44000-P093640
World Bank
Haiti Community Driven Development (CDD) Project / PRODEP
International Development AssociationInternational Development AssociationPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Pierre Olivier Colleye
+1-202-473-1000pcolleye@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Vallieres
19.432739 -71.919418
Thomonde
19.01568 -71.960762
Thomazeau
18.65094 -72.091911
Thomassique
19.08058 -71.838867
Thiote
18.24147 -71.840767
Sainte-Suzanne
19.58333 -72.083328
Roseaux
18.6 -74.01667
Port-Salut
18.076389 -73.916672
Ouanaminthe
19.548071 -71.723969
Maniche
18.34454 -73.778122
Maissade
19.17334 -72.13456
La Vallee de Jacmel
18.27083 -72.666672
Gros Morne
19.668249 -72.677612
Fond Verrettes
18.39249 -71.854469
Cote de Fer
18.65 -74.26667
Cornillon
18.67429 -71.9515
Corail
18.565849 -73.894638
Chantal
18.201099 -73.889481
Cavaillon
18.29928 -73.65551
Belle-Anse
18.23801 -72.061996
Bainet
18.18494 -72.74778
Baie de Henne
19.665689 -73.208878
Bahon
19.466669 -72.116669
Aquin
18.283331 -73.400002
Anse Rouge
19.633141 -73.055733
Anse-a-Veau
18.501101 -73.344902
Anse-a-Pitres
18.049999 -71.75
Cerca la Source
19.16271 -71.790398
Desdunes
19.290421 -72.641441
Dessalines
19.261629 -72.513489
Ennery
19.48333 -72.48333
Grande Saline
19.265129 -72.768967
Grand Gosier
18.18491 -71.914467
Jean-Rabel
19.853331 -73.191673
La Chapelle
18.90999 -72.309464
Lascahobas
18.82902 -71.932991
L'Asile
18.38245 -73.41404
Marigot
18.232309 -72.314278
Marmelade
19.51602 -72.358711
Mirebalais
18.83333 -72.105278
Mont Organise
19.40658 -71.780769
Pestel
18.54142 -73.793091
Petite Riviere de Nippes
18.47611 -73.234947
Petit Trou de Nippes
18.525351 -73.508148
Pilate
19.66667 -72.550003
Plaisance
19.596901 -72.464767
Ranquitte
19.41667 -72.083328
Saint-Jean du Sud
18.07373 -73.816017
Carrefour Saut d'Eau
18.866671 -72.183327
Savanette
19.116671 -71.949997
Torbeck
18.16667 -73.811943
Baraderes
18.48041 -73.637589
Bassin Bleu
19.783461 -72.802063
Belladere
18.866091 -71.761978
Boucan Carre
18.923611 -72.147781
Capotille
19.450001 -71.699997
Carice
19.37587 -71.831284
Rural and Inter-Urban RoadsHealthCentral Government (Central Agencies)Other EducationOther Agriculture, Fishing and ForestryRural Infrastructure and service deliveryMSME DevelopmentEnterprise DevelopmentData production, accessibility and usePublic AdministrationAdministrative and Civil Service ReformJobsMunicipal Institution BuildingSocial Safety NetsRural DevelopmentData Development and Capacity BuildingSocial InclusionOther Excluded GroupsJob CreationParticipation and Civic EngagementSocial Protection
0.00
0.00
0.00
896001.17
896001.17
896001.16
866666.67
866666.67
866666.66
600000.00
600000.00
600000.00
600000.00
600000.00
600000.00
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
566666.67
566666.67
566666.66
566666.67
566666.67
566666.66
933333.33
933333.33
933333.34
1000000.00
1000000.00
1000000.00
850000.00
850000.00
850000.00
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
320665.50
320665.50
320665.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
896001.17
896001.17
896001.16
0.00
0.00
0.00
0.00
0.00
0.00
496373.40
496373.40
496373.39
75620.53
75620.53
75620.54
730453.05
730453.05
730453.06
328836.23
328836.23
328836.22
714924.34
714924.34
714924.34
789928.54
789928.54
789928.53
1275393.92
1275393.92
1275393.93
409516.14
409516.14
409516.15
945722.01
945722.01
945722.00
888248.19
888248.19
888248.20
900000.00
900000.00
900000.00
1066666.67
1066666.67
1066666.66
1266666.67
1266666.67
1266666.66
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1266666.67
1266666.67
1266666.66
615649.15
615649.15
615649.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
38000000Total Commitment in Third Quarter of 2005
International Development Association
2688004Total Disbursement in Fourth Quarter of 2005
International Development Association
44314Total Disbursement in Third Quarter of 2006
International Development Association
1444806Total Disbursement in Third Quarter of 2006
International Development Association
226862Total Disbursement in Fourth Quarter of 2006
International Development Association
2191359Total Disbursement in First Quarter of 2007
International Development Association
986509Total Disbursement in Second Quarter of 2007
International Development Association
310908Total Disbursement in Third Quarter of 2007
International Development Association
1833865Total Disbursement in Third Quarter of 2007
International Development Association
2369786Total Disbursement in Fourth Quarter of 2007
International Development Association
3826182Total Disbursement in First Quarter of 2008
International Development Association
1228548Total Disbursement in Second Quarter of 2008
International Development Association
1465770Total Disbursement in Third Quarter of 2008
International Development Association
1371396Total Disbursement in Third Quarter of 2008
International Development Association
1465770Total Disbursement in Fourth Quarter of 2008
International Development Association
1198975Total Disbursement in Fourth Quarter of 2008
International Development Association
2005310Total Disbursement in First Quarter of 2009
International Development Association
8000000Total Commitment in First Quarter of 2009
International Development Association
1200482Total Disbursement in Second Quarter of 2009
International Development Association
544458Total Disbursement in Second Quarter of 2009
International Development Association
317183Total Disbursement in Second Quarter of 2009
International Development Association
477672Total Disbursement in Second Quarter of 2009
International Development Association
223831Total Disbursement in Third Quarter of 2009
International Development Association
757065Total Disbursement in Third Quarter of 2009
International Development Association
647490Total Disbursement in Third Quarter of 2009
International Development Association
1731884Total Disbursement in Third Quarter of 2009
International Development Association
2067887Total Disbursement in Fourth Quarter of 2009
International Development Association
391675Total Disbursement in Fourth Quarter of 2009
International Development Association
3617111Total Disbursement in Fourth Quarter of 2009
International Development Association
124962Total Disbursement in Second Quarter of 2010
International Development Association
2763092Total Disbursement in Second Quarter of 2010
International Development Association
15000000Total Commitment in Second Quarter of 2010
International Development Association
1246247Total Disbursement in Second Quarter of 2010
International Development Association
1153858Total Disbursement in Second Quarter of 2010
International Development Association
625343Total Disbursement in Third Quarter of 2010
International Development Association
1452175Total Disbursement in Third Quarter of 2010
International Development Association
399007Total Disbursement in Fourth Quarter of 2010
International Development Association
1342835Total Disbursement in Fourth Quarter of 2010
International Development Association
105532Total Disbursement in Second Quarter of 2011
International Development Association
2249921Total Disbursement in Second Quarter of 2011
International Development Association
1398061Total Disbursement in Third Quarter of 2011
International Development Association
2621027Total Disbursement in Fourth Quarter of 2011
International Development Association
2749742Total Disbursement in First Quarter of 2012
International Development Association
1388580Total Disbursement in Second Quarter of 2012
International Development Association
1601834Total Disbursement in Second Quarter of 2012
International Development Association
609148Total Disbursement in Third Quarter of 2012
International Development Association
268627Total Disbursement in Third Quarter of 2012
International Development Association
1163840Total Disbursement in Fourth Quarter of 2012
International Development Association
112500Total Disbursement in Fourth Quarter of 2012
International Development Association
112500Total Disbursement in Fourth Quarter of 2012
International Development Association
637500Total Disbursement in First Quarter of 2013
International Development Association
865111Total Disbursement in First Quarter of 2013
International Development Association
87018Total Disbursement in First Quarter of 2013
International Development Association
883000Total Disbursement in First Quarter of 2013
International Development Association
103122Total Disbursement in Third Quarter of 2013
International Development Association
106709Total Disbursement in Third Quarter of 2013
International Development Association
-31543Total Disbursement in Fourth Quarter of 2013
International Development Association
-112375Total Commitment Cancellations in Fourth Quarter of 2013
International Development Association
-84204Total Commitment Cancellations in Fourth Quarter of 2013
International Development Association
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
The Recipient declares its commitment to the objectives of the Project as set forth in Schedule 2 to this Agreement, and, to thisend, shall carry out the Project, through UCP/PL 480
Procurement of the goods, works and services required for the Project and to be financed out of the proceeds of the Grant shall begoverned by the Procurement Plan
Update the Procurement Plan and furnish such update to the Association not later than 12 months after the date of the precedingProcurement Plan, for the Association#s approval.
Prepare and furnish to the Association not later than six (6) months after the Closing Date a plan designed to ensure thecontinuedachievement of Project#s objectives.
The Recipient shall adopt the Project operational manual, setting forth rules, methods, guidelines, standard documents andprocedures for the carrying out of the Project.
Technical audits are carried out semi-annually in UCP/PL 480 and in each MDOD and submitted to the Association within 4 monthsthereafter.
Appoint independent auditors within three months of Effectiveness.
The UGP/PL480 shall enter into an agreement (the Service Agreement) with each eligible MDOD.
UGP/PL480 shall maintain an FM system, and shall cause each MDOD to establish and maintain, for purposes of the Project, an FMsystem.
UGP/PL480 shall prepare semi-annual financial statements and shall cause each MDOD to prepare semi-annual financial reports
The Borrower shall have the financial statements (UGP/PL480) and the financial reports (MDODs) semi-annually audited for eachFiscal Year.
Intermediate Results Indicator
Roads rehabilitated, Rural
Intermediate Results Indicator
Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions.
Intermediate Results Indicator
Health facilities constructed, renovated, and/or equipped (number)
Intermediate Results Indicator
Improved community water points constructed or rehabilitated under the project
Includes public water fountains constructed and rehabilitated, wells and hand pumps installed and community tanks constructed
PDO Indicator
In 59 Municipalities CBO have successfully managed the direct transfers for community subprojects
PDO Indicator
1.2 million residents in 59 Municipalities of the Project area improved their access to basic social and economic infrastructure and/or benefits of productive subprojects.
Per MDOD estimates
PDO Indicator
75% of productive/ income-generating subprojects within the 59 Municipalities are operational and are being maintained 12 months after completion.
According to MDOD records, and sample of 2011 technical audit
PDO Indicator
3500 CBOs in the 59 Municipalities are officially constituted and participating in CADECs.
Includes accounting for some OCBs that have been dissolved.
PDO Indicator
60% of the adult population in the 59 Municipalities expresses to be aware of PRODEP and its objectives/activities/ means of access.
Per Midterm evaluation survey
PDO Indicator
20-point change in Social Capital Index, reflecting greater citizen participation in resource allocation decisions.
This is a new indicator introduced with the 2nd AF, to be measured as part of the impact evaluation study
Intermediate Results Indicator
75% of CBO members have attended at least one training event.
Number of training events exceeded target
Intermediate Results Indicator
90% of CADEC members have attended at least two training events.
Number of training events exceeded target
Intermediate Results Indicator
80% of subprojects are implemented within 6 months.
Intermediate Results Indicator
10 CADECs allocating funds from other development programs.
Intermediate Results Indicator
Component 3 MIS provides complete quarterly reports within 30 days after the end of the quarter.
Intermediate Results Indicator
Amount of Project funds disbursed within the Project timeframe.
Intermediate Results Indicator
Component 1- 59 CADECs following democratic and open meeting procedures as detailed in the Project Operational Manual.
per MDOD reports
Intermediate Results Indicator
Component 1- # of subprojects: (a) 4050 proposed, (b) 2900 approved, (c) 2020 start implementation, and (d) 2010 completed.
Of the 1685 completed subprojects, 758 are infrastructure, 584 are productive and 327 social subprojects.
Intermediate Results Indicator
Component 1- 100 new CBOs created as a result of the Project.
Intermediate Results Indicator
Component 1--30% of CBO and 15% of CADEC members of the executive committee are women.
As per MDOD estimates
Intermediate Results Indicator
Component 1-75% of subprojects with adequate O&M arrangements implemented.
Intermediate Results Indicator
Component 2 - 460 training events for CBOs, CADECs.
One session is equivalent at 3.5 hours of training
44000-P095523
World Bank
Haiti Transport and Territorial Development Project
International Development AssociationInternational Development AssociationPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Pierre Xavier Bonneau
+1-202-473-1000pbonneau@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Thiotte
18.23333 -71.866669
Département du Sud-Est
18.299999 -72.400002
Departement du Sud-Est
18.299999 -72.400002
Département du Sud
18.299999 -73.73333
Saint- Raphael
19.383329 -72.183327
Département du Nord
19.6 -72.300003
Departement du Nord
19.6 -72.300003
Milot
19.633329 -72.216667
Carrefour La Mort
19.696939 -72.180557
Grand Gosier
18.283331 -71.900002
Grande Riviere du Nord
19.576481 -72.165756
Cap-Haitien
19.75 -72.199997
Belle-Anse
18.283331 -72.099998
Barriere Battant
19.616671 -72.199997
Bahon
19.450001 -72.116669
Anse-a-Pitres
18.049999 -71.75
Dondon
19.51667 -72.26667
Rural and Inter-Urban RoadsSub-National GovernmentCentral Government (Central Agencies)Agricultural markets, commercialization and agri-businessSocial ProtectionUrban Infrastructure and Service DeliverySocial InclusionSocial ProtectionTrade FacilitationTradeRural DevelopmentRural Infrastructure and service deliveryJobsParticipation and Civic EngagementJob CreationUrban DevelopmentSocial Safety Nets
0.00
0.00
0.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16000000Total Commitment in Second Quarter of 2006
International Development Association
200000Total Disbursement in First Quarter of 2007
International Development Association
889248Total Disbursement in Fourth Quarter of 2007
International Development Association
70230Total Disbursement in First Quarter of 2008
International Development Association
54315Total Disbursement in Second Quarter of 2008
International Development Association
175368Total Disbursement in Second Quarter of 2008
International Development Association
45953Total Disbursement in Third Quarter of 2008
International Development Association
675447Total Disbursement in Fourth Quarter of 2008
International Development Association
508031Total Disbursement in First Quarter of 2009
International Development Association
212985Total Disbursement in First Quarter of 2009
International Development Association
225000Total Disbursement in Second Quarter of 2009
International Development Association
194051Total Disbursement in Second Quarter of 2009
International Development Association
140369Total Disbursement in Third Quarter of 2009
International Development Association
51580Total Disbursement in Fourth Quarter of 2009
International Development Association
63242Total Disbursement in Fourth Quarter of 2009
International Development Association
12000000Total Commitment in Fourth Quarter of 2009
International Development Association
1549369Total Disbursement in First Quarter of 2010
International Development Association
413311Total Disbursement in First Quarter of 2010
International Development Association
2953836Total Disbursement in Second Quarter of 2010
International Development Association
521223Total Disbursement in Second Quarter of 2010
International Development Association
215262Total Disbursement in Third Quarter of 2010
International Development Association
2260253Total Disbursement in Third Quarter of 2010
International Development Association
202260Total Disbursement in Third Quarter of 2010
International Development Association
22896Total Disbursement in Fourth Quarter of 2010
International Development Association
422054Total Disbursement in Fourth Quarter of 2010
International Development Association
549024Total Disbursement in Fourth Quarter of 2010
International Development Association
487494Total Disbursement in Fourth Quarter of 2010
International Development Association
2346571Total Disbursement in First Quarter of 2011
International Development Association
185107Total Disbursement in First Quarter of 2011
International Development Association
110808Total Disbursement in First Quarter of 2011
International Development Association
1740376Total Disbursement in Second Quarter of 2011
International Development Association
610825Total Disbursement in Second Quarter of 2011
International Development Association
288256Total Disbursement in Second Quarter of 2011
International Development Association
499308Total Disbursement in Second Quarter of 2011
International Development Association
1225937Total Disbursement in Third Quarter of 2011
International Development Association
77277Total Disbursement in Third Quarter of 2011
International Development Association
140066Total Disbursement in Third Quarter of 2011
International Development Association
904100Total Disbursement in Fourth Quarter of 2011
International Development Association
63406Total Disbursement in First Quarter of 2012
International Development Association
726688Total Disbursement in First Quarter of 2012
International Development Association
142331Total Disbursement in Second Quarter of 2012
International Development Association
695858Total Disbursement in Third Quarter of 2012
International Development Association
1020323Total Disbursement in Fourth Quarter of 2012
International Development Association
141990Total Disbursement in Fourth Quarter of 2012
International Development Association
23520Total Disbursement in First Quarter of 2013
International Development Association
317481Total Disbursement in First Quarter of 2013
International Development Association
282142Total Disbursement in Second Quarter of 2013
International Development Association
64551Total Disbursement in Second Quarter of 2013
International Development Association
681259Total Disbursement in Second Quarter of 2013
International Development Association
828669Total Disbursement in Third Quarter of 2013
International Development Association
795731Total Disbursement in Third Quarter of 2013
International Development Association
554015Total Disbursement in Third Quarter of 2013
International Development Association
47198Total Disbursement in Third Quarter of 2013
International Development Association
-774396Total Disbursement in Fourth Quarter of 2013
International Development Association
559823Total Disbursement in Fourth Quarter of 2013
International Development Association
660635Total Disbursement in Fourth Quarter of 2013
International Development Association
59946Total Disbursement in Fourth Quarter of 2013
International Development Association
-77750Total Commitment Cancellations in First Quarter of 2014
International Development Association
-3695Total Disbursement in First Quarter of 2014
International Development Association
-820338Total Commitment Cancellations in First Quarter of 2014
International Development Association
-4744Total Disbursement in First Quarter of 2014
International Development Association
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
MEF shall furnish to IDA, not later than 60 days prior to the end of each FY a projection of monthly proceeds from taxes earmarkedfor road maintenance for next FY
MEF shall furnish to IDA, not later than 90 days after the end of FY, documentary evidence that all proceeds from taxes earmarkedfor road maintenance have been transferred to FER on monthly basis
MTPTC shall furnish to IDA the published list of roads whose maintenance is the responsibility of FER
MTPTC shall furnish to IDA the list of completed civil works, including those carried out on any road segment financed under theProject
MTPTC shall furnish to IDA, not later than the end of each FY, the maintenance program of the next FY
MTPTC shall furnish to IDA a technical assessment of the civil works for roads completed under the Project as well as a forecastofmaintenance needs for next 5 years after closing
Intermediate Results Indicator
No. spot interventions on transport infrastructure affected by natural disasters
This has been revised from an original value of 12 after the addition of Component 4 through the restructuring and additionalfinancing.
Intermediate Results Indicator
Roads rehabilitated, Rural
8.5 km of road works are completed (RN3) and 40 are completed on RD41. The remainder is under a bidding process carried out by EU.
Intermediate Results Indicator
km of roads improved up to acceptable standards
8.5 km of road works are completed (RN3) and 40 are nearing completion. The remainder is under a bidding process carried out by EU.
Intermediate Results Indicator
km of roads receiving adequate levels of maintenance
Roads first both need to be rehabilitated.
Intermediate Results Indicator
workdays generated by road maintenance activities
Roads first need to be both rehabilitated. Due to the earthquake, FER has practically not had any activity in 2010 or in 2011.
Intermediate Results Indicator
increased traffic
Data collection related to this indicator is to be performed by a specialized consulting firm.
Data collection related to this indicator is to be performed by a specialized consulting firm, once both road works are completed.
Intermediate Results Indicator
cumulated amount of acceptable productive investment proposals prioritized, assessed and presented to financiers
More projects should have been presented to potential financiers during a workshop, which was canceled due to the earthquake. Theworkshop has not yet been rescheduled.
Intermediate Results Indicator
cumulated amount of basic infrastructure proposals financed
North: 15 sub-projectsSouth-East: 13 sub-projectsworks completed
PDO Indicator
Decrease transport cost
Data collection related to this indicator is to be performed by a specialized consulting firm.
Road rehabilitation works are still on-going on one of the two main corridors (RD41). Results with regards to this indicator willonly be measured once they are both completed.
PDO Indicator
Decrease travel time
Data collection related to this indicator is to be performed by a specialized consulting firm.
Road rehabilitation works are still on-going on one of the two main corridors (RD41). Results with regards to this indicator willonly be measured once they are both completed.
PDO Indicator
Days per year during which roads are impracticable
Data collection related to this indicator is to be performed by a specialized consulting firm.
Some critical parts of RN3 and RD41 in terms of trafficability have already been addressed in the on-going works.
PDO Indicator
Lower transit losses
Data collection related to this indicator is to be performed by a specialized consulting firm.
Road rehabilitation works are completed on one of the two main corridors. Results with regards to this indicator will only bemeasured once they are both completed.
44000-P098531
World Bank
HT Electricity Project
International Development AssociationInternational Development AssociationPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Frederic Verdol
+1-202-473-1000fverdol@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Port-au-Prince
18.539169 -72.334999
Petit Goave
18.42939 -72.862968
Republic of Haiti
19 -72.416672
Les Cayes
18.19331 -73.74601
Cap-Haitien
19.75938 -72.198151
Gonaives
19.447491 -72.689034
Jacmel
18.23427 -72.535393
Energy Transmission and DistributionUrban Infrastructure and Service DeliveryBusiness Enabling EnvironmentRural Infrastructure and service deliveryJobsUrban DevelopmentJob CreationRegulation and Competition PolicyRural Development
240000.00
240000.00
240000.00
240000.00
240000.00
240000.00
240000.00
240000.00
240000.00
240000.00
240000.00
240000.00
235833.33
235833.33
235833.33
235833.33
235833.33
235833.33
235833.33
235833.33
235833.33
235833.33
235833.33
235833.37
21666.67
21666.67
21666.67
21666.67
21666.67
21666.67
21666.67
21666.67
21666.67
21666.67
21666.67
21666.63
2500.00
2500.00
2500.00
2500.00
2500.00
2500.00
2500.00
2500.00
2500.00
2500.00
2500.00
2500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
86635.08
86635.08
86635.07
0.00
0.00
0.00
0.00
0.00
0.00
36065.15
36065.15
36065.15
0.00
0.00
0.00
38099.12
38099.12
38099.14
20111.90
20111.90
20111.91
226991.77
226991.77
226991.75
283831.00
283831.00
283831.01
390243.91
390243.91
390243.89
390243.91
390243.91
390243.89
600000.00
600000.00
600000.00
512195.12
512195.12
512195.12
460975.61
460975.61
460975.61
292682.93
292682.93
292682.93
195121.95
195121.95
195121.96
50000.00
50000.00
50000.00
26558.66
26558.66
26558.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6000000Total Commitment in Third Quarter of 2006
International Development Association
169129Total Disbursement in Fourth Quarter of 2007
International Development Association
90776Total Disbursement in Fourth Quarter of 2007
International Development Association
87715Total Disbursement in Third Quarter of 2008
International Development Association
20481Total Disbursement in Third Quarter of 2008
International Development Association
71180Total Disbursement in First Quarter of 2009
International Development Association
44740Total Disbursement in First Quarter of 2009
International Development Association
26346Total Disbursement in Second Quarter of 2009
International Development Association
36498Total Disbursement in Second Quarter of 2009
International Development Association
18768Total Disbursement in Third Quarter of 2009
International Development Association
709569Total Disbursement in Third Quarter of 2009
International Development Association
5000000Total Commitment in Third Quarter of 2009
International Development Association
32308Total Disbursement in Fourth Quarter of 2009
International Development Association
14226Total Disbursement in Fourth Quarter of 2009
International Development Association
31186Total Disbursement in Fourth Quarter of 2009
International Development Association
554600Total Disbursement in First Quarter of 2010
International Development Association
28173Total Disbursement in First Quarter of 2010
International Development Association
241003Total Disbursement in First Quarter of 2010
International Development Association
70712Total Disbursement in First Quarter of 2010
International Development Association
207593Total Disbursement in Second Quarter of 2010
International Development Association
200000Total Disbursement in Second Quarter of 2010
International Development Association
379418Total Disbursement in Second Quarter of 2010
International Development Association
17599Total Disbursement in Second Quarter of 2010
International Development Association
23545Total Disbursement in Third Quarter of 2010
International Development Association
37690Total Disbursement in Third Quarter of 2010
International Development Association
105558Total Disbursement in Fourth Quarter of 2010
International Development Association
13401Total Disbursement in Fourth Quarter of 2010
International Development Association
33657Total Disbursement in Fourth Quarter of 2010
International Development Association
502015Total Disbursement in Fourth Quarter of 2010
International Development Association
104716Total Disbursement in Fourth Quarter of 2010
International Development Association
196730Total Disbursement in Fourth Quarter of 2010
International Development Association
579765Total Disbursement in First Quarter of 2011
International Development Association
254501Total Disbursement in First Quarter of 2011
International Development Association
57128Total Disbursement in First Quarter of 2011
International Development Association
36947Total Disbursement in First Quarter of 2011
International Development Association
28069Total Disbursement in Second Quarter of 2011
International Development Association
166193Total Disbursement in Second Quarter of 2011
International Development Association
48880Total Disbursement in Second Quarter of 2011
International Development Association
460336Total Disbursement in Second Quarter of 2011
International Development Association
84838Total Disbursement in Third Quarter of 2011
International Development Association
67790Total Disbursement in Third Quarter of 2011
International Development Association
69697Total Disbursement in Third Quarter of 2011
International Development Association
40716Total Disbursement in Third Quarter of 2011
International Development Association
31664Total Disbursement in Third Quarter of 2011
International Development Association
33204Total Disbursement in Third Quarter of 2011
International Development Association
60750Total Disbursement in Fourth Quarter of 2011
International Development Association
144573Total Disbursement in Fourth Quarter of 2011
International Development Association
176281Total Disbursement in First Quarter of 2012
International Development Association
374848Total Disbursement in First Quarter of 2012
International Development Association
132896Total Disbursement in First Quarter of 2012
International Development Association
48546Total Disbursement in First Quarter of 2012
International Development Association
180959Total Disbursement in First Quarter of 2012
International Development Association
94315Total Disbursement in First Quarter of 2012
International Development Association
59148Total Disbursement in Second Quarter of 2012
International Development Association
1512Total Disbursement in Second Quarter of 2012
International Development Association
166026Total Disbursement in Second Quarter of 2012
International Development Association
65882Total Disbursement in Second Quarter of 2012
International Development Association
114946Total Disbursement in Third Quarter of 2012
International Development Association
53934Total Disbursement in Third Quarter of 2012
International Development Association
169999Total Disbursement in Third Quarter of 2012
International Development Association
312977Total Disbursement in Fourth Quarter of 2012
International Development Association
291030Total Disbursement in Fourth Quarter of 2012
International Development Association
68212Total Disbursement in Fourth Quarter of 2012
International Development Association
31029Total Disbursement in Fourth Quarter of 2012
International Development Association
87988Total Disbursement in First Quarter of 2013
International Development Association
67618Total Disbursement in First Quarter of 2013
International Development Association
181852Total Disbursement in First Quarter of 2013
International Development Association
38017Total Disbursement in Second Quarter of 2013
International Development Association
74468Total Disbursement in Second Quarter of 2013
International Development Association
46622Total Disbursement in Third Quarter of 2013
International Development Association
1108715Total Disbursement in Third Quarter of 2013
International Development Association
117159Total Disbursement in Fourth Quarter of 2013
International Development Association
-140Total Disbursement in Fourth Quarter of 2013
International Development Association
-508164Total Commitment Cancellations in First Quarter of 2014
International Development Association
-620173Total Commitment Cancellations in First Quarter of 2014
International Development Association
-668Total Disbursement in First Quarter of 2014
International Development Association
Project Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
ensure that PTU-EDH and PCU submit work plans and budget to the Association for its review and approval
Cause the Strategic Steering Committee to convene its first meeting not later than two weeks after the Effective Date and,thereafte r, quarterly during the course of Project implementation
Ensure that MEF shall furnish to the Association a written report with supporting documents, about the status of its payments to EDH
Plan with minimum electricity supply of hours per day that MEF intends to finance
PDO Indicator
Cash Recovery Index
Value has been reset post earthquake. Average value over the last 12 months.
Value expected in April 2013, as an OIA (Tetra Tech) objective.
Commercial progress on private clients could not compensate the increase of payment arrears from public entities.
Intermediate Results Indicator
1.1.Number of customers in CMS database
Value has to be reset post the earthquake.
Major improvement, thanks to the Commercial action plan implemented since October 2012.
Intermediate Results Indicator
1.2. Number of customers in TSMS database
Value has to be reset post the earthquake.
Clients of the provinces in TSMS database, but tool not yet operational in these areas.
Intermediate Results Indicator
1.3. Number of EDH employees trained to use CMS and TSMS (not cumulative)
Remaining staff to be trained are located in the provinces. As deployment of the CMS is considered by EDH management as a priorityaction (following the August 2013 gap analysis conducted under the Project), training of staff will start in September 2013.
Intermediate Results Indicator
1.4. Active Customers/employee ratio
184,000 customers for 2,300 employees, information available in the project PAD.
Value to be adjusted with new commercial and financial recovery plans.
As of July 2013, 224,502 clients for 2302 employees.
Intermediate Results Indicator
5.2. Number of satisfied customers (large customers)
No baseline.
Survey to will be conducted in September2013, for the Government's ICR.
Intermediate Results Indicator
5.3. Employees satisfied with new system
Survey to will be conducted in September2013, for the Government's ICR.
Intermediate Results Indicator
Cash Recovery Index - large customers
CRI indicator not estimated by customer type.
Audit of 310inactive industrial customers showed 8% having a fraudulent use of service.
Intermediate Results Indicator
Number of large customers regularized
Total number of industrial customers may evolve.
Since 2012, 50 new industrial clients in the Port-au-Prince area.
Intermediate Results Indicator
Number of EDH employees trained to attend and follow up on large customers
No specific recurrent training for this frange of custumers
EDH willing to have a cell of 20 staff specialized in large priority customers.
A Large Clients Unit has been created, for individualized customer relationship .
Intermediate Results Indicator
Successful training of MTPTC staff to supervise performance indicators
Baseline is set on the day of effectiveness of the additional financing, which finances the MTPTC staff
Coordinator to recruit team. Former Energy Unit staff who did performance indicators monitoring could be recruited.
Intermediate Results Indicator
Number of EDH employees satisfied with the project
Surveys will be conducted in April 2013.
Intermediate Results Indicator
TA to EDH management
TA supported design and implementation of Commercial action plan 2012-2013 and Financial Audit 2013-2014.
Intermediate Results Indicator
Financial Management Plan
Accounting assistance contract signed on May 13, 2013 with awarded firm. Results expected by February 2014.By end September 2013,a parallel financial audit will provide a tool to present scenarios for the next 2-3 fiscal years..
PDO Indicator
Percentage of customers served at least 6 hours per day on average in the zones served by EDH
Value has been set post earthquake.
Important variations, due to a fragile power system (Epower plant down since June 2013). Lowest value on one distribution circuitwas 8.3h/day in June 2013.
Intermediate Results Indicator
Small customers served at least six hours a day on average
Measurement started in 2011.
100% of industrial clients in the industrial zones have more than 12h/day
Intermediate Results Indicator
Percentage of large customers served at least 12 hours per day on average
This measurement started in 2011.
