44000-P079414
World Bank
Rwanda Transport Sector Development Project
International Development Association
MINISTRY OF IFRASTRUCTURE
International Development Association
MINISTRY OF IFRASTRUCTUREPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Muhammad Zulfiqar Ahmed
+1-202-473-1000zulfiqar@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Prefecture de Ruhengeri
-1.5830 29.6670
Mukungwa
-1.7330 29.6570
Base
-1.7470 29.7490
Bahimba
-1.6560 29.8780
Ruhengeri
-1.5000 29.6350
Shyorongi
-1.8540 29.9620
Bugarama
-2.6920 29.0080
Rusumo
-2.2700 30.6770
Kibuye
-2.0600 29.3480
Gitarama
-2.0740 29.7570
Gisenyi
-1.7030 29.2560
Kigali
-1.9500 30.0590
Gakenke
-1.6670 29.7790
Rural and Inter-Urban RoadsCentral Government (Central Agencies)Job CreationUrban DevelopmentRural DevelopmentUrban Infrastructure and Service DeliveryFragility, Conflict and ViolenceRural Infrastructure and service deliveryAdministrative and Civil Service ReformPublic AdministrationConflict PreventionPost-conflict reconstructionTrade FacilitationTradeJobs
280612.24
280612.24
280612.25
280612.24
280612.24
280612.25
280612.24
280612.24
280612.25
280612.24
280612.24
280612.25
280612.24
280612.24
280612.25
280612.24
280612.24
280612.25
280612.24
280612.24
280612.25
280612.24
280612.24
280612.25
187074.83
187074.83
187074.83
187074.83
187074.83
187074.83
187074.83
187074.83
187074.83
187074.83
187074.83
187074.83
93537.41
93537.41
93537.42
93537.43
93537.43
93537.44
93537.41
93537.41
93537.42
93537.41
93537.41
93537.42
299319.73
299319.73
299319.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
148556.66
148556.66
148556.66
0.00
0.00
0.00
500000.00
500000.00
500000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
274767.00
274767.00
274767.01
0.00
0.00
0.00
76546.63
76546.63
76546.64
0.00
0.00
0.00
0.00
0.00
0.00
138792.52
138792.52
138792.52
841666.67
841666.67
841666.66
841666.67
841666.67
841666.66
841666.67
841666.67
841666.66
666666.67
666666.67
666666.66
566666.67
566666.67
566666.66
533333.33
533333.33
533333.34
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
303003.85
303003.85
303003.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11000000Total Commitment in Third Quarter of 2007
International Development Association445670Total Disbursement in Second Quarter of 2008
International Development Association1500000Total Disbursement in Fourth Quarter of 2008
International Development Association824301Total Disbursement in First Quarter of 2010
International Development Association229640Total Disbursement in Third Quarter of 2010
International Development Association11000000Total Commitment in Second Quarter of 2011
International Development Association416378Total Disbursement in Second Quarter of 2011
International Development Association176360Total Disbursement in First Quarter of 2012
International Development Association959290Total Disbursement in Second Quarter of 2012
International Development Association60000Total Disbursement in Second Quarter of 2012
International Development Association87794Total Disbursement in Second Quarter of 2012
International Development Association1940000Total Disbursement in Second Quarter of 2012
International Development Association3555912Total Disbursement in Third Quarter of 2012
International Development Association1500000Total Disbursement in Fourth Quarter of 2012
International Development Association-3724Total Interest Repayment in Fourth Quarter of 2012
International Development Association429886Total Disbursement in Fourth Quarter of 2012
International Development Association2370707Total Disbursement in First Quarter of 2013
International Development Association777285Total Disbursement in Second Quarter of 2013
International Development Association-29780Total Interest Repayment in Second Quarter of 2013
International Development Association-33410Total Interest Repayment in Fourth Quarter of 2013
International Development Association-34915Total Interest Repayment in Second Quarter of 2014
International Development Association2043791Total Disbursement in Second Quarter of 2014
International Development Association-32836Total Interest Repayment in Fourth Quarter of 2014
International Development Association900000Total Disbursement in First Quarter of 2015
International Development Association516977Total Disbursement in First Quarter of 2015
International Development Association1250000Total Disbursement in First Quarter of 2015
International Development Association237392Total Disbursement in Second Quarter of 2015
International Development Association-32680Total Interest Repayment in Second Quarter of 2015
International Development Association648007Total Disbursement in Second Quarter of 2015
International Development Association-18506Total Commitment Cancellations in Third Quarter of 2015
International Development Association-5408Total Disbursement in Third Quarter of 2015
International Development Association-412307Total Commitment Cancellations in Third Quarter of 2015
International Development Association-9937Total Disbursement in Third Quarter of 2015
International Development Association-36384Total Interest Repayment in Fourth Quarter of 2015
International Development Association-35471Total Interest Repayment in Second Quarter of 2016
International Development Association-35127Total Interest Repayment in Fourth Quarter of 2016
International Development Association-34348Total Interest Repayment in Second Quarter of 2017
International Development Association-36760Total Interest Repayment in Fourth Quarter of 2017
International Development Association-36349Total Interest Repayment in Second Quarter of 2018
International Development Association-35164Total Interest Repayment in Fourth Quarter of 2018
International Development Association-35181Total Interest Repayment in Second Quarter of 2019
International Development Association-34948Total Interest Repayment in Fourth Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementGrant or Trust Fund AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :FA V(a) | Description :Adopt a PIM and a Project Procedure Manual | Due Date :27-Dec-2007
Finance Agreement :FA V(b) | Description :Establish within CGPT and RMF accounting and financial management systems | Due Date:03-Jan-2008
Finance Agreement :FA V(c) | Description :Execute and deliver co-financing agreement | Due Date :05-Oct-2007
Finance Agreement :PAD Para 62 (i) | Description :Adopt and implement a FMAP | Due Date :05-Oct-2007
Finance Agreement :PAD Para 62 (ii) | Description :Adopt and implement PAP | Due Date :05-Oct-2007
Finance Agreement :FA Sch. 2 IV B(b) and FA Sch. 2 V 6) | Description :Establish road agency | Due Date :03-Jul-2009
Finance Agreement :FA Sch. 2 IV B(c) | Description :At least one output-based road mangement contract signed | Due Date :31-Mar-2008
Finance Agreement :FA Sch. 2 V A(1) | Description :Establish and maintain Project Account B | Due Date :04-Feb-2008
Finance Agreement :FA Sch. 2 V (2) | Description :Deposit in Project Account B by 01/31 of each year RWF 2 m in 2008, RWF 3 m in2009 and 2010 each and RWF 4m in 2011 | Due Date :01-Jan-2008
Finance Agreement :FA Sch. 2 V C(1) | Description :Mid-term review | Due Date :25-Oct-2010
Finance Agreement :FA Sch. 2 V C(2) | Description :Furnish to IDA a Pre-MTR report | Due Date :18-Oct-2010
Finance Agreement :FA Sch 2 V D(2) | Description :Recruit external financial | Due Date :03-Feb-2008
Finance Agreement :FA Sch 2 V D(3) | Description :Furnish to IDA a sector policy matrix, a sector results log-frame and a sectorMTEF | Due Date :03-Apr-2008
Finance Agreement :FA Sch 2 V D(4) | Description :Conclude a MoU | Due Date :02-Jan-2009
Finance Agreement :FA Sch. 2 V D(5) | Description :Conclude at least one Output-based management | Due Date :31-Mar-2008
Finance Agreement :FA 2 1 D(2) | Description :Recruit an environmental specialist | Due Date :03-Apr-2008
PDO Indicator
Number of rural people with access to an all-season road
Intermediate Results Indicator
Functional RTDA- Managerial and Key staff positions filled and key standards and systems adopted
PDO Indicator
Direct project beneficiaries
Intermediate Results Indicator
Current and potential transport sector staff having completed masters degrees or equivalent
Intermediate Results Indicator
Number of sector agencies implementing performance agreements signed with the government
PDO Indicator
Number of sustained jobs generated annually from road maintenance works
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
% paved roads maintained in good condition (average IRI less than 3.0m/km)
PDO Indicator
Share of rural population with access to an all-season road
Intermediate Results Indicator
100% of Kigali-Ruhengeri road in good condition (average IRI less than 3)
PDO Indicator
Roads in good and fair condition as a share of total classified roads
Intermediate Results Indicator
Statistics exist and reflected in sector planning
PDO Indicator
50% of national paved road network in good condition (average IRI less than 3.0 m/km) (AAP)
Intermediate Results Indicator
Road and bridge design standard, specifications and manuals completed
Intermediate Results Indicator
Adopted formulae for disaggregation of road maintenance funds amongst executing agencies
Intermediate Results Indicator
Completion and adoption of transport master plan
Intermediate Results Indicator
Project and program implemented according to PIP, disbursement and procurement plans; project audits are released timely
Intermediate Results Indicator
MOU, sector policy matrix and road maintenance strategy adopted according to schedule in FA and being implemented
PDO Indicator
Size of the total classified network
44000-P105176
World Bank
Second Rural Sector Support
International Development Association
MINISTRY OF AGRICULTURE AND ANIMAL RESOURCES
International Development Association
MINISTRY OF AGRICULTURE AND ANIMAL RESOURCESPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Mark A. Austin
+1-202-473-1000maustin@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali
-1.94995 30.0589
Agricultural markets, commercialization and agri-businessOther Agriculture, Fishing and ForestryIrrigation and DrainageLand Administration and ManagementAgriculture FinanceLandscape ManagementRenewable Natural Resources Asset ManagementBiodiversityRural MarketsWater Institutions, Policies and ReformRural Infrastructure and service deliveryFinance for DevelopmentRural DevelopmentWater Resource Management
0.00
0.00
0.00
1325508.60
1325508.61
1325508.61
999608.76
999608.76
999608.77
999608.76
999608.76
999608.77
999608.76
999608.76
999608.77
999608.76
999608.76
999608.77
832550.85
832550.87
832550.87
832550.85
832550.87
832550.87
832550.85
832550.87
832550.87
832550.85
832550.87
832550.87
629890.45
629890.45
629890.46
629890.45
629890.45
629890.46
465571.20
465571.20
465571.22
465571.20
465571.20
465571.22
410798.12
410798.12
410798.12
410798.12
410798.12
410798.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1325508.60
1325508.61
1325508.61
999608.76
999608.76
999608.77
999608.76
999608.76
999608.77
999608.76
999608.76
999608.77
999608.76
999608.76
999608.77
832550.85
832550.87
832550.87
832550.85
832550.87
832550.87
832550.85
832550.87
832550.87
832550.85
832550.87
832550.87
629890.45
629890.45
629890.46
629890.45
629890.45
629890.46
465571.20
465571.20
465571.22
465571.20
465571.20
465571.22
410798.12
410798.12
410798.12
410798.12
410798.12
410798.12
0.00
0.00
0.00
0.00
0.00
35000000Total Commitment in Second Quarter of 2008
International Development Association3274650Total Disbursement in Fourth Quarter of 2008
International Development Association73919Total Disbursement in First Quarter of 2009
International Development Association94740Total Disbursement in Second Quarter of 2009
International Development Association474023Total Disbursement in Second Quarter of 2009
International Development Association244447Total Disbursement in Third Quarter of 2009
International Development Association439624Total Disbursement in Third Quarter of 2009
International Development Association687619Total Disbursement in Third Quarter of 2009
International Development Association684790Total Disbursement in Fourth Quarter of 2009
International Development Association1309242Total Disbursement in Fourth Quarter of 2009
International Development Association433684Total Disbursement in First Quarter of 2010
International Development Association1189066Total Disbursement in First Quarter of 2010
International Development Association742157Total Disbursement in Second Quarter of 2010
International Development Association761047Total Disbursement in Second Quarter of 2010
International Development Association1978245Total Disbursement in Second Quarter of 2010
International Development Association665650Total Disbursement in Third Quarter of 2010
International Development Association1075022Total Disbursement in Third Quarter of 2010
International Development Association2994512Total Disbursement in Fourth Quarter of 2010
International Development Association1337534Total Disbursement in First Quarter of 2011
International Development Association458551Total Disbursement in Second Quarter of 2011
International Development Association1143157Total Disbursement in Second Quarter of 2011
International Development Association2000165Total Disbursement in Second Quarter of 2011
International Development Association1077464Total Disbursement in Third Quarter of 2011
International Development Association1696933Total Disbursement in Third Quarter of 2011
International Development Association1007477Total Disbursement in Fourth Quarter of 2011
International Development Association2003177Total Disbursement in Fourth Quarter of 2011
International Development Association649955Total Disbursement in First Quarter of 2012
International Development Association1970451Total Disbursement in First Quarter of 2012
International Development Association357379Total Disbursement in Second Quarter of 2012
International Development Association952232Total Disbursement in Second Quarter of 2012
International Development Association212382Total Disbursement in Third Quarter of 2012
International Development Association374552Total Disbursement in Third Quarter of 2012
International Development Association222142Total Disbursement in Fourth Quarter of 2012
International Development Association229331Total Disbursement in Fourth Quarter of 2012
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Adoption by the Borrower of a Project Implementation Manual satisfactory to IDA
Establishment of a Designated Account and deposit of first installment of counterpart funds
Intermediate Results Indicator
Direct project beneficiaries
The number of direct beneficiaries supported by RSSP include 34,603 members of rice cooperatives and 47,016members ofcooperativessupporting other crops (mainly maize, wheat and Irish potatoes). Of thecombined total, 43% were women and 57% were men.
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
By the end of the Project, at least 3,300 additional ha of irrigated marshlands have been rehabilitated or developed by the Project(EDPRS/PSTA indicator).
Nine sites were rehabilitated or dams built. Eight dams were built and on theother sites rehabilitation works took place. HoweverSome planned work was rescheduled toRSSP3 because of increased costs relative to the budget. Under RSSP2 additional 3,324 ha ofmarshland was brought into operation.
Intermediate Results Indicator
By the end of the Project, at least 75% of the farmers in irrigated marshlands rehabilitated or developed by the Project (RSSP1 andRSSP2) are paying water charges through water user associations.
This percentage reflects the current proportion of farmers paying water charges even as their formal registration process isunderway. WUAs committees were elected and trained in all 20 marshlands. A draft Ministerial Order adhering to international WUAstandards has been gazetted in December 2011; registration of these 77% of farmers paying water charges into formal WUAs will beundertakenprior to Project end.
Intermediate Results Indicator
By the end of the Project, at least 9,900 additional ha of hillsides have been sustainably developed by the Project (EDPRS/PSTA indicator).
Slightly over 10,000 ha, owned by approximately 20,000 households have been protected againstsoil erosion using differenttechniques, including radical terracing, during the second phase ofRSSP. 8,356 ha were protected during the 2009 and 2010 season,and the remaining 1,740 hawere completed in 2011.
Intermediate Results Indicator
By the end of the Project, at least 80 cooperatives supported by the Project have quality business plans under implementation.
Of the 83 cooperatives supported by RSSP, 81 have been assisted by their local service provider todevelop business plans. Theseinturn were validated as of good quality by the RSSP project staffand are in the process of implementation.
Intermediate Results Indicator
By the end of the Project, at least 6 additional cooperatives supported by RSSP2 are marketing certified maize or potato seed.
The Target was by far achieved. There is general agreement that seed production is a profitableventure and that farmers generallytry to become seed producers if they can. There is an overall shortage of certified seeds in Rwanda.
Intermediate Results Indicator
By the end of the Project, with at least 75% of the rural infrastructure sub-projects funded through the LDF, the majority of usersare satisfied one year after the sub-project was completed.
The Impact Assessment revealed that 98% of users are either very satisfied or quite satisfied by the infrastructure
PDO Indicator
By the end of the Project, production of rice in marshlands rehabilitated or developed under RSSP2 has increased by at least 100 percent relative to the baseline.
As per the PAD, this PDO indicator has a rolling baseline as and when the total selection of marshlands to be developed isfinalized. We have updated the baseline at midterm. The final update baseline has changed from 8,757 tons to 5,527 tons because ofchange in the marshlandrehabilitation and development planning as 1800 ha developed in Muvumba 8 marshland have not yet beenbrought under rice.
End target updated (see comments under rolling baseline)
This progress comprises of 1,358tin season A and9,874t in seasonB.
PDO Indicator
By the end of the Project, at least 50% of farmers in marshland and hillside areas developed or rehabilitated by the RSSP1 & 2 haveadopted sustainable marshland or hillside intensification technolo
The progress on this indicator was measured during the Impact Assessment Survey ended by February 2012. The adoption ofsustainable technologies by farmers has been measured directly fromthe IA survey. Of the techniques included in the survey, soilfertility management, IPM,conservation tillage, contour bunding, construction of erosion control structures includingterraces,vegetative strips, and agroforestry practices, over 75% of farmers, on both marshlands and hillsidefarms were using soilfertility management techniques, IPM, vegetative strips and agroforestry.Radical terracing was the least popular, no doubtreflecting the cost of the technique, and only athird of farmers had adopted conservation tillage
PDO Indicator
By the end of the Project, at least 20 cooperatives with business plans and supported by RSSP2 have increased their revenues from sales by 50% relative to the baseline.
67 out of 81coops haveincreasedrevenue over acombination ofseason A andseason B of 2011over the baselineby more than50%.
