44000-P150754
World Bank
Comoros Social Safety Net Project
International Development Association
FONDS D'APPUI AU DELOPPEMENT COMMUNAUTAIRE (FADC)
International Development Association
FONDS D'APPUI AU DELOPPEMENT COMMUNAUTAIRE (FADC)Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Julia Rachel Ravelosoa
+1-202-473-1000jravelosoa@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COMOROS
MohEli Island
-12.3240 43.7440
Grande Comore
-11.5860 43.3330
Anjouan
-12.2500 44.4170
Public Administration - Social ProtectionSocial ProtectionHealthRenewable Natural Resources Asset ManagementDisaster Response and RecoveryLand Administration and ManagementSocial Safety NetsDisaster Risk FinanceAdaptationDisaster Risk ReductionDisaster Risk ManagementNutrition and Food SecurityClimate changeDisaster PreparednessBiodiversityFinance for DevelopmentFood SecurityLandscape ManagementSocial ProtectionJobsNutritionRural Development
0.00
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
500000.00
500000.00
500000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
500000.00
500000.00
500000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
500000.00
500000.00
500000.00
0.00
0.00
0.00
0.00
0.00
0.00
166666.66
166666.67
166666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44820.00
25812.00
27954.00
30186.00
66780.00
36360.00
38178.00
39960.00
41616.00
91098.00
50076.00
52452.00
54342.00
112032.00
57114.00
57744.00
58806.00
59922.00
122040.00
61506.00
61542.00
60588.00
59868.00
118512.00
59940.00
61164.00
62856.00
133272.00
68904.00
69696.00
70830.00
72594.00
153288.00
80964.00
82692.00
84294.00
86292.00
180630.00
95436.00
99126.00
101646.00
206298.00
105462.00
108162.00
111744.00
116046.00
244026.00
125280.00
127710.00
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.37
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
176234.00
176234.00
176234.00
176234.00
176234.00
176234.00
176234.00
176234.00
176234.00
176234.00
6000000Total Commitment in First Quarter of 2015
International Development Association316457Total Disbursement in Fourth Quarter of 2015
International Development Association300000Total Disbursement in First Quarter of 2016
International Development Association336280Total Disbursement in First Quarter of 2016
International Development Association418946Total Disbursement in Second Quarter of 2016
International Development Association270000Total Disbursement in Third Quarter of 2016
International Development Association273213Total Disbursement in Fourth Quarter of 2016
International Development Association164871Total Disbursement in First Quarter of 2017
International Development Association327896Total Disbursement in First Quarter of 2017
International Development Association163294Total Disbursement in Second Quarter of 2017
International Development Association230000Total Disbursement in Fourth Quarter of 2017
International Development Association417286Total Disbursement in Fourth Quarter of 2017
International Development Association514257Total Disbursement in First Quarter of 2018
International Development Association1021927Total Disbursement in Second Quarter of 2018
International Development Association200000Total Disbursement in Fourth Quarter of 2018
International Development Association482671Total Disbursement in Fourth Quarter of 2018
International Development Association336331Total Disbursement in First Quarter of 2019
International Development Association54124Total Disbursement in Second Quarter of 2019
International Development Association-17880Total Disbursement in Third Quarter of 2019
International Development Association-9189Total Disbursement in Third Quarter of 2019
International Development Association-9197Total Disbursement in Fourth Quarter of 2019
International Development Association11795Total Disbursement in Fourth Quarter of 2019
International Development Association27656Total Disbursement in Fourth Quarter of 2019
International Development Association18000000Total Commitment in Fourth Quarter of 2019
International Development Association225607Total Disbursement in Second Quarter of 2020
International Development Association4591426Total Disbursement in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
The Recipient not later than 30 days after effectiveness date, shall cause the Ministry of Health, Solidarity, Social Cohesion andGender Promotion to create and thereafter maintain during Project implementation, a Project Implementation Unit (PIU) within theDirectorate of Solidarity and Social Protection, to be responsible for the management, coordination, supervision, and monitoring ofProject activities.
No later than 45 days after the Effectiveness Date or such later date as agreed in writing by the Bank, cause the PIU to appointand hire at the national and regional level, and thereafter maintain, throughout Project implementation key staff i.e.: (i) aProject coordinator; (ii) a safeguard and environmental specialist; (iii) a recovery grant specialist; (iv) an accompanyingmeasures specialist; (v) a financial management specialist; (vi) an accountant; (vii) a procurement specialist; (viiii) an M&Especialist; and (ix) an infrastructure specialist and thereafter maintain, until completion of the Project, a structure,responsibilities, and such key staff with functions, experience, responsibilities and qualifications acceptable to the Association.
No later than three (3) months after the Effectiveness Date, or such later date as agreed by the Bank, the Recipient cause the PIUto appoint and hire an internal auditor, and thereafter maintain an internal auditor for the Project, throughout Projectimplementation.
The Recipient shall take all action required on its behalf to establish, not later than six (6) months after the Effective Date,and thereafter maintain and operate, a functional grievance redress mechanism for the Project, with adequate staffing and processesfor registering grievances and acceptable to the Association, thereby ensuring the ongoing improvement on service delivery underthe Project.
PDO Indicator
Beneficiaries of Safety Nets programs (number)
PDO Indicator
Beneficiaries of Safety Nets programs - Female (number)
PDO Indicator
Beneficiaries of Safety Nets programs - Cash-for-work, food-for-work and public works (number)
PDO Indicator
Number of poor communities that have access to safety net and nutrition services.