Not measured yet, remote meters will provide information in end 2012
44000-P106699
World Bank
Haiti - Urban Community Driven Development Project / PRODEPUR
International Development AssociationMinistry of Finance
International Development AssociationBMPAD
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Jonas Ingemann Parby
+1-202-473-1000jparby@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Saint-Marc
19.1 -72.650002
Port-au-Prince
18.539169 -72.334999
Mirebalais
18.83333 -72.105278
Milot
19.6057 -72.209892
Martissant
18.528061 -72.359718
Hinche
19.15 -72.01667
Republic of Haiti
19 -72.416672
Gonaives
19.450001 -72.650002
Dondon
19.526199 -72.240311
Cap-Haitien
19.75938 -72.198151
Cite Soleil
18.58028 -72.338058
Other EducationOther Public AdministrationOther Water Supply, Sanitation and Waste ManagementSocial ProtectionUrban TransportUrban DevelopmentJobsUrban Infrastructure and Service DeliveryServices and Housing for the PoorSocial InclusionParticipation and Civic Engagement
0.00
0.00
0.00
0.00
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
300000.00
300000.00
300000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
266666.66
266666.67
266666.67
266666.66
266666.67
266666.67
266666.66
266666.67
266666.67
266666.66
266666.67
266666.67
266666.66
266666.67
266666.67
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
66666.66
66666.67
66666.67
33333.33
33333.33
33333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
273422.17
273422.17
273422.17
273422.17
273422.17
273422.17
273422.17
273422.17
273422.17
273422.17
273422.17
273422.13
379186.17
379186.17
379186.17
379186.17
379186.17
379186.17
379186.17
379186.17
379186.17
379186.17
379186.17
379186.13
679284.08
679284.08
679284.08
679284.08
679284.08
679284.08
679284.08
679284.08
679284.08
679284.08
679284.08
679284.12
803892.25
803892.25
803892.25
803892.25
803892.25
803892.25
803892.25
803892.25
803892.25
803892.25
803892.25
803892.25
756500.75
756500.75
756500.75
756500.75
756500.75
756500.75
756500.75
756500.75
756500.75
756500.75
756500.75
756500.75
439853.25
439853.25
439853.25
439853.25
439853.25
439853.25
439853.25
439853.25
439853.25
439853.25
439853.25
439853.25
494980.92
494980.92
494980.92
494980.92
494980.92
494980.92
494980.92
494980.92
494980.92
494980.92
494980.92
494980.88
193279.42
193279.42
193279.42
193279.42
193279.42
193279.42
193279.42
193279.42
193279.42
193279.42
193279.42
193279.38
15700000Total Commitment in Second Quarter of 2008
International Development Association
2415387Total Disbursement in Third Quarter of 2009
International Development Association
500000Total Disbursement in Third Quarter of 2009
International Development Association
365680Total Disbursement in Second Quarter of 2010
International Development Association
853596Total Disbursement in Third Quarter of 2010
International Development Association
30000000Total Commitment in Fourth Quarter of 2010
International Development Association
794180Total Disbursement in First Quarter of 2011
International Development Association
224542Total Disbursement in First Quarter of 2011
International Development Association
918584Total Disbursement in First Quarter of 2011
International Development Association
176409Total Disbursement in Second Quarter of 2011
International Development Association
621896Total Disbursement in Second Quarter of 2011
International Development Association
961027Total Disbursement in Second Quarter of 2011
International Development Association
337500Total Disbursement in Third Quarter of 2011
International Development Association
2175000Total Disbursement in Fourth Quarter of 2011
International Development Association
675000Total Disbursement in Fourth Quarter of 2011
International Development Association
198848Total Disbursement in Fourth Quarter of 2011
International Development Association
1210272Total Disbursement in Fourth Quarter of 2011
International Development Association
218748Total Disbursement in Fourth Quarter of 2011
International Development Association
974894Total Disbursement in Fourth Quarter of 2011
International Development Association
841011Total Disbursement in First Quarter of 2012
International Development Association
641035Total Disbursement in First Quarter of 2012
International Development Association
879101Total Disbursement in First Quarter of 2012
International Development Association
353366Total Disbursement in Third Quarter of 2012
International Development Association
98857Total Disbursement in Third Quarter of 2012
International Development Association
139804Total Disbursement in Third Quarter of 2012
International Development Association
896130Total Disbursement in Fourth Quarter of 2012
International Development Association
111393Total Disbursement in Fourth Quarter of 2012
International Development Association
193715Total Disbursement in Fourth Quarter of 2012
International Development Association
1950765Total Disbursement in Fourth Quarter of 2012
International Development Association
314718Total Disbursement in Fourth Quarter of 2012
International Development Association
119950Total Disbursement in First Quarter of 2013
International Development Association
915354Total Disbursement in First Quarter of 2013
International Development Association
671572Total Disbursement in Second Quarter of 2013
International Development Association
2054729Total Disbursement in Second Quarter of 2013
International Development Association
601371Total Disbursement in Second Quarter of 2013
International Development Association
1224983Total Disbursement in Second Quarter of 2013
International Development Association
119990Total Disbursement in Third Quarter of 2013
International Development Association
2342222Total Disbursement in Third Quarter of 2013
International Development Association
43395Total Disbursement in Third Quarter of 2013
International Development Association
335982Total Disbursement in Third Quarter of 2013
International Development Association
474099Total Disbursement in Fourth Quarter of 2013
International Development Association
1379744Total Disbursement in Fourth Quarter of 2013
International Development Association
1566124Total Disbursement in First Quarter of 2014
International Development Association
2534533Total Disbursement in Second Quarter of 2014
International Development Association
227125Total Disbursement in Second Quarter of 2014
International Development Association
7500000Total Commitment in Second Quarter of 2014
International Development Association
54795Total Disbursement in Second Quarter of 2014
International Development Association
1153023Total Disbursement in Third Quarter of 2014
International Development Association
1000000Total Disbursement in Third Quarter of 2014
International Development Association
1296607Total Disbursement in Fourth Quarter of 2014
International Development Association
700000Total Disbursement in First Quarter of 2015
International Development Association
1128610Total Disbursement in Second Quarter of 2015
International Development Association
853314Total Disbursement in Third Quarter of 2015
International Development Association
1110228Total Disbursement in Fourth Quarter of 2015
International Development Association
708145Total Disbursement in Fourth Quarter of 2015
International Development Association
1859817Total Disbursement in First Quarter of 2016
International Development Association
637740Total Disbursement in First Quarter of 2016
International Development Association
770528Total Disbursement in Second Quarter of 2016
International Development Association
1134016Total Disbursement in Third Quarter of 2016
International Development Association
177365Total Disbursement in Third Quarter of 2016
International Development Association
598392Total Disbursement in Third Quarter of 2016
International Development Association
453142Total Disbursement in Third Quarter of 2016
International Development Association
272772Total Disbursement in Third Quarter of 2016
International Development Association
517435Total Disbursement in Fourth Quarter of 2016
International Development Association
1357265Total Disbursement in Fourth Quarter of 2016
International Development Association
316945Total Disbursement in Fourth Quarter of 2016
International Development Association
286980Total Disbursement in Fourth Quarter of 2016
International Development Association
46510Total Disbursement in First Quarter of 2017
International Development Association
31593Total Disbursement in First Quarter of 2017
International Development Association
32934Total Disbursement in Second Quarter of 2017
International Development Association
-167971Total Commitment Cancellations in Second Quarter of 2017
International Development Association
29167Total Disbursement in Second Quarter of 2017
International Development Association
-36826Total Disbursement in Second Quarter of 2017
International Development Association
-67325Total Commitment Cancellations in Second Quarter of 2017
International Development Association
-1305Total Disbursement in Second Quarter of 2017
International Development Association
-1305Total Commitment Cancellations in Second Quarter of 2017
International Development Association
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :3.01 | Description :The Recipient declares its commitment to the objective of the Project, and shall cause theProject to be carried out by BMPAD in accordance with the provisions of Article IV of the General Conditions. | Frequency :Yearly
Finance Agreement :3.02 | Description :The Recipient shall ensure that the Project is carried out in accordnace with the provisionsof Schedule 2 to this Agreement. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I | Description :The Recipient shall cause BMPAD to enter into an agreement (serviceagreement) with each eligible MDOD. | Due Date :01-Jun-2009
Finance Agreement :Schedule 2, Section I | Description :The Recipient shall cause BMPAD to ensure that technical audits are carriedout by an independent auditor semi-annually. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I | Description :The Recipient shall cause BMPAD to ensure that a technical auditor isselected and appointed no later than 3 months after the Effective Date. | Due Date :27-Jan-2009
Finance Agreement :Schedule 2, Section I | Description :The Recipient shall cause BMPAD to ensure that a specialist is selected andappointed to carry out the baseline survey for the Project, no later than one month after the Effective Date. | Due Date:27-Nov-2008
Finance Agreement :Schedule 2, Section I | Description :The Recipient shall cause BMPAD to ensure thath a baseline survey iscarried out no later than 6 months after the Effective Date. | Due Date :27-Apr-2009
Finance Agreement :Schedule 2, Section I | Description :The Recipient shall cause BMPAD to maintain the Operational Manual. |Frequency :Yearly
Finance Agreement :Schedule 2, Section II | Description :The Recipient shall cause BMPAD through its PCU to monitor and evaluatethe progress of the Project and to prepare Project Reports. | Frequency :Quarterly
Finance Agreement :Schedule 2, Section II | Description :The Recipient shall maintain for itself and cause to be maintained inBMPAD a financial management system in accordance with Section 4.09 of the General Conditions. | Frequency :Yearly
Finance Agreement :Schedule 2, Section II | Description :The Recipient shall cause BMPAD, through the PCU, to prepare and furnishto IDA interim unaudited financial reports, no later than 45 days after the end of each calendar quarter. | Frequency :Yearly
Finance Agreement :Schedule 2, Section II | Description :The Recipient shall cause BMPAD to appoint, no later than 4 months afterthe Effective Date, an independent auditor. | Due Date :27-Feb-2009
Finance Agreement :5.03 | Description :the Effectiveness Deadline is the date ninety days (90) days after the date of thisAgreement | Due Date :21-Feb-2011
Finance Agreement :Schedule 2, Section I | Description :The Recipient shall cause BMPAD to: no later than one (1) month aftertheEffective Date, update the POM for the purpose of the Project | Due Date :21-Mar-2011
Finance Agreement :Schedule 2, Section I | Description :The Recipient shall cause BMPAD to ensure that not later than two (2)months after the Effective Date, at least one Service Agreement is concluded by BMPAD | Due Date :21-Apr-2011
Finance Agreement :Schedule 2, Section I | Description :The Recipient shall cause BMPAD to ensure that not later than 3 monthsafter the Effective Date, a technical auditor is selected | Due Date :21-Apr-2011
Finance Agreement :Schedule 2, Section I | Description :No later than six (6) months after the Effective Date, the Recipient shallhaveprepared and disclosed the Resettlement Policy Framework | Due Date :03-Feb-2012
Finance Agreement :ARTICLE V — EFFECTIVENESS; TERMINATION | Description :The Subsidiary Agreement has been entered into between theRecipient and BMPAD, in a manner acceptable to the Association, and it has been duly authorized or ratified by the Recipient andBMPAD and is legally binding upon both parties in accordance with its terms. | Due Date :30-Sep-2014
Intermediate Results Indicator
Volume of construction debris cleared in Project neighborhoods
Intermediate Results Indicator
Roads rehabilitated, Non-rural
PDO Indicator
Increased access to water in disadvantaged urban areas that selected such subprojects (i.e., water kiosks, standpipes, community cisterns, rainwater capture, etc.).
PDO Indicator
Increased access to sanitation in disadvantaged urban areas that selected such subprojects (i.e., garbage collection, solid waste disposal, recycling, composting, sanitary blocks, etc.).
PDO Indicator
Increased access to rehabilitated street and drainage infrastructure in disadvantaged urban areas that selected such subprojects (i.e., cleared and rehabilitated drainage canals, ditches, etc.)
Intermediate Results Indicator
Percent of prioritized projects submitted by women?s CBOs
PDO Indicator
Percentage of productive/income generating subprojects that are self-sustaining six months after being fully operational.
PDO Indicator
Percent of beneficiaries for whom the majority of expected subproject results, as defined by beneficiaries at the start of the project, were achieved (as per results from community evaluation forms)
Intermediate Results Indicator
Percent of women holding membership in COPRODEP?s executive committee
Intermediate Results Indicator
Percent of subprojects successfully implemented, operated, and maintained (as per technical audits)
PDO Indicator
Increased access to social infrastructure and services in disadvantaged urban areas that selected such subprojects (daycare centers, primary schools, secondary schools, health clinics, job training
Intermediate Results Indicator
Percent of municipal governments successfully proposing and implementing subprojects in coordination with CBOs
Intermediate Results Indicator
Percent of subprojects completed in a timely manner
Intermediate Results Indicator
Number of corridors repaired
Intermediate Results Indicator
Number of eligible CBOs joining COPRODEPs
PDO Indicator
Residents that have returned to neighborhoods upon completion of housing reconstruction and repair works or receiving a rental grant
Intermediate Results Indicator
Number of people in urban areas provided with access to Improved Water Sources under the project
Intermediate Results Indicator
Cumulative number of housing repair and reconstruction works financed through grants and completed
Intermediate Results Indicator
Health facilities constructed, renovated, and/or equipped (number)
PDO Indicator
Number of productive/income generating subprojects fully operational.
44000-P113623
World Bank
Strengthening the Management of Agriculture Public Services (GFRP)
International Development AssociationInternational Development AssociationPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Pierre Olivier Colleye
+1-202-473-1000pcolleye@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Thiotte
18.23333 -71.866669
Savane Zombi
18.283331 -71.816673
Port-au-Prince
18.539169 -72.334999
Levy
18.299999 -73.866669
Les Cayes
18.283331 -73.75
Republic of Haiti
19 -72.416672
Arrondissement de Belle-Anse
18.25 -72
Public Administration - Agriculture, Fishing & ForestryAgricultural Extension, Research, and Other Support ActivitiesPublic AdministrationRural MarketsAgriculture FinanceAdministrative and Civil Service ReformFinance for DevelopmentRural DevelopmentRural Infrastructure and service delivery
100000.00
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100000.00
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5000000Total Commitment in Second Quarter of 2009
International Development Association
500000Total Disbursement in Second Quarter of 2010
International Development Association
119024Total Disbursement in Second Quarter of 2011
International Development Association
339232Total Disbursement in Second Quarter of 2011
International Development Association
92663Total Disbursement in Fourth Quarter of 2011
International Development Association
52278Total Disbursement in First Quarter of 2012
International Development Association
90309Total Disbursement in Second Quarter of 2012
International Development Association
216603Total Disbursement in Third Quarter of 2012
International Development Association
140422Total Disbursement in Fourth Quarter of 2012
International Development Association
266452Total Disbursement in Fourth Quarter of 2012
International Development Association
321095Total Disbursement in First Quarter of 2013
International Development Association
359414Total Disbursement in Second Quarter of 2013
International Development Association
235254Total Disbursement in Third Quarter of 2013
International Development Association
144306Total Disbursement in Third Quarter of 2013
International Development Association
364520Total Disbursement in Third Quarter of 2013
International Development Association
245136Total Disbursement in Fourth Quarter of 2013
International Development Association
441845Total Disbursement in First Quarter of 2014
International Development Association
408634Total Disbursement in Second Quarter of 2014
International Development Association
445274Total Disbursement in Second Quarter of 2014
International Development Association
189459Total Disbursement in Third Quarter of 2014
International Development Association
238127Total Disbursement in Third Quarter of 2014
International Development Association
-79768Total Disbursement in First Quarter of 2015
International Development Association
-76159Total Commitment Cancellations in Second Quarter of 2015
International Development Association
Project Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Acquisition and installation of the accounting software for the project management
Appointment through MARNDR of independent auditors
select and appoint a Financial Agent to administer all payments and financial transfers under the Farmer Subsidy Scheme
enter into an agreement with the Financial Agent to set forth the Financial Agent#s obligations under the Project
Selection and appointment of one or several Service Providers with whom an agreement shall be entered into with respect to thetechnical implementation & supervision of the Farmer Subsidy Scheme, thro
PDO Indicator
Rate of commitments of the operating budget
Intermediate Results Indicator
Increase in the commitments of the operating budget (outside of salaries) in the DDAs to 70% before
Intermediate Results Indicator
100% of procurement records over US$100K and managed by MARNDR published on its website before the end of the project
Intermediate Results Indicator
Reduction from 15 to 5 the number of days to issue checks, before the end of the project.
Intermediate Results Indicator
FIOP transmitted to MPCE for 80% of projects in the PIP (Public Investment Program) before the end of the project.
Intermediate Results Indicator
Preparation of manuals of procedures for managing the operation and investment budgets in the MARNDR at the end of the first year of the project
Intermediate Results Indicator
Coverage mechanism against agricultural risks designed in the pilot zones before the end of the project.
Dropped. Activity financed by CIDA and the Government though the new SYFAAH Project.
PDO Indicator
Prioritization and targeting of budget
Preliminary results of study shows alignment between non-staff operational budget and sector strategy.
Intermediate Results Indicator
Establishment of an Environmental Unit within MARNDR
Intermediate Results Indicator
Farmer Registry established
8000+ farmers already registered
PDO Indicator
Farmers receiving agriculture support services
Subsidies have been delivered to 3055 producers in the South and 1510 producers in the South East in four campaigns. 7,328incentives have been distributed, totaling 23,406 vouchers.
Intermediate Results Indicator
Intranet and email system installed for 300 MARNDR staff before the end of the project
Intermediate Results Indicator
20 agricultural agents trained and educational material on gender mainstreaming in subsistence agriculture and environmentally friendly agricultural techniques prepared and disseminated in the pilotz
Data still missing. Agricultural agents no longer exist and have been replaced by over 30 Technical Agents who are still beingtrained. Data will be updated in December 2013.
44000-P114292
World Bank
HT Emergency Bridge Reconst & Vulnerab Reduction Project
International Development AssociationMTPTC
International Development AssociationUnite Centrale d'Execution
BMPAD
UCE
Unite Centrale d'Execution
CIAT
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Pierre Xavier Bonneau
+1-202-473-1000pbonneau@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Torbeck
18.16667 -73.811943
Tabarre
18.58333 -72.26667
Etang Saumatre
18.5975 -72.014717
Saint-Louis du Sud
18.263229 -73.545021
Riviere des Roseaux
18.6 -74.033333
Montrouis
18.950581 -72.701561
Mirebalais
18.83333 -72.105278
Republic of Haiti
19 -72.416672
Riviere de la Gosseline
18.25444 -72.55056
Gonaives
19.447491 -72.689034
Fonfrede
18.216669 -73.800003
Ennery
19.48333 -72.48333
Croix des Missions
18.596109 -72.284439
Croix des Bouquets
18.575121 -72.223022
Chalon
18.41667 -73.083328
Les Cayes
18.19331 -73.74601
Cavaillon
18.29928 -73.65551
Aquin
18.283331 -73.400002
Riviere la Voldrogue
18.616671 -74.083328
Riviere Bretelle
18.716669 -72.400002
Riviere Gauche
18.264441 -72.563332
Ganthier
18.530939 -72.064911
Riviere Grise
18.62389 -72.348061
Zanglais
18.26667 -73.449997
Public Administration - TransportationPublic Administration - Water, Sanitation and Waste ManagementRural and Inter-Urban RoadsRural DevelopmentAdministrative and Civil Service ReformDisaster Response and RecoveryPublic AdministrationDisaster Risk FinanceDisaster Risk ReductionFinance for DevelopmentParticipation and Civic EngagementDisaster Risk ManagementSocial InclusionDisaster PreparednessRural Infrastructure and service delivery
555555.55
555555.55
555555.56
555555.56
555555.56
555555.55
555555.56
555555.56
555555.55
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
555555.55
555555.55
555555.56
555555.56
555555.56
555555.55
555555.56
555555.56
555555.55
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20000000Total Commitment in Fourth Quarter of 2008
International Development Association
1500000Total Disbursement in Second Quarter of 2009
International Development Association
500000Total Disbursement in Second Quarter of 2009
International Development Association
1398212Total Disbursement in Second Quarter of 2010
International Development Association
120668Total Disbursement in Second Quarter of 2010
International Development Association
2167291Total Disbursement in Third Quarter of 2010
International Development Association
1152524Total Disbursement in Fourth Quarter of 2010
International Development Association
208112Total Disbursement in First Quarter of 2011
International Development Association
799740Total Disbursement in Second Quarter of 2011
International Development Association
146247Total Disbursement in Third Quarter of 2011
International Development Association
554381Total Disbursement in Third Quarter of 2011
International Development Association
230023Total Disbursement in First Quarter of 2012
International Development Association
1873005Total Disbursement in Second Quarter of 2012
International Development Association
330591Total Disbursement in Third Quarter of 2012
International Development Association
646901Total Disbursement in Third Quarter of 2012
International Development Association
148826Total Disbursement in First Quarter of 2013
International Development Association
213891Total Disbursement in Second Quarter of 2013
International Development Association
672059Total Disbursement in Third Quarter of 2013
International Development Association
1069835Total Disbursement in Fourth Quarter of 2013
International Development Association
538006Total Disbursement in First Quarter of 2014
International Development Association
1482006Total Disbursement in Second Quarter of 2014
International Development Association
165287Total Disbursement in Second Quarter of 2014
International Development Association
193557Total Disbursement in Third Quarter of 2014
International Development Association
392257Total Disbursement in Fourth Quarter of 2014
International Development Association
1463862Total Disbursement in Fourth Quarter of 2014
International Development Association
386962Total Disbursement in First Quarter of 2015
International Development Association
375573Total Disbursement in First Quarter of 2015
International Development Association
377665Total Disbursement in First Quarter of 2015
International Development Association
311784Total Disbursement in Third Quarter of 2015
International Development Association
-42790Total Disbursement in Fourth Quarter of 2015
International Development Association
-13399Total Disbursement in First Quarter of 2016
International Development Association
-6478Total Disbursement in Second Quarter of 2016
International Development Association
-1791Total Disbursement in Third Quarter of 2016
International Development Association
-68617Total Commitment Cancellations in Third Quarter of 2016
International Development Association
Project Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :H-4320-HA | Description :1) Subsidiary Grant Agreement bewteen the Receipient and the BMPAF ;ii) TheOpeational Manual, including therein the EMF and RAF,has been adopted by the MTPTC on behalf of the receipient | Due Date:16-Jan-2009
PDO Indicator
Roads rehabilitated, Non-rural
Intermediate Results Indicator
(1)Bridge inventory completed and up to date; (2) Constitution of an effective crisis management unit in MTPTC; (3)Constitution of a bridge management unit in MTPTC
PDO Indicator
Disaster Risk Management Units within key ministries are operational and sustainable, with adequate resources and staffing
PDO Indicator
MTPTC bridge management and asset management unit is operational and sustainable, with adequate resources and staffing
Intermediate Results Indicator
Bridge Inventory Completed and up to date
Intermediate Results Indicator
Constitution of an effective crisis management and vulnerability reduction unit in MTPTC
Intermediate Results Indicator
Constitution of a bridge management unit in MTPTC
Intermediate Results Indicator
Number of bridges rebuilt with satisfactory technical standards
Intermediate Results Indicator
10 emergency bridges purchased
Intermediate Results Indicator
Number of bridges and road sections that have been repaired or consolidated with satisfactory technical standards
Intermediate Results Indicator
Number of Emergency Management and Vulnerability Reduction Units (EM-VRU) created/reinforced and operational within line ministriesand within their departmental directorates before the project.
Intermediate Results Indicator
Transversal development strategies and instruments developed by CIAT, established and in place before end of project
44000-P120110
World Bank
Cholera Emergency Response Project
International Development AssociationInternational Development AssociationPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Eleonora Del Valle Cavagnero
+1-202-473-1000ecavagnero@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Sud-Est
18.299999 -72.400002
Sud
18.299999 -73.73333
Departement de l'Ouest
18.663811 -72.291412
Departement de la Grand'Anse
18.5 -74.083328
Centre
19 -72
Departement de l'Artibonite
19.33333 -72.5
Departement de Nippes
18.448351 -73.428497
Public Administration - HealthHealthJobsHealth Systems and PoliciesHealth System StrengtheningDisease Control
0.00
1750000.00
1750000.00
1166666.66
1166666.67
1166666.67
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1750000.00
1750000.00
1166666.66
1166666.67
1166666.67
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15000000Total Commitment in First Quarter of 2011
International Development Association
3000000Total Disbursement in Second Quarter of 2011
International Development Association
520166Total Disbursement in Third Quarter of 2011
International Development Association
225102Total Disbursement in Third Quarter of 2011
International Development Association
35062Total Disbursement in Fourth Quarter of 2011
International Development Association
2819728Total Disbursement in Fourth Quarter of 2011
International Development Association
29172Total Disbursement in First Quarter of 2012
International Development Association
1465770Total Disbursement in Second Quarter of 2012
International Development Association
1069761Total Disbursement in Second Quarter of 2012
International Development Association
226018Total Disbursement in Third Quarter of 2012
International Development Association
515119Total Disbursement in Fourth Quarter of 2012
International Development Association
481210Total Disbursement in First Quarter of 2013
International Development Association
2717624Total Disbursement in Second Quarter of 2013
International Development Association
651882Total Disbursement in Fourth Quarter of 2013
International Development Association
515441Total Disbursement in Fourth Quarter of 2013
International Development Association
599669Total Disbursement in First Quarter of 2014
International Development Association
172555Total Disbursement in Second Quarter of 2014
International Development Association
29097Total Disbursement in Third Quarter of 2014
International Development Association
-308913Total Commitment Cancellations in Third Quarter of 2014
International Development Association
-80009Total Disbursement in Third Quarter of 2014
International Development Association
Project Information DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
The Subsidiary Agreement has been executed on behalf of the Recipient and FAES
The Recipient shall cause FAES to recruit an accountant for the Project, with terms of reference, qualifications and experiencesatisfactory to the Association and in accordance with the provisio
The Recipient shall cause FAES to amend and update the Project Operation Manual in a manner satisfactory to the Association, toreflect the implementation arrangements in respect of this Project.
The Recipient shall prepare and disclose in a manner satisfactory to the Association the Environmental and Social ManagementFramework, in form and substance satisfactory to the Association
The Recipient shall appoint, or cause FAES to appoint, not later than four (4) months after the Effective Date, the independentauditors referred to in Section 4.09 (b) (i) of the General Condit.
PDO Indicator
Increased institutional capacity as measured by achievement of at least four out of five of Component 2 indicators on an annual basis
Four out of five indicators achieved.
Four out of five indicators achieved.
Intermediate Results Indicator
Number of communities that have received targeted health education and/or prevention activities
"Localities" is being used in the place of communities, given the Haitian context.
Indicators met and surpassed
Intermediate Results Indicator
Number of health centers and posts, treatment and chlorination centers and units, and oral rehydration posts supported with supplies
The previous ISR had as target the number of planned facilities corresponding to the implementation plan submitted in the firstsemester of 2012. To make it consistent with the other intermediary indicators, we have changed for the baseline set in 2011, whichwasused thereafter in subsequent aide-memoires
This indicators has been met. Changes in the cholera response strategy by the MSPP, which does not support any longer permanentstand-alone cholera rehydration posts. The hydration posts are part of the emergency response and are put in place in case ofoutbreak.
Intermediate Results Indicator
Number of people receiving water treatment products and soap
0
Total – 178,400
Indicator met and surpassed.
Intermediate Results Indicator
Number of personnel and community workers trained (by type of training)
The previous ISR had as target the number of planned facilities corresponding to the implementation plan submitted in the firstsemester of 2012. To make it consistent with the other intermediary indicators, we have changed for the baseline set in 2011, whichwasused thereafter in subsequent aide-memoires
Indicator met and surpassed.
Intermediate Results Indicator
Departmental Cholera Management Plan developed (by MSPP and DINEPA) for at least five departments
N/A
Indicator achieved and surpassed.
Intermediate Results Indicator
Establishment and functioning of one national and five regional Cholera and Emergency Response Units
Government has decided to recruit cholera coordinators in the departments rather than create new units. Thus, this indicatorreflects the number of coordinators in place.
A national cholera focal point is in place and 6 departmental cholera focal points are in place.
Intermediate Results Indicator
Quarterly project progress reports submitted to Cholera Coordination Committee and to Bank
N/A
The indicators was met and surpass
Project progress was reported in aide-memoires circulated to MSPP at the central and decentralized level, DINEPA and all partnersand submitted to the Bank.
Intermediate Results Indicator
Good quality quarterly IFRs are submitted to the Bank in a timely manner
N/A
Indicator not achieved
One more IFR may be submitted before the end of the Project
PDO Indicator
Percentage of population in project intervention areas who know the cholera early warning symptoms and prevention steps
Identification of Symptoms: 64%Knowledge of Prevention Steps: 13%. Baseline has changed as a result of an harmonizedconsolidation of the two phases and to make it consistent with endline.
Identification of Symptoms: 69%Knowledge of Prevention Steps: 18%
Identification of Symptoms: 82%Knowledge of Prevention Steps: 14%.
PDO Indicator
Percentage of population in project intervention areas with access to improved water sources
Note: The original indicator “improved water source or treated water” was measured in the survey as the percentage of householdsthat treat/chlorinate their drinking water regularly.
The project did not aim at facilitating improvement of water sources. To this end, the project is, in effect, sustaining access toclean water.
A preliminary indicator was used before but it was updated to be appropriately measured. Also sound methodology was ensured tomakeit consistent with end-line. The final baseline was only submitted by CRD in June 2013 and its final report in August 2013.
44000-P120895
World Bank
Infrastructure & Institutions Emergency Recovery
International Development AssociationRepublic of Haiti
International Development AssociationMinistry of Public Works, Transport and Communications, Unité Centrale d'Exécution
Unite de coordination de Projet du Ministere des Finances
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Malaika Becoulet
+1-202-473-1000mbecoulet@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Port-au-Prince
18.539169 -72.334999
Republic of Haiti
19 -72.416672
Other Water Supply, Sanitation and Waste ManagementUrban TransportCentral Government (Central Agencies)SanitationOther TransportationPublic Administration - Financial SectorOther Public AdministrationDisaster Response and RecoveryDisaster Risk ManagementDisaster Risk FinanceFinance for DevelopmentDisaster Risk ReductionDisaster Preparedness
2000000.00
2000000.00
2000000.00
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
1333333.33
1333333.33
1333333.34
1000000.00
1000000.00
1000000.00
1166666.66
1166666.67
1166666.67
1166666.66
1166666.67
1166666.67
666666.66
666666.67
666666.67
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100000.00
100000.00
100000.00
1055882.53
1055882.53
1055882.54
0.00
0.00
0.00
742574.33
742574.33
742574.34
415694.07
415694.07
415694.08
2325323.94
2325323.94
2325323.95
1082005.96
1082005.96
1082005.96
1839440.01
1839440.01
1839440.00
2364428.69
2364428.69
2364428.68
5757231.79
5757231.79
5757231.78
1572875.86
1572875.86
1572875.85
1082674.08
1082674.08
1082674.09
1604300.43
1604300.43
1604300.43
1959062.91
1959062.91
1959062.91
1219139.39
1219139.39
1219139.40
1214353.56
1214353.56
1214353.57
1004795.17
1004795.17
1004795.17
0.00
0.00
0.00
390413.39
390413.39
390413.38
189574.86
189574.86
189574.87
1466666.67
1466666.67
1466666.66
1466666.67
1466666.67
1466666.66
1466666.67
1466666.67
1466666.66
1546666.67
1546666.67
1546666.66
1466895.69
1466895.69
1466895.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
65000000Total Commitment in First Quarter of 2010
International Development Association
300000Total Disbursement in Second Quarter of 2010
International Development Association
667648Total Disbursement in Third Quarter of 2010
International Development Association
2500000Total Disbursement in Third Quarter of 2010
International Development Association
1361515Total Disbursement in First Quarter of 2011
International Development Association
866208Total Disbursement in First Quarter of 2011
International Development Association
1007518Total Disbursement in Second Quarter of 2011
International Development Association
239564Total Disbursement in Second Quarter of 2011
International Development Association
1110065Total Disbursement in Third Quarter of 2011
International Development Association
5536573Total Disbursement in Third Quarter of 2011
International Development Association
329334Total Disbursement in Third Quarter of 2011
International Development Association
3246018Total Disbursement in Fourth Quarter of 2011
International Development Association
1521909Total Disbursement in First Quarter of 2012
International Development Association
3661022Total Disbursement in First Quarter of 2012
International Development Association
335390Total Disbursement in First Quarter of 2012
International Development Association
2497869Total Disbursement in Second Quarter of 2012
International Development Association
2126848Total Disbursement in Second Quarter of 2012
International Development Association
2468570Total Disbursement in Second Quarter of 2012
International Development Association
14915753Total Disbursement in Third Quarter of 2012
International Development Association
1482261Total Disbursement in Third Quarter of 2012
International Development Association
873682Total Disbursement in Third Quarter of 2012
International Development Association
35000000Total Commitment in Third Quarter of 2012
International Development Association
1986041Total Disbursement in Fourth Quarter of 2012
International Development Association
1009646Total Disbursement in Fourth Quarter of 2012
International Development Association
1722941Total Disbursement in Fourth Quarter of 2012
International Development Association
1668644Total Disbursement in First Quarter of 2013
International Development Association
678441Total Disbursement in First Quarter of 2013
International Development Association
900937Total Disbursement in First Quarter of 2013
International Development Association
1812006Total Disbursement in Second Quarter of 2013
International Development Association
816142Total Disbursement in Second Quarter of 2013
International Development Association
2184753Total Disbursement in Second Quarter of 2013
International Development Association
1923309Total Disbursement in Third Quarter of 2013
International Development Association
789541Total Disbursement in Third Quarter of 2013
International Development Association
1000000Total Disbursement in Third Quarter of 2013
International Development Association
558374Total Disbursement in Third Quarter of 2013
International Development Association
1605964Total Disbursement in Third Quarter of 2013
International Development Association
379090Total Disbursement in Fourth Quarter of 2013
International Development Association
3086525Total Disbursement in Fourth Quarter of 2013
International Development Association
191803Total Disbursement in Fourth Quarter of 2013
International Development Association
1718096Total Disbursement in First Quarter of 2014
International Development Association
1091240Total Disbursement in First Quarter of 2014
International Development Association
833724Total Disbursement in First Quarter of 2014
International Development Association
1952647Total Disbursement in Second Quarter of 2014
International Development Association
1061739Total Disbursement in Second Quarter of 2014
International Development Association
853976Total Disbursement in Fourth Quarter of 2014
International Development Association
317264Total Disbursement in Fourth Quarter of 2014
International Development Association
568725Total Disbursement in First Quarter of 2015
International Development Association
548824Total Disbursement in Second Quarter of 2015
International Development Association
623584Total Disbursement in Second Quarter of 2015
International Development Association
350003Total Disbursement in Third Quarter of 2015
International Development Association
162533Total Disbursement in Fourth Quarter of 2015
International Development Association
423554Total Disbursement in Fourth Quarter of 2015
International Development Association
1432940Total Disbursement in First Quarter of 2016
International Development Association
849220Total Disbursement in First Quarter of 2016
International Development Association
295232Total Disbursement in Second Quarter of 2016
International Development Association
654658Total Disbursement in Second Quarter of 2016
International Development Association
902572Total Disbursement in Third Quarter of 2016
International Development Association
840260Total Disbursement in Third Quarter of 2016
International Development Association
417741Total Disbursement in Fourth Quarter of 2016
International Development Association
877036Total Disbursement in Fourth Quarter of 2016
International Development Association
2800000Total Commitment in Fourth Quarter of 2016
International Development Association
835434Total Disbursement in First Quarter of 2017
International Development Association
1031621Total Disbursement in First Quarter of 2017
International Development Association
769132Total Disbursement in Second Quarter of 2017
International Development Association
181724Total Disbursement in Second Quarter of 2017
International Development Association
211631Total Disbursement in Second Quarter of 2017
International Development Association
676831Total Disbursement in Third Quarter of 2017
International Development Association
733392Total Disbursement in Third Quarter of 2017
International Development Association
705978Total Disbursement in Third Quarter of 2017
International Development Association
1000000Total Disbursement in Third Quarter of 2017
International Development Association
947224Total Disbursement in Fourth Quarter of 2017
International Development Association
281952Total Disbursement in Fourth Quarter of 2017
International Development Association
1955624Total Disbursement in Fourth Quarter of 2017
International Development Association
808102Total Disbursement in First Quarter of 2018
International Development Association
700374Total Disbursement in First Quarter of 2018
International Development Association
276788Total Disbursement in First Quarter of 2018
International Development Association
405066Total Disbursement in First Quarter of 2018
International Development Association
228832Total Disbursement in Second Quarter of 2018
International Development Association
354901Total Disbursement in Second Quarter of 2018
International Development Association
431526Total Disbursement in Second Quarter of 2018
International Development Association
479197Total Disbursement in Second Quarter of 2018
International Development Association
273211Total Disbursement in Third Quarter of 2018
International Development Association
150474Total Disbursement in Third Quarter of 2018
International Development Association
158685Total Disbursement in Third Quarter of 2018
International Development Association
227328Total Disbursement in Third Quarter of 2018
International Development Association
27518Total Disbursement in Third Quarter of 2018
International Development Association
525966Total Disbursement in Fourth Quarter of 2018
International Development Association
10861Total Disbursement in Fourth Quarter of 2018
International Development Association
-2808Total Disbursement in First Quarter of 2019
International Development Association
-2086Total Disbursement in First Quarter of 2019
International Development Association
-1300Total Disbursement in Third Quarter of 2019
International Development Association
-32517Total Disbursement in Third Quarter of 2019
International Development Association
-278161Total Commitment Cancellations in Fourth Quarter of 2019
International Development Association
-3331Total Commitment Cancellations in Fourth Quarter of 2019
International Development Association
-169870Total Commitment Cancellations in Second Quarter of 2020
International Development Association
Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Roads rehabilitated, Rural
PDO Indicator
Estimated number of people benefiting from repaired infrastructure
Intermediate Results Indicator
Number of Individuals receiving and using immediate recovery supplies.
Intermediate Results Indicator
MEF established and operationalized four accounting posts (postes comptables) to control budget expenditures in line ministries
Intermediate Results Indicator
Number of months elapsed between the end of a fiscal year and actual submission of the consolidated government general accounts for external audit to CSCCA
Intermediate Results Indicator
Number of masons and engineers trained to paraseismic construction
Intermediate Results Indicator
Number of technical reference guidelines for paraseismic construction prepared under the project
Intermediate Results Indicator
Number of infrastructure built with due attention paid to sustainability as well as social and environmental aspects.
Intermediate Results Indicator
Estimated number of days of work generated by infrastructure repair or reconstruction
Intermediate Results Indicator
Number of building structural damage assessment
Intermediate Results Indicator
Number of days elapsed between the submission of the government general accounts to CSC/CA and the submission of the audit report of the general accounts to MEF by the CSC/CA
Intermediate Results Indicator
Disaggregated by gender
Intermediate Results Indicator
Percentage of investment projects included in the PIP in the six agreed pilot ministries which are evaluated ex-ante by the UEPs according to official guidelines.
Intermediate Results Indicator
Number of Public Financial Management entities back in operation following the earthquake
Intermediate Results Indicator
Small Customs Building is built and used to provide services to the public.
PDO Indicator
MEF restored internal control and audit, and able to process payroll.
PDO Indicator
Project influenced the reconstruction planning process for Port-au-Prince and surrounding affected areas so that public consultation mechanisms are strengthened
Intermediate Results Indicator
CIAT has become an institution capable of influencing the reconstruction planning process with due attention being paid to social and environmental issues
Intermediate Results Indicator
Reconstruction planning alternatives have been consulted with relevant stakeholders
Intermediate Results Indicator
Fiduciary agent has been hired
Intermediate Results Indicator
Truitier Debris Processing Facility is operational, complying to international social and environmental standards and support implementation of all stakeholders efforts for debris removal.
Intermediate Results Indicator
All bridge reconstruction or repairs financed under the project include seismic stops or equivalent design solutions aiming at improving the resilience to future disasters
Intermediate Results Indicator
Key services of MTPTC received institutional strengthening support to be able to handle reconstruction process, Technical Unit for Building Evaluations and Dissemination of Best Practices of Construct
Intermediate Results Indicator
Payment system: The processing of public servants salaries is fully restored and the registry of civil servants is updated.
