44000-P145054
World Bank
Central Asia South Asia Electricity Transmission and Trade Project (CASA-1000)
International Development Association
NATIONAL TRANSMISSION COMPANIES OF AF/PK/TJ/KR
International Development Association
NATIONAL TRANSMISSION COMPANIES OF AF/PK/TJ/KRPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Kwawu Mensan Gaba
+1-202-473-1000kgaba@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
South Asia, regional
Parwan
35.0000 68.9170
Nangarhar
34.3330 70.4170
Wilayat-e Laghman
34.7830 70.1830
Kunduz
36.7500 68.7500
Wilayat-e Kabul
34.5000 69.4170
Wilayat-e Baghlan
35.7500 69.0000
Osh Oblasty
40.0000 73.0000
Batken Oblasty
39.8330 71.0000
Jalal-Abad Oblasty
41.5000 72.5000
Viloyati Sughd
40.0000 69.0000
Viloyati Khatlon
37.8330 69.0000
Federally Administered Tribal Areas
33.0150 69.9990
Peshawar
34.0080 71.5780
Energy Transmission and DistributionUrban Infrastructure and Service DeliveryUrban DevelopmentMitigationRural Infrastructure and service deliveryRural DevelopmentRegional IntegrationClimate changeJobsJob Creation
0.00
0.00
0.00
0.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
8333333.33
8333333.33
8333333.34
8333333.33
8333333.33
8333333.34
8333333.33
8333333.33
8333333.34
8333333.33
8333333.33
8333333.34
12916666.66
12916666.67
12916666.67
12916666.66
12916666.67
12916666.67
12916666.66
12916666.67
12916666.67
12916666.66
12916666.67
12916666.67
9583333.33
9583333.33
9583333.34
9583333.33
9583333.33
9583333.34
9583333.33
9583333.33
9583333.34
9583333.33
9583333.33
9583333.34
7208333.33
7208333.33
7208333.34
7208333.33
7208333.33
7208333.34
7208333.33
7208333.33
7208333.34
7208333.33
7208333.33
7208333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18062.04
18062.04
18062.04
18062.04
18062.04
18062.04
18062.04
18062.04
18062.04
18062.04
18062.04
18062.06
36146.05
36146.05
36146.05
36146.05
36146.05
36146.05
36146.05
36146.05
36146.05
36146.05
36146.05
36146.03
35643.33
35643.33
35643.33
35643.33
35643.33
35643.33
35643.33
35643.33
35643.33
35643.33
35643.33
35643.31
739469.58
739469.58
739469.58
739469.58
739469.58
739469.58
739469.58
739469.58
739469.58
739469.58
739469.58
739469.54
3048262.73
3048262.73
3048262.73
3048262.73
3048262.73
3048262.73
3048262.73
3048262.73
3048262.73
3048262.73
3048262.73
3048262.72
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.63
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.63
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.67
12916666.63
9611864.91
9611864.91
9611864.91
9611864.91
9611864.91
9611864.91
9611864.91
9611864.91
9611864.91
9611864.91
9611864.90
120000000Total Commitment in First Quarter of 2014
International Development Association38250000Total Commitment in First Quarter of 2014
International Development Association316500000Total Commitment in First Quarter of 2014
International Development Association45000000Total Commitment in First Quarter of 2014
International Development Association6750000Total Commitment in First Quarter of 2014
International Development Association2338223Total Disbursement in Second Quarter of 2018
International Development Association6248764Total Disbursement in Second Quarter of 2018
International Development Association3000000Total Disbursement in Third Quarter of 2018
International Development Association470194Total Disbursement in Fourth Quarter of 2018
International Development Association17169822Total Disbursement in Fourth Quarter of 2018
International Development Association32115108Total Disbursement in First Quarter of 2019
International Development Association14602539Total Disbursement in Second Quarter of 2019
International Development Association65000000Total Commitment in Second Quarter of 2019
International Development Association139734Total Disbursement in Second Quarter of 2019
International Development Association2679000Total Disbursement in Second Quarter of 2019
International Development Association3280800Total Disbursement in Second Quarter of 2019
International Development Association8722531Total Disbursement in Third Quarter of 2019
International Development Association3606157Total Disbursement in Third Quarter of 2019
International Development Association10949722Total Disbursement in Third Quarter of 2019
International Development Association115515Total Disbursement in Third Quarter of 2019
International Development Association5961623Total Disbursement in Third Quarter of 2019
International Development Association639313Total Disbursement in Fourth Quarter of 2019
International Development Association-135077Total Interest Repayment in Fourth Quarter of 2019
