44000-P087964
World Bank
Irrigation & Drainage Rehabilitation Project (Serbia)
International Development Association
MINISTRY OF AGRICULTURE, FORESTRY AND WATER MANAGEMENT
International Development Association
MINISTRY OF AGRICULTURE, FORESTRY AND WATER MANAGEMENTPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Nikola Ille
+1-202-473-1000nille@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIACentral Government (Central Agencies)Irrigation and DrainageRural DevelopmentDisaster Risk FinanceFinance for DevelopmentDisaster Response and RecoveryAgriculture FinanceWater Institutions, Policies and ReformWater Resource ManagementRural Infrastructure and service deliveryDisaster Risk ManagementDisaster Risk ReductionRural MarketsDisaster Preparedness
0.00
0.00
0.00
0.00
0.00
0.00
66666.67
66666.67
66666.66
286666.67
286666.67
286666.66
266666.67
266666.67
266666.66
300000.00
300000.00
300000.00
366666.67
366666.67
366666.66
450000.00
450000.00
450000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
666666.67
666666.67
666666.66
746666.67
746666.67
746666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
386666.67
386666.67
386666.66
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
403333.33
403333.33
403333.34
293333.33
293333.33
293333.34
100000.00
100000.00
100000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
64000.00
64000.00
64000.00
64000.00
64000.00
64000.00
64000.00
64000.00
64000.00
64000.00
64000.00
64000.00
18166.67
18166.67
18166.67
18166.67
18166.67
18166.67
18166.67
18166.67
18166.67
18166.67
18166.67
18166.63
50833.33
50833.33
50833.33
50833.33
50833.33
50833.33
50833.33
50833.33
50833.33
50833.33
50833.33
50833.37
178083.33
178083.33
178083.33
178083.33
178083.33
178083.33
178083.33
178083.33
178083.33
178083.33
178083.33
178083.37
484333.33
484333.33
484333.33
484333.33
484333.33
484333.33
484333.33
484333.33
484333.33
484333.33
484333.33
484333.37
775000.00
775000.00
775000.00
775000.00
775000.00
775000.00
775000.00
775000.00
775000.00
775000.00
775000.00
775000.00
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.63
2458333.33
2458333.33
2458333.33
2458333.33
2458333.33
2458333.33
2458333.33
2458333.33
2458333.33
2458333.33
2458333.33
2458333.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25000000Total Commitment in Third Quarter of 2005
International Development Association768600Total Disbursement in Second Quarter of 2006
International Development Association-69377Total Interest Repayment in Fourth Quarter of 2006
International Development Association218636Total Disbursement in First Quarter of 2007
International Development Association-27848Total Interest Repayment in Second Quarter of 2007
International Development Association49370000Total Commitment in Second Quarter of 2007
International Bank for Reconstruction and Development430003Total Disbursement in Third Quarter of 2007
International Development Association-28852Total Interest Repayment in Fourth Quarter of 2007
International Development Association180371Total Disbursement in First Quarter of 2008
International Development Association-18703Total Interest Repayment in Second Quarter of 2008
International Development Association358554Total Disbursement in Third Quarter of 2008
International Development Association-16902Total Interest Repayment in Fourth Quarter of 2008
International Development Association397885Total Disbursement in Fourth Quarter of 2008
International Development Association402621Total Disbursement in First Quarter of 2009
International Development Association377200Total Disbursement in First Quarter of 2009
International Development Association-165663Total Interest Repayment in First Quarter of 2009
International Bank for Reconstruction and Development603160Total Disbursement in Second Quarter of 2009
International Development Association-10549Total Interest Repayment in Second Quarter of 2009
International Development Association481033Total Disbursement in Third Quarter of 2009
International Development Association671419Total Disbursement in Third Quarter of 2009
International Development Association-65105Total Interest Repayment in Third Quarter of 2009
International Bank for Reconstruction and Development862859Total Disbursement in Fourth Quarter of 2009
International Development Association-15997Total Interest Repayment in Fourth Quarter of 2009
International Development Association604077Total Disbursement in First Quarter of 2010
International Development Association2709900Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development-63148Total Interest Repayment in First Quarter of 2010
International Bank for Reconstruction and Development-22830Total Interest Repayment in Second Quarter of 2010
International Development Association360693Total Disbursement in Second Quarter of 2010
International Development Association124427Total Disbursement in Second Quarter of 2010
International Development Association126028Total Disbursement in Third Quarter of 2010
International Development Association129908Total Disbursement in Third Quarter of 2010
International Development Association324324Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development87011Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development-70617Total Interest Repayment in Third Quarter of 2010
International Bank for Reconstruction and Development817173Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development1425897Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development522443Total Disbursement in Fourth Quarter of 2010
International Development Association-26443Total Interest Repayment in Fourth Quarter of 2010
International Development Association277066Total Disbursement in Fourth Quarter of 2010
International Development Association792047Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development-83485Total Interest Repayment in First Quarter of 2011
International Bank for Reconstruction and Development1791740Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development2148277Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development305349Total Disbursement in Second Quarter of 2011
International Development Association-30420Total Interest Repayment in Second Quarter of 2011
International Development Association1386673Total Disbursement in Second Quarter of 2011
International Development Association994953Total Disbursement in Third Quarter of 2011
International Development Association819836Total Disbursement in Third Quarter of 2011
International Development Association1780201Total Disbursement in Third Quarter of 2011
International Development Association1603695Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development2839389Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development-126033Total Interest Repayment in Third Quarter of 2011
International Bank for Reconstruction and Development1685073Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development2442580Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development1970922Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development2318180Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development-36268Total Interest Repayment in Fourth Quarter of 2011
International Development Association853766Total Disbursement in First Quarter of 2012
International Development Association1928250Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development-227931Total Interest Repayment in First Quarter of 2012
International Bank for Reconstruction and Development2109664Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development1190240Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development-53117Total Interest Repayment in Second Quarter of 2012
International Development Association537283Total Disbursement in Second Quarter of 2012
International Development Association863664Total Disbursement in Second Quarter of 2012
International Development Association765990Total Disbursement in Third Quarter of 2012
International Development Association-213860Total Interest Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development-1011172Total Loan Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development2087322Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development2941905Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development2331665Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development-56525Total Interest Repayment in Fourth Quarter of 2012
International Development Association1247762Total Disbursement in Fourth Quarter of 2012
International Development Association974176Total Disbursement in Fourth Quarter of 2012
International Development Association1833139Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development-147994Total Interest Repayment in First Quarter of 2013
International Bank for Reconstruction and Development-1461450Total Loan Repayment in First Quarter of 2013
International Bank for Reconstruction and Development365496Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development1753250Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development1744274Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development2372083Total Disbursement in Second Quarter of 2013
International Development Association-64772Total Interest Repayment in Second Quarter of 2013
International Development Association803374Total Disbursement in Third Quarter of 2013
International Development Association868053Total Disbursement in Third Quarter of 2013
International Development Association135313Total Disbursement in Third Quarter of 2013
International Development Association2135325Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development-113753Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development-1747027Total Loan Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development2124633Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development-79938Total Interest Repayment in Fourth Quarter of 2013
International Development Association1359859Total Disbursement in Fourth Quarter of 2013
International Development Association-119845Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development-2014180Total Loan Repayment in First Quarter of 2014
International Bank for Reconstruction and Development1057610Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development725379Total Disbursement in Second Quarter of 2014
International Development Association-89352Total Interest Repayment in Second Quarter of 2014
International Development Association-879024Total Commitment Cancellations in Third Quarter of 2014
International Development Association-8288Total Disbursement in Third Quarter of 2014
International Development Association-126563Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development-2016391Total Loan Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development-3727004Total Commitment Cancellations in Third Quarter of 2014
International Bank for Reconstruction and Development-1166422Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development-86830Total Interest Repayment in Fourth Quarter of 2014
International Development Association-86346Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-1666847Total Loan Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-80875Total Interest Repayment in Second Quarter of 2015
International Development Association-53090Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-1631295Total Loan Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-89007Total Interest Repayment in Fourth Quarter of 2015
International Development Association-1135437Total Loan Repayment in Fourth Quarter of 2015
International Development Association-45383Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-1634069Total Loan Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-80196Total Interest Repayment in Second Quarter of 2016
International Development Association-1125564Total Loan Repayment in Second Quarter of 2016
International Development Association-19764Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-1630857Total Loan Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-72010Total Interest Repayment in Fourth Quarter of 2016
International Development Association-1103983Total Loan Repayment in Fourth Quarter of 2016
International Development Association-8261Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-1541284Total Loan Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-71623Total Interest Repayment in Second Quarter of 2017
International Development Association-1087927Total Loan Repayment in Second Quarter of 2017
International Development Association-2412Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-1715539Total Loan Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-68188Total Interest Repayment in Fourth Quarter of 2017
International Development Association-1132915Total Loan Repayment in Fourth Quarter of 2017
International Development Association-1821027Total Loan Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-54252Total Interest Repayment in Second Quarter of 2018
International Development Association-1164666Total Loan Repayment in Second Quarter of 2018
International Development Association-1652612Total Loan Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-69589Total Interest Repayment in Fourth Quarter of 2018
International Development Association-1119366Total Loan Repayment in Fourth Quarter of 2018
International Development Association-1645823Total Loan Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-54283Total Interest Repayment in Second Quarter of 2019
International Development Association-1113488Total Loan Repayment in Second Quarter of 2019
International Development Association-1628521Total Loan Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-38228Total Interest Repayment in Fourth Quarter of 2019
International Development Association-1097649Total Loan Repayment in Fourth Quarter of 2019
International Development Association-1582311Total Loan Repayment in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementCredit AgreementAgreementContract AwardsProject URLProcurement Notices
Borrower to prepare first draft of report on M&E activities
Borrower to revise and complete M&E report
Borrower to prepare a plan for the continued achievement of the objectives of the Project
Borrower shall update the Procurement Plan in accordance with terms of reference
PMU to maintain a financial management system
Records, Accounts and Financial Statements audited each fiscal year
Intermediate Results Indicator
Number of farmers that attend environmental awareness program
Intermediate Results Indicator
Number of WUAs fully established under MIDP
Intermediate Results Indicator
Reduced farm production costs as a result of reduced water logging and improved drainage
Intermediate Results Indicator
Area benefiting from reduced water logging and improved drainage
Intermediate Results Indicator
Length of flood embankments rehabilitated to 1:100 flood levels
Intermediate Results Indicator
Number of minor irrigation schemes constructed to increase
Intermediate Results Indicator
Directorate of Water participants attending training and study tours
PDO Indicator
Increased crop yield resulting from improved irrigation and drainage (I&D)
Prior to I&D improvements, wheat yield is 3.5 tons/ha and corn yield is 2.2 tons/ha.
PDO Indicator
Increased area protected against flooding
PDO Indicator
Population protected from flooding risk
Intermediate Results Indicator
Radar for recording precipitation impacting river levels installed and operational
Intermediate Results Indicator
Water policy drafted and approved
Framework Water Law approved
PDO Indicator
Area provided with irrigation and drainage services (ha)
PDO Indicator
Area provided with irrigation and drainage services - Improved (ha)
44000-P163760
World Bank
Enhancing Infrastructure Efficiency and Sustainability
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Victor A Aragones
+1-202-473-1000varagones@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIARural and Inter-Urban RoadsOther Energy and ExtractivesPublic Administration - Energy and ExtractivesPublic Assets and Investment ManagementPublic Private PartnershipsInstitutional strengthening and capacity buildingPublic AdministrationData Development and Capacity BuildingMitigationClimate changeAdaptationUrban Infrastructure and Service DeliveryTransparency, Accountability and Good GovernanceUrban Development
0.00
139366.75
510260.22
198908.97
440043.10
491164.01
827304.75
640494.00
703713.13
738228.64
756850.41
782351.56
804175.80
810817.96
793738.12
780928.24
798008.08
845333.47
901080.17
925988.27
972957.83
1048986.84
1100344.97
1153719.47
1234018.44
1322975.94
1359389.21
1407663.48
1501009.55
1607995.77
1667063.55
1753886.07
1877477.69
2011862.82
2125728.42
2244575.64
2363185.64
3799671.35
2687346.77
1380501.79
4261538.69
2978178.49
3078996.99
3168310.32
3280515.38
3410037.50
3491641.18
3543473.75
3577040.38
3638717.58
3706799.72
3753176.23
3816513.97
3887798.58
3950068.83
4009136.61
4069627.71
4130830.47
5348480.73
0.00
139366.75
510260.22
198908.97
440043.10
491164.01
827304.75
640494.00
703713.13
738228.64
756850.41
782351.56
804175.80
810817.96
793738.12
780928.24
798008.08
845333.47
901080.17
925988.27
972957.83
1048986.84
1100344.97
1153719.47
1234018.44
1322975.94
1359389.21
1407663.48
1501009.55
1607995.77
1667063.55
1753886.07
1877477.69
2011862.82
2125728.42
2244575.64
2363185.64
3799671.35
2687346.77
1380501.79
4261538.69
2978178.49
3078996.99
3168310.32
3280515.38
3410037.50
3491641.18
3543473.75
3577040.38
3638717.58
3706799.72
3753176.23
3816513.97
3887798.58
3950068.83
4009136.61
4069627.71
4130830.47
5348480.73
118600000Total Commitment in Fourth Quarter of 2017
International Bank for Reconstruction and Development303113Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-303113Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development29792500Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development-116380Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-189196Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development3379200Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-180692Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-185378Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices44000-P164824
World Bank
Enabling Digital Governance Project
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Shiho Nagaki
+1-202-473-1000snagaki@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIA
Kragujevac
44.0170 20.9170
Serbia
44.8190 20.4600
ICT ServicesCentral Government (Central Agencies)Public Administration - Information and Communications TechnologiesE-Government, incl. e-servicesData Development and Capacity BuildingClimate changeAdministrative and Civil Service ReformPublic AdministrationICTData production, accessibility and useDisaster Risk ManagementAdaptationICT SolutionsDisaster Response and Recovery
0.00
0.00
0.00
0.00
0.00
0.00
0.00
303066.67
303066.67
303066.67
303066.67
303066.67
303066.67
303066.67
303066.67
303066.67
303066.67
303066.67
303066.63
437495.83
437495.83
437495.83
437495.83
437495.83
437495.83
437495.83
437495.83
437495.83
437495.83
437495.83
437495.87
593400.00
632750.00
677850.00
348000.00
718700.00
763850.00
821100.00
871950.00
454150.00
946200.00
996200.00
1053350.00
1109150.00
572100.00
1172300.00
1206100.00
1255450.00
1297950.00
663250.00
1355350.00
1413200.00
1457000.00
739100.00
1493750.00
1507900.00
1533900.00
1562600.00
788700.00
1594000.00
1624300.00
1652300.00
1677650.00
848150.00
1715550.00
1741350.00
2254650.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
303066.67
303066.67
303066.67
303066.67
303066.67
303066.67
303066.67
303066.67
303066.67
303066.67
303066.67
303066.63
437495.83
437495.83
437495.83
437495.83
437495.83
437495.83
437495.83
437495.83
437495.83
437495.83
437495.83
437495.87
593400.00
632750.00
677850.00
348000.00
718700.00
763850.00
821100.00
871950.00
454150.00
946200.00
996200.00
1053350.00
1109150.00
572100.00
1172300.00
1206100.00
1255450.00
1297950.00
663250.00
1355350.00
1413200.00
1457000.00
739100.00
1493750.00
1507900.00
1533900.00
1562600.00
788700.00
1594000.00
1624300.00
1652300.00
1677650.00
848150.00
1715550.00
1741350.00
2254650.00
50000000Total Commitment in Second Quarter of 2019
International Bank for Reconstruction and Development124666Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-124666Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development4451400Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development-43140Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Loan Agreement. Article 4.01. The Additional Event of Suspension consists of the following, namely that the Project ImplementingEntity's Legislation has been amended, suspended, abrogated, repealed or waived so as to affect materially and adversely theability of the Project Implementing Entity (OITeG) to perform any of its obligations under the Project.
Schedule 2 of the Loan Agreement. Section I. Part C. Safeguards. Borrower through OITeG to ensure project implementation inaccordance with the Project's Safeguard Instruments.
Schedule 2 of the Loan Agreement. Section I. Part A.2. Unless otherwise agreed with the Bank, not later than one (1) month afterthe Effective Date, the Borrower shall establish and thereafter maintain throughout Project implementation a Project SteeringCommittee with responsibilities, composition and functions as set forth in the Project Operations Manual.