44000-P121391
World Bank
Haiti Post-Disaster Partial Credit Guarantee Program Support Project
International Development AssociationBRH
BRH
International Development AssociationFonds de Développement Industriel, FDI
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Juan Buchenau
+1-202-473-1000jbuchenau@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Arrondissement de Port-au-Prince
18.5 -72.366669
Port-au-Prince
18.539169 -72.334999
Banking InstitutionsOther Non-bank Financial InstitutionsPublic Administration - Financial SectorMSME DevelopmentMSME FinanceUrban PlanningHousing FinanceFinancial Infrastructure and AccessUrban DevelopmentDisaster Risk ManagementDisaster Response and RecoveryDisaster Risk FinanceFinancial StabilityFinance for DevelopmentDisaster Risk ReductionDisaster PreparednessFinancial Sector oversight and policy/banking regulation & restructuringEnterprise Development
0.00
3525.00
3945.00
8961.00
10425.00
11796.00
13023.00
14265.00
16200.00
17799.00
18672.00
9519.00
19425.00
20115.00
20463.00
20355.00
19851.00
19869.00
20670.00
22212.00
23100.00
23904.00
12510.00
26532.00
27831.00
29181.00
31212.00
33462.00
34383.00
35604.00
37965.00
40671.00
20880.00
43122.00
45831.00
49266.00
52317.00
55257.00
58275.00
61371.00
64995.00
67971.00
34917.00
71268.00
73830.00
76659.00
79029.00
81321.00
84792.00
87420.00
88989.00
90108.00
45348.00
92034.00
93756.00
94929.00
96531.00
98334.00
99909.00
101403.00
102933.00
104481.00
52833.00
82446.00
0.00
3525.00
3945.00
8961.00
10425.00
11796.00
13023.00
14265.00
16200.00
17799.00
18672.00
9519.00
19425.00
20115.00
20463.00
20355.00
19851.00
19869.00
20670.00
22212.00
23100.00
23904.00
12510.00
26532.00
27831.00
29181.00
31212.00
33462.00
34383.00
35604.00
37965.00
40671.00
20880.00
43122.00
45831.00
49266.00
52317.00
55257.00
58275.00
61371.00
64995.00
67971.00
34917.00
71268.00
73830.00
76659.00
79029.00
81321.00
84792.00
87420.00
88989.00
90108.00
45348.00
92034.00
93756.00
94929.00
96531.00
98334.00
99909.00
101403.00
102933.00
104481.00
52833.00
82446.00
3000000Total Commitment in Fourth Quarter of 2010
International Development Association
2500000Total Disbursement in Second Quarter of 2011
International Development Association
50000Total Disbursement in Second Quarter of 2013
International Development Association
-2204640Total Disbursement in Second Quarter of 2015
International Development Association
-2809254Total Commitment Cancellations in Third Quarter of 2015
International Development Association
Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :schedule 2, section IV.B.1 | Description :Recruitment of consultant to support FDI | Due Date :22-Feb-2011
Finance Agreement :Schedule 2, Section II.B.4 | Description :Recruitment of independent auditor | Due Date :22-Aug-2011
Finance Agreement :Schedule 2, Section I.E, Schedule 2, Section IV.B.1 (b) | Description :Environmental and social Managementframework satisfactory to IDA | Due Date :22-Feb-2011
Finance Agreement :Schedule 2. Section I.E.1(b) (ii) | Description :Update of the Environmental and social management framework |Due Date :30-Jun-2012
Finance Agreement :Schedule 2, Section IV.B.1 (b) | Description :Opening of PCG account | Due Date :22-Feb-2011
Finance Agreement :Article IV | Description :Operational manual satisfactory to IDA | Due Date :22-Jun-2011
Finance Agreement :Article IV | Description :Signature agreement MEF-FDI | Due Date :22-Feb-2011
Finance Agreement :Schedule 2, Section II.A.2 | Description :Mid term review | Due Date :22-Feb-2013
Finance Agreement :Article III, 3.01 (b) | Description :Make deposit of US$ 10 million into the second PCG account | Due Date:04-Apr-2013
Finance Agreement :Schedule 2, Section IV.B.1 (c) | Description :Opening of a second PCG account | Due Date :04-Apr-2013
PDO Indicator
Outstanding SME Loan Portfolio
Intermediate Results Indicator
The design and implementation of measures alongside the PCGP to remove some obstacles to credit growth.
PDO Indicator
Total volume of outstanding loan portfolio at the end of each calendar year
PDO Indicator
Total of SME benefitting from the project
PDO Indicator
Number of women benefitting from Guarantees under the program
PDO Indicator
Total volume of overdue loans at the end of each calendar year (NPL Ratio)
PDO Indicator
Percentage of project-supported institutions that are reporting on this indicator
44000-P123706
World Bank
Improving Maternal and Child Health through Integrated Social Services
International Development AssociationRepublic of Haiti
International Development AssociationFonds d'Assistance Economique et Sociale (FAES)
Ministry of Public Health and Population (MSPP)
Institut Haïtien de Statistique et d’Informatique
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Andrew Sunil Rajkumar
+1-202-473-1000arajkumar@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Nord-Ouest
19.83333 -73
HealthSub-National GovernmentPublic Administration - HealthSocial ProtectionHealth Systems and PoliciesPandemic ResponseChild HealthDisease ControlNutritionFood SecurityReproductive and Maternal HealthSocial Safety NetsNutrition and Food SecuritySocial Protection
0.00
0.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1833333.33
1833333.33
1833333.34
1833333.33
1833333.33
1833333.34
1833333.33
1833333.33
1833333.34
1833333.33
1833333.33
1833333.34
1166666.66
1166666.67
1166666.67
1166666.66
1166666.67
1166666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120833.33
120833.33
120833.33
120833.33
120833.33
120833.33
120833.33
120833.33
120833.33
120833.33
120833.33
120833.37
732101.52
732101.52
732101.52
732101.52
732101.52
732101.52
732101.52
732101.52
732101.52
732101.52
732101.52
732101.49
736690.83
736690.83
736690.83
736690.83
736690.83
736690.83
736690.83
736690.83
736690.83
736690.83
736690.83
736690.79
1185550.76
1185550.76
1185550.76
1185550.76
1185550.76
1185550.76
1185550.76
1185550.76
1185550.76
1185550.76
1185550.76
1185550.70
1893051.49
1893051.49
1893051.49
1893051.49
1893051.49
1893051.49
1893051.49
1893051.49
1893051.49
1893051.49
1893051.49
1893051.47
2740158.61
2740158.61
2740158.61
2740158.61
2740158.61
2740158.61
2740158.61
2740158.61
2740158.61
2740158.61
2740158.61
2740158.64
1382357.32
1382357.32
1382357.32
1382357.32
1382357.32
1382357.32
1382357.32
1382357.32
1382357.32
1382357.32
1382357.32
1382357.32
833333.33
833333.33
833333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70000000Total Commitment in Second Quarter of 2013
International Development Association
1000000Total Disbursement in First Quarter of 2014
International Development Association
2000000Total Disbursement in Third Quarter of 2014
International Development Association
238590Total Disbursement in Fourth Quarter of 2014
International Development Association
5592387Total Disbursement in First Quarter of 2015
International Development Association
352014Total Disbursement in First Quarter of 2015
International Development Association
633697Total Disbursement in Second Quarter of 2015
International Development Association
643106Total Disbursement in Third Quarter of 2015
International Development Association
3235085Total Disbursement in Fourth Quarter of 2015
International Development Association
530072Total Disbursement in Fourth Quarter of 2015
International Development Association
4304709Total Disbursement in First Quarter of 2016
International Development Association
241543Total Disbursement in Second Quarter of 2016
International Development Association
-114226Total Disbursement in Second Quarter of 2016
International Development Association
3500000Total Disbursement in Third Quarter of 2016
International Development Association
3579805Total Disbursement in Fourth Quarter of 2016
International Development Association
394185Total Disbursement in First Quarter of 2017
International Development Association
4002620Total Disbursement in First Quarter of 2017
International Development Association
3455560Total Disbursement in Second Quarter of 2019
International Development Association
2000000Total Disbursement in Third Quarter of 2019
International Development Association
-310466Total Disbursement in Third Quarter of 2019
International Development Association
401004Total Disbursement in Fourth Quarter of 2019
International Development Association
1600000Total Disbursement in Fourth Quarter of 2019
International Development Association
644519Total Disbursement in First Quarter of 2020
International Development Association
3119733Total Disbursement in First Quarter of 2020
International Development Association
1098498Total Disbursement in First Quarter of 2020
International Development Association
1400000Total Disbursement in Second Quarter of 2020
International Development Association
-278028Total Disbursement in First Quarter of 2021
International Development Association
-63099Total Disbursement in First Quarter of 2021
International Development Association
0Total Disbursement in Second Quarter of 2021
International Development Association
-108497Total Disbursement in Second Quarter of 2021
International Development Association
-48198Total Disbursement in Second Quarter of 2021
International Development Association
-888Total Disbursement in Fourth Quarter of 2021
International Development Association
-15677Total Disbursement in Fourth Quarter of 2021
International Development Association
-10290Total Disbursement in Fourth Quarter of 2021
International Development Association
2750000Total Disbursement in Second Quarter of 2017
International Development Association
25000000Total Commitment in Second Quarter of 2017
International Development Association
2597556Total Disbursement in Third Quarter of 2017
International Development Association
3308596Total Disbursement in Third Quarter of 2017
International Development Association
2500000Total Disbursement in Fourth Quarter of 2017
International Development Association
4000000Total Disbursement in First Quarter of 2018
International Development Association
310466Total Disbursement in Second Quarter of 2018
International Development Association
4500000Total Disbursement in Second Quarter of 2018
International Development Association
5000000Total Disbursement in Third Quarter of 2018
International Development Association
3491149Total Disbursement in Third Quarter of 2018
International Development Association
925000Total Disbursement in Fourth Quarter of 2018
International Development Association
4900000Total Disbursement in Fourth Quarter of 2018
International Development Association
-65639Total Disbursement in First Quarter of 2019
International Development Association
3025000Total Disbursement in First Quarter of 2019
International Development Association
850000Total Disbursement in First Quarter of 2019
International Development Association
2615000Total Disbursement in Second Quarter of 2019
International Development Association
6235834Total Disbursement in Second Quarter of 2019
International Development Association
-1480Total Disbursement in First Quarter of 2022
International Development Association
-26483Total Disbursement in First Quarter of 2022
International Development Association
-55640Total Disbursement in First Quarter of 2022
International Development Association
Project Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementAgreementGrant or Trust Fund AgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Amended Financing Agreement Schedule 2 Section I, A5: For the purpose of carrying out Component 3 of the Project, the Recipientshall cause IHSI to maintain throughout the duration of the Project a team of professionals consisting of key staff withqualifications and terms of reference satisfactory to the Association.
Amended Financing Agreement Schedule 2 Section I, A3: For the purpose of carrying out Component 1 and Sub-Component 2.1 of theProject, MSPP shall maintain throughout the duration of the Project a team of professionals in adequate numbers and withqualifications, experience and terms of reference satisfactory to the Association as set forth in the MSPP Operations Manual.
Amended Financing Agreement Schedule 2 Section I, A4: For the purpose of carrying out Subcomponents 1.2 and 2.2 of the Project,FAES shall maintain throughout the duration of the Project a team of professionals in adequate numbers and with qualifications,experience and terms of reference satisfactory to the Association as set forth in the FAES.
Finance Agreement :Financing Agreement Schedule 2 Section I, A3 | Description :For the purpose of carrying out Component 1 andSub-Component 2.1 of the Project, MSPP shall maintain throughout the duration of the Project a team of professionals in adequatenumbers and with qualifications, experience and terms of reference satisfactory to the Association as set forth in the MSPPOperations Manual. | Frequency :CONTINUOUS
Finance Agreement :Financing Agreement Schedule 2 Section I, D1 | Description :The Recipient shall ensure that, throughout theimplementation of the Project, the Project shall be implemented in accordance with the guidelines, procedures, timetables and otherspecifications set forth in the Environmental and Social Management Framework and the Resettlement Policy Framework. | Frequency:CONTINUOUS
Finance Agreement :Financing Agreement Schedule 2 Section I, E2 (a) (vi) | Description :The MSPP Operations Manual shall include,inter alia, a detailed elaboration of the specific timeline for the preparation and adoption of the Medical Waste Management Plan(by Effectiveness). | Due Date :30-Sep-2017
Intermediate Results Indicator
Children aged under 12 months that are completely vaccinated at health facilities under the RBF program (percentage increase over baseline).
Intermediate Results Indicator
Births at health facilities under the RBF program (percentage increase over baseline).
Intermediate Results Indicator
Utilization of modern contraceptives via health facilities under the RBF program (percentage increase over baseline).
Intermediate Results Indicator
Children aged between 6 and 59 months receiving nutritional screening and follow up under the RBF program (percentage increase overbaseline).
Intermediate Results Indicator
Preliminary calculation by the IHSI of vulnerability clusters in the four pilot departments
PDO Indicator
Pilot census carried out in four departments
Intermediate Results Indicator
Steering committee to oversee registry identified or created and operational
PDO Indicator
Children under five immunized
PDO Indicator
Institutional deliveries
PDO Indicator
Contraceptive prevalence rate
PDO Indicator
Cholera Case Fatality Rate
Intermediate Results Indicator
Citizen Engagement Indicator: % of facilities under RBF that developed an action plan(s) based on the results of community satisfaction surveys
Intermediate Results Indicator
Contracted health providers supervised at least quarterly
Intermediate Results Indicator
Providers using the contracting model
Intermediate Results Indicator
Percentage of cholera alerts and outbreaks investigated and acted on by mobile rapid response teams (EMIRAs) within 48 hours of onset
Intermediate Results Indicator
Percentage of health facilities assessed with adequate stocks of cholera supplies, in Departments affected by the Hurricane
Intermediate Results Indicator
Contracted service providers achieving the minimum quality score
Intermediate Results Indicator
Number of health facilities rehabilitated and fully functioning, in Departments affected by Hurricane
Intermediate Results Indicator
Number of refrigerators restored and fully functional as part of the vaccine cold chain in the Hurricane-affected Departments
Intermediate Results Indicator
Health personnel receiving training
Intermediate Results Indicator
Number of water and sanitation interventions supported at health facility and community levels
Intermediate Results Indicator
Children 6-59 months old receiving Vitamin A supplementation
Intermediate Results Indicator
People who have received essential health, nutrition, and population (HNP) services
Intermediate Results Indicator
Number of households included in the social registry
Intermediate Results Indicator
Number of children immunized
Intermediate Results Indicator
Number of women and children who have received basic nutrition services
Intermediate Results Indicator
Number of deliveries attended by skilled health personnel
44000-P123974
World Bank
Haiti Business Development and Investment Project
International Development AssociationRepublic of Haiti
International Development AssociationMinistry of Commerce and Industry
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Emiliano Duch Navarro
+1-202-473-1000educh@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Sud-Est
18.299999 -72.400002
Sud
18.299999 -73.73333
Departement de l'Ouest
18.663811 -72.291412
Nord-Ouest
19.83333 -73
DEpartement du Nord-Est
19.48897 -71.857132
DEpartement du Nord
19.6 -72.300003
DEpartement de la Grand’Anse
18.5 -74.083328
Centre
19 -72
Departement de l'Artibonite
19.33333 -72.5
Departement de Nippes
18.448351 -73.428497
Other Industry, Trade and ServicesAgricultural markets, commercialization and agri-businessPublic Administration - Industry, Trade and ServicesSocial ProtectionDisaster Response and RecoveryDisaster PreparednessBusiness Enabling EnvironmentMSME FinanceDisaster Risk FinanceDisaster Risk ManagementFinance for DevelopmentRegulation and Competition PolicyMSME DevelopmentFinancial Infrastructure and AccessDisaster Risk ReductionEnterprise Development
0.00
0.00
15240.00
44580.00
25280.00
56660.00
64320.00
34820.00
74660.00
40220.00
88740.00
97580.00
51000.00
104720.00
53180.00
108000.00
111400.00
57480.00
118160.00
115400.00
57340.00
120040.00
64960.00
144020.00
75540.00
155000.00
168160.00
92580.00
201780.00
215940.00
114360.00
245560.00
132400.00
279960.00
297200.00
156260.00
328400.00
172540.00
361960.00
382440.00
198780.00
412020.00
213600.00
448560.00
472920.00
243080.00
492840.00
250640.00
522120.00
539780.00
271640.00
537980.00
268440.00
547220.00
553480.00
275680.00
545120.00
274120.00
551660.00
551140.00
273940.00
542880.00
268660.00
535460.00
533640.00
265600.00
528660.00
263700.00
526100.00
523620.00
260760.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
197368.20
197368.20
197368.20
197368.20
197368.20
197368.20
197368.20
197368.20
197368.20
197368.20
197368.20
197368.22
93089.23
93089.23
93089.23
93089.23
93089.23
93089.23
93089.23
93089.23
93089.23
93089.23
93089.23
93089.26
188909.82
188909.82
188909.82
188909.82
188909.82
188909.82
188909.82
188909.82
188909.82
188909.82
188909.82
188909.77
118069.77
118069.77
118069.77
118069.77
118069.77
118069.77
118069.77
118069.77
118069.77
118069.77
118069.77
118069.75
122758.06
122758.06
122758.06
122758.06
122758.06
122758.06
122758.06
122758.06
122758.06
122758.06
122758.06
122758.08
141041.61
141041.61
141041.61
141041.61
141041.61
141041.61
141041.61
141041.61
141041.61
141041.61
141041.61
141041.61
39340.33
39340.33
39340.33
39340.33
39340.33
39340.33
39340.33
39340.33
39340.33
39340.33
39340.33
39340.30
254520.46
254520.46
254520.46
254520.46
254520.46
254520.46
254520.46
254520.46
254520.46
254520.46
254520.46
254520.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
295751Total Disbursement in Second Quarter of 2018
International Development Association
458206Total Disbursement in Third Quarter of 2018
International Development Association
765048Total Disbursement in First Quarter of 2019
International Development Association
469246Total Disbursement in Second Quarter of 2019
International Development Association
163439Total Disbursement in Third Quarter of 2019
International Development Association
308645Total Disbursement in Fourth Quarter of 2019
International Development Association
420196Total Disbursement in Third Quarter of 2020
International Development Association
538416Total Disbursement in Fourth Quarter of 2020
International Development Association
980000Total Disbursement in First Quarter of 2021
International Development Association
335040Total Disbursement in First Quarter of 2021
International Development Association
780594Total Disbursement in Second Quarter of 2021
International Development Association
889154Total Disbursement in Third Quarter of 2021
International Development Association
-4285281Total Commitment Cancellations in Fourth Quarter of 2021
International Development Association
-602283Total Disbursement in Second Quarter of 2022
International Development Association
20000000Total Commitment in Second Quarter of 2013
International Development Association
2213190Total Disbursement in Fourth Quarter of 2013
International Development Association
155228Total Disbursement in Second Quarter of 2014
International Development Association
226770Total Disbursement in Fourth Quarter of 2014
International Development Association
451135Total Disbursement in First Quarter of 2015
International Development Association
439165Total Disbursement in Second Quarter of 2015
International Development Association
1325316Total Disbursement in Third Quarter of 2015
International Development Association
262005Total Disbursement in Fourth Quarter of 2015
International Development Association
302649Total Disbursement in First Quarter of 2016
International Development Association
376947Total Disbursement in Second Quarter of 2016
International Development Association
301972Total Disbursement in Third Quarter of 2016
International Development Association
361340Total Disbursement in Fourth Quarter of 2016
International Development Association
307880Total Disbursement in First Quarter of 2017
International Development Association
445645Total Disbursement in Second Quarter of 2017
International Development Association
384123Total Disbursement in Third Quarter of 2017
International Development Association
526131Total Disbursement in Fourth Quarter of 2017
International Development Association
264392Total Disbursement in First Quarter of 2018
International Development Association
Project Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement: MEF / MCI contractual arrangements in place satisfactory to IDA | Description :MEF / MCI contractualarrangements in place satisfactory to IDA (FA: Section IA 2 of Schedule 2) | Due Date :30-Jun-2013
Intermediate Results Indicator
Electronic moveable collateral registry (to secure loans) system available for use by MSMEs
PDO Indicator
Private sector investment in supported value chains
PDO Indicator
Increased value added of supported MSMEs in the selected value chains
PDO Indicator
Increased value added of supported MSMEs in the poorest Departments (poverty rate above 60%)
Intermediate Results Indicator
Of which, are women
PDO Indicator
Number of MSMEs that receive cash or in-kind assistance to continue or restart productive activity in their value chain (Number)
PDO Indicator
Of which, are women (Number)
Intermediate Results Indicator
Number of recommended laws, regulations, amendments, codes presented to the Parliament
Intermediate Results Indicator
Number of Haitian public servants that have satisfactorily completed the Value Chain Strategic Analysis Program
Intermediate Results Indicator
Number of completed value chain diagnostics
Intermediate Results Indicator
Of which, are women owned or operated
Intermediate Results Indicator
Firms benefiting from private sector initiatives
Intermediate Results Indicator
Of which, are women
Intermediate Results Indicator
Of which, are located in the Southern region affected most by Hurricane Matthew
Intermediate Results Indicator
Of which, are women
Intermediate Results Indicator
Number of participants in public consultations
Intermediate Results Indicator
Number of pre-bidding conferences on the value chain tenders
Intermediate Results Indicator
Number of MSMEs registered in the electronic moveable registry who are able to secure loans (Number)
Intermediate Results Indicator
Number of firms providing new services in selected value chains
Intermediate Results Indicator
Number of MSMEs registered in the MCI project database
Intermediate Results Indicator
Of which, are women (Number)
44000-P124134
World Bank
Haiti - Education for All Project - Phase II
International Development AssociationMinistere de l'Economie et des Finances
International Development AssociationMinistère de l'Education Nationale et de la Formation Professionnelle
Ministère de l'Education Nationale et de la Formation Professionnelle
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Yves Jantzem
+1-202-473-1000yjantzem@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Departement du Sud-Est
18.299999 -72.400002
Departement du Sud
18.299999 -73.73333
Departement de l'Ouest
18.663811 -72.291412
Departement du Nord-Ouest
19.83333 -73
Departement du Nord-Est
19.48897 -71.857132
Departement du Nord
19.6 -72.300003
Departement de la Grand'Anse
18.5 -74.083328
Departement du Centre
19 -72
Departement de l'Artibonite
19.33333 -72.5
Departement de Nippes
18.448351 -73.428497
Public Administration - EducationPrimary EducationEarly Childhood EducationAccess to EducationNutrition and Food SecurityFood SecurityEducation FinancingNutritionRural Infrastructure and service deliveryRural DevelopmentEducation
1333333.33
1333333.33
1333333.34
1666666.67
1666666.67
1666666.66
2333333.33
2333333.33
2333333.34
1833333.33
1833333.33
1833333.34
1833333.33
1833333.33
1833333.34
1833333.33
1833333.33
1833333.34
1833333.33
1833333.33
1833333.34
1833333.33
1833333.33
1833333.34
1833333.33
1833333.33
1833333.34
1833333.33
1833333.33
1833333.34
1833333.33
1833333.33
1833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
985714.29
985714.29
985714.29
985714.29
985714.29
985714.29
985714.26
1026369.83
1026369.83
1026369.83
1026369.83
1026369.83
1026369.83
1026369.83
1026369.83
1026369.83
1026369.83
1026369.83
1026369.79
1614178.11
1614178.11
1614178.11
1614178.11
1614178.11
1614178.11
1614178.11
1614178.11
1614178.11
1614178.11
1614178.11
1614178.10
921164.39
921164.39
921164.39
921164.39
921164.39
921164.39
921164.39
921164.39
921164.39
921164.39
921164.39
921164.33
693064.19
693064.19
693064.19
693064.19
693064.19
693064.19
693064.19
693064.19
693064.19
693064.19
693064.19
693064.19
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
44699.88
44699.88
44699.88
44699.88
44699.88
44699.88
44699.88
44699.88
44699.88
44699.88
44699.88
44699.89
70000000Total Commitment in Fourth Quarter of 2011
International Development Association
6900000Total Disbursement in Second Quarter of 2012
International Development Association
199847Total Disbursement in Third Quarter of 2012
International Development Association
5923258Total Disbursement in Fourth Quarter of 2012
International Development Association
2230578Total Disbursement in Second Quarter of 2013
International Development Association
3962755Total Disbursement in Second Quarter of 2013
International Development Association
4892490Total Disbursement in Third Quarter of 2013
International Development Association
4073944Total Disbursement in Third Quarter of 2013
International Development Association
8758044Total Disbursement in First Quarter of 2014
International Development Association
1645659Total Disbursement in First Quarter of 2014
International Development Association
5116728Total Disbursement in Third Quarter of 2014
International Development Association
3308508Total Disbursement in Third Quarter of 2014
International Development Association
1000000Total Disbursement in Third Quarter of 2015
International Development Association
6251946Total Disbursement in First Quarter of 2016
International Development Association
2151283Total Disbursement in Second Quarter of 2016
International Development Association
5283664Total Disbursement in Fourth Quarter of 2016
International Development Association
2000000Total Disbursement in Third Quarter of 2017
International Development Association
660839Total Disbursement in First Quarter of 2018
International Development Association
-1942Total Commitment Cancellations in Fourth Quarter of 2018
International Development Association
Project Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2 Section I. A. 5 | Description :The Recipient shall, no later than three months after the beginning ofeach school year during Project implementation, disclose thelist of schools, number of students covered and grade level of studentsbenefiting from the Universal, Free and Compulsory Primary Education Program (“PSUGO - Programme de Scolarisation Universelle,Gratuite et Obligatoire”). | Frequency :Yearly
Finance Agreement :Schedule 2Section I.C.3 | Description :No transfer of Financing funds shall be made to any SMC or BeneficiaryService Provider, as the case may be prior to the date on which the pertinent SMC or Beneficiary Service Provider has entered intothe pertinent Grant Agreement. | Frequency :Yearly
Finance Agreement :Schedule 2Section I.F. 1 | Description :1. The Recipient shall ensure that the Project is carried out inaccordance with the ESMF and RPF. | Frequency :Yearly
Finance Agreement :Schedule 2Section I.F. 2 | Description :2. The Recipient shall include in the Project Reports referred to inSection II.A of this Schedule, adequate information on the implementation of the ESMF and the RPF, any EMP, RAP or similarsafeguard instrument. | Frequency :Yearly
Finance Agreement :Schedule 2Section I.F. 3 | Description :3. The Recipient, through MENFP, shall ensure that any works to becarried out under the Project do not affect Natural Habitats, Forests or Physical Cultural Resources. | Frequency :Yearly
Finance Agreement :Schedule 2 Section I.A.1(b) (ii) | Description :No later than September 30, 2014, establish and thereafteroperate and maintain throughout Project implementation, a committee (theNational Strategic Committee) with a structure andfunctions and responsibilities acceptable to the Association, as set forth in detail in the Operational Manual. | Due Date:30-Sep-2014
Finance Agreement :Schedule 2Section I.F.7 | Description :The Recipient shall carry out the RRAP in accordance with its terms andin a manner satisfactory to the Association. | Frequency :Yearly
Finance Agreement :Schedule 2Section I.A.3 | Description :By no later than October 30, 2014, the Recipient through MENFP, shallappoint, and thereafter maintain, where applicable, throughout the duration of the Project implementation, independent verificationagencies, with qualifications, experience, and terms of reference satisfactory to the Association, for purposes of the third-partyverification of the Subprojects to be carried out under the Project | Frequency :CONTINUOUS
Intermediate Results Indicator
The school registration database is operational
PDO Indicator
MENFP uses data on registered public and non-public primary schools to assess, categorize, and improve the quality of service delivery.
Intermediate Results Indicator
MENFP develops a multi-year sector operational plan
Intermediate Results Indicator
Targeted supervision approach of the Tuition Waiver Program based on school needs is implemented
Intermediate Results Indicator
Percentage of school feeding project beneficiary schools contacted at least twice per year through a beneficiary feedback mechanismto collect actionable feedback.
Intermediate Results Indicator
Activties to support MENFP actors' technical and administrative capacity are provided
Intermediate Results Indicator
Diagnostic sector studies completed
Intermediate Results Indicator
Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions.
Intermediate Results Indicator
Communities receiving Grants
Intermediate Results Indicator
Number of children enrolled in tuition waiver schools (annual, non-cumulative)
Intermediate Results Indicator
Cumulative Students benefiting from improved reading instruction approach (M ap Li Net Ale)
Intermediate Results Indicator
Cumulative children participating in integrated nutrition/health program (cumulative)
PDO Indicator
Enrollment of students in select non-public primary schools in disadvantaged areas: Number of tuition waivers financed in non-public schools
Intermediate Results Indicator
Impact evaluations completed
Intermediate Results Indicator
Textbooks per pupil in tuition waiver schools (non-cumulative)
Intermediate Results Indicator
Number of schools affected by hurricane Matthew rehabilitated or receiving a semi-permanent shelter at the primary level resulting from project intervention
Intermediate Results Indicator
Number of school kits, student kits and teacher kits delivered to schools impacted by hurricane Matthew
Intermediate Results Indicator
Cumulative number of children participating in post hurricane Matthew enhanced emergency integrated nutrition/health program
PDO Indicator
Student attendance in select public and non-public primary schools in disadvantaged areas: Attendance rate is at least maintained in schools benefiting from the school health and nutrition program
Intermediate Results Indicator
Percentage of schools inspected at least once per year by the MENFP (non-cumulative)
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
Percentage of Tuition Waiver Program (TWP) schools publicly posting annual expenditure reports (non-cumulative)
Intermediate Results Indicator
Direct project beneficiaries
Intermediate Results Indicator
Number of additional qualified primary teachers resulting from project interventions.