44000-P111567
World Bank
Rwanda Electricity Access Scale-up and Sector Wide Approach (SWAp) Development Project
International Development Association
ELECTROGAZ
International Development Association
ELECTROGAZPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Norah Kipwola
+1-202-473-1000nkipwola@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali Province
-1.9170 30.0830
Ruhengeri Province
-1.5830 29.6670
Prefegitura ya Kibuye
-2.1670 29.4170
Gitarama Province
-2.0000 29.5830
Cyangugu Province
-2.5000 29.1670
Gicumbi District
-1.6160 30.1210
Gakenke Distric
-1.6980 29.7850
Huye District
-2.5820 29.7020
Rulindo
-1.7210 29.9240
Masoro
-1.8190 30.0600
Ruhango
-2.0290 29.8890
Bugarama
-1.5140 30.4340
Energy Transmission and DistributionRenewable Energy SolarRenewable Energy BiomassRenewable Energy GeothermalRenewable Energy WindPublic Administration - Energy and ExtractivesUrban Infrastructure and Service DeliveryRural Infrastructure and service deliveryRural DevelopmentJob CreationServices and Housing for the PoorUrban DevelopmentJobs
0.00
333333.33
333333.33
333333.34
666666.66
666666.67
666666.67
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
666666.66
666666.67
666666.67
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70000000Total Commitment in Fourth Quarter of 2009
International Development Association2830176Total Disbursement in Fourth Quarter of 2010
International Development Association2046989Total Disbursement in First Quarter of 2011
International Development Association2261719Total Disbursement in First Quarter of 2011
International Development Association2726903Total Disbursement in First Quarter of 2011
International Development Association-11695Total Interest Repayment in First Quarter of 2011
International Development Association102713Total Disbursement in Second Quarter of 2011
International Development Association2619149Total Disbursement in Second Quarter of 2011
International Development Association5056115Total Disbursement in Second Quarter of 2011
International Development Association1248102Total Disbursement in Third Quarter of 2011
International Development Association1574067Total Disbursement in Third Quarter of 2011
International Development Association2701913Total Disbursement in Third Quarter of 2011
International Development Association-61650Total Interest Repayment in Third Quarter of 2011
International Development Association318617Total Disbursement in Fourth Quarter of 2011
International Development Association1816261Total Disbursement in Fourth Quarter of 2011
International Development Association1952371Total Disbursement in Fourth Quarter of 2011
International Development Association711972Total Disbursement in First Quarter of 2012
International Development Association1027619Total Disbursement in First Quarter of 2012
International Development Association1532228Total Disbursement in First Quarter of 2012
International Development Association-97085Total Interest Repayment in First Quarter of 2012
International Development Association10854Total Disbursement in Second Quarter of 2012
International Development Association2635522Total Disbursement in Second Quarter of 2012
International Development Association3025280Total Disbursement in Third Quarter of 2012
International Development Association-115182Total Interest Repayment in Third Quarter of 2012
International Development Association680700Total Disbursement in Fourth Quarter of 2012
International Development Association993547Total Disbursement in Fourth Quarter of 2012
International Development Association1179041Total Disbursement in Fourth Quarter of 2012
International Development Association339117Total Disbursement in First Quarter of 2013
International Development Association649466Total Disbursement in First Quarter of 2013
International Development Association1634892Total Disbursement in First Quarter of 2013
International Development Association-144681Total Interest Repayment in First Quarter of 2013
International Development Association60000000Total Commitment in First Quarter of 2013
International Development Association1177220Total Disbursement in Second Quarter of 2013
International Development Association1761408Total Disbursement in Second Quarter of 2013
International Development Association781554Total Disbursement in Third Quarter of 2013
International Development Association1212804Total Disbursement in Third Quarter of 2013
International Development Association2595952Total Disbursement in Third Quarter of 2013
International Development Association-156675Total Interest Repayment in Third Quarter of 2013
International Development Association136504Total Disbursement in Fourth Quarter of 2013
International Development Association211128Total Disbursement in Fourth Quarter of 2013
International Development Association1948082Total Disbursement in Fourth Quarter of 2013
International Development Association1313528Total Disbursement in First Quarter of 2014
International Development Association-194790Total Interest Repayment in First Quarter of 2014
International Development Association4000000Total Disbursement in First Quarter of 2014
International Development Association112739Total Disbursement in Second Quarter of 2014
International Development Association2056577Total Disbursement in Second Quarter of 2014
International Development Association633145Total Disbursement in Second Quarter of 2014
International Development Association774240Total Disbursement in Second Quarter of 2014
International Development Association715136Total Disbursement in Third Quarter of 2014
International Development Association1671542Total Disbursement in Third Quarter of 2014
International Development Association3155975Total Disbursement in Third Quarter of 2014
International Development Association-201080Total Interest Repayment in Third Quarter of 2014
International Development Association84607Total Disbursement in Third Quarter of 2014
International Development Association186983Total Disbursement in Third Quarter of 2014
International Development Association2717219Total Disbursement in Third Quarter of 2014
International Development Association-21636Total Interest Repayment in Third Quarter of 2014
International Development Association569929Total Disbursement in Fourth Quarter of 2014
International Development Association1063406Total Disbursement in Fourth Quarter of 2014
International Development Association1393918Total Disbursement in Fourth Quarter of 2014
International Development Association252152Total Disbursement in Fourth Quarter of 2014
International Development Association1570132Total Disbursement in Fourth Quarter of 2014
International Development Association2128609Total Disbursement in Fourth Quarter of 2014
International Development Association49135Total Disbursement in First Quarter of 2015
International Development Association149472Total Disbursement in First Quarter of 2015
International Development Association-208000Total Interest Repayment in First Quarter of 2015
International Development Association49581Total Disbursement in First Quarter of 2015
International Development Association1820610Total Disbursement in First Quarter of 2015
International Development Association2330640Total Disbursement in First Quarter of 2015
International Development Association-38923Total Interest Repayment in First Quarter of 2015
International Development Association117668Total Disbursement in Second Quarter of 2015
International Development Association287020Total Disbursement in Second Quarter of 2015
International Development Association75734Total Disbursement in Second Quarter of 2015
International Development Association2449063Total Disbursement in Second Quarter of 2015
International Development Association3093670Total Disbursement in Second Quarter of 2015
International Development Association181671Total Disbursement in Third Quarter of 2015
International Development Association-216863Total Interest Repayment in Third Quarter of 2015
International Development Association385419Total Disbursement in Third Quarter of 2015
International Development Association682497Total Disbursement in Third Quarter of 2015
International Development Association915013Total Disbursement in Third Quarter of 2015
International Development Association-72849Total Interest Repayment in Third Quarter of 2015
International Development Association292474Total Disbursement in Fourth Quarter of 2015
International Development Association2859232Total Disbursement in Fourth Quarter of 2015
International Development Association4621853Total Disbursement in Fourth Quarter of 2015
International Development Association96539Total Disbursement in First Quarter of 2016
International Development Association-218408Total Interest Repayment in First Quarter of 2016
International Development Association444897Total Disbursement in First Quarter of 2016
International Development Association1349854Total Disbursement in First Quarter of 2016
International Development Association1891896Total Disbursement in First Quarter of 2016
International Development Association-107078Total Interest Repayment in First Quarter of 2016
International Development Association475945Total Disbursement in Second Quarter of 2016
International Development Association80812Total Disbursement in Second Quarter of 2016
International Development Association1241030Total Disbursement in Second Quarter of 2016
International Development Association4099498Total Disbursement in Second Quarter of 2016
International Development Association-220630Total Interest Repayment in Third Quarter of 2016
International Development Association159336Total Disbursement in Third Quarter of 2016
International Development Association1221045Total Disbursement in Third Quarter of 2016
International Development Association1419237Total Disbursement in Third Quarter of 2016
International Development Association-144188Total Interest Repayment in Third Quarter of 2016
International Development Association1187240Total Disbursement in Fourth Quarter of 2016
International Development Association615670Total Disbursement in Fourth Quarter of 2016
International Development Association1014352Total Disbursement in Fourth Quarter of 2016
International Development Association3511364Total Disbursement in Fourth Quarter of 2016
International Development Association-217249Total Interest Repayment in First Quarter of 2017
International Development Association47059Total Disbursement in First Quarter of 2017
International Development Association438729Total Disbursement in First Quarter of 2017
International Development Association1063361Total Disbursement in First Quarter of 2017
International Development Association-170379Total Interest Repayment in First Quarter of 2017
International Development Association82724Total Disbursement in Second Quarter of 2017
International Development Association545120Total Disbursement in Second Quarter of 2017
International Development Association149216Total Disbursement in Second Quarter of 2017
International Development Association155927Total Disbursement in Second Quarter of 2017
International Development Association1126325Total Disbursement in Second Quarter of 2017
International Development Association292767Total Disbursement in Third Quarter of 2017
International Development Association749074Total Disbursement in Third Quarter of 2017
International Development Association-226792Total Interest Repayment in Third Quarter of 2017
International Development Association137245Total Disbursement in Third Quarter of 2017
International Development Association-188843Total Interest Repayment in Third Quarter of 2017
International Development Association301861Total Disbursement in Fourth Quarter of 2017
International Development Association431280Total Disbursement in Fourth Quarter of 2017
International Development Association635000Total Disbursement in Fourth Quarter of 2017
International Development Association1527120Total Disbursement in Fourth Quarter of 2017
International Development Association169200Total Disbursement in First Quarter of 2018
International Development Association519366Total Disbursement in First Quarter of 2018
International Development Association-243191Total Interest Repayment in First Quarter of 2018
International Development Association7693Total Disbursement in First Quarter of 2018
International Development Association618563Total Disbursement in First Quarter of 2018
International Development Association-209226Total Interest Repayment in First Quarter of 2018
International Development Association21293Total Disbursement in Second Quarter of 2018
International Development Association75125Total Disbursement in Second Quarter of 2018
International Development Association299515Total Disbursement in Second Quarter of 2018
International Development Association33661Total Disbursement in Second Quarter of 2018
International Development Association-240290Total Interest Repayment in Third Quarter of 2018
International Development Association-207910Total Interest Repayment in Third Quarter of 2018
International Development Association-235886Total Interest Repayment in First Quarter of 2019
International Development Association-203982Total Interest Repayment in First Quarter of 2019
International Development Association-232237Total Interest Repayment in Third Quarter of 2019
International Development Association-200826Total Interest Repayment in Third Quarter of 2019
International Development Association-233081Total Interest Repayment in First Quarter of 2020
International Development Association-621550Total Loan Repayment in First Quarter of 2020
International Development Association-201556Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :FA, Section IV, A, 1 | Description :The PIE shall earn, for each of its fiscal years after its fiscal yearending on December 31, 2015, an annual return of not less than zero percent (0%) of the average current net value of its fixedassets in operation. Frequency: Yearly.
Finance Agreement :FA, Section IV, A, 2 | Description :The PIE shall produce, for each of its FY after its FY year ending on June30, 2010, funds from internal sources equivalent to not less than ten percent (10%) of the annual average of the PIE's distributioncapital expenditures incurred, or expected to be incurred, for that fiscal year and the next following fiscal year, includingconsumer contributions in aid of construction. Frequency: Yearly.
PDO Indicator
Of which female (beneficiaries)
PDO Indicator
Household Connections from the Project
PDO Indicator
People provided with access to electricity by hhold connections-Grid
PDO Indicator
Project Beneficiaries
Intermediate Results Indicator
Transformers rehabilitated/Replaced
PDO Indicator
Households connected to electricity under the Government Program EARP
PDO Indicator
People provided with access to electricity by household connections
PDO Indicator
Health Centers/Hospitals
PDO Indicator
Administrative Community Centers
PDO Indicator
Schools
PDO Indicator
Average cost per connection [Connection Cost Index (CCI)]
PDO Indicator
Monthly interruptions per km of MV line (% reduction of rolling average )
Intermediate Results Indicator
New Customers Using Energy Efficient Light Bulbs (CFLs)
PDO Indicator
Number of Community electricity connections under the project (Energy Core ind)
Intermediate Results Indicator
Improved customer complaint and resolution system in place and functioning
Intermediate Results Indicator
Quarterly monitoring progress reports approved by SWG
Intermediate Results Indicator
Spatial grid rollout investment plan updated by EWSA and Approved by the SWG
Intermediate Results Indicator
Joint Annual Sector Performance Report approved by SWG
Intermediate Results Indicator
Transmission and distribution lines (KM) constructed or rehabilitated under the project. (Energy Core Ind)
44000-P112712
World Bank
Second Emergency Demobilization and Reintegration Project
International Development Association
RWANDA DEMOBILIZATION AND REINTEGRATION COMMISSION
International Development Association
RWANDA DEMOBILIZATION AND REINTEGRATION COMMISSIONPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Natacha Caroline Lemasle
+1-202-473-1000nlemasle@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Province du Nord
-1.5830 29.9170
Prefegitura ya Kibungo
-2.0000 30.5830
Mutobo
-2.8070 29.5040
Social ProtectionPublic Administration - Social ProtectionParticipation and Civic EngagementGenderSocial InclusionPost-conflict reconstructionJobsFragility, Conflict and ViolenceConflict Prevention
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
287500.00
287500.00
287500.00
287500.00
287500.00
287500.00
287500.00
287500.00
287500.00
287500.00
287500.00
287500.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
29166.67
29166.67
29166.66
29166.67
29166.67
29166.66
29166.67
29166.67
29166.66
29166.67
29166.67
29166.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
287500.00
287500.00
287500.00
287500.00
287500.00
287500.00
287500.00
287500.00
287500.00
287500.00
287500.00
287500.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
29166.67
29166.67
29166.66
29166.67
29166.67
29166.66
29166.67
29166.67
29166.66
29166.67
29166.67
29166.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8000000Total Commitment in Third Quarter of 2009
International Development Association1700000Total Disbursement in Third Quarter of 2010
International Development Association152933Total Disbursement in Fourth Quarter of 2010
International Development Association344193Total Disbursement in Fourth Quarter of 2010
International Development Association519483Total Disbursement in First Quarter of 2011
International Development Association1365326Total Disbursement in Second Quarter of 2011
International Development Association1917919Total Disbursement in Second Quarter of 2011
International Development Association-1248266Total Disbursement in Third Quarter of 2011
International Development Association330394Total Disbursement in Third Quarter of 2011
International Development Association442000Total Disbursement in Second Quarter of 2012
International Development Association1324871Total Disbursement in Second Quarter of 2012
International Development Association39897Total Disbursement in Third Quarter of 2012
International Development Association12353Total Disbursement in First Quarter of 2013
International Development Association104938Total Disbursement in Third Quarter of 2013
International Development Association419945Total Disbursement in Third Quarter of 2013
International Development Association251691Total Disbursement in Fourth Quarter of 2013
International Development Association352140Total Disbursement in Fourth Quarter of 2013
International Development Association8970000Total Commitment in Second Quarter of 2014
International Development Association1135982Total Disbursement in Fourth Quarter of 2014
International Development Association12394Total Disbursement in First Quarter of 2015
International Development Association705405Total Disbursement in First Quarter of 2015
International Development Association41925Total Disbursement in Second Quarter of 2015
International Development Association455286Total Disbursement in Second Quarter of 2015
International Development Association944280Total Disbursement in Second Quarter of 2015
International Development Association434313Total Disbursement in Third Quarter of 2015
International Development Association-9487Total Interest Repayment in Third Quarter of 2015
International Development Association1789Total Disbursement in Fourth Quarter of 2015
International Development Association517107Total Disbursement in Fourth Quarter of 2015
International Development Association154229Total Disbursement in First Quarter of 2016
International Development Association717552Total Disbursement in First Quarter of 2016
International Development Association-15451Total Interest Repayment in First Quarter of 2016
International Development Association183821Total Disbursement in Second Quarter of 2016
International Development Association184571Total Disbursement in Second Quarter of 2016
International Development Association468663Total Disbursement in Second Quarter of 2016
International Development Association384909Total Disbursement in Third Quarter of 2016
International Development Association-20344Total Interest Repayment in Third Quarter of 2016
International Development Association449948Total Disbursement in Fourth Quarter of 2016
International Development Association159770Total Disbursement in First Quarter of 2017
International Development Association296454Total Disbursement in First Quarter of 2017
International Development Association-23399Total Interest Repayment in First Quarter of 2017
International Development Association121178Total Disbursement in Second Quarter of 2017
International Development Association221436Total Disbursement in Second Quarter of 2017
International Development Association315110Total Disbursement in Second Quarter of 2017
International Development Association224132Total Disbursement in Third Quarter of 2017
International Development Association-28150Total Interest Repayment in Third Quarter of 2017
International Development Association-31538Total Interest Repayment in First Quarter of 2018
International Development Association-31088Total Interest Repayment in Third Quarter of 2018
International Development Association-29993Total Interest Repayment in First Quarter of 2019
International Development Association-30007Total Interest Repayment in Third Quarter of 2019
International Development Association-29743Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementGrant or Trust Fund AgreementGrant or Trust Fund AgreementGrant or Trust Fund AgreementGrant or Trust Fund AgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Resettlement kits delivered to dependents of ex-AG members (Comp 2)
Intermediate Results Indicator
Ex-combatants who receive reintegration benefits (RG) in time and in accordance with the implementation manual (Comp 3)
PDO Indicator
Direct project beneficiaries
PDO Indicator
Demobilized RDF members
PDO Indicator
Demobilized AG
PDO Indicator
Women
PDO Indicator
Ill/disabled
PDO Indicator
Women
PDO Indicator
Children
PDO Indicator
Ill/disbaled
Intermediate Results Indicator
Demobilized persons who are satisfied with the services and information provided in the demobilization centers (Comp 1)
Intermediate Results Indicator
Ex-combatants who have received reinsertion benefits (BNK, RSA) (comp 1)
Intermediate Results Indicator
Ex-combatants who settle down in their community of choice (with access to shelter and food security) (Comp 2)
Intermediate Results Indicator
Ex-combatants provided with a national ID number before they leave the demobilization center (comp 4)
PDO Indicator
Demand for demobilization services met
PDO Indicator
Ex-combatants who are economically active
PDO Indicator
Ex-combatants who report social acceptance by their communities
Intermediate Results Indicator
Incoming ex-combatants who are screened for mental health issues (comp 3)
Intermediate Results Indicator
Categorized disabled ex-combatants who receive Mutuelles de SantE and monthly allowance as per current legislation, within 9 monthsafter demobilization (comp 4)
Intermediate Results Indicator
Ex-combatants selected to receive VSW support and registered to receive training have successfully completed training/education/IGA(comp 3)
Intermediate Results Indicator
Adults
Intermediate Results Indicator
Children
44000-P114931
World Bank
Land Husbandry, Water Harvesting and Hillside Irrigation
International Development Association
MINISTRY OF AGRICULTURE AND ANIMAL RESOURCES (MINAGRI)
International Development Association
MINISTRY OF AGRICULTURE AND ANIMAL RESOURCES (MINAGRI)Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Aimee Marie Ange Mpambara
+1-202-473-1000ampambara@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Northern Province
-1.5830 29.9170
Nyanza
-2.3730 29.6800
Gatsibo
-1.9540 29.7200
Muyumbu
-1.9720 30.2540
Kayonza
-1.8850 30.5170