PDO Indicator
Pregnant/lactating women, adolescent girls and/or children under age five-reached by basic nutrition services (number)
PDO Indicator
Children under the age of 24 months benefiting from improved infant and young child feeding (IYCF) practices (number)
PDO Indicator
Beneficiary households receiving recovery grants (Number)
Intermediate Results Indicator
Number of rehabilitated, reconstructed and constructed infrastructure sub-projects
Intermediate Results Indicator
Number of children under five years enrolled in the growth monitoring program
Intermediate Results Indicator
Operational costs of the project
Intermediate Results Indicator
Number of person/days of employment created
Intermediate Results Indicator
Number of Community Health Workers trained to provide IYCF services
Intermediate Results Indicator
Number of Operational Audits implemented
Intermediate Results Indicator
Number of households benefiting from post-disaster activities
Intermediate Results Indicator
Percentage of beneficiary households of the Productive Safety Net activities registered in the PIU's MIS
Intermediate Results Indicator
Beneficiaries' feedback related to the project (Citizen engagement Indicator)
Intermediate Results Indicator
Beneficiaries with recovery plan for their recovery grant for income-generating activities
Intermediate Results Indicator
Periodic report on the Grievance Redress Mechanism (Citizen Engagement Indicator)
Intermediate Results Indicator
Beneficiaries having launched income-generating activities with their recovery grant
Intermediate Results Indicator
Female beneficiaries of socio economic recovery grant
44000-P102376
World Bank
Economic Governance Technical
International Development Association
MINISTRY OF FINANCE, BUDGET, ECONOMY, TRADE AND PLANNING
International Development Association
MINISTRY OF FINANCE, BUDGET, ECONOMY, TRADE AND PLANNINGPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Anne-Lucie Lefebvre
+1-202-473-1000alefebvre@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COMOROS
Moroni
-11.7020 43.2550
Central Government (Central Agencies)Public Administration - Financial SectorEnterprise DevelopmentPublic Expenditure ManagementAdministrative and Civil Service ReformPublic AdministrationPublic Finance ManagementTransparency, Accountability and Good GovernanceMSME Development
0.00
275000.00
275000.00
66666.66
66666.67
66666.67
60000.00
60000.00
60000.00
23333.33
23333.33
23333.34
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
50000.00
50000.00
50000.00
25000.00
25000.00
25000.00
41666.66
41666.67
41666.67
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
275000.00
275000.00
66666.66
66666.67
66666.67
60000.00
60000.00
60000.00
23333.33
23333.33
23333.34
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
50000.00
50000.00
50000.00
25000.00
25000.00
25000.00
41666.66
41666.67
41666.67
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1800000Total Commitment in First Quarter of 2011
International Development Association515635Total Disbursement in First Quarter of 2011
International Development Association73905Total Disbursement in Third Quarter of 2011
International Development Association105956Total Disbursement in Third Quarter of 2011
International Development Association10808Total Disbursement in Fourth Quarter of 2011
International Development Association55746Total Disbursement in Fourth Quarter of 2011
International Development Association61268Total Disbursement in Fourth Quarter of 2011
International Development Association24799Total Disbursement in First Quarter of 2012
International Development Association70103Total Disbursement in First Quarter of 2012
International Development Association110123Total Disbursement in First Quarter of 2012
International Development Association29284Total Disbursement in Second Quarter of 2012
International Development Association47304Total Disbursement in Second Quarter of 2012
International Development Association33304Total Disbursement in Third Quarter of 2012
International Development Association65137Total Disbursement in Third Quarter of 2012
International Development Association13524Total Disbursement in Fourth Quarter of 2012
International Development Association38328Total Disbursement in Fourth Quarter of 2012
International Development Association17997Total Disbursement in First Quarter of 2013
International Development Association20860Total Disbursement in First Quarter of 2013
International Development Association59606Total Disbursement in First Quarter of 2013
International Development Association2437Total Disbursement in Second Quarter of 2013
International Development Association21744Total Disbursement in Second Quarter of 2013
International Development Association77559Total Disbursement in Fourth Quarter of 2013
International Development Association3500000Total Commitment in Fourth Quarter of 2013
International Development Association33804Total Disbursement in First Quarter of 2014
International Development Association141765Total Disbursement in First Quarter of 2014
International Development Association411214Total Disbursement in First Quarter of 2014
International Development Association12980Total Disbursement in Second Quarter of 2014
International Development Association23961Total Disbursement in Third Quarter of 2014
International Development Association129910Total Disbursement in Third Quarter of 2014
International Development Association7143Total Disbursement in Third Quarter of 2014
International Development Association15692Total Disbursement in Third Quarter of 2014
International Development Association82511Total Disbursement in Third Quarter of 2014
International Development Association52545Total Disbursement in Fourth Quarter of 2014
International Development Association58203Total Disbursement in Fourth Quarter of 2014
International Development Association82841Total Disbursement in Fourth Quarter of 2014
International Development Association9834Total Disbursement in First Quarter of 2015
International Development Association16981Total Disbursement in First Quarter of 2015
International Development Association61757Total Disbursement in First Quarter of 2015
International Development Association15647Total Disbursement in Second Quarter of 2015
