Quarter of 2014
International Development Association1852854Total Disbursement in Second Quarter of 2014
International Development Association567259Total Disbursement in Third Quarter of 2014
International Development Association2710207Total Disbursement in Third Quarter of 2014
International Development Association-394983Total Interest Repayment in Third Quarter of 2014
International Development Association792241Total Disbursement in Fourth Quarter of 2014
International Development Association2498158Total Disbursement in Fourth Quarter of 2014
International Development Association-27665031Total Commitment Cancellations in First Quarter of 2015
International Development Association-379457Total Interest Repayment in First Quarter of 2015
International Development Association-389871Total Interest Repayment in Third Quarter of 2015
International Development Association-389471Total Interest Repayment in First Quarter of 2016
International Development Association-379825Total Interest Repayment in Third Quarter of 2016
International Development Association-2604145Total Loan Repayment in Third Quarter of 2016
International Development Association-380248Total Interest Repayment in First Quarter of 2017
International Development Association-2509840Total Loan Repayment in First Quarter of 2017
International Development Association-3533Total Loan Repayment in Third Quarter of 2017
International Development Association-333355Total Interest Repayment in Fourth Quarter of 2017
International Development Association-2617441Total Loan Repayment in Fourth Quarter of 2017
International Development Association-374552Total Interest Repayment in First Quarter of 2018
International Development Association-2702672Total Loan Repayment in First Quarter of 2018
International Development Association-392799Total Interest Repayment in Third Quarter of 2018
International Development Association-2608590Total Loan Repayment in Third Quarter of 2018
International Development Association-341362Total Interest Repayment in First Quarter of 2019
International Development Association-2589361Total Loan Repayment in First Quarter of 2019
International Development Association-325593Total Interest Repayment in Third Quarter of 2019
International Development Association-2553673Total Loan Repayment in Third Quarter of 2019
International Development AssociationProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Audit of Financial Statements
Audit of Financial Statements
Intermediate Results Indicator
Direct project beneficiaries
measured as population with improved access due to the project in Central and Southern Governorates only.
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
Bridge replacements.
Old decaying floating bridges in place.
At least three bridges improved on critical road sections.
3 completed 1 under construction
Intermediate Results Indicator
Road asset management.
Completed for GDRBOngoing for SCRB
PDO Indicator
Improved capacity both at SCRB and KRG-GDRB measured by the development of road asset management tools and their effective use.
Asset management has been developed for the rural roads project in KRG.
Asset management has been developed for the rural roads project in KRG.
Asset management has been developed for the rural roads project in KRG.Asset management development is ongoing for SCRB
PDO Indicator
% of population in the targeted villages with access to an all-weather road.
Percent of population in the targeted villages have access to an all-weather road.
Percent of population in the targeted villages have access to an all-weather road.
Percent of population in the targeted villages have access to an all-weather road.
PDO Indicator
Average reduction in travel time for villagers to reach markets/services.
reduction in travel time.
travel time reduced by 50%
Travel time reduction was measured only for Altun-Kopri road . It is 30% reduction ( from 60 min to 40 min). Travel time reductionwill be measured for other roads during ICR preparation.
Intermediate Results Indicator
Local Employment Created
No. of temporary employment generated
No. of temporary employment generated
No. of temporary employment generated
Intermediate Results Indicator
PART A ( Central and Southern Governorates)
Intermediate Results Indicator
PART B ( Northern Governorates, KRG)
Intermediate Results Indicator
Transport Sector Master Plan
Transport Sector Master Plan
Transport Sector Master Plan completed
Transport Sector Master Plan under implementation
Intermediate Results Indicator
Roads rehabilitated, Non-rural
No. of km of rehabilitated non-rural roads
No. of km of rehabilitated non-rural roads
No. of km of rehabilitated non-rural roads
Intermediate Results Indicator
Roads rehabilitated, Rural
No. of km of rural roads rehabilitated.
No. of km of rural roads rehabilitated.
The target of rural roads rehabilitated have been exceeded by 6.5 km.