Gatsibo
-1.5950 30.2250
Karongi
-2.1510 29.3950
Agricultural markets, commercialization and agri-businessAgricultural Extension, Research, and Other Support ActivitiesPublic Administration - Agriculture, Fishing & ForestryIrrigation and DrainageOther Agriculture, Fishing and ForestryRural MarketsLandscape ManagementRural Infrastructure and service deliveryFinance for DevelopmentBiodiversityLand Administration and ManagementAgriculture FinanceRenewable Natural Resources Asset ManagementRural Development
0.00
0.00
0.00
0.00
0.00
0.00
0.00
453333.33
453333.33
453333.34
453333.33
453333.33
453333.34
453333.33
453333.33
453333.34
453333.33
453333.33
453333.34
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
935000.00
510000.00
510000.00
510000.00
510000.00
510000.00
510000.00
510000.00
510000.00
510000.00
510000.00
510000.00
510000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
338614.53
338614.53
338614.53
338614.53
338614.53
338614.53
338614.53
338614.53
338614.53
338614.53
338614.53
338614.53
410328.66
410328.66
410328.66
410328.66
410328.66
410328.66
410328.66
410328.66
410328.66
410328.66
410328.66
410328.62
702916.67
702916.67
702916.67
702916.67
702916.67
702916.67
702916.67
702916.67
702916.67
702916.67
702916.67
702916.63
678750.00
678750.00
678750.00
678750.00
678750.00
678750.00
678750.00
678750.00
678750.00
678750.00
678750.00
678750.00
636500.00
636500.00
636500.00
636500.00
636500.00
636500.00
636500.00
636500.00
636500.00
636500.00
636500.00
636500.00
506166.67
506166.67
506166.67
506166.67
506166.67
506166.67
506166.67
506166.67
506166.67
506166.67
506166.67
506166.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
994333.33
994333.33
994333.33
994333.33
994333.33
994333.33
994333.33
994333.33
994333.33
994333.33
994333.33
994333.37
0.00
0.00
0.00
0.00
34000000Total Commitment in Fourth Quarter of 2009
International Development Association1001203Total Disbursement in Third Quarter of 2010
International Development Association1421271Total Disbursement in Fourth Quarter of 2010
International Development Association714802Total Disbursement in First Quarter of 2011
International Development Association-9912Total Interest Repayment in First Quarter of 2011
International Development Association926098Total Disbursement in Second Quarter of 2011
International Development Association269345Total Disbursement in Third Quarter of 2011
International Development Association1000000Total Disbursement in Third Quarter of 2011
International Development Association-15633Total Interest Repayment in Third Quarter of 2011
International Development Association534558Total Disbursement in Fourth Quarter of 2011
International Development Association1155215Total Disbursement in First Quarter of 2012
International Development Association-21113Total Interest Repayment in First Quarter of 2012
International Development Association729863Total Disbursement in Second Quarter of 2012
International Development Association1234964Total Disbursement in Second Quarter of 2012
International Development Association-29895Total Interest Repayment in Third Quarter of 2012
International Development Association859874Total Disbursement in Fourth Quarter of 2012
International Development Association1809308Total Disbursement in Fourth Quarter of 2012
International Development Association370000Total Disbursement in First Quarter of 2013
International Development Association931091Total Disbursement in First Quarter of 2013
International Development Association1842070Total Disbursement in First Quarter of 2013
International Development Association-40641Total Interest Repayment in First Quarter of 2013
International Development Association134964Total Disbursement in Second Quarter of 2013
International Development Association1153950Total Disbursement in Second Quarter of 2013
International Development Association1332769Total Disbursement in Second Quarter of 2013
International Development Association672255Total Disbursement in Third Quarter of 2013
International Development Association1158065Total Disbursement in Third Quarter of 2013
International Development Association-61477Total Interest Repayment in Third Quarter of 2013
International Development Association220231Total Disbursement in Fourth Quarter of 2013
International Development Association402942Total Disbursement in Fourth Quarter of 2013
International Development Association35000000Total Commitment in Fourth Quarter of 2013
International Development Association262535Total Disbursement in First Quarter of 2014
International Development Association281620Total Disbursement in First Quarter of 2014
International Development Association448015Total Disbursement in First Quarter of 2014
International Development Association-75303Total Interest Repayment in First Quarter of 2014
International Development Association899716Total Disbursement in Second Quarter of 2014
International Development Association1799432Total Disbursement in Second Quarter of 2014
International Development Association2000000Total Disbursement in Second Quarter of 2014
International Development Association294373Total Disbursement in Third Quarter of 2014
International Development Association359250Total Disbursement in Third Quarter of 2014
International Development Association-79832Total Interest Repayment in Third Quarter of 2014
International Development Association588747Total Disbursement in Third Quarter of 2014
International Development Association718499Total Disbursement in Third Quarter of 2014
International Development Association-9528Total Interest Repayment in Third Quarter of 2014
International Development Association114683Total Disbursement in Fourth Quarter of 2014
International Development Association192041Total Disbursement in Fourth Quarter of 2014
International Development Association114683Total Disbursement in Fourth Quarter of 2014
International Development Association192041Total Disbursement in Fourth Quarter of 2014
International Development Association119583Total Disbursement in First Quarter of 2015
International Development Association318826Total Disbursement in First Quarter of 2015
International Development Association-76205Total Interest Repayment in First Quarter of 2015
International Development Association119583Total Disbursement in First Quarter of 2015
International Development Association318826Total Disbursement in First Quarter of 2015
International Development Association-18244Total Interest Repayment in First Quarter of 2015
International Development Association55846Total Disbursement in Second Quarter of 2015
International Development Association125747Total Disbursement in Second Quarter of 2015
International Development Association160398Total Disbursement in Second Quarter of 2015
International Development Association55846Total Disbursement in Second Quarter of 2015
International Development Association125747Total Disbursement in Second Quarter of 2015
International Development Association160398Total Disbursement in Second Quarter of 2015
International Development Association-80140Total Interest Repayment in Third Quarter of 2015
International Development Association299959Total Disbursement in Third Quarter of 2015
International Development Association-21300Total Interest Repayment in Third Quarter of 2015
International Development Association108762Total Disbursement in First Quarter of 2016
International Development Association647580Total Disbursement in First Quarter of 2016
International Development Association-80510Total Interest Repayment in First Quarter of 2016
International Development Association326287Total Disbursement in First Quarter of 2016
International Development Association1942740Total Disbursement in First Quarter of 2016
International Development Association-22438Total Interest Repayment in First Quarter of 2016
International Development Association173761Total Disbursement in Second Quarter of 2016
International Development Association513324Total Disbursement in Second Quarter of 2016
International Development Association521284Total Disbursement in Second Quarter of 2016
International Development Association1539972Total Disbursement in Second Quarter of 2016
International Development Association178273Total Disbursement in Third Quarter of 2016
International Development Association355511Total Disbursement in Third Quarter of 2016
International Development Association-85672Total Interest Repayment in Third Quarter of 2016
International Development Association534819Total Disbursement in Third Quarter of 2016
International Development Association1066534Total Disbursement in Third Quarter of 2016
International Development Association-36663Total Interest Repayment in Third Quarter of 2016
International Development Association86957Total Disbursement in Fourth Quarter of 2016
International Development Association584946Total Disbursement in Fourth Quarter of 2016
International Development Association260870Total Disbursement in Fourth Quarter of 2016
International Development Association1754837Total Disbursement in Fourth Quarter of 2016
International Development Association144824Total Disbursement in First Quarter of 2017
International Development Association482623Total Disbursement in First Quarter of 2017
International Development Association560855Total Disbursement in First Quarter of 2017
International Development Association-87794Total Interest Repayment in First Quarter of 2017
International Development Association434472Total Disbursement in First Quarter of 2017
International Development Association1447870Total Disbursement in First Quarter of 2017
International Development Association1682566Total Disbursement in First Quarter of 2017
International Development Association-50432Total Interest Repayment in First Quarter of 2017
International Development Association598752Total Disbursement in Second Quarter of 2017
International Development Association685379Total Disbursement in Second Quarter of 2017
International Development Association1756677Total Disbursement in Second Quarter of 2017
International Development Association2095716Total Disbursement in Second Quarter of 2017
International Development Association268284Total Disbursement in Third Quarter of 2017
International Development Association449012Total Disbursement in Third Quarter of 2017
International Development Association-97596Total Interest Repayment in Third Quarter of 2017
International Development Association804851Total Disbursement in Third Quarter of 2017
International Development Association-74728Total Interest Repayment in Third Quarter of 2017
International Development Association318412Total Disbursement in Fourth Quarter of 2017
International Development Association1170379Total Disbursement in Fourth Quarter of 2017
International Development Association955237Total Disbursement in Fourth Quarter of 2017
International Development Association1347037Total Disbursement in Fourth Quarter of 2017
International Development Association3510308Total Disbursement in Fourth Quarter of 2017
International Development Association196511Total Disbursement in First Quarter of 2018
International Development Association504529Total Disbursement in First Quarter of 2018
International Development Association-110834Total Interest Repayment in First Quarter of 2018
International Development Association590360Total Disbursement in First Quarter of 2018
International Development Association1513586Total Disbursement in First Quarter of 2018
International Development Association-103023Total Interest Repayment in First Quarter of 2018
International Development Association181855Total Disbursement in Second Quarter of 2018
International Development Association189153Total Disbursement in Second Quarter of 2018
International Development Association301443Total Disbursement in Second Quarter of 2018
International Development Association567460Total Disbursement in Second Quarter of 2018
International Development Association862164Total Disbursement in Second Quarter of 2018
International Development Association-113873Total Interest Repayment in Third Quarter of 2018
International Development Association-119352Total Interest Repayment in Third Quarter of 2018
International Development Association1119Total Disbursement in Fourth Quarter of 2018
International Development Association-111928Total Interest Repayment in First Quarter of 2019
International Development Association-119249Total Interest Repayment in First Quarter of 2019
International Development Association-110197Total Interest Repayment in Third Quarter of 2019
International Development Association-117406Total Interest Repayment in Third Quarter of 2019
International Development Association-110597Total Interest Repayment in First Quarter of 2020
International Development Association-294926Total Loan Repayment in First Quarter of 2020
International Development Association-117833Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementAgreementAgreementAgreementAgreementAgreementAgreementGrant or Trust Fund AgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
PDO Indicator
Productivity of targeted non-irrigated hillside ($/ha)
PDO Indicator
Productivity of target irrigated command area ($/ha)
PDO Indicator
Female direct project beneficiaries
Intermediate Results Indicator
Kitchen gardens constructed
PDO Indicator
Direct project beneficiaries (individual) of which female (beneficiaries)
Intermediate Results Indicator
Participating Financial Institutions (PFI) using new products
Intermediate Results Indicator
Number of cooperatives which have increased their net revenues by 50% relative to the baseline
Intermediate Results Indicator
Proportion of female farmers in project area using improved farm methods
Intermediate Results Indicator
Reduced sediment yield (volume or weight per unit area of catchment (T/ha/yr) in the project areas
Intermediate Results Indicator
Land protected against soil erosion in project areas
Intermediate Results Indicator
Households with acceptable food consumption
Intermediate Results Indicator
Cooperatives and their Self Help Groups (SHG) ranked and graded high (A and B)
Intermediate Results Indicator
Male adult population in project areas using services of formal financial institutions
Intermediate Results Indicator
Female Adult Population in project area using the services of formal financial institutions
Intermediate Results Indicator
Proportion of male Farmers in Project area using improved farm methods
Intermediate Results Indicator
Cost Recovery Ratio for operation and maintenance of WUA in project area
PDO Indicator
share of commercialized products from target areas (%)
Intermediate Results Indicator
Area developed for Irrigation in project
44000-P118101
World Bank
Skills Development Project
International Development Association
MINISTRY OF EDUCATION
International Development Association
MINISTRY OF EDUCATIONPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Hiroshi Saeki
+1-202-473-1000hsaeki@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Province du Nord
-1.5830 29.9170
Kirehe District
-2.2570 30.7260
Gicumbi District
-1.6160 30.1210
Kibungo
-2.1600 30.5430
Kabarondo
-2.0090 30.5570
Busogo
-1.5580 29.5430
Kibuye
-2.0600 29.3480
Workforce Development and Vocational EducationAdult, Basic and Continuing EducationPublic Administration - EducationStandards, Curriculum and TextbooksEducationScience and TechnologyTeachersJobsAccess to Education
202072.54
202072.54
202072.54
1084166.67
1084166.67
1084166.66
1084166.67
1084166.67
1084166.66
1084166.67
1084166.67
1084166.66
1084287.57
1084287.57
1084287.57
542741.67
542741.67
542741.66
542741.67
542741.67
542741.66
542741.67
542741.67
542741.66
542759.46
542759.46
542759.45
275900.00
275900.00
275900.00
275900.00
275900.00
275900.00
275900.00
275900.00
275900.00
275926.94
275926.94
275926.94
248700.00
248700.00
248700.00
248700.00
248700.00
248700.00
248700.00
248700.00
248700.00
248718.65
248718.65
248718.65
397233.33
397233.33
397233.34
397233.33
397233.33
397233.34
397243.18
397243.18
397243.17
0.00
202072.54
202072.54
202072.54
1084166.67
1084166.67
1084166.66
1084166.67
1084166.67
1084166.66
1084166.67
1084166.67
1084166.66
1084287.57
1084287.57
1084287.57
542741.67
542741.67
542741.66
542741.67
542741.67
542741.66
542741.67
542741.67
542741.66
542759.46
542759.46
542759.45
275900.00
275900.00
275900.00
275900.00
275900.00
275900.00
275900.00
275900.00
275900.00
275926.94
275926.94
275926.94
248700.00
248700.00
248700.00
248700.00
248700.00
248700.00
248700.00
248700.00
248700.00
248718.65
248718.65
248718.65
397233.33
397233.33
397233.34
397233.33
397233.33
397233.34
397243.18
397243.18
397243.17
0.00
30000000Total Commitment in First Quarter of 2011
International Development Association2000000Total Disbursement in First Quarter of 2012
International Development Association190509Total Disbursement in Third Quarter of 2012
International Development Association-7823Total Interest Repayment in Third Quarter of 2012
International Development Association184166Total Disbursement in Fourth Quarter of 2012
International Development Association272875Total Disbursement in First Quarter of 2013
International Development Association-8798Total Interest Repayment in First Quarter of 2013
International Development Association476708Total Disbursement in Third Quarter of 2013
International Development Association564487Total Disbursement in Third Quarter of 2013
International Development Association-9657Total Interest Repayment in Third Quarter of 2013
International Development Association924060Total Disbursement in Fourth Quarter of 2013
International Development Association102813Total Disbursement in First Quarter of 2014
International Development Association693276Total Disbursement in First Quarter of 2014
International Development Association1705472Total Disbursement in First Quarter of 2014
International Development Association-17484Total Interest Repayment in First Quarter of 2014
International Development Association559364Total Disbursement in Second Quarter of 2014
International Development Association1182765Total Disbursement in Second Quarter of 2014
International Development Association2348478Total Disbursement in Second Quarter of 2014
International Development Association1044700Total Disbursement in Third Quarter of 2014
International Development Association2626689Total Disbursement in Third Quarter of 2014
International Development Association-37230Total Interest Repayment in Third Quarter of 2014
International Development Association1363760Total Disbursement in Fourth Quarter of 2014
International Development Association1802397Total Disbursement in Fourth Quarter of 2014
International Development Association718511Total Disbursement in First Quarter of 2015
International Development Association1000888Total Disbursement in First Quarter of 2015
International Development Association2362107Total Disbursement in First Quarter of 2015
International Development Association-60604Total Interest Repayment in First Quarter of 2015
International Development Association609450Total Disbursement in Second Quarter of 2015
International Development Association686295Total Disbursement in Second Quarter of 2015
International Development Association921170Total Disbursement in Second Quarter of 2015
International Development Association217200Total Disbursement in Third Quarter of 2015
International Development Association384575Total Disbursement in Third Quarter of 2015
International Development Association-82728Total Interest Repayment in Third Quarter of 2015
International Development Association433479Total Disbursement in Fourth Quarter of 2015
International Development Association1718901Total Disbursement in Fourth Quarter of 2015
International Development Association183231Total Disbursement in First Quarter of 2016
International Development Association212161Total Disbursement in First Quarter of 2016
International Development Association307044Total Disbursement in First Quarter of 2016
International Development Association-92521Total Interest Repayment in First Quarter of 2016
International Development Association681010Total Disbursement in Second Quarter of 2016
International Development Association-101419Total Interest Repayment in Third Quarter of 2016
International Development Association-510Total Commitment Cancellations in Fourth Quarter of 2016
International Development Association-98124Total Interest Repayment in First Quarter of 2017
International Development Association-100633Total Interest Repayment in Third Quarter of 2017
International Development Association-106136Total Interest Repayment in First Quarter of 2018
International Development Association-102920Total Interest Repayment in Third Quarter of 2018
International Development Association-100943Total Interest Repayment in First Quarter of 2019
International Development Association-99381Total Interest Repayment in Third Quarter of 2019
International Development Association-99742Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportContract AwardsProject URLProcurement Notices
PDO Indicator
Persons completing the training financed through Skills Development Facility
Intermediate Results Indicator
Sub projects satisfactorily completed
Intermediate Results Indicator
Sub-grant agreements for sub-projects signed
Intermediate Results Indicator
Number of VTCs and IBT which have annual work plan and budget
Intermediate Results Indicator
VTCs and IBT rehabilitated and/or equipped for targeted occupations
Intermediate Results Indicator
Examination mechanisms validated for occupations targeted by the project
Intermediate Results Indicator
Curricula & teacher/training material validated for occupations targeted by the project
Intermediate Results Indicator
Number of occupations for which training is offered in at least one targeted VTC or IBT using the new Competency Based Training Approach
PDO Indicator
Direct project beneficiaries
PDO Indicator
Persons completing vocational training in VTCs and IBT
PDO Indicator
Female beneficiaries
PDO Indicator
SDF graduates who are employed or self-employed within six months of graduation
Intermediate Results Indicator
VTC and IBT graduates who carried out industrial attachment
Intermediate Results Indicator
Adequately skilled trainers in place
PDO Indicator
VTC and IBT graduates who are employed of self-employed within 6 months of graduation
PDO Indicator
Pre-employed persons trained through Skills Development Facility (SDF) sub-grants who improved job performance
PDO Indicator
Employer satisfaction with VTC and IBT graduates
Intermediate Results Indicator
System in place to monitor and evaluate TVET performance, producing timely and accurate information
44000-P126440
World Bank
Third Rural Sector Support Project
International Development Association
MINISTRY OF AGRICULTURE AND ANIMAL RESOURCES
International Development Association
MINISTRY OF AGRICULTURE AND ANIMAL RESOURCESPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Aimee Marie Ange Mpambara
+1-202-473-1000ampambara@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Rwagitima
-1.6750 30.4070
Mushaduka
-2.4470 29.8930
Kamiranzovu
-2.3370 29.1190
Ndongozi
-1.5200 29.8350
Muvumba
-1.3830 30.2410
Gacaca
-1.5030 29.6860
Mirayi
-2.6000 29.7900
Rwinkwavu
-1.9440 30.6090
Cyili
-1.6790 29.9010
Mukunguri
-2.1440 29.9330
Other Agriculture, Fishing and ForestryIrrigation and DrainageAgricultural markets, commercialization and agri-businessAgricultural Extension, Research, and Other Support ActivitiesPublic Administration - Agriculture, Fishing & ForestryFinance for DevelopmentBiodiversityRural MarketsLand Administration and ManagementAgriculture FinanceLandscape ManagementRural Infrastructure and service deliveryJobsRenewable Natural Resources Asset ManagementRural Development
500000.00
166666.66
166666.67
166666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
0.00
0.00
0.00
0.00
500000.00
166666.66
166666.67
166666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
0.00
0.00
0.00
0.00
80000000Total Commitment in First Quarter of 2012