International Development Association-3519323Total Loan Repayment in Fourth Quarter of 2019
International Development Association1551662Total Disbursement in Fourth Quarter of 2019
International Development Association3012867Total Disbursement in Fourth Quarter of 2019
International Development Association10696127Total Disbursement in Fourth Quarter of 2019
International Development Association19455696Total Disbursement in Fourth Quarter of 2019
International Development Association2649389Total Disbursement in Fourth Quarter of 2019
International Development Association248960Total Disbursement in First Quarter of 2020
International Development Association-3985Total Interest Repayment in First Quarter of 2020
International Development Association5695747Total Disbursement in First Quarter of 2020
International Development Association14979188Total Disbursement in First Quarter of 2020
International Development Association-202241Total Interest Repayment in Second Quarter of 2020
International Development Association-1764687Total Loan Repayment in Second Quarter of 2020
International Development Association2988105Total Disbursement in Second Quarter of 2020
International Development Association8020681Total Disbursement in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementAgreementAgreementAgreementAgreementAgreementGrant or Trust Fund AgreementGrant or Trust Fund AgreementGrant or Trust Fund AgreementGrant or Trust Fund AgreementGrant or Trust Fund AgreementFinancing AgreementFinancing AgreementFinancing AgreementFinancing AgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Core Construction Agreements. The contracts for the HVDC converter stations will be signed by December 2018. The contracts for theHVDC transmission line will be signed by September 30, 2019. The contracts for the HVAC transmission line will be signed byDecember30, 2018. The operations and maintenance contracts will be signed by June 30, 2020.This covenant also applied to IDA-54380,IDA-H9270.
Revenue Management: Tajikistan and the Kyrgyz Republic shall adopt and implement a transparent revenue management program by nolater than 24 months after the Effective date. This covenant also applies to IDA-H9410, IDA-H9420.
Co-financing: Additional Co-Financing for Parts A and B of the Project (for Tajikistan, Kyrgyz Republic and Pakistan) shall besecured in a manner satisfactory to the Association by no later than 12 months after the Effective Date. This covenant also appliesto IDA-54090, IDA-H9410, IDA-H9420.
Guidelines for Community Support Programs: Prior to the commencement of construction work for the HVDC transmission line, theoperational manual for the Community Support Programs for Pakistan and Afghanistan will be finalized and financing secured, for thepurpose of implementing said component, in form and substance acceptable to the Association. This covenant also applies toIDA-H9270.
Off-take Arrangements. The Core Commercial Agreements (PPAs, Master Agreement, the Coordination Agreement, Host GovernmentAgreements, Technical Code and the Account Bank Agreement), with terms and conditions satisfactory to the Association, shallbecome effective by 24 months after Effective Date. This covenant also applies to IDA-54380, IDA-H9270, IDA-H9410, IDA-H9420.
Inter-Governmental Agreements: Additional Event of Suspension. Any of the Host Government Agreements, the Coordination Agreement,the Inter-Governmental Agreement, or any IGC Resolution has been amended, suspended, abrogated or waived so as to affect materiallyand adversely the ability of any of the Participating Countries or the IGC to carry out their respective responsibilities inconnection with the Project. This covenant also applies to IDA-54380, IDA-H9270, IDA-H9410, IDA-H9420.
Core Financing Agreements: Additional Event of Suspension. The right of any of the Participating Countries under any of the CoreFinancing Agreements to withdraw the proceeds of such financing is suspended, canceled or terminated, in whole or in part, pursuantto the terms of such agreement. This covenant also applies to IDA-54380, IDA-H9270, IDA-H9410, IDA-H9420.
Legislation of National Transmission Companies: Additional Event of Suspension. Any National Transmission Company's Legislation hasbeen amended, suspended, abrogated, repealed or waived so as to affect materially and adversely the ability of the ProjectImplementing Agency to perform any of its obligations under the Project. This covenant also applies to IDA-54380, IDA-H9270,IDA-H9410, IDA-H9420.