Intermediate Results Indicator
PART A ( Central and Southern Governorates)
No. of Km of roads rehabilitated
No. of Km of roads rehabilitated
15 additional km are expected to be completed by end of June 2014
Intermediate Results Indicator
PART B ( North Governorates, KRG)
No. of Km of roads rehabilitated
Works completed and road open to traffic
Works completed and road open to traffic
Intermediate Results Indicator
PART A ( Central and Southern Governorates)
No. of km of rural roads rehabilitated
No. of km of rural roads rehabilitated open to traffic
40 km of rural roads rehabilitated open to traffic
Intermediate Results Indicator
PART B ( Northern Governorates, KRG)
No. of km of rural roads rehabilitated open to traffic
No. of km of rural roads rehabilitated open to traffic
Target has been exceeded by 6.5 km.
44000-P163108
World Bank
Iraq Social Fund for Development
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Rene Antonio Leon Solano
+1-202-473-1000rleonsolano@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
IRAQ
Muhafazat al Basrah
30.4170 47.4170
Muhafazat Wasit
32.7500 45.4170
Muhafazat Salah ad Din
34.5000 43.6500
Muhafazat Ninawa
36.0830 42.5000
Muhafazat Maysan
31.9000 47.0670
Muhafazat Karbala'
32.5000 43.8330
Muhafazat Arbil
36.3330 44.2000
Diyala
34.0000 45.0000
Muhafazat Dhi Qar
31.2500 46.2500
Dihok
37.0670 43.1330
Muhafazat Baghdad
33.3170 44.3670
Muhafazat Babil
32.5330 44.6170
Muhafazat Kirkuk
35.3670 44.1330
Muhafazat as Sulaymaniyah
35.5830 45.3330
An Najaf
31.2500 43.8330
Muhafazat al Qadisiyah
31.9170 45.0830
Muhafazat al Muthanna
30.2500 45.3330
Muhafazat al Anbar
33.5440 41.3180
Other Non-bank Financial InstitutionsSocial ProtectionPublic Administration - Social ProtectionJob CreationGenderMSME DevelopmentSocial Safety NetsAdaptationJobsSocial ProtectionClimate changeEnterprise Development
0.00
0.00
352500.00
824700.00
969000.00
1113000.00
1242300.00
1359600.00
1518300.00
1708800.00
1832100.00
940800.00
1914300.00
1978800.00
2034000.00
2050800.00
2007600.00
1975200.00
2018400.00
2138100.00
2279100.00
1161600.00
2390400.00
2554800.00
2727600.00
2843100.00
3010500.00
3242700.00
3405000.00
3485100.00
3665100.00
1934100.00
4067100.00
4216500.00
4436100.00
4748700.00
5088600.00
5376600.00
5677200.00
5977200.00
6320100.00
3290400.00
6797100.00
7033800.00
7236600.00
7532700.00
7787700.00
8013600.00
8297400.00
8625000.00
8831400.00
4464300.00
9010800.00
9112200.00
9296400.00
9437400.00
9564000.00
9745800.00
9913800.00
10065900.00
10216500.00
10370100.00
10527000.00
8244600.00
0.00
0.00
352500.00
824700.00
969000.00
1113000.00
1242300.00
1359600.00
1518300.00
1708800.00
1832100.00
940800.00
1914300.00
1978800.00
2034000.00
2050800.00
2007600.00
1975200.00
2018400.00
2138100.00
2279100.00
1161600.00
2390400.00
2554800.00
2727600.00
2843100.00
3010500.00
3242700.00
3405000.00
3485100.00
3665100.00
1934100.00
4067100.00
4216500.00
4436100.00
4748700.00
5088600.00
5376600.00
5677200.00
5977200.00
6320100.00
3290400.00
6797100.00
7033800.00
7236600.00
7532700.00
7787700.00
8013600.00
8297400.00
8625000.00
8831400.00
4464300.00
9010800.00
9112200.00
9296400.00
9437400.00
9564000.00
9745800.00
9913800.00
10065900.00
10216500.00
10370100.00
10527000.00
8244600.00
300000000Total Commitment in First Quarter of 2018
International Bank for Reconstruction and Development750000Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-750000Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-265480Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development5000000Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-438781Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-465174Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Schedule 2, Section I, Part A (5): The Borrower, through its Ministry of Planning (MOP), shall: establish, by no later than 90 daysof the Effective Date, and thereafter maintain within each Participating Governorate throughout the period of implementation of theProject, a Project Management Team (“PMT”), under the direction of qualified management provided with sufficient resources, andstaffed with competent technical and other personnel in adequate numbers and with composition, terms of reference and resourcessatisfactory to the Bank, as set forth in the POM. Each PMT shall be responsible for, inter alia: identification of Projectactivities and Subprojects at the local level; day to day implementation, supervision, management, reporting, monitoring andevaluation of said Project activities and results (including fiduciary and safeguards management).