International Development Association942879Total Disbursement in Second Quarter of 2012
International Development Association7050073Total Disbursement in Third Quarter of 2012
International Development Association936462Total Disbursement in Fourth Quarter of 2012
International Development Association1013943Total Disbursement in Fourth Quarter of 2012
International Development Association-13780Total Interest Repayment in Fourth Quarter of 2012
International Development Association1398075Total Disbursement in First Quarter of 2013
International Development Association928155Total Disbursement in Second Quarter of 2013
International Development Association3333105Total Disbursement in Second Quarter of 2013
International Development Association-37636Total Interest Repayment in Second Quarter of 2013
International Development Association1327314Total Disbursement in Third Quarter of 2013
International Development Association5402806Total Disbursement in Third Quarter of 2013
International Development Association1520217Total Disbursement in Fourth Quarter of 2013
International Development Association2137045Total Disbursement in Fourth Quarter of 2013
International Development Association2552323Total Disbursement in Fourth Quarter of 2013
International Development Association-74525Total Interest Repayment in Fourth Quarter of 2013
International Development Association5683836Total Disbursement in First Quarter of 2014
International Development Association15900000Total Commitment in First Quarter of 2014
International Development Association1564875Total Disbursement in Second Quarter of 2014
International Development Association-123421Total Interest Repayment in Second Quarter of 2014
International Development Association1537002Total Disbursement in Third Quarter of 2014
International Development Association1595526Total Disbursement in Third Quarter of 2014
International Development Association700000Total Disbursement in Third Quarter of 2014
International Development Association1655554Total Disbursement in Fourth Quarter of 2014
International Development Association-135256Total Interest Repayment in Fourth Quarter of 2014
International Development Association-1030Total Interest Repayment in Fourth Quarter of 2014
International Development Association601094Total Disbursement in First Quarter of 2015
International Development Association934413Total Disbursement in First Quarter of 2015
International Development Association1015857Total Disbursement in First Quarter of 2015
International Development Association481048Total Disbursement in First Quarter of 2015
International Development Association613167Total Disbursement in Second Quarter of 2015
International Development Association1960355Total Disbursement in Second Quarter of 2015
International Development Association-140328Total Interest Repayment in Second Quarter of 2015
International Development Association519078Total Disbursement in Second Quarter of 2015
International Development Association653452Total Disbursement in Second Quarter of 2015
International Development Association921917Total Disbursement in Second Quarter of 2015
International Development Association-3532Total Interest Repayment in Second Quarter of 2015
International Development Association358258Total Disbursement in Third Quarter of 2015
International Development Association576335Total Disbursement in Third Quarter of 2015
International Development Association596943Total Disbursement in Third Quarter of 2015
International Development Association119419Total Disbursement in Third Quarter of 2015
International Development Association192112Total Disbursement in Third Quarter of 2015
International Development Association198981Total Disbursement in Third Quarter of 2015
International Development Association231174Total Disbursement in Fourth Quarter of 2015
International Development Association712539Total Disbursement in Fourth Quarter of 2015
International Development Association1331757Total Disbursement in Fourth Quarter of 2015
International Development Association-164258Total Interest Repayment in Fourth Quarter of 2015
International Development Association77058Total Disbursement in Fourth Quarter of 2015
International Development Association237513Total Disbursement in Fourth Quarter of 2015
International Development Association443919Total Disbursement in Fourth Quarter of 2015
International Development Association-13187Total Interest Repayment in Fourth Quarter of 2015
International Development Association662182Total Disbursement in First Quarter of 2016
International Development Association1121799Total Disbursement in First Quarter of 2016
International Development Association1228161Total Disbursement in First Quarter of 2016
International Development Association373933Total Disbursement in First Quarter of 2016
International Development Association409387Total Disbursement in First Quarter of 2016
International Development Association3046622Total Disbursement in First Quarter of 2016
International Development Association8477683Total Disbursement in Second Quarter of 2016
International Development Association-178197Total Interest Repayment in Second Quarter of 2016
International Development Association-18532Total Interest Repayment in Second Quarter of 2016
International Development Association5508331Total Disbursement in Third Quarter of 2016
International Development Association1836111Total Disbursement in Third Quarter of 2016
International Development Association-226130Total Interest Repayment in Fourth Quarter of 2016
International Development Association-34068Total Interest Repayment in Fourth Quarter of 2016
International Development Association1992862Total Disbursement in First Quarter of 2017
International Development Association664287Total Disbursement in First Quarter of 2017
International Development Association2649548Total Disbursement in Second Quarter of 2017
International Development Association4452439Total Disbursement in Second Quarter of 2017
International Development Association-233808Total Interest Repayment in Second Quarter of 2017
International Development Association1484146Total Disbursement in Second Quarter of 2017
International Development Association1865572Total Disbursement in Second Quarter of 2017
International Development Association-39476Total Interest Repayment in Second Quarter of 2017
International Development Association-281690Total Interest Repayment in Fourth Quarter of 2017
International Development Association-54421Total Interest Repayment in Fourth Quarter of 2017
International Development Association405970Total Disbursement in Second Quarter of 2018
International Development Association-278028Total Interest Repayment in Second Quarter of 2018
International Development Association285544Total Disbursement in Second Quarter of 2018
International Development Association-54613Total Interest Repayment in Second Quarter of 2018
International Development Association1501Total Disbursement in Fourth Quarter of 2018
International Development Association-270151Total Interest Repayment in Fourth Quarter of 2018
International Development Association1056Total Disbursement in Fourth Quarter of 2018
International Development Association-53666Total Interest Repayment in Fourth Quarter of 2018
International Development Association-6Total Commitment Cancellations in Second Quarter of 2019
International Development Association-270591Total Interest Repayment in Second Quarter of 2019
International Development Association-4Total Commitment Cancellations in Second Quarter of 2019
International Development Association-53911Total Interest Repayment in Second Quarter of 2019
International Development Association-268798Total Interest Repayment in Fourth Quarter of 2019
International Development Association-53554Total Interest Repayment in Fourth Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2. I. A. 4 - Single Project Implementation Unit (SPIU) properly staffed | Description :The Recipientshall, throughout Project implementation: (a) maintain withinMINAGRI an SPIU comprising the SPIUCoordinator , Component Heads andothertechnical specialists as may be agreed with the WB, all withqualifications and experience satisfactory to the WB; and (b)ensure that the SPIU has adequate resources to carry out its responsibilities. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2. I. B. 1 - Project Implementation Manual (PIM) | Description :The Recipient shall: (a) maintain a PIMin form and substance satisfactory to the WB, and carry out the Project in accordancewith PIM; and (b) not amend, abrogate, orwaive, or permit to be amended, abrogated, or waived, the aforementioned, or any provision thereof without the prior writtenapproval of the WB. 2. In case of a conflict between the provisions of the PIM and FA, the FA prevails. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2. V. 2. (a) Recipient's Contribution | Description :The Recipient shall: for purposes of financingPart I (d) {resettlement}of the Project maintain at all times during Project implementation, in Rwandan Francs, a Counterpart FundAccount, into which it shall deposit from time to time from its own resources for implementation of resettlement. | Frequency:CONTINUOUS
Finance Agreement :Schedule 2. V. s (b) Recipient's Contribution | Description :Deposit into the Counterpart Fund Account, notlater than one hundred and twenty (120) days of the Effective Date, an initial advance sufficient to meet the cost ofimplementation of Part 1 (d) of the Project during the first Fiscal Year of the Project implementation period, and thereafterreplenish the Counterpart Fund Account in advance of every fiscal year. | Frequency :CONTINUOUS
PDO Indicator
1. (b) Productivity of targeted areas ($/ha) in Non-irrigated hillsides
PDO Indicator
1. (a) Productivity of targeted areas ($/ha) in irrigated marshlands
Intermediate Results Indicator
14. Coops doing certified seed production
Intermediate Results Indicator
Operational water user associations created and/or strengthened (number)
Intermediate Results Indicator
11. Coops having access to finance
Intermediate Results Indicator
Water users provided with irrigation and drainage services - female (number)
Intermediate Results Indicator
Direct project beneficiaries
Intermediate Results Indicator
Water users provided with new/improved irrigation and drainage services (number)
Intermediate Results Indicator
9. Number of Cooperatives which have increased their revenues by 50% relative to the baseline
PDO Indicator
3. Project beneficiaries involved in up and downstream activities along the value chain
Intermediate Results Indicator
12. Users in irrigated marshlands rehabilitated or developed by the Project (RSSP1, RSSP2, RSSP3) paying water charges through WUAs
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
10. c) Increase in share of production sold through hillside cooperatives
Intermediate Results Indicator
10. b) Share of production sold through RSSP3 marshland cooperatives
Intermediate Results Indicator
10. a) Share of production sold through cooperatives for marshlands
PDO Indicator
3. (b) Percentage of female project beneficiaries involved in up and downstream activities along the value chain
PDO Indicator
4. Female Farmers in areas targeted by RSSP that have adopted sustainable land management practices on the hillsides or marshlands of which women (%)
PDO Indicator
2.d Share of commercialized agricultural products from the targeted hillside (%) for Men
PDO Indicator
2.c Share of commercialized agricultural products from the targeted hillside (%) for Women
PDO Indicator
4. Male Farmers in areas targeted by RSSP that have adopted sustainable land management practices on the hillsides or marshlands (%)
PDO Indicator
2.b Share of commercialized agricultural products from the targeted marshaland (%) for men
PDO Indicator
2.a Share of commercialized agricultural products from the targeted marshaland (%) for Women
Intermediate Results Indicator
Area provided with irrigation and drainage services - Improved (ha)
Intermediate Results Indicator
Area provided with irrigation and drainage services (ha)
Intermediate Results Indicator
Land area where sustainable land mgt. practices were adopted as a result of proj
44000-P126498
World Bank
Rwanda Feeder Roads Development Project
International Development Association
RWANDA TRANSPORT DEVELOPMENT AGENCY
International Development Association
RWANDA TRANSPORT DEVELOPMENT AGENCYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Emmanuel Taban
+1-202-473-1000etaban@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Gakenke District
-1.6980 29.7850
Nyaruguru District
-2.6980 29.5240
Nyamasheke
-2.3400 29.0860
Gisagara
-2.5940 29.8380
Rutsiro
-1.9580 29.3840
Rwamagana
-1.9490 30.4350
Gatsibo
-1.5950 30.2250
Nyabihu
-1.7830 29.5830
Karongi
-2.1510 29.3950
Nyagatare
-1.4230 30.1950
Central Government (Central Agencies)Rural and Inter-Urban RoadsSub-National GovernmentRural DevelopmentRural Infrastructure and service deliveryMunicipal Institution BuildingPublic Administration
35775.00
71595.00
171765.00
100260.00
109665.00
246600.00
136395.00
144990.00
317655.00
175455.00
383040.00
205245.00
212760.00
443790.00
230760.00
481770.00
251100.00
257175.00
532620.00
275175.00
278910.00
571275.00
295290.00
617400.00
326385.00
337860.00
700290.00
362835.00
753705.00
391635.00
401985.00
840735.00
437895.00
447345.00
915480.00
464895.00
948690.00
490230.00
499095.00
1009575.00
504765.00
1014300.00
516825.00
522090.00
1053360.00
528165.00
526860.00
1055340.00
534915.00
1078200.00
540180.00
537840.00
1064295.00
533880.00
536355.00
1070640.00
529020.00
1034325.00
508770.00
508050.00
1010430.00
497475.00
969885.00
472275.00
468000.00
923175.00
453960.00
448245.00
877635.00
428580.00
836370.00
409275.00
404460.00
798750.00
394920.00
776970.00
381555.00
377055.00
741150.00
364320.00
716355.00
352080.00
347895.00
617670.00
858240.00
35775.00
71595.00
171765.00
100260.00
109665.00
246600.00
136395.00
144990.00
317655.00
175455.00
383040.00
205245.00
212760.00
443790.00
230760.00
481770.00
251100.00
257175.00
532620.00
275175.00
278910.00
571275.00
295290.00
617400.00
326385.00
337860.00
700290.00
362835.00
753705.00
391635.00
401985.00
840735.00
437895.00
447345.00
915480.00
464895.00
948690.00
490230.00
499095.00
1009575.00
504765.00
1014300.00
516825.00
522090.00
1053360.00
528165.00
526860.00
1055340.00
534915.00
1078200.00
540180.00
537840.00
1064295.00
533880.00
536355.00
1070640.00
529020.00
1034325.00
508770.00
508050.00
1010430.00
497475.00
969885.00
472275.00
468000.00
923175.00
453960.00
448245.00
877635.00
428580.00
836370.00
409275.00
404460.00
798750.00
394920.00
776970.00
381555.00
377055.00
741150.00
364320.00
716355.00
352080.00
347895.00
617670.00
858240.00
45000000Total Commitment in First Quarter of 2014
International Development Association273413Total Disbursement in Third Quarter of 2014
International Development Association2000000Total Disbursement in First Quarter of 2015
International Development Association-1232Total Interest Repayment in First Quarter of 2015
International Development Association305885Total Disbursement in Third Quarter of 2015
International Development Association-7421Total Interest Repayment in Third Quarter of 2015
International Development Association621641Total Disbursement in Fourth Quarter of 2015
International Development Association28745Total Disbursement in First Quarter of 2016
International Development Association235623Total Disbursement in First Quarter of 2016
International Development Association-10859Total Interest Repayment in First Quarter of 2016
International Development Association98234Total Disbursement in Second Quarter of 2016
International Development Association491820Total Disbursement in Second Quarter of 2016
International Development Association152419Total Disbursement in Third Quarter of 2016
International Development Association709799Total Disbursement in Third Quarter of 2016
International Development Association1055293Total Disbursement in Third Quarter of 2016
International Development Association-14182Total Interest Repayment in Third Quarter of 2016
International Development Association84066Total Disbursement in Fourth Quarter of 2016
International Development Association1063437Total Disbursement in First Quarter of 2017
International Development Association1405273Total Disbursement in First Quarter of 2017
International Development Association-20942Total Interest Repayment in First Quarter of 2017
International Development Association318155Total Disbursement in Second Quarter of 2017
International Development Association1003149Total Disbursement in Second Quarter of 2017
International Development Association1513936Total Disbursement in Second Quarter of 2017
International Development Association-34931Total Interest Repayment in Third Quarter of 2017
International Development Association1063133Total Disbursement in Fourth Quarter of 2017
International Development Association1072521Total Disbursement in Fourth Quarter of 2017
International Development Association1528144Total Disbursement in Fourth Quarter of 2017
International Development Association1102040Total Disbursement in First Quarter of 2018
International Development Association-51926Total Interest Repayment in First Quarter of 2018
International Development Association1276648Total Disbursement in Second Quarter of 2018
International Development Association1985268Total Disbursement in Second Quarter of 2018
International Development Association1719617Total Disbursement in Third Quarter of 2018
International Development Association-66157Total Interest Repayment in Third Quarter of 2018
International Development Association2156923Total Disbursement in Fourth Quarter of 2018
International Development Association-79662Total Interest Repayment in First Quarter of 2019
International Development Association262372Total Disbursement in Second Quarter of 2019
International Development Association2417344Total Disbursement in Second Quarter of 2019
International Development Association313101Total Disbursement in Third Quarter of 2019
International Development Association-91782Total Interest Repayment in Third Quarter of 2019
International Development Association1002360Total Disbursement in Fourth Quarter of 2019
International Development Association1024377Total Disbursement in Fourth Quarter of 2019
International Development Association-99509Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Project Implementation Agreement (Financing Agreement (FA) Schedule 2 Section I) | Description :The Recipientshall: (a) cause RTDA to provide technical support to MINAGRI; and (b) cause MINAGRI not later than six (6) months after theEffective Date, to enter into a Project Implementation Agreement with RTDA, in form and substance satisfactory to the Association,setting forth RTDA's role and responsibilities with respect to the carrying out of Part B of the Project. | Due Date :24-Jan-2015
Finance Agreement :Amended and Restated FA Schedule 2 Section V.1 | Description :Undertakings- Recipient's Contribution. TheRecipient shall cause RTDA to prepare and furnish to the Association, on or before May 31 in each year, or such other date as maybe agreed with the Association, a proposed cash flow based maintenance plan for such year, detailing the maintenance works underParts A(3) and A(6) of the Project proposed to be carried out by the Recipient. | Frequency :Yearly
Finance Agreement :Amended and Restated FA Schedule 2 Section V.3 | Description :Undertakings- Recipient's Contribution: TheRecipient shall deposit into the Counterpart Fund Account, not later than 90 days after the Effective Date of the FA, an initialadvance for purposes of carrying out Parts A (3) and A (6) of the Project and any resettlement activities, as detailed in the CashFlow Maintenance Plan, and shall thereafter replenish the Counterpart Fund Account. | Frequency :SemiAnnual
Finance Agreement :Amended and Restated FA Schedule 2 Section V.4 | Description :Undertakings- Recipient's Contribution: TheRecipient shall ensure that funds deposited into the Counterpart Fund Account shall be used exclusively to finance expendituresunder the Project and any resettlement activities under Parts A (3) and A (6) of the Project. | Frequency :SemiAnnual
Finance Agreement :Amended and Restated FA Schedule 2 Section V.2 | Description :Undertakings- Recipient's Contribution: Forpurposes of the Project, the Recipient shall maintain at all times during Project implementation, in Rwandan Francs, in itsnational bank, a separate account under terms and conditions acceptable to the Association (âCounterpart Fund Accountâ?), tomeet the cost of carrying out Parts A (3) and A (6) of the Project and any resettlement activities. | Frequency :SemiAnnual
Finance Agreement :Amended and Restated FA Schedule 2 Section V.5 | Description :Undertakings- Recipient's Contribution: Forpurposes of implementing Part A (3) and Part A (6) of the Project, the Recipient shall enter into multi-year maintenance contracts,in form and substance satisfactory to the Association, with contractors whose qualifications, experience, and terms of referenceshall be satisfactory to the Association. | Frequency :CONTINUOUS
Finance Agreement :GA Schedule 2, Section I.C.3 | Description :The Recipient shall cause RTDA to, not later than May 31 of eachyear, prepare and furnish to the World Bank, an annual program of activities proposed for implementation under the Project duringthe following Fiscal Year, together with a proposed budget for the purpose. | Frequency :Yearly
Finance Agreement :Amended and Restated FA Schedule 2 Section I.C.3 | Description :The Recipient shall cause RTDA to, not laterthan May 31 of each year, prepare and furnish to the Association, an annual program of activities proposed for implementation underthe Project during the following Fiscal Year, together with a proposed budget for the purpose. | Frequency :Yearly
Finance Agreement :GA Schedule 2 Section I.C.5 | Description :The Recipient shall cause RTDA to, not later than six (6) monthsafter the Effective Date of the Grant Agreement, enter into implementation agreements with each Selected District detailing mutualresponsibilities for the implementation of the Project and detailing other terms and conditions as may be approved by the WorldBank (âDistrict Implementation Agreementâ?). | Due Date :10-Sep-2018
Finance Agreement :GA Schedule 2 Section V.1 | Description :Undertakings- Recipient's Contribution. The Recipient shall cause RTDAto prepare and furnish to the World Bank, on or before May 31 in each year, or such other date as may be agreed with theAssociation, a proposed cash flow based maintenance plan for such year, detailing the maintenance works under Parts A (3) and A (6)of the Project proposed to be carried out by the Recipient. | Frequency :Yearly
Finance Agreement :GA Schedule 2 Section V.2 | Description :Undertakings- Recipient's Contribution: For purposes of the Project,the Recipient shall maintain at all times during Project implementation, in Rwandan Francs, in its national bank, a separateaccount under terms and conditions acceptable to the World Bank (âCounterpart Fund Accountâ?), to meet the cost of carrying outParts A (3) and A (6) of the Project and any resettlement activities. | Frequency :SemiAnnual
Finance Agreement :GA Schedule 2 Section V.3 | Description :Undertakings- Recipient's Contribution: The Recipient shall depositinto the Counterpart Fund Account, not later than 90 days after the Effective Date of the Grant Agreement, an initial advance forpurposes of carrying out Parts A (3) and A (6) of the Project and any resettlement activities, as detailed in the Cash FlowMaintenance Plan, and shall thereafter replenish the Counterpart Fund Account. | Frequency :SemiAnnual
Finance Agreement :GA Schedule 2 Section V.4 | Description :Undertakings- Recipient's Contribution: The Recipient shall ensure thatfunds deposited into the Counterpart Fund Account shall be used exclusively to finance expenditures under the Project and anyresettlement activities under Parts A (3) and A (6) of the Project. | Frequency :SemiAnnual