Performance under Subsidiary Agreements: Additional Event of Suspension. Any of the parties to the Subsidiary Agreements (betweenthe Participating Countries and National Transmission Companies) has failed to perform any of its obligations under its respectiveSubsidiary Agreement. This covenant also applies to IDA-54380, IDA-H9270, IDA-H9410, IDA-H9420.
Core Construction Agreements. The contracts for the HVDC converter stations will be signed by December 2018. The contracts for theHVDC transmission line will be signed by September 30, 2019. The contracts for the HVAC transmission line will be signed byDecember30, 2018. The operations and maintenance contracts will be signed by June 30, 2020.This covenant also applied to IDA-H9420.
PDO Indicator
Trade initiated between the participating countries
PDO Indicator
Commercial framework between the countries is established and operational
PDO Indicator
Institutional mechanism for project sustainability is in place
PDO Indicator
Transmission lines constructed or rehabilitated under the project
PDO Indicator
Transmission lines constructed under the project
Intermediate Results Indicator
Construction contracts signed for HVDC converter stations
Intermediate Results Indicator
Owner's Engineer hired and in place
Intermediate Results Indicator
Development of operations manual for the Community Support Programs
Intermediate Results Indicator
Construction contracts signed for HVDC line
Intermediate Results Indicator
Timely Audits carried out of Entity Financial Statements within 9 months of the closure of financial year - Tajikistan and Kyrgyz Republic
Intermediate Results Indicator
Agreement on financing of Community Support Programs for operations phase
Intermediate Results Indicator
Converter stations constructed under the Project
Intermediate Results Indicator
Timely Audits carried out of Entity Financial Statements within 9 months of the closure of the financial year - Pakistan and Afghanistan
Intermediate Results Indicator
HVDC line constructed under the Project
Intermediate Results Indicator
Number of staff receiving knowledge transfer on HVDC technology/ Transmission Dispatch
Intermediate Results Indicator
HVAC line between the Kyrgyz Republic and Tajikistan constructed under the Project
Intermediate Results Indicator
Indirect Project Beneficiaries
44000-P126193
World Bank
Second Phase of the APL on Strengthening Regional Cooperation for Wildlife Protection in Asia
International Development Association
MINISTRY OF AGRICULTURE AND FORESTS
International Development Association
MINISTRY OF AGRICULTURE AND FORESTSPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Nathalie Weier Johnson
+1-202-473-1000njohnson@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
South Asia, regional
Kingdom of Bhutan
27.5000 90.5000
Other Agriculture, Fishing and ForestryPublic Administration - Agriculture, Fishing & ForestryJobsRenewable Natural Resources Asset ManagementBiodiversityEnvironmental policies and institutions
27818.13
27818.13
27818.14
27818.13
27818.13
27818.14
41727.20
41727.20
41727.20
41727.20
41727.20
41727.20
51213.47
51213.47
51213.46
51213.47
51213.47
51213.46
76820.20
76820.20
76820.20
76820.20
76820.20
76820.20
39120.20
39120.20
39120.20
39120.20
39120.20
39120.20
58680.30
58680.30
58680.30
58680.30
58680.30
58680.30
22884.80
22884.80
22884.80
22884.80
22884.80
22884.80
34327.20
34327.20
34327.20
34327.20
34327.20
34327.20
8963.40
8963.40
8963.40
8963.40
8963.40
8963.40
13445.10
13445.10
13445.10
13445.10
13445.10
13445.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27818.13
27818.13
27818.14
27818.13
27818.13
27818.14
41727.20
41727.20
41727.20
41727.20
41727.20
41727.20
51213.47
51213.47
51213.46
51213.47
51213.47
51213.46
76820.20
76820.20
76820.20
76820.20
76820.20
76820.20
39120.20
39120.20
39120.20
39120.20
39120.20
39120.20
58680.30
58680.30
58680.30
58680.30
58680.30
58680.30
22884.80
22884.80
22884.80
22884.80
22884.80
22884.80
34327.20
34327.20
34327.20
34327.20
34327.20
34327.20
8963.40
8963.40
8963.40
8963.40
8963.40
8963.40
13445.10
13445.10
13445.10
13445.10
13445.10
13445.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2250000Total Commitment in Second Quarter of 2011
International Development Association177231Total Disbursement in Fourth Quarter of 2012
International Development Association10295Total Disbursement in Second Quarter of 2013
International Development Association24263Total Disbursement in Second Quarter of 2013
International Development Association-677Total Interest Repayment in Second Quarter of 2013
International Development Association24956Total Disbursement in Third Quarter of 2013