Schedule 2, Section I, Part A (6): The Borrower, through its Ministry of Planning (MOP) shall: by no later than two years of theEffective Date, establish and maintain a Social Fund for Development (“SFD”) as a separate legal entity, in a form and withfunctions and management satisfactory to the Bank, and having the capacity to perform functions under the Project.
Schedule 2, Section I, Part E. 7 (a) (b): The Borrower shall: (a) by no later than three (3) months after the Effective Date,establish, and thereafter maintain, throughout the period of implementation of the Project, a Grievance Redress Mechanism,satisfactory to the Bank, for the management of complaints related to the Project; and (b) ensure that adequate measures,satisfactory to the Bank, are put in place to ensure that all aspects of Project implementation are carried out in an inclusive,non-discriminatory and participatory manner.
PDO Indicator
Households benefitting from improved access to basic services
PDO Indicator
Beneficiaries of short term employment
PDO Indicator
Households benefitting from improved access to basic services, of which female-headed households
PDO Indicator
Beneficiaries of short term employment, of which women
Intermediate Results Indicator
Subprojects approved
Intermediate Results Indicator
Targeted government staff trained in participatory decision-making
Intermediate Results Indicator
Targeted communities trained in participatory decison-making
Intermediate Results Indicator
Person days of short-term employment created by the project
Intermediate Results Indicator
Share of women represented on CDGs
Intermediate Results Indicator
Subprojects implemented
Intermediate Results Indicator
Beneficiaries satisfied with the quality of sub-project investments
Intermediate Results Indicator
Share of grievances received that are resolved in accordance with service standards
44000-P165114
World Bank
Iraq Emergency Social Stabilization and Resilience Project
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Rene Antonio Leon Solano
+1-202-473-1000rleonsolano@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
IRAQ
Muhafazat Salah ad Din
34.5000 43.6500
Muḩāfaz̧at Nīnawá
36.0830 42.5000
Diyālá
34.0000 45.0000
Muḩāfaz̧at Baghdād
33.3170 44.3670
Muhafazat Babil
32.5330 44.6170
Muḩāfaz̧at Kirkūk
35.3670 44.1330
Muḩāfaz̧at al Anbār
33.5440 41.3180
Public Administration - Social ProtectionSocial ProtectionFragility, Conflict and ViolenceJob CreationMitigationAdaptationPost-conflict reconstructionClimate changeForced DisplacementICTSocial ProtectionJobsSocial Safety NetsGenderICT Solutions
0.00
1095400.00
1077400.00
1734600.00
1568600.00
1804200.00
2556800.00
2021800.00
2705600.00
1982800.00
2105000.00
3080800.00
2509800.00
2755000.00
4026200.00
3371400.00
4766800.00
4000800.00
4266800.00
6339800.00
5304400.00
7769600.00
6407000.00
6859200.00
9673200.00
7726200.00
8074400.00
11480800.00
8931400.00
12167200.00
9405200.00
9609200.00
13216200.00
10178600.00
10409200.00
9018600.00
0.00
0.00
1095400.00
1077400.00
1734600.00
1568600.00
1804200.00
2556800.00
2021800.00
2705600.00
1982800.00
2105000.00
3080800.00
2509800.00
2755000.00
4026200.00
3371400.00
4766800.00
4000800.00
4266800.00
6339800.00
5304400.00
7769600.00
6407000.00
6859200.00
9673200.00
7726200.00
8074400.00
11480800.00
8931400.00
12167200.00
9405200.00
9609200.00
13216200.00
10178600.00
10409200.00
9018600.00
0.00
200000000Total Commitment in Second Quarter of 2018
International Bank for Reconstruction and Development500000Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-500000Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-177065Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-255847Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development10000000Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development14000000Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development-364994Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Schedule 2, Section I. B. 1: The Borrower shall no later than three (3) months after the Effective Date, prepare, in accordancewith terms of reference acceptable to the Bank: (i) an operations manual, providing details of arrangements and procedures for theimplementation of the Project, including: (A) capacity building activities for sustained achievement of the Project's objective;(B) procurement, financial management and disbursement arrangements; (C) institutional administration, coordination and day-to-dayexecution of Project activities; (D) monitoring, evaluation, reporting, information, education and communication arrangements ofProject activities; and (E) such other administrative, financial, technical and organizational arrangements and procedures as shallbe required for the Project; (ii) a handbook for the Cash for Work Program, setting forth the detailed policies and procedures forsaid program; and (iii) detailed guidelines and procedures for provision of Microfinance for Business Subprojects under theProject.