Finance Agreement :GA Schedule 2 Section V.5 | Description :Undertakings- Recipient's Contribution: For purposes of implementingPart A (3) and Part A (6) of the Project, the Recipient shall enter into multi-year maintenance contracts, in form and substancesatisfactory to the World Bank, with contractors whose qualifications, experience, and terms of reference shall be satisfactory tothe World Bank. | Frequency :CONTINUOUS
PDO Indicator
Direct project beneficiaries
PDO Indicator
Number of rural people with access to an all-season road
PDO Indicator
Number of agricultural marketing centers connected by all season road
Intermediate Results Indicator
Employment generated under rehabilitation contracts
Intermediate Results Indicator
Number of Early Warning Systems (EWS) stations installed along rural roads network
Intermediate Results Indicator
Citizen engagement surveys
Intermediate Results Indicator
Local Community Associations (LCAs) established
Intermediate Results Indicator
Road safety sensitization campaigns conducted for schools, health centers and markets along project roads
Intermediate Results Indicator
Employment generated under maintenance contracts
Intermediate Results Indicator
Workers trained on gender relations, healthy relationships and non-violent conflict resolution, HIV and STD during roads rehabilitation/maintenance (% of trained workers)
PDO Indicator
Female beneficiaries
PDO Indicator
Roads in good and fair condition as a share of total classified roads
PDO Indicator
Share of rural population with access to an all-season road
Intermediate Results Indicator
Percentage of women employed in established LCAs
Intermediate Results Indicator
Percentage of trained women trained on gender relations, healthy relationships and non-violent conflict resolution, HIV and STD
PDO Indicator
Reduction in travel time per kilometer
Intermediate Results Indicator
Landslide management plan developed and operationalized
Intermediate Results Indicator
Project implemented according to planned time and budget
Intermediate Results Indicator
Business plan for rural/feeder roads development prepared
PDO Indicator
Size of the total classified network
Intermediate Results Indicator
Roads rehabilitated, Rural
Intermediate Results Indicator
Rural/feeder roads with readily available design and bidding document
Intermediate Results Indicator
Rural/feeder roads receiving maintenance
44000-P126877
World Bank
RW-Support to Social Protection System
International Development Association
MINISTRY OF LOCAL GOVERNMENT
International Development Association
MINISTRY OF LOCAL GOVERNMENTPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Alex Kamurase
+1-202-473-1000akamurase@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali
-1.94995 30.0589
Public Administration - Social ProtectionSocial ProtectionRural DevelopmentSocial Safety NetsRural MarketsAdaptationClimate changeSocial Insurance and PensionsSocial Protection
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40000000Total Commitment in First Quarter of 2012
International Development Association39524274Total Disbursement in Second Quarter of 2012
International Development Association50000000Total Commitment in First Quarter of 2013
International Development Association48792250Total Disbursement in Second Quarter of 2013
International Development AssociationProject Appraisal DocumentProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices44000-P127105
World Bank
Rwanda - Governance & Competitiveness TA Project
International Development Association
MINISTRY OF FINANCE
International Development Association
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Adja Mansora Dahourou Simpore
+1-202-473-1000adahourou@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali Province
-1.9170 30.0830
Public Administration - Industry, Trade and ServicesAgricultural markets, commercialization and agri-businessPublic Administration - Agriculture, Fishing & ForestryOther Industry, Trade and ServicesPublic AdministrationInvestment and Business ClimateBusiness Enabling EnvironmentTransparency, Accountability and Good GovernanceTradeAdministrative and Civil Service ReformTrade FacilitationRegulation and Competition Policy
404040.41
404040.41
404040.39
277777.77
277777.77
277777.79
277777.77
277777.77
277777.79
277777.77
277777.77
277777.79
277777.77
277777.77
277777.79
189393.94
189393.94
189393.94
180303.03
180303.03
180303.03
189393.94
189393.94
189393.94
189393.94
189393.94
189393.94
72222.23
72222.23
72222.21
63131.32
63131.32
63131.30
63131.32
63131.32
63131.30
63131.32
63131.32
63131.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
404040.41
404040.41
404040.39
277777.77
277777.77
277777.79
277777.77
277777.77
277777.79
277777.77
277777.77
277777.79
277777.77
277777.77
277777.79
189393.94
189393.94
189393.94
180303.03
180303.03
180303.03
189393.94
189393.94
189393.94
189393.94
189393.94
189393.94
72222.23
72222.23
72222.21
63131.32
63131.32
63131.30
63131.32
63131.32
63131.30
63131.32
63131.32
63131.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5000000Total Commitment in First Quarter of 2012
International Development Association1000000Total Disbursement in Third Quarter of 2012
International Development Association25349Total Disbursement in First Quarter of 2013
International Development Association67536Total Disbursement in First Quarter of 2013
International Development Association-4535Total Interest Repayment in First Quarter of 2013
International Development Association5775Total Disbursement in Second Quarter of 2013
International Development Association79139Total Disbursement in Third Quarter of 2013
International Development Association-4177Total Interest Repayment in Third Quarter of 2013
International Development Association154547Total Disbursement in First Quarter of 2014
International Development Association507404Total Disbursement in First Quarter of 2014
International Development Association-4545Total Interest Repayment in First Quarter of 2014
International Development Association258605Total Disbursement in Second Quarter of 2014
International Development Association481378Total Disbursement in Second Quarter of 2014
International Development Association204113Total Disbursement in Third Quarter of 2014
International Development Association438884Total Disbursement in Third Quarter of 2014
International Development Association-9431Total Interest Repayment in Third Quarter of 2014
International Development Association208638Total Disbursement in Fourth Quarter of 2014
International Development Association624928Total Disbursement in Fourth Quarter of 2014
International Development Association-12296Total Interest Repayment in First Quarter of 2015
International Development Association801389Total Disbursement in Second Quarter of 2015
International Development Association7095Total Disbursement in Third Quarter of 2015
International Development Association48628Total Disbursement in Third Quarter of 2015
International Development Association-16207Total Interest Repayment in Third Quarter of 2015
International Development Association-17260Total Interest Repayment in First Quarter of 2016
International Development Association-72729Total Commitment Cancellations in Third Quarter of 2016
International Development Association-65633Total Disbursement in Third Quarter of 2016
International Development Association-17350Total Interest Repayment in Third Quarter of 2016
International Development Association-16508Total Interest Repayment in First Quarter of 2017
International Development Association-16937Total Interest Repayment in Third Quarter of 2017
International Development Association-17863Total Interest Repayment in First Quarter of 2018
International Development Association-17322Total Interest Repayment in Third Quarter of 2018
International Development Association-16989Total Interest Repayment in First Quarter of 2019
International Development Association-16726Total Interest Repayment in Third Quarter of 2019
International Development Association-16787Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2 - Section II A. Project Reports | Description :The Recipient shall monitor and evaluate the progressof the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on thebasis of the indicators acceptable to the Association and set forth in the Project Operations Manual. Each Project Report shallcover the period of one quarter, and shall be furnished to the Association not later th | Frequency :Quarterly
Finance Agreement :Schedule 2 - Section II B. Financial Reports | Description :Without limitation on the provisions of Part A ofthis Section, the Recipient shall prepare and furnish to the Association as part of the Project Report not later than forty-five(45) days after the end of each quarter, interim unaudited financial reports for theProject covering the quarter, in form andsubstance satisfactory to the Association. | Frequency :Quarterly
Finance Agreement :Schedule 2 - Section II B. Financial Audits | Description :The Recipient shall have its Financial Statementsaudited in accordance with the provisions of Section 4.09 (b) of the General Conditions. Each audit of the Financial Statementsshall cover the period of one fiscal year of the Recipient. The audited Financial Statements for each such period shall befurnished to the Association not later than six months after the end of such period. | Frequency :Yearly
Finance Agreement :Schedule 1 - Section I A. Institutional Arrangements | Description :The Recipient shall, throughout Projectimplementation, maintain within MINICOM the Single Project Implementation Unit (SPIU) with an institutional framework, functions,and resources satisfactory to the Association, including staff with qualifications, experience, and terms of reference satisfactoryto the Association. | Due Date :01-Sep-2011
Finance Agreement :Schedule 1 - Section I Institutional ArrangementsB.Project Operational Manual | Description :1. The Recipientshall: (a) adopt a Project Operations Manual and carry out the Project in accordance with the Project Operations Manual as soadopted; and (b) not amend, abrogate, or waive, or permit to be amended, abrogated, or waived, the aforementioned, or any provisionthereof without the prior written approval of the Association | Due Date :01-Dec-2011
Finance Agreement :Schedule 1 - Section I Institutional ArrangementsC. Annual Work Plans | Description :1. The Recipient shall,not later than May 31 of each year, prepare and furnish to the Association, an annual program of activitiesproposed forimplementation during the following Fiscal Year, together with a proposed budget. | Frequency :Yearly
PDO Indicator
Number of project priority institutions that have undertaken functional reviews and have in place organizational frameworks alignedwith their mandates
Intermediate Results Indicator
Number of SCBI Action Plans implemented in the project 's priority institutions
Intermediate Results Indicator
Number of project's priority institutions implementing the Pay and Retention Policy related to HRM elements
PDO Indicator
Number of cooperatives supported to produce horticulture products for export.
Intermediate Results Indicator
Number of project priority institutions implementing the Rwanda public service competency framework
PDO Indicator
Number of Tourism arrivals from targeted new markets
Intermediate Results Indicator
Number of sector analytical papers produced and submitted by PSF to GoR for consideration
Intermediate Results Indicator
Number of MICE events organized with support by the Rwanda convention bureau
Intermediate Results Indicator
PSF dialogues with GoR to discuss progress of NES per year between private sector and government
Intermediate Results Indicator
Number of Women from chambers and associations trained under the project in leadership entrepreneurship and issues for competitiveness
Intermediate Results Indicator
Number of project priority institutions implementing the career development plans.
PDO Indicator
Direct project beneficiaries
Intermediate Results Indicator
Number of horticulture commodity unions formed under the project
Intermediate Results Indicator
Number of cooperatives supported in production of clean planting materials
Intermediate Results Indicator
Number of horticulture cooperatives that receive training in QMS for selected fruits and vegetables
Intermediate Results Indicator
Number of outbound operators packaging and selling destination Rwanda
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
A revised and published sustainable tourism master plan aligned with EDPRS II
44000-P145114
World Bank
Quality of Decentralized Service Delivery Support Development Policy Operation
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Yoichiro Ishihara
+1-202-473-1000yishihara@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali
-1.94995 30.0589
Sub-National GovernmentCentral Government (Central Agencies)Public Finance ManagementPublic Expenditure ManagementAdministrative and Civil Service ReformSocial InclusionParticipation and Civic EngagementMunicipal Institution BuildingTransparency, Accountability and Good GovernancePublic Administration
0.00
0.00
50000000Total Commitment in Second Quarter of 2013
International Development Association50915628Total Disbursement in Second Quarter of 2013
International Development AssociationProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewProject Performance Assessment ReportContract AwardsProject URLProcurement Notices44000-P146452
World Bank
Rwanda Third Support to the Social Protection System (SSPS-3)
International Development Association
MINISTRY OF LOCAL GOVERNMENT
International Development Association
MINISTRY OF LOCAL GOVERNMENTPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Laura B. Rawlings
+1-202-473-1000lrawlings@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali
-1.94995 30.0589
Social ProtectionPublic Administration - Social ProtectionSocial ProtectionSocial Safety NetsSocial protection delivery systems
0.00
0.00
46000000Total Commitment in First Quarter of 2014
International Development Association24000000Total Commitment in First Quarter of 2014
International Development Association46545330Total Disbursement in Second Quarter of 2014
International Development Association24284520Total Disbursement in Second Quarter of 2014
International Development Association-93342Total Interest Repayment in Third Quarter of 2014
International Development Association-158713Total Interest Repayment in First Quarter of 2015
International Development Association-157383Total Interest Repayment in Third Quarter of 2015
International Development Association-156283Total Interest Repayment in First Quarter of 2016
International Development Association-157813Total Interest Repayment in Third Quarter of 2016
International Development Association-150223Total Interest Repayment in First Quarter of 2017
International Development Association-156142Total Interest Repayment in Third Quarter of 2017
International Development Association-161121Total Interest Repayment in First Quarter of 2018
International Development Association-160221Total Interest Repayment in Third Quarter of 2018
International Development Association-154619Total Interest Repayment in First Quarter of 2019
International Development Association-154693Total Interest Repayment in Third Quarter of 2019
International Development Association-153332Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Number of SP staff within MINALOC recruited as a % of total SP Staff needed to implement NSPS, as stipulated by law
44000-P148927
World Bank
Transformation of Agriculture Sector Program Phase 3 PforR
International Development Association
MINISTRY OF AGRICULTURE AND ANIMAL RESOURCES (MINAGRI)
International Development Association
MINISTRY OF AGRICULTURE AND ANIMAL RESOURCES (MINAGRI)Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Winston Dawes
+1-202-473-1000wdawes@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali
-1.94995 30.0589
Other Non-bank Financial InstitutionsBanking InstitutionsIrrigation and DrainageLivestockCropsAgricultural markets, commercialization and agri-businessFinancial StabilityAdaptationRural MarketsTrade FacilitationRural Non-farm Income GenerationClimate changeMitigationRural Infrastructure and service deliveryTradeFinancial Sector oversight and policy/banking regulation & restructuringRural DevelopmentJobs
0.00
0.00
79500.00
159100.00
381700.00
222800.00
507800.00
587000.00
322200.00
705900.00
804400.00
436700.00
928900.00
486800.00
1012200.00
1070600.00
558000.00
1156400.00
598700.00
1231300.00
1269500.00
656200.00
1372000.00
725300.00
1520200.00
1593100.00
826700.00
1718500.00
893300.00
1868300.00
1967200.00
1010800.00
2056700.00
1043500.00
2154100.00
2229200.00
1123400.00
2242800.00
1132900.00
2308700.00
2340800.00
1173700.00
2339200.00
1176800.00
2384400.00
2400700.00
1195200.00
2365100.00
1186400.00
2384200.00
2362500.00
1158400.00
2270700.00
1129000.00
2245400.00
2193900.00
1066900.00
2089500.00
1031100.00
2029200.00
1978400.00
968000.00
1888900.00
922100.00
1808300.00
1775000.00
877600.00
1726600.00
847900.00
1666200.00
1628300.00
800400.00
1573900.00
773100.00
1372600.00
1907200.00
0.00
0.00
79500.00
159100.00
381700.00
222800.00
507800.00
587000.00
322200.00
705900.00
804400.00
436700.00
928900.00
486800.00
1012200.00
1070600.00
558000.00
1156400.00
598700.00
1231300.00
1269500.00
656200.00
1372000.00
725300.00
1520200.00
1593100.00
826700.00
1718500.00
893300.00
1868300.00
1967200.00
1010800.00
2056700.00
1043500.00
2154100.00
2229200.00
1123400.00
2242800.00
1132900.00
2308700.00
2340800.00
1173700.00
2339200.00
1176800.00
2384400.00
2400700.00
1195200.00
2365100.00
1186400.00
2384200.00
2362500.00
1158400.00
2270700.00
1129000.00
2245400.00
2193900.00
1066900.00
2089500.00
1031100.00
2029200.00
1978400.00
968000.00
1888900.00
922100.00
1808300.00
1775000.00
877600.00
1726600.00
847900.00
1666200.00
1628300.00
800400.00
1573900.00
773100.00
1372600.00
1907200.00
100000000Total Commitment in Fourth Quarter of 2014
International Development Association28244765Total Disbursement in Fourth Quarter of 2014
International Development Association38023105Total Disbursement in Third Quarter of 2015
International Development Association-132454Total Interest Repayment in Third Quarter of 2015
International Development Association-207795Total Interest Repayment in First Quarter of 2016
International Development Association23785083Total Disbursement in Third Quarter of 2016
International Development Association-245268Total Interest Repayment in Third Quarter of 2016
International Development Association-298330Total Interest Repayment in First Quarter of 2017
International Development Association46000000Total Commitment in First Quarter of 2017
International Development Association519365Total Disbursement in Second Quarter of 2017
International Development Association30833679Total Disbursement in Second Quarter of 2017
International Development Association2813659Total Disbursement in Third Quarter of 2017
International Development Association-332688Total Interest Repayment in Third Quarter of 2017
International Development Association16657977Total Disbursement in Third Quarter of 2017
International Development Association-62364Total Interest Repayment in Third Quarter of 2017
International Development Association-352822Total Interest Repayment in First Quarter of 2018
International Development Association-170459Total Interest Repayment in First Quarter of 2018
International Development Association-353060Total Interest Repayment in Third Quarter of 2018
International Development Association-183368Total Interest Repayment in Third Quarter of 2018
International Development Association-340783Total Interest Repayment in First Quarter of 2019
International Development Association-177373Total Interest Repayment in First Quarter of 2019
International Development Association-340946Total Interest Repayment in Third Quarter of 2019
International Development Association-177458Total Interest Repayment in Third Quarter of 2019
International Development Association-337946Total Interest Repayment in First Quarter of 2020
International Development Association-175896Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Appraisal DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices44000-P149095
World Bank
Rwanda Public Sector Governance Program-For-Results
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Enagnon Ernest Eric Adda
+1-202-473-1000eadda@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali
-1.94995 30.0589
Sub-National GovernmentCentral Government (Central Agencies)Municipal Institution BuildingPublic Expenditure ManagementTransparency, Accountability and Good GovernanceTax policyDomestic Revenue AdministrationFiscal PolicyPublic Finance ManagementPublic Administration
0.00
0.00
90500.00
203200.00
501300.00
297900.00
688200.00
807200.00
447100.00
987800.00
1127000.00
613500.00
1312500.00
693300.00
1456400.00
1562000.00
816200.00
1690700.00
873700.00
1818300.00
1914300.00
989800.00
2041500.00
1058200.00
2195100.00
2317100.00
1196500.00
2428100.00
1218900.00
2519800.00
2627400.00
1324500.00
2611300.00
1278400.00
2582200.00
2599000.00
1273400.00
2472100.00
1212500.00
2397000.00
2350300.00
1154200.00
2260200.00
1109200.00
2180200.00
2132200.00
1050600.00
2065000.00
1016400.00
1993300.00
1936500.00
942700.00
1835300.00
898700.00
1766500.00
1713100.00
834800.00
1629000.00
797200.00
1555500.00
1499100.00
727900.00
1415100.00
685600.00
1330600.00
1292800.00
637000.00
1246600.00
607000.00
1182600.00
1143400.00
557500.00
1086900.00
529100.00
594000.00
0.00
0.00
0.00
90500.00
203200.00
501300.00
297900.00
688200.00
807200.00
447100.00
987800.00
1127000.00
613500.00
1312500.00
693300.00
1456400.00
1562000.00
816200.00
1690700.00
873700.00
1818300.00
1914300.00
989800.00
2041500.00
1058200.00
2195100.00
2317100.00
1196500.00
2428100.00
1218900.00
2519800.00
2627400.00
1324500.00
2611300.00
1278400.00
2582200.00
2599000.00
1273400.00
2472100.00
1212500.00
2397000.00
2350300.00
1154200.00
2260200.00
1109200.00
2180200.00
2132200.00
1050600.00
2065000.00
1016400.00
1993300.00
1936500.00
942700.00
1835300.00
898700.00
1766500.00
1713100.00
834800.00
1629000.00
797200.00
1555500.00
1499100.00
727900.00
1415100.00
685600.00
1330600.00
1292800.00
637000.00
1246600.00
607000.00
1182600.00
1143400.00
557500.00
1086900.00
529100.00
594000.00
0.00
100000000Total Commitment in Fourth Quarter of 2014
International Development Association28736684Total Disbursement in Fourth Quarter of 2014
International Development Association23404034Total Disbursement in Third Quarter of 2015
International Development Association-126946Total Interest Repayment in Third Quarter of 2015
International Development Association10466195Total Disbursement in Fourth Quarter of 2015
International Development Association-182570Total Interest Repayment in First Quarter of 2016
International Development Association-230097Total Interest Repayment in Third Quarter of 2016
International Development Association28954297Total Disbursement in Fourth Quarter of 2016
International Development Association-290237Total Interest Repayment in First Quarter of 2017
International Development Association1814147Total Disbursement in Third Quarter of 2017
International Development Association-337645Total Interest Repayment in Third Quarter of 2017
International Development Association-355060Total Interest Repayment in First Quarter of 2018
International Development Association-356163Total Interest Repayment in Third Quarter of 2018
International Development Association-341831Total Interest Repayment in First Quarter of 2019
International Development Association-342154Total Interest Repayment in Third Quarter of 2019
International Development Association-339278Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Appraisal DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices44000-P150634