PDO Indicator
Number of citizens and businesss accessing e-services disagreggated by gender and size of businesses
PDO Indicator
Number of services digitalized and available online targetted at businesses and citizens
Intermediate Results Indicator
Number of entities connnected to the Interoperability Platform
Intermediate Results Indicator
Number of Citizen Satisfaction Surveys completed
Intermediate Results Indicator
Number of "to be" process maps generated for selected services
Intermediate Results Indicator
Number of services available online through the e-Gov Portal
PDO Indicator
Average increase in user satisfaction with selected e-services provided disagregated by gender and size of businesses (Citizens Engagement)
PDO Indicator
Amount of time it takes for citizens and businesses to obtain selected digitalized services
Intermediate Results Indicator
Development of an Administrative Service Inventory
Intermediate Results Indicator
Establishment of GOS Meta Register
44000-P155694
World Bank
Serbia Public Expenditure and Public Utilities DPL 1
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Ashley D. Taylor
+1-202-473-1000ataylor2@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIAOther Energy and ExtractivesRailwaysPublic Administration - Energy and ExtractivesCentral Government (Central Agencies)MitigationEnergyPublic Finance ManagementPublic AdministrationAdministrative and Civil Service ReformEnergy Policies & ReformState-owned Enterprise Reform and PrivatizationClimate changePublic Expenditure Management
0.00
0.00
200000000Total Commitment in First Quarter of 2017
International Bank for Reconstruction and Development510572Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development-510572Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development207006088Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-714037Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-744028Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-739113Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-750348Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-792831Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentLoan AgreementLoan AgreementContract AwardsProject URLProcurement Notices44000-P108005
World Bank
CORRIDOR X HIGHWAY PROJECT
International Bank for Reconstruction and Development
CORRIDOR X LIMITED LIABILITY COMPANY
International Bank for Reconstruction and Development
CORRIDOR X LIMITED LIABILITY COMPANYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Svetlana Vukanovic
+1-202-473-1000svukanovic@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIAPublic Administration - TransportationRural and Inter-Urban RoadsFinance for DevelopmentRural Infrastructure and service deliveryRural MarketsAgriculture FinanceRural Development
1000000.00
1000000.00
1000000.00
1666666.67
1666666.67
1666666.66
2333333.33
2333333.33
2333333.34
3333333.33
3333333.33
3333333.34
4166666.67
4166666.67
4166666.66
4166666.67
4166666.67
4166666.66
4166666.67
4166666.67
4166666.66
4166666.67
4166666.67
4166666.66
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
6250000.00
12500000.00
12500000.00
12500000.00
12500000.00
12500000.00
12500000.00
12500000.00
12500000.00
12500000.00
12500000.00
12500000.00
12500000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
2333333.33
2333333.33
2333333.34
2333333.33
2333333.33
2333333.34
2333333.33
2333333.33
2333333.34
2333333.33
2333333.33
2333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1149105.08
1149105.08
1149105.07
4188500.00
4188500.00
4188500.00
613480.00
613480.00
613480.00
0.00
0.00
0.00
0.00
0.00
0.00
720189.97
720189.97
720189.96
1385775.90
1385775.90
1385775.91
2984079.38
2984079.38
2984079.38
4838261.11
4838261.11
4838261.12
199976.17
199976.17
199976.18
4322641.50
4322641.50
4322641.51
1576147.82
1576147.82
1576147.83
4305320.53
4305320.53
4305320.52
5417084.79
5417084.79
5417084.79
5448451.03
5448451.03
5448451.02
2625842.83
2625842.83
2625842.83
8872182.64
8872182.65
8872182.65
2956161.78
2956161.78
2956161.78
5859272.65
5859272.66
5859272.66
4205762.14
4205762.14
4205762.14
3810545.54
3810545.55
3810545.55
6838463.10
6838463.10
6838463.11
5318328.96
5318328.97
5318328.97
1442108.00
1442108.00
1442108.00
6669047.00
6669047.00
6669047.00
3517286.60
3517286.60
3517286.60
2852545.68
2852545.68
2852545.68
1666666.66
1666666.67
1666666.67
3333333.33
3333333.33
3333333.34
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
3333333.33
3333333.33
3333333.34
1216773.10
1216773.10
1216773.10
4333333.33
4333333.33
4333333.34
5000000.00
5000000.00
5000000.00
3333333.33
3333333.33
3333333.34
1000000.00
1000000.00
1000000.00
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
388000000Total Commitment in Third Quarter of 2009
International Bank for Reconstruction and Development1022678Total Disbursement in Fourth Quarter of 2009
International Bank for Reconstruction and Development-1022678Total Interest Repayment in Fourth Quarter of 2009
International Bank for Reconstruction and Development-4056Total Interest Repayment in Second Quarter of 2010
International Bank for Reconstruction and Development3447315Total Disbursement in Second Quarter of 2010
International Bank for Reconstruction and Development12565500Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development-52828Total Interest Repayment in Fourth Quarter of 2010
International Bank for Reconstruction and Development1840440Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development-132555Total Interest Repayment in Second Quarter of 2011
International Bank for Reconstruction and Development2160570Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development4157328Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development-181734Total Interest Repayment in Fourth Quarter of 2011
International Bank for Reconstruction and Development8952238Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development-267954Total Interest Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development14514783Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development295067Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development304862Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development768666Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development-251253Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development12199258Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development3147551Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development1580893Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development9536199Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development-122471Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development1541352Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development1838411Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development1971227Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development3369030Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development10910997Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development1575836Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development-118823Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development4991933Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development9777584Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development6120790Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development1756739Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development1866851Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development-206295Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development21242212Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development3507484Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development1502444Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development2757920Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development4608121Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development4543895Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development-318731Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development1771602Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development11262321Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development10931783Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development1685504Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development2778948Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development-182084Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development670723Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development7981966Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development3902085Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development13698866Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development2914438Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development1540444Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development-181216Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development5054649Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development9359894Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development2102259Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development911319Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development1312746Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development7118263Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development-179314Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development9786685Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development3102193Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development380283Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development10019747Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development151830Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development8557637Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development-23485Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development201065Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development178179Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development38900000Total Commitment in Fourth Quarter of 2016
International Bank for Reconstruction and Development93319Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-93319Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development12770163Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development1830791Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development957727Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development-264Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development1210340Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development-37551Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development11758764Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development1195926Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development1095373Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development12899626Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development-12385848Total Loan Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development816808Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development548730Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development-52394Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development910295Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development11460646Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development-13653630Total Loan Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development20909897Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development518196Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development-49241Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development1873044Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development4641333Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-91387Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-13383290Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development3460587Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development18396Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development292647Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-100100Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-13052112Total Loan Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development3371358Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development1441976Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development1146900Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development1246156Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development1326819Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development-108108Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development-12711702Total Loan Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementAgreementAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :7746-YF | Description :Borrower shall undertake project in accordance with EIA/EMP and RPF/RAP. | Frequency:Monthly
Finance Agreement :7746-YF | Description :Prior to the signing of each contract for works, the Borrower shall submit to the Bank,evidence, confirming the availability of adequate compensation amounts. | Frequency :Yearly
Finance Agreement :7746-YF | Description :(xii) The Borrower shall ensure that the Project is carried out in accordance with theprovisions of the Anti-Corruption Guidelines | Frequency :Yearly
Finance Agreement :7746-YF | Description :Borrower shall hire a firm of independent consultants to supervise the environmental andsocial aspects in the project | Due Date :31-Dec-2009
Finance Agreement :7746-YF | Description :(xv) The Borrower shall, not later than June 30, 2010, adopt and submit to the Bank anaction plan, in form and substance satisfactory to the Bank, for the reform of PEPS | Due Date :30-Jun-2010
Intermediate Results Indicator
Grievances related to delivery of project benefits that are addressed-(number)
Intermediate Results Indicator
Total number of person months of employment created under contractors to the local people (disaggregated by gender)
PDO Indicator
Road User costs for road section Nis-Dimitrovgrad
PDO Indicator
Road user costs for road section Grabovnica to Donji Neradovac
Intermediate Results Indicator
Grievances registered related to delivery of project benefits addressed (%)
PDO Indicator
Action Plan to improve institutional aspects of road management through reforms at PEPS adopted.
PDO Indicator
National Road Safety Strategy developed and launched
Intermediate Results Indicator
Lead agency for road safety established and operational
Intermediate Results Indicator
Two road safety pilot projects implemented
Intermediate Results Indicator
Making Road Safety Action Plan gender sensitive
Intermediate Results Indicator
Number of km constructed/upgraded for E-75 section
Intermediate Results Indicator
Number of km constructed/upgraded for E-80
44000-P094212
World Bank
Transitional Agriculture Reform Project
International Bank for Reconstruction and Development
REPUBLIC OF SERBIA
International Bank for Reconstruction and Development
REPUBLIC OF SERBIAPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Olivera Jordanovic
+1-202-473-1000ojordanovic@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIAAgricultural Extension, Research, and Other Support ActivitiesCentral Government (Central Agencies)Rural DevelopmentAgriculture FinanceRegional IntegrationFinance for DevelopmentRural MarketsRural Infrastructure and service delivery
0.00
405000.00
405000.00
405000.00
405000.00
405000.00
405000.00
405000.00
405000.00
405000.00
405000.00
405000.00
405000.00
394166.67
394166.67
394166.66
394166.67
394166.67
394166.66
394166.67
394166.67
394166.66
394166.67
394166.67
394166.66
320000.00
320000.00
320000.00
320000.00
320000.00
320000.00
320000.00
320000.00
320000.00
320000.00
320000.00
320000.00
297500.00
297500.00
297500.00
297500.00
297500.00
297500.00
297500.00
297500.00
297500.00
297500.00
297500.00
297500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
154822.50
154822.50
154822.50
0.00
0.00
0.00
53347.96
53347.96
53347.97
37162.97
37162.97
37162.98
104666.56
104666.56
104666.57
500000.00
500000.00
500000.00
666666.67
666666.67
666666.66
750000.00
750000.00
750000.00
833333.33
833333.33
833333.34
1166666.67
1166666.67
1166666.66
1400000.00
1400000.00
1400000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17000000Total Commitment in Second Quarter of 2007
International Bank for Reconstruction and Development-56271Total Interest Repayment in First Quarter of 2009
International Bank for Reconstruction and Development464468Total Disbursement in Second Quarter of 2009
International Bank for Reconstruction and Development-25550Total Interest Repayment in Third Quarter of 2009
International Bank for Reconstruction and Development160044Total Disbursement in Fourth Quarter of 2009
International Bank for Reconstruction and Development-24798Total Interest Repayment in First Quarter of 2010
International Bank for Reconstruction and Development111489Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development292243Total Disbursement in Second Quarter of 2010
International Bank for Reconstruction and Development313235Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development-23929Total Interest Repayment in Third Quarter of 2010
International Bank for Reconstruction and Development1391150Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development1389368Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development525359Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development-33550Total Interest Repayment in First Quarter of 2011
International Bank for Reconstruction and Development-57593Total Interest Repayment in Third Quarter of 2011
International Bank for Reconstruction and Development1037971Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development1211739Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development1313945Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development870851Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development-81741Total Interest Repayment in First Quarter of 2012
International Bank for Reconstruction and Development-3052657Total Commitment Cancellations in Second Quarter of 2012
International Bank for Reconstruction and Development691918Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development436627Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development-72882Total Interest Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development-371808Total Loan Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development135595Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development-44178Total Interest Repayment in First Quarter of 2013
International Bank for Reconstruction and Development-424289Total Loan Repayment in First Quarter of 2013
International Bank for Reconstruction and Development133200Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development262380Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development-30006Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development-446948Total Loan Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development-2959751Total Commitment Cancellations in Fourth Quarter of 2013
International Bank for Reconstruction and Development-52688Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development-27364Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development-458620Total Loan Repayment in First Quarter of 2014
International Bank for Reconstruction and Development-27425Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development-447529Total Loan Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development-19640Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-381969Total Loan Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-12166Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-373822Total Loan Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-10400Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-374457Total Loan Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-4529Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-373721Total Loan Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-1893Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-353195Total Loan Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-553Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-393127Total Loan Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-417300Total Loan Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-378707Total Loan Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-377151Total Loan Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-373186Total Loan Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-362597Total Loan Repayment in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementGrant or Trust Fund AgreementContract AwardsProject URLProcurement Notices
MAFWM has contracted the ISAA to administer contracts for applied research and extension support
No withdrawal will be made for support of ext.service and applied research contracts unless Borrower has adopted Ag.Ext.Strategysat.to Bank
NO WITHDRAWAL WILL BE MADE FOR RURAL DEVELOPMENT GRANTS UNLESS STARA PLANINA ADVISORY COMMITTEE IS ESTABLISHED
Intermediate Results Indicator
Clients who adopted an improved agr. technology promoted by project – female
Gender-disaggregated data not available
Gender-disaggregated data not available.
Intermediate Results Indicator
Collaborative research or extension sub-projects - completed (number)
4 canceled during implementation. End target 93 percent achieved.
Intermediate Results Indicator
Collaborative research or extension sub-projects - under implementation
No sub-projects under implementation as all have been completed.
Intermediate Results Indicator
Technologies demonstrated in the project areas (number)
End target achieved.
Intermediate Results Indicator
Clients who have adopted an improved agr. technology promoted by the project
30% of the 83,548 framers and SMEs involved in the program.
Intermediate Results Indicator
Collaborative research/extension sub-projects under implementation/completed
4 canceled during implementation. End target 93 percent achieved.
GEO Indicator
Expanded areas under ecological management and/or restoration within the Stara Planina Park and surrounding area
Community attitudes towards ecologically sustainable farming practices adoption substantially improved.Target mainly achieved.Srbijashume not yet implemented all aspects of the monitoring plan for the ecological management plan (Monitoring Plan), aspastures and biodiversity monitoring is lacking.
PDO Indicator
Rising profitability and competitiveness of Serbian agriculture
Achieved from an aggregate sector perspective. Rapidly rising agriculture exports confirm export competitiveness. Attribution toproject unmeasured. Final project evaluation confirmed improved competitiveness of direct project beneficiaries.
PDO Indicator
Improved farmer access to appropriate technology.
2010 extension law created a public extension service, however, fee-based advisory services also available from certified privateproviders. Extension advisor registration law under preparation. End target partially achieved. Sustainability challenged bylimited budget funding and competitive grant schemes not being streamlined by the MAFWM.
PDO Indicator
Improved MAFWM ability to disburse and track rural development funds and to evaluate their impact on the agri-food sector
Serbia does not have access to EU-IPARD funds yet, due to delayed EU accession process. However, a compliant rural developmentstrategy is under preparation; and a paper-based EU-compliant rural development and agrarian payment processes in place in thePaying Agency (PA) which was established in 2009. PA is under self-evaluation process which is the step toward accreditation forprocessing the EU funds. End target partially achieved. Gap to end target caused by overall delays in EU accession process and lackof commitment on part of the Ministry.
Intermediate Results Indicator
Increase in number of RD grants to SPNP municipalities for targeted activities
Complex administrative procedures and clearances have prevented the optimization of the program so as to absorb more projectresources, where demand existed, and capacity to undertake works was adequate.
Intermediate Results Indicator
Area of abandoned and degraded meadows/grasslands and pastures restored (Pilot program)
Grazing practices as a management tool for high mountain grasslands was re-introduced through GEF grant program. First callresulted in 400 livestock units brought to selected endangered pastures, while there was 532 livestock units under the second call.The ministry needs to continue support in order to maintain the increasing trend in the number of livestock brought to the selectedpastures. Without a subsidy policy, current numbers will be difficult to maintain, especially given the ongoing drop in livestockfigures. Target 75 percent achieved.
Intermediate Results Indicator
Management plan for SPNP prepared in a participatory manner with communities, landowners and Srbijasume, including areas of highestpriority for wild biodiversity in core protection zone
Target achieved. Possible EU LEADER activities are likely to strengthen future SPNP management.
Intermediate Results Indicator
Number of extension service providers accredited with specific competencies
None of original 347 providers had been accredited at project start.
End target achieved and exceeded.
Intermediate Results Indicator
Number of farmers within target group who implement activities directly related to knowledge products developed with project assistance
Achieved.30% of 83,548 farmers (about 25,000) who benefited from applied research & extension service competitive grant schemes(ARES CGS) are estimated to have adopted the technology and knowledge disseminated through ARES CGS program.
Intermediate Results Indicator
EU compliant rural development Managing Authority (MA) and Monitoring Committee (MC) operating effectively