Schedule 2, Section I. E. 2: Without limitation upon the foregoing, the Borrower shall, no later than three (3) months after theEffective Date, prepare and disclose in a manner satisfactory to the Bank an Environmental and Social Management Framework (ESMF)and a Resettlement Policy Framework (RPF), in form and substance satisfactory to the Bank.
Schedule 2, Section I. E. 7: The Borrower shall: (a) by no later than three (3) months after the Effective Date, establish andthereafter maintain throughout the period of implementation of the Project, a grievance redress mechanism, satisfactory to theBank, for the management of complaints related to the Project; and (b) ensure that adequate measures, satisfactory to the Bank, areput in place to ensure that all aspects of Project implementation are carried out in an inclusive, non-discriminatory andparticipatory manner.
Schedule 2, Section II. The Borrower shall furnish to the Bank each Project Report not later than forty-five (45) days after theend of each calendar quarter, covering the calendar quarter.
Intermediate Results Indicator
Average of social worker home visits required to register conditional cash transfer beneficiaries
Intermediate Results Indicator
Integrated Mental Health, Psychosocial Services and GBV Centers established
Intermediate Results Indicator
Social Service Counselors trained
Intermediate Results Indicator
Sub-projects supported by the project
PDO Indicator
Beneficiaries of social safety net programs - Female
PDO Indicator
Beneficiaries of social safety net programs
PDO Indicator
Beneficiaries receiving direct counseling
PDO Indicator
Beneficiary households receiving Cash for Work support
PDO Indicator
Beneficiaries receiving livelihood support, of which women
PDO Indicator
Beneficiaries receiving direct counseling, of which children (5-15 years)
PDO Indicator
Beneficiaries receiving livelihood support
PDO Indicator
Beneficiaries receiving direct counseling, of which returnees
PDO Indicator
Beneficiaries receiving direct counseling, of which women
PDO Indicator
Beneficiary households receiving Cash for Work support, of which female headed households
Intermediate Results Indicator
Share of beneficiaires of microfinance from the lowest and second lowest income quintiles
Intermediate Results Indicator
Share of sampled beneficiaries expressing satisfaction with the cash for work program
Intermediate Results Indicator
Share of grievances resolved in accordance with service standards
PDO Indicator
Average share of cash for work resources transferred as wages
PDO Indicator
Beneficiaries of conditional cash transfers receiving payments in a timely manner
PDO Indicator
Share of beneficiaries included in the social registry from the poorest and second poorest quintiles
Intermediate Results Indicator
Person work days generated by the project, of which women
Intermediate Results Indicator
Person work days generated by the project
Intermediate Results Indicator
Time to process conditional cash transfer payments, from registration to enrollment
44000-P161167
World Bank
IRAQ: SECOND EXPENDITURE RATIONALIZATION, ENERGY EFFICIENCY AND STATE-OWNED ENTERPRISE GOVERNANCE PROGRAMMATIC DPF
International Bank for Reconstruction and Development
MINISTRY OF FINANCE
International Bank for Reconstruction and Development
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Luca Bandiera
+1-202-473-1000lbandiera@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
IRAQ
Baghdad
33.34058 44.400879
ICT ServicesInsurance and PensionSub-National GovernmentSocial ProtectionOil and GasEnergy Transmission and DistributionCentral Government (Central Agencies)Social ProtectionPublic Finance ManagementDebt ManagementTransparency, Accountability and Good GovernancePublic Assets and Investment ManagementFinancial StabilityPublic Expenditure ManagementEnergyMitigationICTPublic AdministrationClimate changeEnergy Policies & ReformSocial Safety NetsEnergy EfficiencyICT Solutions
0.00
0.00
1443820000Total Commitment in Fourth Quarter of 2016
International Bank for Reconstruction and Development1443820000Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development-3609550Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-10954374Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-15423206Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-16550990Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-23540683Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-25770182Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-24278635Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Capping of state-owned banks exposure to non-financial SOEs.