Intermediate Results Indicator
Children participating in integrated nutrition/health program (annual, non-cumulative)
Intermediate Results Indicator
Students benefitting from improved reading instruction approach (M'ap Li Net Ale) (non-cumulative)
44000-P126346
World Bank
Disaster Risk Management and Reconstruction
International Development AssociationMinistry of Economy and Finance
International Development AssociationUnite de Coordination et Execution - Ministry of Public Works
Unite de Coordination de Projet - Ministry of Interior and Local Authorities
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Claudia Ruth Soto Orozco
+1-202-473-1000csoto@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Departement du Sud-Est
18.299999 -72.400002
Departement du Sud
18.299999 -73.73333
Departement de l'Ouest
18.663811 -72.291412
Departement du Nord-Ouest
19.83333 -73
Departement du Nord-Est
19.48897 -71.857132
Departement du Nord
19.6 -72.300003
Departement de la Grand'Anse
18.5 -74.083328
Departement du Centre
19 -72
Departement de l'Artibonite
19.33333 -72.5
Departement de Nippes
18.448351 -73.428497
Sub-National GovernmentSocial ProtectionPublic Administration - TransportationPublic Administration - Water, Sanitation and Waste ManagementRural and Inter-Urban RoadsGenderDisaster Risk ReductionDisaster PreparednessDisaster Risk FinanceDisaster Risk ManagementFinance for DevelopmentDisaster Response and Recovery
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
533333.33
533333.33
533333.34
966666.66
966666.67
966666.67
0.00
0.00
0.00
1333333.33
1333333.33
1333333.34
733333.33
733333.33
733333.34
500000.00
500000.00
500000.00
400000.00
400000.00
400000.00
1366666.66
1366666.67
1366666.67
533333.33
533333.33
533333.34
40000.00
40000.00
40000.00
600000.00
600000.00
600000.00
833333.33
833333.33
833333.34
250000.00
250000.00
250000.00
900000.00
900000.00
900000.00
266666.66
266666.67
266666.67
0.00
0.00
0.00
1000000.00
1000000.00
1000000.00
933333.33
933333.33
933333.34
0.00
0.00
0.00
433333.33
433333.33
433333.34
150000.00
150000.00
150000.00
233333.33
233333.33
233333.34
500000.00
500000.00
500000.00
533333.33
533333.33
533333.34
643333.33
643333.33
643333.34
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
333333.33
333333.33
333333.34
1933333.33
1933333.33
1933333.34
483333.33
483333.33
483333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60000000Total Commitment in Fourth Quarter of 2011
International Development Association
1000000Total Disbursement in Fourth Quarter of 2012
International Development Association
600000Total Disbursement in Fourth Quarter of 2012
International Development Association
2938276Total Disbursement in First Quarter of 2013
International Development Association
514386Total Disbursement in Third Quarter of 2013
International Development Association
831293Total Disbursement in Third Quarter of 2013
International Development Association
2546210Total Disbursement in Third Quarter of 2013
International Development Association
2203708Total Disbursement in Fourth Quarter of 2013
International Development Association
698364Total Disbursement in First Quarter of 2014
International Development Association
825358Total Disbursement in First Quarter of 2014
International Development Association
1195843Total Disbursement in Second Quarter of 2014
International Development Association
4120594Total Disbursement in Third Quarter of 2014
International Development Association
353364Total Disbursement in Fourth Quarter of 2014
International Development Association
1259003Total Disbursement in Fourth Quarter of 2014
International Development Association
117266Total Disbursement in First Quarter of 2015
International Development Association
918241Total Disbursement in Second Quarter of 2015
International Development Association
306232Total Disbursement in Second Quarter of 2015
International Development Association
629127Total Disbursement in Second Quarter of 2015
International Development Association
1699273Total Disbursement in Third Quarter of 2015
International Development Association
298695Total Disbursement in Third Quarter of 2015
International Development Association
622410Total Disbursement in Third Quarter of 2015
International Development Association
267973Total Disbursement in Fourth Quarter of 2015
International Development Association
476985Total Disbursement in Fourth Quarter of 2015
International Development Association
331811Total Disbursement in First Quarter of 2016
International Development Association
1674666Total Disbursement in First Quarter of 2016
International Development Association
1085341Total Disbursement in First Quarter of 2016
International Development Association
246000Total Disbursement in Second Quarter of 2016
International Development Association
2936792Total Disbursement in Fourth Quarter of 2016
International Development Association
1920000Total Disbursement in First Quarter of 2017
International Development Association
943322Total Disbursement in First Quarter of 2017
International Development Association
20000000Total Commitment in Second Quarter of 2017
International Development Association
586674Total Disbursement in Third Quarter of 2017
International Development Association
1000000Total Disbursement in Third Quarter of 2017
International Development Association
1980000Total Disbursement in Fourth Quarter of 2017
International Development Association
222877Total Disbursement in First Quarter of 2018
International Development Association
591017Total Disbursement in Second Quarter of 2018
International Development Association
246729Total Disbursement in Second Quarter of 2018
International Development Association
468589Total Disbursement in Second Quarter of 2018
International Development Association
1019709Total Disbursement in Third Quarter of 2018
International Development Association
400000Total Disbursement in Third Quarter of 2018
International Development Association
400000Total Disbursement in Third Quarter of 2018
International Development Association
2000000Total Disbursement in Third Quarter of 2018
International Development Association
1417568Total Disbursement in Fourth Quarter of 2018
International Development Association
1324052Total Disbursement in Fourth Quarter of 2018
International Development Association
870859Total Disbursement in Fourth Quarter of 2018
International Development Association
192478Total Disbursement in Fourth Quarter of 2018
International Development Association
1275000Total Disbursement in First Quarter of 2019
International Development Association
400000Total Disbursement in First Quarter of 2019
International Development Association
135070Total Disbursement in Second Quarter of 2019
International Development Association
373734Total Disbursement in Second Quarter of 2019
International Development Association
1828256Total Disbursement in Third Quarter of 2019
International Development Association
52725Total Disbursement in Third Quarter of 2019
International Development Association
1606097Total Disbursement in First Quarter of 2020
International Development Association
1111685Total Disbursement in First Quarter of 2020
International Development Association
1207755Total Disbursement in First Quarter of 2020
International Development Association
450000Total Disbursement in First Quarter of 2020
International Development Association
239285Total Disbursement in Second Quarter of 2020
International Development Association
-3735001Total Commitment Cancellations in Second Quarter of 2020
International Development Association
1678172Total Disbursement in Second Quarter of 2020
International Development Association
2642403Total Disbursement in Second Quarter of 2020
International Development Association
-265000Total Commitment Cancellations in Second Quarter of 2020
International Development Association
3368905Total Disbursement in Second Quarter of 2020
International Development Association
587206Total Disbursement in Third Quarter of 2020
International Development Association
965235Total Disbursement in Third Quarter of 2020
International Development Association
147068Total Disbursement in Third Quarter of 2020
International Development Association
2640671Total Disbursement in Third Quarter of 2020
International Development Association
28259Total Disbursement in Fourth Quarter of 2020
International Development Association
-219415Total Disbursement in Fourth Quarter of 2020
International Development Association
156859Total Disbursement in Fourth Quarter of 2020
International Development Association
-51471Total Disbursement in First Quarter of 2021
International Development Association
-4275Total Disbursement in Second Quarter of 2021
International Development Association
-3120Total Disbursement in Second Quarter of 2021
International Development Association
-1912Total Disbursement in Third Quarter of 2021
International Development Association
-28237Total Disbursement in Third Quarter of 2021
International Development Association
-23463Total Disbursement in Third Quarter of 2021
International Development Association
Project Information DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Per section E.1 of the Financing Agreement's Schedule 2 | Description :The Recipient shall, not later than sixmonths after theEffective Date: (a) prepare, adopt and disclose, in formand substance satisfactory to the Association,theEnvironmental and Social Management Framework(ESMF) and the Resettlement Policy Framework (RPF);and (b) ensure that theProject is carried out inaccordance with the ESMF and the RPF. | Due Date :02-Oct-2012
Finance Agreement :Schedule 2, Section I, A.1. | Description :Institutional Arrangements - Ministere de l Interieur et desCollectivites Territoriales (MICT): The Recipient, through MICT, shall ensure that the DPC (or any successor to said DPC) ismaintained at all times during the implementation of the Project, with the responsibility for overall institutional coordination ofthe Project implementation. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I, A.2.a. | Description :Institutional Arrangements - Project Coordination, Implementationand Management: The Recipient shall maintain, at all times during the implementation of the Project: (i) the UCP-DPC within theMICT; and (ii) the UCE-MTPTC within the MTPTC, all with functions, responsibilities, staffing, terms of reference and resourcessatisfactory to the Association. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I, A.2.b(i). | Description :Institutional Arrangements: Recipient shall ensure that: (i) theUCP-DPC shall be responsible for day-to-day administration of overall planning, coordination, technical, fiduciary (i.e,procurement and financial management), environmental and social safeguards compliance, coordination, monitoring, evaluation,reporting and communication of the activities under Parts 1, 2 and 5.1 of the Project; & | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I, A.2.b(ii). | Description :(ii) UCE-MTPTC shall be responsible for day-to-dayadministration of overall planning, coordination, technical, fiduciary (i.e, procurement and financial management), environmental &social safeguards compliance, coordination, monitoring, evaluation, reporting & communication of the activities under Parts 3, 4and 5.2 of the Project. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I, E.1 | Description :The Recipient shall ensure to carry out the Project in conformity withappropriate administrative, technical, financial, economic, environmental and social standards and practices. The Recipient shallensure that the Project is carried out in accordance with the Environmental and Social Management Framework (ESMF), the RPF, andany EMP or RAP once adopted and published. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I, E.2(a)(i) | Description :The Recipient shall, in a manner satisfactory to theAssociation, take the following actions: (a)prior to commencement of any works under the Project:(i) prepare, in form andsubstance satisfactory to the Association, an EMP (based on the ESMF) and/or a RAP (based on the RPF) if required;
Finance Agreement :Schedule 2, Section I, E.2(a)(ii) | Description :(ii) thereafter, except as otherwise agreed with theAssociation, submit the said EMP and/or said RAP (as the case may be), to the Association for review and approval; | Frequency:CONTINUOUS
Finance Agreement :Schedule 2, Section I, E.2(a)(iii) and (iv) | Description :(iii) subsequently, adopt and disclose, in a manneracceptable to the Association, said EMP and/or said RAP (as the case may be); and(iv) immediately thereafter, implement said EMPand/or RAP (as the case may be), all in accordance with their terms and in a manner acceptable to the Association; and | Frequency:CONTINUOUS
Finance Agreement :Schedule 2, Section I, E.2(b) | Description :Except as the Association shall otherwise agree in writing, theRecipient shall not amend or waive, or permit to be amended or waived, any provision of any EMP or any RAP. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section II, C. | Description :The Recipient shall, not later than six months after the EffectiveDate, appoint the independent auditors referred to in Section 4.09 (b) of the General Conditions, in accordance with the provisionsof Section III of this Schedule. | Due Date :28-Feb-2018
Intermediate Results Indicator
Roads rehabilitated, Non-rural
Intermediate Results Indicator
Actions are taken in a timely manner in response to feedback received during consultation sessions with beneficiaries/project affected people(Feedback, Responses and Action are monitored and reported)
Intermediate Results Indicator
Pilot evacuation shelters tool to evaluate and prioritize shelters needs is developed and used in the affected area by Matthew
Intermediate Results Indicator
A first pilot detailed hydrological risk modelling is developed using the Digital Elevation Model
Intermediate Results Indicator
A draft road map with a score card for a disaster risk management system is developed
PDO Indicator
Share of population living in a municipality with a CCPC (Comite Communal de Protection Civile - Municipal Civil Protection Staff) of category 2 or higher
PDO Indicator
Percentate of Female Beneficiaries from an improved and resilient investments on the primary and secondary road network
Intermediate Results Indicator
Female Beneficiaries
Intermediate Results Indicator
Percentage of the national territory covered by a high resolution Digital Elevation Model and high resolution aero-photography
PDO Indicator
Line ministries developing an action plan for vulnerability reduction
PDO Indicator
Number of beneficiaries from an improved and resilient investments on the road network
Intermediate Results Indicator
Number of CCPC Staff trained and level 2-certified (Office Management and Emergency Operation Center Management), disaggregated bysex
Intermediate Results Indicator
Number of bridges and road sections damaged by hurricane Matthew that have been repaired or consolidatedwith satisfactory technical standards
Intermediate Results Indicator
Number of risk maps are produced, disseminated and available in an open-data online platform
Intermediate Results Indicator
Number of bridges damaged by hurricane Matthew that have been rebuiltwith satisfactory technical standards
Intermediate Results Indicator
Number of man/days of LIW generated by project activities
Intermediate Results Indicator
Number of spot interventions to protect the local access executed with satisfactory technical standards
Intermediate Results Indicator
Number of departments with investment plan to improve all weather rural accessibility based on the Rural Index Access methodology
Intermediate Results Indicator
Dissaggregation by sex in percent
Intermediate Results Indicator
Pilot evacuation shelters have been rehabilitated or reconstructed with multi-hazard resilient measures
Intermediate Results Indicator
Number of beneficiaries from a training in disaster risk management, disaggregated by sex
Intermediate Results Indicator
Number of level 2-certified operational Municipal Civil Protection Committees (CCPCs)
Intermediate Results Indicator
Number of bridges built or rehabilitated with satisfactory technical standards
Intermediate Results Indicator
Dissaggregation by sex in percent
Intermediate Results Indicator
A national radio communication system has been initiated and at least four pilot departments have been connected to the national level
Intermediate Results Indicator
Number of ministry officials benefitting from a training program in risk management, disaggregated by sex
44000-P126744
World Bank
Relaunching Agriculture: Strengthening Agriculture Public Services II Project (GAFSP - IDA)
International Development AssociationRepublic of Haiti
International Development AssociationMinistry of Agriculture, Natural Resources and Rural Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Soulemane Fofana
+1-202-473-1000sfofana@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Sud-Est
18.299999 -72.400002
Sud
18.299999 -73.73333
Departement du Nord-Est
19.48897 -71.857132
Nord
19.6 -72.300003
Grandans
18.5 -74.08333
Département de Nippes
18.44835 -73.4285
Agricultural Extension, Research, and Other Support ActivitiesFisheriesLivestockPublic Administration - Agriculture, Fishing & ForestryGenderNutrition and Food SecurityRural MarketsFood SecurityAgriculture FinanceNutritionRural DevelopmentFinance for DevelopmentRural Infrastructure and service delivery
0.00
0.00
0.00
0.00
333333.33
333333.33
333333.34
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
333333.33
333333.33
333333.34
666666.67
666666.67
666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
431819.25
431819.25
431819.25
431819.25
431819.25
431819.25
431819.25
431819.25
431819.25
431819.25
431819.25
431819.25
269689.00
269689.00
269689.00
269689.00
269689.00
269689.00
269689.00
269689.00
269689.00
269689.00
269689.00
269689.00
366436.17
366436.17
366436.17
366436.17
366436.17
366436.17
366436.17
366436.17
366436.17
366436.17
366436.17
366436.13
309814.08
309814.08
309814.08
309814.08
309814.08
309814.08
309814.08
309814.08
309814.08
309814.08
309814.08
309814.12
491526.08
491526.08
491526.08
491526.08
491526.08
491526.08
491526.08
491526.08
491526.08
491526.08
491526.08
491526.12
1209155.58
1209155.58
1209155.58
1209155.58
1209155.58
1209155.58
1209155.58
1209155.58
1209155.58
1209155.58
1209155.58
1209155.62
536787.67
536787.67
536787.67
536787.67
536787.67
536787.67
536787.67
536787.67
536787.67
536787.67
536787.67
536787.63
1567444.17
1567444.17
1567444.17
1567444.17
1567444.17
1567444.17
1567444.17
1567444.17
1567444.17
1567444.17
1567444.17
1567444.13
1037702.83
1037702.83
1037702.83
1037702.83
1037702.83
1037702.83
1037702.83
1037702.83
1037702.83
1037702.83
1037702.83
1037702.87
59250.33
59250.33
59250.33
59250.33
59250.33
59250.35
0.00
0.00
0.00
0.00
0.00
0.00
40000000Total Commitment in Fourth Quarter of 2011
International Development Association
4000000Total Disbursement in Third Quarter of 2012
International Development Association
181831Total Disbursement in First Quarter of 2013
International Development Association
582635Total Disbursement in Third Quarter of 2013
International Development Association
947987Total Disbursement in Second Quarter of 2014
International Development Association
1257479Total Disbursement in Second Quarter of 2014
International Development Association
980500Total Disbursement in First Quarter of 2015
International Development Association
1055159Total Disbursement in First Quarter of 2015
International Development Association
1604603Total Disbursement in Second Quarter of 2015
International Development Association
1212858Total Disbursement in Third Quarter of 2015
International Development Association
680127Total Disbursement in Fourth Quarter of 2015
International Development Association
423649Total Disbursement in First Quarter of 2016
International Development Association
748835Total Disbursement in Second Quarter of 2016
International Development Association
555091Total Disbursement in Third Quarter of 2016
International Development Association
1240289Total Disbursement in Fourth Quarter of 2016
International Development Association
1704565Total Disbursement in First Quarter of 2017
International Development Association
1723283Total Disbursement in Second Quarter of 2017
International Development Association
35000000Total Commitment in Second Quarter of 2017
International Development Association
1296419Total Disbursement in Third Quarter of 2017
International Development Association
2121336Total Disbursement in Fourth Quarter of 2017
International Development Association
2029230Total Disbursement in First Quarter of 2018
International Development Association
7000000Total Disbursement in First Quarter of 2018
International Development Association
1285117Total Disbursement in Second Quarter of 2018
International Development Association
2426800Total Disbursement in Third Quarter of 2018
International Development Association
91469Total Disbursement in Third Quarter of 2018
International Development Association
1582513Total Disbursement in Fourth Quarter of 2018
International Development Association
1601981Total Disbursement in First Quarter of 2019
International Development Association
137273Total Disbursement in First Quarter of 2019
International Development Association
394917Total Disbursement in Third Quarter of 2019
International Development Association
895910Total Disbursement in Third Quarter of 2019
International Development Association
1507850Total Disbursement in Third Quarter of 2019
International Development Association
-890054Total Disbursement in Third Quarter of 2019
International Development Association
1972093Total Disbursement in Fourth Quarter of 2019
International Development Association
1846334Total Disbursement in Fourth Quarter of 2019
International Development Association
8041374Total Disbursement in First Quarter of 2020
International Development Association
1773732Total Disbursement in First Quarter of 2020
International Development Association
-1626755Total Disbursement in Second Quarter of 2020
International Development Association
-4113161Total Disbursement in Second Quarter of 2020
International Development Association
4212344Total Disbursement in Second Quarter of 2020
International Development Association
3861129Total Disbursement in Third Quarter of 2020
International Development Association
1313369Total Disbursement in Third Quarter of 2020
International Development Association
2943154Total Disbursement in Fourth Quarter of 2020
International Development Association
2670221Total Disbursement in First Quarter of 2021
International Development Association
2372167Total Disbursement in First Quarter of 2021
International Development Association
1136558Total Disbursement in Second Quarter of 2021
International Development Association
326033Total Disbursement in Third Quarter of 2021
International Development Association
937872Total Disbursement in Fourth Quarter of 2021
International Development Association
3099023Total Disbursement in First Quarter of 2022
International Development Association
Project Information DocumentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement: Article IV, 4.01 | Description:The Grant Agreement has been executed and delivered and all conditions precedentto the effectiveness or to the right of the Recipient to make withdrawals under said agreement (other than the eff | DueDate:01-Mar-2012
Finance Agreement: Schedule 2, Section II. B.4 | Description: Appointment, not later than four months after the Effective Date, theindependent auditors referred to in Section 4.09 (b) of the General Conditions | Due Date:03-Aug-2012
Finance Agreement: Schedule 2, Section II. B.5 | Description: Acquire and configure, through MARNDR, an accounting software agreedwith the Association for the accounting and financial management system for the Project. | Due Date:03-Aug-2012
Finance Agreement: Schedule 2, Section I. C. 1 | Description: Establish a market support facility and operate and maintain saidfacility during project implementation. | Due Date:01-Mar-2013
Finance Agreement: Schedule 2, Section I. A. 2 | Description:2. The Recipient, through MARNDR, shall, not later than February 28 ofeach year of Project implementation: (a) submit to the Association, annual Project work plans and budgets for its prior review.Frequency: Yearly
Finance Agreement: Schedule 2, Section II. B. 2 | Description: The Recipient shall prepare and furnish to the Association not laterthan one month after the end of each calendar quarter, interim unaudited financial reports for the Project covering the quarte |Frequency: Quarterly
Finance Agreement: Schedule 2, Section II. B. 3 | Description:The Recipient shall have its Financial Statements audited inaccordance with the provisions of Section 4.09 (b) of the General Conditions | Frequency: Yearly
PDO Indicator
2. Value of production generated by the farmer subsidy scheme program
Intermediate Results Indicator
1.6 Agricultural Middle School's infrastructure is upgraded
PDO Indicator
5. Time taken to disburse funds requested by the government for an eligible emergency
Intermediate Results Indicator
Area provided with improved irrigation or drainage services
Intermediate Results Indicator
Area provided with new/improved irrigation or drainage services
Intermediate Results Indicator
Area provided with new irrigation or drainage services
PDO Indicator
4. Direct project beneficiaries
Intermediate Results Indicator
1.4b Number of Departments where producers have had access to market information by SMS, community radio and/or by publication at all DDA and BACs.
Intermediate Results Indicator
1.5 Number of didactical material elaborated and diffused in the Project zone, classified by themes.
Intermediate Results Indicator
2.2 Number of hectares restored or converted to agroforestry productions by the Project
Intermediate Results Indicator
2.3 Number of client days of extension services provided to producers, members of producer organizations, different than SPS training.
Intermediate Results Indicator
1.3 Number of cattle identified by the Project and included in the information system
Intermediate Results Indicator
1.4a Number of Departments where market prices have been collected and disseminated through a user-friendly web-based system
PDO Indicator
Of which households affected by Hurricane Matthew that received support from the Crisis Response Window
PDO Indicator
Of which beneficiaries in the Southern region
Intermediate Results Indicator
1.1 Central Building built and equipped
Intermediate Results Indicator
4.1 Number of agricultural producers registered in the MARNDR registry.
Intermediate Results Indicator
1.2 Number of client days of training linked to SPS provided to epidemiological volunteers and private veterinarians.
PDO Indicator
3. Increase in sales of the supported producer organizations
PDO Indicator
1. Key elements to strengthen institutional capacity of MARNDR implemented
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
2.6 Percentage of sub-projects that are sensitive to a) gender; b) environment; or c) nutrition.
Intermediate Results Indicator
2.4 Satisfaction rate of participants of the farmer field schools.
Intermediate Results Indicator
2.5 Percentage of producer organizations having an operational investment at least 12 months after its completion.
Intermediate Results Indicator
2.1 Producers adopting improved agriculture technologies promoted by the Project.
44000-P127203
World Bank
Rebuilding Energy Infrastructure and Access
International Development AssociationRepublic of Haiti
International Development AssociationEDH
MTPTC, UCP Energie
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Jose Francisco Perez Caceres
+1-202-473-1000jperezcaceres@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Port-au-Prince
18.539169 -72.334999
Petit Goâve
18.42939 -72.862968
Mirebalais
18.83333 -72.105278
Grand Goâve
18.426201 -72.766533
Drouet
18.216669 -73.783333
Cap-Haïtien
19.75938 -72.198151
DEpartement de l'Artibonite
19.33333 -72.5
Renewable Energy HydroOther Energy and ExtractivesPublic Administration - Energy and ExtractivesEnergy Transmission and DistributionRenewable Energy SolarRural DevelopmentDisaster Response and RecoveryDisaster PreparednessUrban DevelopmentDisaster Risk FinanceMitigationRural Infrastructure and service deliveryDisaster Risk ManagementFinance for DevelopmentClimate changeJobsJob CreationUrban Infrastructure and Service DeliveryDisaster Risk Reduction
0.00
0.00
0.00
0.00
166666.67
166666.67
166666.66
500000.00
500000.00
500000.00
666666.67
666666.67
666666.66
1166666.67
1166666.67
1166666.66
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1666666.67
1666666.67
1666666.66
2000000.00
2000000.00
2000000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2833333.33
2833333.33
2833333.34
2333333.33
2333333.33
2333333.34
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
1333333.33
1333333.33
1333333.34
1000000.00
1000000.00
1000000.00
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40985.35
40985.35
40985.35
40985.35
40985.35
40985.35
40985.35
40985.35
40985.35
40985.37
198764.85
198764.85
198764.85
198764.85
198764.85
198764.85
198764.85
198764.85
198764.85
198764.85
198764.85
198764.89
447441.35
447441.35
447441.35
447441.35
447441.35
447441.35
447441.35
447441.35
447441.35
447441.35
447441.35
447441.29
358728.91
358728.91
358728.91
358728.91
358728.91
358728.91
358728.91
358728.91
358728.91
358728.91
358728.91
358728.93
395669.75
395669.75
395669.75
395669.75
395669.75
395669.75
395669.75
395669.75
395669.75
395669.75
395669.75
395669.75
337368.18
337368.18
337368.18
337368.18
337368.18
337368.18
337368.18
337368.18
337368.18
337368.18
337368.18
337368.17
426115.92
426115.92
426115.92
426115.92
426115.92
426115.92
426115.92
426115.92
426115.92
426115.92
426115.92
426115.89
436371.21
436371.21
436371.21
436371.21
436371.21
436371.21
436371.21
436371.21
436371.21
436371.21
436371.21
436371.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
90000000Total Commitment in Third Quarter of 2012
International Development Association
200000Total Disbursement in Second Quarter of 2013
International Development Association
55199Total Disbursement in Third Quarter of 2013
International Development Association
97428Total Disbursement in Fourth Quarter of 2013
International Development Association
167311Total Disbursement in Fourth Quarter of 2013
International Development Association
104557Total Disbursement in Fourth Quarter of 2013
International Development Association
158603Total Disbursement in First Quarter of 2014
International Development Association
114003Total Disbursement in First Quarter of 2014
International Development Association
220726Total Disbursement in Second Quarter of 2014
International Development Association
50624Total Disbursement in Second Quarter of 2014
International Development Association
90881Total Disbursement in Second Quarter of 2014
International Development Association
275934Total Disbursement in Third Quarter of 2014
International Development Association
686266Total Disbursement in Third Quarter of 2014
International Development Association
134015Total Disbursement in Fourth Quarter of 2014
International Development Association
1260683Total Disbursement in Fourth Quarter of 2014
International Development Association
572127Total Disbursement in Fourth Quarter of 2014
International Development Association
288994Total Disbursement in First Quarter of 2015
International Development Association
1545304Total Disbursement in First Quarter of 2015
International Development Association
875574Total Disbursement in Second Quarter of 2015
International Development Association
114284Total Disbursement in Second Quarter of 2015
International Development Association
358433Total Disbursement in Second Quarter of 2015
International Development Association
341982Total Disbursement in Third Quarter of 2015
International Development Association
690278Total Disbursement in Third Quarter of 2015
International Development Association
411618Total Disbursement in Third Quarter of 2015
International Development Association
914032Total Disbursement in Fourth Quarter of 2015
International Development Association
1534528Total Disbursement in Fourth Quarter of 2015
International Development Association
409890Total Disbursement in Fourth Quarter of 2015
International Development Association
2168300Total Disbursement in First Quarter of 2016
International Development Association
255161Total Disbursement in First Quarter of 2016
International Development Association
662770Total Disbursement in Third Quarter of 2016
International Development Association
1462053Total Disbursement in Third Quarter of 2016
International Development Association
964807Total Disbursement in Third Quarter of 2016
International Development Association
106171Total Disbursement in Fourth Quarter of 2016
International Development Association
363382Total Disbursement in Fourth Quarter of 2016
International Development Association
958463Total Disbursement in First Quarter of 2017
International Development Association
246911Total Disbursement in First Quarter of 2017
International Development Association
110340Total Disbursement in Second Quarter of 2017
International Development Association
1150534Total Disbursement in Third Quarter of 2017
International Development Association
1321863Total Disbursement in Third Quarter of 2017
International Development Association
1376063Total Disbursement in Third Quarter of 2017
International Development Association
554187Total Disbursement in Fourth Quarter of 2017
International Development Association
203117Total Disbursement in Fourth Quarter of 2017
International Development Association
721598Total Disbursement in Fourth Quarter of 2017
International Development Association
-25000000Total Commitment Cancellations in First Quarter of 2018
International Development Association
1002960Total Disbursement in First Quarter of 2018
International Development Association
206759Total Disbursement in First Quarter of 2018
International Development Association
1916472Total Disbursement in Second Quarter of 2018
International Development Association
2754271Total Disbursement in Second Quarter of 2018
International Development Association
213041Total Disbursement in Third Quarter of 2018
International Development Association
281663Total Disbursement in Fourth Quarter of 2018
International Development Association
366106Total Disbursement in Fourth Quarter of 2018
International Development Association
566158Total Disbursement in First Quarter of 2019
International Development Association
925514Total Disbursement in First Quarter of 2019
International Development Association
755079Total Disbursement in Second Quarter of 2019
International Development Association
1021790Total Disbursement in Second Quarter of 2019
International Development Association
-14000000Total Commitment Cancellations in Third Quarter of 2019
International Development Association
1050613Total Disbursement in Third Quarter of 2019
International Development Association
1112714Total Disbursement in Third Quarter of 2019
International Development Association
681571Total Disbursement in Fourth Quarter of 2019
International Development Association
943304Total Disbursement in Fourth Quarter of 2019
International Development Association
564313Total Disbursement in Fourth Quarter of 2019
International Development Association
512239Total Disbursement in First Quarter of 2020
International Development Association
367022Total Disbursement in First Quarter of 2020
International Development Association
342706Total Disbursement in First Quarter of 2020
International Development Association
832500Total Disbursement in Second Quarter of 2020
International Development Association
337162Total Disbursement in Second Quarter of 2020
International Development Association
-2005977Total Commitment Cancellations in Third Quarter of 2020
International Development Association
-118266Total Disbursement in Third Quarter of 2020
International Development Association
1529545Total Disbursement in Fourth Quarter of 2020
International Development Association
86226Total Disbursement in First Quarter of 2021
International Development Association
93062Total Disbursement in First Quarter of 2021
International Development Association
-7666Total Disbursement in Second Quarter of 2021
International Development Association
Project Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Distribution lines rehabilitated
Intermediate Results Indicator
Capacity of Renewable Energy (including Hydropower) constructed or rehabilitated
PDO Indicator
Direct project beneficiaries
PDO Indicator
Female beneficiaries
Intermediate Results Indicator
Restored connections
Intermediate Results Indicator
Offgrid access to electricity for collective uses (street lighting, schools etc.)
Intermediate Results Indicator
Offgrid connections to electricity
Intermediate Results Indicator
People provided with new or improved electricity service
PDO Indicator
Strengthening of Government's oversight capacity and transparency in sector financial flows
Intermediate Results Indicator
Government entity responsible for the energy sector adequately staffed
Intermediate Results Indicator
External audits of EDH accounts
Intermediate Results Indicator
Electricity sector financial model and energy sector database
PDO Indicator
Cash Recovery Index
Intermediate Results Indicator
Technical and non technical losses
44000-P127208
World Bank
Economic Reconstruction and Growth Development Policy Credit
International Development AssociationMinistry of Economy and Finance
International Development AssociationMinistry of Economy and Finance
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Evans Jadotte
+1-202-473-1000ejadotte@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Port-au-Prince
18.54349 -72.33881
Central Government (Central Agencies)Banking InstitutionsOther Public AdministrationEnergy Transmission and DistributionAdministrative and Civil Service ReformPublic AdministrationTransparency, Accountability and Good GovernancePublic Expenditure ManagementPublic Finance Management
0.00
0.00
20000000Total Commitment in Second Quarter of 2013
International Development Association
20402200Total Disbursement in Third Quarter of 2013
International Development Association
Project Appraisal DocumentProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentProject Information DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Execution of Public Investment Budget
Intermediate Results Indicator
Cash Management and Accountability
The General Directorate of Debt and Treasury (DGDT) within the Ministry of Finance, which has the mandate to implement theTreasurySingle Account (TSA) continues to make progress towards implementation. There remain 57 accounts to be closed to reach theobjectiveof 3 accounts per line ministry and other entities. The WB Team wil continue to work with the Client and monitor progresstowards the TSA implementation throughout June 30th.
Intermediate Results Indicator
Transparent Institutional Framework and Capacity for Effective Public Procurement
Intermediate Results Indicator
Transparent Institutional Framework and Capacity for Effective Public Procurement
At this stage, the Team does not have sufficient information to assess the percentage of contracts above the prior-reviewthresholdand signed after March 2013. The Team will continue to work with the National Procurement Agency to collect thisinformation. In any case, since no budget has been approved by the Parliament, the procurement plans submitted so far by the lineministries will needto be revised in accordance with the new draft budget. In addition, it is very unlikely that six months priorto the end of the Haitian fiscal year that at least two-thirds the contracts above the threshold will be awarded using acompetitive process.
Intermediate Results Indicator
Recovery of the State Utility Electricity Company (EDH)
In addition to the prior action of installing the 6 meters at the IPP entry point, a follow on action of installing 16 additionalmeters is still pending.
Intermediate Results Indicator
Recovery of the State Utility Electricity Company (EDH)
EdH will resume the process of installing these meters to reach 350. A second phase of meters installing should follow toeventually cover the total of 1200 priority costumers.
Intermediate Results Indicator
Recovery of the State Utility Electricity Company (EDH)
The WB team will continue to work with Client to explore ways to settle the Central GOvernment arrears to EdH before the end oftheoperation.
Intermediate Results Indicator
Execution of Public Investment Budget
Intermediate Results Indicator
Cash Management and Accountability
44000-P133352
World Bank
HT Center and Artibonite Regional Development
International Development AssociationMinistry of Economy and Finance
International Development AssociationUnite Technique d'Execution (UTE)
Unite Centale d'Execution (UCE)
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Malaika Becoulet
+1-202-473-1000mbecoulet@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Departement de l'Ouest
18.663811 -72.291412
Nord
19.6 -72.300003
Centre
19 -72
Departement de l'Artibonite
19.33333 -72.5
Other Public AdministrationSub-National GovernmentRural and Inter-Urban RoadsAgricultural markets, commercialization and agri-businessAgricultural Extension, Research, and Other Support ActivitiesClimate changeRural DevelopmentUrban PlanningUrban Infrastructure and Service DeliveryJobsUrban DevelopmentHousing FinanceRural Infrastructure and service deliveryMitigationFinance for DevelopmentRural Markets
0.00
0.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.37
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.63
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.63
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
133333.33
133333.33
133333.33
133333.33
133333.33
133333.33
133333.33
133333.33
133333.33
133333.33
133333.33
133333.37
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.63
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
741666.67
741666.67
741666.67
741666.67
741666.67
741666.67
741666.67
741666.67
741666.67
741666.67
741666.67
741666.63
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.37
50000000Total Commitment in Second Quarter of 2014
International Development Association
500000Total Disbursement in Fourth Quarter of 2014
International Development Association
1000000Total Disbursement in First Quarter of 2015
International Development Association
1000000Total Disbursement in Third Quarter of 2015
International Development Association
1000000Total Disbursement in Fourth Quarter of 2016
International Development Association
1000000Total Disbursement in Second Quarter of 2017
International Development Association
2000000Total Disbursement in Third Quarter of 2018
International Development Association
3000000Total Disbursement in Fourth Quarter of 2018
International Development Association
8507168Total Disbursement in Fourth Quarter of 2018
International Development Association
2338857Total Disbursement in Third Quarter of 2019
International Development Association
-23247670Total Commitment Cancellations in First Quarter of 2020
International Development Association
900000Total Disbursement in First Quarter of 2020
International Development Association
-3900414Total Disbursement in Third Quarter of 2020
International Development Association
775851Total Disbursement in Fourth Quarter of 2020
International Development Association
-1935602Total Disbursement in First Quarter of 2021
International Development Association
-705245Total Disbursement in First Quarter of 2021
International Development Association
-17493Total Disbursement in Second Quarter of 2021
International Development Association
-5987270Total Commitment Cancellations in Second Quarter of 2021
International Development Association
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Road Maintenance Centers | Description :The Recipient shall have the road maintenance centers established or tobe established in Hinche, Mirebalais and Saint Michel staffed and equipped in a manner satisfactory to the Association throughoutthe duration of the Project. | Frequency :CONTINUOUS
Finance Agreement :Update List of Eligible Roads to FER | Description :The Recipient shall, throughout the duration of the Project,periodically add the roads which are rehabilitated under Part A.1 of the Project to the subsequent updated list of eligible roadsunder the Road Maintenance Fund. | Frequency :CONTINUOUS
Finance Agreement :Appointment of Auditor | Description :The Recipient shall appoint an independent auditor with terms of referenceand qualifications acceptable to the Association, in accordance with the provision set up in the Financing Agreement, Schedule 2,Section III, by not later than four (4) months as of the Effective Date. | Due Date :31-Dec-2014
Intermediate Results Indicator
Roads rehabilitated, Rural
Intermediate Results Indicator
Roads rehabilitated, Non-rural
PDO Indicator
Number of producers and users serviced by an all-weather-road accessing urban and rural markets.
PDO Indicator
Number of rural people with access to an all-season road
Intermediate Results Indicator
Number of Road Maintenance Centers build or rehabilitated
Intermediate Results Indicator
Spot interventions to enhance all-weather and resilient connectivity
Intermediate Results Indicator
Number of events/activities dedicated for knowledge dissemination and consultation
Intermediate Results Indicator
Number of people trained within selected communities on basic Rural Road Maintenance (disaggregated by gender)
Intermediate Results Indicator
Urban plans developed and consulted with Local officials and local stakeholders
PDO Indicator
Share of rural population with access to an all-season road
PDO Indicator
Female beneficiaries
PDO Indicator
Share of the population in the Project area satisfied with the quality and impact of infrastructure financed by the Project
Intermediate Results Indicator
disaggregated by gender, in % of women
44000-P144614
World Bank
Cultural Heritage Preservation and Tourism Sector Support Project
International Development AssociationRepublic of Haiti
International Development AssociationUNITE TECHNIQUE D'EXECUTION
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Alexandra Ortiz
+1-202-473-1000aortiz@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Milot
19.633329 -72.216667
Dondon
19.51667 -72.26667
Cap-Haïtien
19.75938 -72.198151
TradeOther Public AdministrationOther Water Supply, Sanitation and Waste ManagementSocial ProtectionPublic Administration - Industry, Trade and ServicesUrban Infrastructure and Service DeliveryJobsDisaster Risk ReductionUrban DevelopmentDisaster Risk FinanceAdministrative and Civil Service ReformMunicipal Institution BuildingDisaster PreparednessDisaster Response and RecoveryCultural HeritageDisaster Risk ManagementFinance for DevelopmentPublic Administration
0.00
0.00
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.63
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.37
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.37
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
186984.86
186984.86
186984.86
186984.86
186984.86
186984.86
186984.86
186984.86
186984.86
186984.86
186984.86
186984.83
128324.32
128324.32
128324.32
128324.32
128324.32
128324.32
128324.32
128324.32
128324.32
128324.32
128324.32
128324.29
173808.96
173808.96
173808.96
173808.96
173808.96
173808.96
173808.96
173808.96
173808.96
173808.96
173808.96
173808.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
507032.44
507032.44
507032.44
507032.44
507032.44
507032.44
507032.44
507032.44
507032.44
507032.44
507032.44
507032.45
141888.84
141888.84
141888.84
141888.84
141888.84
141888.84
141888.84
141888.84
141888.84
141888.84
141888.84
141888.81
504186.01
504186.01
504186.01
504186.01
504186.01
504186.01
504186.01
504186.01
504186.01
504186.01
504186.01
504186.02
941791.91
941791.91
941791.91
941791.91
941791.91
941791.91
941791.91
941791.91
941791.91
941791.91
941791.91
941791.96
941791.90
45000000Total Commitment in Second Quarter of 2014
International Development Association
1321039Total Disbursement in Fourth Quarter of 2014
International Development Association
1000000Total Disbursement in First Quarter of 2015
International Development Association
1531683Total Disbursement in Fourth Quarter of 2015
International Development Association
2000000Total Disbursement in First Quarter of 2017
International Development Association
3000000Total Disbursement in Third Quarter of 2018
International Development Association
3000000Total Disbursement in Second Quarter of 2019
International Development Association
684694Total Disbursement in Third Quarter of 2019
International Development Association
-5300000Total Commitment Cancellations in Second Quarter of 2020
International Development Association
-7750000Total Commitment Cancellations in Third Quarter of 2020
International Development Association
1000000Total Disbursement in First Quarter of 2021
International Development Association
455702Total Disbursement in Second Quarter of 2021
International Development Association
800000Total Disbursement in Second Quarter of 2021
International Development Association
350000Total Disbursement in Third Quarter of 2021
International Development Association
700000Total Disbursement in Third Quarter of 2021
International Development Association
-5800000Total Commitment Cancellations in First Quarter of 2022
International Development Association
1000000Total Disbursement in Second Quarter of 2022
International Development Association
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement : Preparation and Implementation of a Park Management Plan | Description :The Recipient shall: (a) by not laterthan two years as of the Effective Date submit the management plan of PNH-CSSR prepared under Part A.2 (a) of the Project to theWorld Heritage Committee of the UNESCO for its review and approval; and (b) immediately after said plan has been approved the WorldHeritage Committee of the UNESCO implement said park management plan in accordance with its terms.
Finance Agreement :Establishment and Maintainance of PNH-CSSR Park Authority | Description :The Recipient shall by not later thanthirty (30) months as of the Effective Date establish, and thereafter maintain a park management authority for PNH-CSSR withadequate staffing and budgeting satisfactory to the Association.