International Development Association-834Total Interest Repayment in Fourth Quarter of 2013
International Development Association845683Total Disbursement in First Quarter of 2014
International Development Association-2929Total Interest Repayment in Second Quarter of 2014
International Development Association-3889Total Interest Repayment in Fourth Quarter of 2014
International Development Association162618Total Disbursement in First Quarter of 2015
International Development Association236742Total Disbursement in Second Quarter of 2015
International Development Association-3641Total Interest Repayment in Second Quarter of 2015
International Development Association564712Total Disbursement in Third Quarter of 2015
International Development Association-6167Total Interest Repayment in Fourth Quarter of 2015
International Development Association-7307Total Interest Repayment in Second Quarter of 2016
International Development Association-7236Total Interest Repayment in Fourth Quarter of 2016
International Development Association-3953Total Disbursement in First Quarter of 2017
International Development Association-6454Total Commitment Cancellations in Second Quarter of 2017
International Development Association-7076Total Interest Repayment in Second Quarter of 2017
International Development Association-7499Total Interest Repayment in Fourth Quarter of 2017
International Development Association-7473Total Interest Repayment in Second Quarter of 2018
International Development Association-7229Total Interest Repayment in Fourth Quarter of 2018
International Development Association-7232Total Interest Repayment in Second Quarter of 2019
International Development Association-7185Total Interest Repayment in Fourth Quarter of 2019
International Development Association-7119Total Interest Repayment in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Appraisal Document Implementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementFinancing AgreementProject Performance Assessment ReportContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2, Section I. A, Paragraph 1 | Description :Establishment of Project Implementation Steering Committee| Due Date :15-Jul-2011
Finance Agreement :Schedule 2, Section I. C, Paragraph 1 (b) (i) | Description :Prior to commencement of any works under theproject, the Borrower must implement applicable RAP or IPDP in a manner satisfactory to the Association. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I. C, Paragraph 1 (b) (ii) | Description :If any modification or finalization of anyactivity design or implementation gives rise to Displaced persons, Borrower shall implement a RAP and/or IPDP satisfactory to theAssociation | Frequency :Yearly
Finance Agreement :Schedule 2, Section I. C, Paragraph 1 | Description :Application of Environmental and Social ManagementFramework (ESMF) | Frequency :Yearly
Finance Agreement :Schedule 2, Section I. C, Paragraph 2 and 3 | Description :Monitor implementation of ESMF, EMPs, RAPs, RPF, SIA& IPDS & submission of semi-annual M&E reports. Obtain prior concurrence for any modification/waiver of safeguard instruments. |Frequency :Yearly
Finance Agreement :Schedule 2, Section IV. B, Paragraph 1 | Description :For Category 2 of FA's eligible expenditure table:preparation and adoption of the Operational Manual in form and substance satisfactory to the Association (Condition ofdisbursement) | Due Date :30-Dec-2011
Intermediate Results Indicator
Regional 1: Number of agreed research programs for regional wildlife management developed among participating countries.
Intermediate Results Indicator
Regional 2: Number of thematic meetings on wildlife crime and trans-boundary conservation issues among participating and other relevant countries
Intermediate Results Indicator
Comp 1: Indicator 1: Strengthened enforcement and effective control of illegal wildlife trade
Intermediate Results Indicator
Component 1: Indicator 2: Improved record of trained staff vis-à-vis capacity for enforcement, trans-boundary coordination and responsiveness to wildlife crimes.
Intermediate Results Indicator
Component 2: Indicator 3: Improved facilities for environmental education and interpretation
Intermediate Results Indicator
Component 2: Indicator 4: Measures taken to reduce HWC.
PDO Indicator
PDO 1: A regional mechanism is developed and operational for addressing illegal wildlife trade and other conservation threats.
PDO Indicator
PDO 2: Number of agreed knowledge products developed and shared among SAWEN countries on wildlife crime and/or wildlife conservation .
PDO Indicator
PDO 3: Wildlife crime control institutions established in the three participating countries.