International Development Association128145Total Disbursement in Second Quarter of 2015
International Development Association62759Total Disbursement in Third Quarter of 2015
International Development Association97483Total Disbursement in Third Quarter of 2015
International Development Association176151Total Disbursement in Fourth Quarter of 2015
International Development Association205966Total Disbursement in Fourth Quarter of 2015
International Development Association258337Total Disbursement in Fourth Quarter of 2015
International Development Association105644Total Disbursement in First Quarter of 2016
International Development Association244196Total Disbursement in First Quarter of 2016
International Development Association97653Total Disbursement in Second Quarter of 2016
International Development Association186147Total Disbursement in Second Quarter of 2016
International Development Association523014Total Disbursement in Second Quarter of 2016
International Development Association16739Total Disbursement in Third Quarter of 2016
International Development Association36926Total Disbursement in Third Quarter of 2016
International Development Association232671Total Disbursement in Third Quarter of 2016
International Development Association20710Total Disbursement in Fourth Quarter of 2016
International Development Association25088Total Disbursement in Fourth Quarter of 2016
International Development Association78117Total Disbursement in Fourth Quarter of 2016
International Development Association-43195Total Commitment Cancellations in Second Quarter of 2017
International Development Association-29438Total Disbursement in Second Quarter of 2017
International Development AssociationProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2, Section I.A.1. (a) | Description :The Recipient shall establish and thereafter maintain a ProjectSteering Committee, whose mandate , terms of reference and composition shall be acceptable to the Association. | Frequency :Monthly
Finance Agreement :Schedule 2, Section I.A.1. (b) | Description :The recipient shall establish and thereafter maintain ProjectCoordination Unit to be headed by the Coordinator, and those mandate,terms of reference and composition shall be acceptable toIDA. | Frequency :Monthly
Finance Agreement :Schedule 2, Section I.A.2. (b) | Description :The Recipient shall ensure that the Project coordinator shall beassisted by a team of key personnel consisting of an accountant assistant, a FM consultant and an administrative assistant |Frequency :Monthly
Finance Agreement :Schedule 2, Section I.B.2. (a) | Description :The recipient shall not later than 12 months after effectivenessdate, in conjunction with the Bank and other interested donors, undertake a midterm review of the Project | Due Date :31-Mar-2012
Finance Agreement :Schedule 2, Section II.A.1 | Description :The Recipient shall monitor and evaluate the progress of the projectand prepare Project Reports in accordance with the provision of Scction 4.08 of the G.C'; covering one calendar semester | DueDate :30-Jun-2011
Finance Agreement :Schedule 2, Section II.B.2 | Description :The Recipient shall prepare and furnish to the association, as part ofthe Project reports, not later than one month after the end of each calendar quarter, interim unaudited financial report. |Frequency :Quarterly
Finance Agreement :Schedule 2, Section II.B.3 | Description :The recipient shall furnish to the Association not later than sixmonths after the end of each Fiscal year, its audited Financial Statements covering the period of one Fiscal Year | Due Date:30-Jun-2012
Finance Agreement :Schedule 2, Section II.B.4. (a) | Description :The Recipient shall have recruited, not later than three monthsafter the Effectiveness date, under terms of reference acceptable to the Bank, the auditors referred to in Section 4.09 (b) of GC.| Due Date :31-May-2011
Finance Agreement :Schedule 2, Section II.B.4. (b) | Description :The Recipient shall have acquired, not later that three monthsafter the Effectiveness date, a suitable accounting software | Due Date :31-May-2011
Finance Agreement :Schedule 2, Section V.1. (a) | Description :The Recipient shall, not later than December 15 in each calendaryear, prepare and submit to the Bank, for review and approval, a proposed Annual Work Plan and Budget for the forthcoming FY. |Frequency :Yearly
Finance Agreement :Section I.A.2 of Schedule 2 | Description :The Recipient shall update the Project Implementation Manual for theProject, on form and substance satisfactory to the Association. | Due Date :20-Mar-2014
Finance Agreement :Section I.A.3 of Schedule 2 | Description :The Recipient shall recruit a public finance reform specialist, anaccounting assistant and procurement assistant as well as, when it shall have been agreed between the Association and theRecipient, a civil service reform specialist, each on the basis of terms of reference, qualifications and experience satisfactoryto the Association. | Due Date :20-Mar-2014
Finance Agreement :Section II.A.4 of Schedule 2 | Description :The Recipient shall: (a) adopt a monitoring and evaluation manualfor the Project, in form and substance satisfactory to the Association; and (b) recruit a monitoring and evaluation specialist forthe Project, on the basis of terms of reference, qualifications and experience satisfactory to the Association and in accordancewith the provisions of Section III of this Schedule. | Due Date :20-Mar-2014
Finance Agreement :Section II, B.4 of Schedule 2 | Description :The Recipient shall engage independent auditors to carry out anannual audit of the Project's financial statements. | Due Date :20-Apr-2014
Finance Agreement :Section.II.A. 2 of schedule 2 | Description :The Recipient shall, in conjunction with the Association, carry outa mid-term review of the Project (the “Mid-term Review”). | Due Date :20-Apr-2015
Intermediate Results Indicator
New organic law for PFM prepared for adoption
PDO Indicator
Budget execution reports published (on the web or national media) regularly (PEFA PI-10)
Intermediate Results Indicator
Enhanced computerization of budget management and reporting (PEFA P1-24).