Intermediate Results Indicator
Improved collection from non-government sources
Intermediate Results Indicator
Share of total domestic debt issued using market instruments on total domestic annual borrowing.
Intermediate Results Indicator
Number of government spending units whose detailed payroll data is captured monthly in Central Payroll Database.
Intermediate Results Indicator
Reduced electricity subsidies, as measured by improved revenue collection as a percentage of generation
Intermediate Results Indicator
Improve electricity generation efficiency, cost, and environmental impact through increased share of gas used in the power generation mix.
Intermediate Results Indicator
Share of the domestic debt in total public debt
Intermediate Results Indicator
Improved selection and assessment of public investment projects as measured by the percentage of capital projects that exceed ID100,000 billion (about US$85 million) for which a feasibility study with
Intermediate Results Indicator
Improved SOEs transparency and governance as measured by the ISAR Benchmark of Corporate Governance Disclosures to measure corporate governance disclosure changes at a regulatory level as well as the
Intermediate Results Indicator
Improved social safety net efficiency as measured by: (1) coverage ratio of the poor
Intermediate Results Indicator
Strengthened payroll expenditure control as measured by the percentage of verified central government employees whose compensation and daily attendance is tracked electronically (minimum of the two va
Intermediate Results Indicator
Improved social insurance efficiency, coverage, and sustainability as measured by the expected actuarial deficit period (years lefttill going into deficit from 2015)
44000-P096234
World Bank
Iraq Third Emergency Education Project
International Development Association
IRAQ MINISTRY OF EDUCATION
International Development Association
IRAQ MINISTRY OF EDUCATIONPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Amira Mohamed Ibrahim Kazem
+1-202-473-1000akazem@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
IRAQ
Muhafazat al Basrah
30.4170 47.4170
Muhafazat Wasit
32.7500 45.4170
Muhafazat Salah ad Din
34.5000 43.6500
Muhafazat Ninawa
36.0830 42.5000
Muhafazat Maysan
31.9000 47.0670
Muhafazat Karbala’
32.5000 43.8330
Muhafazat Arbil
36.3330 44.2000
Muhafazat Diyala
34.0000 45.0000
Muhafazat Dhi Qar
31.2500 46.2500
Muhafazat Dahuk
37.0670 43.1330
Muhafazat Baghdad
33.3170 44.3670
Muhafazat Babil
32.5330 44.6170
Muhafazat Kirkuk
35.3670 44.1330
Muhafazat as Sulaymaniyah
35.5830 45.3330
Muhafazat an Najaf
31.2500 43.8330
Muhafazat al Qadisiyah
31.9170 45.0830
Muhafazat al Muthanna
30.2500 45.3330
Muhafazat al Anbar
33.0000 41.7500
Secondary EducationCentral Government (Central Agencies)Primary EducationEducationLabor Market InstitutionsLabor Market Policy and ProgramsEducation FinancingActive Labor Market ProgramsAccess to Education
0.00
0.00
0.00
0.00
0.00
0.00
4823.92
4823.92
4823.94
4823.92
4823.92
4823.94
168837.44
168837.44
168837.42
1259044.86
1259044.86
1259044.86
4823926.67
4823926.67
4823926.69
6271104.67
6271104.67
6271104.69
6753497.35
6753497.35
6753497.34
6753497.35
6753497.35
6753497.34
4823926.67
4823926.67
4823926.69
2411963.34
2411963.34
2411963.33
48239.26
48239.26
48239.28
9647.86
9647.86
9647.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6280.65
6280.67
6280.67
19833.79
19833.79
19833.81
0.00
0.00
0.00
0.00
0.00
0.00
23741.13
23741.13
23741.14
21480.64
21480.64
21480.64
6746.25
6746.27
6746.27
49736.15
49736.15
49736.15
225323.27
225323.27
225323.27
223930.85
223930.85
223930.85
19598.45
19598.47
19598.47
309701.09
309701.09
309701.10
1597172.69
1597172.71
1597172.71
810191.39
810191.39
810191.39
1042273.84
1042273.84
1042273.85
1893056.32
1893056.34
1893056.34
842212.14
842212.14
842212.14
553028.77
553028.77
553028.77
964785.34
964785.34
964785.33
1447178.00
1447178.00
1447178.00
3016570.46
3016570.46
3016570.46
4823926.67
4823926.67
4823926.69
5788712.01
5788712.01
5788712.01
9647853.36
9647853.36
9647853.34
0.00
0.00
0.00
0.00
0.00
0.00
100000000Total Commitment in Fourth Quarter of 2005
International Development Association19800Total Disbursement in Fourth Quarter of 2008
International Development Association-186481Total Interest Repayment in Fourth Quarter of 2008
International Development Association28825Total Disbursement in First Quarter of 2009
International Development Association33000Total Disbursement in First Quarter of 2009
International Development Association-121Total Interest Repayment in Second Quarter of 2009
International Development Association78531Total Disbursement in Fourth Quarter of 2009
International Development Association-345Total Interest Repayment in Fourth Quarter of 2009
International Development Association52800Total Disbursement in First Quarter of 2010
International Development Association15659Total Disbursement in First Quarter of 2010
International Development Association-697Total Interest Repayment in Second Quarter of 2010