PDO Indicator
An effective Park Management system is contributing to sustainable development of the park
Intermediate Results Indicator
PNH Management Plan (i) finalized and (ii) under implementation
Intermediate Results Indicator
An interim authority (AutoritE de Gestion Provisoire) with staffing acceptable to IDA is established in the PNH-CSSR
PDO Indicator
Direct project beneficiaries
PDO Indicator
Number of restored buildings with increased resistance to seismic events
PDO Indicator
Number of entities providing cultural and tourism services in the project areas
Intermediate Results Indicator
Touristic routes developed and promoted through project investments/activities
PDO Indicator
Tickets sold annually to the PNH-CSSR
Intermediate Results Indicator
Activities supported by the Community Event & Tourism Development Grants
Intermediate Results Indicator
Infrastructure properly operated and maintained following project financing
PDO Indicator
Female beneficiaries
PDO Indicator
Population in project areas satisfied with the quality of infrastructure financed by the project
Intermediate Results Indicator
Of which are youth
Intermediate Results Indicator
Of which are women
Intermediate Results Indicator
Streetscapes upgraded in project target areas
44000-P148970
World Bank
Haiti Sustainable Rural and Small Towns Water and Sanitation Project
International Development AssociationREPUBLIC OF HAITI
International Development AssociationDINEPA
Ministry of Economy and Finance, MEF
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Veronique Verdeil
+1-202-473-1000vverdeil@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Sud
18.299999 -73.73333
Nord-Ouest
19.83333 -73
Grandans
18.5 -74.083328
DEpartement de Nippes
18.448351 -73.428497
Water SupplyHealthPublic Administration - Water, Sanitation and Waste ManagementSanitationRural MarketsRural DevelopmentDisaster Risk FinanceFragility, Conflict and ViolenceAgriculture FinanceDisaster PreparednessDisaster Response and RecoveryRural Infrastructure and service deliveryDisaster Risk ManagementDisaster Risk ReductionDisease ControlFinance for Development
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
1141666.67
1141666.67
1141666.67
1141666.67
1141666.67
1141666.67
1141666.67
1141666.67
1141666.67
1141666.67
1141666.67
1141666.63
1708333.33
1708333.33
1708333.33
1708333.33
1708333.33
1708333.33
1708333.33
1708333.33
1708333.33
1708333.33
1708333.33
1708333.37
1716666.67
1716666.67
1716666.67
1716666.67
1716666.67
1716666.67
1716666.67
1716666.67
1716666.67
1716666.67
1716666.67
1716666.63
683333.33
683333.33
683333.33
683333.33
683333.33
683333.33
683333.33
683333.33
683333.33
683333.33
683333.33
683333.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
111850.00
74850.00
82250.00
186700.00
104000.00
110800.00
240750.00
129850.00
137750.00
304350.00
164700.00
171200.00
356400.00
183400.00
186300.00
384900.00
199200.00
203150.00
417700.00
212450.00
211700.00
425400.00
218650.00
225650.00
481800.00
257650.00
263200.00
267400.00
554250.00
291700.00
304800.00
648100.00
339150.00
348850.00
728650.00
380950.00
392350.00
816250.00
424250.00
434850.00
897300.00
460350.00
468050.00
968400.00
499450.00
508450.00
1040700.00
530050.00
536550.00
1105650.00
568700.00
577200.00
1169650.00
587750.00
591550.00
1213700.00
618000.00
621450.00
621750.00
1234000.00
616350.00
622050.00
1254150.00
626800.00
623650.00
1234100.00
618550.00
620500.00
1500000.00
1500000.00
1500000.00
1666666.67
1666666.67
1666666.66
1833333.33
1833333.33
1833333.34
2166666.67
2166666.67
2166666.66
2175333.33
2175333.33
2175333.34
1971666.67
1971666.67
1971666.66
1015333.33
1015333.33
1015333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50000000Total Commitment in Second Quarter of 2015
International Development Association
1047848Total Disbursement in Fourth Quarter of 2015
International Development Association
4400000Total Disbursement in Second Quarter of 2016
International Development Association
599457Total Disbursement in Fourth Quarter of 2016
International Development Association
1264819Total Disbursement in First Quarter of 2017
International Development Association
238667Total Disbursement in Second Quarter of 2017
International Development Association
20000000Total Commitment in Second Quarter of 2017
International Development Association
1399298Total Disbursement in Third Quarter of 2017
International Development Association
1958008Total Disbursement in Fourth Quarter of 2017
International Development Association
3040437Total Disbursement in Fourth Quarter of 2017
International Development Association
2182830Total Disbursement in Second Quarter of 2018
International Development Association
2971064Total Disbursement in Fourth Quarter of 2021
International Development Association
1591940Total Disbursement in First Quarter of 2022
International Development Association
63579Total Disbursement in Second Quarter of 2022
International Development Association
1879679Total Disbursement in Third Quarter of 2018
International Development Association
2234941Total Disbursement in First Quarter of 2019
International Development Association
4000000Total Disbursement in First Quarter of 2019
International Development Association
1951110Total Disbursement in Third Quarter of 2019
International Development Association
3472038Total Disbursement in Fourth Quarter of 2019
International Development Association
3046890Total Disbursement in Second Quarter of 2020
International Development Association
2040849Total Disbursement in Fourth Quarter of 2020
International Development Association
2355004Total Disbursement in Fourth Quarter of 2020
International Development Association
503129Total Disbursement in First Quarter of 2021
International Development Association
953853Total Disbursement in First Quarter of 2021
International Development Association
577739Total Disbursement in Second Quarter of 2021
International Development Association
5478370Total Disbursement in Second Quarter of 2021
International Development Association
155298Total Disbursement in Third Quarter of 2021
International Development Association
1250909Total Disbursement in Third Quarter of 2021
International Development Association
2425108Total Disbursement in Third Quarter of 2021
International Development Association
1241218Total Disbursement in Third Quarter of 2021
International Development Association
2111401Total Disbursement in Fourth Quarter of 2021
International Development Association
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :DINEPA Subsidiary Agreement (Schedule 2, Section I.B.1) | Description :To facilitate the carrying out of theProject, the Recipient shall make the proceeds of the Financing available to DINEPA under a Subsidiary Agreement between theRecipient, acting through the MTPTC and the MEF, and DINEPA, under terms and conditions approved by the Association.
Finance Agreement :Sub-Grants (Schedule 2, Section I.D.1) | Description :For purposes of carrying out Part 1 (c) (iii) of theProject and upon the selection of an OP, the Recipient shall cause DINEPA to enter into a Sub-grant Agreement with the OP inaccordance with criteria and procedures acceptable to the Association, as set forth in the Project Operations Manual, and underterms and conditions acceptable to the Association.
Finance Agreement :Safeguards (Schedule 2, Section I.G.1) | Description :No later than six (6) months from the date of thisAgreement, and in any case prior to the carrying out of any works under the Project, the Recipient shall and shall cause DINEPA toadopt the ESMF and the RPF in a manner satisfactory to the Association.
Finance Agreement :Financial Management, Financial Reports and Audits (Schedule 2, Section II.B.4) | Description :The Recipientshall not later than six (6) months after the Effective Date recruit an external auditor based on terms of reference acceptable tothe Association to carry out the annual audit.
Finance Agreement :Safeguards (Schedule 2, Section I.G.3) | Description :Prior to the carrying out of any works under the Project,the Recipient shall cause DINEPA to (i) carry out an environmental and social screening and assessment of the proposed activities;(ii) exclude from the Project any activities requiring physical relocation of people; and (iii) as applicable, prepare a plan forland acquisition acceptable to the Association, all in accordance with the RPF.
Finance Agreement :DINEPA Subsidiary Agreement (Schedule 2, Section I.B.1) | Description :To facilitate the carrying out of theProject, the Recipient shall make the proceeds of the Financing available to DINEPA under an amended Subsidiary Agreement betweenthe Recipient, acting through the MTPTC and the MEF, and DINEPA, under terms and conditions approved by the Association. | Due Date:31-Oct-2017
Finance Agreement :Financial Management, Financial Reports and Audits (Schedule 2, Section II.B.4) | Description :The Recipientshall not later than six (6) months after the Effective Date recruit an external auditor based on terms of reference acceptable tothe Association to carry out the annual audits of such Financial Statements referred to in Section 4.09(b) of the GeneralConditions. | Due Date :30-Apr-2018
Finance Agreement :Safeguards (Schedule 2, Section I.G.2) | Description :Prior to the carrying out of any works under the Project,the Recipient shall cause DINEPA to: (i) carry out an environmental and social screening and assessment of the proposed activities;(ii) carry out a resettlement screening and assessment of the proposed activities, if need be. | Due Date :31-Oct-2017
Finance Agreement :Safeguards (Schedule 2, Section I.G.2) | Description :Prior to the carrying out of any works under the Project,the Recipient shall cause DINEPA to, as applicable, prepare plans for environmental management or resettlement, acceptable to theAssociation, all in accordance with the ESMF and the RPF. | Due Date :31-Oct-2017
Finance Agreement :Sub-Grants (Schedule 2, Section I.D.1) | Description :For purposes of carrying out Part 1 (c)(iii) of theProject, the Recipient shall cause DINEPA to: (i) select an OP in accordance with criteria and procedures acceptable to theAssociation, as set forth in the Project Operations Manual; and thereafter (ii) enter into a Sub-grant Agreement with the selectedOP under terms and conditions acceptable to the Association. | Due Date :31-Oct-2017
Intermediate Results Indicator
At least one OREPA uses the baseline developed under the Project to prioritize interventions and inform DINEPA's program budget
Intermediate Results Indicator
At least one OREPA has installed an accounting system which facilitates the consolidation of financial information at the central level
Intermediate Results Indicator
DINEPA acknowledged a gender action plan
PDO Indicator
DINEPA's system in place to respond to major emergencies
Intermediate Results Indicator
A fecal sludge management service chain for rural areas and small towns is defined
Intermediate Results Indicator
DINEPA conducts an annual joint Government/ partners sector review
PDO Indicator
Required functions deconcentrated to targeted OREPA
PDO Indicator
Piped water systems managed sustainably by a professional operator (PO) under the Project
PDO Indicator
Number of people in rural areas and small towns provided with access to Improved Water Sources under the project
PDO Indicator
Number of people in rural areas provided with access to Improved Water Sources in zones affected by Hurricane Matthew
PDO Indicator
People provided with access to "improved sanitation facilities” under the proj.
PDO Indicator
People in rural areas provided with access to "improved sanitation facilities" - female
Intermediate Results Indicator
Number of handwashing facilities built in the context of COVID-19 awareness campaign
Intermediate Results Indicator
Number of OREPAs among the 4 existing ones, using the baseline developed under the project to prioritize.
Intermediate Results Indicator
Number of OREPAs among the 4 existing ones that have installed an accounting system which facilitates the consolidation of financial information at the central level.
PDO Indicator
Number of people provided with access to improved water sources under the project except in the areas affected by Hurricane Matthew
Intermediate Results Indicator
Communities where DINEPA and MSPP local structures have jointly been trained or collaborated in water supply, hygiene promotion andsanitation themes and activities
Intermediate Results Indicator
A national programming mechanism for deconcentrated WSS service delivery is operationalized, as evidenced by tools in place
PDO Indicator
Project beneficiaries of small repairs of water systems in the context of COVID-19 emergency
Intermediate Results Indicator
Students and teachers benefitting from improved sanitation facilities in public schools under the Project
Intermediate Results Indicator
Latrine blocks for public institutions or spaces constructed or rehabilitated with management and maintenance arrangements in placeunder the Project
Intermediate Results Indicator
Households with latrine built during project implementation and of which use is verified
Intermediate Results Indicator
Number of hospitals and health centers whose water supply system was repaired under the COVID-19 emergency
Intermediate Results Indicator
Latrine blocks for public institutions or spaces constructed or rehabilitated with management and maintenance arrangements in placein zones affected by Hurricane Matthew
Intermediate Results Indicator
People benefitting from consolidation work (small repairs and expansions) in zones affected by Hurricane Matthew
Intermediate Results Indicator
Improved community water points constructed or rehabilitated under the project
Intermediate Results Indicator
People trained to improve hygiene behavior/sanitation practices under the project
Intermediate Results Indicator
Grievances registered related to delivery of project benefits addressed (%)
Intermediate Results Indicator
CAEPAs that include at least 20 percent female representation in project area
PDO Indicator
Female beneficiaries
PDO Indicator
Priority cholera communes targeted under the Project
PDO Indicator
Direct project beneficiaries
PDO Indicator
Project beneficiaries in localities on the border with the DR including bi-national markets
Intermediate Results Indicator
Departments covered by WSS baseline information
Intermediate Results Indicator
New piped household water connections that are resulting from the project intervention
44000-P155191
World Bank
Providing an Education of Quality in Haiti (PEQH)
International Development AssociationThe Republic of Haiti
International Development AssociationMinistry of Education and Vocational Training (MENFP)
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Quynh Thu Nguyen
+1-202-473-1000qnguyen4@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Sud-Est
18.3 -72.4
Sud
18.3 -73.73333
Departement du Nord-Est
19.48897 -71.85713
Nord
19.6 -72.3
Grandans
18.5 -74.08333
Departement de Nippes
18.44835 -73.4285
Public Administration - EducationPrimary EducationEducation FinancingAccess to EducationEducationTeachersEducation FacilitiesEducation Governance, School-Based Management
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
125000.00
125000.00
125000.00
125000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.63
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1583333.33
1583333.33
1583333.33
1583333.33
1583333.33
1583333.33
1583333.33
1583333.33
1583333.33
1583333.33
1583333.33
1583333.37
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
400000.00
400000.00
400000.00
400000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30000000Total Commitment in Fourth Quarter of 2016
International Development Association
2000000Total Disbursement in Second Quarter of 2017
International Development Association
1276894Total Disbursement in Fourth Quarter of 2017
International Development Association
2506438Total Disbursement in First Quarter of 2018
International Development Association
1160929Total Disbursement in Second Quarter of 2018
International Development Association
2026449Total Disbursement in Second Quarter of 2018
International Development Association
1453037Total Disbursement in Fourth Quarter of 2018
International Development Association
1396976Total Disbursement in First Quarter of 2019
International Development Association
1529823Total Disbursement in First Quarter of 2019
International Development Association
2268553Total Disbursement in Second Quarter of 2019
International Development Association
39000000Total Commitment in Second Quarter of 2019
International Development Association
1601944Total Disbursement in Third Quarter of 2019
International Development Association
4876968Total Disbursement in Third Quarter of 2019
International Development Association
462360Total Disbursement in Fourth Quarter of 2019
International Development Association
2645200Total Disbursement in Fourth Quarter of 2019
International Development Association
3250000Total Disbursement in First Quarter of 2020
International Development Association
2027210Total Disbursement in First Quarter of 2020
International Development Association
2083698Total Disbursement in Second Quarter of 2020
International Development Association
939296Total Disbursement in Third Quarter of 2020
International Development Association
1840734Total Disbursement in Third Quarter of 2020
International Development Association
1081165Total Disbursement in Third Quarter of 2020
International Development Association
931526Total Disbursement in Third Quarter of 2020
International Development Association
92529Total Disbursement in Fourth Quarter of 2020
International Development Association
2628896Total Disbursement in Fourth Quarter of 2020
International Development Association
1258401Total Disbursement in First Quarter of 2021
International Development Association
3423322Total Disbursement in First Quarter of 2021
International Development Association
952142Total Disbursement in First Quarter of 2021
International Development Association
4373541Total Disbursement in Second Quarter of 2021
International Development Association
3618659Total Disbursement in Third Quarter of 2021
International Development Association
-40492Total Disbursement in Third Quarter of 2021
International Development Association
323701Total Disbursement in Third Quarter of 2021
International Development Association
951870Total Disbursement in Fourth Quarter of 2021
International Development Association
3212579Total Disbursement in Fourth Quarter of 2021
International Development Association
2138574Total Disbursement in First Quarter of 2022
International Development Association
1537756Total Disbursement in First Quarter of 2022
International Development Association
7039361Total Disbursement in Second Quarter of 2022
International Development Association
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementGrant or Trust Fund AgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2, Section I.C.2 CSMC and Beneficiary Public Primary School Sub-grant | Description :Upon approval ofthe specific activities under Components 2.1(b) and Components 2.2(c)(iv) to be financed by the pertinent Sub-grant, and prior tothe carrying out of any said activities by the corresponding CSMC or Beneficiary Public Primary School, as the case may be, theRecipient shall, have entered into the pertinent Sub-grant Agreement under the terms and conditions acceptable to the Association.| Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I.D.1(a) NPPSMC Sub-grant agreements | Description :For purposes of carrying out: (i)Component 3.1(a) of the Project, enter into an agreement (Student Enrollment Grant Agreement) with the pertinent NPPSMC; and (ii)Component 3.2(b) of the Project, enter into an agreement (QEAP Grant Agreement) with the pertinent NPPSMC; all under terms andconditions satisfactory to the Association. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I.D.1(c ) and (d) Verification of compliance | Description :Unless otherwise agreed by theAssociation, no later than twelve (12) months from the Effective Date, or any other later date agreed by the Association; (i) hirean independent verification agent, under terms of reference acceptable to the Association to carry out the verification ofcompliance with the conditions set forth in the Operations Manual for the disbursement of Conditional Grants, all pursuant to theverification protocol and disbursement procedures set forth in the Operations Manual; and (ii) cause said independent verificationagent to prepare and furnish to the Association, no later than July 15th of each calendar year, prepare and furnish to theAssociation, a report of such scope and in such detail as the Association shall reasonably request, on the results of theverification of compliance of the conditions mentioned under paragraph (c) above covering the last twelve (12) months prior to thedate of presentation of each such report. | Frequency :CONTINUOUS
Financing Agreement: Schedule 2. Section IV.1. The Recipient shall, no later than ninety (90) days from Effectiveness Date, hire agender specialist in form and substance acceptable to the Association.
PDO Indicator
PDO1. Use of an Education Management Information System (EMIS) to enable national implementation of the QAS
Intermediate Results Indicator
IRI1. Development of QAS and learning assessments by MENFP and application in schools supported by the Project
Intermediate Results Indicator
IRI 4. Data from the scorecard results used in decision-making for results-based financing of non-public schools supported by the project
Intermediate Results Indicator
IRI 14. Attendance rate for primary education girls in public schools supported by the Project
Intermediate Results Indicator
IRI 5. Development and provision of school director training program to sub-components 2.2 and 2.3 public primary project schools
Intermediate Results Indicator
IRI 6. Development and provision of school teacher training program to sub-components 2.2 and 2.3 public primary project schools
Intermediate Results Indicator
IRI 9. System for learning assessment at the primary level
PDO Indicator
PDO2. Net proportion of schools supported by the Project that improve their school learning conditions score
Intermediate Results Indicator
IRI 10. Stakeholder hotline to MENFP - proportion of calls responded to/resolved within stipulated service standards for response times
Intermediate Results Indicator
IRI 11. Proportion of public schools receiving maintenance products for latrines (sud-components 2.2 and 2.3)
Intermediate Results Indicator
IRI 13. Percentage of teachers and directors in Component 2.2 schools having received in-service training on gender issues
Intermediate Results Indicator
IRI 16. Percentage of public school in sub-component 2.2 that maintain a "basic" level of learning conditions
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
IRI 12. Percentage of sub-component 2.2 public primary schools offering girls, boys and parent clubs established to develop interpersonal skills (with a focus on gender equality)
Intermediate Results Indicator
IRI 3. Proportion of public schools supported by the Project that develop and implement school improvement plans approved by MENFP
PDO Indicator
PDO3.a.Number of children enrolled in primary school through the provision of community education grants for school access, of which female
Intermediate Results Indicator
IRI 8. Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions.
Intermediate Results Indicator
Students benefiting from direct interventions to enhance learning - Female
Intermediate Results Indicator
Utility of the learning assessment system
PDO Indicator
PDO3.c. Number of children enrolled in primary school through the provision of results-based financing to non-public schools, of which female
PDO Indicator
PDO3.d. Number of children enrolled in the sub-component 2.2 “full-packge” public primary schools of which are female (Number,cumulative)
Intermediate Results Indicator
Students benefiting from direct interventions to enhance learning
PDO Indicator
PDO3.e. Number of children enrolled in sub-component 2.3 “light-package” primary schools of which are female (number,cumulative) (Number)
Intermediate Results Indicator
IRI 2. Number of communities proposing and implementing community education plans
PDO Indicator
PDO3.b. Number of children enrolled in primary school through the provision of tuition waivers to non-public schools, of which female
Intermediate Results Indicator
IRI 7. Direct project beneficiaries
44000-P155201
World Bank
Municipal Development and Urban Resilience Project
International Development AssociationMinistry of Finance
International Development AssociationMinistry of Interior and Local Authorities
Ministry of Public Works, Transport and Communications
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Paula Restrepo Cadavid
+1-202-473-1000prestrepocadavid@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Milot
19.63333 -72.21667
RiviEre Haut du Cap
19.75139 -72.20333
Haut du Cap
19.72333 -72.22889
Bassin
19.61667 -72.48333
Acul du Nord
19.65 -72.31667
Limonade
19.66667 -72.13333
Plaine du Nord
19.63333 -72.25
Quartier Morin
19.69667 -72.15694
Sub-National GovernmentOther Water Supply, Sanitation and Waste ManagementFlood and Drought Risk ManagementWatershed ManagementClimate changeUrban Infrastructure and Service DeliveryUrban DevelopmentUrban PlanningDisaster Risk ManagementMunicipal Institution BuildingRenewable Natural Resources Asset ManagementAdaptationPublic Administration
0.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.37
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1450000.00
1450000.00
1450000.00
1450000.00
1450000.00
1450000.00
1450000.00
1450000.00
1450000.00
1450000.00
1450000.00
1450000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
266666.67
266666.67
266666.66
400000.00
400000.00
400000.00
0.00
0.00
0.00
155053.12
155053.12
155053.11
280020.85
280020.85
280020.86
519241.59
519241.59
519241.60
232207.79
232207.79
232207.79
67106.42
67106.42
67106.41
535374.00
535374.00
535374.00
4110855.53
4110855.53
4110855.54
1622725.06
1622725.06
1622725.05
2576471.92
2576471.92
2576471.91
1121666.66
1121666.66
1121666.67
1121666.66
1121666.66
1121666.67
788333.33
788333.33
788333.33
1121666.68
1121666.68
1121666.67
604540.21
604540.21
604540.20
600000.00
600000.00
600000.00
600000.00
600000.00
600000.00
600000.00
600000.00
600000.00
600000.00
600000.00
600000.00
603736.83
603736.83
603736.84
0.00
0.00
0.00
0.00
48400000Total Commitment in Second Quarter of 2017
International Development Association
800000Total Disbursement in Third Quarter of 2018
International Development Association
1200000Total Disbursement in Fourth Quarter of 2018
International Development Association
465159Total Disbursement in Second Quarter of 2019
International Development Association
74374Total Disbursement in Third Quarter of 2019
International Development Association
400000Total Disbursement in Third Quarter of 2019
International Development Association
365689Total Disbursement in Third Quarter of 2019
International Development Association
1557725Total Disbursement in Fourth Quarter of 2019
International Development Association
356623Total Disbursement in First Quarter of 2020
International Development Association
130707Total Disbursement in Second Quarter of 2020
International Development Association
850852Total Disbursement in Third Quarter of 2020
International Development Association
515189Total Disbursement in Third Quarter of 2020
International Development Association
240081Total Disbursement in Third Quarter of 2020
International Development Association
95011Total Disbursement in Fourth Quarter of 2020
International Development Association
11931533Total Disbursement in Fourth Quarter of 2020
International Development Association
2666807Total Disbursement in First Quarter of 2021
International Development Association
143652Total Disbursement in First Quarter of 2021
International Development Association
783433Total Disbursement in First Quarter of 2021
International Development Association
529416Total Disbursement in Second Quarter of 2021
International Development Association
7793264Total Disbursement in Second Quarter of 2021
International Development Association
274187Total Disbursement in Third Quarter of 2021
International Development Association
680662Total Disbursement in Third Quarter of 2021
International Development Association
641378Total Disbursement in Third Quarter of 2021
International Development Association
676292Total Disbursement in Fourth Quarter of 2021
International Development Association
244486Total Disbursement in Fourth Quarter of 2021
International Development Association
355459Total Disbursement in First Quarter of 2022
International Development Association
117191Total Disbursement in First Quarter of 2022
International Development Association
248484Total Disbursement in First Quarter of 2022
International Development Association
323937Total Disbursement in Second Quarter of 2022
International Development Association
Project Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Project Steering Committee: Maintain at all times during Project implementation, the Project Steering Committee, with composition,responsibilities, resources and mandate satisfactory to the Association, as further detailed in the Operational Manual. Schedule 2,Section I, A.1 (a) for the IDA and SCF-PPCR Grants. (Continuous) (for both IDA and SCF-PPCR Grants).
The Project Coordination Unit (UCP) under the Ministry of Interior and Local Authorities (MICT) : Ensure that the UCP-MICT shall beresponsible for the day-to-day administration, overall planning, coordination, fiduciary (procurement, disbursement, safeguards andfinancial management), monitoring evaluation reporting and communication of the activities under Part 2 and 4.2 of the Project; asfurther detailed in the Operational Manual. Schedule 2, Section I, A.3 (b) for the IDA and SCF-PPCR Grants. (Continuous). (for bothIDA and SCF-PPCR Grants).
The Central Implementing Unit (UCE) under the Ministry of Public Works, Transport and Communications (MTPTC): Ensure that theUCE-MTPTC shall be responsible for the day-to-day administration, overall planning, coordination, fiduciary (procurement,disbursement, safeguards and financial management), monitoring evaluation reporting and communication of the activities under Parts1 and 4.1 of the Project; as further detailed in the Operational Manual. Schedule 2, Section I, A.4 (b) for the IDA and SCF-PPCRGrants. (Continuous). (for both IDA and SCF-PPCR Grants).
Mobile Technical Support Team (MTST): No later than three months after the Effective Date, hire under terms of reference acceptableto the Association, the MTST, and thereafter maintain, during the implementation of the Project, the MTST with functions, staffingand resources satisfactory to the Association, as further detailed in the Operational Manual. Schedule 2, Section I, A.5 (a) fortheIDA and SCF-PPCR Grants. (3 months after effectiveness). (for both IDA and SCF-PPCR Grants).
Technical Project Coordinators: No later than two months after the Effective Date, appoint under terms of reference and in form andsubstance satisfactory to the Association, the Technical Coordinators, and thereafter maintain at all times during theimplementation of the Project, the Technical Project Coordinators within UCP-MICT and UCE-MTPTC, respectively, with functions,qualifications, and resources satisfactory to the Association, as further detailed in the Operational Manual. Schedule 2, SectionI, A.6 (a) for the IDA and SCF-PPCR Grants. (2 months after effectiveness). (for both IDA and SCF-PPCR Grants).
The Project's Delegated Implementation Agency (MDOD): No later than three months after the Effective Date, hire under terms ofreference and in form and substance satisfactory to the Association, the MDOD, and thereafter operate and maintain, at least duringthe first three years of the implementation of the Project, the MDOD with functions, staffing and resources satisfactory to theAssociation, as further detailed in the Operational Manual. Schedule 2, Section I, A.7 (a) for the IDA and SCF-PPCR Grants. (3months after effectiveness). (for both IDA and SCF-PPCR Grants).
Contingency Emergency Response: In order to ensure the proper implementation of Part 3 of the Project (“CER Part”), the Recipientshall take the following measures:(a) prepare and furnish to the Association for its review and approval, an operations manual(“CER Operations Manual”) which shall set forth detailed implementation arrangements for the CER Part, including: (i) designationof terms of reference for, and resources to be allocated to, the entity to be responsible for coordinating and implementing the CERPart (“Coordinating Authority”); (ii) specific activities which may be included in the CER Part, Eligible Expenditures requiredtherefore (“Emergency Expenditures”), and any procedures for such inclusion; (iii) financial management arrangements for the CERPart; (iv) procurement methods and procedures for Emergency Expenditures to be financed under the CER Part; (v) documentationrequired for withdrawals of Emergency Expenditures; (vi) environmental and social safeguard management frameworks for the CER Part,consistent with the Association's policies on the matter; and (vii) any other arrangements necessary to ensure proper coordinationand implementation of the CER Part;(b) afford the Association a reasonable opportunity to review the proposed CER OperationsManual;(c) promptly adopt the CER Operations Manual for the CER Part as shall have been approved by the Association;(d) ensurethat the CER Part is carried out in accordance with the CER Operations Manual; provided, however, that in the event of anyinconsistency between the provisions of the CER Operations Manual and this Agreement, the provisions of this Agreement shallprevail; and(e) not amend, suspend, abrogate, repeal or waive any provision of the CER Operations Manual without prior approvalby the Association.Schedule 2, Section I, D.1 for the IDA and SCF-PPCR Grants. (In case of a CER). (for both IDA and SCF-PPCRGrants to harmonize implementation arrangements but the SCF-PPCR Grant will not finance contingency emergency response).
Anti-corruption: Ensure that the Project is carried out in accordance with the provisions of the Anti-Corruption Guidelines.Schedule 2, Section I, E for the IDA and SCF-PPCR Grants. (Continuous) (for both IDA and SCF-PPCR Grants).
ESIA and RAP: Prepare, consult, adopt and publish no later than four months after the Effective Date, the Environmental and SocialImpact Assessment (ESIA) and the Resettlement Action Plan for Part 1 of the Project, both in form and substance satisfactory to theAssociation. Schedule 2, Section I, F.1 for the IDA and SCF-PPCR Grants. (4 months after effectiveness). (for both IDA and SCF-PPCRGrants).
Safeguards: Ensure that the Project is carried out in accordance with the ESMF, the ESIA (once published), the RPF, the RAPs (oncepublished) and any site-specific EMP to be developed and approved in accordance with the ESMF or the ESIA, all in a manneracceptable to the Association. The Recipient shall not amend, suspend or abrogate any of the provisions of the ESMF, the ESIA, theRPF or any EMP or RAP without the prior agreement of the Association. Schedule 2, Section I, F.2 for the IDA and SCF-PPCR Grants.(Continuous). (for both IDA and SCF-PPCR Grants).
Implementation arrangements: Maintain at all times during Project implementation, MICT, MTPTC and the Targeted Municipalities, withresponsibilities, resources and mandate satisfactory to the Association, as further detailed in the Operational Manual. Schedule 2,Section I, A.2 (c) for the IDA and SCF-PPCR Grants. (Continuous). (for both IDA and SCF-PPCR Grants).
Operational Manual: Carry out the Project in accordance with a manual (the Operational Manual), satisfactory in form and substanceto the Association, Schedule 2, Section I, B for the IDA and SCF-PPCR Grants (continuous) (for both IDA and SCF-PPCR Grants).
Intermediate Results Indicator
Reduction in the flooded areas of Cap Haitien
Intermediate Results Indicator
Non-structural Measures Plan developed and implemented
Intermediate Results Indicator
Progress in implementing the Resettlement Action Plan of the Bassin Rhodo
Intermediate Results Indicator
Availability of a flood risk management plan for the city of Cap Haitien
Intermediate Results Indicator
Contingent Emergency Response Operations Manual developed and adopted
Intermediate Results Indicator
Roads rehabilitated - non-rural
Intermediate Results Indicator
Kilometers of urban ravines dredged and stabilized
Intermediate Results Indicator
Roads rehablitated
Intermediate Results Indicator
Roads rehabilitated - rural
Intermediate Results Indicator
Project Affected Households reporting satisfaction with consultation activities regarding the resettlement process
Intermediate Results Indicator
Share of sub-projects captured by M&E framework and reflected in annual reporting from the PIU
Intermediate Results Indicator
Inquiries and Grievances related to the project recorded in the cash-transfer GRM system that are addressed and communicated back to the concerned stakeholder within 30 days
Intermediate Results Indicator
Number of communes in which hand-washing station were installed
PDO Indicator
Number of beneficiaries receiving COVID-19 emergency cash transfers
PDO Indicator
People benefiting from reduced flood risk in Cap Haitien
PDO Indicator
People provided with improved urban living conditions
PDO Indicator
Women beneficiaries receiving COVID-19 emergency cash transfers
PDO Indicator
People provided with improved urban living conditions - Female (RMS requirement)
Intermediate Results Indicator
Number of key municipal staff trained and provided with on the job support
Intermediate Results Indicator
Number of municipalities with fully functional City Hall/administration buildings
Intermediate Results Indicator
Number of municipalities submitting financial reports to MICT no later than one month after the start of the Fiscal Year
Intermediate Results Indicator
Number COVID-19 personal protection equipment kits distributed to civil protection committees
Intermediate Results Indicator
Cities with improved livability, sustainability, and/or management
44000-P156719
World Bank
Haiti: Renewable Energy for All
International Development AssociationMinistry of Finance
International Development AssociationMTPTC Energy Cell
Ministry of Public Works, Transportation and Communication
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Jose Francisco Perez Caceres
+1-202-473-1000jperezcaceres@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Tiburon
18.32589 -74.39598
Saint-Marc
19.10819 -72.69379
Roche-à-Bateau
18.18095 -74.00104
Port-de-Paix
19.9389 -72.83257
Port-au-Prince
18.51667 -72.31667
Port-à-Piment
18.24963 -74.0971
Plateau
18.75 -71.9
Tigwav
18.42939 -72.86297
PEligre
18.90333 -72.03917
Les Anglais
18.3054 -74.21968
Jeremi
18.58333 -74.2
Jacmel
18.23427 -72.53539
Cap Haitien
19.76667 -72.21667
Republic of Haiti
19 -72.41667
Drouet
18.21667 -73.78333
Arrondissement des Coteaux
18.25 -74
Chivre
19.66667 -72.5
Les Cayes
18.19331 -73.74601
Camp Perrin
18.32667 -73.86268
DEpartement de l'Artibonite
19.33333 -72.5
Aquin
18.28333 -73.4
Public Administration - Energy and ExtractivesEnergy Transmission and DistributionRenewable Energy SolarClimate changeGenderEnergy EfficiencyMitigationAccess to EnergyEnergyEnergy Policies & Reform
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30000.00
20000.00
20000.00
20000.00
20000.00
30000.00
20000.00
20000.00
20000.00
20000.00
30000.00
20000.00
20000.00
20000.00
20000.00
30000.00
20000.00
20000.00
20000.00
20000.00
30000.00
20000.00
20000.00
20000.00
20000.00
40000.00
20000.00
20000.00
20000.00
30000.00
50000.00
30000.00
30000.00
30000.00
30000.00
70000.00
40000.00
40000.00
40000.00
90000.00
50000.00
50000.00
50000.00
40000.00
80000.00
40000.00
40000.00
40000.00
50000.00
120000.00
80000.00
80000.00
70000.00
70000.00
140000.00
70000.00
70000.00
70000.00
70000.00
130000.00
70000.00
70000.00
70000.00
70000.00
130000.00
70000.00
130000.00
70000.00
130000.00
70000.00
70000.00
70000.00
70000.00
130000.00
70000.00
70000.00
70000.00
150000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16666.67
16666.67
16666.67
16666.67
16666.67
16666.67
16666.67
16666.67
16666.67
16666.67
16666.67
16666.63
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.63
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.37
312000.00
312000.00
312000.00
312000.00
312000.00
312000.00
312000.00
312000.00
312000.00
312000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4000000Total Commitment in Third Quarter of 2020
International Development Association
352587Total Disbursement in Second Quarter of 2021
International Development Association
320003Total Disbursement in Second Quarter of 2021
International Development Association
528628Total Disbursement in Fourth Quarter of 2021
International Development Association
310888Total Disbursement in Fourth Quarter of 2021
International Development Association
Project Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportGrant or Trust Fund AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :MTPTC Energy Cell | Description :The Recipient shall operate and maintain, at all times during theimplementation of the Project, the MTPTC Energy Cell under the administrative authority of MTPTC, with functions, staffing andresources satisfactory to the World Bank | Frequency :CONTINUOUS
Finance Agreement :MTPTC PIU | Description :The Recipient shall operate and maintain, at all times during the implementation of theProject, the PIU under the administrative authority of MTPTC, with functions, staffing and resources satisfactory to the WorldBank. | Frequency :CONTINUOUS
Finance Agreement :EDH Escrow Account | Description :The Recipient shall establish and thereafter operate and maintain at all timesduring the implementation of the Project, the Escrow Account under the administrative authority of EDH and on terms and conditionssatisfactory to the World Bank, as further detailed in the Operational Manual, to facilitate payments under the O&M Contract, andensure sustainability of Sub-component 1a of the Project. | Frequency :CONTINUOUS
Schedule 2 Section I A 1, 2, 3 and 4 (Institutional Arrangements)1. MTPTC and MG Beneficiaries(a) The Recipient shall ensure atall times during Project implementation, that the MTPTC and the MG Beneficiaries have responsibilities, resources and mandatesatisfactory to the Association, as further detailed in the Operational Manual.(b) Without limitation to sub-paragraph (a)immediately above, the Recipient shall ensure that the MTPTC and the MG Beneficiaries shall be responsible for providingoperational guidance to ensure prompt and efficient implementation of the parts of the Project under their respectiveresponsibility, including, inter alia: (i) reviewing progress made towards achieving the Project's objectives; (ii) facilitatingthe coordination of Project activities, and making recommendations for removal of any obstacles to the implementation of theProject; and (iii) providing comments on reports and reviews prepared by MTPTC Energy Cell under the Project, all in accordancewith the Operational Manual.2. MTPTC Energy Cell(a) The Recipient shall operate and maintain, at all times during theimplementation of the Project, the MTPTC Energy Cell under the administrative authority of the MTPTC, with functions, staffing andresources satisfactory to the Association, as further detailed in the Operational Manual.(b) Without limitation to the provisionsof Section I.A.1 of this Schedule, the Recipient shall ensure that the MTPTC Energy Cell shall be responsible for the day-to-dayadministration, overall planning, coordination, monitoring, evaluation, reporting, and communication of the activities under Part 1and Parts 2(a), 2(b) and 2(d) of the Project; as further detailed in the Operational Manual. 3. Project Implementing Unit(a) TheRecipient shall operate and maintain, at all times during the implementation of the Project, the PIU under the administrativeauthority of the MTPTC, with functions, staffing and resources satisfactory to the Association, as further detailed in theOperational Manual.(b) Without limitation to the provisions of Section I.A.1 of this Schedule, the Recipient shall ensure that thePIU shall be responsible for procurement, disbursement, safeguards, and financial management of the activities under Part 1 andParts 2(a), 2(b) and 2(d) of the Project; as further detailed in the Operational Manual.4. Escrow AccountUpon completion of theinvestments under Part 1(a) benefiting EDH grids, the Recipient shall establish and thereafter operate and maintain for theremainder of the Project, an escrow account (the Escrow Account) under the administrative authority of EDH and on terms andconditions satisfactory to the Association, as further detailed in the Operational Manual, to facilitate payments under the O&MContract, and ensure sustainability under Part 1(a) of the Project.