Intermediate Results Indicator
Publication of public tender procurement notice for any public procurement financed by the national budget or by donors according to law No. 11-027/AU
Intermediate Results Indicator
Comprehensive strategy for civil service management reform is adopted
PDO Indicator
Share of civil servants paid through the automated payroll system
PDO Indicator
Public access to key sectoral fiscal information
Intermediate Results Indicator
Enhanced efficiency in controls of civil service wage bill accuracy (through cross checks across databases, timely updates, and internal controls) (PEFA PI-18))
Intermediate Results Indicator
Annual budget prepared in timely manner (PEFA PI-11)
Intermediate Results Indicator
Limited use of budgetary adjustments during the FY (PEFA PI-16)
44000-P150924
World Bank
Comoros Second Economic Governance Reform Grant
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Shireen Mahdi
+1-202-473-1000smahdi@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COMOROS
Moroni
-11.7022 43.2551
ICT InfrastructureOther Energy and ExtractivesCentral Government (Central Agencies)Public Expenditure ManagementFiscal PolicyPublic Finance ManagementPublic AdministrationAdministrative and Civil Service ReformFiscal sustainabilityE-Government, incl. e-servicesDebt ManagementTransparency, Accountability and Good Governance
0.00
0.00
3000000Total Commitment in Second Quarter of 2015
International Development Association3091824Total Disbursement in Second Quarter of 2015
International Development Association-2702Total Commitment Cancellations in First Quarter of 2017
International Development AssociationProject Appraisal DocumentProject Information DocumentFinancing AgreementContract AwardsProject URLProcurement Notices 44000-P164584
World Bank
Integrated Development and Competitiveness Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Lorenzo Bertolini
+1-202-473-1000lbertolini@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COMOROS
MohEli
-12.3430 43.7360
Ouanani
-12.3380 43.7980
Sima
-12.1960 44.2770
Sambia
-12.3670 43.7960
Pidjani
-11.7610 43.4430
Panda
-11.8710 43.3830
Oussivo
-11.5850 43.2670
Ntsoudjini
-11.6600 43.2610
Chaoueni
-12.3530 44.5010
Nioumachoua
-12.3610 43.7150
Mremani
-12.3080 44.4990
Moya
-12.3070 44.4380
Mitsamiouli
-11.3850 43.2840
Miringoni
-12.2970 43.6350
Mbeni
-11.5010 43.3780
Mrijou
-12.3320 44.4930
Koni-Djodjo
-12.2300 44.4820
Koimbani
-11.6230 43.3570
Hoani
-12.2510 43.6750
Foumbouni
-11.8620 43.4840
Dzahadjou
-11.9080 43.4440
Domoni
-12.2570 44.5320
Dibouani
-11.5570 43.3140
Dembeni
-11.8740 43.3980
Chindini
-11.9210 43.4810
Bambao
-12.1990 44.5180
Hajoho
-12.1180 44.4880
Chindrini
-12.3170 44.4630
Ouzio
-11.4040 43.3760
Mbaleni
-11.5500 43.2740
Vanadjou
-11.6080 43.2760
Batsa
-11.6280 43.2600
Tsangadjou
-11.7150 43.4250
Mvouni
-11.7160 43.2650
Moutsamoudou
-12.1670 44.3990
Fomboni
-12.2880 43.7430
Moroni
-11.7020 43.2550
Djimbili
-11.4250 43.3670
Pande
-11.4340 43.3670
Banda Samlimi
-11.5000 43.3300
Houngouni
-12.1880 44.4240
LivestockPublic Administration - Agriculture, Fishing & ForestryAgricultural markets, commercialization and agri-businessTourismOther Industry, Trade and ServicesMitigationClimate changeRural MarketsRural DevelopmentEnterprise DevelopmentMSME FinanceRural Infrastructure and service deliveryFinancial Infrastructure and AccessAdaptationMSME DevelopmentRural Non-farm Income GenerationEntrepreneurshipJobs
0.00
0.00
22125.00
71225.00
85975.00
100500.00
55400.00
120375.00
133800.00
152175.00
167950.00
88125.00
181775.00
188250.00
196950.00
205050.00
105375.00
212075.00
212700.00
222150.00
240900.00
128825.00
265300.00
277125.00
298250.00
324050.00
169575.00
353900.00
375325.00
397575.00
206725.00
429550.00
448650.00
464200.00
484200.00
249725.00
512575.00
527025.00
541675.00
563775.00
288600.00
584825.00
589650.00
606850.00
309000.00
621600.00
617000.00
619200.00
627075.00
313400.00
621050.00
617100.00
620650.00
619225.00
307725.00
610200.00
602275.00
599400.00
598175.00
298550.00
595900.00
594350.00
592375.00
590475.00
294625.00
587925.00
586100.00
705800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22125.00
71225.00
85975.00
100500.00
55400.00
120375.00
133800.00
152175.00
167950.00
88125.00
181775.00
188250.00
196950.00
205050.00
105375.00
212075.00
212700.00
222150.00
240900.00
128825.00
265300.00
277125.00
298250.00
324050.00
169575.00
353900.00
375325.00
397575.00
206725.00
429550.00
448650.00
464200.00
484200.00
249725.00
512575.00
527025.00
541675.00
563775.00
288600.00
584825.00
589650.00
606850.00
309000.00
621600.00
617000.00
619200.00
627075.00
313400.00
621050.00
617100.00
620650.00
619225.00
307725.00
610200.00
602275.00
599400.00
598175.00
298550.00
595900.00
594350.00
592375.00
590475.00
294625.00
587925.00
586100.00
705800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25000000Total Commitment in Second Quarter of 2019
International Development Association0Total Disbursement in First Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
The Recipient shall maintain, at all times throughout Project implementation, a Project implementing unit within MEAPE (MEAPE PIU), and no later than three (3) months after the Effective Date, appoint within the MEAPE PIU, in accordance with the ProcurementRegulations, a team comprised of a full-time Project coordinator, a MSME specialist, a value chain specialist, a procurementspecialist, a senior accountant, a financial management specialist, an internal auditor, a social safeguards specialist, anenvironmental safeguards specialist, a monitoring and evaluation specialist, a communications specialist, and such other technical,safeguards and fiduciary specialists as may be agreed with the Association, all under terms of reference, and with qualificationsand experience satisfactory to the Association. (Schedule 2, Section I, A, 1 (a)).
The Recipient shall ensure that throughout Project implementation, the MEAPE PIU has adequate resources and staffing to carry outits responsibilities under the Project, all as further detailed in the PIM. The Recipient, through the MEAPE PIU, shall beresponsible for the overall day-to-day management and implementation of the Project, including its technical, fiduciary,safeguards, monitoring and evaluation, supervision and reporting aspects, as further detailed in the PIM. (Schedule 2, Section I,A, 1 (b)).