PDO Indicator
PDO 4: Number of implemented pilot initiatives that address trans-boundary wildlife issues.
Intermediate Results Indicator
Component 2: Indicator 6: Introduction of a scientific method of surveying snow leopards
Intermediate Results Indicator
Component 3: Indicator 1: Effective Project Coordination
PDO Indicator
PDO 5: Number of activities contributing to tiger conservation.
Intermediate Results Indicator
Component 2: Indicator 1 - Better care and management of injured and rescued wildlife
44000-P121210
World Bank
APL on Strengthening Regional Cooperation For Wildlife Protection in Asia
International Development Association
MINISTRY OF FORESTS IN PARTICIPATING COUNTRIES
International Development Association
MINISTRY OF FORESTS IN PARTICIPATING COUNTRIESPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Nathalie Weier Johnson
+1-202-473-1000njohnson@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
South Asia, regional
Bangladesh
24.0000 90.0000
Federal Democratic Republic of Nepal
28.0000 84.0000
Public Administration - Agriculture, Fishing & ForestryOther Agriculture, Fishing and ForestryJobsRenewable Natural Resources Asset ManagementBiodiversityEnvironmental policies and institutions
0.00
0.00
0.00
643085.53
643085.53
643085.54
643085.53
643085.53
643085.54
964628.30
964628.30
964628.30
964628.30
964628.30
964628.30
687585.87
687585.87
687585.86
687585.87
687585.87
687585.86
1031378.80
1031378.80
1031378.80
1031378.80
1031378.80
1031378.80
629052.53
629052.53
629052.54
629052.53
629052.53
629052.54
943578.80
943578.80
943578.80
943578.80
943578.80
943578.80
541252.53
541252.53
541252.54
541252.53
541252.53
541252.54
811878.80
811878.80
811878.80
811878.80
811878.80
811878.80
99023.53
99023.53
99023.54
99023.53
99023.53
99023.54
148535.30
148535.30
148535.30
148535.30
148535.30
148535.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1348333.33
1348333.33
1348333.33
1348333.33
1348333.33
1348333.33
1348333.33
1348333.33
1348333.33
1348333.33
1348333.33
1348333.37
1551666.67
1551666.67
1551666.67
1551666.67
1551666.67
1551666.67
1551666.67
1551666.67
1551666.67
1551666.67
1551666.67
1551666.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36000000Total Commitment in Second Quarter of 2011
International Development Association3000000Total Commitment in Second Quarter of 2011
International Development Association2135448Total Disbursement in First Quarter of 2012
International Development Association166691Total Disbursement in First Quarter of 2012
International Development Association65601Total Disbursement in Third Quarter of 2012
International Development Association772210Total Disbursement in Third Quarter of 2012
International Development Association-10395Total Interest Repayment in Third Quarter of 2012
International Development Association608763Total Disbursement in Third Quarter of 2012
International Development Association38142Total Disbursement in First Quarter of 2013
International Development Association173593Total Disbursement in First Quarter of 2013
International Development Association-11822Total Interest Repayment in First Quarter of 2013
International Development Association125015Total Disbursement in Second Quarter of 2013
International Development Association164969Total Disbursement in Second Quarter of 2013
International Development Association443484Total Disbursement in Third Quarter of 2013
International Development Association-12435Total Interest Repayment in Third Quarter of 2013
International Development Association93797Total Disbursement in Fourth Quarter of 2013
International Development Association709333Total Disbursement in Fourth Quarter of 2013
International Development Association1030Total Disbursement in Fourth Quarter of 2013
International Development Association559368Total Disbursement in Fourth Quarter of 2013
International Development Association158921Total Disbursement in First Quarter of 2014
International Development Association178576Total Disbursement in First Quarter of 2014
International Development Association230263Total Disbursement in First Quarter of 2014
International Development Association-17222Total Interest Repayment in First Quarter of 2014
International Development Association360961Total Disbursement in Second Quarter of 2014
International Development Association1021223Total Disbursement in Second Quarter of 2014
International Development Association1125626Total Disbursement in Second Quarter of 2014
International Development Association81735Total Disbursement in Third Quarter of 2014
International Development Association1293536Total Disbursement in Third Quarter of 2014
International Development Association-26072Total Interest Repayment in Third Quarter of 2014
International Development Association214340Total Disbursement in Fourth Quarter of 2014