Schedule 2 Section I B 1, 2, 3, 4 and 5 (Operational Manual and Annual Work Plans)1. The Recipient shall carry out the Project inaccordance with a manual (the Operational Manual), satisfactory in form and substance to the Association, to be updated on orbefore November 30, 2020 and which consists of different schedules setting forth rules, methods, guidelines, specific developmentplans, standard documents, and procedures for the carrying out of the Project, including the following:(a) the detaileddescription of all Project activities, their sequencing and the prospective timetable and benchmarks in relation thereto;(b) theProject administrative, financial, accounting, auditing, procurement safeguards (environmental and social), and disbursementprocedures, including all relevant standard documents;(c) the eligibility criteria for the Village Grid Investments, the modelform for the Service Agreements, including the criteria to be met by Municipal Grid Service Providers to receive such MunicipalGrid Grants and by MG Beneficiaries;(d) the eligibility criteria for the Productive Use Investments, the main characteristics ofthe Productive Use Agreements, including the criteria to be met by Distributed Energy Service Companies to receive such ProductiveUse Grants and by PU Beneficiaries to benefit from said Productive Use Grants;(e) the eligibility criteria for the DistributedSystem Investments, the main characteristics of the Distributed System Agreements, including the criteria to be met by DistributedEnergy Service Companies to receive such Distributed System Grants and by households and small businesses to be selected to benefitfrom said Distributed System Grants;(f) the monitoring indicators for the Project; (g) the list ofactivities/investments excluded under the Project, including any activity involving the rehabilitation and/or construction of damsthat are 15 meters or more in height;(h) the description of the functioning of the Escrow Account; and(i) the grievancemechanisms and the code of ethics and conduct.2. The Operational Manual may only be amended from time to time in consultationwith, and after approval of, the Association. In case of any conflict between the terms of the Operational Manual and those ofthis Agreement, the terms of this Agreement shall prevail.3. In addition, and without limitation to the obligations set forth inParagraphs 1 and 2 above, the Recipient shall carry out Part 1 of the Project in accordance with Annual Work Plans to be preparedand furnished to the Association not later than October 31 of each calendar year during the implementation of the Project (thefirst such Annual Work Plan being due by November 30, 2020), and containing all activities proposed for inclusion in the Projectfor the next calendar year, including: (a) a detailed timetable for the sequencing and implementation of proposed Projectactivities; (b) the types of expenditures required for such activities and a proposed financing plan and sources of funding forsuch expenditures; (c) any Operating Costs or Training that may be required under the Project; and (d) the reference to eachSafeguard instrument applicable to said activities in accordance with the provisions of Section I.F of this Schedule 2 and theproposed approach to ensure preparation and implementation of said Safeguard instrument during the relevant year. 4. The Recipient shall afford the Association a reasonable opportunity to exchange views on each such proposed Annual Work Plan; and, thereafterensure that the Project is implemented with due diligence during said following calendar year in accordance with such Annual WorkPlan as shall have been approved by the Association.5. The Annual Work Plans may only be amended from time to time inconsultation with, and after approval of, the Association. In case of any conflict between the terms of the Annual Work Plans andthose of this Agreement, the terms of this Agreement shall prevail.
Schedule 2 Section I C; D; and E (Municipal Grid Investments; Productive Use Investments; and Distributed SystemInvestments)C. Municipal Grid Investments1. For purposes of carrying out Part 2(a) of the Project, and upon selection of anygiven Municipal Grid Investment in accordance with criteria and procedures acceptable to the Association, as set forth in theOperational Manual, the Recipient, through the MTPTC Energy Cell, shall enter into an agreement (the Tripartite Service Agreement)with the pertinent MG Beneficiary and the Municipal Grid Service Provider (if applicable, as determined by the Association) underterms and conditions acceptable to the Association, which shall include, inter alia, the following: (a) the obligation of theRecipient, through the MTPTC Energy Cell, to make a Municipal Grid Grant to the selected Municipal Grid Service Provider for theimplementation of a Municipal Grid Investment.(b) the right of the Recipient, through the MTPTC Energy Cell, to:(i) suspend inwhole or in part the right of the selected Municipal Grid Service Provider to benefit from the proceeds of the Municipal GridGrant, or obtain a refund of all or any part of the amount of the Municipal Grid Grant then withdrawn, upon the selected MunicipalGrid Service Provider's failure to perform any of its obligations under the Service Agreement; or (ii) terminate the ServiceAgreement, as the case may be.(c) the obligation of the Municipal Grid Service Provider to:(i) carry out the pertinent MunicipalGrid Investment with due diligence and efficiency and in accordance with the provisions of the Operational Manual, theAnti-Corruption Guidelines applicable to recipient of Grant proceeds other than the Recipient, and the pertinent provisions of thisAgreement, including those set forth in Section I.F of this Schedule; and(ii) (A) maintain adequate records and accounts, and makeavailable such documentation to the Recipient and any other information that the Recipient may request in order to comply with itsobligations under Section II of this Schedule; and (B) ensure that the Municipal Grid Investments are used for the intendedpurpose.2. The Recipient shall exercise its rights and carry out its obligations, through the MTPTC Energy Cell, under eachService Agreement in such manner as to protect the interests of the Association and to accomplish the purposes of the Grant. Exceptas the Association shall otherwise agree, the Recipient, through the MTPTC Energy Cell, shall not assign, amend, abrogate, repeal,terminate, waive or fail to enforce any Service Agreement or any provision thereof.D. Productive Use Investments1. For purposesof carrying out Part 2(b) of the Project, and upon selection of any given Productive Use Investment in accordance with criteria andprocedures acceptable to the Association, as set forth in the Operational Manual, the Recipient, through the MTPTC Energy Cell,shall enter into an agreement (the Productive Use Agreement) with the Distributed Energy Service Company or the PU Beneficiary, asthe case may be, under terms and conditions acceptable to the Association, which shall include, inter alia, the following: (a) theobligation of the Recipient, through the MTPTC Energy Cell, to: make a Productive Use Grant to the Distributed Energy ServiceCompanies or the Municipal Grid Service Providers, for the benefit of the PU Beneficiaries, or to the PU Beneficiaries (as the casemay be), for the implementation of a Productive Use Investment under a Productive Use Agreement.(b) the right of the Recipient,through the MTPTC Energy Cell, to:(i) suspend in whole or in part the right of the Distributed Energy Service Companies or the PUBeneficiaries to benefit from the proceeds of the Productive Use Grant, or obtain a refund of all or any part of the amount of theProductive Use Grant then withdrawn, upon the Distributed Energy Service Company's or PU Beneficiaries failure to perform any ofits obligations under the Productive Use Agreement; or (ii) terminate the Productive Use Agreement, as the case may be.(c) theobligation of the Distributed Energy Service Company or the PU Beneficiary to:(i) carry out the pertinent Productive UseInvestment with due diligence and efficiency and in accordance with the provisions of the Operational Manual, the Anti-CorruptionGuidelines applicable to recipient of Grant proceeds other than the Recipient, and the pertinent provisions of this Agreement,including those set forth in Section I.F of this Schedule; and(ii) (A) maintain adequate records and accounts, and make availablesuch documentation to the Recipient and any other information that the Recipient may request in order to comply with itsobligations under Section II of this Schedule; and (B) ensure that the Productive Use Investments are used for the intendedpurpose.2. The Recipient shall exercise its rights and carry out its obligations, through the MTPTC Energy Cell, under eachProductive Use Agreement in such manner as to protect the interests of the Association and to accomplish the purposes of the Grant.Except as the Association shall otherwise agree, the Recipient, through the MTPTC Energy Cell, shall not assign, amend, abrogate,repeal, terminate, waive or fail to enforce any Productive Use Agreement or any provision thereof.E. Distributed SystemInvestments1. For purposes of carrying out Part 2(c) of the Project, and upon selection of any given Distributed SystemInvestment in accordance with criteria and procedures acceptable to the Association, as set forth in the Operational Manual, theRecipient shall cause FDI, to enter into an agreement (the Distributed System Agreement) with the Distributed Energy ServiceCompany (if applicable, as determined by the Association) under terms and conditions acceptable to the Association, which shallinclude, inter alia, the following: (a) the obligation of FDI to make a Distributed System Grant to the selected DistributedEnergy Service Company for the implementation of a Distributed System Investment.(b) the right of the FDI, to:(i) suspend inwhole or in part the right of the selected Distributed Energy Service Company to benefit from the proceeds of the DistributedSystem Grant, or obtain a refund of all or any part of the amount of the Distributed System Grant then withdrawn, upon the selectedDistributed Energy Service Company's failure to perform any of its obligations under the Distributed System Agreement; or(ii) terminate the Distributed System Agreement, as the case may be.(c) the obligation of the Distributed Energy Service Companyto:(i) carry out the pertinent Distributed System Investment with due diligence and efficiency and in accordance with theprovisions of the Operational Manual, the Anti-Corruption Guidelines applicable to recipient of Grant proceeds other than theRecipient, and the pertinent provisions of this Agreement, including those set forth in Section I.F of this Schedule; and(ii) (A)maintain adequate records and accounts, and make available such documentation to the Recipient and any other information that theRecipient may request in order to comply with its obligations under Section II of this Schedule; and (B) ensure that theDistributed System Investments are used for the intended purpose.2. The Recipient shall exercise its rights and carry out itsobligations, through the FDI, under each Distributed System Agreement in such manner as to protect the interests of the Associationand to accomplish the purposes of the Grant; except as the Association shall otherwise agree, the Recipient, through the FDI, shallnot assign, amend, abrogate, repeal, terminate, waive or fail to enforce any Distributed System Agreement or any provisionthereof.
Schedule 2 Section I F, 1, 2, 3, 4, 5 and 6 (Safeguards )1. The Recipient shall ensure that the Project is carried out inaccordance with the ESMF, the RPF, and any site-specific EMP or RAP to be developed and approved in accordance with the ESMF andthe RPF, respectively, all in a manner acceptable to the Association. The Recipient shall not amend, suspend or abrogate any of theprovisions of the ESMF, the RPF or any EMP or RAP without the prior agreement of the Association.2. Prior to the carrying out ofany works under the Project, the Recipient shall: (i) carry out an environmental and social screening and assessment of theproposed activities; (ii) carry out a resettlement screening and assessment of the proposed activities; (iii) as applicable, and asdetermined by the Association, prepare an EMP and/or RAP, all in accordance with the ESMF, or the RPF; and (iv) immediatelythereafter, carry out the pertinent EMP and/or RAP in accordance with its terms and in a manner acceptable to the Association.3. The Recipient shall ensure that the contractors for civil works under the Project include the obligation of the relevantcontractor to comply with and implement the relevant ESMF, RPF, EMP or RAP, as applicable to such civil works commissioned orcarried out pursuant to said contract.4. The Recipient shall ensure that the terms of reference for any consultancy in respect ofany Project activity shall be satisfactory to the Association following its review thereof, and to that end, such terms ofreference shall duly incorporate the requirements of the Association's Safeguards Policies then in force, as applied to the adviceconveyed through such technical assistance.5. The Recipient undertakes that no physical or economic involuntary resettlement (asinterpreted in accordance with the Association's Operational Policy 4.12 (OP 4.12)) shall take place in connection with Projectimplementation without a RAP.6. The Recipient undertakes that no activity involving the use or potential pollution of theArtibonite River or the Massacre and Artibonite aquifers (as determined by the Association) shall be carried out under the Projectin accordance with the Association's Safeguards Policies (OP/BP 7.50).
Intermediate Results Indicator
Increased public and private investments in targeted subsectors as a result of SREP interventions (Component 1)
Intermediate Results Indicator
Increased public and private investments in targeted subsectors as a result of SREP interventions (Component 2)
Intermediate Results Indicator
Generation capacity of energy constructed or rehabilitated (Component 1)
Intermediate Results Indicator
Generation capacity of energy constructed or rehabilitated (Component 2)
Intermediate Results Indicator
Annual electricity output from renewable energy, as a result of SREP interventions (Component 1)
Intermediate Results Indicator
Annual electricity output from renewable energy, as a result of SREP interventions (Component 2)
Intermediate Results Indicator
Annual greenhouse gas emission reductions (Component 1)
Intermediate Results Indicator
Annual greenhouse gas emission reductions (Component 2)
Intermediate Results Indicator
Electricity access gap between mono-parental rural households and other rural households (Component 2)
Intermediate Results Indicator
Gap between the share of men and women not feeling safe to go out after dark
Intermediate Results Indicator
Actions are taken in a timely manner in response to beneficiary feedback from phone surveys and household visits
Intermediate Results Indicator
Enabling framework for mini-grids, including Tripartite Service Agreements in place (Component 2)
Intermediate Results Indicator
Users reporting mini-grid or off-grid electricity service provided according to the advertised performance
PDO Indicator
People provided with new or improved electricity service
PDO Indicator
People served by facilities with new or improved electricity supply in response to COVID-19
PDO Indicator
Women and girls provided with new or improved electricity service
PDO Indicator
Enterprises and community services with new or improved electricity service
PDO Indicator
of which prioritized healthcare and water facilities in the context of COVID-19
PDO Indicator
Enabling policy and regulatory framework for clean energy and access enacted
Intermediate Results Indicator
Number of people trained in renewable energy (Component 2)
Intermediate Results Indicator
Number of female jobs and female-headed (micro-) enterprises created (Component 2)
Intermediate Results Indicator
People served by facilities with new or improved electricity supply in response to COVID-19 (Component 2)
Intermediate Results Indicator
Number of businesses and community services benefitting from improved access to electricity and fuels, as a result of SREP interventions (Component 1)
Intermediate Results Indicator
Number of businesses and community services benefitting from improved access to electricity and fuels, as a result of SREP interventions (Component 2)
Intermediate Results Indicator
of which prioritized healthcare and water facilities in the context of COVID-19 (Component 1)
Intermediate Results Indicator
of which prioritized healthcare and water facilities in the context of COVID-19 (Component 2)
Intermediate Results Indicator
Number of people benefitting from improved access to electricity and fuels, as a result of SREP interventions (Component 1)
Intermediate Results Indicator
Number of people, benefitting from improved access to electricity and fuels, as a result of SREP interventions (Component 2)
Intermediate Results Indicator
Number of women benefitting from improved access to electricity and fuels, as a result of SREP interventions (Component 1)
Intermediate Results Indicator
Number of women with improved access to electricity and fuels, as a result of SREP interventions (Component 2)
Intermediate Results Indicator
People served by facilities with new or improved electricity supply in response to COVID-19 (Component 1)
PDO Indicator
Private investment and other commercial financing leveraged
44000-P157531
World Bank
Statistical Capacity Building Project
International Development AssociationMinistry of Economy and Finance, MEF
MINISTRY OF ECONOMY AND FINANCE
International Development AssociationINSTITUT HAITIEN DE STATISTIQUE ET DE L'INFORMATIQUE
UCP - MEF
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Celestin Adjalou Niamien
+1-202-473-1000cniamien@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Republic of Haiti
19 -72.41667
Central Government (Central Agencies)Data Development and Capacity BuildingData production, accessibility and useDemographics and AgingGenderInstitutional strengthening and capacity building
0.00
0.00
625000.00
625000.00
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
833333.33
833333.33
833333.34
0.00
0.00
0.00
0.00
0.00
0.00
333333.33
333333.33
333333.34
666666.66
666666.67
666666.67
0.00
0.00
0.00
248976.33
248976.33
248976.34
228849.20
228849.20
228849.20
108810.71
108810.72
108810.72
279409.91
279409.91
279409.92
0.00
0.00
0.00
265305.40
265305.40
265305.40
265305.40
265305.40
265305.40
265305.40
265305.40
265305.40
265305.40
265305.40
265305.39
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.63
266666.67
266666.67
266666.67
266666.67
266666.67
266666.67
266666.67
266666.67
266666.67
266666.67
266666.67
266666.63
283032.79
283032.79
283032.79
283032.79
283032.79
283032.77
5000000Total Commitment in First Quarter of 2017
International Development Association
2500000Total Disbursement in Fourth Quarter of 2017
International Development Association
15000000Total Commitment in Second Quarter of 2018
International Development Association
1000000Total Disbursement in Third Quarter of 2018
International Development Association
915155Total Disbursement in First Quarter of 2022
International Development Association
2000000Total Disbursement in Fourth Quarter of 2018
International Development Association
746929Total Disbursement in Second Quarter of 2019
International Development Association
686548Total Disbursement in Third Quarter of 2019
International Development Association
326432Total Disbursement in Fourth Quarter of 2019
International Development Association
464423Total Disbursement in First Quarter of 2020
International Development Association
373807Total Disbursement in First Quarter of 2020
International Development Association
255613Total Disbursement in Third Quarter of 2020
International Development Association
359671Total Disbursement in Third Quarter of 2020
International Development Association
371538Total Disbursement in Fourth Quarter of 2020
International Development Association
344160Total Disbursement in Fourth Quarter of 2020
International Development Association
138975Total Disbursement in First Quarter of 2021
International Development Association
590262Total Disbursement in First Quarter of 2021
International Development Association
523241Total Disbursement in Second Quarter of 2021
International Development Association
507555Total Disbursement in Second Quarter of 2021
International Development Association
92650Total Disbursement in Second Quarter of 2021
International Development Association
423697Total Disbursement in Third Quarter of 2021
International Development Association
221143Total Disbursement in Fourth Quarter of 2021
International Development Association
Project Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
The Recipient shall operate and maintain, throughout Project implementation, a Project Implementation Unit (the PIU) within IHSI,with qualified and experienced staff in sufficient numbers, as well as with adequate funds, facilities, services and otherresources, and responsible for the procurement, financial management, and monitoring and evaluation aspects of the Project, allacceptable to the Association (FA, Schedule 2, section I A).
The Recipient, through IHSI, shall carry out, and/or cause to be carried out, the Project in accordance with the OperationalManual, which consists of different schedules setting forth, respectively, rules, methods, guidelines, specific development plans,standard documents and procedures for the carrying out of the Project (FA, Schedule 2, section I B).
For purposes of facilitating the implementation of Part 2.1 of the Project, the Recipient shall, no later than eighteen months (18)after the Effective Date, develop and adopt a sustainability strategy for the IFMIS, acceptable to the Association.
The Recipient shall, no later than four (4) months after the Effective Date, hire an auditor under terms and conditions acceptableto the Association.
The Recipient shall establish, and thereafter operate and maintain, throughout the implementation of Part 2 and Part 3(b) ofProject, the IFMIS Team within the MEF by appointing qualified and experience staff in sufficient numbers as well as by assigningadequate funds, facilities, services and other resources acceptable to the Association.
The Recipient shall operate and maintain, throughout the implementation of Part 2 and Part 3(b) of the Project, the UCP, and theCRFP, with qualified and experienced staff in sufficient numbers, as well as with adequate funds, facilities, services and otherresources, all acceptable to the Association.
The Recipient, shall adopt the Operational Manual and carry out, Part 2 and Part 3(b) of the Project in accordance with said manual.
PDO Indicator
Efficiency and security of payments other than salaries
Intermediate Results Indicator
Impact of the coordination group of control institutions against corruption
PDO Indicator
Timeliness of annual financial statement
PDO Indicator
Data, including gender disaggregated, and reports related to the census are posted on the IHSI website
PDO Indicator
Coverage of fiscal reports produced by the budget and accounting system
PDO Indicator
Public access to transparent fiscal information
Intermediate Results Indicator
Census preliminary results published by IHSI
Intermediate Results Indicator
Vulnerability indicators at the enumeration section level calculated by IHSI for the entire national territory and published at thecommunal section level
Intermediate Results Indicator
Implementation of a citizen budget
Intermediate Results Indicator
Equipment (tablets) effectively used for collecting census data
Intermediate Results Indicator
Preliminary report on the results of the census is produced and published by IHSI staff
Intermediate Results Indicator
Data from the census uploaded on the central IT system
Intermediate Results Indicator
Dissemination strategy designed by IHSI and approved by its management
Intermediate Results Indicator
Pilot census process and results are evaluated by IHSI staff to identify and make needed adjustments
Intermediate Results Indicator
Data from the pilot census uploaded on the central IT system
Intermediate Results Indicator
Progress of full data collection is monitored by IHSI staff who also provide technical support to enumerators
PDO Indicator
Strengthen competencies at IHSI
Intermediate Results Indicator
Impact of Change Management activities as assessed through the Change Readiness Index (CRI)
Intermediate Results Indicator
Transparency of fiscal information
Intermediate Results Indicator
Strengthened CSCCA
44000-P162452
World Bank
Haiti Fiscal and Social Resilience Development Policy Financing
International Development AssociationMinistry of Economy and Finance
International Development AssociationMinistry of Economy and Finance
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
David Cal MacWilliam
+1-202-473-1000cmacwilliam@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Port-au-Prince
18.54349 -72.33881
Central Government (Central Agencies)Social ProtectionOther EducationPublic Finance ManagementEducation FinancingTax policyFiscal PolicyPublic Expenditure ManagementEducationDisabilityDebt ManagementDomestic Revenue AdministrationSocial protection delivery systemsSocial Protection
0.00
0.00
20000000Total Commitment in Third Quarter of 2018
International Development Association
19952075Total Disbursement in Third Quarter of 2018
International Development Association
Project Appraisal DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices 44000-P162908
World Bank
Resilient Productive Landscapes in Haiti
International Development AssociationMinistry of Economy and Finance
International Development AssociationMinistry of Agriculture, Natural Resources and Rural Development (MARNDR)
Ministry of Environment
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Soulemane Fofana
+1-202-473-1000sfofana@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Petite Riviere de Nippes
18.47611 -73.23495
Anse-a-Veau
18.5011 -73.3449
Paillant
18.41764 -73.1457
Agricultural Extension, Research, and Other Support ActivitiesPublic Administration - Agriculture, Fishing & ForestryDisaster PreparednessWatershed ManagementMitigationDisaster Risk ManagementRenewable Natural Resources Asset ManagementAdaptationClimate changeRural Infrastructure and service deliveryRural MarketsLandscape ManagementRural Development
0.00
0.00
0.00
0.00
0.00
0.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.63
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
83333.33
83333.33
83333.33
83333.33
83333.33
83333.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
116666.67
116666.67
116666.67
116666.67
116666.67
116666.67
116666.67
116666.67
116666.67
116666.67
116666.67
116666.63
203328.75
203328.75
203328.75
203328.75
203328.75
203328.75
203328.75
203328.75
203328.75
203328.75
203328.75
203328.75
555004.58
555004.58
555004.58
555004.58
555004.58
555004.58
555004.58
555004.58
555004.58
555004.58
555004.58
555004.62
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.63
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15000000Total Commitment in First Quarter of 2018
International Development Association
1000000Total Disbursement in First Quarter of 2019
International Development Association
41590Total Disbursement in Third Quarter of 2019
International Development Association
101273Total Disbursement in Fourth Quarter of 2019
International Development Association
161491Total Disbursement in Second Quarter of 2020
International Development Association
2000000Total Disbursement in Second Quarter of 2020
International Development Association
132170Total Disbursement in Second Quarter of 2020
International Development Association
779853Total Disbursement in Third Quarter of 2020
International Development Association
2714780Total Disbursement in Fourth Quarter of 2020
International Development Association
7750000Total Commitment in Fourth Quarter of 2020
International Development Association
1847Total Disbursement in First Quarter of 2021
International Development Association
2730086Total Disbursement in Second Quarter of 2021
International Development Association
650000Total Disbursement in Second Quarter of 2021
International Development Association
2360354Total Disbursement in Third Quarter of 2021
International Development Association
1885798Total Disbursement in Fourth Quarter of 2021
International Development Association
4605Total Disbursement in Fourth Quarter of 2021
International Development Association
147661Total Disbursement in Fourth Quarter of 2021
International Development Association
Project Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
SCHEDULE 2, Section I., A. 1. of the Grand Agreements: Project Implementation UnitsThe Recipient shall operate and maintain,throughout Project implementation, a Project Implementation Unit (PIU) under the administrative authority of both MARNDR and MdE,to be established not later than three month after the Effective Date and to be located at the central and local level through twosub-units, i.e. : (a) the Project Implementation Unit at the Central Level (the PIU-C) located in Port-au-Prince, responsible forthe overall implementation, management, monitoring and evaluation of the Project at the national level; and (b) the ProjectImplementation Unit at the Local Level (the PIU-L) located in the Nippes Department ; responsible for the implementation,management, monitoring and evaluation of Part 2 of the Project at the local level, both with qualified and experienced staff insufficient numbers, as well as with adequate funds, facilities, services and other resources acceptable to the World Bank, asfurther detailed in the Project Implementation Manual.
SCHEDULE 2, Section I., A. 2. of the Grand Agreements: Steering and Advisory CommitteesThe Recipient shall: (a) establish notlater than six months after the Effective Date and thereafter operate and maintain in form and substance satisfactory to the WorldBank, as further detailed in the Project Implementation Manual and throughout Project implementation, a Project Steering Committeeto be co-chaired by MdE and MARNDR, and with representatives from all line ministries and other key stakeholders in charge of theoverall strategic guidance and oversight of the Project; and (b) establish not later than six months after the Effective Date andthereafter operate and maintain in form and substance satisfactory to the World Bank, as further detailed in the ProjectImplementation Manual and throughout Project implementation, an Advisory Committee to be chaired by the PIU-C coordinator, and withrepresentatives from key stakeholders in charge of operational guidance and regular follow-up on the implementation of the Projectactivities.
SCHEDULE 2, Section I., B. of the Grand Agreements: Project Implementation ManualThe Recipient shall carry out the Project, and/orcause the Project to be carried out, in accordance with the Project Implementation Manual, which consists of different schedulessetting forth, respectively, rules, methods, guidelines, specific development plans, standard documents and procedures for thecarrying out of the Project. The Project Implementation Manual may only be amended from time to time in consultation with, andprior approval of, the World Bank.
SCHEDULE 2, Section I., I. of the Grant Agreements: Safeguards1. The Recipient, through the PIU, shall ensure that the Project iscarried out in accordance with the Safeguard Documents, including the guidelines, rules and procedures defined in said SafeguardDocuments. 2. The Recipient shall include in the Project Reports adequate information on the implementation of the ESMF, the RPF,the Pest Management Plan, any EMP or any RAP.
SCHEDULE 2, Section II., A. of the Grant Agreements: Project ReportsThe Recipient shall furnish to the Association each ProjectReport not later than forty-five days after the end of each calendar quarter, covering said calendar quarter.
Schedule 2 Section I A 1 and 2 (Institutional Arrangements)1. The Recipient shall operate and maintain, throughout Projectimplementation, a Project Implementation Unit (PIU) under the administrative authority of both MARNDR and MdE, to be establishednot later than three month after the Effective Date and located at the central and local levels through two sub-units, i.e.:(a) the Project Implementation Unit at the Central Level (the PIU-C) located in Port-au-Prince, responsible for the overallimplementation, management, monitoring and evaluation of the Project at the national level; and (b) the Project ImplementationUnit at the Local Level (the PIU-L) located in the Nippes Department ; responsible for the implementation, management, monitoringand evaluation of Part 2 of the Project at the local level, both with qualified and experienced staff in sufficient numbers, aswell as with adequate funds, facilities, services and other resources acceptable to the Association, as further detailed in theProject Implementation Manual.2. The Recipient shall: (a) establish not later than six months after the Effective Date andthereafter operate and maintain in form and substance satisfactory to the Association, as further detailed in the ProjectImplementation Manual and throughout Project implementation, a Project Steering Committee to be co-chaired by MdE and MARNDR, andwith representatives from all line ministries and other key stakeholders in charge of the overall strategic guidance and oversightof the Project; and (a) establish not later than six months after the Effective Date and thereafter operate and maintain in formand substance satisfactory to the Association, as further detailed in the Project Implementation Manual and throughout Projectimplementation, an Advisory Committee to be chaired by the PIU-C coordinator, and with representatives from key stakeholders incharge of operational guidance and regular follow-up on the implementation of the Project activities.
Schedule 2 Section I B and C (Operational Manual and Annual Work Plans and Budgets)B. Project Implementation Manual1. TheRecipient shall carry out the Project, and/or cause the Project to be carried out, in accordance with the Project ImplementationManual, which consists of different schedules setting forth, respectively, rules, methods, guidelines, specific development plans,standard documents, and procedures for the carrying out of the Project, including the following:(a) the detailed description ofProject implementation activities, their sequencing and the prospective timetable and benchmarks in relation thereto; (b) theProject administrative, accounting, auditing, reporting, financial, and disbursement procedures, including all pertinent standarddocuments and model contracts; (c) the plan for capacity building and training activities under the Project; (d) the plan for themonitoring, evaluation and supervision of the Project; (e) (i) the eligibility criteria for Eligible Farmers to participate in theFarmers Subsidy Scheme; and (ii) the conditions and procedures for receiving Farmers Subsidy Scheme Payments;(f) (i) theeligibility criteria for Eligible Beneficiaries to participate in the Market Support Facility; and (ii) the conditions andprocedures for receiving Matching Grants under the Market Support Facility;(g) (i) the eligibility criteria for Eligible Workersunder the Community Participatory Works Program; and (ii) the conditions and procedures for receiving payments under said CommunityParticipatory Works Program;(h) the model forms of the Matching Grant Agreement; the Community Participatory Works Agreement; andthe Farmers Subsidy Agreement;(i) the list of municipalities included in the Project;(j) the Negative List;(k) the SafeguardsDocuments;(l) the grievance mechanisms and the code of conduct; and(m) the performance indicators for the Project. 2. In theevent that any provision of the Project Implementation Manual shall conflict with any of the provisions under this Agreement, theterms of this Agreement shall prevail.3. The Project Implementation Manual may only be amended from time to time in consultationwith, and prior approval of, the Association.C. Annual Work Plans and Budgets1. Without limitation to the obligations set forthin Section I.B above, the Recipient shall carry out the Project in accordance with Annual Work Plans and Budgets to be prepared andfurnished to the Association not later than October 31 of each calendar year during the implementation of the Project (thefirst such Annual Work Plan and Budget being due two months after the Effective Date), and containing all activities proposed forinclusion in the Project for the next calendar year, including: (a) detailed timetables for the sequencing and implementation ofproposed Project activities; (b) types of expenditures required for such activities and a proposed financing plan and sources offunding for such expenditures; and (c) any Operating Costs or Training that may be required under the Project.2. The Recipientshall afford the Association a reasonable opportunity to exchange views on each such proposed Annual Work Plan and Budget; and,thereafter ensure that the Project is implemented with due diligence during said following calendar year in accordance with suchAnnual Work Plan and Budget as shall have been approved by the Association.3. The Annual Work Plans and Budgets may only beamended from time to time in consultation with, and after approval of, the Association. In case of any conflict between the termsof the Annual Work Plans and Budgets and those of this Agreement, the terms of this Agreement shall prevail.
Schedule 2 Section I H (Contingency Emergency Response) In order to ensure the proper implementation of Part 4 of the Project(“Contingency Emergency Response Component” or “CERC Part”), the Recipient shall take the measures set for the below: 1. TheRecipient, through the PIU, shall:(a) prepare and furnish to the Association for its review and approval, an CERC Manual whichshall set forth detailed implementation arrangements for the CERC Part, including: (i) designation of, terms of reference for andresources to be allocated to, the entity to be responsible for coordinating and implementing the CERC Part (“CoordinatingAuthority”); (ii) specific activities which may be included in the CERC Part, Eligible Expenditures required therefor (“EligibleEmergency Expenditures”), and any procedures for such inclusion; (iii) financial management arrangements for the CERC Part; (iv)procurement methods and procedures for Eligible Emergency Expenditures to be financed under the CERC Part; (v) documentationrequired for withdrawals of Eligible Emergency Expenditures; (vi) environmental and social safeguards management frameworks for theCERC Part, consistent with the Association's policies on the matter; and (vi) any other arrangements necessary to ensure propercoordination and implementation of the CERC Part;(b) afford the Association a reasonable opportunity to review said proposed CERCManual; (c) promptly adopt such CERC Manual for the CERC Part as shall have been approved by the Association; (d) ensure that theCERC Part is carried out in accordance with the CERC Manual; provided, however, that in the event of any inconsistency between theprovisions of the CERC Manual and this Agreement, the provisions of this Agreement shall prevail; and(e) not amend, suspend,abrogate, repeal or waive any provision of the CERC Manual without prior approval by the Association. 2. The Recipient shall,throughout the implementation of the CERC Part, maintain the Coordinating Authority, with adequate staff and resources satisfactoryto the Association.3. The Recipient shall undertake no activities under the CERC Part (and no activities shall be included in theCERC Part) unless and until the following conditions have been met in respect of said activities: (a) the Recipient hasdetermined that an Eligible Emergency has occurred, has furnished to the Association a request to include said activities in theCERC Part in order to respond to said Eligible Emergency, and the Association has agreed with such determination, accepted saidrequest and notified the Recipient thereof; (b) the Recipient has prepared and disclosed all safeguards instruments required forsaid activities, in accordance with the CERC Manual, the Association has approved all such instruments, and the Recipient hasimplemented any actions which are required to be taken under said instruments; and(c) the Recipient has ensured that no EmergencyRecovery and Rehabilitation Sub-projects under the CERC Part falls under the prohibited activities mentioned in the Negative List.
Schedule 2 Section I I (Procurement of emergency Expenditures under the CERC Part of the Project) The Recipient shall procure theEmergency Expenditures required for the CERC Part of the Project in accordance with the procurement methods and procedures setforth in the CERC Manual.
Schedule 2 Section I J (Safeguards) 1. The Recipient, through the PIU, shall ensure that Parts 1 through 3 of the Project arecarried out in accordance with the Safeguards Documents, including the guidelines, rules and procedures defined in said SafeguardsDocuments. 2. To this end, if an EMP or a RAP is required on the basis of the ESMF or the RPF, the Recipient shall specificallytake the following actions, in a manner acceptable to the Association:(a) such EMP, or RAP shall be prepared in accordance withthe requirements of the ESMF or the RPF, consulted and disclosed locally and furnished to the Association for approval; and(b) the pertinent Project activity shall be carried out in accordance with such EMP, or RAP as approved by the Association.3. TheRecipient shall include in the Project Reports referred to in Section II.A of this Schedule, adequate information on theimplementation of the ESMF, the RPF, the Pest Management Plan, any EMP or any RAP, giving details of:(a) measures taken infurtherance of the Safeguards Documents, any EMP or any RAP;(b) conditions, if any, which interfere or threaten to interfere withthe smooth implementation of the Safeguards Documents, any EMP or any RAP; and(c) remedial measures taken or required to be takento address such conditions and to ensure the continued efficient and effective implementation of the Safeguards Documents, any EMPor any RAP.4. Without limitation to the provisions of Section I.I.1 of this Schedule, the Recipient shall, in a mannersatisfactory to the Association, take the following actions: (a) prior to commencement of any works under Parts 1 through 3 ofthe Project:(i) prepare, in form and substance satisfactory to the Association, an EMP (based on the ESMF) and/or a RAP (based onthe RPF) if required;(ii) thereafter, except as otherwise agreed with the Association, submit the said EMP and/or said RAP (asthe case may be), to the Association for review and approval; (iii) subsequently, adopt and disclose, in a manner acceptable tothe Association, said EMP and/or said RAP (as the case may be); and(iv) immediately thereafter, implement said EMP and/or RAP (asthe case may be), all in accordance with their terms and in a manner acceptable to the Association; and(b) Except as theAssociation shall otherwise agree in writing, the Recipient shall not amend or waive, or permit to be amended or waived, anyprovision of any EMP or any RAP. 5. The Recipient through the PIU shall ensure that the terms of reference for any consultancy inrespect of any activity under Parts 1 through 3 of the Project shall: (a) duly incorporate, in the opinion of the Association, therequirements of the applicable Safeguards Policies then in force; and (b) require that the advice conveyed through any suchconsultancy comply, in the opinion of the Association, with the requirement of the applicable Safeguards Policies then in force.