World Bank
Rwanda Electricity Sector Strengthening Project
International Development Association
MINISTRY OF INFRASTRCTURE
International Development Association
MINISTRY OF INFRASTRCTUREPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Norah Kipwola
+1-202-473-1000nkipwola@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Eastern Province
-1.7500 30.5000
Kigali Province
-1.9170 30.0830
Northern Province
-1.5830 29.9170
Western Province
-2.1670 29.3330
Southern Province
-2.3330 29.6670
Gatsibo District
-1.5920 30.4550
Kayonza District
-1.8510 30.6510
Rwamagana District
-1.9730 30.3540
Ngoma District
-2.1850 30.4700
Rulindo District
-1.7380 29.9980
Burera District
-1.4740 29.8350
Rubavu District
-1.6810 29.3290
Rutsiro District
-1.9150 29.3150
Karongi District
-2.1300 29.3620
Kamonyi District
-2.0050 29.8980
Ruhango District
-2.2000 29.7700
Nyanza District
-2.3370 29.7950
Nyamagabe District
-2.4080 29.4680
Huye District
-2.5170 29.6960
Ruhengeri
-1.6290 29.6350
Mukungwa
-1.7330 29.6570
Ntaruka
-1.4730 29.7370
Rulindo
-1.7210 29.9240
Kabarondo
-2.0090 30.5570
Cyangugu
-2.4850 28.9080
Musha
-1.9160 30.3420
Gikondo
-1.9790 30.0840
Jabana
-1.8590 30.0690
Rwinka
-2.0740 30.2850
Butara
-2.3160 29.8030
Gitarama
-2.0740 29.7570
Gisenyi
-1.7030 29.2560
Jali
-1.8880 30.0170
Kilinda
-2.1860 29.5800
Mururu
-2.5110 28.8890
Gasogi
-1.9490 30.1950
Kibungo
-2.3280 30.1100
Karongi
-2.1510 29.3950
Gihira
-1.8430 29.3900
Gikongoro
-2.5760 29.6350
Kigoma
-2.5120 29.7360
Byumba
-1.5360 29.8300
Birembo
-1.8450 30.0410
Kibuye
-1.8980 29.8190
Public Administration - Energy and ExtractivesOther Energy and ExtractivesEnergy Transmission and DistributionRural DevelopmentPublic AdministrationUrban Infrastructure and Service DeliveryJobsUrban DevelopmentTransparency, Accountability and Good GovernanceJob CreationRural Infrastructure and service delivery
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
95000000Total Commitment in Fourth Quarter of 2015
International Development Association1500000Total Disbursement in Third Quarter of 2016
International Development Association99108Total Disbursement in First Quarter of 2017
International Development Association-4456Total Interest Repayment in First Quarter of 2017
International Development Association4736633Total Disbursement in Second Quarter of 2017
International Development Association-17453Total Interest Repayment in Third Quarter of 2017
International Development Association2111467Total Disbursement in Fourth Quarter of 2017
International Development Association3279277Total Disbursement in First Quarter of 2018
International Development Association-30243Total Interest Repayment in First Quarter of 2018
International Development Association1123721Total Disbursement in Second Quarter of 2018
International Development Association616657Total Disbursement in Third Quarter of 2018
International Development Association1290054Total Disbursement in Third Quarter of 2018
International Development Association-44168Total Interest Repayment in Third Quarter of 2018
International Development Association212346Total Disbursement in Fourth Quarter of 2018
International Development Association434767Total Disbursement in Fourth Quarter of 2018
International Development Association691137Total Disbursement in First Quarter of 2019
International Development Association2386927Total Disbursement in First Quarter of 2019
International Development Association3847873Total Disbursement in First Quarter of 2019
International Development Association-54594Total Interest Repayment in First Quarter of 2019
International Development Association2957253Total Disbursement in Second Quarter of 2019
International Development Association5062443Total Disbursement in Second Quarter of 2019
International Development Association1486477Total Disbursement in Third Quarter of 2019
International Development Association-89364Total Interest Repayment in Third Quarter of 2019
International Development Association556362Total Disbursement in Fourth Quarter of 2019
International Development Association1374109Total Disbursement in Fourth Quarter of 2019
International Development Association1996368Total Disbursement in Fourth Quarter of 2019
International Development Association3289195Total Disbursement in First Quarter of 2020
International Development Association7553597Total Disbursement in First Quarter of 2020
International Development Association-128996Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Submission of annual financial audits | Description :Annual financial audits submitted within six months afterthe end of each financial year. | Frequency :Yearly
Finance Agreement :Open and maintain customer contribution account | Description :Not later than 30th of the month, EUCL to depositinto the customer designated account the customer contribution collected the preceding month. | Frequency :Yearly
Finance Agreement :EUCL Operating Revenue | Description :The Recipient shall ensure that the EUCL's Operating Revenue shall reflectthe principles of Cost Recovery and be sufficient to cover Operating Expenses and Debt Service. | Frequency :Yearly
Finance Agreement :EUCL Financial Recovery Plan | Description:The Recipient has developed and obtained Cabinet approval of theSector Financial Recovery Plan. | Due Date :11-Mar-2016
Intermediate Results Indicator
Health facilities
Intermediate Results Indicator
Administrative centers
Intermediate Results Indicator
Schools
Intermediate Results Indicator
Community electricity connections constructed –Grid
Intermediate Results Indicator
Community electricity connections constructed under the project
Intermediate Results Indicator
Switching stations rehabilitated and added to the SCADA/EMS in Kigali distribution system
Intermediate Results Indicator
Preparation of quarterly financial reports by the 5th day of the end of each quarter
PDO Indicator
People provided with access to electricity by hhold connections-Grid
PDO Indicator
People provided with access to electricity by household connections
PDO Indicator
Direct project beneficiaries
Intermediate Results Indicator
Industrial consumers covered by RPP
PDO Indicator
Female beneficiaries
PDO Indicator
Reduction in commercial losses
Intermediate Results Indicator
Reduced average outage duration in 15 KV system of Kigali distribution network
Intermediate Results Indicator
Reduced average receivables debtors age for postpaid customers
Intermediate Results Indicator
Development of a corporate strategic plan (including key KPIs and a dash board)
Intermediate Results Indicator
Utility publishes annual report on citizen engagement
Intermediate Results Indicator
Distribution lines constructed under the project
Intermediate Results Indicator
Distribution lines constructed or rehabilitated under the project
PDO Indicator
Reduction of technical losses in the Kigali City 15KV distribution network (total annual GWh savings)
44000-P150844
World Bank
Rwanda Urban Development Project
International Development Association
MINISTRY OF INFRASTRUCTURE
International Development Association
MINISTRY OF INFRASTRUCTUREPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Abebaw Alemayehu
+1-202-473-1000aalemayehu@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Nyagatare District
-1.3150 30.3720
Musanze District
-1.5080 29.6070
Nyarugenge District
-1.9910 30.0210
Rubavu District
-1.6810 29.3290
Rusizi District
-2.5700 29.0750
Rusizi District
-2.5700 29.0750
Muhanga District
-1.9390 29.7180
Huye District
-2.5170 29.6960
Republic of Rwanda
-2.0000 30.0000
Ruhengeri
-1.6290 29.6350
Nyabugogo
-1.9490 29.9980
Muvumba
-1.1300 30.3440
Agatare
-2.7150 29.4900
Akagera
-2.6260 29.5620
Ndobogo
-2.5670 29.7450
Ruranga
-2.5550 29.7180
Nyanza
-2.3730 29.6800
Mpenge
-1.5270 29.6670
Mirambo
-1.6110 29.7930
Rwampara
-1.9520 30.0760
Muhe
-1.6850 29.4660
Rwantama
-2.5690 29.7600
Cyezuboro
-2.5850 29.7580
Ngoma
-2.6240 29.8210
Musanze
-1.5000 29.6350
Kamembe
-2.4800 28.9020
Kabgayi
-2.0970 29.7510
Kabgayi
-2.0970 29.7510
Gihundwe
-2.4760 28.9160
Gihundwe
-2.4760 28.9160
Cyangugu
-2.4850 28.9080
Nengo
-1.7080 29.2650
Huye
-2.5810 29.7160
Kigombe
-1.5110 29.6420
Karubanda
-2.2740 29.6660
Kanyundo
-1.5960 29.3780
Goma
-1.6940 29.2450
Kiyovu
-2.0750 30.5230
Gahogo
-2.0800 29.7530
Gahogo
-2.0800 29.7530
Gisenyi
-1.7030 29.2560
Kigali
-1.9500 30.0590
Ruhango
-2.2250 29.7910
Mbazi
-2.5570 29.7450
Karongi
-2.1510 29.3950
Rwamabare
-2.7360 29.7350
Gatobotobo
-2.5570 29.7460
Nyabisindu
-2.3290 29.5680
Cyarwa
-2.3350 29.6620
Mirama
-2.4200 29.5870
Muhanga
-2.4310 29.6750
Rugerero
-1.7250 29.5990
Kavumo
-1.6930 29.8620
Rusagara
-1.7360 29.9790
Nyagatare
-1.4370 30.0460
Umutulirwa
-1.5280 30.0020
Karera
-1.7980 30.0920
Agatare
-1.8520 30.0660
Umurenge
-2.0100 30.5180
Mukoni
-2.2380 29.8850
Rusizi
-2.2140 29.6540
Kibirizi
-2.2290 29.2200
Gahora
-2.5830 29.7690
Mpanda
-2.3820 29.9250
Rubavu
-1.6730 29.2800
Nyarugenge
-1.9520 30.0670
Bilyogo
-1.9680 30.0570
Waste ManagementSub-National GovernmentOther Public AdministrationOther TransportationSanitationOther Water Supply, Sanitation and Waste ManagementUrban TransportServices and Housing for the PoorMunicipal Institution BuildingUrban DevelopmentUrban Infrastructure and Service DeliveryPublic AdministrationAdministrative and Civil Service Reform
0.00
0.00
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
2083333.33
2083333.33
2083333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
95000000Total Commitment in First Quarter of 2016
International Development Association6200000Total Disbursement in Third Quarter of 2016
International Development Association23866Total Disbursement in Fourth Quarter of 2016
International Development Association46832Total Disbursement in Fourth Quarter of 2016
International Development Association8726Total Disbursement in First Quarter of 2017
International Development Association15015Total Disbursement in First Quarter of 2017
International Development Association21624Total Disbursement in First Quarter of 2017
International Development Association-16667Total Interest Repayment in First Quarter of 2017
International Development Association3963Total Disbursement in Second Quarter of 2017
International Development Association54132Total Disbursement in Second Quarter of 2017
International Development Association5755570Total Disbursement in Second Quarter of 2017
International Development Association4749Total Disbursement in Third Quarter of 2017
International Development Association5072Total Disbursement in Third Quarter of 2017
International Development Association23503Total Disbursement in Third Quarter of 2017
International Development Association-23266Total Interest Repayment in Third Quarter of 2017
International Development Association28823Total Disbursement in Fourth Quarter of 2017
International Development Association200702Total Disbursement in Fourth Quarter of 2017
International Development Association200812Total Disbursement in Fourth Quarter of 2017
International Development Association710288Total Disbursement in First Quarter of 2018
International Development Association910002Total Disbursement in First Quarter of 2018
International Development Association2733585Total Disbursement in First Quarter of 2018
International Development Association-50227Total Interest Repayment in First Quarter of 2018
International Development Association6771Total Disbursement in Second Quarter of 2018
International Development Association5319294Total Disbursement in Second Quarter of 2018
International Development Association7956210Total Disbursement in Second Quarter of 2018
International Development Association5689Total Disbursement in Third Quarter of 2018
International Development Association27296Total Disbursement in Third Quarter of 2018
International Development Association2716901Total Disbursement in Third Quarter of 2018
International Development Association-65920Total Interest Repayment in Third Quarter of 2018
International Development Association20228Total Disbursement in Fourth Quarter of 2018
International Development Association556346Total Disbursement in Fourth Quarter of 2018
International Development Association3911075Total Disbursement in Fourth Quarter of 2018
International Development Association16205Total Disbursement in First Quarter of 2019
International Development Association95437Total Disbursement in First Quarter of 2019
International Development Association4648070Total Disbursement in First Quarter of 2019
International Development Association-123311Total Interest Repayment in First Quarter of 2019
International Development Association475227Total Disbursement in Second Quarter of 2019
International Development Association565740Total Disbursement in Second Quarter of 2019
International Development Association682174Total Disbursement in Second Quarter of 2019
International Development Association14340Total Disbursement in Third Quarter of 2019
International Development Association1007163Total Disbursement in Third Quarter of 2019
International Development Association-159466Total Interest Repayment in Third Quarter of 2019
International Development Association33719Total Disbursement in Fourth Quarter of 2019
International Development Association194681Total Disbursement in Fourth Quarter of 2019
International Development Association456973Total Disbursement in Fourth Quarter of 2019
International Development Association5718Total Disbursement in First Quarter of 2020
International Development Association1707375Total Disbursement in First Quarter of 2020
International Development Association6248363Total Disbursement in First Quarter of 2020
International Development Association-164923Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Project Implementation Manual | Description :The Recipient shall ensure and cause the Project ImplementingEntity to, not later than two (2) months of the Effective Date, adopt a Project Implementation Manual containing detailedguidelines and procedures for the implementation of the Project. | Due Date :01-Aug-2016
PDO Indicator
Number of people in urban areas provided with access to all-season roads within a 500 meter range under the project
PDO Indicator
Direct project beneficiaries
Intermediate Results Indicator
Participants in consultation activities during project implementation (number)
Intermediate Results Indicator
Participants in consultation activities during project implementation - female
PDO Indicator
Increase in share of maintenance expenditures of district budget
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
District system for tracking business activity operational.
Intermediate Results Indicator
Districts use GIS as key planning tool
Intermediate Results Indicator
District infrastructure management system for road and drainage assets operational
Intermediate Results Indicator
Urban roads rehabilitated or constructed
Intermediate Results Indicator
Standalone drains constructed or rehabilitated under the project
PDO Indicator
Land Area provided with drainage services financed under the project
Intermediate Results Indicator
Unplanned settlement area upgraded
44000-P151279
World Bank
Social Protection System Support
International Development Association
MINISTRY OF LOCAL GOVERNMENT (MINALOC)
International Development Association
MINISTRY OF LOCAL GOVERNMENT (MINALOC)Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Laura B. Rawlings
+1-202-473-1000lrawlings@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali
-1.94995 30.0589
Social ProtectionPublic Administration - Social ProtectionSocial InclusionOther Excluded GroupsSocial Safety NetsIndigenous People and Ethnic MinoritiesParticipation and Civic EngagementSocial protection delivery systemsGenderSocial Protection
0.00
0.00
70000000Total Commitment in First Quarter of 2015
International Development Association66240910Total Disbursement in Second Quarter of 2015
International Development Association-186295Total Interest Repayment in Third Quarter of 2015
International Development Association-250367Total Interest Repayment in First Quarter of 2016
International Development Association-252817Total Interest Repayment in Third Quarter of 2016
International Development Association-240658Total Interest Repayment in First Quarter of 2017
International Development Association-250141Total Interest Repayment in Third Quarter of 2017
International Development Association-258117Total Interest Repayment in First Quarter of 2018
International Development Association-256675Total Interest Repayment in Third Quarter of 2018
International Development Association-247701Total Interest Repayment in First Quarter of 2019
International Development Association-247820Total Interest Repayment in Third Quarter of 2019
International Development Association-245639Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewFinancing AgreementContract AwardsProject URLProcurement Notices44000-P155024
World Bank
Second Social Protection System DPO (SPS-2)
International Development Association
MINISTRY OF LOCAL GOVERNMENT
International Development Association
MINISTRY OF LOCAL GOVERNMENTPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Laura B. Rawlings
+1-202-473-1000lrawlings@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali
-1.94995 30.0589
Social ProtectionSocial InclusionParticipation and Civic EngagementSocial ProtectionGenderSocial protection delivery systems
0.00
0.00
95000000Total Commitment in Fourth Quarter of 2015
International Development Association93962861Total Disbursement in Fourth Quarter of 2015
International Development Association-458622Total Interest Repayment in Third Quarter of 2016
International Development Association-340137Total Interest Repayment in First Quarter of 2017
International Development Association-353539Total Interest Repayment in Third Quarter of 2017
International Development Association-364813Total Interest Repayment in First Quarter of 2018
International Development Association-362774Total Interest Repayment in Third Quarter of 2018
International Development Association-350091Total Interest Repayment in First Quarter of 2019
International Development Association-350259Total Interest Repayment in Third Quarter of 2019
International Development Association-347177Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentImplementation Completion and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices44000-P158698
World Bank
Third Social Protection System Support (SPS-3)
International Development Association
MINISTRY OF FINANCE AND ECONOMIC PLANNING
International Development Association
MINISTRY OF FINANCE AND ECONOMIC PLANNINGPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Laura B. Rawlings
+1-202-473-1000lrawlings@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali
-1.94995 30.0589
Social ProtectionSocial Safety NetsSocial ProtectionSocial protection delivery systems
0.00
0.00
95000000Total Commitment in Fourth Quarter of 2016
International Development Association91399594Total Disbursement in Fourth Quarter of 2016
International Development Association-457583Total Interest Repayment in Third Quarter of 2017
International Development Association-369177Total Interest Repayment in First Quarter of 2018
International Development Association-365503Total Interest Repayment in Third Quarter of 2018
International Development Association-352677Total Interest Repayment in First Quarter of 2019
International Development Association-352846Total Interest Repayment in Third Quarter of 2019
International Development Association-349741Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentImplementation Completion and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices44000-P161876
World Bank
Transformation of Agriculture Sector Program 4 Phase 2
International Development Association
MINISTRY OF AGRICULTURE AND ANIMAL RESOURCES (MINAGRI)
International Development Association
MINISTRY OF AGRICULTURE AND ANIMAL RESOURCES (MINAGRI)Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Winston Dawes
+1-202-473-1000wdawes@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali
-1.94995 30.0589
Public Administration - Agriculture, Fishing & ForestryOther Agriculture, Fishing and ForestryAgricultural Extension, Research, and Other Support ActivitiesIrrigation and DrainageAgricultural markets, commercialization and agri-businessRenewable Natural Resources Asset ManagementMitigationRural Infrastructure and service deliveryPublic Expenditure ManagementAdaptationPublic Finance ManagementRural DevelopmentClimate changeLandscape ManagementFinance for DevelopmentAgriculture FinanceRural Markets
12500000.00
12500000.00
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.37
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.37
1833333.33
1833333.33
1833333.33
1833333.33
1833333.33
1833333.33
1833333.33
1833333.33
1833333.33
1833333.33
1833333.33
1833333.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12500000.00
12500000.00
2666666.67
2666666.67
2666666.67
2666666.67
2666666.67
2666666.67
2666666.67
2666666.67
2666666.67
2666666.67
2666666.67
2666666.63
4326908.50
4326908.50
4326908.50
4326908.50
4326908.50
4326908.50
4326908.50
4326908.50
4326908.50
4326908.50
4326908.50
4326908.50
5173091.50
5173091.50
5173091.50
5173091.50
5173091.50
5173091.50
5173091.50
5173091.50
5173091.50
5173091.50
5173091.50
5173091.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100000000Total Commitment in Second Quarter of 2018
International Development Association24505464Total Disbursement in Second Quarter of 2018
International Development Association-47561Total Interest Repayment in Fourth Quarter of 2018
International Development Association4841406Total Disbursement in Second Quarter of 2019
International Development Association-90577Total Interest Repayment in Second Quarter of 2019
International Development Association14140690Total Disbursement in Fourth Quarter of 2019
International Development Association-98062Total Interest Repayment in Fourth Quarter of 2019
International Development AssociationProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
LA, Schedule 2, Section I.D. 2(a), Without limitation on the generality of Part A of Section I of the FA, the Recipient shallprepare, in form and substance satisfactory to the Association and no later than three (3) months after the Effective Date, anoperational manual containing detailed institutional, administrative, financial, environmental and social, technical andoperational guidelines and procedures for the implementation of the Program, including a description of the PSTA4 and the roles andresponsibilities of each of the Program Implementing Entities, and thereafter, carry out the Program and cause the ProgramImplementing Entities to carry out the Program, in accordance with such operational manual, as shall have been approved by theAssociation (“Program Operational Manual”).
LA, Schedule 2, Section III.B.(a). The Recipient shall vest in the Office of the Auditor General the responsibility of undertakingthe verification of compliance of the DLIs/DLRs, which are set forth in the table in Section IV.A.2.
LA, Schedule 2, Section III.B.(b).The Recipient shall cause the Office of the Auditor General (“OAG”) to, not later than thirty(30) days, after the verification of compliance of said DLIs/DLRs has been completed, prepare and furnish to the Recipient and theAssociation, a report on the results of said verification of compliance process of such scope and in such detail as the Associationshall reasonably request.
Grant Agreement, Schedule 2, Section I.D. 2(a): Within three (3) months from the date on which this Agreement is declaredeffective, the Recipient shall update the Program Operational Manual (POM) in accordance with terms of reference acceptable to theWorld Bank and adopt the updated POM.
Grant Agreement, Schedule 2, Section III.B. (a): the Recipient shall vest in the Office of the Auditor General the responsibilityof undertaking the verification of compliance of the DLIs/DLRs, which are set forth in the table in Section IV.A.2.