Harmonization with IPARD requirements underway. Limited national funding of Rural Development measures. Managing Authorityestablished, preparing national rural development strategy 2014-2020. Monitoring Committee not formally established.
Intermediate Results Indicator
Payment Agency established and transparent and efficient EU-compliant procedures adopted
Paying Agency functioning and EU accreditation initiated, however, delayed EU accession and limited funding have constrained IPARDsystems application. Harmonization of PA procedures with IPARD procedures is ongoing.
44000-P157117
World Bank
Inclusive Early Childhood Education and Care
International Bank for Reconstruction and Development
MINISTRY OF EDUCATION
International Bank for Reconstruction and Development
MINISTRY OF EDUCATIONPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Bojana Naceva
+1-202-473-1000bnaceva@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIA
Opstina Beograd-Zvezdara
44.7740 20.5340
Opstina Zrenjanin
45.3790 20.3960
Opstina Zitoraga
43.1910 21.7140
Opstina Zitiste
45.4850 20.5520
Opstina Beograd-Zemun
44.8440 20.4080
Opstina Zagubica
44.1970 21.7870
Opstina Zabari
44.3570 21.2130
Opstina Zabalj
45.3730 20.0700
Opstina Vrsac
45.1170 21.3010
Opstina Vrnjacka Banja
43.6100 20.8880
Opstina Vranje
42.5500 21.8980
Opstina Beograd-Vracar
44.7890 20.4710
Opstina Beograd-Vozdovac
44.7770 20.4790
Opstina Vlasotince
42.9650 22.1290
Opstina Vladicin Han
42.7060 22.0640
Opstina Veliko Gradiste
44.7610 21.5190
Opstina Velika Plana
44.3350 21.0770
Opstina Varvarin
43.7230 21.3630
Opstina Ub
44.4580 20.0770
Opstina Tutin
42.9890 20.3330
Opstina Trstenik
43.6180 20.9980
Opstina Trgoviste
42.3640 22.0830
Opstina Topola
44.2530 20.6830
Opstina Titel
45.2040 20.2980
Opstina Svrljig
43.4150 22.1240
Opstina Svilajnac
44.2340 21.1960
Opstina Jagodina
43.9760 21.2630
Opstina Surdulica
42.6900 22.1740
Opstina Beograd-Stari Grad
44.8180 20.4640
Opstina Stara Pazova
44.9840 20.1650
Opstina Beograd-Sopot
44.5230 20.5760
Opstina Sokobanja
43.6450 21.8670
Opstina Smederevska Palanka
44.3670 20.9600
Opstina Smederevo
44.6610 20.9330
Opstina Senta
45.9330 20.0830
Opstina Secanj
45.3670 20.7740
Opstina Beograd-Savski Venac
44.7730 20.4410
Opstina Rekovac
43.8630 21.0930
Opstina Razanj
43.6740 21.5480
Opstina Raska
43.2820 20.6210
Opstina Raca
44.2270 20.9790
Opstina Prokuplje
43.2360 21.5910
Opstina Presevo
42.3120 21.6510
Opstina Pozega
43.8470 20.0360
Opstina Pozarevac
44.6220 21.1850
Opstina Plandiste
45.2290 21.1240
Opstina Pirot
43.1530 22.5880
Opstina Petrovac na Mlavi
44.3760 21.4220
Opstina Pecinci
44.9100 19.9680
Opstina Paracin
43.8600 21.4140
Pancevo-grad
44.8640 20.6580
Opstina Opovo
45.0550 20.4310
Opstina Beograd-Obrenovac
44.6540 20.1980
Opstina Novi Knezevac
46.0480 20.1070
Opstina Novi Becej
45.5990 20.1380
Opstina Nova Crnja
45.6670 20.6030
Opstina Niska Banja
43.2900 22.0030
Opstina Negotin
44.2260 22.5290
Opstina Beograd-Mladenovac
44.4450 20.6980
Opstina Mionica
44.2510 20.0820
Opstina Merosina
43.2830 21.7210
Opstina Medveda
42.8410 21.5860
Opstina Malo Crnice
44.5580 21.2850
Opstina Majdanpek
44.4250 21.9450
Opstina Lucani
43.8580 20.1400
Opstina Ljig
44.2220 20.2380
Opstina Leskovac
42.9970 21.9470
Opstina Lebane
42.9180 21.7350
Opstina Beograd-Lazarevac
44.3850 20.2600
Opstina Lajkovac
44.3730 20.1650
Opstina Kursumlija
43.1420 21.2780
Opstina Kucevo
44.4730 21.6650
Opstina Krusevac-grad
43.5830 21.3260
Opstina Kraljevo
43.7260 20.6860
Opstina Kragujevac
44.0230 20.9090
Opstina Kovin
44.7470 20.9790
Opstina Kovacica
45.1100 20.6230
Opstina Knic
43.9260 20.7200
Opstina Kladovo
44.6060 22.6170
Opstina Kikinda
45.8290 20.4640
Opstina Ivanjica
43.5790 20.2320
Opstina Indija
45.0510 20.0820
Opstina Beograd-Grocka
44.6700 20.7170
Opstina Gornji Milanovac
44.0340 20.4660
Opstina Golubac
44.6530 21.6300
Opstina Gadzin Han
43.2230 22.0330
Opstina Doljevac
43.1990 21.8330
Opstina Dimitrovgrad
43.0150 22.7800
Opstina Despotovac
44.0940 21.4430
Opstina Cuprija
43.9280 21.3740
Opstina Beograd-Cukarica
44.7830 20.4160
Opstina Crna Trava
42.8110 22.2990
Opstina Coka
45.9410 20.1460
Opstina Cicevac
43.7190 21.4410
Opstina Cacak-grad
43.8840 20.3440
Opstina Bujanovac
42.4600 21.7690
Opstina Brus
43.3850 21.0330
Opstina Bosilegrad
42.5010 22.4740
Opstina Bor
44.0650 22.0980
Opstina Boljevac
43.8310 21.9590
Opstina Bojnik
43.0120 21.7200
Opstina Blace
43.2990 21.2830
Opstina Bela Palanka
43.2210 22.3180
Opstina Bela Crkva
44.9000 21.4200
Opstina Batocina
44.1530 21.0800
Opstina Beograd-Barajevo
44.5770 20.4120
Opstina Babusnica
43.0660 22.4130
Opstina Arilje
43.7510 20.0980
Opstina Arandelovac
44.3100 20.5610
Opstina Alibunar
45.0790 20.9680
Opstina Aleksinac
43.5430 21.7030
Opstina Aleksandrovac
43.4590 21.0490
Opstina Ada
45.8030 20.1340
Opstina Beograd-Rakovica
44.7510 20.4680
Opstina Sjenica
43.2730 20.0040
Opstina Lapovo
44.1860 21.1010
Palilula
44.8120 20.5160
Opstina Vrbas
45.5670 19.6510
Opstina Valjevo
44.2730 19.8930
Opstina Temerin
45.4110 19.9020
Opstina Subotica
46.0990 19.6630
Opstina Srbobran
45.5520 19.8020
Opstina Sombor
45.7760 19.1200
Opstina Ruma
45.0080 19.8170
Opstina Novi Sad
45.2500 19.8330
Opstina Mali Idos
45.7070 19.6670
Opstina Kula
45.6090 19.5260
Opstina Koceljeva
44.4680 19.8190
Opstina Irig
45.1020 19.8560
Opstina Beocin
45.2100 19.7200
Opstina Becej
45.6160 20.0360
Opstina Backi Petrovac
45.3600 19.5940
Opstina Backa Topola
45.8170 19.6410
Opstina Backa Palanka
45.2500 19.3930
Opstina Bac
45.3910 19.2330
Opstina Apatin
45.6700 18.9830
Opstina Sid
45.1280 19.2250
Opstina Sremska Mitrovica
44.9770 19.6150
Opstina Sremski Karlovci
45.2020 19.9340
Opstina Sabac-grad
44.7520 19.6910
Opstina Vladimirci
44.6150 19.7840
Opstina Bogatic
44.8400 19.4840
Opstina Loznica
44.5310 19.2260
Opstina Mali Zvornik
44.3730 19.1050
Opstina Krupanj
44.3670 19.3640
Opstina Osecina
44.3740 19.5950
Opstina Ljubovija
44.1890 19.3760
Opstina Kosjeric
43.9980 19.9070
Opstina Bajina Basta
43.9730 19.5600
Opstina Uzice-grad
43.8610 19.8410
Opstina Cajetina
43.7490 19.7140
Opstina Priboj
43.5820 19.5270
Opstina Nova Varos
43.4610 19.8180
Opstina Prijepolje
43.3850 19.6470
Opstina Petrovaradin
45.2530 19.8740
Opstina Beograd-Surcin
44.7940 20.2830
Opstina Nis-Medijana
43.3140 21.9080
Opstina Nis-Pantelej
43.3340 21.9240
Opstina Nis-Palilula
43.3020 21.9020
Opstina Nis-Crveni Krst
43.3460 21.8400
Opstina Kostolac
44.7150 21.1690
Opstina Vranjska Banja
42.5510 21.9950
Public Administration - EducationSocial ProtectionEarly Childhood EducationSocial ProtectionEducationEducation FacilitiesEducation Governance, School-Based ManagementStandards, Curriculum and TextbooksSocial Safety NetsAccess to EducationTeachers
0.00
0.00
0.00
0.00
0.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
0.00
0.00
0.00
0.00
0.00
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.37
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
823541.67
823541.67
823541.67
823541.67
823541.67
823541.67
823541.67
823541.67
823541.67
823541.67
823541.67
823541.63
50000000Total Commitment in First Quarter of 2017
International Bank for Reconstruction and Development144995Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-144995Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development121845Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development698100Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development-122692Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-68063Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development5209163Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-66655Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development816957Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development-73062Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Project Management Unit (PMU) | Description :The Borrower shall establish and maintain throughout Projectimplementation, with composition, resources, terms of reference and functions acceptable to the Bank a Project Management Unit(PMU), within MoESTD, as further detailed in the Project Operations Manual. | Frequency :CONTINUOUS
Finance Agreement :Central Fiduciary Unit (CFU) | Description :The Borrower shall establish and maintain throughout Projectimplementation, with composition, resources, terms of reference and functions acceptable to the Bank a Central Fiduciary Unit(CFU), within MoF, to be responsible for the procurement and financial management of the Project, and appoint a MoF staff tocoordinate and oversee the CFU, as further detailed in the Project Operations Manual. | Frequency :CONTINUOUS
Finance Agreement :Working Group | Description :The Borrower shall establish and maintain throughout Project implementation, withcomposition, resources, terms of reference and functions acceptable to the Bank a Working Group to be responsible for providingtechnical expertise and support to the Project Management Unit on day-to-day Project implementation activities, as further detailedin the Project Operations Manual. | Frequency :CONTINUOUS
Finance Agreement :Consultative Group | Description :The Borrower shall establish and maintain throughout Project implementation,with composition, resources, terms of reference and functions acceptable to the Bank a Consultative Group to advise on ECED policyissues, programs and related grants and other actions at the local, regional, and national levels, and to contribute to events andinformation dissemination, as further detailed in the Project Operations Manual. | Frequency :CONTINUOUS
Finance Agreement :Grant Approval Committee (GAC) | Description :The Borrower shall establish and maintain throughout Projectimplementation, with composition, resources, terms of reference and functions acceptable to the Bank a Grant Approval Committee tobe responsible for evaluating and selecting grant proposals under Part 3.B of the Project, in accordance with the criteria setforth in the Grant Operations Manual (GOM). | Frequency :CONTINUOUS
Finance Agreement :Inter-sectoral teams | Description :The Borrower shall establish and maintain throughout Project implementation,with composition, resources, terms of reference and functions acceptable to the Bank inter-sectoral teams, as further detailed inthe Project Operations Manual. | Frequency :CONTINUOUS
Finance Agreement :Agreement between Borrower and local self-government | Description :Prior to carrying out the works selectedwithin an individual municipality, the Borrower shall enter into an agreement with the respective local self-government, with allterms and conditions required under the GOM, including specifically the obligation of the local self-government to maintain thenew, renovated, repurposed and/or upgraded preschools, and to provide the necessary staffing and public utilities connectionsnecessary for the functioning and maintenance of the said preschools. | Frequency :CONTINUOUS
Finance Agreement :Grant eligibility criteria and procedures | Description :The Borrower shall provide grants to grant recipientsin accordance with eligibility criteria and procedures acceptable to the Bank, as set forth in Grant Operations Manual, and shallextend each grant to the respective grant recipient under a grant agreement on terms and conditions approved by the Bank. |Frequency :CONTINUOUS
Finance Agreement :Environmental, Social and Resettlement Frameworks (ESMF and RPF) | Description :The Borrower shall ensure thatthe Project is carried out in accordance with the respective terms of the Environmental and Social Management Framework (ESMF) andthe Resettlement Policy Framework (RPF), and the policies, procedures and arrangements therein set forth are applied andimplemented; and the ESMF and the RPF, or any provision thereof, shall not be amended, suspended, abrogated, terminated or waivedor permitted to be amended, suspended, abrogated, terminated or waived, except with the prior written approval of the Bank. |Frequency :CONTINUOUS
Finance Agreement :Resettlement Action Plan (RAP) | Description :Prior to the commencement of civil works, the Borrower shall: (a)submit to the Bank for its approval, in form and substance satisfactory to the Bank (i) any required Resettlement Action Plan(RAP),including the relevant social assessment, and (ii) any required Environmental Management Plan (EMP); (b) ensure that theprovisions of the said RAP(s) and EMP(s) are adequately included in the contract(s) for works; and (c) ensure that the said RAP(s)is/are disclosed and, unless the Bank shall otherwise agree, all related, adequate compensation amounts are paid in full, all inaccordance with the related RAP(s) and EMP(s), the RPF and the ESMF. | Frequency :CONTINUOUS
Finance Agreement :Accounting software | Description :No later than ninety (90) days from the date of effectiveness, the Borrower,through the CFU, shall have, under terms of reference and in a manner acceptable to the Bank installed and adapted appropriateaccounting software for Project accounting, budgeting and reporting. | Due Date :17-Nov-2017
Finance Agreement :Eligibility of Grant proceeds | Description :For grants financed under Component 3.2 of the Project, if, in theopinion of the Bank, the loan amounts advanced to the Borrower for grants were not used for the grantsâ intended purposes, theBorrower shall refund such advance (or portion of such advance as determined by the Bank) to the Bank promptly upon notice thereofby the Bank. | Frequency :CONTINUOUS
Intermediate Results Indicator
Additional qualified preschool teachers resulting from project interventions
Intermediate Results Indicator
Pre-service training institutions that reformed their study programs based on the new preschool curriculum, and core competences required for preschool teachers
Intermediate Results Indicator
Grants awarded to eligible municipalities
Intermediate Results Indicator
Number of sub-projects with civil works for which consultation summaries are produced and disseminated
Intermediate Results Indicator
Additional classrooms built or rehabilitated at the preschool level resulting from project interventions
Intermediate Results Indicator
Primary school pedagogical staff trained in new preschool curriculum
Intermediate Results Indicator
Additional classrooms built at the preschool level resulting from project interventions
Intermediate Results Indicator
Additional classrooms rehabilitated or re-purposed at the preschool level resulting from project interventions
PDO Indicator
National preschool enrollment rates for children ages 3 and 5.5 years
PDO Indicator
Preschools that undergo external evaluation and rank 4 (on a scale of 1 to 4)
PDO Indicator
Children ages 12 to 59 months in the lowest quintile with whom an adult has engaged in early stimulation activities at home
PDO Indicator
National preschool enrollment rates for children ages 3 and 5.5 years within the eligible municipalities
PDO Indicator
Children ages 12 to 59 months from Roma families with whom an adult has engaged in early stimulation activities at home
Intermediate Results Indicator
Preschool construction and rehabilitation projects preceded by a community stakeholder consultation
Intermediate Results Indicator
Male participants (among benefiting families) in grant activities
Intermediate Results Indicator
Preschools with self-evaluations completed using updated instrument.
Intermediate Results Indicator
Communication campaign developed and rolled out
Intermediate Results Indicator
Evaluation of first phase of grant program completed and lessons incorporated into the second phase of the program
44000-P152018
World Bank
Floods Emergency Recovery Project
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Berina Uwimbabazi
+1-202-473-1000buwimbabazi@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIA
Zaječar
43.9040 22.2640
Velika Plana
44.3340 21.0770
Varvarin
43.7240 21.3620
Trstenik
43.6170 21.0030
Svilajnac
44.2340 21.1970
Smederevska Palanka
44.3650 20.9590
Rekovac
43.8630 21.0930
Ražanj
43.6720 21.5490
Rakovica
44.7420 20.4410
Rača
44.2270 20.9780
Požarevac
44.6210 21.1880
Petrovac
44.3770 21.4190
Paraćin
43.8610 21.4080
Obrenovac
44.6550 20.2000
Mladenovac
44.4390 20.6990
Mionica
44.2520 20.0820
Lučani
43.8610 20.1380
Loznica
44.3220 20.0540
Ljig
44.2300 20.2380
Lazarevac
44.3850 20.2560
Lajkovac
44.3690 20.1650
Kruševac
43.5800 21.3340
Kraljevo
43.7260 20.6890
Kragujevac
44.0170 20.9170
Jagodina
43.9770 21.2610
Grocka
44.6720 20.7180
Gornji Milanovac
44.0260 20.4620
Doljevac
43.1980 21.8330
Despotovac
44.0920 21.4470
Ćuprija
43.9280 21.3700
Čačak
43.8910 20.3500
Aleksinac
43.5420 21.7080
Knić
43.9270 20.7190
Vladimirci
44.6150 19.7850
Valjevo
44.2750 19.8980
Užice
43.8590 19.8490
Sremska Mitrovica
44.9760 19.6120
Požega
45.3400 17.6850
Šabac
44.7470 19.6900
Osečina
44.3730 19.6010
Mali Zvornik
44.3730 19.1070
Ljubovija
44.1890 19.3770
Krupanj
44.3660 19.3620
Kosjerić
43.9960 19.9070
Koceljeva
44.4740 19.8120
Bogatić
44.8380 19.4810
Bajina Bašta
43.9710 19.5670
Other Energy and ExtractivesOther TransportationOther Public AdministrationOther Agriculture, Fishing and ForestryOther Water Supply, Sanitation and Waste ManagementDisaster PreparednessDisaster Risk FinanceFinance for DevelopmentDisaster Risk ReductionAir quality managementWater PollutionSoil PollutionJobsDisaster Response and RecoveryEnvironmental Health and Pollution ManagementDisaster Risk Management
33333333.33
33333333.33
33333333.34
13333333.33
13333333.33
13333333.34
13333333.33
13333333.33
13333333.34
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18166666.67
18166666.67
18166666.67
18166666.67
18166666.67
18166666.67
18166666.67
18166666.67
18166666.64
2116666.67
2116666.67
2116666.67
2116666.67
2116666.67
2116666.67
2116666.67
2116666.67
2116666.67
2116666.67
2116666.67
2116666.63
1758333.33
1758333.33
1758333.33
1758333.33
1758333.33
1758333.33
1758333.33
1758333.33
1758333.33
1758333.33
1758333.33
1758333.37
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.63
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
300000000Total Commitment in Fourth Quarter of 2014
International Bank for Reconstruction and Development622073Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development-622073Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development100405955Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development41471955Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development21625996Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development4034782Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development11584981Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development-1122363Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development2363168Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development1290971Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development6139203Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development-906196Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development66703Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development3303840Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development-799382Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development2717653Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development62766Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-758542Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development861744Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development2528950Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development281800Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development305322Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development3425345Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development-829595Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development3316637Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development2581587Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development623441Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development520381Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development433609Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development1640101Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development-843746Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development406162Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development4444471Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development1808679Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development1243440Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-3679360Total Commitment Cancellations in Fourth Quarter of 2018
International Bank for Reconstruction and Development3586281Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-850528Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development351009Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development376588Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development84690Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development11185649Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-873549Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development85948Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development1767040Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development239573Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development1607928Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development-961860Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Farm Incentives Program | Description :The Borrower shall not amend, suspend, abrogate, repeal or waive the FarmIncentive Program in any way that, in the opinion of the Bank, would affect materially and adversely the payments to farmers in theFlood Affected Areas, under Part II of the Project. | Frequency :CONTINUOUS
Finance Agreement :Project Implementation Team - EPS | Description :The Borrower through the Office for Reconstruction and FloodRelief shall cause the Project Implementing Entity to establish not later than November 15, 2014, and thereafter maintain a Projectimplementation team with terms of reference, competent staff and sufficient resources, satisfactory to the Bank, for purposes ofcarrying out Part I of the Project. | Due Date :15-Nov-2014
Finance Agreement :Project Implementation Unit - DWM | Description :The Borrower shall ensure that MAEP establishes and maintains aProject Implementation Unit under the Directorate of Water Management with terms of reference, competent staff, including amanager, a procurement specialist, a financial management specialist, a safeguards specialist, and a monitoring and evaluationspecialist, and sufficient resources, satisfactory to the Bank, to carry out Parts II and III of the Project.
Finance Agreement :Subsidiary Agreement | Description :The Borrower shall make proceeds of the Loan to the Project ImplementingEntity under a subsidiary agreement (SA): the principal amount of the Loan made available under the SA shall be: (a) denominatedand repayable in Euros; and (b) made in no less favorable terms than the terms of the Loan. The Borrower shall not assign, amend,abrogate or waive the SA or any of its provisions. | Frequency :CONTINUOUS
Finance Agreement :Environmental Management Plan (EMP) Implementation | Description :The Borrower shall ensure, and shall cause theProject Implementing Entity to ensure, the complete implementation of the EMP for the Tamnava West Open Pit Mine and any and allEMPs in a manner acceptable to the Bank, including all necessary measures to minimize and to mitigate any adverse environmentalimpacts caused by the implementation of the Project. | Frequency :CONTINUOUS
Finance Agreement :Project Reports | Description :The Borrower shall monitor and evaluate the progress of the Project and prepareProject Reports. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not laterthan forty-five (45) days after the end of the period covered by such report. | Frequency :CONTINUOUS
Finance Agreement :Financial Reports | Description :The Borrower shall prepare and furnish to the Bank not later than 45 days afterthe end of each calendar quarter, interim unaudited financial reports for the Project covering the quarter, in form and substancesatisfactory to the Bank. | Frequency :Quarterly
Finance Agreement :Auditing of Financial Reports | Description :The Borrower shall have its Financial Statements audited inaccordance with the provisions of Section 5.09(b) of the General Conditions. Each audit of the Financial Statements shall coverthe period of one fiscal year of the Borrower. The audited Financial Statements for each such period shall be furnished to theBank not later than six months after the end of such period. | Frequency :Yearly
Finance Agreement :Auditing of Financial Reports of PIE | Description :The Borrower shall ensure that the Project ImplementingEntity has its financial statements audited on an annual basis. The audited Financial Statements for each such period shall befurnished to the Bank not later than nine (9) months after the end of such period. | Frequency :Yearly
Finance Agreement :Financial Sustainability of Project Implementing Agency (EPS) | Description :The Borrower undertakes to ensurethe financial sustainability of the PIE, on the basis of a set of operational and financial target indicators acceptable to theBank and set forth in the PIE Operations Manual, to be reviewed and adjusted, at least annually. The Borrower undertakes to preparea time-bound action plan, acceptable to the Bank to address deviations from the targets. | Frequency :CONTINUOUS
PDO Indicator
Number of households receiving improved flood protection
Intermediate Results Indicator
Number of meters replaced in affected areas
Intermediate Results Indicator
Direct project beneficiaries
Intermediate Results Indicator
Number of fixed substations rehabilitated in the flood affected areas
Intermediate Results Indicator
Number of public lighting meters installed
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
Farms benefiting from Government support in the affected areas
PDO Indicator
Agriculture production in flood affected municipalities recovered to pre-floods levels
Intermediate Results Indicator
Dewatering of the Tamnava West Field mine finalized
Intermediate Results Indicator
Length of flood protection reconstruction / rehabilitation works
PDO Indicator
Availability of power supplies restored to pre-flood levels through additional domestic generation/imports.