Intermediate Results Indicator
1.1. Comprehensive Master Plan (MARNDR / MdE) in place for the implementation of the Resilient Productive Landscapes approach
Intermediate Results Indicator
1.4a. Haiti National Trust legally established
Intermediate Results Indicator
1.4b. Haiti National Trust operational
Intermediate Results Indicator
1.3a. Spatial decision support tool for the prevention and / or management of climatic risks operational
PDO Indicator
of which female (in percentage)
PDO Indicator
Share of targeted farmers with improved market access (%)
Intermediate Results Indicator
of which female (in percentage)
Intermediate Results Indicator
of which female (in percentage)
Intermediate Results Indicator
of which female (in percentage)
Intermediate Results Indicator
3. Percentage of beneficiaries satisfied with Project interventions (disaggregated by gender)
Intermediate Results Indicator
of which female (in percentage)
PDO Indicator
Land area under sustainable landscape management practices
Intermediate Results Indicator
1.3b. Spatial decision support tool for the prevention and / or management of climatic risks applied to the area covered by the Project.
PDO Indicator
Farmers adopting improved agricultural technology
Intermediate Results Indicator
2.1a. Farmers field schools promoting a RPL approach established FFS
Intermediate Results Indicator
4. Number of farmers provided with climate-resilient crop varieties/seeds
Intermediate Results Indicator
5. Farmers receiving urgent production inputs and services under CERC
Intermediate Results Indicator
2.2b. Members of the groups benefiting from sub-projects
Intermediate Results Indicator
1.2a. Number of sub-watersheds with participatory plans developed
Intermediate Results Indicator
2.1b. Farmers participating in the FFS
Intermediate Results Indicator
1.2b. Number of sub-watersheds with investments plans developed
Intermediate Results Indicator
2.2a. Sub-projects supported by the RPL Project improving access to markets for products from targeted areas
44000-P163490
World Bank
Haiti Rural Accessibility & Resilience Project
International Development AssociationThe Republic of Haiti
International Development AssociationUnite Centrale d' Execution of the Ministry of Public Works (UCE)
Unite Technique d'Execution
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Malaika Becoulet
+1-202-473-1000mbecoulet@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Arrondissement de ValliEres
19.36667 -71.9
Thiotte
18.23333 -71.86667
Sud-Est
18.3 -72.4
Sud
18.3 -73.73333
Arrondissement de Marmelade
19.33333 -72.36667
Arrondissement du Môle Saint-Nicolas
19.75 -73.25
Marigot
18.3 -72.31667
Arrondissement de Hinche
19.13333 -72.06667
Cotes-de-Fer
18.21667 -72.8
Arrondissement des ChardonniEres
18.36667 -74.25
Arrondissement de Cerca La Source
19.11667 -71.75
Arrondissement de Belle-Anse
18.25 -72
Belle-Anse
18.28333 -72.1
Baraderes
18.48255 -73.63884
Arrondissement de BaradEres
18.45 -73.66667
Arrondissement de Bainet
18.25 -72.85
Bainet
18.18333 -72.75
Aken
18.28333 -73.38333
Aquin
18.28333 -73.25
Departement de Nippes
18.44835 -73.4285
Public Administration - TransportationRural and Inter-Urban RoadsPublic TransportUrban DevelopmentRural DevelopmentFlood and Drought Risk ManagementAdaptationDisaster Risk ManagementRural Infrastructure and service deliveryClimate changeGender
0.00
0.00
0.00
0.00
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.63
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.37
363636.36
363636.36
363636.36
363636.36
363636.36
363636.36
363636.36
363636.36
363636.36
363636.36
363636.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
762459.96
762459.96
762459.96
762459.96
762459.96
762459.96
762459.96
762459.96
762459.96
762459.96
762459.96
762459.94
1305251.18
1305251.18
1305251.18
1305251.18
1305251.18
1305251.18
1305251.18
1305251.18
1305251.18
1305251.18
1305251.18
1305251.16
4515622.20
4515622.20
4515622.20
4515622.20
4515622.20
4515622.20
4515622.20
4515622.20
4515622.20
4515622.20
4515622.20
4515622.16
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.63
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.63
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
10000000.00
0.00
75000000Total Commitment in Second Quarter of 2018
International Development Association
3000000Total Disbursement in First Quarter of 2019
International Development Association
1619Total Disbursement in Third Quarter of 2019
International Development Association
9147901Total Disbursement in First Quarter of 2020
International Development Association
33000000Total Commitment in Second Quarter of 2020
International Development Association
1000000Total Disbursement in Fourth Quarter of 2020
International Development Association
1500000Total Disbursement in Fourth Quarter of 2020
International Development Association
877306Total Disbursement in Fourth Quarter of 2020
International Development Association
992544Total Disbursement in First Quarter of 2021
International Development Association
2083032Total Disbursement in First Quarter of 2021
International Development Association
1353903Total Disbursement in First Quarter of 2021
International Development Association
900000Total Disbursement in Second Quarter of 2021
International Development Association
2016162Total Disbursement in Second Quarter of 2021
International Development Association
2022187Total Disbursement in Second Quarter of 2021
International Development Association
1108831Total Disbursement in Second Quarter of 2021
International Development Association
1809050Total Disbursement in Second Quarter of 2021
International Development Association
5394414Total Disbursement in Third Quarter of 2021
International Development Association
1967673Total Disbursement in Third Quarter of 2021
International Development Association
1314571Total Disbursement in Third Quarter of 2021
International Development Association
1693981Total Disbursement in Third Quarter of 2021
International Development Association
1858517Total Disbursement in Third Quarter of 2021
International Development Association
390993Total Disbursement in Fourth Quarter of 2021
International Development Association
1424054Total Disbursement in Fourth Quarter of 2021
International Development Association
735996Total Disbursement in Fourth Quarter of 2021
International Development Association
7170780Total Disbursement in Fourth Quarter of 2021
International Development Association
1656069Total Disbursement in Fourth Quarter of 2021
International Development Association
1124132Total Disbursement in First Quarter of 2022
International Development Association
23836532Total Disbursement in First Quarter of 2022
International Development Association
940577Total Disbursement in First Quarter of 2022
International Development Association
4596420Total Disbursement in First Quarter of 2022
International Development Association
1379068Total Disbursement in First Quarter of 2022
International Development Association
30000000Total Commitment in First Quarter of 2022
International Development Association
1650665Total Disbursement in Second Quarter of 2022
International Development Association
899730Total Disbursement in Second Quarter of 2022
International Development Association
Project Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementFinancing AgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Schedule 2, Section I., A. 1 of the Grant Agreement: Implementation Arrangements1. The Recipient shall operate and maintain,throughout Project implementation, the UCE, with qualified and experienced staff in sufficient numbers, as well as with adequatefunds, facilities, services, and other resources, all acceptable to the Association.
Schedule 2, Section I., A. 2 of the Grant Agreement: Independent Auditor.2. For purposes of implementing Section 5.09 of theGeneral Conditions, the Recipient shall, no later than four (4) months after the Effective Date, hire an independent auditor underterms and conditions acceptable to the Association.
Schedule 2, Section I., D, 1 and 2 of the Grant Agreement: Safeguards.1. The Recipient, through the MTPTC, shall ensure that theProject is carried out in accordance with the Safeguards Instruments, including the guidelines, rules and procedures defined insaidSafeguards Instruments. 2. To this end, if an EMP or a RAP is required on the basis of the ESMF or the RPF, the Recipientshall specifically take the following actions, in a manner acceptable to the Association:(a) such EMP, or RAP shall be preparedin accordance with the requirements of the ESMF or the RPF, consulted and disclosed locally and furnished to the Association forapproval; and (b) the pertinent Project activity shall be carried out in accordance with such EMP, or RAP as approved by theAssociation.
Schedule 2 Section I A 1, 2, and 3 (Institutional Arrangements)A. Institutional Arrangements1. The Recipient shall vest theresponsibility for the implementation of Parts 1.1; 1.2; 2; 3 and 5.1 of the Project in UCE and ensure that: (a) UCE shall carryout said Parts of the Project with qualified staff in sufficient number, as well as with adequate funds, facilities, services andother resources; all acceptable to the Association and in accordance with the Project Implementation Manual, the ESMF, RPF and theCER Operations Manual, as applicable. 2. The Recipient shall vest the responsibility for the implementation of Parts 1.3 and 5.2of the Project in UTE and ensure that: (a) UTE shall carry out said Parts of the Project with qualified staff in sufficient number,as well as with adequate funds, facilities, services and other resources; all acceptable to the Association and in accordance withthe Project Implementation Manual, the Safeguard Instruments and the CER Operations Manual, as applicable. 3. The Recipient shallvest the responsibility for the implementation of Part 4 of the Project in the Coordinating Authority and ensure that: (a) theCoordinating Authority shall carry out said Part of the Project with qualified staff in sufficient number, as well as with adequatefunds, facilities, services and other resources; all acceptable to the Association and in accordance with the ProjectImplementation Manual, the Safeguard Instruments and the CER Operations Manual, as applicable.
Schedule 2 Section I B 1 and 2 (Operational Manual)1. The Recipient shall carry out the Project in accordance with a manual (theProject Implementation Manual), satisfactory in form and substance to the Association, which consists of different schedulessettingforth rules, methods, guidelines, specific development plans, standard documents and procedures for the carrying out of theProject, including the following:(a) the detailed description of all Project activities, their sequencing and the prospectivetimetable and benchmarks in relation thereto; (b) the detailed institutional and implementation arrangements, including theresponsibilities of UCE, UTE, and the content of the Memorandum of Understanding;(c) the Project administrative, financial,accounting, auditing, reporting and procurement and disbursement procedures, including all relevant standard documents;(d) theplan for capacity building and training activities under the Project; (e) the plan for the monitoring, evaluation and supervisionof the Project; (f) the eligibility criteria for the investments under the Project;(g) the Safeguard Instruments for theProject;(h) the CER Operations Manual, as needed;(i) the grievance mechanisms and the code of conduct; and(j) the performanceindicators for the Project.2. The Project Implementation Manual shall only be amended from time to time in consultation with, andafter approval of, the Association. In case of any conflict between the terms of the Project Implementation Manual and those ofthis Agreement, the terms of this Agreement shall prevail.
Schedule 2 Section I C 1, 2 and 3 (Implementation Arrangements for Part 4 of the Project (CERC)1. In order to ensure the properimplementation of contingent emergency response activities under Part 4 of the Project (“CER Part”), the Recipient shall take thefollowing measures:(a) prepare and furnish to the Association for its review and approval, an operations manual (“CER OperationsManual”) which shall set forth detailed implementation arrangements for the CER Part, including: (i) designation of terms ofreference for, and resources to be allocated to, the entity to be responsible for coordinating and implementing the CER Part(“Coordinating Authority”); (ii) specific activities which may be included in the CER Part, Eligible Expenditures requiredtherefore (“Emergency Expenditures”), and any procedures for such inclusion; (iii) financial management arrangements for the CERPart; (iv) procurement methods and procedures for the CER Part; (v) documentation required for withdrawals of EmergencyExpenditures; (vi) environmental and social management arrangements and instruments applicable to the CER Part, consistent with theprovisions of Section E below; and (vii) any other arrangements necessary to ensure proper coordination and implementation of theCER Part;(b) afford the Association a reasonable opportunity to review the proposed CER Operations Manual;(c) promptly adoptthe CER Operations Manual for the CER Part as accepted by the Association and integrate it as an annex to the ProjectImplementation Manual;(d) ensure that the CER Part is carried out in accordance with the CER Operations Manual; provided,however, that in the event of any inconsistency between the provisions of the CER Operations Manual and this Agreement, theprovisions of this Agreement shall prevail; and(e) not amend, suspend, abrogate, repeal or waive any provision of the CEROperations Manual without prior approval by the Association.2. The Recipient shall, throughout the implementation of the CERPart, maintain the Coordinating Authority, with adequate staff and resources satisfactory to the Association, as further detailedin the CER Operations Manual.3. The Recipient shall undertake no activities under the CER Part (and no activities shall beincluded in the CER Part) unless and until the following conditions have been met in respect of said activities:(a) the Recipienthas determined that an Eligible Crisis or Emergency has occurred, has furnished to the Association a request to include saidactivities in the CER Part in order to respond to said Eligible Crisis or Emergency, and the Association has agreed with suchdetermination, accepted said request and notified the Recipient thereof; and(b) the Recipient has prepared and ensured thedisclosure of all environmental and social instruments as may be required for said activities, in accordance with the CEROperations Manual and the Safeguard Instruments, the Association has approved all said instruments, and the Recipient has ensuredthe implementation of any actions which are required to be taken under said instruments.
Schedule 2 Section I E 1, 2, 3, 4 and 5 (Safeguards)1. The Recipient, through UCE, UTE and/or the Coordinating Authority fortheir respective Parts of the Project, shall ensure that the Project is carried out in accordance with the Safeguards Instruments,including the guidelines, rules and procedures defined in said Safeguards Instruments. 2. To this end, if an EMP or a RAP isrequired on the basis of the ESMF or the RPF, the Recipient shall specifically take the following actions, in a manner acceptableto the Association:(a) such EMP, or RAP shall be prepared in accordance with the requirements of the ESMF or the RPF, consultedand disclosed locally and furnished to the Association for approval; and (b) the pertinent Project activity shall be carried outin accordance with such EMP, or RAP as approved by the Association.3. The Recipient shall include in the Project Reports referredto in Section II of this Schedule, adequate information on the implementation of the ESMF, the RPF, and any EMP or any RAP, givingdetails of:(a) measures taken in furtherance of the Safeguards Instruments, any EMP or any RAP;(b) conditions, if any, whichinterfere or threaten to interfere with the smooth implementation of the Safeguards Instruments, any EMP or any RAP;and(c) remedial measures taken or required to be taken to address such conditions and to ensure the continued efficient andeffective implementation of the Safeguards Instruments, any EMP or any RAP.4. The Recipient shall, in a manner satisfactory to theAssociation, take the following actions: (a) prior to commencement of any works under the Project:(i) prepare, in form andsubstance satisfactory to the Association, an EMP (based on the ESMF) and/or a RAP (based on the RPF) if required;(ii) thereafter,except as otherwise agreed with the Association, submit the said EMP and/or said RAP (as the case may be), to the Association forreview and approval; (iii) subsequently, adopt and disclose, in a manner acceptable to the Association, said EMP and/or said RAP(as the case may be); and(iv) immediately thereafter, implement said EMP and/or RAP (as the case may be), all in accordance withtheir terms and in a manner acceptable to the Association; and(b) Except as the Association shall otherwise agree in writing, theRecipient shall not amend or waive, or permit to be amended or waived, any provision of any EMP or any RAP. 5. The Recipientthrough UCE, UTE and/or the Coordinating Authority for their respective Parts of the Project, shall ensure that the terms ofreference for any consultancy in respect of any activity under the Project shall: (a) duly incorporate, in the opinion of theAssociation, the requirements of the applicable Safeguards Policies then in force; and (b) require that the advice conveyed throughany such consultancy comply, in the opinion of the Association, with the requirement of the applicable Safeguards Policies then inforce.
Schedule 2 Section I F 1 and 2 (Memorandum of Understanding)1. To facilitate the carrying out of Part 5.1(b) of the Project, theRecipient, through UCE shall sign, no later than three months after the Effective Date and thereafter maintain a Memorandum ofUnderstanding with CIAT-ES during the implementation of the Project, on terms and conditions acceptable to the Association, inorder to assist the Recipient to monitor the Pilot Program for Climate Resilience in accordance with the Anti-CorruptionGuidelines, the Procurement Regulations, Project Implementation Manual, and the Safeguard Instruments.2. The Recipient shallexercise its rights or carry out its obligations under the Memorandum of Understanding in such manner as to protect the interestsof the Recipient, CIAT and the Association and to accomplish the purposes of the Project. Except as the Association shallotherwise agree, the Recipient shall not assign, amend, abrogate, waive, terminate or fail to enforce the Memorandumof Understanding, or any of its provisions
Intermediate Results Indicator
Climate Resilient and Sustainable Mobility Roadmap prepared and associated monitoring tool developed
Intermediate Results Indicator
Establishment of a road traffic database and monitoring tool
Intermediate Results Indicator
Regional development dashboard with open data including spatial analysis encompassing risk and climate data developed with Local officials and local stakeholders in the CAL Region
Intermediate Results Indicator
Road safety assessments/measures included as part of all technical design and feasability studies
Intermediate Results Indicator
Bridge Management System within MTPTC developed and functional
PDO Indicator
Total population living in areas serviced by connecting roads upgraded to a climate resilient standard
Intermediate Results Indicator
Number of critical bridges rehabilitated or protected on the primary and secondary network
Intermediate Results Indicator
Number of Road Maintenance Centers build or rehabilitated in the selected sub-regions of the Center of Artibonite Loop Region
Intermediate Results Indicator
Number of people trained within selected communities on basic Rural Road Maintenance in the selected sub-regions of the Center of Artibonite Loop Region (disaggregated by gender)
Intermediate Results Indicator
Urban and rural markets rehabilitated/constructed in the selected sub regions of the Center of Artibonite Loop Region
Intermediate Results Indicator
Urban plans developed and consulted with Local officials and local stakeholders in the selected sub-regions of the Center of Artibonite Loop Region
Intermediate Results Indicator
Number of people who can access regional size markets within 120 minutes in select project areas
Intermediate Results Indicator
Number of women who can access health services with obstetrical facilities within 60 minutes in select project areas
Intermediate Results Indicator
Number of critical bridges built in the CAL region
Intermediate Results Indicator
Spot interventions to enhance all-weather and resilient connectivity in the selected sub-regions of the Center of Artibonite Loop Region
Intermediate Results Indicator
Number of critical spot/segments built or rehabilitated on the primary and secondary road network
Intermediate Results Indicator
Number of territorial mobility plans developed, climate informed and incorporating womens security needs
Intermediate Results Indicator
Roads rehablitated
Intermediate Results Indicator
Roads rehabilitated - rural
Intermediate Results Indicator
Roads rehabilitated - non-rural
PDO Indicator
Share of rural population in selected sub-regions with access within 2 km to an all-weather road
Intermediate Results Indicator
Grievances registered related to delivery of project benefits that are addressed (%)
Intermediate Results Indicator
Disaggregated by gender, in % of women
Intermediate Results Indicator
Share of citizens who consider that design of investments subjected to consultation is responsive to their needs/views (%)
Intermediate Results Indicator
Of which women, to reflect the focus of consultations on gender
44000-P165870
World Bank
Strengthening DRM and Climate Resilience Project
International Development AssociationMinistry of Economy and Finance
International Development AssociationMinistry of Interior and Local authorities
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Naraya Carrasco
+1-202-473-1000ncarrasco@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Sud
18.3 -73.73333
Nord-Ouest
19.83333 -73
Nord
19.6 -72.3
Republic of Haiti
19 -72.41667
Grandans
18.5 -74.08333
Departement de Nippes
18.44835 -73.4285
Other Public AdministrationDisaster PreparednessAdaptationDisaster Risk ManagementMitigationDisaster Response and RecoveryEducationClimate changeGenderEducation FacilitiesDisaster Risk Reduction
0.00
0.00
0.00
0.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.37
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.37
74708.00
74708.00
74708.00
291131.89
0.00
0.00
515362.44
400425.65
0.00
141788.14
0.00
242276.92
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.37
1034387.67
1034387.67
1034387.67
1034387.67
1034387.67
1034387.67
1034387.67
1034387.67
1034387.67
1034387.67
1034387.67
1034387.63
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
464353.25
464353.25
464353.25
464353.25
464353.25
464353.25
464353.25
464353.25
464353.25
464353.25
464353.25
464353.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
35000000Total Commitment in Second Quarter of 2019
International Development Association
1000000Total Disbursement in First Quarter of 2020
International Development Association
224125Total Disbursement in Third Quarter of 2020
International Development Association
291132Total Disbursement in Fourth Quarter of 2020
International Development Association
219415Total Disbursement in Fourth Quarter of 2020
International Development Association
295947Total Disbursement in First Quarter of 2021
International Development Association
400426Total Disbursement in First Quarter of 2021
International Development Association
141788Total Disbursement in Second Quarter of 2021
International Development Association
242277Total Disbursement in Second Quarter of 2021
International Development Association
312652Total Disbursement in Third Quarter of 2021
International Development Association
272907Total Disbursement in Fourth Quarter of 2021
International Development Association
275330Total Disbursement in Fourth Quarter of 2021
International Development Association
254714Total Disbursement in Fourth Quarter of 2021
International Development Association
468342Total Disbursement in First Quarter of 2022
International Development Association
1721530Total Disbursement in First Quarter of 2022
International Development Association
377662Total Disbursement in Second Quarter of 2022
International Development Association
Project Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
IDA Financing Agreement Schedule 2, Section I.E- MDOD: For purposes of carrying out Component 2 of the Project, the Recipient shallno later than four (4) months after the Effective Date, contract at least one MDOD in accordance with the Procurement Regulations
PDO Indicator
Improved National Early Warning and Communication System for Hydromet events based on approved and adopted standard protocols
PDO Indicator
Number of CCPCs with excellent competencies in emergency planning and management, in high climate risk-prone areas - Level 1 certification
Intermediate Results Indicator
Number of CCPCs with improved competencies in emergency planning and management - Level 2 certification
Intermediate Results Indicator
Number of safe havens constructed/rehabilitated by the project
Intermediate Results Indicator
Number of safe havens constructed/ rehabilitated by the project benefitting from gender friendly infrastructure design
Intermediate Results Indicator
Number of persons trained to apply resilient construction techniques
PDO Indicator
Increase in number of people living in flood-risk areas who are covered by a safe haven
PDO Indicator
Increase in number of females living in flood-risk areas who are covered by a safe haven
Intermediate Results Indicator
Percentage of grievances appropriately addressed as part of the Project
Intermediate Results Indicator
Percentage of beneficiaries reporting satisfaction with project interventions
Intermediate Results Indicator
Share of municipalities in risk-prone areas with an improved emergency preparedness and response capability
Intermediate Results Indicator
Percentage improvement in the level of understanding of early warning messages
Intermediate Results Indicator
Share of women participation in the shelter management committees for each “safe-haven” constructed/ rehabilitated by the project
Intermediate Results Indicator
Share of women leadership in the shelter management committees for each “safe-haven” constructed/ rehabilitated by the project
44000-P167512
World Bank
Strengthening Primary Health Care and Surveillance in Haiti
International Development AssociationRepublic of Haiti
International Development AssociationMinistère de la Santé Publique et de la Population
UNITE DE GESTION DE PROJET (UGP)
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Nicolas Antoine Robert Collin Dit De Montesson
+1-202-473-1000ncollin@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Nord-Ouest
19.83333 -73
Departement du Nord-Est
19.48897 -71.85713
Grandans
18.5 -74.08333
Centre
19 -72
Departement de l'Artibonite
19.33333 -72.5
Departement de Nippes
18.44835 -73.4285
Public Administration - HealthHealth Facilities and ConstructionHealthHealth Systems and PoliciesAdaptationChild HealthHealth Service DeliveryReproductive and Maternal HealthHealth FinanceGenderClimate changeMitigationDisease ControlNutrition and Food SecurityNutrition
37500.00
37500.00
37500.00
37500.00
462500.00
462500.00
462500.00
462500.00
462500.00
462500.00
462500.00
462500.00
462500.00
462500.00
462500.00
462500.00
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.37
1075000.00
1075000.00
1075000.00
1075000.00
1075000.00
1075000.00
1075000.00
1075000.00
1075000.00
1075000.00
1075000.00
1075000.00
1650000.00
1650000.00
1650000.00
1650000.00
1650000.00
1650000.00
1650000.00
1650000.00
1650000.00
1650000.00
1650000.00
1650000.00
1616666.67
1616666.67
1616666.67
1616666.67
1616666.67
1616666.67
1616666.67
1616666.67
1616666.67
1616666.67
1616666.67
1616666.63
916666.67
916666.67
916666.67
916666.67
916666.67
916666.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.37
356502.37
356502.37
356502.37
356502.37
356502.37
356502.37
356502.37
356502.37
356502.37
356502.37
356502.37
356502.39
1254166.67
1254166.67
1254166.67
1254166.67
1254166.67
1254166.67
1254166.67
1254166.67
1254166.67
1254166.67
1254166.67
1254166.63
2117929.62
2117929.62
2117929.62
2117929.62
2117929.62
2117929.62
2117929.62
2117929.62
2117929.62
2117929.62
2117929.62
2117929.58
1958617.34
1958617.34
1958617.34
1958617.34
1958617.34
1958617.34
1958617.34
1958617.34
1958617.34
1958617.34
1958617.34
1958617.36
3690681.60
3690681.60
3690681.60
3690681.60
3690681.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
55000000Total Commitment in Second Quarter of 2019
International Development Association
5500000Total Disbursement in First Quarter of 2020
International Development Association
278028Total Disbursement in First Quarter of 2021
International Development Association
4000000Total Disbursement in Second Quarter of 2021
International Development Association
4250000Total Disbursement in Third Quarter of 2021
International Development Association
3500000Total Disbursement in Fourth Quarter of 2021
International Development Association
329101Total Disbursement in First Quarter of 2022
International Development Association
Project Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Schedule 2 Section IV.2: No later than six (6) months after the Effective Date, the Recipient shall develop and furnish to theWorld Bank (WB) the Community Health Strategy and Implementation Plan referred to in Part 1(b) of the Project, all in a manneracceptable to the WB.
Schedule 2 Section IV.1 No later than 1 month before the beginning of each fiscal year (FY), the Recipient shall prepare andfurnish an annual work plan (AWP) for that FY, satisfactory to the Association, including the activities to be carried out underthe Project during said FY with their respective sources of funding. Said AWP may be modified during the FY with prior approval ofthe Association
Schedule 2 Section IV.1: No later than one month before the beginning of each FY, the Recipient shall prepare and furnish an AWPfor that FY, satisfactory to the WB, including the activities to be carried under the Project during said FY with their respectivesources of funding. Said AWP may be modified from time to time during the FY, with prior approval of the WB.
Schedule 2 Section IV. 2: No later than six (6) months after the Effective Date, the Recipient shall develop and furnish to theAssociation the Community Health Strategy and Implementation Plan referred to in Part 1(b) of the Project, all in a manneracceptable to the Association.
Intermediate Results Indicator
People who have received essential health, nutrition, and population (HNP) services
Intermediate Results Indicator
Number of health facilities undergoing rehabilitation
Intermediate Results Indicator
People who have received essential health, nutrition, and population (HNP) services - Female (RMS requirement)
Intermediate Results Indicator
Number of children immunized
Intermediate Results Indicator
Number of women and children who have received basic nutrition services
Intermediate Results Indicator
Number of deliveries attended by skilled health personnel
PDO Indicator
Percentage of children aged between 12 and 23 months fully vaccinated in Project intervention areas
PDO Indicator
Percentage of notifications of suspected cases of cholera for which laboratory results are available to the Health Departmental Directorates (DDSs) within 10 days of collection
PDO Indicator
Percentage of institutional deliveries in Project intervention areas
Intermediate Results Indicator
Percentage of suspected cases of diphtheria investigated and responded to within 48h after notification
Intermediate Results Indicator
Percentage of suspected cases of measles investigated within 48h after notification
Intermediate Results Indicator
Contracted health providers supervised at least quarterly - maintained at 100 percent
Intermediate Results Indicator
Citizen Engagement: percentage of facilities under RBF that developed an action plan(s) based on the results of community satisfaction surveys
Intermediate Results Indicator
Percentage of notified maternal deaths investigated per year
Intermediate Results Indicator
Contracted service providers achieving the minimum quality score
44000-P168951
World Bank
Cap Haitien Urban Development Project
International Development AssociationMinistry of Finance
International Development AssociationMinistry of Public Works, Transport and Communications
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Sophie Chanson
+1-202-473-1000schanson@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Quartier Morin
19.69696 -72.15712
Cap Haitien
19.76667 -72.21667
Rural and Inter-Urban RoadsSub-National GovernmentUrban TransportUrban DevelopmentSpatial GrowthPublic TransportAdaptationDisaster Risk ManagementUrban Infrastructure and Service DeliveryMitigationUrban PlanningEconomic Growth and PlanningGenderServices and Housing for the PoorClimate change
0.00
0.00
0.00
0.00
0.00
0.00
119400.67
119400.67
119400.67
119400.67
119400.67
119400.67
119400.67
119400.67
119400.67
119400.67
119400.67
119400.63
260856.67
260856.67
260856.67
260856.67
260856.67
260856.67
260856.67
260856.67
260856.67
260856.67
260856.67
260856.63
674108.67
674108.67
674108.67
674108.67
674108.67
674108.67
674108.67
674108.67
674108.67
674108.67
674108.67
674108.63
497672.00
507304.00
1039808.00
536256.00
1107736.00
569464.00
578704.00
1180536.00
600936.00
612416.00
1262856.00
646464.00
1054079.33
1054079.33
1054079.33
1054079.33
1054079.33
1054079.33
1054079.33
1054079.33
1054079.33
1054079.33
1054079.33
1054079.37
995008.67
995008.67
995008.67
995008.67
995008.67
995008.67
995008.67
995008.67
995008.67
995008.67
995008.67
995008.63
1068711.11
1068711.11
1068711.11
1068711.11
1068711.11
1068711.11
1068711.11
1068711.11
1068711.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2000000.00
0.00
0.00
0.00
0.00
0.00
367387.07
367387.07
367387.06
0.00
0.00
0.00
16666.67
16666.67
16666.66
533333.33
533333.33
533333.34
283333.33
283333.33
283333.34
674108.67
674108.67
674108.67
674108.67
674108.67
674108.67
674108.99
674108.99
674108.99
674108.56
674108.56
674108.55
681594.67
681594.67
681594.66
737818.67
737818.67
737818.66
807754.67
807754.67
807754.66
840578.67
840578.67
840578.66
1054079.33
1054079.33
1054079.33
1054079.33
1054079.33
1054079.33
1054079.33
1054079.33
1054079.33
1054079.34
1054079.34
1054079.35
995008.67
995008.67
995008.67
995008.67
995008.67
995008.67
995008.67
995008.67
995008.67
995017.66
995017.66
995017.65
1068711.11
1068711.11
1068711.11
1068711.11
1068711.11
1068711.11
1068711.11
1068711.11
1068711.12
56000000Total Commitment in First Quarter of 2020
International Development Association
2000000Total Disbursement in Fourth Quarter of 2020
International Development Association
1102161Total Disbursement in Second Quarter of 2021
International Development Association
395865Total Disbursement in First Quarter of 2022
International Development Association
117945Total Disbursement in Second Quarter of 2022
International Development Association
Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Schedule 2 Section I A 1, 2 and 31. The Recipient shall vest the overall responsibility for the implementation of the Project inMTPTC and ensure that: (a) MTPTC shall carry out Parts 1, 2 and 4 of the Project; and (b) the Coordinating Authority shall carryoutPart 3 of the Project; all in accordance with the Operational Manual, the ESCP and the CER Operations Manual, as applicable.2. The Recipient shall operate and maintain, at all times during the implementation of the Project, the Project Implementing Unitunder the administrative authority of MTPTC, with functions, staffing and resources satisfactory to the Association, as furtherdetailed in the Operational Manual. 3. The Recipient shall ensure that the Project Implementing Unit shall be responsible for theday-to-day administration, overall planning, coordination, fiduciary (procurement, disbursement, safeguards and financialmanagement), monitoring evaluation reporting and communication of Project activities; as further detailed in the OperationalManual.
Schedule 2 Section I B 1 and 21. The Recipient shall carry out the Project in accordance with a manual (the Operational Manual),satisfactory in form and substance to the Association, which consists of different schedules setting forth rules, methods,guidelines, specific development plans, standard documents and procedures for the carrying out of the Project, including thefollowing:(a) the detailed description of all Project activities, their sequencing and the prospective timetable and benchmarksin relation thereto; (b) the Project administrative, financial, accounting, auditing, procurement and disbursement procedures,including all relevant standard documents;(c) the monitoring indicators for the Project; and(d) The grievance mechanisms andthe code of ethics and conduct.2. The Operational Manual shall only be amended from time to time in consultation with, and afterapproval of, the Association. In case of any conflict between the terms of the Operational Manual and those of this Agreement, theterms of this Agreement shall prevail.
Schedule 2 Section I C 1, 2 and 31. In order to ensure the proper implementation of Part 3 of the Project (“CER Part”), theRecipient shall take the following measures:(a) prepare and furnish to the Association for its review and approval, an operationsmanual (“CER Operations Manual”) which shall set forth detailed implementation arrangements for the CER Part, including: (i)designation of terms of reference for, and resources to be allocated to, the entity to be responsible for coordinating andimplementing the CER Part (“Coordinating Authority”); (ii) specific activities which may be included in the CER Part, EligibleExpenditures required therefore (“Emergency Expenditures”), and any procedures for such inclusion; (iii) financial managementarrangements for the CER Part; (iv) procurement methods and procedures for Emergency Expenditures to be financed under the CERPart; (v) documentation required for withdrawals of Emergency Expenditures; (vi) environmental and social safeguard managementframeworks for the CER Part, consistent with the Association's policies on the matter; and (vii) any other arrangements necessaryto ensure proper coordination and implementation of the CER Part;(b) afford the Association a reasonable opportunity to reviewthe proposed CER Operations Manual;(c) promptly adopt the CER Operations Manual for the CER Part as shall have been approved bythe Association;(d) ensure that the CER Part is carried out in accordance with the CER Operations Manual; provided, however, thatin the event of any inconsistency between the provisions of the CER Operations Manual and this Agreement, the provisions of thisAgreement shall prevail; and(e) not amend, suspend, abrogate, repeal or waive any provision of the CER Operations Manual withoutprior approval by the Association.2. The Recipient shall, throughout the implementation of the CER Part, maintain theCoordinating Authority, with adequate staff and resources satisfactory to the Association.3. The Recipient shall undertake noactivities under the CER Part (and no activities shall be included in the CER Part) unless and until the following conditions havebeen met in respect of said activities:(a) the Recipient has determined that an Eligible Emergency has occurred, has furnished tothe Association a request to include said activities in the CER Part in order to respond to said Eligible Emergency, and theAssociation has agreed with such determination, accepted said request and notified the Recipient thereof; and(b) the Recipienthas prepared and disclosed all safeguards instruments required for said activities, in accordance with the CER Operations Manual,the Association has approved all such instruments, and the Recipient has implemented any actions which are required to be takenunder said instruments.
Schedule 2 Section I E 1, 2, 3 and 41. The Recipient shall ensure that the Project is carried out in accordance with theEnvironmental and Social Standards, in a manner acceptable to the Association.2. Without limitation upon paragraph 1 above, theRecipient shall ensure that the Project is implemented in accordance with the Environmental and Social Commitment Plan (“ESCP”), ina manner acceptable to the Association. To this end, the Recipient shall ensure that: (a) the measures and actions specified inthe ESCP are implemented with due diligence and efficiency, and as further specified in the ESCP; (b) sufficient funds areavailable to cover the costs of implementing the ESCP; (c) policies, procedures and qualified staff are maintained to enable itto implement the ESCP, as further specified in the ESCP; and (d) the ESCP or any provision thereof, is not amended, revised orwaived, except as the Association shall otherwise agree in writing and the Recipient has, thereafter, disclosed the revised ESCP.In case of any inconsistencies between the ESCP and the provisions of this Agreement, the provisions of this Agreement shallprevail. 3. The Recipient shall:(a) take all measures necessary on its part to collect, compile, and furnish to theAssociation through regular reports, with the frequency specified in the ESCP, and promptly in a separate report or reports, if sorequested by the Association, information on the status of compliance with the ESCP and the management tools and instrumentsreferred to therein, including RAPs, all such reports in form and substance acceptable to the Association, setting out, inter alia:(i) the status of implementation of the ESCP; (ii) conditions, if any, which interfere or threaten to interfere with theimplementation of the ESCP; and (iii) corrective and preventive measures taken or required to be taken to address such conditions;and(b) promptly notify the Association of any incident or accident related to or having an impact on the Project which has, or islikely to have, a significant adverse effect on the environment, the affected communities, the public or workers, including,gender-based violence and violence against minors, in accordance with the ESCP, the instruments referenced therein and theEnvironmental and Social Standards. 4. The Recipient shall maintain and publicize the availability of a grievance mechanism, inform and substance satisfactory to the Association, to hear and determine fairly and in good faith all complaints raised inrelation to the Project and take all measures necessary to implement the determinations made by such mechanism in a mannersatisfactory to the Association.