International Development Association1669078Total Disbursement in Fourth Quarter of 2014
International Development Association431860Total Disbursement in Fourth Quarter of 2014
International Development Association821072Total Disbursement in First Quarter of 2015
International Development Association882146Total Disbursement in First Quarter of 2015
International Development Association992782Total Disbursement in First Quarter of 2015
International Development Association-36060Total Interest Repayment in First Quarter of 2015
International Development Association-19312Total Commitment Cancellations in Second Quarter of 2015
International Development Association742515Total Disbursement in Second Quarter of 2015
International Development Association1926686Total Disbursement in Second Quarter of 2015
International Development Association585343Total Disbursement in Third Quarter of 2015
International Development Association756420Total Disbursement in Third Quarter of 2015
International Development Association956660Total Disbursement in Third Quarter of 2015
International Development Association-52577Total Interest Repayment in Third Quarter of 2015
International Development Association420766Total Disbursement in Fourth Quarter of 2015
International Development Association1038846Total Disbursement in Fourth Quarter of 2015
International Development Association753637Total Disbursement in Fourth Quarter of 2015
International Development Association302114Total Disbursement in First Quarter of 2016
International Development Association991071Total Disbursement in First Quarter of 2016
International Development Association-69560Total Interest Repayment in First Quarter of 2016
International Development Association438666Total Disbursement in Second Quarter of 2016
International Development Association462595Total Disbursement in Second Quarter of 2016
International Development Association1704212Total Disbursement in Second Quarter of 2016
International Development Association505652Total Disbursement in Third Quarter of 2016
International Development Association760357Total Disbursement in Third Quarter of 2016
International Development Association1295653Total Disbursement in Third Quarter of 2016
International Development Association-81786Total Interest Repayment in Third Quarter of 2016
International Development Association403296Total Disbursement in Third Quarter of 2016
International Development Association721161Total Disbursement in Fourth Quarter of 2016
International Development Association766200Total Disbursement in Fourth Quarter of 2016
International Development Association1073469Total Disbursement in Fourth Quarter of 2016
International Development Association-98594Total Interest Repayment in First Quarter of 2017
International Development Association335Total Disbursement in Second Quarter of 2017
International Development Association-18968Total Disbursement in Third Quarter of 2017
International Development Association-106147Total Interest Repayment in Third Quarter of 2017
International Development Association-959Total Commitment Cancellations in Third Quarter of 2017
International Development Association-417845Total Disbursement in Fourth Quarter of 2017
International Development Association-108966Total Interest Repayment in First Quarter of 2018
International Development Association-4095378Total Commitment Cancellations in Second Quarter of 2018
International Development Association-106408Total Interest Repayment in Third Quarter of 2018
International Development Association-104168Total Interest Repayment in First Quarter of 2019
International Development Association-102757Total Interest Repayment in Third Quarter of 2019
International Development Association-102856Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2, Section I. A, Paragraph 1 | Description :BD: Establishment of National Project Steering Committee |Due Date :30-Apr-2011
Finance Agreement :Schedule 2, Section I. A, Paragraph 2 | Description :BD: Establishment of Project Implementation Unit within BFDand Project Implementation Committee to be chaired by Chief Conservatorof Forest, consisting of senior officials from BFD. | DueDate :15-May-2011
Finance Agreement :Schedule 2, Section I. C, Paragraph 1 (b) (i) | Description :BD: Prior to commencement of any works under theproject, the Borrower must implement applicable RAP or IPDP in a manner satisfactory to the Association. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I. C, Paragraph 1 (b) (ii) | Description :BD: If any modification or finalisation of anyactivity design or implementation gives rise to Displaced persons, Borrower shall implement a RAP and/or IPDP satisfactory to theAssociation. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I. C, Paragraph 2 | Description :BD: Application of Environmental and Social ManagementFramework (ESMF) and Environmental Management Plans (EMPs) | Frequency :Yearly