PDO Indicator
Agricultural land receiving improved flood protection
44000-P149750
World Bank
Second Programmatic State Owned Enterprises Reform DPL
International Bank for Reconstruction and Development
111MINISTRY OF FINANCE
International Bank for Reconstruction and Development
111MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Javier Suarez
+1-202-473-1000jsuarez@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIASub-National GovernmentState-owned Enterprise Reform and PrivatizationLabor Market Policy and ProgramsPublic AdministrationActive Labor Market Programs
0.00
0.00
100000000Total Commitment in Fourth Quarter of 2016
International Bank for Reconstruction and Development239149Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-239149Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development96705710Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-44625Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-305229Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-279756Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-264715Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-267024Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-286631Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Information DocumentImplementation Completion and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Reduction of direct and indirect support to companies in the Privatization Agency portfolio - new arrears to public utilities (EUR mn)
Intermediate Results Indicator
Reduction of direct and indirect support to companies in the Privatization Agency portfolio - new tax obligations and social contributions arrears (EUR mn)
Intermediate Results Indicator
Reduction of direct subsidies and issuance of new guarantees for liquidity purposes for remaining large SOEs - annual guarantees for liquidity purposes (EUR mn)
Intermediate Results Indicator
Number of participants in public works increases from 2,882 in 2013 to at least 7,000 in 2016
Intermediate Results Indicator
Number of redundant workers receiving compensation from the Transition Fund increases from approx. 5,700 (2014) to at least 25,000 (cumulative 2015 and 2016)
Intermediate Results Indicator
Reduction of direct subsidies and issuance of new guarantees for liquidity purposes for remaining large SOEs - direct subsidies (EUR mn)
Intermediate Results Indicator
Audited financial statements prepared and published by enterprises in accordance with provisions of Law on PE and new Laws on Accounting and Auditing, for PEs which the founder is the Republic of Serb
Intermediate Results Indicator
Reduction of direct and indirect support to companies in the Privatization Agency portfolio - annual direct subsidies and soft loans (EUR mn)
Intermediate Results Indicator
At least 30 percent of workers made redundant from public enterprises during 2016 register with NES
Intermediate Results Indicator
Disposal and treatment of legacy hazardous waste generated by companies in the Privatization Agency portfolio - total volume of legacy hazardous waste that was disposed and/or treated
44000-P167634
World Bank
Serbia Competitive Agriculture Project (SCAP)
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Svetlana Edmeades
+1-202-473-1000sedmeades@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIAAgricultural Extension, Research, and Other Support ActivitiesPublic Administration - Agriculture, Fishing & ForestryAgricultural markets, commercialization and agri-businessJob CreationICT SolutionsRural DevelopmentGenderRural MarketsFinance for DevelopmentAgriculture FinanceICTJobs
62500.00
62500.00
62500.00
62500.00
62500.00
62500.00
62500.00
62500.00
529291.67
529291.67
529291.67
529291.67
529291.67
529291.67
529291.67
529291.67
529291.67
529291.67
529291.67
529291.63
720166.67
720166.67
720166.67
720166.67
720166.67
720166.67
720166.67
720166.67
720166.67
720166.67
720166.67
720166.63
739350.00
791450.00
848100.00
896100.00
946200.00
996200.00
1053350.00
1109150.00
1154050.00
1187800.00
1230500.00
1277650.00
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
2525800.00
1715550.00
1741350.00
2254650.00
0.00
0.00
0.00
0.00
62500.00
62500.00
62500.00
62500.00
62500.00
62500.00
62500.00
62500.00
529291.67
529291.67
529291.67
529291.67
529291.67
529291.67
529291.67
529291.67
529291.67
529291.67
529291.67
529291.63
720166.67
720166.67
720166.67
720166.67
720166.67
720166.67
720166.67
720166.67
720166.67
720166.67
720166.67
720166.63
739350.00
791450.00
848100.00
896100.00
946200.00
996200.00
1053350.00
1109150.00
1154050.00
1187800.00
1230500.00
1277650.00
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
1169937.50
2525800.00
1715550.00
1741350.00
2254650.00
0.00
0.00
0.00
0.00
50000000Total Commitment in Fourth Quarter of 2019
International Bank for Reconstruction and Development123946Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development-123946Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Loan AgreementContract AwardsProject URLProcurement Notices
PDO Indicator
New formal contracts signed between beneficiaries and buyers of their products/services
PDO Indicator
New formal contracts signed between women beneficiaries and buyers of their products/services
Intermediate Results Indicator
Beneficiaries successfully completing their business plans
Intermediate Results Indicator
Applications accessible from the integrated data platform of MAFWM
Intermediate Results Indicator
Farmers reached with agricultural assets or services
Intermediate Results Indicator
Unique users of the integrated information system
Intermediate Results Indicator
Farmers reached with agricultural assets or services - Female
Intermediate Results Indicator
Beneficiaries reached with financial services
Intermediate Results Indicator
Number of previously unbanked adults reached with transaction accounts
PDO Indicator
Increase in the value of beneficiaries production
Intermediate Results Indicator
Users of the integrated information platform reporting satisfaction (satisfied or very satisfied) with the information received viathe platform
Intermediate Results Indicator
Surveyed beneficiary women that report training/advisory services offered were responsive to their needs
Intermediate Results Indicator
Productivity increase of beneficiary production
44000-P170185
World Bank
Serbia Accelerating Innovation and Growth Entrepreneurship
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Maja Andjelkovic
+1-202-473-1000mandjelkovic@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIASocial ProtectionOther Industry, Trade and ServicesEnterprise DevelopmentMigration, Remittances and Diaspora EngagementBusiness Enabling EnvironmentEconomic Growth and PlanningInnovation and Technology PolicyEntrepreneurship
11111.11
11111.11
11111.11
11111.11
11111.11
11111.11
11111.11
11111.11
11111.12
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.63
741944.00
741944.00
741944.00
741944.00
741944.00
741944.00
741944.00
741944.00
741944.00
741944.00
741944.00
741944.00
814176.00
1308384.00
932400.00
981936.00
1039920.00
1087536.00
1125408.00
1157856.00
1205232.00
1246032.00
1282176.00
1327584.00
1380000.00
1413024.00
1434000.00
1447584.00
1472544.00
1500096.00
1518864.00
1544496.00
1573344.00
1598544.00
1622448.00
1646928.00
1671696.00
2164464.00
11111.11
11111.11
11111.11
11111.11
11111.11
11111.11
11111.11
11111.11
11111.12
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.63
741944.00
741944.00
741944.00
741944.00
741944.00
741944.00
741944.00
741944.00
741944.00
741944.00
741944.00
741944.00
814176.00
1308384.00
932400.00
981936.00
1039920.00
1087536.00
1125408.00
1157856.00
1205232.00
1246032.00
1282176.00
1327584.00
1380000.00
1413024.00
1434000.00
1447584.00
1472544.00
1500096.00
1518864.00
1544496.00
1573344.00
1598544.00
1622448.00
1646928.00
1671696.00
2164464.00
48000000Total Commitment in Fourth Quarter of 2019
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Contract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Amount of grant awards by SF, cumulative (USD million)
Intermediate Results Indicator
Amount of international funds attracted by SF supported projects (USD million)
PDO Indicator
Number of scientific publications in top 10 percent of internationally recognized journals (annual, not cumulative)
PDO Indicator
External investment generated by participating companies (USD million)
PDO Indicator
Number of collaborative applied research projects
PDO Indicator
Number of new or improved innovative products or services introduced to the market
Intermediate Results Indicator
Number of enterprises completing acceleration program
Intermediate Results Indicator
Number of diaspora members participating in the program
Intermediate Results Indicator
Number of joint publications by local and diaspora researchers
Intermediate Results Indicator
Number of collaborations between participating RDIs and private sector/international entities
Intermediate Results Indicator
Number of international R&D institutions participating in the Program
Intermediate Results Indicator
Number of SF staff trained
Intermediate Results Indicator
Number of internal assessment of RDIs
Intermediate Results Indicator
Number of Serbian researchers participating in the program
Intermediate Results Indicator
Number of accelerated enterprises achieving at least 10% annual growth one year after the program
Intermediate Results Indicator
Number of external assessments of RDIs
Intermediate Results Indicator
Number of publications supported by SF programs
Intermediate Results Indicator
Number of RDIs executing transformation plans
Intermediate Results Indicator
Percentage of which have at least one woman founder
Intermediate Results Indicator
Percentage of which going to projects with women principal investigators
Intermediate Results Indicator
Percent of which are women
Intermediate Results Indicator
Percentage of SF and IF survey respondents who report in annual surveys that effective engagement processes have been established
Intermediate Results Indicator
Establishment of Institutional Funding of SROs
44000-P147050
World Bank
Serbia - Real Estate Management Project
International Bank for Reconstruction and Development
REPUBLIC GEODETIC AUTHORITY
International Bank for Reconstruction and Development
REPUBLIC GEODETIC AUTHORITYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Olivera Jordanovic
+1-202-473-1000ojordanovic@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIA
Zemun
44.8430 20.4010
Autonomna Pokrajina Vojvodina
45.0000 20.0000
Sopot
43.2300 22.5650
Nis
43.3250 21.9030
Krusevac
43.5800 21.3340
Kragujevac
44.0170 20.9170
Zemun Polje
44.8670 20.3210
Ruma
45.0080 19.8220
Novi Sad
45.2520 19.8370
Belgrade
44.7970 20.4730
ICT ServicesPublic Administration - Information and Communications TechnologiesCentral Government (Central Agencies)Sub-National GovernmentOther Information and Communications TechnologiesFiscal PolicyE-Government, incl. e-servicesPersonal and Property RightsRule of LawTransparency, Accountability and Good GovernancePublic AdministrationUrban DevelopmentPublic Finance ManagementTax policyMunicipal FinanceDomestic Revenue Administration
0.00
0.00
0.00
0.00
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.37
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28129.50
31481.10
34329.96
37178.82
40147.38
88817.40
48358.80
50776.74
53146.80
113834.70
62674.92
66601.08
69761.16
72274.86
149002.56
75961.62
76799.52
78211.98
160517.70
81491.76
81802.98
81850.86
80582.04
158410.98
78834.42
79720.20
81348.12
83598.48
177251.76
91642.32
92695.68
94203.90
196379.82
104043.24
107682.12
109980.36
112111.02
232864.38
169846.48
169846.48
169846.48
169846.48
169846.48
169846.48
169846.48
169846.48
169846.48
169846.48
169846.48
169846.48
188750.75
188750.75
188750.75
188750.75
188750.75
188750.75
188750.75
188750.75
188750.75
188750.75
188750.75
188750.77
350447.67
350447.67
350447.67
350447.67
350447.67
350447.67
350447.67
350447.67
350447.67
350447.67
350447.67
350447.63
509333.33
509333.33
509333.33
509333.33
509333.33
509333.33
509333.33
509333.33
509333.33
509333.33
509333.33
509333.37
481496.02
481496.02
481496.02
481496.02
481496.02
481496.02
481496.02
481496.02
481496.02
481496.00
44000000Total Commitment in First Quarter of 2015
International Bank for Reconstruction and Development1701731Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development-102206Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development371861Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development-95482Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development615178Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development96249Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development1209562Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development1158993Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development-49645Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development1113448Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development708503Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development726862Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development-51684Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development1460174Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development507568Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development1109207Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development443467Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development-56659Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development1519535Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development2417938Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development288511Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development-55936Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development1240699Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development2160463Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development181729Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development1211868Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development1300810Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-56502Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development894410Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development902575Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development356883Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-59506Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-1000188Total Loan Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development4220344Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development353469Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development920045Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development-65300Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development-1259091Total Loan Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development215061Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development22900000Total Commitment in Fourth Quarter of 2019
International Bank for Reconstruction and Development56658Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development-56658Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development1047208Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementLoan AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Project Implementation Unit | Description :The Borrower establishes and maintains the PIU under the RGA at alltimes during Project implementation with the necessary resources and staff to carry out the Project, and with a composition andterms of reference satisfactory to the Bank. | Due Date :01-Oct-2015
Finance Agreement :Project Council | Description :The Borrower establishes and maintains at all times during Project implementationa Project Council with a composition, terms of reference, and resources satisfactory to the Bank. The Project Council shall be incharge of making any major policy decisions concerning Project implementation and of approving annual work plans, training plansand reports. | Due Date :31-Dec-2015
Finance Agreement :Project Steering Committee | Description :The Borrower establishes and maintains at all times during Projectimplementation a Project Steering Committee with a composition, terms of reference, and resources satisfactory to the Bank. Membersof the Steering Committee shall include the Director General of RGA, and the relevant RGA Sector and Department Directors whoseunits are directly related to the Project activities. | Due Date :01-Oct-2015
Finance Agreement :Accounting Software | Description :No later than 90 days after the Project becomes effective, the Borrower shallensure that the PIU has acquired and maintains operational accounting software for Project accounting and financial reporting,acceptable to the Bank. | Due Date :31-Dec-2015
Finance Agreement :Project Reports | Description :The Borrower shall monitor and evaluate the progress of the Project and prepareProject Reports. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not laterthan one month after the end of the period covered by such report. | Frequency :Quarterly
Finance Agreement :Auditing of Financial Reports | Description :The Borrower shall have its Financial Statements audited inaccordance with the provisions of Section 5.09(b) of the General Conditions. Each audit of the Financial Statements shall coverthe period of one fiscal year of the Borrower. The audited Financial Statements for each such period shall be furnished to the Banknot later than six (6) months after the end of such period. | Frequency :Yearly
Finance Agreement :RGA Office Infrastructure Enhancement | Description :The Borrower ensures that all RGA offices refurbished underthe Project shall be furnished and equipped to provide the necessary services to the public, in a manner satisfactory to the Bank,and shall provide sufficient resources for the purpose. | Frequency :CONTINUOUS
Finance Agreement :RGA Mobile Service | Description :The Borrower provides the necessary staff, vehicles, and resources for vehiclemaintenance, insurance, and operation for the provision of mobile services at the selected RGA offices. | Frequency :CONTINUOUS
Finance Agreement :Training Plan | Description :The Borrower shall, not later than December 1 of each year during Projectimplementation (starting on December 1 of the year in which Project implementation begins), furnish to Bank for its approval, aproposal for the Training plan to be carried out under the Project during the following calendar year. | Frequency :Yearly
PDO Indicator
Avg no. of days to complete recordn of purchase/sale of property in land adm systm
Intermediate Results Indicator
Number of persons trained
Intermediate Results Indicator
Number of institutions providing data through NSDI.
PDO Indicator
Avg no. of days to complete recordn of purchase/sale of property–Urban
Intermediate Results Indicator
Number of persons trained - female
PDO Indicator
Avg no. of days to complete recordn of purchase/sale of property–Rural
PDO Indicator
Increased custiomer satisfaction with real property management system, including as to quality and efficiency.
Intermediate Results Indicator
Building register
Intermediate Results Indicator
Level of satisfaction of trainees with training
Intermediate Results Indicator
Number of properties with data maintained in gender disaggregated manner as share of total number of properties registered
Intermediate Results Indicator
Clearing backlogs in accordance with defined service standards.
Intermediate Results Indicator
Properties registered to women as a share of total properties registered.
Intermediate Results Indicator
Area covered with leveling network established under the project as a share of total country area.
PDO Indicator
Increased customer satisfaction with real property management system, including as to quality and efficiency - female
Intermediate Results Indicator
Level of satisfaction of trainees with training - female
PDO Indicator
Rules, procedures, methodologies and information widely and easily accessible and procedures operate for public to verify their information
PDO Indicator
Open (structured) data available to municipalities for re-use
Intermediate Results Indicator
Property price index established
Intermediate Results Indicator
Integrated REC and Registration System is operational in all RGA offices
Intermediate Results Indicator
Valuers operating in accordance with valuation standards.
Intermediate Results Indicator
System for electronic issuing of building permit established.
Intermediate Results Indicator
Mass appraisal system developed
Intermediate Results Indicator
Number of beneficiaries from vulnerable groups assisted through mobile services
Intermediate Results Indicator
Number of beneficiaries from vulnerable groups assisted through mobile services - female
Intermediate Results Indicator
Corporate strategy and business plan submitted to government
Intermediate Results Indicator
Central archive operational
Intermediate Results Indicator
RGA's institutional development roadmap submitted to the government.
Intermediate Results Indicator
Digital utility lines completed under the project
Intermediate Results Indicator
Area covered by digital maps under the project.