PDO Indicator
Increased revenue among beneficiary start-ups, MSMEs and Value Chain actors
PDO Indicator
Increase in volume of sold raw and processed agriculture products by project beneficiaries (% disaggregated by farmers and cooperatives for selected indicative crops and livestock products)
PDO Indicator
Number of jobs created by beneficiary start-ups, MSMEs and Value Chain actors (# disaggregated by female and youth)
PDO Indicator
Value of private finance catalyzed
Intermediate Results Indicator
Agriculture investment plan adopted by government (Y/N)
Intermediate Results Indicator
Number of established firms/cooperatives that receive matching grants, with breakdown for women-owned companies
Intermediate Results Indicator
Agriculture Data Unit Established and Operational
Intermediate Results Indicator
Percentage of women-owned companies that received matching grants
Intermediate Results Indicator
Number of tourism investment promotion campaigns conducted
Intermediate Results Indicator
Number of young entrepreneurs who receive cash grants or technical assistance
Intermediate Results Indicator
Number of multi-service platforms for export crops and livestock established or upgraded
Intermediate Results Indicator
Number of beneficiaries in the business development services capacity building program
Intermediate Results Indicator
Number of Trained livestock and crop technicians
Intermediate Results Indicator
Satisfaction rating by project beneficiaries administered through a survey questionnaire (%) (Citizen Engagement)
Intermediate Results Indicator
Number of farmers benefitting from enhanced services and assets
Intermediate Results Indicator
Percentage of complaints responded and/or resolved within the stipulated standard for response times. (Citizen engagement)
Intermediate Results Indicator
Increase in yield per hectare, selected indicative crops (disaggregated by gender).
Intermediate Results Indicator
Cooperatives established, registered, or received training (number, disaggregated)
Intermediate Results Indicator
Increase in volume of chilled milk collected and transported to market (%)
Intermediate Results Indicator
Operational cold-storage, dry storage and warehouse facilities (number, disaggregated)
Intermediate Results Indicator
Feeder roads/agriculture paths and drainage rehabilitated (km)
44000-P131688
World Bank
Comoros Economic Governance Reform Grant
International Development Association
VICE PRESIDENCY OF FINANCE
International Development Association
VICE PRESIDENCY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Shireen Mahdi
+1-202-473-1000smahdi@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COMOROS
Moroni
-11.7022 43.2551
Other Energy and ExtractivesFisheriesCentral Government (Central Agencies)LivestockICT InfrastructureUrban DevelopmentPublic Finance ManagementDebt ManagementJob CreationRural DevelopmentJobsUrban Infrastructure and Service DeliveryState-owned Enterprise Reform and PrivatizationFiscal sustainabilityPublic AdministrationTransparency, Accountability and Good GovernanceRural Infrastructure and service deliveryPublic Expenditure ManagementFiscal Policy
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3800000Total Commitment in Second Quarter of 2014
International Development Association3851950Total Disbursement in Second Quarter of 2014
International Development AssociationProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
National Accounts prepared using the 1993 methodology and National Statistics Institute operational.
The national statistics institute (INSEED) has prepared national accounts estimates for a base year (2007) using the SNA ’93methodology. The institute is now preparing to update the series to the current year with technical assistance from developmentpartners. The base surveys for updating the estimates to 2013 are underway.
Intermediate Results Indicator
Increase in the number of Telecom operators with a service license andreduction in the monthly price per 1 GB of mobile data (3G)
The authorities adopted a law that removes Comores Telecom's exclusive privileges in 2014, effectively providing a level playingfield for new competitive market entry. The processes for licensing a new operator is underway, a technical firm has beencontracted to support the GoC in issuing a new license.
Intermediate Results Indicator
Reduction in total losses in the electricity sector.
The preparation of the recovery plan is at an advanced stage. The consultation document is due in September 2014 and it will formthe basis for policy dialogue to adopt performance and management benchmarks for the recovery of the sector. The fiscal managementaspects of the dialogue will also be supported by the Comoros public expenditure and fiscal management review.
Intermediate Results Indicator
Public budget that includes detailed information on investment and recurrentexpenditures adopted.
The Comoros budget is more comprehensiveness. The 2014 budget includes overall envelopes per ministry, budget execution reporting,debt reporting and data on government revenues (own resources and external resources). The planning commission and the ministry offinance are collaborating to include the public investment plan in the 2015 budget with technical support from the World Bank team.
Intermediate Results Indicator
Percentage of senior officials who filed their Asset Declaration Form,publicly available on the CNLPC website and/or in a national newspaper.
[Data to update indicator pending: not received from GoC]The Anti-Corruption Commission has published a list of compliant publicofficials who have filed their asset declarations. The GoC has also adopted a set of amendments to the anti-corruption legislation,aiming at empowering the Commission. These changes will enhance the independence of the Anti-Corruption Commission and reinforceits authority.
Intermediate Results Indicator
Information on access granted for fishing activities systematically disclosed,with revenue and its use documented in the budget law.
The GoC published a presidential decree to systematize disclosure of information on fishing licenses and related revenues. Theinformation has now been consolidated and made publicly available.
Intermediate Results Indicator
Cash management plans integrating the Union and island treasuries are operational.
The Government of Comoros (GoC) has made progress in treasury reforms. It has issued a decree that lists all government bankaccounts, and that requires their integration in treasury records. A framework has been designed to support the adoption of thetreasury single account (TSA), and has been subject to consultations at the island level. The directorate for treasury andaccounting is beingestablished and is expected to play a leading role in managing integrated cash management. Technical supportwill be needed to improve cash planning and to implement the TSA framework (potentially from ABGE project).
Intermediate Results Indicator
Transparency and accountability of debt management has improved.
The GoC has made progress in increasing transparency in debt management. An updated debt report was prepared and annexed to the2014 budget. A debt management bill has been prepared and approved by the cabinet. The bill has been authorized for submission atthe next sitting of the national assembly.