Grant Agreement, Schedule 2, Section III.B. (b): the Recipient shall cause the Office of the Auditor General (“OAG”) to, not laterthan thirty (30) days after the verification of compliance of said DLIs/DLRs has been completed, prepare and furnish to theRecipient and the World Bank, a report on the results of said verification of compliance process of such scope and in such detailas the World Bank shall reasonably request.
44000-P162646
World Bank
Strengthening Social Protection Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Iftikhar Malik
+1-202-473-1000mmalik@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Nyagatare District
-1.3150 30.3720
Gatsibo District
-1.5920 30.4550
Kayonza District
-1.8510 30.6510
Rwamagana District
-1.9730 30.3540
Bugesera District
-2.2350 30.1480
Ngoma District
-2.1850 30.4700
Kirehe District
-2.2570 30.7260
Gicumbi District
-1.6160 30.1210
Rulindo District
-1.7380 29.9980
Burera District
-1.4740 29.8350
Musanze District
-1.5080 29.6070
Gakenke District
-1.6980 29.7850
Gasabo District
-1.8850 30.1310
Nyarugenge District
-1.9910 30.0210
Kicukiro District
-2.0040 30.1470
Nyabihu District
-1.6530 29.5070
Ngororero District
-1.8780 29.5690
Rubavu District
-1.6810 29.3290
Rutsiro District
-1.9150 29.3150
Karongi District
-2.1300 29.3620
Nyamasheke District
-2.3620 29.1480
Rusizi District
-2.5700 29.0750
Muhanga District
-1.9390 29.7180
Kamonyi District
-2.0050 29.8980
Ruhango District
-2.2000 29.7700
Nyanza District
-2.3370 29.7950
Nyamagabe District
-2.4080 29.4680
Huye District
-2.5170 29.6960
Gisagara District
-2.6180 29.8500
Nyaruguru District
-2.6980 29.5240
Public Administration - Social ProtectionSocial ProtectionJobsNutrition and Food SecurityHealth Systems and PoliciesSocial Safety NetsJob CreationMitigationClimate changeAdaptationChild HealthNutritionDisabilitySocial Protection
0.00
0.00
200000.00
200000.00
200000.00
200000.00
200000.00
3000000.00
3000000.00
3000000.00
3000000.00
3000000.00
3000000.00
3000000.00
3000000.00
3000000.00
3000000.00
3000000.00
3000000.00
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.63
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
740900.00
443913.33
443913.33
443913.34
3623420.00
3623420.00
3623420.00
3623420.00
3623420.00
3623420.00
3623420.00
3623420.00
3623420.00
3623420.00
3623420.00
3623420.00
3586133.34
3586133.34
3586133.34
3586133.34
3586133.34
3586133.34
3586133.34
3586133.34
3586133.34
3586133.31
3586133.31
3586133.32
1201060.00
1201060.00
1201060.00
1201060.00
1201060.00
1201060.00
1201060.00
1201060.00
1201060.00
1201060.00
1201060.00
1201060.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
80000000Total Commitment in Fourth Quarter of 2017
International Development Association8538927Total Disbursement in Second Quarter of 2018
International Development Association-30348Total Interest Repayment in Fourth Quarter of 2018
International Development Association3039962Total Disbursement in First Quarter of 2019
International Development Association9069463Total Disbursement in First Quarter of 2019
International Development Association15120740Total Disbursement in Second Quarter of 2019
International Development Association-65014Total Interest Repayment in Second Quarter of 2019
International Development Association11296678Total Disbursement in Fourth Quarter of 2019
International Development Association-127798Total Interest Repayment in Fourth Quarter of 2019
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Appointment of key staff of the Single Project Implementation Unit (MINALOC-SPIU) throughout Project implementation, no later thanthree (3) months after the Effective Date. (Schedule 2; Section I.A.1.)
Appointment of key staff of the Single Project Implementation Unit (LODA-SPIU) throughout Project implementation, no later thanthree (3) months after the Effective Date. (Schedule 2; Section I.A.3.)
Adoption by Recipient and LODA, not later than three (3) months after the Effective Date, the Procurement Guidelines, in a mannerand substance satisfactory to the Association. (Schedule 2; Section I.D.2.)
Adoption by Recipient and LODA, not later than three (3) months after the Effective Date, the FM Guidelines, in a manner andsubstance satisfactory to the Association. (Schedule 2; Section I.C.1.)
Adoption, not later than three (3) months after the Effective Date, the Project Implementation Plan, in a manner and substancesatisfactory to the Association. (Schedule 2; Section I.E.1.)
No later than six (6) months after the Effective Date, the Recipient shall and shall cause LODA to adopt the Guidelines forSustainable Livelihood Enhancements, in form and substance satisfactory to the Association. (Schedule 2; Section IV.B.)
No later than six (6) months after the Effective Date, the Recipient shall and shall cause LODA to adopt the Guidelines forCaseworkers, in form and substance satisfactory to the Association. (Schedule 2; Section IV.A.)
Intermediate Results Indicator
Number of community/home-based childcare ePW supervisors trained
Intermediate Results Indicator
Average annual number of days of work of cPW beneficiaries
Intermediate Results Indicator
Beneficiaries of Safety Nets programs - Cash-for-work, food-for-work and public works (number)
Intermediate Results Indicator
Number of local government staff trained on the Citizens' Monitoring System (CMS)
Intermediate Results Indicator
Beneficiaries of Safety Nets programs - Unconditional cash transfers (number)
Intermediate Results Indicator
Beneficiaries of Safety Nets programs - Female (number)
Intermediate Results Indicator
Number of community meetings where behavior change parenting sessions are delivered
Intermediate Results Indicator
Number of community/home-based childcare groups operational
Intermediate Results Indicator
Beneficiaries of Safety Nets programs (number)
Intermediate Results Indicator
Percent of eligible households in Ubudehe 1 with children <2 years receiving child sensitive cash transfer grants
Intermediate Results Indicator
Percent of enrolled children 7 weeks to 24 months attending 6 height for age measurement at health facility
Intermediate Results Indicator
Percent of 0-6 weeks old children who attended 2 PNC visits at health facility, inclduing height-for-age-measurement
Intermediate Results Indicator
Percent of enrolled pregnant women attending 4 ANC visits
PDO Indicator
% of beneficiaries who received their NSDS benefit payments on time
PDO Indicator
% of VUP cPW beneficiary payments delivered on time
PDO Indicator
% of eligible DS households that receive their full DS entitlement (in the reporting period)
Intermediate Results Indicator
Grievances registered related to delivery of project benefits addressed (%)
PDO Indicator
% of eligible ePW households that receive their full ePW entitlement (in the reporting period)
PDO Indicator
% of cPW households reaching the minimum number of workdays of cPW employment (in the reporting period)
PDO Indicator
% of eligible Ubudehe 1 households covered by the VUP DS
PDO Indicator
% of eligible households covered by the VUP PW in targeted sectors
PDO Indicator
% of all eligible households covered by the VUP (ePW, cPW and DS) in targeted sectors
Intermediate Results Indicator
Action plan completed and operationalized for priority activities related to birth registration, certification and the assignment of unique identifiers at birth
Intermediate Results Indicator
LODA MEIS includes functionality for reporting on ePW and cPW timelineness
Intermediate Results Indicator
E-payments and workflow system piloted
Intermediate Results Indicator
Mass media campaign implemented
44000-P162671
World Bank
Rwanda Energy Sector Development Policy Loan
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Yadviga Viktorivna Semikolenova
+1-202-473-1000ysemikolenova@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali
-1.94995 30.0589
Energy Transmission and DistributionRenewable Energy SolarOther Energy and ExtractivesPublic Administration - Energy and ExtractivesPublic Private PartnershipsMitigationEnergy EfficiencyEnergy Policies & ReformEnergyClimate change
0.00
0.00
125000000Total Commitment in Fourth Quarter of 2017
International Development Association125308920Total Disbursement in Fourth Quarter of 2017
International Development Association-418195Total Interest Repayment in Second Quarter of 2018
International Development Association-459059Total Interest Repayment in Fourth Quarter of 2018
International Development Association-457198Total Interest Repayment in Second Quarter of 2019
International Development Association-452020Total Interest Repayment in Fourth Quarter of 2019
International Development AssociationProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Reduce total commercial losses as a percentage of electricity supply
Intermediate Results Indicator
Contain electricity subsidies as percentage of GDP
Intermediate Results Indicator
Expand electrification rate countrywide (percentage of households)
Intermediate Results Indicator
Initiate competitive procurement processes to implement investments identified in the LCPDP
Intermediate Results Indicator
Reduce average duration of interruptions (SAIDI)
Intermediate Results Indicator
Expand electrification rate among rural households (percentage of households)
Intermediate Results Indicator
Ensure all generation and transmission projects initiated or accepted by the Government over the past 24 months are consistent withthe LCPDP and comply with the PPP Law and competitive procurement pr
Intermediate Results Indicator
Implement and publish annual customer satisfaction survey
Intermediate Results Indicator
Ensure REG's financial statements are in full compliance with IFRS, their independent audit is without qualifications, and they arepublished within the first two quarters of the following year and di
44000-P164130
World Bank
Socio-economic Inclusion of Refugees & Host Communities in Rwanda Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Matthew Stephens
+1-202-473-1000mstephens@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Gatsibo District
-1.5920 30.4550
Kirehe District
-2.2570 30.7260
Gicumbi District
-1.6160 30.1210
Karongi District
-2.1300 29.3620
Nyamagabe District
-2.4080 29.4680
Gisagara District
-2.6180 29.8500
Republic of Rwanda
-2.0000 30.0000
Social ProtectionRural and Inter-Urban RoadsWater SupplyWorkforce Development and Vocational EducationHealthHealth Facilities and ConstructionPublic Administration - Social ProtectionFinancial Infrastructure and AccessJobsFragility, Conflict and ViolenceWater Resource ManagementRural DevelopmentWater Institutions, Policies and ReformRural MarketsMitigationForced DisplacementAdaptationRural Infrastructure and service deliveryClimate changeGenderMSME Finance
0.00
0.00
0.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.63
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.37
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.37
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.63
375000.00
375000.00
375000.00
375000.00
0.00
0.00
0.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.63
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.37
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.37
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.63
375000.00
375000.00
375000.00
375000.00
35000000Total Commitment in Second Quarter of 2019
International Development Association25000000Total Commitment in Second Quarter of 2019
International Development Association818308Total Disbursement in Fourth Quarter of 2019
International Development Association1560202Total Disbursement in First Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Section I.A.1: No later than three (3) months after the Effective Date, the Recipient shall, through MINEMA, maintain, throughoutProject implementation, the MINEMA-SPIU within MINEMA, composed of key staff, with qualifications and under terms of referenceacceptable to the Association, including a dedicated Team for Project implementation.
Section I.A.7: No later than three (3) months after the Effective Date, the Recipient shall adopt, and, thereafter implement,throughout Project implementation, a communications plan, in form and substance acceptable to the Association, detailing how topublicize the right to work of refugees in the Recipient's territory.
Intermediate Results Indicator
Beneficiaries of capacity building activities under component two
Intermediate Results Indicator
Surface water reservoirs constructed
Intermediate Results Indicator
Beneficiaries participating in project planning activities
Intermediate Results Indicator
Ravines rehabilitated
Intermediate Results Indicator
People employed by cooperatives and MSMEs receiving financing support through the project
Intermediate Results Indicator
Climate resilient Infrastructure subprojects completed in refugee hosting districts
Intermediate Results Indicator
Beneficiaries using surface reservoir water for productive use
PDO Indicator
Direct project beneficiaries
PDO Indicator
Beneficiaries of economic opportunity activities that report an increase in income
PDO Indicator
Beneficiaries with improved access to social and economic infrastructure and services
PDO Indicator
People provided with improved environmental conditions in refugee hosting districts
Intermediate Results Indicator
Female
Intermediate Results Indicator
Female
Intermediate Results Indicator
Host community members
Intermediate Results Indicator
Female
Intermediate Results Indicator
Increase in social cohesion among project beneficiaries
Intermediate Results Indicator
Refugees
PDO Indicator
Host community members
PDO Indicator
Refugees
PDO Indicator
Host community members
PDO Indicator
Refugees
Intermediate Results Indicator
Host community members
Intermediate Results Indicator
Grievances registered related to delivery of project benefits that are addressed
Intermediate Results Indicator
Refugees
Intermediate Results Indicator
Beneficiaries that feel project investments reflected their needs
PDO Indicator
Female
PDO Indicator
Female
Intermediate Results Indicator
P-MIS providing necessary information to measure project effectiveness and results
Intermediate Results Indicator
Roads rehabilitated or upgraded
44000-P164807
World Bank
Rwanda Public Finance Management Reform Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Jiwanka B. Wickramasinghe
+1-202-473-1000jwickramasinghe@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Republic of Rwanda
-2.0000 30.0000
Central Government (Central Agencies)ICT ServicesDisaster Risk ManagementMacroeconomic & Structural Policy ModellingE-Government, incl. e-servicesDisaster Risk ReductionJobsSocial InclusionPublic Expenditure ManagementEconomic Growth and PlanningTransparency, Accountability and Good GovernanceGenderPublic Finance ManagementParticipation and Civic EngagementPublic AdministrationJob Creation
160000.00
160000.00
160000.00
160000.00
160000.00
160000.00
160000.00
160000.00
160000.00
160000.00
366666.67
366666.67
366666.67
366666.67
366666.67
366666.67
366666.67
366666.67
366666.67
366666.67
366666.67
366666.63
450000.00
450000.00
450000.00
450000.00
450000.00
450000.00
450000.00
450000.00
450000.00
450000.00
450000.00
450000.00
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.63
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
160000.00
160000.00
160000.00
160000.00
160000.00
160000.00
160000.00
160000.00
160000.00
160000.00
366666.67
366666.67
366666.67
366666.67
366666.67
366666.67
366666.67
366666.67
366666.67
366666.67
366666.67
366666.63
450000.00
450000.00
450000.00
450000.00
450000.00
450000.00
450000.00
450000.00
450000.00
450000.00
450000.00
450000.00
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.63
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20000000Total Commitment in Fourth Quarter of 2018
International Development Association657750Total Disbursement in First Quarter of 2019
International Development Association-1633Total Interest Repayment in Third Quarter of 2019
International Development Association3013461Total Disbursement in Fourth Quarter of 2019
International Development Association-2438Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Section IV. A. No later than three (3) months after the Effective Date, the Recipient shall have upgraded the IFMIS to, inter alia,prepare consolidated financial reports and annual statements for projects, in form and substance satisfactory to the Association.
PDO Indicator
Number of public finance staff with a level of professional qualification achieved
Intermediate Results Indicator
Number of approved IPSAS standards
Intermediate Results Indicator
Number of public finance officials who recieved training or are in training under the project
Intermediate Results Indicator
Number of female trained qualified accountants
PDO Indicator
Improved reliability of budgeting
PDO Indicator
Share of districts expenditure arrears to consolidated district budget
Intermediate Results Indicator
FMIS coverage of performance information
Intermediate Results Indicator
FMIS coverage of education institutions
PDO Indicator
Improved budget transparency and citizens engagement
Intermediate Results Indicator
Improved program budgeting methodology in use
44000-P164845
World Bank
Rwanda Stunting Prevention and Reduction Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Miriam Schneidman
+1-202-473-1000mschneidman@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kayonza District
-1.8510 30.6510
Bugesera District
-2.2350 30.1480
Gakenke District
-1.6980 29.7850
Nyabihu District
-1.6530 29.5070
Ngororero District
-1.8780 29.5690
Rubavu District
-1.6810 29.3290
Rutsiro District
-1.9150 29.3150
Karongi District
-2.1300 29.3620
Rusizi District
-2.5700 29.0750
Ruhango District
-2.2000 29.7700
Nyamagabe District
-2.4080 29.4680
Huye District
-2.5170 29.6960
Nyaruguru District
-2.6980 29.5240
SanitationHealthHealth Systems and PoliciesFood SecurityNutrition and Food SecurityFlood and Drought Risk ManagementChild HealthNutritionHealth Service DeliveryDisaster Risk Management
560000.00
560000.00
560000.00
560000.00
560000.00
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.63
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.63
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.63
550000.00
550000.00
550000.00
550000.00
550000.00
550000.00
550000.00
550000.00
550000.00
550000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
560000.00
560000.00
560000.00
560000.00
560000.00
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.63
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.63
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
1375000.00
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.63
550000.00
550000.00
550000.00
550000.00
550000.00
550000.00
550000.00
550000.00
550000.00
550000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25000000Total Commitment in First Quarter of 2018
International Development Association2805955Total Disbursement in Second Quarter of 2018
International Development Association-9656Total Interest Repayment in Fourth Quarter of 2018
International Development Association1592357Total Disbursement in Second Quarter of 2019
International Development Association-10370Total Interest Repayment in Second Quarter of 2019
International Development Association2990280Total Disbursement in Fourth Quarter of 2019
International Development Association-17745Total Interest Repayment in Fourth Quarter of 2019
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
No later than three (3) months after the Effective Date, appointment within RBC-SPIU, of a team headed by a Projectcoordinator/focal point with experience in community nutrition matters and comprised of a monitoring and evaluation specialist, twoaccountants and an internal auditor. [Schedule 2, Section I.A.1 of the FA; also reflected in the GFF and MDTF Grant Agreements]
Adoption by RBC, not later than three (3) months after the Effective Date, of the Project Implementation Manual, in a manner andsubstance satisfactory to the Association. [Schedule 2, Section I.C. of the FA; also reflected in the GFF and MDTF Grant Agreements]
PDO Indicator
People who have received essential health, nutrition, and population (HNP) services
PDO Indicator
Number of women and children who have received basic nutrition services
PDO Indicator
Indicator 4a: Number of children under 5 were beneficiaries of project interventions
PDO Indicator
Indicator 4b: Number of women of reproductive age (including pregnant and lactating women) who were beneficiaries of project interventions
Intermediate Results Indicator
IRI 19: Number of peer learning events conducted (within and between districts and sectors)
Intermediate Results Indicator
IRI 10: Number of Ubudehe 1 households with improved latrines (from project interventions)
Intermediate Results Indicator
IRI 11: Number of districts with satisfactory ratings on the DPEM activity scorecard (to be developed)
PDO Indicator
Indicator 1a: Percentage of children under 5 years with height-for-age z-score below -2 standard deviations
PDO Indicator
Indicator 1b: Percentage of children under 2 years with height-for-age z-score below -2 standard deviations
PDO Indicator
Indicator 2: Percentage of children 6-23 months old who are fed a diverse diet
PDO Indicator
Indicator 3: Percentage of women who attended 4 or more ANC visits during their most recent pregnancy
Intermediate Results Indicator
IRI 12: Percentage of children under 5 with height measured and recorded at health facility
Intermediate Results Indicator
IRI 18: Percentage of participating health facilities that receive satisfactory rating from women and caregivers whose children received nutrition services (Citizen Engagement indicator)
Intermediate Results Indicator
IRI 5: Percentage of pregnant women who attended the first ANC visit during the first trimester
Intermediate Results Indicator
IRI 6: Percentage of pregnant women with anemia
Intermediate Results Indicator
IRI 17: Percentage of children 6-23 months old who consumed FBF in the past 24 hours
Intermediate Results Indicator
IRI 7: Percentage of participants at CHW education sessions surveyed who demonstrate knowledge of proper care, feeding, and WASH practices
Intermediate Results Indicator
IRI 8: Percentage of children 6-23 months old receiving micronutrient powders
Intermediate Results Indicator
IRI 9: Percentage of children under two with diarrhea treated with ORS and zinc.
Intermediate Results Indicator
IRI 13: Percentage of CHWs with no stock out of Zinc for diarrhea treatment.