44000-P156837
World Bank
State Owned Financial Institutions Strengthening Project
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Gunhild Berg
+1-202-473-1000gberg@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIA
Serbia
44.8190 20.4600
Other Non-bank Financial InstitutionsBanking InstitutionsPublic Administration - Financial SectorMitigationFinancial Sector oversight and policy/banking regulation & restructuringPublic AdministrationFinancial StabilityState-owned Enterprise Reform and PrivatizationClimate change
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
604166.67
604166.67
604166.67
604166.67
604166.67
604166.67
604166.67
604166.67
604166.67
604166.67
604166.67
604166.63
1188333.33
1188333.33
1188333.33
1188333.33
1188333.33
1188333.33
1188333.33
1188333.33
1188333.33
1188333.33
1188333.33
1188333.37
1097083.33
1097083.33
1097083.33
1097083.33
1097083.33
1097083.33
1097083.33
1097083.33
1097083.33
1097083.33
1097083.33
1097083.37
1702777.78
1702777.78
1702777.78
1702777.78
1702777.78
1702777.78
1702777.78
1702777.78
1702777.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
604166.67
604166.67
604166.67
604166.67
604166.67
604166.67
604166.67
604166.67
604166.67
604166.67
604166.67
604166.63
1188333.33
1188333.33
1188333.33
1188333.33
1188333.33
1188333.33
1188333.33
1188333.33
1188333.33
1188333.33
1188333.33
1188333.37
1097083.33
1097083.33
1097083.33
1097083.33
1097083.33
1097083.33
1097083.33
1097083.33
1097083.33
1097083.33
1097083.33
1097083.37
1702777.78
1702777.78
1702777.78
1702777.78
1702777.78
1702777.78
1702777.78
1702777.78
1702777.76
50000000Total Commitment in First Quarter of 2018
International Bank for Reconstruction and Development116210Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-116210Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development349789Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development4540924Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development225080Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-102072Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development2432966Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-58787Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development2659592Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
PDO Indicator
BPS gross amount of performing credit exposures to medium and large private sector enterprises is reduced compared to end-2016
PDO Indicator
Reduction in state-owned NPLs compared to end-2016
PDO Indicator
BPS gross NPLs are reduced compared to end-2016
Intermediate Results Indicator
Number of outreach sessions organized with business representatives as a two-way interaction
Intermediate Results Indicator
BPS is in compliance with the prudential ratios set forth in Selected NBS Decisions
Intermediate Results Indicator
Updated NPL resolution strategy, which includes a strategy for state-owned NPLs with a separate action plan, has been adopted
Intermediate Results Indicator
Strategy for Development Finance has been adopted
Intermediate Results Indicator
BPS in compliance with limit on lending to State Owned Enterprises
Intermediate Results Indicator
Tender issued for the sale of SOFIs' NPLs, in an approximate amount of EUR 145.6 million
Intermediate Results Indicator
BPS BoD adopts (i) strengthened risk management policies and the Executive Board adopts implementing procedures, and (ii) compensation scheme in line with approved 2018-2020 business plan
Intermediate Results Indicator
BPS completes installation of core banking system and associated software, hardware and services
44000-P092999
World Bank
Bor Regional Development Project
International Bank for Reconstruction and Development
REPUBLIC OF SERBIA - MIN. OF ECONOMY
International Bank for Reconstruction and Development
International Development Association
International Development Association
REPUBLIC OF SERBIA - MIN. OF ECONOMYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Nikola Ille
+1-202-473-1000nille@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIAMiningOther Public AdministrationOther Non-bank Financial InstitutionsOther Industry, Trade and ServicesBanking InstitutionsSocial ProtectionActive Labor Market ProgramsMSME DevelopmentEnvironmental Health and Pollution ManagementWater PollutionAir quality managementSoil PollutionLabor Market Policy and ProgramsRegional IntegrationPublic AdministrationState-owned Enterprise Reform and PrivatizationLabor Market InstitutionsFinancial Infrastructure and AccessMSME FinanceJobsEnterprise Development
0.00
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.34
208333.34
208333.35
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.34
458333.34
458333.35
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.66
666666.66
666666.65
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
1666666.67
1666666.67
1666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.34
208333.34
208333.35
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.34
458333.34
458333.35
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.66
666666.66
666666.65
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
1666666.67
1666666.67
1666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33000000Total Commitment in Second Quarter of 2007
International Bank for Reconstruction and Development
10000000Total Commitment in Second Quarter of 2007
International Development Association
277610Total Disbursement in Second Quarter of 2009
International Bank for Reconstruction and Development
-164941Total Interest Repayment in Third Quarter of 2009
International Bank for Reconstruction and Development
11851Total Disbursement in Third Quarter of 2009
International Bank for Reconstruction and Development
-9153Total Interest Repayment in Third Quarter of 2009
International Development Association
43105Total Disbursement in Fourth Quarter of 2009
International Bank for Reconstruction and Development
56735Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development
61750Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development
-43464Total Interest Repayment in First Quarter of 2010
International Bank for Reconstruction and Development
30721Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development
39445Total Disbursement in Second Quarter of 2010
International Bank for Reconstruction and Development
54741Total Disbursement in Second Quarter of 2010
International Bank for Reconstruction and Development
138046Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development
12717Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development
-40678Total Interest Repayment in Third Quarter of 2010
International Bank for Reconstruction and Development
172754Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development
606969Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development
-46294Total Interest Repayment in First Quarter of 2011
International Bank for Reconstruction and Development
346725Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development
331601Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development
272719Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development
229151Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development
586574Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development
-57598Total Interest Repayment in Third Quarter of 2011
International Bank for Reconstruction and Development
323259Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development
1386261Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development
484878Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development
283443Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development
833337Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development
304165Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development
-80233Total Interest Repayment in First Quarter of 2012
International Bank for Reconstruction and Development
532376Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development
651070Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development
317883Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development
291228Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development
118846Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development
53063Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development
-86939Total Interest Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development
-329233Total Loan Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development
144038Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development
-64010Total Interest Repayment in First Quarter of 2013
International Bank for Reconstruction and Development
-371896Total Loan Repayment in First Quarter of 2013
International Bank for Reconstruction and Development
83533Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development
689964Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development
-51181Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development
-374378Total Loan Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development
-53465Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development
-420459Total Loan Repayment in First Quarter of 2014
International Bank for Reconstruction and Development
-16693004Total Commitment Cancellations in First Quarter of 2014
International Bank for Reconstruction and Development
-22511Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development
-410291Total Loan Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development
-23711Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development
-350186Total Loan Repayment in First Quarter of 2015
International Bank for Reconstruction and Development
-4585418Total Commitment Cancellations in Second Quarter of 2015
International Bank for Reconstruction and Development
-57713Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development
-9354378Total Commitment Cancellations in Second Quarter of 2015
International Development Association
-13895Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development
-339575Total Loan Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development
-9447Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development
-340153Total Loan Repayment in First Quarter of 2016
International Bank for Reconstruction and Development
-4114Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development
-339484Total Loan Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development
-1720Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development
-320838Total Loan Repayment in First Quarter of 2017
International Bank for Reconstruction and Development
-502Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development
-357112Total Loan Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development
-379070Total Loan Repayment in First Quarter of 2018
International Bank for Reconstruction and Development
-344013Total Loan Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development
-342599Total Loan Repayment in First Quarter of 2019
International Bank for Reconstruction and Development
-338998Total Loan Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development
0Total Disbursement in First Quarter of 2020
International Development Association
-329379Total Loan Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
Project Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Financing Agreement (4326-YF) | Description :Not later than 12 months after the project effectiveness, theRecipient shall have successfully completed the resolution of RTB Bor's Core Assets, in a manner satisfactory to the Bank | DueDate :16-Dec-2009
Intermediate Results Indicator
Rehabilitation of Veliki Krivelj river by-pass/collector
PDO Indicator
Elimination of environmental risks related to poor state and possible failure of the Veliki Krivelj tailing facility's collector for Kriveljska River discharge
44000-P075343
World Bank
Energy Efficiency Project
International Development Association
GOVERNMENT OF SERBIA,SEEA,MOH,MOES
International Development Association
GOVERNMENT OF SERBIA,SEEA,MOH,MOESPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Arturo S. Rivera
+1-202-473-1000arivera2@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIAOther Energy and ExtractivesCentral Government (Central Agencies)Environmental Health and Pollution ManagementAir quality managementPublic Expenditure ManagementUrban Infrastructure and Service DeliveryTransparency, Accountability and Good GovernanceUrban DevelopmentMitigationClimate changePublic AdministrationPublic Finance ManagementWater PollutionSoil Pollution
0.00
0.00
0.00
0.00
283333.33
283333.33
283333.33
283333.33
283333.33
283333.33
283333.33
283333.33
283333.33
283333.33
283333.33
283333.37
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.37
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.37
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.37
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
122825.00
122825.00
122825.00
0.00
0.00
0.00
33187.62
33187.62
33187.63
29168.34
29168.34
29168.34
42533.79
42533.79
42533.79
214478.11
214478.11
214478.12
159434.01
159434.02
159434.02
161525.13
161525.13
161525.14
734013.86
734013.86
734013.87
217930.83
217930.83
217930.84
497354.32
497354.32
497354.32
241070.94
241070.95
241070.95
1840923.91
1840923.91
1840923.91
1099865.93
1099865.94
1099865.94
464626.80
464626.80
464626.80
631654.42
631654.42
631654.43
305065.65
305065.65
305065.66
133147.03
133147.03
133147.03
105959.50
105959.50
105959.51
666666.66
666666.67
666666.67
0.00
0.00
0.00
251048.13
251048.13
251048.13
268761.07
268761.07
268761.08
255087.13
255087.13
255087.14
0.00
0.00
0.00
227386.70
227386.70
227386.70
136465.49
136465.49
136465.48
0.00
0.00
0.00
1731897.24
1731897.24
1731897.25
1458354.59
1458354.59
1458354.60
1400000.00
1400000.00
1400000.00
1566666.67
1566666.67
1566666.66
1000000.00
1000000.00
1000000.00
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21000000Total Commitment in First Quarter of 2004
International Development Association368475Total Disbursement in Third Quarter of 2004
International Development Association-59225Total Interest Repayment in First Quarter of 2005
International Development Association99563Total Disbursement in First Quarter of 2005
International Development Association87505Total Disbursement in Second Quarter of 2005
International Development Association127601Total Disbursement in Third Quarter of 2005
International Development Association-38215Total Interest Repayment in Third Quarter of 2005
International Development Association397077Total Disbursement in Fourth Quarter of 2005
International Development Association246357Total Disbursement in Fourth Quarter of 2005
International Development Association478302Total Disbursement in First Quarter of 2006
International Development Association-32590Total Interest Repayment in First Quarter of 2006
International Development Association484575Total Disbursement in Second Quarter of 2006
International Development Association1308527Total Disbursement in Third Quarter of 2006
International Development Association-36711Total Interest Repayment in Third Quarter of 2006
International Development Association893515Total Disbursement in Third Quarter of 2006
International Development Association134237Total Disbursement in Fourth Quarter of 2006
International Development Association519556Total Disbursement in Fourth Quarter of 2006
International Development Association1492063Total Disbursement in First Quarter of 2007
International Development Association-33918Total Interest Repayment in First Quarter of 2007
International Development Association193305Total Disbursement in Second Quarter of 2007
International Development Association76405Total Disbursement in Second Quarter of 2007
International Development Association453504Total Disbursement in Second Quarter of 2007
International Development Association10000000Total Commitment in Second Quarter of 2007
International Development Association18000000Total Commitment in Second Quarter of 2007
International Bank for Reconstruction and Development1177900Total Disbursement in Third Quarter of 2007
International Development Association2433622Total Disbursement in Third Quarter of 2007
International Development Association-42774Total Interest Repayment in Third Quarter of 2007
International Development Association1911250Total Disbursement in Third Quarter of 2007
International Development Association2949961Total Disbursement in Fourth Quarter of 2007
International Development Association349636Total Disbursement in Fourth Quarter of 2007
International Development Association142670Total Disbursement in First Quarter of 2008
International Development Association1251211Total Disbursement in First Quarter of 2008
International Development Association-59257Total Interest Repayment in First Quarter of 2008
International Development Association1894963Total Disbursement in Second Quarter of 2008
International Development Association915197Total Disbursement in Third Quarter of 2008
International Development Association-73745Total Interest Repayment in Third Quarter of 2008
International Development Association399441Total Disbursement in Fourth Quarter of 2008
International Development Association317879Total Disbursement in First Quarter of 2009
International Development Association-74843Total Interest Repayment in First Quarter of 2009
International Development Association-8676Total Interest Repayment in First Quarter of 2009
International Development Association-59873Total Interest Repayment in First Quarter of 2009
International Bank for Reconstruction and Development1972050Total Disbursement in Second Quarter of 2009
International Bank for Reconstruction and Development1314700Total Disbursement in Second Quarter of 2009
International Development Association439717Total Disbursement in Second Quarter of 2009
International Development Association-83163Total Interest Repayment in Third Quarter of 2009
International Development Association-3587Total Interest Repayment in Third Quarter of 2009
International Development Association-38621Total Interest Repayment in Third Quarter of 2009
International Bank for Reconstruction and Development477322Total Disbursement in Fourth Quarter of 2009
International Bank for Reconstruction and Development200577Total Disbursement in Fourth Quarter of 2009
International Development Association75245Total Disbursement in Fourth Quarter of 2009
International Development Association12286Total Disbursement in First Quarter of 2010
International Development Association-78190Total Interest Repayment in First Quarter of 2010
International Development Association237602Total Disbursement in First Quarter of 2010
International Development Association-5421Total Interest Repayment in First Quarter of 2010
International Development Association556395Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development-36351Total Interest Repayment in First Quarter of 2010
International Bank for Reconstruction and Development535859Total Disbursement in Second Quarter of 2010
International Bank for Reconstruction and Development229402Total Disbursement in Second Quarter of 2010
International Development Association-6932Total Interest Repayment in Third Quarter of 2010
International Development Association-82652Total Interest Repayment in Third Quarter of 2010
International Development Association-34379Total Interest Repayment in Third Quarter of 2010
International Bank for Reconstruction and Development477587Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development204573Total Disbursement in Fourth Quarter of 2010
International Development Association-8255Total Interest Repayment in First Quarter of 2011
International Development Association122857Total Disbursement in First Quarter of 2011
International Development Association-82282Total Interest Repayment in First Quarter of 2011
International Development Association-45973Total Interest Repayment in First Quarter of 2011
International Bank for Reconstruction and Development286540Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development-8773Total Disbursement in Second Quarter of 2011
International Development Association-84335Total Interest Repayment in Third Quarter of 2011
International Development Association507140Total Disbursement in Third Quarter of 2011
International Development Association827940Total Disbursement in Third Quarter of 2011
International Development Association-9100Total Interest Repayment in Third Quarter of 2011
International Development Association213757Total Disbursement in Third Quarter of 2011
International Development Association1185525Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development1962563Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development-53340Total Interest Repayment in Third Quarter of 2011
International Bank for Reconstruction and Development498767Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development1625304Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development696704Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development1427683Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development705236Total Disbursement in Fourth Quarter of 2011
International Development Association299339Total Disbursement in Fourth Quarter of 2011
International Development Association606706Total Disbursement in Fourth Quarter of 2011
International Development Association-8703Total Commitment Cancellations in Fourth Quarter of 2011
International Development Association-82033Total Interest Repayment in First Quarter of 2012
International Development Association118602Total Disbursement in First Quarter of 2012
International Development Association142008Total Disbursement in First Quarter of 2012
International Development Association-17260Total Interest Repayment in First Quarter of 2012
International Development Association370422Total Disbursement in First Quarter of 2012
International Development Association276101Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development331923Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development-102283Total Interest Repayment in First Quarter of 2012
International Bank for Reconstruction and Development859210Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development238660Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development1579046Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development109009Total Disbursement in Second Quarter of 2012
International Development Association1015817Total Disbursement in Second Quarter of 2012
International Development Association727454Total Disbursement in Third Quarter of 2012
International Development Association535728Total Disbursement in Third Quarter of 2012
International Development Association-22791Total Interest Repayment in Third Quarter of 2012
International Development Association-78231Total Interest Repayment in Third Quarter of 2012
International Development Association2355277Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development301162Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development-105267Total Interest Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development-529999Total Loan Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development-75729Total Interest Repayment in First Quarter of 2013
International Bank for Reconstruction and Development-746721Total Loan Repayment in First Quarter of 2013
International Bank for Reconstruction and Development-82121Total Interest Repayment in First Quarter of 2013
International Development Association860561Total Disbursement in First Quarter of 2013
International Development Association-33393Total Interest Repayment in First Quarter of 2013
International Development Association287111Total Disbursement in Second Quarter of 2013
International Development Association-34557Total Interest Repayment in Third Quarter of 2013
International Development Association-80241Total Interest Repayment in Third Quarter of 2013
International Development Association-44396Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development-743866Total Loan Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development-496263Total Commitment Cancellations in Fourth Quarter of 2013
International Development Association-16586Total Disbursement in Fourth Quarter of 2013
International Development Association-36441Total Interest Repayment in First Quarter of 2014
International Development Association-81194Total Interest Repayment in First Quarter of 2014
International Development Association-43626Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development-767523Total Loan Repayment in First Quarter of 2014
International Bank for Reconstruction and Development-45900Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development-748961Total Loan Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development-74907Total Interest Repayment in Third Quarter of 2014
International Development Association-1077561Total Loan Repayment in Third Quarter of 2014
International Development Association-35975Total Interest Repayment in Third Quarter of 2014
International Development Association-31772Total Interest Repayment in First Quarter of 2015
International Development Association-21602Total Interest Repayment in First Quarter of 2015
International Development Association-997539Total Loan Repayment in First Quarter of 2015
International Development Association-32871Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-639243Total Loan Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-20363Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-625609Total Loan Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-117777Total Interest Repayment in Third Quarter of 2015
International Development Association-989181Total Loan Repayment in Third Quarter of 2015
International Development Association-34625Total Interest Repayment in Third Quarter of 2015
International Development Association-33207Total Interest Repayment in First Quarter of 2016
International Development Association-67021Total Interest Repayment in First Quarter of 2016
International Development Association-990717Total Loan Repayment in First Quarter of 2016
International Development Association-17406Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-626673Total Loan Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-7580Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-625441Total Loan Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-59010Total Interest Repayment in Third Quarter of 2016
International Development Association-983494Total Loan Repayment in Third Quarter of 2016
International Development Association-32845Total Interest Repayment in Third Quarter of 2016
International Development Association-31771Total Interest Repayment in First Quarter of 2017
International Development Association-53512Total Interest Repayment in First Quarter of 2017
International Development Association-951316Total Loan Repayment in First Quarter of 2017
International Development Association-3169Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-591089Total Loan Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-925Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-657917Total Loan Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-52070Total Interest Repayment in Third Quarter of 2017
International Development Association-991803Total Loan Repayment in Third Quarter of 2017
International Development Association-33123Total Interest Repayment in Third Quarter of 2017
International Development Association-441635Total Loan Repayment in Third Quarter of 2017
International Development Association-32612Total Interest Repayment in First Quarter of 2018
International Development Association-457711Total Loan Repayment in First Quarter of 2018
International Development Association-50110Total Interest Repayment in First Quarter of 2018
International Development Association-1027906Total Loan Repayment in First Quarter of 2018
International Development Association-698372Total Loan Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-633784Total Loan Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-39556Total Interest Repayment in Third Quarter of 2018
International Development Association-974903Total Loan Repayment in Third Quarter of 2018
International Development Association-27340Total Interest Repayment in Third Quarter of 2018
International Development Association-434110Total Loan Repayment in Third Quarter of 2018
International Development Association-26632Total Interest Repayment in First Quarter of 2019
International Development Association-435111Total Loan Repayment in First Quarter of 2019
International Development Association-37875Total Interest Repayment in First Quarter of 2019
International Development Association-977151Total Loan Repayment in First Quarter of 2019
International Development Association-631180Total Loan Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-624545Total Loan Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-39655Total Interest Repayment in Third Quarter of 2019
International Development Association-968568Total Loan Repayment in Third Quarter of 2019
International Development Association-27394Total Interest Repayment in Third Quarter of 2019
International Development Association-431289Total Loan Repayment in Third Quarter of 2019
International Development Association-17273Total Interest Repayment in First Quarter of 2020
International Development Association-429130Total Loan Repayment in First Quarter of 2020
International Development Association-17436Total Interest Repayment in First Quarter of 2020
International Development Association-963719Total Loan Repayment in First Quarter of 2020
International Development Association-606823Total Loan Repayment in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementCredit AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
The Borrower shall ensure that the Republic of Serbia shall have the financial statements for each fiscal year (or other periodagreed to by the Association) audited by independent auditors
The Borrower shall ensure that the Republic of Serbia shall furnish to the Association certified copies of audited financialstatements and an opinion on such statements by said auditors
The first Financial Monitoring Report shall be furnished to the Association not later than 45 days after the end of the firstcalendar quarter after the Effective Date
The Borrower shall ensure that the Republic of Serbia maintains during the term of the project the PSC, PIU, MOH PCU, MOES PCU andCCS PCU
The Borrower shall ensure that the Republic of Serbia implements the project in accordance with the implementation program setforth in schedule 3 of the DCA and terms and conditions set forth in EMP
The Borrower shall prepare, under terms of reference satisfactory to the Association, and furnish to the Association, by September30, 2007, a report integrating the results of the monitoring and eval
PDO Indicator
Financial savings registered by the Ministry of Health and the Clinical center of Serbia by using the new heat supply system
This has been achieved.
PDO Indicator
Improvement in air quality through reduction of emissions at the Clinical Center of Serbia (CCS) from the new energy system
PDO Indicator
Quantified energy savings of retrofitted public buildings (hospitals)
CO2 emission reductions 49% on average for above hospitals, social care centers and schools.
PDO Indicator
Quantified energy savings of the retrofitted public buildings (Schools)
Energy savings this winter are being monitored, an updated set of actual savings will be completed by the end of January, 2013.
Intermediate Results Indicator
Number of Buildings (schools, hospitals) retrofitted with energy efficiency equipment
Final achieved target figures to be updated following on next SPN mission.
Construction on 20 buildings started in May, 2011.
Intermediate Results Indicator
Improved heat generation efficiency and reduction in heat losses in the rehabilitated network of the CCS
To be updated in December , 2012 based on values at Nis CC.
44000-P163673
World Bank
Tax Administration Modernization Project
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Nataliya Biletska
+1-202-473-1000nbiletska@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIA
Serbia
44.8190 20.4600
Central Government (Central Agencies)ICT ServicesPublic Finance ManagementTax policyICT SolutionsDomestic Revenue AdministrationDisaster Response and RecoveryAdministrative and Civil Service ReformFiscal PolicyPublic AdministrationICTDisaster Risk Management
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
395166.67
395166.67
395166.67
395166.67
395166.67
395166.67
395166.67
395166.67
395166.67
395166.67
395166.67
395166.63
1323083.33
1323083.33
1323083.33
1323083.33
1323083.33
1323083.33
1323083.33
1323083.33
1323083.33
1323083.33
1323083.33
1323083.37
1001166.67
1001166.67
1001166.67
1001166.67
1001166.67
1001166.67
1001166.67
1001166.67
1001166.67
1001166.67
1001166.67
1001166.63
1300583.33
1300583.33
1300583.33
1300583.33
1300583.33
1300583.33
1300583.33
1300583.33
1300583.33
1300583.33
1300583.33
1300583.37
313333.33
313333.33
313333.33
313333.33
313333.33
313333.33
313333.33
313333.33
313333.33
313333.33
313333.33
313333.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
395166.67
395166.67
395166.67
395166.67
395166.67
395166.67
395166.67
395166.67
395166.67
395166.67
395166.67
395166.63
1323083.33
1323083.33
1323083.33
1323083.33
1323083.33
1323083.33
1323083.33
1323083.33
1323083.33
1323083.33
1323083.33
1323083.37
1001166.67
1001166.67
1001166.67
1001166.67
1001166.67
1001166.67
1001166.67
1001166.67
1001166.67
1001166.67
1001166.67
1001166.63
1300583.33
1300583.33
1300583.33
1300583.33
1300583.33
1300583.33
1300583.33
1300583.33
1300583.33
1300583.33
1300583.33
1300583.37
313333.33
313333.33
313333.33
313333.33
313333.33
313333.33
313333.33
313333.33
313333.33
313333.33
313333.33
313333.37
52000000Total Commitment in Second Quarter of 2019
International Bank for Reconstruction and Development127944Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-127944Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-45292Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Schedule 2 of the Loan Agreement. Section I. Part A.2. Unless otherwise agreed with the Bank, not later than one (1) month afterthe Effective Date, the Borrower shall establish and thereafter maintain throughout Project implementation: (i) a Project SteeringCommittee; and (ii) an Advisory Committee; all with responsibilities, composition and functions as set forth in the ProjectOperations Manual.