44000-P120631
World Bank
Comoros - Emergency Crises Response Project
International Development Association
FONDS D'APPUI AU DEVELOPPEMENT COMMUNAUTAIRE (FADC)
International Development Association
FONDS D'APPUI AU DEVELOPPEMENT COMMUNAUTAIRE (FADC)Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Andrea Vermehren
+1-202-473-1000avermehren@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COMOROS
Mwali
-12.3430 43.7360
Union of the Comoros
-12.2330 44.4460
Grande Comore
-11.5860 43.3330
Anjouan
-12.2500 44.4170
Other Agriculture, Fishing and ForestrySocial ProtectionOther Water Supply, Sanitation and Waste ManagementOther EducationPublic Administration - Social ProtectionRural Infrastructure and service deliveryParticipation and Civic EngagementSocial InclusionNutrition and Food SecurityFood SecuritySocial ProtectionJobsRural DevelopmentSocial Safety Nets
38434.28
38434.28
38434.30
133002.86
133002.86
133002.85
121371.43
121371.43
121371.43
121371.43
121371.43
121371.43
126428.57
126428.57
126428.58
147162.86
147162.86
147162.86
151714.29
151714.29
151714.29
151714.29
151714.29
151714.29
161828.58
161828.58
161828.56
156771.42
156771.42
156771.44
151714.29
151714.29
151714.29
156771.42
156771.42
156771.44
151714.29
151714.29
151714.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
38434.28
38434.28
38434.30
133002.86
133002.86
133002.85
121371.43
121371.43
121371.43
121371.43
121371.43
121371.43
126428.57
126428.57
126428.58
147162.86
147162.86
147162.86
151714.29
151714.29
151714.29
151714.29
151714.29
151714.29
161828.58
161828.58
161828.56
156771.42
156771.42
156771.44
151714.29
151714.29
151714.29
156771.42
156771.42
156771.44
151714.29
151714.29
151714.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5310000Total Commitment in Second Quarter of 2010
International Development Association493101Total Disbursement in Fourth Quarter of 2010
International Development Association307057Total Disbursement in First Quarter of 2011
International Development Association426105Total Disbursement in Second Quarter of 2011
International Development Association106153Total Disbursement in Third Quarter of 2011
International Development Association176212Total Disbursement in Fourth Quarter of 2011
International Development Association955869Total Disbursement in First Quarter of 2012
International Development Association1151259Total Disbursement in Second Quarter of 2012
International Development Association434071Total Disbursement in Fourth Quarter of 2012
International Development Association504804Total Disbursement in First Quarter of 2013
International Development Association3000000Total Commitment in First Quarter of 2013
International Development Association179827Total Disbursement in Third Quarter of 2013
International Development Association428723Total Disbursement in Third Quarter of 2013
International Development Association211934Total Disbursement in Fourth Quarter of 2013
International Development Association160171Total Disbursement in Fourth Quarter of 2013
International Development Association762659Total Disbursement in First Quarter of 2014
International Development Association797446Total Disbursement in Third Quarter of 2014
International Development Association288694Total Disbursement in Fourth Quarter of 2014
International Development Association609570Total Disbursement in Fourth Quarter of 2014
International Development Association329085Total Disbursement in First Quarter of 2015
International Development Association64058Total Disbursement in Second Quarter of 2015
International Development Association-2834Total Commitment Cancellations in Fourth Quarter of 2015
International Development Association-2834Total Disbursement in Fourth Quarter of 2015
International Development AssociationProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2, Section II.A.1 | Description :The Recipient shall monitor and evaluate the progress of the Projectand prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions. | Frequency :Quarterly
Finance Agreement :Schedule 2, Section II.C. | Description :The Recipient shall ensure that the Project is carried out inaccordance with the provisions of the Anti-Corruption Guidelines. | Frequency :CONTINUOUS
PDO Indicator
1. Beneficiaries of cash-for-work program
PDO Indicator
2.1. Students enrolled in FADC built/rehabilitated schools or classrooms
PDO Indicator
Number of people in rural areas provided with access to Improved Water Sources under the project
PDO Indicator
Direct project beneficiaries
Intermediate Results Indicator
1.1 Person-days of employment created
Intermediate Results Indicator
1.2. Social protection sub-projects completed
Intermediate Results Indicator
1.3 Percentage of women among beneficiaries (under cash-for-work)
Intermediate Results Indicator
2.1 Community-based sub-projects completed
Intermediate Results Indicator
Improved community water points constructed or rehabilitated under the project
Intermediate Results Indicator
2.6. Community-development plans completed
Intermediate Results Indicator
3.1. Operating ratio
Intermediate Results Indicator
3.2. Technical audit of community-based sub-projects completed
Intermediate Results Indicator
3.3. Assessment of cash-for-work completed
Intermediate Results Indicator
2.2 Community-based sub-projects properly maintained one year after completion
PDO Indicator
People in Project areas benefiting from improved roads
Intermediate Results Indicator
Roads rehabilitated, Rural
Intermediate Results Indicator
Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions.