International Development Association20310Total Disbursement in Second Quarter of 2010
International Development Association156494Total Disbursement in Third Quarter of 2010
International Development Association454400Total Disbursement in Fourth Quarter of 2010
International Development Association-909Total Interest Repayment in Fourth Quarter of 2010
International Development Association276226Total Disbursement in Fourth Quarter of 2010
International Development Association269678Total Disbursement in First Quarter of 2011
International Development Association457764Total Disbursement in First Quarter of 2011
International Development Association9539Total Disbursement in Second Quarter of 2011
International Development Association-4941Total Interest Repayment in Second Quarter of 2011
International Development Association55241Total Disbursement in Second Quarter of 2011
International Development Association525734Total Disbursement in Third Quarter of 2011
International Development Association492254Total Disbursement in Third Quarter of 2011
International Development Association99498Total Disbursement in Fourth Quarter of 2011
International Development Association883859Total Disbursement in Fourth Quarter of 2011
International Development Association-8698Total Interest Repayment in Fourth Quarter of 2011
International Development Association4178875Total Disbursement in Fourth Quarter of 2011
International Development Association297503Total Disbursement in First Quarter of 2012
International Development Association1397757Total Disbursement in First Quarter of 2012
International Development Association900256Total Disbursement in First Quarter of 2012
International Development Association780465Total Disbursement in Second Quarter of 2012
International Development Association2504859Total Disbursement in Second Quarter of 2012
International Development Association-30014Total Interest Repayment in Second Quarter of 2012
International Development Association2549426Total Disbursement in Third Quarter of 2012
International Development Association1595406Total Disbursement in Third Quarter of 2012
International Development Association1807691Total Disbursement in Third Quarter of 2012
International Development Association1700770Total Disbursement in Fourth Quarter of 2012
International Development Association-59259Total Interest Repayment in Fourth Quarter of 2012
International Development Association982422Total Disbursement in Fourth Quarter of 2012
International Development Association842398Total Disbursement in First Quarter of 2013
International Development Association807502Total Disbursement in First Quarter of 2013
International Development Association101081Total Disbursement in First Quarter of 2013
International Development Association1350308Total Disbursement in Second Quarter of 2013
International Development Association432715Total Disbursement in Second Quarter of 2013
International Development Association-86536Total Interest Repayment in Second Quarter of 2013
International Development Association1516067Total Disbursement in Second Quarter of 2013
International Development Association1587170Total Disbursement in Third Quarter of 2013
International Development Association1449859Total Disbursement in Third Quarter of 2013
International Development Association3384575Total Disbursement in Third Quarter of 2013
International Development Association3519851Total Disbursement in Fourth Quarter of 2013
International Development Association405217Total Disbursement in Fourth Quarter of 2013
International Development Association-107847Total Interest Repayment in Fourth Quarter of 2013
International Development Association4217072Total Disbursement in Fourth Quarter of 2013
International Development Association1265063Total Disbursement in First Quarter of 2014
International Development Association4117344Total Disbursement in First Quarter of 2014
International Development Association1649221Total Disbursement in First Quarter of 2014
International Development Association2396311Total Disbursement in Second Quarter of 2014
International Development Association4985355Total Disbursement in Second Quarter of 2014
International Development Association-170596Total Interest Repayment in Second Quarter of 2014
International Development Association117600Total Disbursement in Second Quarter of 2014
International Development Association2120752Total Disbursement in Third Quarter of 2014
International Development Association2541000Total Disbursement in Third Quarter of 2014
International Development Association4725585Total Disbursement in Third Quarter of 2014
International Development Association771233Total Disbursement in Fourth Quarter of 2014
International Development Association-214121Total Interest Repayment in Fourth Quarter of 2014
International Development Association1243848Total Disbursement in Fourth Quarter of 2014
International Development Association1257447Total Disbursement in First Quarter of 2015
International Development Association-34217967Total Commitment Cancellations in First Quarter of 2015