Schedule 2 of the Loan Agreement. Section I. Part A.3. Unless otherwise agreed with the Bank, not later than October 31, 2019, theBorrower, through STA, shall inform the Bank which technical modality has been selected for the carrying out of the modernizationofthe STA's tax administration ICT system.
Schedule 2 of the Loan Agreement. Section 1. Part A.4. Unless otherwise agreed with the Bank, not later than November 30, 2019,the Borrower shall hire the following additional staff for the CFU: (i) a procurement Specialist; and (ii) a financial managementspecialist, all with terms of reference and qualifications acceptable to the Bank.
Schedule 2 of the Loan Agreement. Section 1. Part C. Safeguards. Borrower, through STA, to ensure project implementation inaccordance with the Project's Safeguard Instruments.
Article 4.01 of the Loan Agreement. The Additional Event of Suspension consists of the following, namely that the ProjectImplementing Entity's Legislation has been amended, suspended, abrogated, repealed, or waived so as to affect materially andadversely the ability of the Project Implementing Entity to perform any of its obligations under the Project.
Intermediate Results Indicator
Increase in number of STA staff trained in National Archives processes
Intermediate Results Indicator
Increase in the number of offices with duly cleared paper records
PDO Indicator
Reduction of VAT gap
Intermediate Results Indicator
Increase in on-time e-filing rate for PAYE witholding tax
Intermediate Results Indicator
Increase in on-time e-filing rate for PAYE withholding tax
Intermediate Results Indicator
Decrease in tax arrears
Intermediate Results Indicator
Decrease in uncollectable tax arrears
PDO Indicator
Increase in additional net taxes assessed per audit
PDO Indicator
Percentage of taxpayers reporting that the experience of taxpayer services: i) STA website; ii) STA call center, has improved
Intermediate Results Indicator
Separation of core and non-core tax administration activities
Intermediate Results Indicator
Improved case management process for enforcement and tax collections
Intermediate Results Indicator
Improvement in taxpayer satisfaction with the appeals process in terms of impartiality and efficiency
Intermediate Results Indicator
Percentage of taxpayers reporting satisfaction with their interaction with the tax administration
PDO Indicator
Time required to comply with taxes - WB Doing Business Paying Taxes subindicator
44000-P155172
World Bank
PforR on Modernization and Optimization of Public Administration
International Bank for Reconstruction and Development
MINISTRY OF PUBLIC ADMINISTRATION AND LOCAL SELF-GOVERNMENT
International Bank for Reconstruction and Development
MINISTRY OF PUBLIC ADMINISTRATION AND LOCAL SELF-GOVERNMENTPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Verena Maria Fritz
+1-202-473-1000vfritz@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIAOther Public AdministrationAdministrative and Civil Service ReformPublic Finance ManagementMunicipal Institution BuildingTransparency, Accountability and Good GovernancePublic AdministrationMSME DevelopmentPublic Expenditure ManagementEnterprise Development
0.00
0.00
0.00
2479166.67
2479166.67
2479166.67
2479166.67
2479166.67
2479166.67
2479166.67
2479166.67
2479166.67
2479166.67
2479166.67
2479166.63
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.63
1687500.00
1687500.00
1687500.00
1687500.00
1687500.00
1687500.00
1687500.00
1687500.00
1687500.00
1687500.00
1687500.00
1687500.00
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1768397.33
1768397.33
1768397.34
0.00
0.00
0.00
12353691.33
12353691.33
12353691.34
0.00
0.00
0.00
4000000.00
4000000.00
4000000.00
6877911.33
6877911.33
6877911.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75000000Total Commitment in Second Quarter of 2016
International Bank for Reconstruction and Development183230Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development-183230Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development18560138Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-134170Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-124388Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-122654Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-116066Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development19198982Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development-106783Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-151295Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development16805254Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
The Borrower shall ensure that the Program is carried out in accordance with the ESSA, in a manner acceptable to the Bank. TheBorrower shall not assign, amend, abrogate, or waive the ESSA, or any provisions thereof, without prior approval of the Bank.
44000-P096823
World Bank
Delivery of Improved Local Services Project
International Bank for Reconstruction and Development
MINISTRY OF FINANCE
International Bank for Reconstruction and Development
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Ana Holt
+1-202-473-1000aholt@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIA
Vojvodina
45.5000 20.0000
Šumadija
44.3670 20.6000
Southern Serbia
42.6920 21.9290
Belgrade
44.7970 20.4730
Other EducationHealthSub-National GovernmentCentral Government (Central Agencies)Social ProtectionSocial ProtectionEducation FinancingHealth Systems and PoliciesAdministrative and Civil Service ReformSocial Safety NetsMunicipal Institution BuildingPublic AdministrationHealth System StrengtheningAccess to EducationEducation
0.00
0.00
0.00
0.00
333333.33
333333.33
333333.34
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1466666.67
1466666.67
1466666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
464666.66
464666.67
464666.67
0.00
0.00
0.00
321773.12
321773.13
321773.13
129904.80
129904.80
129904.80
90478.05
90478.06
90478.06
592286.58
592286.58
592286.58
906761.80
906761.80
906761.80
483692.56
483692.57
483692.57
797778.69
797778.69
797778.69
992810.78
992810.78
992810.78
1523294.58
1523294.58
1523294.59
469987.60
469987.60
469987.61
906764.21
906764.21
906764.21
348200.03
348200.03
348200.03
64320.63
64320.64
64320.64
766363.59
766363.60
766363.60
366062.70
366062.70
366062.70
525912.31
525912.31
525912.31
1543713.39
1543713.39
1543713.40
2052613.93
2052613.94
2052613.94
2052613.93
2052613.93
2052613.94
66666.66
66666.67
66666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
46400000Total Commitment in First Quarter of 2008
International Bank for Reconstruction and Development101444Total Disbursement in First Quarter of 2009
International Bank for Reconstruction and Development-101444Total Interest Repayment in First Quarter of 2009
International Bank for Reconstruction and Development1394000Total Disbursement in Second Quarter of 2009
International Bank for Reconstruction and Development299977Total Disbursement in Fourth Quarter of 2009
International Bank for Reconstruction and Development307669Total Disbursement in Fourth Quarter of 2009
International Bank for Reconstruction and Development-11447Total Interest Repayment in Fourth Quarter of 2009
International Bank for Reconstruction and Development357673Total Disbursement in Fourth Quarter of 2009
International Bank for Reconstruction and Development263545Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development126170Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development134071Total Disbursement in Second Quarter of 2010
International Bank for Reconstruction and Development137363Total Disbursement in Second Quarter of 2010
International Bank for Reconstruction and Development-11738Total Interest Repayment in Second Quarter of 2010
International Bank for Reconstruction and Development912656Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development233629Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development630575Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development336505Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development-19879Total Interest Repayment in Fourth Quarter of 2010
International Bank for Reconstruction and Development2383780Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development860197Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development590881Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development248897Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development767485Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development-54946Total Interest Repayment in Second Quarter of 2011
International Bank for Reconstruction and Development1376954Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development508205Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development581481Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development1888746Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development1182575Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development1861437Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development-109381Total Interest Repayment in Fourth Quarter of 2011
International Bank for Reconstruction and Development1525872Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development978039Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development431924Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development461853Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development2234047Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development-162012Total Interest Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development24393Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development790033Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development254568Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development-115097Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development192962Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development893076Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development1172573Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development233441Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development454691Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development182718Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development-40764Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development-1275730Total Loan Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development460779Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development460474Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development673261Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development444002Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development299230Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development-37731Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development-1473558Total Loan Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development1577100Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development1457793Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development1581024Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development1270143Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development514813Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development84939Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development-51168Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-1838135Total Loan Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development497900Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development3185984Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development64326Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development-69306Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-1740434Total Loan Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development202401Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development280412Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development1964916Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development-32559Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-1799548Total Loan Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-176288Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development-179280Total Commitment Cancellations in Third Quarter of 2015
International Bank for Reconstruction and Development-17171Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-1828840Total Loan Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-6805Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-1923083Total Loan Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-1824772Total Loan Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-1859350Total Loan Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-2008088Total Loan Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-2020123Total Loan Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-1917659Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-1897743Total Loan Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-1870029Total Loan Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementProject Performance Assessment ReportContract AwardsProject URLProcurement Notices
Finance Agreement :LA, Article IV, Section 4.01 (a) | Description :Establish the Project Policy Board, a body composed of all thestakeholder ministries, the Ministry of Public Administration and Local Self Government, the Ministry of Financ | Due Date:15-Sep-2008
Finance Agreement :LA, Article IV, Section 4.01 (b) | Description :Establish the FSU and appoint the Fiduciary Services Manager andthe three Project Administrators | Due Date :15-Sep-2008
Finance Agreement :LA, Article IV, Section 4.01 (c) | Description :The Borrower, through the PPB, shall have adopted the ProjectOperational and Grants Manual in form and substance satisfactory to the Bank. | Due Date :15-Sep-2008
Intermediate Results Indicator
Number of staff in Social Protection Institutions trained and certified in the use of the Centralized MIS
Intermediate Results Indicator
Number of educational institutions (schools and preschools) by type of grants received (school and municipal)
Intermediate Results Indicator
Number of medical staff and associates trained to recognize needs of vulnerable groups
Intermediate Results Indicator
Number of PHC centers that have adopted clinical pathways
PDO Indicator
Number of Roma children receiving vaccinations through the Roma health mediators program
Intermediate Results Indicator
Number of schools that have undergone a school performance external evaluation
Intermediate Results Indicator
Number of training participants among education staff that have undergone development training organized by the project
Intermediate Results Indicator
Number of inter-sectoral committees trained
Intermediate Results Indicator
For schools without violence
Intermediate Results Indicator
For inclusive education
Intermediate Results Indicator
For inclusion of Roma children
Intermediate Results Indicator
Percent of primary health care centers that have completed quality accreditation process
PDO Indicator
Percent of children from vulnerable groups in project schools (vulnerable groups according to OECD classification).
PDO Indicator
Percent of MLESP financing allocated for Disabled Peoples Organizations (DPOs), allowing for equal access and improved transparencyand based on results
Intermediate Results Indicator
Percent of PHC centers with fully operational HMIS platform at the PHC level
PDO Indicator
Percent of primary health care centers receiving at least a 3-year certificate of accreditation
Intermediate Results Indicator
Improved allocation framework for equalization funds developed / Health
Intermediate Results Indicator
Central and local formulae developed
PDO Indicator
Primary health care financing allocated according to capitation- and output-based formula
PDO Indicator
Central and local per capita funding formulae in the education sector piloted
Intermediate Results Indicator
Legislative framework allows for capitation- and output-based formula / Health
Intermediate Results Indicator
Centralized Management Information System (MIS) fully operational in all Social Protection Institutions
44000-P161184
World Bank
Serbia Second Public Expenditure and Public Utilities DPL
International Bank for Reconstruction and Development
MINISTRY OF FINANCE
International Bank for Reconstruction and Development
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Ekaterina Vostroknutova
+1-202-473-1000evostroknutova@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIARural and Inter-Urban RoadsRailwaysOther Energy and ExtractivesCentral Government (Central Agencies)Public Expenditure ManagementDebt ManagementMitigationFlood and Drought Risk ManagementAdministrative and Civil Service ReformAdaptationEnergyPublic TransportPublic Finance ManagementDisaster Risk ManagementEnergy Policies & ReformUrban DevelopmentClimate changePublic Administration
0.00
0.00
200000000Total Commitment in First Quarter of 2018
International Bank for Reconstruction and Development469875Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-469875Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development182089625Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development-602559Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-516190Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Appraisal DocumentProject Appraisal DocumentContract AwardsProject URLProcurement Notices44000-P127408
World Bank
First Programmatic State Owned Enterprises Reform DPL
International Bank for Reconstruction and Development
MINISTRY OF FINANCE AND MINISTRY OF ECONOMY
International Bank for Reconstruction and Development
MINISTRY OF FINANCE AND MINISTRY OF ECONOMYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Dusko Vasiljevic
+1-202-473-1000dvasiljevic@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIAOther Industry, Trade and ServicesSocial ProtectionActive Labor Market ProgramsFinancial Sector oversight and policy/banking regulation & restructuringLabor Market InstitutionsState-owned Enterprise Reform and PrivatizationRegulation and Competition PolicyFinancial StabilityPublic AdministrationLabor Market Policy and ProgramsBusiness Enabling EnvironmentFinancial Sector IntegrityInvestment and Business Climate
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100000000Total Commitment in First Quarter of 2015
International Bank for Reconstruction and Development241843Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development-241843Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development101216270Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development-253520Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-307317Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-238315Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-244244Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-254212Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-253617Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-253280Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-276557Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-270864Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Appraisal DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Reduction of direct and indirect support to companies in the Privatization Agency portfolio - annual direct subsidies and soft loans (EUR mn)
Intermediate Results Indicator
Audited financial statements prepared and published by enterprises in accordance with provisions of Law on PE and new Laws on Accounting and Auditing, for PEs which the founder is the Republic of Serb
Intermediate Results Indicator
Reduction of direct subsidies and issuance of new guarantees for liquidity purposes for remaining large SOEs - direct subsidies (EUR mn)
Intermediate Results Indicator
Number of redundant workers receiving compensation from the Transition Fund increases from approx. 5,700 (2014) to at least 25,000 (cumulative 2015 and 2016)
Intermediate Results Indicator
Number of participants in public works increases from 2,882 in 2013 to at least 7,000 in 2016
Intermediate Results Indicator
Reduction of direct subsidies and issuance of new guarantees for liquidity purposes for remaining large SOEs - annual guarantees for liquidity purposes (EUR mn)
Intermediate Results Indicator
Reduction of direct and indirect support to companies in the Privatization Agency portfolio - new tax obligations and social contributions arrears (EUR mn)
Intermediate Results Indicator
Reduction of direct and indirect support to companies in the Privatization Agency portfolio - new arrears to public utilities (EUR mn)
Intermediate Results Indicator
At least 30 percent of workers made redundant from public enterprises during 2016 register with NES
Intermediate Results Indicator
Disposal and treatment of legacy hazardous waste generated by companies in the Privatization Agency portfolio - total volume of legacy hazardous waste that was disposed and/or treated
44000-P127876
World Bank
SERBIA ROAD REHABILITATION AND SAFETY PROJECT
International Bank for Reconstruction and Development
PUBLIC ENTERPRISE ROADS OF SERBIA
International Bank for Reconstruction and Development
PUBLIC ENTERPRISE ROADS OF SERBIAPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Murad Gurmeric
+1-202-473-1000mgurmeric@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIA
Zrenjanin
45.3840 20.3820
Zaječar
43.9040 22.2640
Žabalj
45.3720 20.0640
Vršac
45.1170 21.3040
Vratarnica
43.7950 22.3030
Autonomna Pokrajina Vojvodina
45.0000 20.0000
Vlasotince
42.9670 22.1340
Svođe
42.9770 22.2660
Subotica
44.1710 21.3390
Štavalj
43.2740 20.1170
Prokuplje
43.2340 21.5880
Preševo
42.3090 21.6490
Požega
43.1540 20.4190
Paralovo
43.1210 20.4820
Paraćin
43.8610 21.4080
Pančevo
44.8710 20.6400
Pančevo
44.8710 20.6400
Leskovac
44.5300 20.3270
Lazarevac
44.3850 20.2560
Kuršumlija
43.1380 21.2730
Krćevac
44.3010 20.6890
Kragujevac
44.0170 20.9170
Kladovo
44.6070 22.6120
Ivanjica
43.5800 20.2310
Grabovnica
43.1490 21.3550
Gornja Trnava
44.1850 20.7650
Dimitrovgrad
43.0140 22.7760
Cerovac
44.3290 20.8670
Čačak
43.8910 20.3500
Brza Palanka
44.4700 22.4460
Belgrade
44.8040 20.4650
Belgrade
44.8040 20.4650
Arilje
43.7530 20.0960
Aranđelovac
44.3070 20.5600
Aranđelovac
44.3070 20.5600
Niš
43.0250 20.5980
Bela Zemlja
43.4930 21.5680
Valjavica
42.4050 22.1690
Uzići
43.8150 19.9620
Užice
43.8590 19.8490
Užice
43.8590 19.8490
Sušica
44.1980 19.7880
Šabac
44.7470 19.6900
Ribarice
44.5570 19.4600
Putinci
44.9930 19.9710
Novi Sad
45.2520 19.8370
Likodra
44.3970 19.4320
Kuzmin
45.0220 19.4050
Kremna
43.8380 19.5740
Kratovska Reka
43.5170 19.5900
Irig
45.1010 19.8580
Horgoš
46.1540 19.9680
Adaševci
45.0790 19.2210
Kamenica
44.4730 19.7220
Knježevići
44.0230 19.7030
Gradina
43.4840 19.5730
Knjazevac
43.5660 22.2570
Other TransportationRural and Inter-Urban RoadsPublic Administration - TransportationPublic AdministrationUrban Infrastructure and Service DeliveryRural Infrastructure and service deliveryAdministrative and Civil Service ReformJob CreationRural DevelopmentJobsTrade FacilitationUrban DevelopmentTrade
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
3000000.00
3000000.00
3000000.00
666666.67
666666.67
666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3391112.04
3391112.04
3391112.04
3391112.04
3391112.04
3391112.04
3391112.04
3391112.04
3391112.04
3391112.04
3391112.04
3391112.06
1453083.33
1453083.33
1453083.33
1453083.33
1453083.33
1453083.33
1453083.33
1453083.33
1453083.33
1453083.33
1453083.33
1453083.37
968333.33
968333.33
968333.33
968333.33
968333.33
968333.33
968333.33
968333.33
968333.33
968333.33
968333.33
968333.37
100000000Total Commitment in Second Quarter of 2013
International Bank for Reconstruction and Development233448Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development-233448Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development19910625Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development-29223Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-62738Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-54369Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development7327720Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development-50639Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-47044Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-42411Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-41448Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-1464009Total Loan Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-20765008Total Commitment Cancellations in Fourth Quarter of 2018
International Bank for Reconstruction and Development-38537Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-1424992Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development31433110Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development-74825Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-3145858Total Loan Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-78179Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development-3121002Total Loan Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
PDO Indicator
Improvement in road conditions measured by a reduction in the average IRI for the roads in the first phase of NRNRP
PDO Indicator
Reduction in road traffic accidents with fatalities on the improved roads in the first phase of NRNRP
Intermediate Results Indicator
Roads in good and fair condition as a share of total classified roads
Intermediate Results Indicator
Implementation of a circular for the preparation of rehabilitation program based socioeconomic & regional considerations
Intermediate Results Indicator
Road Condition Survey Completed on National Roads
Intermediate Results Indicator
Safety Inspection of National Roads beyond the first phase of NRNRP
Intermediate Results Indicator
Size of the total classified network
Intermediate Results Indicator
Roads rehabilitated, Non-rural
Intermediate Results Indicator
PBMC Contracts in Implementation
44000-P146248
World Bank
Deposit Insurance Strengthening Project
International Bank for Reconstruction and Development
MINISTRY OF FINANCE AND ECONOMY
International Bank for Reconstruction and Development
MINISTRY OF FINANCE AND ECONOMYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Gunhild Berg
+1-202-473-1000gberg@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIA
Belgrade
44.7970 20.4730
Banking InstitutionsPublic Administration - Financial SectorFinancial Sector oversight and policy/banking regulation & restructuringFinancial Sector IntegrityFinancial Stability
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
200000000Total Commitment in First Quarter of 2014
International Bank for Reconstruction and Development452337Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development-452337Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development133260744Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development211480Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development-181407Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-261141Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development37600669Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development66478Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development111146Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development-285739Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development143369Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development92256Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development139525Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development84898Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development-185673Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development138461Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development42774Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development51710Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development60892Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-163095Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development158983Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development210959Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development109849Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development111180Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development-174346Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development38291Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development-181093Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-1482Total Commitment Cancellations in Second Quarter of 2018
International Bank for Reconstruction and Development-171326Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-182791Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-85504376Total Loan Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-105390Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development-6162353Total Loan Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development-69547525Total Loan Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Para. 1, Section IA of Schedule 2 | Description :The Borrower shall maintain the Project Implementing Entitywith the necessary resources to carry out the Project, and with a composition and terms of reference satisfactory to the Bank. |Frequency :CONTINUOUS
Finance Agreement :Para. 2, Section IA of Schedule 2 | Description :The Borrower shall cause the Project Implementing Entity tomaintain the PIT at all times during Project implementation with resources and responsibilities satisfactory to the World Bank,including procurement and financial management, and with competent staff inadequate numbers. | Frequency :CONTINUOUS
Finance Agreement :Para. 3, Section IA of Schedule 2 | Description :The Borrower shall cause the Project Implementing Entity tocarry out the Project in accordance with the Project Operations Manual,and shall not, and shall cause the Project ImplementingEntity to not amend or waive any provision thereto without the Bank's priorwritten approval. In case of any conflict between theterms of the Project Operations Manual and the Agreement, the Agreement shall prevai | Frequency :CONTINUOUS
Finance Agreement :Para. 4, Section IIB of Schedule 2 | Description :In the event that in any given calendar year the DIF Assetsbecome less than the sum of Transfers to the DIF made pursuant to this Agreement, the Borrower shall ensure that each audit reportshall confirm that the difference is justified by: payments in an equivalent amount made by the Project Implementing Entity tofulfill its deposit insurance and bank resolution obligations, in accordancewith | Frequency :CONTINUOUS
Intermediate Results Indicator
Number of Independent Board Members
Intermediate Results Indicator
Regular government financial stability committee meetings
Intermediate Results Indicator
Premium Rate
PDO Indicator
Cumulative inflows into the Deposit Insurance Fund equivalent to 2.5 percent insured deposits
Intermediate Results Indicator
Stand-by funding available for DIF
Intermediate Results Indicator
Cumulative value recovered from bank bankruptcies since February 1, 2014
Intermediate Results Indicator
Sharing of NBS risk information on problematic banks with DIA
Intermediate Results Indicator
Sharing of NBS Supervision Conclusions on Problematic Banks with DIA
Intermediate Results Indicator
Information Collected by the MoF on State Owned Banks.