PDO Indicator
Female beneficiaries
44000-P166013
World Bank
Comprehensive Approach to Health System Strengthening
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Voahirana Hanitriniala Rajoela
+1-202-473-1000vrajoela@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COMOROS
Moheli
-12.3430 43.7360
Grande Comore
-11.5830 43.3330
Ndzuwani
-12.2500 44.4170
Union of the Comoros
-12.2330 44.4460
Health Facilities and ConstructionPublic Administration - HealthHealthHealth Systems and PoliciesParticipation and Civic EngagementHealth Service DeliverySocial Safety NetsNon-communicable diseasesClimate changeSocial InclusionNutrition and Food SecurityHealth System StrengtheningMitigationSocial ProtectionDisease ControlAdaptationNutritionPandemic ResponseHealth Finance
575000.00
575000.00
575000.00
575000.00
575000.00
575000.00
575000.00
575000.00
575000.00
575000.00
575000.00
575000.00
525000.00
525000.00
525000.00
525000.00
525000.00
525000.00
525000.00
525000.00
525000.00
525000.00
525000.00
525000.00
475000.00
475000.00
475000.00
475000.00
475000.00
475000.00
475000.00
475000.00
475000.00
475000.00
475000.00
475000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
575000.00
575000.00
575000.00
575000.00
575000.00
575000.00
575000.00
575000.00
575000.00
575000.00
575000.00
575000.00
525000.00
525000.00
525000.00
525000.00
525000.00
525000.00
525000.00
525000.00
525000.00
525000.00
525000.00
525000.00
475000.00
475000.00
475000.00
475000.00
475000.00
475000.00
475000.00
475000.00
475000.00
475000.00
475000.00
475000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
425000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15000000Total Commitment in Third Quarter of 2019
International Development Association15000000Total Commitment in Third Quarter of 2019
International Development Association1711523Total Disbursement in Second Quarter of 2020
International Development Association2132505Total Disbursement in Second Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Schedule 2- Section II. C The Recipient shall take all action required on its behalf to establish, not later than six (6) monthsafter the Effective Date, and thereafter maintain and operate, a functional grievance handling mechanism for the Project, withadequate staffing and processes for registering grievances and acceptable to the Association, thereby ensuring the ongoingimprovement on service delivery under the Project.
Schedule 2-Section I.A.2. the Recipient shall strengthen the PIU, with the recruitment, not later than three months after theEffective Date, an internal auditor, a financial officer, a chief accountant and an accountant, all under terms of reference andwith qualifications and experience satisfactory to the Association
PDO Indicator
PHC facilities with accreditation level 2 above as per the facility accreditation program
PDO Indicator
PHC facilities participating in the PBF scheme supported by the project which reimburses for both quantity and quality of service
PDO Indicator
People who have received essential health, nutrition, and population (HNP) services
PDO Indicator
Number of children immunized
PDO Indicator
Number of women and children who have received basic nutrition services
PDO Indicator
Number of deliveries attended by skilled health personnel
PDO Indicator
Functional community health sites
PDO Indicator
Annual District and National Health Assemblies
Intermediate Results Indicator
PHC facilities renovated (minor renovations) and/or equipped among the PHC structures in need of these renovations and/or equipment (percentage)
Intermediate Results Indicator
National Health Strategies and Plans adopted (Quality of Care, NCDs, Human Resources for Health) (number)
Intermediate Results Indicator
Operational hotline for patient complaints and feedbacks
Intermediate Results Indicator
Emergency Action Plan validated
Intermediate Results Indicator
PHC health workers receiving annual CME
Intermediate Results Indicator
PHC health workers benefiting from annual clinical mentorship and/or coaching
Intermediate Results Indicator
Patient associations/support groups established (diabetes, hypertension, chronic lung diseases, cancer)
Intermediate Results Indicator
Revision of the pre-service nurse training curriculum to make it competency-based
Intermediate Results Indicator
PHC facilities self-monitoring a set of quality of care indicator quarterly for quality improvement
Intermediate Results Indicator
Primary health care facilities submitting monthly report according to national guidelines
Intermediate Results Indicator
Recipients of scholarships for pre-service training in selected clinical disciplines, public health and health management
Intermediate Results Indicator
Membership of health professional associations
Intermediate Results Indicator
Nationally representative patient experience surveys conducted
Intermediate Results Indicator
Community health workers trained to provide health and nutrition services
Intermediate Results Indicator
Complaints for grievances timely addressed
Intermediate Results Indicator
PHC facilities with at least one quality improvement initiative with the team based problem solving approach
Intermediate Results Indicator
Functional Emergency Medical Transportation with a dedicated hotline on each island
Intermediate Results Indicator
Community health workers trained to provide health and nutrition services
44000-P159437
World Bank
Comoros Statistics Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Djibril Ndoye
+1-202-473-1000dndoye@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COMOROS
Union of the Comoros
-12.2330 44.4460
Moroni
-11.7020 43.2550
ICT InfrastructureICT ServicesOther Agriculture, Fishing and ForestryCentral Government (Central Agencies)Data production, accessibility and useICT SolutionsMigration, Remittances and Diaspora EngagementEconomic Growth and PlanningGenderICTInstitutional strengthening and capacity buildingData Development and Capacity Building
66666.67
66666.67
66666.67
66666.67
66666.67
66666.67
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
66666.67
66666.67
66666.67
66666.67
66666.67
66666.67
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2500000Total Commitment in First Quarter of 2017
International Development Association121393Total Disbursement in Fourth Quarter of 2017
International Development Association239050Total Disbursement in Fourth Quarter of 2017
International Development Association504192Total Disbursement in Fourth Quarter of 2017
International Development Association130989Total Disbursement in First Quarter of 2018
International Development Association315802Total Disbursement in First Quarter of 2018
International Development Association376328Total Disbursement in First Quarter of 2018
International Development Association51133Total Disbursement in Second Quarter of 2018
International Development Association73166Total Disbursement in Second Quarter of 2018
International Development Association55599Total Disbursement in Third Quarter of 2018
International Development Association61301Total Disbursement in Third Quarter of 2018
International Development Association92896Total Disbursement in Fourth Quarter of 2018
International Development Association16111Total Disbursement in First Quarter of 2019
International Development Association147809Total Disbursement in First Quarter of 2019
International Development Association48460Total Disbursement in Second Quarter of 2019
International Development Association64637Total Disbursement in Third Quarter of 2019
International Development Association83276Total Disbursement in Fourth Quarter of 2019
International Development Association68398Total Disbursement in First Quarter of 2020
International Development Association80671Total Disbursement in First Quarter of 2020
International Development Association104023Total Disbursement in Second Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
PDO Indicator
Population census and household poverty & living standard survey implemented
PDO Indicator
Population census and household poverty & living standard survey implemented
PDO Indicator
Population census and household poverty & living standard survey implemented
PDO Indicator
Proportion of statistical outputs supported by the project that are disseminated according to the statistical release calendar
PDO Indicator
Proportion of statistical outputs supported by the project that are disseminated according to the statistical release calendar
Intermediate Results Indicator
Proportion of project-funded survey reports with key gender statistics made publicly available
Intermediate Results Indicator
Number of statistical reports available utilizing data from project-funded data production activities
Intermediate Results Indicator
Publication of methodology for NA, CPI and GDP update
Intermediate Results Indicator
Number of microdatasets available in INSEED micro-data library
Intermediate Results Indicator
Proportion of project-funded survey reports with key gender statistics made publicly available
Intermediate Results Indicator
Proportion of beneficiaries of project-provided trainings who have achieved improvements in statistical skills and knowledge
Intermediate Results Indicator
Number of statistical reports available utilizing data from project-funded data production activities
Intermediate Results Indicator
Proportion of beneficiaries of project-provided trainings who have achieved improvements in statistical skills and knowledge
Intermediate Results Indicator
Focus groups to provide feedback on the quality, relevance and timeliness of statistics held.