Finance Agreement :Schedule 2, Section I. C, Paragraphs 3 and 4 | Description :BD: Monitor implementation of ESMF, EMPs, RAPs, RPF,SIA & IPDS & submission of semi-annual M&E reports. Obtain prior concurrence for any modification/waiver of safeguard instruments.| Frequency :Yearly
Finance Agreement :Schedule 2, Section IV. B. Paragraph 1 | Description :BD: Preparation and adoption of the Operational Manual inform and substance satisfactory to the Association (Condition of disbursement) | Due Date :30-Dec-2011
Finance Agreement :Schedule 2, Section I. A, Paragraph 1 | Description :NP: Establishment of National Project Steering Committee(NPSC) | Due Date :15-Jun-2011
Finance Agreement :Schedule 2, Section I. A, Paragraph 2 | Description :NP: Establishment of National Project Management Committeewithin NPSC | Due Date :15-Jun-2011
Finance Agreement :Schedule 2, Section I. A, Paragraphs 3, 4 and 5 | Description :NP: Appointment of NTNC as PCU; staffing of PCU;staff retention until project completion/6 months of closing; retention of PCU staff who benefit from international training perCivil Service Act | Due Date :05-Sep-2011
Finance Agreement :Schedule 2, Section I. C, Paragraph 1 (b) (i) | Description :NP: Prior to commencement of any works under theproject, the Borrower must implement applicable RAP or IPDP in a manner satisfactory to the Association. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I. C, Paragraph 1 (b) (ii) | Description :NP: If any modification or finalisation of anyactivity design or implementation gives rise to Displaced persons, the Borrower shall implement a RAP and/or IPDP satisfactory tothe Association. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I. C, Paragraph 2 | Description :NP: Application of Environmental and Social ManagementFramework (ESMF) and Environmental Management Plans (EMPs) | Frequency :Yearly
Finance Agreement :Schedule 2, Section I. C, Paragraphs 3 and 4 | Description :NP: Monitor the implementation of EMPs, RAPs, RPF,SIA & IPDS & submission of semi-annual M&E reports. Obtain prior concurrence forany modification/waiver of safeguard instruments. |Frequency :Yearly
Finance Agreement :Schedule 2, Section IV B, Paragraph 1 | Description :NP: The Recipient has entered into the MOU with NTNC, inform and substance satisfactory to the Association (Condition of disbursement) | Due Date :05-Sep-2011
Finance Agreement :Schedule 2, Section IV. B, Paragraph 1 | Description :NP: Preparation and adoption of the Operational Manual inform and substance satisfactory to the Association (Condition of disbursement) | Due Date :30-Dec-2011
PDO Indicator
PDO 1: A regional mechanism is developed and operational for addressing illegal wildlife trade and other conservation threats
Intermediate Results Indicator
Regional 1: Number of agreed research programs for regional wildlife management developed among participating countries.
PDO Indicator
PDO 2: Number of agreed knowledge products developed and shared among SAWEN countries on wildlife crime and/or wildlife conservation.
Intermediate Results Indicator
Regional 2: Number of thematic meetings on wildlife crime and trans-boundary conservation issues among participating and other relevant countries
PDO Indicator
PDO 3: Wildlife crime control institutions established in the three participating countries.
Intermediate Results Indicator
Bangladesh Component 1: Indicator I: New draft Wildlife Conservation Act giving more powers to the Wildlife Circle approved by Parliament
PDO Indicator
PDO 4: Number of implemented pilot initiatives that address trans-boundary wildlife issues.
Intermediate Results Indicator
Bangladesh Component 1: Indicator 2: Number of staff added to the Wildlife Circle and who have been trained on enforcement and wildlife crime control.
Intermediate Results Indicator
Bangladesh Component 1: Indicator 3: Establishment and Operationalizing of Wildlife Crime Control Unit (WCCU) with at least forensic section, legal support arm and wildlife crime bank
PDO Indicator
PDO 5: Number of activities contributing to tiger conservation.
Intermediate Results Indicator
Bangladesh Component 1: Indicator 4: Number of training modules developed and delivered by the Wildlife Center
Intermediate Results Indicator
Bangladesh Component 1: Indicator 5: Number of BFD staff trained in wildlife crime and/or conservation.
Intermediate Results Indicator
Bangladesh Component 2: Indicator 1: Number of flagship species for which breeding habitats have been identified in targeted areas.
Intermediate Results Indicator
Bangldsh Comp 2: Indicator 2: Number of species conservation pilot plans developed for more effective wildlife management.
Intermediate Results Indicator
Bangladesh Component 2: Indicator 3: Number of national parks with an ecotourism plan.