International Development Association-934962Total Disbursement in First Quarter of 2015
International Development Association-235937Total Interest Repayment in Second Quarter of 2015
International Development Association-230659Total Interest Repayment in Fourth Quarter of 2015
International Development Association-192662Total Interest Repayment in Second Quarter of 2016
International Development Association-1586591Total Loan Repayment in Second Quarter of 2016
International Development Association-269611Total Interest Repayment in Fourth Quarter of 2016
International Development Association-1542229Total Loan Repayment in Fourth Quarter of 2016
International Development Association-191618Total Interest Repayment in Second Quarter of 2017
International Development Association-1532982Total Loan Repayment in Second Quarter of 2017
International Development Association-245771Total Interest Repayment in Fourth Quarter of 2017
International Development Association-1572901Total Loan Repayment in Fourth Quarter of 2017
International Development Association-216337Total Interest Repayment in Second Quarter of 2018
International Development Association-1602533Total Loan Repayment in Second Quarter of 2018
International Development Association-203722Total Interest Repayment in Fourth Quarter of 2018
International Development Association-1551677Total Loan Repayment in Fourth Quarter of 2018
International Development Association-198030Total Interest Repayment in Second Quarter of 2019
International Development Association-1553177Total Loan Repayment in Second Quarter of 2019
International Development Association-176479Total Interest Repayment in Fourth Quarter of 2019
International Development Association-1544826Total Loan Repayment in Fourth Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Each Project Report should cover the period of 6 months and shall be furnished to the Bank not later than 45 days after the end oft he period covered by such report
PDO Indicator
Additional number of seats available, resulting from newly built schools, to reduce overcrowding
This includes additional seats resulting from newly built schools and six-classroom block extensions (including toilettes)
Intermediate Results Indicator
MOE and DOE engineers who have completed training in procurement and contract management
Due to the limitation set by the indicator definition, the FM and M&E training cannot be included in the actual, which wouldincrease the number of those receiving training under TEEP to 168. Additional procurement training for 20 engineers is scheduledbefore project closing.
Intermediate Results Indicator
Number of schools built
With a likelihood of completion an additional 7 by June 30, 2014.
Intermediate Results Indicator
Number of teachers trained
The MOE is committed to train the 6,000 teachers after the project closing using the training handbook developed and drawing onTeacher Trainers trained under the Project.
Intermediate Results Indicator
Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions.
Intermediate Results Indicator
Number of additional classrooms built or rehabilitated at the secondary level resulting from project intervention
Intermediate Results Indicator
Number of six-classroom block extensions (including toilets) built
Average physical progress is 59 percent with a likelihood of completing an additional 11 by June 30, 2014.
Intermediate Results Indicator
MOE and DOE engineers who have completed training in procurement and contract management, of which % females
Intermediate Results Indicator
Number of teachers trained, of which % females
PDO Indicator
Number of (a) curriculum development leaders and (b) curriculum developers trained according to standards set by the MOE (able to produce curriculum development elements)
The reduced TOR to focus on training curriculum developers at the subject level was drafted and the draft contract is beingnegotiated. This will be revisited on June 30, 2014.
PDO Indicator
Number of teacher training (a) master trainers and (b) trainers successfully trained (able to provide satisfactory training for teachers)
Intermediate Results Indicator
Number of beneficiaries, of which % females: Enrollment in project schools.
Intermediate Results Indicator
Teacher training materials developed
The Handbook has also benefited from the Task Team's comments; and the training material was revised accordingly prior to thetraining of the 120 teacher trainers.
Intermediate Results Indicator
Curriculum Evaluation Manual and Curriculum Authoring Manual developed
Intermediate Results Indicator
Development of four prototype designs for school buildings
The PMT conducted a site visit to a school in Najaf and shared pictured of a school constructed through governorate budget usingTEEP's prototype; with minor adjustments.
Intermediate Results Indicator
At least two progress reports produced per year
Intermediate Results Indicator
Annual updating of implementation schedules