PDO Indicator
DIA performing its legally mandated technical functions in any future bank failures in which DIF resources are utilized
44000-P129539
World Bank
Second Serbia Health Project
International Bank for Reconstruction and Development
MINISTRY OF HEALTH OF SERBIA
International Bank for Reconstruction and Development
MINISTRY OF HEALTH OF SERBIAPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Dorothee Chen
+1-202-473-1000dchen6@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIA
Vojvodina
45.5000 20.0000
Šumadija
44.3670 20.6000
Belgrade
44.8040 20.4650
Southern Serbia
42.6920 21.9290
Public Administration - HealthHealthHealth System StrengtheningHealth Systems and PoliciesDisease ControlNon-communicable diseases
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
252360.00
259000.00
133160.00
271200.00
273440.00
267680.00
263360.00
269120.00
285080.00
303880.00
312280.00
328120.00
353760.00
183760.00
379080.00
401400.00
432360.00
454000.00
464680.00
488680.00
525600.00
552960.00
574960.00
611080.00
322400.00
678480.00
716880.00
756960.00
796960.00
842680.00
887320.00
923240.00
950240.00
984400.00
506880.00
1038360.00
1068480.00
1106320.00
1150000.00
1177520.00
1195000.00
1206320.00
1227120.00
1250080.00
630960.00
1275200.00
1299440.00
1321840.00
1342120.00
1362200.00
1382680.00
1403600.00
1099280.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
35174.10
127167.90
74826.60
82383.90
186724.40
103842.90
110467.20
116967.10
255610.90
141473.90
150461.80
158330.10
335258.00
174439.90
178234.10
370245.50
194375.00
200097.40
204233.70
417517.50
212133.10
213874.70
216922.50
446129.50
230419.90
236297.80
243264.20
506494.60
260929.00
265562.90
545991.60
280801.90
286897.50
294952.40
612172.40
314234.40
317562.10
319428.10
642899.20
329939.90
337217.30
684728.70
342815.30
340078.50
336719.70
681401.00
345178.90
346174.10
345894.20
685506.20
336875.20
333982.90
334169.50
667499.30
332241.30
330468.60
652229.20
321480.70
319428.10
317779.80
631765.40
314638.70
314856.40
315291.80
627598.00
310968.90
308791.90
306428.30
607507.40
301732.20
300737.00
598861.60
297844.70
296538.50
295356.70
583995.80
288328.10
287239.60
287021.90
577527.00
291282.60
291469.20
291127.10
581849.90
291064.90
291282.60
583840.30
292651.00
293055.30
293335.20
587136.90
372267.00
0.00
0.00
0.00
0.00
40000000Total Commitment in First Quarter of 2014
International Bank for Reconstruction and Development81578Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development-81578Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development2211100Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development113251Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development155935Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development-4868Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development94526Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development127593Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development-3775Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development211684Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development190587Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-3096Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development91065Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development222349Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-3542Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development2156557Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development387870Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development2721061Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-5251Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development660091Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development31100000Total Commitment in First Quarter of 2018
International Bank for Reconstruction and Development10580733Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development1169073Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development778032Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development661630Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-14304Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development3092237Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development73209Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-73209Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development444089Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development1001384Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-26074Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development509877Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development-50491Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development2276800Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development3636039Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-35299Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development298995Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-33632Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-1280367Total Loan Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development262524Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development463067Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development1601261Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development-33655Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development-16659Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development-1334210Total Loan Repayment in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Project Policy Board | Description :No later than 30 days from the Effective Date, the Borrower shall formallyestablish and shall thereafter maintain, the Project Policy Board, with terms of reference, staff and resources satisfactory to theBank. | Due Date :10-Feb-2015
Finance Agreement :Project Coordination Unit | Description :The Borrower shall maintain, throughout Project implementation, the PCUwith terms of reference, staff and resources satisfactory to the Bank. The PCU shall be headed by a senior official of the Ministryof Health. | Frequency :CONTINUOUS
Finance Agreement :Quality Improvement Agreements | Description :The Borrower shall enter into an agreement with each of theEligible PHC facilities (“Quality Improvement Agreements”), under terms and conditions approved by the Bank and elaborated in theProject Operations and Grants Manual, setting forth the technical, administrative and fiduciary aspects of their participation inthe implementation and use of funds under Part 1(b) of the Project. | Frequency :Yearly
Finance Agreement :Project Operations and Grants Manual | Description :The Borrower shall carry out the Project in accordance withthe Project Operations and Grants Manual satisfactory to the Bank. | Frequency :CONTINUOUS
Finance Agreement :Accounting software | Description :No later than thirty (30) days after the Effective Date, the Borrower shallcause the PCU to have installed and operational an accounting system and software satisfactory to the Bank. | Due Date :10-Feb-2015
Finance Agreement :PCU Quarterly Meetings | Description :The PCU shall be in charge of organizing quarterly Project review meetingsto be called by the Ministry of Health, and attended by relevant officials of the Ministry of Health, Institute for Public Health,Health Insurance Fund, and key stakeholders. | Frequency :Quarterly
Intermediate Results Indicator
Number of pharmaceuticals and health products that are procured through centralized framework contracts
Intermediate Results Indicator
Number of clinical pathways developed
Intermediate Results Indicator
Number of health care institutions that have completed staff training on priority clinical pathways
Intermediate Results Indicator
Number of health workers receiving training
Intermediate Results Indicator
Number of new linear accelerators installed at national level
Intermediate Results Indicator
Annual training organized for health Roma mediators
PDO Indicator
Percentage of total acute care hospitalization cases in public hospitals reported accurately based on DRGs
PDO Indicator
Percent reduction in average unit price relative to baseline for the 50 most frequently dispensed multi-source pharmaceuticals thatare procured through centralized framework contracts
PDO Indicator
Percentage of registered adult patients in Dom Zdravljas with recorded blood pressure value, BMI, smoking status and recommended tips for healthy behavior in the preceding 12 months in their med recor
Intermediate Results Indicator
Percentage of pilot Dom Zdravljas who meet grant agreement performance criteria in the preceding one year
Intermediate Results Indicator
Reduction in the total consumption of antibiotics for systemic use (J01) DDD/1000 person/per day
Intermediate Results Indicator
Percentage of adult diabetic patients in Dom Zdravljas with at least one determined value of glycosylated hemoglobin (HbA1c) in thelast year
Intermediate Results Indicator
Percentage of registered adult patients in DZs with hypertension under treatment whom in the last recorded blood pressure (measuredin the preceding one year) is ≤ 140/90 mm Hg
Intermediate Results Indicator
Percentage of patients satisfied with the quality of care in PHC facilities (CE)
PDO Indicator
Percentage of patients starting radiotherapy treatment at public hospitals within 28 days between the date of issuance of treatmentprotocol and the first radiotherapy session for a) breast, b) cervic
PDO Indicator
Percentage of registered insured persons covered by the targeted examination for early detection of a) breast (age 50-69 in the past two years), b) cervical (age 25-64 in the past three years) and c)
Intermediate Results Indicator
Percentage of a) Dom Zdravljas and b) pharmacies implementing e-prescription system
Intermediate Results Indicator
Ranking of health institutions according to quality criteria in place based on quality indicators in health care
Intermediate Results Indicator
Strengthen systems for Health Technology Assessment
Intermediate Results Indicator
Strengthen systems for medical equipment maintenance
Intermediate Results Indicator
DRGs payment system developed and financing for a portion of acute hospital care based on DRGs initiated
44000-P090418
World Bank
Consolidated Collection & Pension Administration Reform Project (Serbia)
International Development Association
MLESP AND MOF
International Development Association
MLESP AND MOFPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Rajna Cemerska-Krtova
+1-202-473-1000rcemerska@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIACentral Government (Central Agencies)Banking InstitutionsPublic Administration - Social ProtectionAdministrative and Civil Service ReformSocial ProtectionPublic AdministrationSocial Insurance and Pensions
150602.41
150602.41
180722.89
180722.89
180722.89
180722.89
180722.89
180722.89
180722.89
180722.89
180722.89
235943.78
235943.78
235943.77
251004.02
251004.02
251004.01
351405.62
351405.62
351405.63
376506.02
376506.02
376506.02
451807.23
451807.23
451807.23
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
753012.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
150000.00
150000.00
150000.00
263333.33
263333.33
263333.34
433333.33
433333.33
433333.34
551666.67
551666.67
551666.66
863333.33
863333.33
863333.34
863333.33
863333.33
863333.34
891666.67
891666.67
891666.66
863333.34
863333.34
863333.35
863333.33
863333.33
863333.34
863333.33
863333.33
863333.34
863333.33
863333.33
863333.34
863333.33
863333.33
863333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25000000Total Commitment in Second Quarter of 2005
International Development Association-72737Total Interest Repayment in Third Quarter of 2006
International Development Association380681Total Disbursement in Third Quarter of 2006
International Development Association-25486Total Interest Repayment in First Quarter of 2007
International Development Association-26661Total Interest Repayment in Third Quarter of 2007
International Development Association488187Total Disbursement in Fourth Quarter of 2007
International Development Association591014Total Disbursement in Fourth Quarter of 2007
International Development Association187606Total Disbursement in First Quarter of 2008
International Development Association-16300Total Interest Repayment in First Quarter of 2008
International Development Association277327Total Disbursement in First Quarter of 2008
International Development Association346065Total Disbursement in Second Quarter of 2008
International Development Association236113Total Disbursement in Second Quarter of 2008
International Development Association176785Total Disbursement in Third Quarter of 2008
International Development Association433761Total Disbursement in Third Quarter of 2008
International Development Association-19487Total Interest Repayment in Third Quarter of 2008
International Development Association416827Total Disbursement in Third Quarter of 2008
International Development Association359125Total Disbursement in Fourth Quarter of 2008
International Development Association331171Total Disbursement in Fourth Quarter of 2008
International Development Association918093Total Disbursement in First Quarter of 2009
International Development Association-13960Total Interest Repayment in First Quarter of 2009
International Development Association354199Total Disbursement in First Quarter of 2009
International Development Association594701Total Disbursement in Second Quarter of 2009
International Development Association1052304Total Disbursement in Second Quarter of 2009
International Development Association24759Total Disbursement in Third Quarter of 2009
International Development Association407430Total Disbursement in Third Quarter of 2009
International Development Association-24355Total Interest Repayment in Third Quarter of 2009
International Development Association157559Total Disbursement in Third Quarter of 2009
International Development Association11242Total Disbursement in Fourth Quarter of 2009
International Development Association765430Total Disbursement in First Quarter of 2010
International Development Association274481Total Disbursement in First Quarter of 2010
International Development Association-27712Total Interest Repayment in First Quarter of 2010
International Development Association260843Total Disbursement in Second Quarter of 2010
International Development Association270710Total Disbursement in Third Quarter of 2010
International Development Association-34441Total Interest Repayment in Third Quarter of 2010
International Development Association415843Total Disbursement in Third Quarter of 2010
International Development Association97619Total Disbursement in Fourth Quarter of 2010
International Development Association1195193Total Disbursement in Fourth Quarter of 2010
International Development Association89471Total Disbursement in Fourth Quarter of 2010
International Development Association289810Total Disbursement in First Quarter of 2011
International Development Association211697Total Disbursement in First Quarter of 2011
International Development Association-39296Total Interest Repayment in First Quarter of 2011
International Development Association292577Total Disbursement in First Quarter of 2011
International Development Association1848292Total Disbursement in Second Quarter of 2011
International Development Association527524Total Disbursement in Second Quarter of 2011
International Development Association373693Total Disbursement in Second Quarter of 2011
International Development Association765923Total Disbursement in Third Quarter of 2011
International Development Association-52348Total Interest Repayment in Third Quarter of 2011
International Development Association816076Total Disbursement in Third Quarter of 2011
International Development Association1101917Total Disbursement in Fourth Quarter of 2011
International Development Association815760Total Disbursement in Fourth Quarter of 2011
International Development Association1101308Total Disbursement in First Quarter of 2012
International Development Association869579Total Disbursement in First Quarter of 2012
International Development Association-64529Total Interest Repayment in First Quarter of 2012
International Development Association224758Total Disbursement in First Quarter of 2012
International Development Association547685Total Disbursement in Second Quarter of 2012
International Development Association1812344Total Disbursement in Third Quarter of 2012
International Development Association597973Total Disbursement in Third Quarter of 2012
International Development Association-73381Total Interest Repayment in Third Quarter of 2012
International Development Association1176221Total Disbursement in First Quarter of 2013
International Development Association734127Total Disbursement in First Quarter of 2013
International Development Association-89271Total Interest Repayment in First Quarter of 2013
International Development Association-514127Total Commitment Cancellations in First Quarter of 2013
International Development Association-92595Total Interest Repayment in Third Quarter of 2013
International Development Association-93695Total Interest Repayment in First Quarter of 2014
International Development Association-93227Total Interest Repayment in Third Quarter of 2014
International Development Association-82338Total Interest Repayment in First Quarter of 2015
International Development Association-85767Total Interest Repayment in Third Quarter of 2015
International Development Association-1141478Total Loan Repayment in Third Quarter of 2015
International Development Association-85739Total Interest Repayment in First Quarter of 2016
International Development Association-1143251Total Loan Repayment in First Quarter of 2016
International Development Association-76607Total Interest Repayment in Third Quarter of 2016
International Development Association-1134916Total Loan Repayment in Third Quarter of 2016
International Development Association-69984Total Interest Repayment in First Quarter of 2017
International Development Association-1097784Total Loan Repayment in First Quarter of 2017
International Development Association-68670Total Interest Repayment in Third Quarter of 2017
International Development Association-1144504Total Loan Repayment in Third Quarter of 2017
International Development Association-66722Total Interest Repayment in First Quarter of 2018
International Development Association-1186165Total Loan Repayment in First Quarter of 2018
International Development Association-54048Total Interest Repayment in Third Quarter of 2018
International Development Association-1125002Total Loan Repayment in Third Quarter of 2018
International Development Association-52143Total Interest Repayment in First Quarter of 2019
International Development Association-1127597Total Loan Repayment in First Quarter of 2019
International Development Association-54171Total Interest Repayment in Third Quarter of 2019
International Development Association-1117691Total Loan Repayment in Third Quarter of 2019
International Development Association-28335Total Interest Repayment in First Quarter of 2020
International Development Association-1112096Total Loan Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportCredit AgreementProject Performance Assessment ReportContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Feasibility study completed and the institutional framework for the new system identified
Achieved
The Feasibility study provided recommendations relevant for the selection of the model and location of the Central Registry, as ainstitutional and organizational setting of the new reporting and record-keeping system for individual contributions
PDO Indicator
effectiveness of administration improved measured by administrative costs/pension expenditures
Achieved
the baseline value of this indicator (a share of pension administration costs in total pension expenditures) has been set at 4% atbaseline and 2.5% as end target. During project monitoring two issues were identified with this indicator: first, the baselinevaluecould not have been reconstructed, and second, the target value of this indicator has been set well over its internationallyrecognized best practice between 1% and 2%. According to Pension Fund's annual financial report, the share of all operativeexpenses (including postal charges) in 2011 stood at 1.5%. Following the same methodology, the 2005 baseline figure would be 2.2%.The MoLSP has proposed that these values are replaced by those in the PAD.
PDO Indicator
progress in administrative consolidation of the three PIOs
Overachieved
target value has been met prior to the anticipated deadline including the integration of military pension fund into theconsolidated PDIF
PDO Indicator
regular monthly reporting on pension contributions paid on individual basis introduced and individual pension accounts established;
Partially achieved
Full operationalization of the CR and its internal systems, planned for January 2013, is expected to allow monthly individualreporting of paid social contributions . Although all conditions are in place, the target will not be achieved before January 2013
PDO Indicator
reduced employers' reporting burden, measured by fewer reporting forms required
Achieved
Introduction of the unified application form for mandatory social insurance (“Official Gazette”54/2010) resulted in reduction ofthe number of forms to 17
PDO Indicator
improved client service in the pension system measured by number of resolved cases /employee
Achieved
The baseline value defined as the number of annual resolved cases per employee, has been set in the PAD at 220, while its targetvalue at 320. This definition was revised and more precise indicator of number of annually resolved cases per case officers wasintroduced. This number has increased from 1560 in 2007 to 1840 in 2011, with the baseline value still to be reconstructed.
Intermediate Results Indicator
Component 2: Pension administration processes streamlined and modernized
Overachieved
The target has been met prior to the anticipated deadline including the integration of military pension fund into theconsolidatedPDIF
Intermediate Results Indicator
Component 3:Actuarial models of the pension system developed and the MLSP, PDI Fund and PSA staff trained in using them and developing options for further policy changes Public knowledge on PAYGO pens
Achieved
Intermediate Results Indicator
Component 4:PMU staff trained in procurement, disbursement and accounting functions needed for successful implementation of the project PMU staff trained for monitoring and evaluation of the project
Acheived
PDO Indicator
the MLESP policy analysis capacities built; long- and short-term actuarial models of the pension system developed in MLESP and the MLESP, PIO and MOF staff trained in using them
Achieved
LT and ST actuarial models of pension system were developed, became operational and regularly updated and used by the MoLSP policydepartment as a policy making instruments. Total of five MoLSP staff were trained in PROST and other pension policy models, threeofthem use them in their everyday work.The public understanding of the reforms in the pension system, including both PAYG andvoluntary private system has been increased from 15% of population as a baseline data from 2005 up to 56% as confirmed by thepublic opinionpoll conducted in May 2012.