Intermediate Results Indicator
Areas brought under enhanced biodiversity protection (ha)
Intermediate Results Indicator
Bangladesh Component 3: Indicator 1: Effective project coordination among participating countries at each regional thematic meeting.
Intermediate Results Indicator
Bangladesh Component 3: Indicator 2: Development and implementation of project communication plan
Intermediate Results Indicator
Nepal Comp 1: Indicator 1: Implementation challenges of key policy and legislation identified.
Intermediate Results Indicator
Nepal Comp 1: Indicator 2: Wildlife crime control mechanisms institutionalized and operationalized with capacity for forensic, legal support, and wildlife crime data access and collection.
Intermediate Results Indicator
Nepal Comp 1: Indicator 3: Legislation for effective compliance of CITES established.
Intermediate Results Indicator
Nepal Comp 1: Indicator 4: Number of staff trained in state of the art tools on wildlife conservation.
Intermediate Results Indicator
Nepal Comp 2: Indicator 1: Number of pilot projects designed and implemented to improve protection and conservation of key flagshipspecies.
Intermediate Results Indicator
Nepal Comp 2: Ind 2: Number of models developed for more effective wildlife management.
Intermediate Results Indicator
Nepal Comp 2: Ind 3: A ranging model developed based on research information for elephant conservation to reduce conflict with humans.
Intermediate Results Indicator
Nepal Comp 2: Ind. 4: A replication strategy developed with action plan for mitigating human elephant conflict.
Intermediate Results Indicator
Nepal Comp 2. Indicator 5: An ecotourism plan for Banke National Park developed.
Intermediate Results Indicator
Areas brought under enhanced biodiversity protection (ha)
Intermediate Results Indicator
Nepal Comp 3 Ind 1: Effective project coordination among participating countries at each regional thematic meeting.
44000-P171054
World Bank
Climate Adaptation and Resilience for South Asia
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Haris Khan
+1-202-473-1000hkhan1@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
South Asia, regionalOther Public AdministrationDisaster Risk ManagementDisaster Risk FinanceFinance for DevelopmentDisaster Risk ReductionAdaptationClimate changeDisaster PreparednessData Development and Capacity BuildingData production, accessibility and use
0.00
110000.00
460000.00
230000.00
230000.00
460000.00
230000.00
230000.00
460000.00
230000.00
230000.00
460000.00
230000.00
230000.00
460000.00
230000.00
230000.00
460000.00
230000.00
460000.00
230000.00
230000.00
460000.00
230000.00
230000.00
480000.00
260000.00
280000.00
560000.00
280000.00
280000.00
570000.00
280000.00
280000.00
560000.00
290000.00
580000.00
300000.00
310000.00
660000.00
360000.00
390000.00
670000.00
350000.00
370000.00
790000.00
430000.00
460000.00
1530000.00
680000.00
600000.00
1080000.00
510000.00
510000.00
1010000.00
500000.00
1000000.00
500000.00
500000.00
1000000.00
500000.00
500000.00
1010000.00
510000.00
510000.00
1520000.00
510000.00
1020000.00
510000.00
510000.00
1020000.00
510000.00
900000.00
0.00
0.00
110000.00
460000.00
230000.00
230000.00
460000.00
230000.00
230000.00
460000.00
230000.00
230000.00
460000.00
230000.00
230000.00
460000.00
230000.00
230000.00
460000.00
230000.00
460000.00
230000.00
230000.00
460000.00
230000.00
230000.00
480000.00
260000.00
280000.00
560000.00
280000.00
280000.00
570000.00
280000.00
280000.00
560000.00
290000.00
580000.00
300000.00
310000.00
660000.00
360000.00
390000.00
670000.00
350000.00
370000.00
790000.00
430000.00
460000.00
1530000.00
680000.00
600000.00
1080000.00
510000.00
510000.00
1010000.00
500000.00
1000000.00
500000.00
500000.00
1000000.00
500000.00
500000.00
1010000.00
510000.00
510000.00
1520000.00
510000.00
1020000.00
510000.00
510000.00
1020000.00
510000.00
900000.00
0.00
0Total Disbursement in First Quarter of 2020
International Development Association24000000Total Commitment in Second Quarter of 2020
International Development Association12000000Total Commitment in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentContract AwardsProject URLProcurement Notices