Intermediate Results Indicator
IRI 2: Percentage of home-based ECD centers with satisfactory scores on quality score card
Intermediate Results Indicator
IRI 14: Percentage of women of reproductive age who are new acceptors of modern contraceptives
Intermediate Results Indicator
IRI 15: Percentage of fortified blended food (FBF) distribution centers with no stock outs in the previous quarter.
Intermediate Results Indicator
IRI 4: % of CHWs who received a quarterly supportive supervision visit from HC
Intermediate Results Indicator
IRI 16: Percent of eligible pregnant and lactating women from ubudehe 1 & 2 households who consumed FBF in the past 24 hours.
44000-P165649
World Bank
Rwanda Housing Finance Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Brice Gakombe
+1-202-473-1000bgakombe@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Republic of Rwanda
-2.0000 30.0000
Kigali
-1.9500 30.0590
Public Administration - Financial SectorCapital MarketsFinance for DevelopmentHousing Finance
0.00
0.00
135750.00
656850.00
846750.00
1032300.00
1210800.00
1387350.00
1584000.00
1791750.00
1968750.00
1039950.00
2184600.00
2343000.00
2478450.00
2592450.00
2727450.00
2871450.00
2999850.00
3134400.00
3292650.00
1715100.00
3555300.00
3642150.00
3691350.00
3875550.00
3969000.00
3916950.00
3843000.00
3904050.00
3852450.00
1871700.00
3655200.00
3595500.00
3525450.00
3438300.00
3347100.00
3270300.00
3198300.00
3133500.00
3064500.00
1504800.00
2949450.00
2854500.00
2752950.00
2681850.00
2611350.00
2526450.00
2443500.00
2372400.00
2292000.00
2205150.00
1072050.00
2079000.00
1995900.00
1939200.00
1898400.00
1579625.00
1579625.00
1579625.00
1579625.00
1579625.00
1579625.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
135750.00
656850.00
846750.00
1032300.00
1210800.00
1387350.00
1584000.00
1791750.00
1968750.00
1039950.00
2184600.00
2343000.00
2478450.00
2592450.00
2727450.00
2871450.00
2999850.00
3134400.00
3292650.00
1715100.00
3555300.00
3642150.00
3691350.00
3875550.00
3969000.00
3916950.00
3843000.00
3904050.00
3852450.00
1871700.00
3655200.00
3595500.00
3525450.00
3438300.00
3347100.00
3270300.00
3198300.00
3133500.00
3064500.00
1504800.00
2949450.00
2854500.00
2752950.00
2681850.00
2611350.00
2526450.00
2443500.00
2372400.00
2292000.00
2205150.00
1072050.00
2079000.00
1995900.00
1939200.00
1898400.00
1579625.00
1579625.00
1579625.00
1579625.00
1579625.00
1579625.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
150000000Total Commitment in Fourth Quarter of 2018
International Development Association7657946Total Disbursement in Second Quarter of 2019
International Development Association-362750Total Interest Repayment in Second Quarter of 2019
International Development Association0Total Disbursement in Fourth Quarter of 2019
International Development Association-259051Total Interest Repayment in Fourth Quarter of 2019
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Not later than three (3) months after the Effective Date, the Recipient shall establish, and thereafter maintain, throughoutProject implementation, the PSC, with composition and mandate acceptable to the Bank, which shall be headed by high levelrepresentatives of MINECOFIN and include, inter alia, high level representatives of MININFRA, RHA, CoK, and other entities, asfurther detailed in the PIM. The PSC shall be responsible for coordinating, including at the inter-ministerial level, and providingoverall strategic guidance for Project implementation. (Schedule 2, Section I. A.3)
PDO Indicator
Volume of bonds issued by RMRC
Intermediate Results Indicator
Average maturity of housing loans financed by the project
Intermediate Results Indicator
Number of Participating Financial Institutions (Shareholders of RMRC)
Intermediate Results Indicator
Number of entities receiving technical assistance
Intermediate Results Indicator
Number of Participating Financial Institutions (LoC)
PDO Indicator
Number of bonds issued by RMRC
PDO Indicator
Number of housing loans financed by this project
Intermediate Results Indicator
Project beneficiaries satisfied with access to housing finance
PDO Indicator
Number of housing loans financed by financial institutions
44000-P166458
World Bank
Second Rwanda Energy Sector Development Policy Operation
International Development Association
MINECOFIN
International Development Association
MINECOFINPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Yadviga Viktorivna Semikolenova
+1-202-473-1000ysemikolenova@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali
-1.94995 30.0589
Energy Transmission and DistributionRenewable Energy SolarOther Energy and ExtractivesEnergy EfficiencyEnergy Policies & ReformEnergyAccess to EnergyClimate changeMitigation
0.00
0.00
99375.00
424125.00
251875.00
583125.00
330125.00
733750.00
402750.00
882375.00
487375.00
1064000.00
570125.00
1199500.00
1265250.00
659500.00
1376250.00
714375.00
1479500.00
764375.00
1560625.00
801000.00
1663750.00
871500.00
1845125.00
961750.00
1991375.00
1033375.00
2148125.00
1116625.00
2335375.00
1216375.00
2506125.00
1279500.00
2595750.00
2692625.00
1386375.00
2804375.00
1402125.00
2817500.00
1435625.00
2910375.00
1465875.00
2930625.00
1460500.00
2956875.00
1494625.00
3000875.00
1494000.00
2956375.00
1483000.00
2980250.00
1483625.00
2917500.00
1425125.00
2824500.00
1408375.00
2780250.00
1360500.00
2645500.00
2588875.00
1275500.00
2506125.00
1227875.00
2400500.00
1170625.00
2289500.00
1123500.00
2218750.00
1097000.00
2158250.00
1059875.00
2082750.00
1023375.00
2012500.00
989375.00
1944375.00
954375.00
3145375.00
0.00
0.00
99375.00
424125.00
251875.00
583125.00
330125.00
733750.00
402750.00
882375.00
487375.00
1064000.00
570125.00
1199500.00
1265250.00
659500.00
1376250.00
714375.00
1479500.00
764375.00
1560625.00
801000.00
1663750.00
871500.00
1845125.00
961750.00
1991375.00
1033375.00
2148125.00
1116625.00
2335375.00
1216375.00
2506125.00
1279500.00
2595750.00
2692625.00
1386375.00
2804375.00
1402125.00
2817500.00
1435625.00
2910375.00
1465875.00
2930625.00
1460500.00
2956875.00
1494625.00
3000875.00
1494000.00
2956375.00
1483000.00
2980250.00
1483625.00
2917500.00
1425125.00
2824500.00
1408375.00
2780250.00
1360500.00
2645500.00
2588875.00
1275500.00
2506125.00
1227875.00
2400500.00
1170625.00
2289500.00
1123500.00
2218750.00
1097000.00
2158250.00
1059875.00
2082750.00
1023375.00
2012500.00
989375.00
1944375.00
954375.00
3145375.00
125000000Total Commitment in Fourth Quarter of 2018
International Development Association124018048Total Disbursement in Fourth Quarter of 2018
International Development Association-285033Total Interest Repayment in Second Quarter of 2019
International Development Association-457639Total Interest Repayment in Fourth Quarter of 2019
International Development AssociationProject Information DocumentProject Appraisal DocumentProject Information DocumentImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Initiate competitive procurement processes to implement investments identified in the LCPDP
Intermediate Results Indicator
Contain electricity subsidies as percentage of GDP
Intermediate Results Indicator
Reduce total electricity sector losses as a percentage of electricity supply
Intermediate Results Indicator
Expand electrification rate countrywide (percentage of households)
Intermediate Results Indicator
Expand electrification rate among rural households (percentage of households)
Intermediate Results Indicator
Reduce average duration of interruptions (SAIDI) and average frequency of interruptions (SAIFI)
Intermediate Results Indicator
Implement the quarterly automatic tariff adjustment
Intermediate Results Indicator
Ensure all generation and transmission projects initiated or accepted by the Government over the past 24 months are consistent withthe LCPDP and comply with the PPP Law and competitive procurement
Intermediate Results Indicator
Implement and publish annual customer satisfaction survey
Intermediate Results Indicator
Ensure EUCL's financial statements are in full compliance with IFRS, the independent audit of REG's and EUCL's financial statementsis without qualifications, and REG's and EUCL's financial statements
44000-P168551
World Bank
Rwanda Quality Basic Education for Human Capital Development Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Huma Kidwai
+1-202-473-1000hkidwai@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Nyagatare District
-1.3150 30.3720
Gatsibo District
-1.5920 30.4550
Kayonza District
-1.8510 30.6510
Rwamagana District
-1.9730 30.3540
Bugesera District
-2.2350 30.1480
Ngoma District
-2.1850 30.4700
Kirehe District
-2.2570 30.7260
Gicumbi District
-1.6160 30.1210
Rulindo District
-1.7380 29.9980
Burera District
-1.4740 29.8350
Musanze District
-1.5080 29.6070
Gakenke District
-1.6980 29.7850
Gasabo District
-1.8850 30.1310
Nyarugenge District
-1.9910 30.0210
Kicukiro District
-2.0040 30.1470
Nyabihu District
-1.6530 29.5070
Ngororero District
-1.8780 29.5690
Rubavu District
-1.6810 29.3290
Rutsiro District
-1.9150 29.3150
Karongi District
-2.1300 29.3620
Nyamasheke District
-2.3620 29.1480
Rusizi District
-2.5700 29.0750
Muhanga District
-1.9390 29.7180
Kamonyi District
-2.0050 29.8980
Ruhango District
-2.2000 29.7700
Nyanza District
-2.3370 29.7950
Nyamagabe District
-2.4080 29.4680
Huye District
-2.5170 29.6960
Gisagara District
-2.6180 29.8500
Nyaruguru District
-2.6980 29.5240
Early Childhood EducationPublic Administration - EducationPrimary EducationSecondary EducationGenderEducation Governance, School-Based ManagementTeachersEducationLabor Market Policy and ProgramsDisaster Risk ManagementStandards, Curriculum and TextbooksClimate changeDisaster Risk ReductionMitigationSkills DevelopmentEducation FacilitiesAdaptation
0.00
0.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.37
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
0.00
0.00
0.00
0.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.37
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
0.00
0.00
200000000Total Commitment in Third Quarter of 2019
International Development Association32845514Total Disbursement in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportContract AwardsProject URLProcurement Notices
PDO Indicator
Teachers recruited or trained
PDO Indicator
Students benefiting from direct interventions to enhance learning
PDO Indicator
Students benefiting from direct interventions to enhance learning - Female
PDO Indicator
Teachers recruited or trained - Female (RMS requirement)
PDO Indicator
Number of teachers trained
Intermediate Results Indicator
2.1.a. Number of additional classrooms built by the project in existing public and government-aided schools and new schools
Intermediate Results Indicator
1.3.d. Number of TTCs with a completed in-depth institutional review by peer TTC principals, REB and UR-CE
Intermediate Results Indicator
1.3.e. Number of TTCs with satisfactory improvements to infrastructure and facilities
Intermediate Results Indicator
1.4.a. Number of model schools with satisfactory infrastructure and facilities improvements
Intermediate Results Indicator
1.4.b. Number of model lessons developed, recorded by model schools, and made available online and sent to schools without internet access
Intermediate Results Indicator
1.4.c. Number of TTCs satisfied with model schools' coaching in their practical training
Intermediate Results Indicator
2.1.b. Number of latrines built by the project in existing public and government-aided schools and new schools
Intermediate Results Indicator
2.1.c. Average pupil to classroom ratio in public primary schools that are newly constructed by the project or that benefit from additional classrooms through the project
Intermediate Results Indicator
2.2.a. Number of edutainment episodes produced locally and broadcasted on national radio or television
Intermediate Results Indicator
1.2.a. Number of new or updated high-quality scripted lessons in Maths and Science subjects for P4-S3
Intermediate Results Indicator
2.2.b. Number of classrooms receiving pre-primary teaching and learning kits
Intermediate Results Indicator
2.3.a. Number of after-school clubs set up in model schools for boys and girls at secondary level to discuss gender-related issues
PDO Indicator
PDO 1: Share of P1-S3 public and government-aided school teachers awarded certificate of achieving at least intermediate level of competency in English
PDO Indicator
PDO 3: Share of P1 students who reach P6
PDO Indicator
PDO 4: Share of P3 students in public and government-aided schools achieving grade-level proficiency in English (Percentage)
PDO Indicator
PDO 1 (female): Share of P1-S3 public and government-aided school teachers awarded certificate of achieving at least intermediate level of competency in English - Female
PDO Indicator
PDO 3 (female): Share of P1 students who reach P6 - Female
PDO Indicator
PDO 4 (female): Share of P3 students in public and government-aided schools achieving grade-level proficiency in English - Female
Intermediate Results Indicator
1.1.b. Share of P1-S3 teachers in public and government-aided schools registered in digital literacy e-learning courses
Intermediate Results Indicator
1.1.c. Share of P1-S3 teachers in public and government-aided schools achieving Intermediate level or above on the online digital literacy assessment
Intermediate Results Indicator
1.2.b. Share of trained lower secondary teachers using the modernized instructional package in beneficiary schools in target districts
Intermediate Results Indicator
1.3.b. Share of TTC final year students awarded certificate of advanced competency in English through digital platform
Intermediate Results Indicator
1.3.c. Share of TTC final year students awarded certificate of advanced competency in digital literacy through digital platform
Intermediate Results Indicator
3.2.c. Share of grievances received and addressed within the project Grievance Redress Mechanism timeframe
PDO Indicator
PDO 2: Gain in average scores of targeted lower secondary teachers on tests of Mathematics and Science
PDO Indicator
PDO 5: Share of P3 students in public and government-aided schools achieving grade-level proficiency in numeracy
PDO Indicator
PDO 2 (female): Gain in average scores of targeted lower secondary teachers on tests of Maths and Science - Female
PDO Indicator
PDO 5 (female): Share of P3 students in public and government-aided schools achieving grade-level proficiency in numeracy - Female
Intermediate Results Indicator
1.1.a. Share of P1-S3 teachers in public and government-aided schools registered in English e-learning courses
Intermediate Results Indicator
3.1.b. Share of Sector Education Officers using digital reporting tool to collect school information and provide feedback to schools on instructional practice and student learning environment
Intermediate Results Indicator
3.1.a. New national teacher recruitment policy finalized, officially endorsed, and implemented (including teacher recruitment tests) in all districts
Intermediate Results Indicator
3.1.c. LARS conducted every 2 years
Intermediate Results Indicator
3.1.d. Rwanda participating in an international or regional assessment program (process completed and data analyzed and published)
Intermediate Results Indicator
3.2.a. Simulation models fully developed to project future student indicators, teachers' recruitment and infrastructure needs, and used for education planning, budgeting and policy development
Intermediate Results Indicator
1.3.a. Establishment of English and digital skills volunteer support program in 16 TTCs
Intermediate Results Indicator
3.2.b. Beneficiary survey conducted, with online component launched and survey results processed in a timely manner
44000-P169040
World Bank
Third Rwanda Energy Sector Development Policy Operation
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Yadviga Viktorivna Semikolenova
+1-202-473-1000ysemikolenova@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali
-1.94995 30.0589
Other Energy and ExtractivesEnergy Transmission and DistributionRenewable Energy SolarEnergy EfficiencyEnergy Policies & ReformAccess to EnergyEnergyClimate changeMitigation
0.00
0.00
125000000Total Commitment in Third Quarter of 2019
International Development Association123365700Total Disbursement in Fourth Quarter of 2019
International Development AssociationProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentFinancing AgreementContract AwardsProject URLProcurement Notices44000-P252350
World Bank
Rwanda Priority Skills for Growth (PSG)
International Development Association
MINISTRY OF EDUCATION (MINEDUC)
International Development Association
MINISTRY OF EDUCATION (MINEDUC)Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Ruth Karimi Charo
+1-202-473-1000rcharo@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Kigali
-1.94995 30.0589
Public Administration - EducationTertiary EducationWorkforce Development and Vocational EducationActive Labor Market ProgramsLabor Market InstitutionsSkills DevelopmentEducation FinancingLabor Market Policy and ProgramsEducation
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6272500.00
6272500.00
6272500.00
6272500.00
6272500.00
6272500.00
6272500.00
6272500.00
6272500.00
6272500.00
6272500.00
6272500.00
2608333.33
2608333.33
2608333.33
2608333.33
2608333.33
2608333.33
2608333.33
2608333.33
2608333.33
2608333.33
2608333.33
2608333.37
1119166.67
1119166.67
1119166.67
1119166.67
1119166.67
1119166.67
1119166.67
1119166.67
1119166.67
1119166.67
1119166.67
1119166.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120000000Total Commitment in Third Quarter of 2017
International Development Association7493179Total Disbursement in Fourth Quarter of 2017
International Development Association30703362Total Disbursement in Fourth Quarter of 2017
International Development Association-81522Total Interest Repayment in First Quarter of 2018
International Development Association-143754Total Interest Repayment in Third Quarter of 2018
International Development Association5087546Total Disbursement in Fourth Quarter of 2018
International Development Association10430555Total Disbursement in Fourth Quarter of 2018
International Development Association-152382Total Interest Repayment in First Quarter of 2019
International Development Association6040064Total Disbursement in Second Quarter of 2019
International Development Association13193093Total Disbursement in Second Quarter of 2019
International Development Association24029030Total Disbursement in Third Quarter of 2019
International Development Association-222973Total Interest Repayment in Third Quarter of 2019
International Development Association1666142Total Disbursement in Fourth Quarter of 2019
International Development Association4511381Total Disbursement in First Quarter of 2020
International Development Association10732392Total Disbursement in First Quarter of 2020
International Development Association-365832Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Appraisal DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementAgreementAgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
PDO Indicator
New or updated programs accredited for occupations in at least one of the selected economic sectors
Intermediate Results Indicator
Number of graduates of SDF supported programs by window
Intermediate Results Indicator
Number of accredited new or updated programs taught by staff participating in industry attachments in the selected economic sectors.
Intermediate Results Indicator
Action plans for specialized technical and professional skills development are formulated for the selected economic Sectors
Intermediate Results Indicator
Key elements of the action plans are incorporated in NEP JPC
Intermediate Results Indicator
Number of loan recipients from the 1980 – 2015 cohort who are repaying loans that are registered in the loan recovery MIS
Intermediate Results Indicator
Number of students receiving loans for long-term training (% female, % STEM)
PDO Indicator
Percentage of SDF supported trainees employed/self-employed 6 months after graduation(% of female graduates:34)
PDO Indicator
Improved sustainability of financing for long term training programs as measured by student loan recovery(percentage)
Intermediate Results Indicator
Percentage of new or updated programs with a modularized design aligned with the REQF in the selected economic sectors
PDO Indicator
Capacity Building for targeted entities in five areas, each with progress milestones, is completed
Intermediate Results Indicator
Strengthened Pillar 1 (skills development) of the NEP, as evidenced by the implementation of a JPC that integrates the results of the sector level action plans
Intermediate Results Indicator
Capacity building for targeted entities in five areas, each with progress milestones, is completed
Intermediate Results Indicator
BRD Loan Recovery Management Information System is operational
Intermediate Results Indicator
Skills Development and Employment Promotion Strategy as a follow-on to the NEP is approved by Cabinet
44000-P173855
World Bank
Rwanda COVID-19 Emergency Response Project
International Development Association
International Development Association
Actual start date of the activity
Planned end date of the activity
The World Bank
Miriam Schneidman
+1-202-473-1000mschneidman@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
RWANDA
Project Information DocumentProject Appraisal Document Contract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Number of participants involved in consultations
PDO Indicator
•Number of “flagship” NDC projects supported
PDO Indicator
•Number of risk mitigation and/or revenue raising instruments, designed and operational to promote climate change adaptation
PDO Indicator
Number of instruments supporting green growth designed
PDO Indicator
Operational Procedures for the Rwanda Catalytic Climate Finance Facility approved by FONERWA's Board