Schedule 2 Section IV A and BA. The Recipient shall, through MTPTC, cause the Project Implementing Unit to ensure that any andeach urban infrastructure investment and neighborhood upgrading investment to be carried out during Project implementation underPart 1 of the Project, is duly discussed and agreed between the Parties before activities are included in the procurement plans. Tothis end, the Recipient shall include in each Project Report, a list of all urban infrastructure investments and neighborhoodupgrading investments discussed and approved by the Association, as further detailed in the Operational Manual. B. 1. TheRecipient shall, no later than six (6) months after the Effective Date, hire under terms of reference and in form and substancesatisfactory to the Association, the MDOD, and thereafter operate and maintain during the implementation of the Project, the MDODwith functions, staffing and resources satisfactory to the Association, as further detailed in the Operational Manual2. Withoutlimitation to the provisions of Sections I.A.1 and I.A.2 of this Schedule, the Recipient shall ensure that the MDOD shall, ifapplicable (as determined by the Association), assist in the carrying out of selected activities under Parts 1 and 2 of theProject; as further detailed in the Operational Manual.
Intermediate Results Indicator
Km of roads rehabilitated or expanded
Intermediate Results Indicator
Km of roads/pedestrian paths with improved street lighting
Intermediate Results Indicator
Km of non-motorized transport infrastructure constructed/rehabilitated
PDO Indicator
New or rehabilitated urban public spaces
Intermediate Results Indicator
Baseline study conducted
Intermediate Results Indicator
Gender gap monitored
PDO Indicator
Time saved to go from National Road 1 to National Road 3
Intermediate Results Indicator
Increase in the number of people accessing enhanced public spaces
Intermediate Results Indicator
of which are women
Intermediate Results Indicator
Detailed designs for integrated urban upgrading developed
PDO Indicator
People directly benefiting from resilient urban infrastructure and public space improvements
PDO Indicator
disaggregated by gender (women)
Intermediate Results Indicator
Number of Urban Management Initiatives (UMI) implemented
Intermediate Results Indicator
Semi-annual community meetings held to discuss the decisions and/or actions taken based on feedback from key project stakeholders (Number)
Intermediate Results Indicator
Number of community meetings chaired by the local authorities
Intermediate Results Indicator
Number of meetings held with women's focus groups to discuss their inputs to the design of the urban infrastructure investments
44000-P170907
World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti
International Development AssociationRepublic of Haiti
International Development AssociationCentral Execution Unit of the Ministry of Public Works (UCE)
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Malaika Becoulet
+1-202-473-1000mbecoulet@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Republic of Haiti
19.07582 -72.29616
Public Administration - TransportationAviationDisaster Risk ReductionUrban DevelopmentDisaster Risk ManagementAdaptationPublic TransportInfrastructure FinanceClimate changeFinance for Development
0.00
0.00
0.00
0.00
0.00
0.00
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.63
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.63
1416666.67
1416666.67
1416666.67
1416666.67
1416666.67
1416666.67
1416666.67
1416666.67
1416666.67
1416666.67
1416666.67
1416666.63
1458333.33
1458333.33
1458333.33
1458333.33
1458333.33
1458333.33
1458333.33
1458333.33
1458333.33
1458333.33
1458333.33
1458333.37
1291666.67
1291666.67
1291666.67
1291666.67
1291666.67
1291666.67
1291666.67
1291666.67
1291666.67
1291666.67
1291666.67
1291666.63
1041666.67
1041666.67
1041666.67
1041666.67
1041666.67
1041666.67
1041666.67
1041666.67
1041666.67
1041666.67
1041666.67
1041666.63
2750000.00
2750000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3000000.00
0.00
0.00
0.00
0.00
7333.33
7333.33
7333.34
0.00
0.00
0.00
1259333.33
1259333.33
1259333.34
0.00
0.00
0.00
2000000.00
2000000.00
2000000.00
1000000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
2133333.33
2133333.33
2133333.34
1766666.67
1766666.67
1766666.66
2000000.00
2000000.00
2000000.00
1333333.33
1333333.33
1333333.34
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1000000.00
1000000.00
1000000.00
1500000.00
1500000.00
1000000.00
2000000.00
2000000.00
2000000.00
1000000.00
1000000.00
1000000.00
500000.00
1500000.00
1000000.00
1000000.00
1000000.00
1000000.00
2000000.00
2000000.00
2000000.00
1333333.33
1333333.33
1333333.34
0.00
0.00
0.00
0.00
0.00
84000000Total Commitment in Second Quarter of 2020
International Development Association
3000000Total Disbursement in First Quarter of 2021
International Development Association
22110Total Disbursement in Third Quarter of 2021
International Development Association
95023Total Disbursement in First Quarter of 2022
International Development Association
353287Total Disbursement in First Quarter of 2022
International Development Association
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Schedule 2 Section I A 1, 2, 3 and 4 (Institutional Arrangements)1. The Recipient shall vest the overall responsibility for theimplementation of the Project in MTPTC and ensure that: (a) MTPTC shall carry out Parts 1, 2 and 3 of the Project in collaborationwith AAN and OFNAC; and (b) the Coordinating Authority shall carry out Part 4 of the Project; all in accordance with theOperational Manual, the ESCP and the CER Operations Manual, as applicable. 2. The Recipient shall operate and maintain, at alltimes during the implementation of the Project, the Project Implementing Unit under the administrative authority of MTPTC, withfunctions, staffing and resources satisfactory to the Association, as further detailed in the Operational Manual. 3. The Recipientshall operate and maintain, at all times during the implementation of the Project, AAN and OFNAC under the administrative authorityof MTPTC, with functions, staffing and resources satisfactory to the Association, as further detailed in the Operational Manual.4. The Recipient shall ensure that the Project Implementing Unit shall be responsible for the day-to-day administration, overallplanning, coordination, fiduciary (procurement, disbursement, safeguards and financial management), monitoring, evaluation,reporting, and communication of Project activities; as further detailed in the Operational Manual.
Schedule 2 Section I B 1 and 2 (Operational Manual)1. The Recipient shall carry out the Project in accordance with a manual (theOperational Manual), satisfactory in form and substance to the Association, which consists of different schedules setting forthrules, methods, guidelines, specific development plans, standard documents and procedures for the carrying out of the Project,including the following:(a) the detailed description of all Project activities, their sequencing and the prospective timetableand benchmarks in relation thereto; (b) the Project administrative, financial, accounting, auditing, procurement and disbursementprocedures, including all relevant standard documents;(c) the monitoring indicators for the Project; and(d) The grievancemechanisms and the code of ethics and conduct.2. The Operational Manual shall only be amended from time to time in consultationwith, and after approval of, the Association. In case of any conflict between the terms of the Operational Manual and those ofthis Agreement, the terms of this Agreement shall prevail.
Schedule 2 Section I C 1, 2 and 3 (Implementation Arrangements for Part 4 of the Project (CERC)1. In order to ensure the properimplementation of contingent emergency response activities under Part 4 of the Project (“CER Part”), the Recipient shall take thefollowing measures:(a) prepare and furnish to the Association for its review and approval, an operations manual (“CER OperationsManual”) which shall set forth detailed implementation arrangements for the CER Part, including: (i) designation of terms ofreference for, and resources to be allocated to, the entity to be responsible for coordinating and implementing the CER Part(“Coordinating Authority”); (ii) specific activities which may be included in the CER Part, Eligible Expenditures requiredtherefore (“Emergency Expenditures”), and any procedures for such inclusion; (iii) financial management arrangements for the CERPart; (iv) procurement methods and procedures for the CER Part; (v) documentation required for withdrawals of EmergencyExpenditures; (vi) environmental and social management arrangements and instruments applicable to the CER Part, consistent with theprovisions of Section E below; and (vii) any other arrangements necessary to ensure proper coordination and implementation of theCER Part;(b) afford the Association a reasonable opportunity to review the proposed CER Operations Manual;(c) promptly adopt theCER Operations Manual for the CER Part as accepted by the Association and integrate it as an annex to the OperationalManual;(d) ensure that the CER Part is carried out in accordance with the CER Operations Manual; provided, however, that in theevent of any inconsistency between the provisions of the CER Operations Manual and this Agreement, the provisions of this Agreementshall prevail; and(e) not amend, suspend, abrogate, repeal or waive any provision of the CER Operations Manual without priorapproval by the Association.2. The Recipient shall, throughout the implementation of the CER Part, maintain the CoordinatingAuthority, with adequate staff and resources satisfactory to the Association.3. The Recipient shall undertake no activities underthe CER Part (and no activities shall be included in the CER Part) unless and until the following conditions have been met inrespect of said activities:(a) the Recipient has determined that an Eligible Crisis or Emergency has occurred, has furnished tothe Association a request to include said activities in the CER Part in order to respond to said Eligible Crisis or Emergency, andthe Association has agreed with such determination, accepted said request and notified the Recipient thereof; and(b) the Recipienthas prepared and ensured the disclosure of all environmental and social instruments as may be required for said activities, inaccordance with the CER Operations Manual and the ESCP, the Association has approved all said instruments, and the Recipient hasensured the implementation of any actions which are required to be taken under said instruments.
Schedule 2 Section I E 1, 2 and 3 (Environmental and Social Standards)1. The Recipient shall ensure that the Project is carriedout in accordance with the Environmental and Social Standards, in a manner acceptable to the Association.2. Without limitationupon paragraph 1 above, the Recipient shall ensure that the Project is implemented in accordance with the Environmental and SocialCommitment Plan (“ESCP”), in a manner acceptable to the Association. To this end, the Recipient shall ensure that: (a) themeasures and actions specified in the ESCP are implemented with due diligence and efficiency, and as further specified in the ESCP;(b) sufficient funds are available to cover the costs of implementing the ESCP; (c) policies, procedures and qualified staff aremaintained to enable it to implement the ESCP, as further specified in the ESCP; and (d) the ESCP or any provision thereof, is notamended, revised or waived, except as the Association shall otherwise agree in writing and the Recipient has, thereafter, disclosedthe revised ESCP. In case of any inconsistencies between the ESCP and the provisions of this Agreement, the provisions of thisAgreement shall prevail. 2. The Recipient shall:(a) take all measures necessary on its part to collect, compile, and furnish tothe Association through regular reports, with the frequency specified in the ESCP, and promptly in a separate report or reports, ifso requested by the Association, information on the status of compliance with the ESCP and the management tools and instrumentsreferred to therein, including resettlement action plans, all such reports in form and substance acceptable to the Association,setting out, inter alia: (i) the status of implementation of the ESCP; (ii) conditions, if any, which interfere or threaten tointerfere with the implementation of the ESCP; and (iii) corrective and preventive measures taken or required to be taken toaddress such conditions; and(b) promptly notify the Association of any incident or accident related to or having an impact on theProject which has, or is likely to have, a significant adverse effect on the environment, the affected communities, the public orworkers, including, gender-based violence and violence against minors, in accordance with the ESCP, the instruments referencedtherein and the Environmental and Social Standards. 3. The Recipient shall maintain and publicize the availability of a grievancemechanism, in form and substance satisfactory to the Association, to hear and determine fairly and in good faith all complaintsraised in relation to the Project, and take all measures necessary to implement the determinations made by such mechanism in amanner satisfactory to the Association.
PDO Indicator
Average Runway Occupancy Time (ROT) of airplanes at PAP
PDO Indicator
Average number of days per year the discharge exceeds the capacity of the airport drainage system at PAP and CAP
PDO Indicator
Average number of days per year the discharge exceeds the capacity of the airport drainage system at PAP
PDO Indicator
Average number of days per year the discharge exceeds the capacity of the airport drainage system at CAP
Intermediate Results Indicator
Additional aircraft parking apron built at PAP
Intermediate Results Indicator
People with Enhanced Access to Transportation Services
Intermediate Results Indicator
Semi-annual meetings held with stakeholders to discuss their suggestions and related actions taken by the Project
Intermediate Results Indicator
OFNAC safety inspectors trained by a certified agency
Intermediate Results Indicator
New culverts built at CAP
Intermediate Results Indicator
Rescue Coordination Center staff trained by a certified agency
Intermediate Results Indicator
Regional training programs attended by AAN and OFNAC
PDO Indicator
Targeted upgrade of air navigation systems achieved at CAP and PAP
PDO Indicator
PAP and CAP runways in compliance with ICAO SARPs
Intermediate Results Indicator
Constructed CAP Air Traffic Control Tower (ATCT) in compliance with ICAO SARPs
Intermediate Results Indicator
ADS-B for CAP and PAP installed and operational
Intermediate Results Indicator
Airfield Ground Lighting (AGL) for the CAP runway is installed and operational
Intermediate Results Indicator
PAP RESAs implemented and consistent with ICAO SARPs
Intermediate Results Indicator
Aviation sector strategy prepared
Intermediate Results Indicator
Wildlife management plan prepared and implemented for PAP and CAP airports
Intermediate Results Indicator
Grievances adequately responded to and/or resolved within the stipulated service standards
Intermediate Results Indicator
Share of women hired in medium-skill jobs by UCE-MTPC, OFNAC and AAN
Intermediate Results Indicator
Share of women included in the medium-skills training
Intermediate Results Indicator
Share of infrastructure activities identified as climate resilient
Intermediate Results Indicator
Length of PAP taxiway system built
Intermediate Results Indicator
Length of PAP drainage system
Intermediate Results Indicator
Length of CAP runway rehabilitated
44000-P171474
World Bank
Haiti COVID-19 Response and Resilience Development Policy Operation
International Development AssociationRepublic of Haiti
International Development AssociationMinistry of Economy and Finance
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Jose C. Joaquin Toro Landivar
+1-202-473-1000jtoro@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Port-au-Prince
18.54349 -72.33881
HealthSocial ProtectionOther Public AdministrationCentral Government (Central Agencies)Finance for DevelopmentHealth System StrengtheningDisaster PreparednessHealth Systems and PoliciesAdaptationDisaster Risk FinanceDisaster Risk ReductionDisaster Risk ManagementSocial Safety NetsPublic Private PartnershipsClimate changeSocial ProtectionPandemic ResponseGenderDisaster Response and RecoveryDisease Control
20000000Total Commitment in Second Quarter of 2020
International Development Association
-20860042Total Commitment Cancellations in Third Quarter of 2021
International Development Association
0Total Disbursement in First Quarter of 2022
International Development Association
Project Appraisal DocumentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentContract AwardsProject URLProcurement Notices 44000-P171976
World Bank
Haiti Digital Acceleration Project
International Development AssociationMinistère de l'Economie et des Finances d'Haïti
International Development AssociationMinistère des Travaux Publics, Transports et Communications
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Axel Rifon Perez
+1-202-473-1000arifonperez@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Republic of Haiti
19.07582 -72.29616
Public Administration - Information and Communications TechnologiesICT InfrastructureICT ServicesRural DevelopmentFinance for DevelopmentGeospatial ServicesLabor Market Policy and ProgramsMitigationAdaptationInfrastructure FinanceICTICT PoliciesICT SolutionsClimate changeSkills DevelopmentPandemic ResponseGenderDisease Control
0.00
0.00
0.00
380000.00
1040000.00
520000.00
520000.00
1030000.00
510000.00
510000.00
1020000.00
510000.00
510000.00
1010000.00
500000.00
500000.00
1000000.00
500000.00
500000.00
990000.00
500000.00
990000.00
500000.00
500000.00
1030000.00
530000.00
550000.00
1120000.00
470000.00
380000.00
770000.00
390000.00
400000.00
830000.00
440000.00
460000.00
910000.00
460000.00
920000.00
470000.00
470000.00
970000.00
500000.00
510000.00
870000.00
440000.00
450000.00
930000.00
480000.00
490000.00
1550000.00
840000.00
840000.00
1640000.00
800000.00
800000.00
1580000.00
780000.00
1570000.00
790000.00
790000.00
1580000.00
790000.00
790000.00
1590000.00
800000.00
800000.00
1610000.00
810000.00
810000.00
1630000.00
820000.00
1427500.00
1427500.00
1427500.00
1427500.00
0.00
0.00
0.00
0.00
0.00
0.00
110833.33
110833.33
110833.33
110833.33
110833.33
110833.33
110833.33
110833.33
110833.33
110833.33
110833.33
110833.37
290833.33
290833.33
290833.33
290833.33
290833.33
290833.33
290833.33
290833.33
290833.33
290833.33
290833.33
290833.37
1129166.67
1129166.67
1129166.67
1129166.67
1129166.67
1129166.67
1129166.67
1129166.67
1129166.67
1129166.67
1129166.67
1129166.63
1285833.33
1285833.33
1285833.33
1285833.33
1285833.33
1285833.33
1285833.33
1285833.33
1285833.33
1285833.33
1285833.33
1285833.37
1059166.67
1059166.67
1059166.67
1059166.67
1059166.67
1059166.67
1059166.67
1059166.67
1059166.67
1059166.67
1059166.67
1059166.63
940833.33
940833.33
940833.33
940833.33
940833.33
940833.33
940833.33
940833.33
940833.33
940833.33
940833.33
940833.37
550000.00
550000.00
550000.00
550000.00
0.00
0.00
0.00
0.00
0.00
0.00
60000000Total Commitment in Fourth Quarter of 2020
International Development Association
1250000Total Disbursement in Fourth Quarter of 2020
International Development Association
78536Total Disbursement in Second Quarter of 2021
International Development Association
102764Total Disbursement in Fourth Quarter of 2021
International Development Association
152691Total Disbursement in First Quarter of 2022
International Development Association
Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
PDO Indicator
Mean down time per month of connectivity services provided under this project
Intermediate Results Indicator
Development of national broadband strategy with a gender lens
Intermediate Results Indicator
Cybersecurity Capacity Maturity Model assessment undertaken
Intermediate Results Indicator
Digital economy strategy with an integrated gender and resilience lens
PDO Indicator
Percentage of newly built or upgraded infrastructure that is resilient to shocks
Intermediate Results Indicator
Percentage of women completing advanced technical training
Intermediate Results Indicator
Percentage of users of digital broadband services reporting satisfaction with the service
Intermediate Results Indicator
Percentage of women completing general digital literacy training
Intermediate Results Indicator
Percentage of women completing cybersecurity training
PDO Indicator
Broadband penetration over mobile and fixed network providing high speed broadband services
PDO Indicator
Mobile broadband penetration
PDO Indicator
Fixed broadband penetration
Intermediate Results Indicator
Amount of private sector investment in the sector due to the project
PDO Indicator
People provided with access to the Internet
PDO Indicator
Number of people that benefitted from new access to Internet service.
PDO Indicator
Number of people that benefitted from the improved Internet service.
PDO Indicator
People provided with access to the Internet - Female
Intermediate Results Indicator
Number of people trained through the digital skills program
Intermediate Results Indicator
Quality of Service and resilience: Fixed broadband download speed in Mbps
Intermediate Results Indicator
Quality of Service and resilience: Mobile broadband download speed in Mbps
Intermediate Results Indicator
Number of sectoral policies/legislation/regulations reviewed and consulted on by stakeholders
Intermediate Results Indicator
Number of institutions connected through the project
44000-P173743
World Bank
Private Sector Jobs and Economic Transformation (PSJET)
International Development Association
International Development Association
2021-09-28
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Mariana Vijil
+1-202-473-1000mvijil@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Sud-Est
18.3 -72.4
Sud
18.3 -73.73333
Departement de l'Ouest
18.66381 -72.29141
Republic of Haiti
19.07582 -72.29616
Departement de l'Artibonite
19.33333 -72.5
Project Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Financing AgreementContract AwardsProject URLProcurement Notices 44000-P173811
World Bank
Haiti COVID-19 Response
International Development AssociationRepublic of Haiti
International Development AssociationMinistry of Public Health and the Population
UNITE DE GESTION DE PROJET (UGP)
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Marie Isabelle Simeon
+1-202-473-1000msimeon1@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Republic of Haiti
19 -72.41667
HealthPublic Administration - HealthHealth Facilities and ConstructionPandemic ResponseDisease ControlMitigationHealth System StrengtheningHealth Systems and PoliciesAdaptationHealth Service DeliveryClimate change
1625000.00
1625000.00
1625000.00
1625000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.37
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.37
75000.00
75000.00
75000.00
75000.00
75000.00
75000.00
75000.00
75000.00
75000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4365238.50
4365238.50
4365238.50
4365238.50
180035.30
180035.30
180035.30
180035.30
180035.30
180035.30
180035.30
180035.30
180035.30
180035.30
180035.30
180035.35
31551.86
31551.86
31551.86
31551.86
31551.86
31551.86
31551.86
31551.86
31551.86
31551.86
31551.86
31551.89
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.63
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20000000Total Commitment in Second Quarter of 2020
International Development Association
8000000Total Disbursement in Second Quarter of 2020
International Development Association
5961291Total Disbursement in Second Quarter of 2020
International Development Association
3499663Total Disbursement in Second Quarter of 2020
International Development Association
408000Total Disbursement in Third Quarter of 2020
International Development Association
62144Total Disbursement in Fourth Quarter of 2020
International Development Association
1690280Total Disbursement in First Quarter of 2021
International Development Association
Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Schedule 2. Section I. Implementation ArrangementsA. Institutional Arrangements1. The Recipient shall vest the responsibility forthe implementation of the Project in MSPP and ensure that the UGP shall carry out said Project with qualified staff in sufficientnumber, as well as with adequate funds, facilities, services and other resources; all acceptable to the Association and inaccordance with the Operations Manual, and the ESCP, as applicable.
Schedule 2. Section I. Implementation ArrangementsB. Operations Manual1. The Recipient shall adopt a manual (the OperationsManual) not later than one month after the Effective Date, thereafter maintain said manual and carry out the Project in accordancewith said manual, as considered satisfactory in form and substance to the Association, which consists of different schedulessetting forth rules, methods, guidelines, specific development plans, standard documents and procedures for the carrying out of theProject, including the following:(a) the detailed description of all Project activities, their sequencing and the prospectivetimetable and benchmarks in relation thereto;(b) the Project administrative, financial, accounting, auditing, reporting andprocurement and disbursement procedures, including all relevant standard documents;(c) the plan for capacity building and trainingactivities under the Project;(d) the plan for the monitoring, evaluation and supervision of the Project;(e) criteria and processfor the selection of health personnel, departmental health directorates, and health supervisory units participating in the Projectactivities;(f) the eligibility criteria for intervention and investments under the Project;(g) the ESCP for the Project;(h) thegrievance mechanisms, the code of conduct and the gender-based violence prevention measures; and(i) the performance indicators forthe Project.
Schedule 2. Section I. Implementation ArrangementsB. Operations Manual2. The Operations Manual shall only be amended from time totime in consultation with, and after approval of, the Association. In case of any conflict between the terms of the OperationsManual and those of this Agreement, the terms of this Agreement shall prevail.
Schedule 2. Section I. Implementation ArrangementsC. Agreements for the Provision of Technical Assistance1. To facilitate thecarrying out of selected activities under the Project, the Recipient shall, not later than three months after the Effective Date,enter into agreements (the Agreements for the Provision of Technical Assistance) with UN Agencies and Regional Organizations, andthereafter maintain said agreements during the implementation of the Project, on terms and conditions acceptable to theAssociation, including, inter alia: the Recipient's obligation to make part of the proceeds of the Financing allocated to Category(1) available to UN Agencies and Regional Organizations in order to assist the Recipient in the carrying out selected activitiesunder the Project in accordance with the Anti-Corruption Guidelines, the Procurement Regulations, the ESCP and the OperationsManual.
Schedule 2. Section I. Implementation ArrangementsC. Agreements for the Provision of Technical Assistance2. The Recipient shallexercise its rights or carry out its obligations under the Agreements for the Provision of Technical Assistance in such manner asto protect the interests of the Recipient and the Association and to accomplish the purposes of the Financing. Except as theAssociation shall otherwise agree, the Recipient shall not assign, amend, abrogate, waive, terminate or fail to enforce theAgreements for the Provision of Technical Assistance, or any of their provisions.
Schedule 2. Section I. Implementation ArrangementsE. Environmental and Social Standards1. The Recipient shall ensure that theProject is carried out in accordance with the Environmental and Social Standards, in a manner acceptable to the Association.
Schedule 2. Section I. Implementation ArrangementsE. Environmental and Social Standards2. Without limitation upon paragraph 1above, the Recipient shall ensure that the Project is implemented in accordance with the Environmental and Social Commitment Plan(“ESCP”), in a manner acceptable to the Association.
Schedule 2. Section I. Implementation ArrangementsE. Environmental and Social Standards3. The Recipient shall:(a) take allmeasures necessary on its part to collect, compile, and furnish to the Association through regular reports, with the frequencyspecified in the ESCP, and promptly in a separate report or reports, if so requested by the Association, information on the statusof compliance with the ESCP and the management tools and instruments referred to therein, including RAPs, all such reports in formand substance acceptable to the Association, setting out, inter alia: (i) the status of implementation of the ESCP; (ii)conditions, if any, which interfere or threaten to interfere with the implementation of the ESCP; and (iii) corrective andpreventive measures taken or required to be taken to address such conditions.
Schedule 2. Section I. Implementation ArrangementsE. Environmental and Social Standards3. The Recipient shall:(b) promptlynotify the Association of any incident or accident related to or having an impact on the Project which has, or is likely to have, asignificant adverse effect on the environment, the affected communities, the public or workers, including, gender-based violenceand violence against minors, in accordance with the ESCP, the instruments referenced therein and the Environmental and SocialStandards.
Schedule 2. Section I. Implementation ArrangementsE. Environmental and Social Standards4. The Recipient shall maintain andpublicize the availability of a grievance mechanism, in form and substance satisfactory to the Association, to hear and determinefairly and in good faith all complaints raised in relation to the Project and take all measures necessary to implement thedeterminations made by such mechanism in a manner satisfactory to the Association.
PDO Indicator
Percentage of suspected cases of COVID-19 cases reported and investigated based on national guidelines
Intermediate Results Indicator
Percentage of specimens of diseases with mandatory immediate notification submitted for laboratory testing confirmed within WHO standard time at reference laboratories supported by the project
PDO Indicator
Number of designated laboratories with diagnostic equipment, test kits, and reagents for diseases with mandatory immediate notification per MSPP norms
PDO Indicator
Country has activated their public health Emergency Operations Centre or a coordination mechanism for COVID-19
Intermediate Results Indicator
Number of health staff trained in infection prevention and control per MSPP-approved protocols
Intermediate Results Indicator
Number of individuals reached with tailored information (e.g., individuals and decision makers in different sectors — travel and tourism, food and agriculture, healthcare workers and businesses . . .)
44000-P174111
World Bank
Adaptive Social Protection for Increased Resilience Project
International Development AssociationMinistry of Economy and Finance
International Development AssociationMinistry of Social Affairs and Labor
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Cornelia M. Tesliuc
+1-202-473-1000ctesliuc@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Republic of Haiti
19.07582 -72.29616
Public Administration - Social ProtectionSocial ProtectionDisease ControlPandemic ResponseAdaptationDisaster Risk ManagementDisaster Risk ReductionSocial protection delivery systemsSocial Safety NetsFlood and Drought Risk ManagementICTICT SolutionsGenderClimate changeSocial Protection
642857.14
642857.14
642857.14
642857.14
642857.14
642857.14
642857.16
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.37
1041666.67
1041666.67
1041666.67
1041666.67
1041666.67
1041666.67
1041666.67
1041666.67
1041666.67
1041666.67
1041666.67
1041666.63
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.37
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.37
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.33
958333.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
333333.33
333333.33
333333.34
2631833.67
2631833.67
2631833.66
361134.32
361134.32
361134.33
308349.02
308349.02
308349.03
275396.94
275396.94
275396.94
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
426666.67
426666.67
426666.66
533333.33
533333.33
533333.34
700000.00
700000.00
700000.00
966666.67
966666.67
966666.66
900000.00
900000.00
900000.00
1266666.67
1266666.67
1266666.66
1100000.00
1100000.00
1100000.00
1100000.00
1100000.00
1100000.00
1366666.67
1366666.67
1366666.66
1506666.67
1506666.67
1506666.66
1490000.00
1490000.00
1490000.00
1493333.33
1493333.33
1493333.34
1496666.67
1496666.67
1496666.66
1883333.33
1883333.33
1883333.34
1510000.00
1510000.00
1510000.00
1518333.33
1518333.33
1518333.34
1000000.00
1000000.00
1000000.00
0.00
0.00
0.00
75000000Total Commitment in First Quarter of 2021
International Development Association
1000000Total Disbursement in Second Quarter of 2021
International Development Association
7895501Total Disbursement in Third Quarter of 2021
International Development Association
422100Total Disbursement in Fourth Quarter of 2021
International Development Association
775801Total Disbursement in Second Quarter of 2022
International Development Association
Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Schedule 2 Section I A 1 to 5 (Institutional Arrangements)1. The Recipient shall vest the overall responsibility for theimplementation of the Project in MAST and ensure that: (a) Parts 1, 2 and 3 are carried out or caused to be carried out by MAST;and (b) Part 4 of the Project is carried out through one or more implementing agencies or entities, as shall be further defined inthe CER Manual; all in accordance with the Operational Manual, and the ESCP, as applicable.
Schedule 2 Section I B 1, 2 and 3 (Operational Manual)1. The Recipient shall carry out the Project in accordance with a manual(the Operational Manual), satisfactory in form and substance to the Association {...}.
Schedule 2 Section I C 1, 2 and 3 (Annual Work Plans)1. Without limitation to the obligations set forth in Section I.B above, theRecipient shall carry out the Project in accordance with Annual Work Plans to be prepared and furnished to the Association notlater than October 31 of each calendar year during the implementation of the Project (the first such Annual Work Plan being due onemonth after the Effective Date), and containing all activities proposed for inclusion in the Project for the next calendar year,including: (a) detailed timetables for the sequencing and implementation of proposed Project activities; (b) types of expendituresrequired for such activities and a proposed financing plan and sources of funding for such expenditures, including counter-partfunds; and (c) any Operating Costs or Training that may be required under the Project.
Schedule 2 Section I D 1, 2 and 3 (Contingent Emergency Response) 3. The Recipient shall undertake no activities under theEmergency Response Part unless and until the following conditions have been met in respect of said activities:(a) the Recipienthas determined that an Eligible Crisis or Emergency has occurred, has furnished to the Association a request to include saidactivities in the Emergency Response Part in order to respond to said Eligible Crisis or Emergency, and the Association has agreedwith such determination, accepted said request and notified the Recipient thereof; and (b) the Recipient has ensured thepreparation and disclosure of all environmental and social instruments as may be required for said activities in accordance withthe CER Manual, the Association has approved all said instruments, and the Recipient has ensured the implementation of any actionswhich are required to be taken under said instruments.
Schedule 2 Section I E 1 and 2 (Standard Output Agreement)l. To facilitate the carrying out of Parts 1 and 2 of the Project, theRecipient, through the PIU, shall enter into and thereafter maintain an agreement (the Standard Output Agreement) with WFP, underterms and conditions approved by the Association, which shall include, inter alia: (a) the obligation of the Recipient to transferthe proceeds of the Grant allocated under Category (2) to WFP; and (b) the obligation of WFP to: (i) comply with theAnti-Corruption Guidelines; (ii) provide the UCTP to eligible households under Part 1 of the Project, as further described in theOperational Manual; (iii) provide technical assistance to support MAST in implementing activities under Part 2 of the Project, and(iv) comply with the pertinent obligations set forth in Section I.F of this Schedule.
Schedule 2 Section I F 1- 6 (Environmental and Social Standards)1. The Recipient shall ensure that the Project is carried out inaccordance with the Environmental and Social Standards, in a manner acceptable to the Association.
PDO Indicator
Cash transfers paid to eligible beneficiaries during climate hazard/disaster event
PDO Indicator
Beneficiaries of social safety net programs
PDO Indicator
Beneficiaries of social safety net programs - Female
PDO Indicator
Number of households added to SIMAST
PDO Indicator
Number of SIMAST households with updated information
PDO Indicator
Standard Operating Procedures to scale up cash transfers in response to shocks are adopted by Social Protection Roundtable (TSPS)
Intermediate Results Indicator
The Government contributes to the financing of expenditures linked to SIMAST and/or Klere Chimen through Annual Work Plan
Intermediate Results Indicator
Impact evaluation generating lessons
Intermediate Results Indicator
MAST has a manual (Standard Operating Procedures) and an automated payment platform to manage contracts with Payment Providers
PDO Indicator
Percentage of female direct recipients of the cash transfer
Intermediate Results Indicator
Percentage of GRM complaints addressed and responded to within the timeframe outlined in the POM
Intermediate Results Indicator
Percentage of households receiving accompanying measures on a regular basis as defined in the POM
Intermediate Results Indicator
Percentage of beneficiaries consulted during feedback surveys
Intermediate Results Indicator
Percentage of female beneficiaries who own and operate a bank or mobile money account or participate in a Village Savings and Loan Association (VSLA)
Intermediate Results Indicator
Percentage of households receiving payments within the timeframe specified in the POM
Intermediate Results Indicator
Percentage of SSN beneficiaries managed through MAST
Intermediate Results Indicator
Percentage of beneficiary households receiving payment through modality other than cash distribution
44000-P174707
World Bank
Promoting a more Equitable, Sustainable and Safer Education
International Development AssociationMinistry of Economy and Finance
International Development AssociationMinistère de l’Education et Formation Professionnelle; MENFP
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Quynh Thu Nguyen
+1-202-473-1000qnguyen4@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HAITI
Republic of Haiti
19.07582 -72.29616
Public Administration - EducationPrimary EducationData Development and Capacity BuildingData production, accessibility and useICTStandards, Curriculum and TextbooksEducation FacilitiesEducation Governance, School-Based ManagementEducationStudent AssessmentICT SolutionsGender
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
640000.00
1060000.00
1070000.00
1070000.00
1080000.00
1080000.00
1080000.00
1090000.00
1090000.00
1090000.00
1640000.00
1090000.00
1090000.00
1080000.00
1090000.00
1190000.00
1380000.00
1440000.00
1500000.00
1600000.00
1660000.00
1670000.00
2650000.00
1860000.00
1930000.00
2000000.00
1770000.00
1810000.00
1850000.00
1920000.00
2670000.00
2720000.00
2650000.00
2600000.00
3870000.00
2570000.00
2580000.00
2590000.00
2600000.00
2600000.00
2610000.00
2620000.00
2630000.00
2640000.00
2650000.00
2660000.00
4170000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8333.33
8333.33
8333.33
8333.33
8333.33
8333.33
8333.33
8333.33
8333.33
8333.33
8333.33
8333.37
1708333.33
1708333.33
1708333.33
1708333.33
1708333.33
1708333.33
1708333.33
1708333.33
1708333.33
1708333.33
1708333.33
1708333.37
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.37
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.67
2916666.63
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.37
90000000Total Commitment in First Quarter of 2022
International Development Association
0Total Disbursement in First Quarter of 2022
International Development Association
Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
GA- Schedule 2 - section 1.D - The Recipient, through the PIU, shall not later than three (3) months after the Effective Date, orany later date agreed by the Association, enter into and thereafter maintain an agreement (the Output Delivery Agreement) withUNICEF, under terms and conditions approved by the Association [...]
GA- Schedule 2 - section 1.E - The Recipient, through the PIU, shall not later than three (3) months after the Effective Date, orany later date agreed by the Association, enter into and thereafter maintain an agreement (the Technical Assistance Agreement) withUNESCO, under terms and conditions approved by the Association [...]
FA- Schedule 2 - section 1.D - The Recipient, through the PIU, shall not later than three (3) months after the Effective Date, orany later date agreed by the Association, enter into and thereafter maintain an agreement (the Output Delivery Agreement) withUNICEF, under terms and conditions approved by the Association [...]
FA- Schedule 2 - section 1.E - The Recipient, through the PIU, shall not later than three (3) months after the Effective Date, orany later date agreed by the Association, enter into and thereafter maintain an agreement (the Technical Assistance Agreement) withUNESCO, under terms and conditions approved by the Association [...]