PDO Indicator
web publication containing updated monthly data available;
Achieved
web publication containing updated monthly pension data available
PDO Indicator
further pension reform measures to improve long-term sustainability, adequacy and transparency of the pension system identified;
Partially achieved
"Pension sustainability" indicator defined as share of pension expenditures in GDP, has been set at 15% at baseline and 12% astarget value. In the meantime, the GDP has been significantly revised on several occasions, in 2011 the value of net pensionexpenditures stood at 12.5% of GDP, and its corresponding baseline in 2005 at 11% (instead of 15% as set in PAD). The recenteconomic crisis was the major factor of increasing pension/GDP ratio.
PDO Indicator
increased public information on pension system due to the public better informed
Achieved
public opinion poll conducted in May 2012 used the same questions as the public opinion poll conducted in 2008
PDO Indicator
improvement in the rate of collection of pension contributions.
Achieved
Target value has been set to "improve by 10%" but the baseline value has not yet been set. The teams agreed to i) apply thecompliance definition (the ratio of covered to actual wage bill) in reconstructing the baseline value, and to ii) calculate currentand past years values
Intermediate Results Indicator
Component 1: Regular monthly reporting on pension contributions paid on individual basis introduced and individual pension accountsestablished
Partially achieved
The CR IS designed and most of the SW modules are undergoing testing, but the new system is not expected to become operationalbefore January 2012tto be legislated b soe missing linkages bwtween
44000-P152104
World Bank
Serbia Competitiveness and Jobs
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Dusko Vasiljevic
+1-202-473-1000dvasiljevic@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIA
Serbia
44.8190 20.4600
Other Industry, Trade and ServicesPublic Administration - Industry, Trade and ServicesSocial ProtectionTradeEnterprise DevelopmentLabor Market Policy and ProgramsJobsInnovation and Technology PolicyLabor Market InstitutionsTrade FacilitationMSME DevelopmentBusiness Enabling EnvironmentActive Labor Market Programs
620000.00
620000.00
620000.00
620000.00
620000.00
620000.00
620000.00
620000.00
620000.00
620000.00
620000.00
620000.00
2598333.33
2598333.33
2598333.33
2598333.33
2598333.33
2598333.33
2598333.33
2598333.33
2598333.33
2598333.33
2598333.33
2598333.37
2515833.33
2515833.33
2515833.33
2515833.33
2515833.33
2515833.33
2515833.33
2515833.33
2515833.33
2515833.33
2515833.33
2515833.37
2599166.67
2599166.67
2599166.67
2599166.67
2599166.67
2599166.67
2599166.67
2599166.67
2599166.67
2599166.67
2599166.67
2599166.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2219098.33
2219098.33
2219098.34
0.00
0.00
0.00
1980648.93
1980648.93
1980648.94
100702.88
100702.89
100702.89
0.00
0.00
0.00
2658596.96
2658596.96
2658596.95
315473.33
315473.33
315473.34
6838583.33
6838583.33
6838583.34
219633.33
219633.33
219633.34
2276200.00
2276200.00
2276200.00
199666.67
199666.67
199666.66
7477516.67
7477516.67
7477516.66
9047212.89
9047212.89
9047212.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100000000Total Commitment in Third Quarter of 2015
International Bank for Reconstruction and Development254583Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development-254583Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development6657295Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development-190725Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development5941947Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development302109Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-134197Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development7694514Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development281276Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-157620Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development465114Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-180488Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development366645Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-171338Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development25397863Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-186083Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development233380Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development287724Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-225156Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development411697Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development10919090Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and DevelopmentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Maintain PPS through Project implementation | Description :Loan Agreement Schedule 2, Section I.A.1. TheBorrower shall maintain and operate, throughout Project implementation, PPS in a manner, with resources, staff, terms of reference,functions and responsibilities satisfactory to the Bank. | Frequency :CONTINUOUS
Finance Agreement :Maintain PIU through Project implementation | Description :Loan Agreement Schedule 2, Section I.A.2. TheBorrower, through PPS, shall establish and, thereafter, operate and maintain throughout Project Implementation the PIU, as atechnical coordination unit of the Project, with technical experts and other personnel in adequate numbers and with qualifications,and with terms and conditions, all satisfactory to the Bank, including a PIU director, a procurem | Frequency :CONTINUOUS
Finance Agreement :Matching Grant Program and Safeguards | Description :Loan Agreement Schedule 2, Section I.A.3. In respect ofPart A.3.(a) of the Project, the Borrower shall ensure that the Matching Grants Program is implemented in a manner satisfactory tothe Bank, and in accordance with the Matching Grants Manual, the Environmental and Social Management Framework (“ESMF”) and anyapplicable Environmental Management Plan (“EMP”) thereunder. | Frequency :CONTINUOUS
PDO Indicator
New investor leads generated by the reformed investment promotion agency (annual)
PDO Indicator
New collaborations facilitated between research organizations and the private sector
PDO Indicator
NES registered unemployment cases transitioning into formal job (annual)
PDO Indicator
Participants in export promotion programs that engage in new export activities (annual)
Intermediate Results Indicator
NES registered female unemployment cases transitioning into formal job
Intermediate Results Indicator
Annual performance reviews of pilot policy planning, monitoring, and coordination system (to support competitveness and jobs reforms) (see DL1)
Intermediate Results Indicator
Citizen Engagement: Innovation matching grant beneficiary annual survey (number of surveys)
Intermediate Results Indicator
Innovative products or services launched by MG beneficiary firms
Intermediate Results Indicator
Number of new or re-designed ALMPs in the NES [DLI 8]
Intermediate Results Indicator
Technology transfer: transactions initiated [see DLI 4]
Intermediate Results Indicator
Citizen engagement: Number of employers reached by client satisfaction and needs survey
Intermediate Results Indicator
Science Fund programs initiated
Intermediate Results Indicator
Science Fund programs competitive grants awarded
Intermediate Results Indicator
Number of documented interests by investors (annual)
Intermediate Results Indicator
Enterprises and startups financed through Innovation Fund programs (including MMG)
Intermediate Results Indicator
Number of firms participating in the new Supplier Development Program
Intermediate Results Indicator
Enterprises and startups financed with female owner
Intermediate Results Indicator
Standard Deviation of mean case load per branch office over all branch offices [DLI 7]
Intermediate Results Indicator
Innovative products or services developed by MG beneficiary firms
Intermediate Results Indicator
% of total NES staff that is operating as certified case worker [DLI 6]
Intermediate Results Indicator
Gross placement rate of NES start-up support program for self-employment 6 months from completion
Intermediate Results Indicator
Gross placement rate of NES hiring subsidy program for new employment 6 months from completion
Intermediate Results Indicator
Private financing catalyzed through IF support programs (Ammount USD)
Intermediate Results Indicator
MoE investment and export promotion programs restructured [DLI 2]
Intermediate Results Indicator
Number of field visits to employers per year by the NES (Number)
Intermediate Results Indicator
Technology transfer: IF TTF service lines deployed [see DLI 4]
Intermediate Results Indicator
R&I strategy, action plan, RI Roadmap and public research sector reforms including establishment of Science Fund designed and adopted
44000-P075207
World Bank
Transport Rehabilitation Project (Serbia)
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Svetlana Vukanovic
+1-202-473-1000svukanovic@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SERBIAOther TransportationCentral Government (Central Agencies)Rural and Inter-Urban RoadsJob CreationRegional IntegrationRural Infrastructure and service deliveryPublic AdministrationUrban DevelopmentJobsAdministrative and Civil Service ReformRural DevelopmentNon-communicable diseasesDisease ControlBusiness Enabling EnvironmentRegulation and Competition PolicyUrban Infrastructure and Service Delivery
0.00
0.00
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
250000.00
250000.00
250000.00
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
1000000.00
1000000.00
1000000.00
2166666.66
2166666.67
2166666.67
2166666.66
2166666.67
2166666.67
2166666.66
2166666.67
2166666.67
2833333.33
2833333.33
2833333.34
2833333.33
2833333.33
2833333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
55000000Total Commitment in Second Quarter of 2004
International Development Association2030853Total Disbursement in Fourth Quarter of 2004
International Development Association318775Total Disbursement in Fourth Quarter of 2004
International Development Association733523Total Disbursement in First Quarter of 2005
International Development Association-104116Total Interest Repayment in First Quarter of 2005
International Development Association252354Total Disbursement in First Quarter of 2005
International Development Association553098Total Disbursement in Second Quarter of 2005
International Development Association897714Total Disbursement in Third Quarter of 2005
International Development Association-105597Total Interest Repayment in Third Quarter of 2005
International Development Association885652Total Disbursement in Third Quarter of 2005
International Development Association553460Total Disbursement in Fourth Quarter of 2005
International Development Association1406698Total Disbursement in Fourth Quarter of 2005
International Development Association1353225Total Disbursement in First Quarter of 2006
International Development Association-93052Total Interest Repayment in First Quarter of 2006
International Development Association222366Total Disbursement in First Quarter of 2006
International Development Association76980Total Disbursement in Second Quarter of 2006
International Development Association712417Total Disbursement in Second Quarter of 2006
International Development Association427753Total Disbursement in Second Quarter of 2006
International Development Association1187245Total Disbursement in Third Quarter of 2006
International Development Association1883698Total Disbursement in Third Quarter of 2006
International Development Association-107500Total Interest Repayment in Third Quarter of 2006
International Development Association1245990Total Disbursement in Third Quarter of 2006
International Development Association844315Total Disbursement in Fourth Quarter of 2006
International Development Association760470Total Disbursement in Fourth Quarter of 2006
International Development Association608891Total Disbursement in Fourth Quarter of 2006
International Development Association1347041Total Disbursement in First Quarter of 2007
International Development Association679433Total Disbursement in First Quarter of 2007
International Development Association-98596Total Interest Repayment in First Quarter of 2007
International Development Association1024777Total Disbursement in First Quarter of 2007
International Development Association965598Total Disbursement in Second Quarter of 2007
International Development Association270802Total Disbursement in Second Quarter of 2007
International Development Association640364Total Disbursement in Second Quarter of 2007
International Development Association50000000Total Commitment in Second Quarter of 2007
International Bank for Reconstruction and Development3543769Total Disbursement in Third Quarter of 2007
International Development Association3520989Total Disbursement in Third Quarter of 2007
International Development Association-119192Total Interest Repayment in Third Quarter of 2007
International Development Association1085093Total Disbursement in Third Quarter of 2007
International Development Association2276603Total Disbursement in Fourth Quarter of 2007
International Development Association2512751Total Disbursement in Fourth Quarter of 2007
International Development Association1222649Total Disbursement in Fourth Quarter of 2007
International Development Association2622239Total Disbursement in First Quarter of 2008
International Development Association491798Total Disbursement in First Quarter of 2008
International Development Association-140945Total Interest Repayment in First Quarter of 2008
International Development Association1050232Total Disbursement in First Quarter of 2008
International Development Association208891Total Disbursement in Second Quarter of 2008
International Development Association236188Total Disbursement in Second Quarter of 2008
International Development Association922324Total Disbursement in Second Quarter of 2008
International Development Association1070109Total Disbursement in Third Quarter of 2008
International Development Association-166004Total Interest Repayment in Third Quarter of 2008
International Development Association821852Total Disbursement in Third Quarter of 2008
International Development Association1949557Total Disbursement in Fourth Quarter of 2008
International Development Association1223819Total Disbursement in Fourth Quarter of 2008
International Development Association2211627Total Disbursement in Fourth Quarter of 2008
International Development Association1536067Total Disbursement in First Quarter of 2009
International Development Association706110Total Disbursement in First Quarter of 2009
International Development Association-170437Total Interest Repayment in First Quarter of 2009
International Development Association51100Total Disbursement in First Quarter of 2009
International Development Association625459Total Disbursement in Second Quarter of 2009
International Development Association267450Total Disbursement in Third Quarter of 2009
International Development Association21462Total Disbursement in Third Quarter of 2009
International Development Association-202672Total Interest Repayment in Third Quarter of 2009
International Development Association-247830Total Interest Repayment in Third Quarter of 2009
International Bank for Reconstruction and Development372445Total Disbursement in Fourth Quarter of 2009
International Development Association182931Total Disbursement in First Quarter of 2010
International Development Association173879Total Disbursement in First Quarter of 2010
International Development Association-190637Total Interest Repayment in First Quarter of 2010
International Development Association-63204Total Interest Repayment in First Quarter of 2010
International Bank for Reconstruction and Development152029Total Disbursement in Second Quarter of 2010
International Development Association340560Total Disbursement in Third Quarter of 2010
International Development Association325588Total Disbursement in Third Quarter of 2010
International Development Association-204628Total Interest Repayment in Third Quarter of 2010
International Development Association108214Total Disbursement in Third Quarter of 2010
International Development Association1898349Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development-57922Total Interest Repayment in Third Quarter of 2010
International Bank for Reconstruction and Development1909048Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development1580298Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development2158783Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development1185686Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development640612Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development624975Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development-98799Total Interest Repayment in First Quarter of 2011
International Bank for Reconstruction and Development-206557Total Interest Repayment in First Quarter of 2011
International Development Association151239Total Disbursement in Second Quarter of 2011
International Development Association46781Total Disbursement in Second Quarter of 2011
International Development Association147000Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development1365641Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development1798969Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development2214085Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development-139958Total Interest Repayment in Third Quarter of 2011
International Bank for Reconstruction and Development5644317Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development374381Total Disbursement in Third Quarter of 2011
International Development Association927880Total Disbursement in Third Quarter of 2011
International Development Association-212276Total Interest Repayment in Third Quarter of 2011
International Development Association199158Total Disbursement in Third Quarter of 2011
International Development Association323475Total Disbursement in Fourth Quarter of 2011
International Development Association-1299492Total Commitment Cancellations in Fourth Quarter of 2011
International Development Association-22495Total Disbursement in Fourth Quarter of 2011
International Development Association667586Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development937478Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development6595060Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development761277Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development-248328Total Interest Repayment in First Quarter of 2012
International Bank for Reconstruction and Development904084Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development-212893Total Interest Repayment in First Quarter of 2012
International Development Association2033964Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development184096Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development122572Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development2994438Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development2917533Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development-268239Total Interest Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development-1262069Total Loan Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development1073413Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development-203509Total Interest Repayment in Third Quarter of 2012
International Development Association3746795Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development1122139Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development1097876Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development1350103Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development-1423501Total Commitment Cancellations in First Quarter of 2013
International Bank for Reconstruction and Development-282246Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development-182887Total Interest Repayment in First Quarter of 2013
International Bank for Reconstruction and Development-1920444Total Loan Repayment in First Quarter of 2013
International Bank for Reconstruction and Development-213629Total Interest Repayment in First Quarter of 2013
International Development Association-208738Total Interest Repayment in Third Quarter of 2013
International Development Association-121929Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development-2011783Total Loan Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development-117986Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development-2075763Total Loan Repayment in First Quarter of 2014
International Bank for Reconstruction and Development-211219Total Interest Repayment in First Quarter of 2014
International Development Association-194863Total Interest Repayment in Third Quarter of 2014
International Development Association-2803163Total Loan Repayment in Third Quarter of 2014
International Development Association-124139Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development-2025563Total Loan Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development-88900Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-1728831Total Loan Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-56195Total Interest Repayment in First Quarter of 2015
International Development Association-2594995Total Loan Repayment in First Quarter of 2015
International Development Association-306385Total Interest Repayment in Third Quarter of 2015
International Development Association-2573252Total Loan Repayment in Third Quarter of 2015
International Development Association-55071Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-1691957Total Loan Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-47076Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-1694834Total Loan Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-174349Total Interest Repayment in First Quarter of 2016
International Development Association-2577249Total Loan Repayment in First Quarter of 2016
International Development Association-153507Total Interest Repayment in Third Quarter of 2016
International Development Association-2558458Total Loan Repayment in Third Quarter of 2016
International Development Association-20501Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-1691503Total Loan Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-8569Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-1598599Total Loan Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-139205Total Interest Repayment in First Quarter of 2017
International Development Association-2474750Total Loan Repayment in First Quarter of 2017
International Development Association-135454Total Interest Repayment in Third Quarter of 2017
International Development Association-2580072Total Loan Repayment in Third Quarter of 2017
International Development Association-2502Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-1779334Total Loan Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-1888744Total Loan Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-130357Total Interest Repayment in First Quarter of 2018
International Development Association-2673990Total Loan Repayment in First Quarter of 2018
International Development Association-102902Total Interest Repayment in Third Quarter of 2018
International Development Association-2536110Total Loan Repayment in Third Quarter of 2018
International Development Association-1714066Total Loan Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-1707024Total Loan Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-98529Total Interest Repayment in First Quarter of 2019
International Development Association-2541958Total Loan Repayment in First Quarter of 2019
International Development Association-103159Total Interest Repayment in Third Quarter of 2019
International Development Association-2519629Total Loan Repayment in Third Quarter of 2019
International Development Association-1689080Total Loan Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-1641151Total Loan Repayment in First Quarter of 2020
International Bank for Reconstruction and Development-45358Total Interest Repayment in First Quarter of 2020
International Development Association-2507016Total Loan Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementCredit AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Number of accident blackspots address in project
9 addressed under IDA credit, 9 under IBRD loan.
PDO Indicator
Defined reduction in vehicle operating costs (in %) for road users by car, on priority sections
442.4 is average value of VOCs on all IDA financed sections
386.1 is average of VOCs on all IDA financed sections after works have been completed.IBRD sections have been just recentlycompleted and the VOC values are not available yet.
PDO Indicator
Number of road traffic accidents reduced by 5 percentage points on project sections
PEPS now has the baseline data - average number of accidents on IDA financed sections is 10.8.
Average number after works on IDA financed sections is 10.4, but there are concerns over the quality and reliability of the datareceived from the traffic police.Data will be investigated and updated once data for newly completed sections are collected.
Intermediate Results Indicator
Cumulative reduction in unit costs for maintenance activities in two pilot regions
Cumulative improvement over the three year period.
PDO Indicator
Defined reduction in vehicle operating costs (in %) for road users by car, or IBRD financed sections
393.8 is average value of VOCs on all IDA financed sections
TThis reflects the work on the IDA-financed roads only, since the sections under the IBRD project either have been just completedor are still under construction. Data will be updated as soon as data for newly completed sections are collected.
Intermediate Results Indicator
Roads in good and fair condition as a share of total classified roads
As per the latest "Road Network Analysis" prepared by PEPS (2011)
PDO Indicator
Satisfactory piloting of output and performance based contracts in the two pilot regions.
No experience with OPMBC approach
Solid experience with PBC approach based on contracts in two pilot regions. A plan to roll out the PBC to all 25 regions inSerbia.EU IPA grant money should be used to finance preparation of biding documents and education of the contractors.
Pilots projects have been successful.
Intermediate Results Indicator
Database for road and bridge condition, traffic and accidents is established and operational
Established and operational. It is advisable to improve user interfaces as well as interface to the HDM4.
Intermediate Results Indicator
Number of km of highway rehabilitated within project
Up from 310 km, following restructuring of project.
This does not include the roads within the pilot regions improved as part of those contracts.
Intermediate Results Indicator
Length of road in lane km covered by road safety audit
Out of these, 17.15 km have been audited by independent auditor, 208.17 km by supervision consultant road safety specialist, and44km by PERS road audit accredited staff and/or Swedish international Development Agency (SIDA) consultant.
Intermediate Results Indicator
Roads rehabilitated, Non-rural
Up from 310 km, following restructuring of project.
This does not include the roads within the pilot regions improved as part of those contracts.Remaining 21 km is underconstruction and are expected to be completed by the project closing date.
Intermediate Results Indicator
Size of the total classified network