Intermediate Results Indicator
Number of micro-datasets available in INSEED micro-data library
Intermediate Results Indicator
Number of beneficiaries within and outside INSEED benefitting from project-provided trainings
Intermediate Results Indicator
Number of beneficiaries within and outside INSEED benefitting from project-provided trainings
44000-P171361
World Bank
Comoros Post-Kenneth Recovery and Resilience Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Van Anh Vu Hong
+1-202-473-1000vvuhong@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COMOROS
Moheli
-12.3430 43.7360
Ndzuwani
-12.2500 44.4170
Ouroveni
-11.9100 43.4890
Ouani
-12.1360 44.4250
Nioumachoua
-12.3610 43.7150
Mremani
-12.3080 44.4990
Mohoro
-11.8260 43.4460
Foumbouni
-11.8620 43.4840
Domoni
-12.2570 44.5320
Djoyezi
-12.3060 43.7740
Bandamadzi
-11.7840 43.4440
Mirontsi
-12.1570 44.4080
Paje
-12.1700 44.3880
Moutsamoudou
-12.1670 44.3990
Fomboni
-12.2880 43.7430
Moroni
-11.7020 43.2550
Other Public AdministrationSub-National GovernmentHousing ConstructionParticipation and Civic EngagementMitigationClimate changeSocial InclusionDisaster Response and RecoveryRoad SafetyServices and Housing for the PoorDisaster Risk ManagementUrban PlanningAdaptationDisaster Risk ReductionGenderUrban Development
812500.00
812500.00
812500.00
812500.00
812500.00
812500.00
812500.00
812500.00
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.63
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.63
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.63
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.63
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.63
375000.00
375000.00
375000.00
375000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
812500.00
812500.00
812500.00
812500.00
812500.00
812500.00
812500.00
812500.00
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.63
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.63
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.63
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.63
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.67
541666.63
375000.00
375000.00
375000.00
375000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22500000Total Commitment in Fourth Quarter of 2019
International Development Association22500000Total Commitment in Fourth Quarter of 2019
International Development Association1877208Total Disbursement in Second Quarter of 2020
International Development AssociationProject Information DocumentContract AwardsProject URLProcurement Notices
PDO Indicator
Number of people benefiting from houses rebuilt with resilient standards
PDO Indicator
Of which women are heads of household
PDO Indicator
Number of people benefiting from housing reconstruction assistance activities and neighborhood improvements
PDO Indicator
of which percentage of women
PDO Indicator
Number of people trained in resilient construction standards and practices
PDO Indicator
Number of people protected with resilient coastal defense system
PDO Indicator
of which percentage of women
PDO Indicator
Number of people benefiting from primary/main road rehabilitation works
PDO Indicator
of which percentage of women
Intermediate Results Indicator
Number of houses rebuilt with resilient standards and practices
Intermediate Results Indicator
Number of km protected with resilient coastal defense system
Intermediate Results Indicator
Number of strategic and operational Documents or Tools mainstreamed, updated or developed on Disaster Risk Reduction
Intermediate Results Indicator
Number of consultative and dissemination events organized for the communities
Intermediate Results Indicator
Number of awareness-raising/education campaigns contributing to increasing infrastructure resilience and road safety
Intermediate Results Indicator
Georeferenced database for multi-risks updated
Intermediate Results Indicator
Percentage of women representatives in the participating Housing Committees
Intermediate Results Indicator
of which women of are heads of households
Intermediate Results Indicator
Number of community infrastructures built or rebuilt
Intermediate Results Indicator
Roads rehablitated
Intermediate Results Indicator
Number of people trained in integrated Disaster Risk Reduction
Intermediate Results Indicator
Grievances registered related to project that are actually addressed
Intermediate Results Indicator
Number of strategic and operational Documents or Tools updated or developed supporting urban system enhancement
Intermediate Results Indicator
GBV grievances registered have been referred to GBV service providers
Intermediate Results Indicator
of which percentage of women
Intermediate Results Indicator
Roads rehabilitated - rural
Intermediate Results Indicator
Number of training/awareness campaigns provided to relevant ministries and stakeholders on GBV risk management and referral pathway(disaggregated by island)
Intermediate Results Indicator
of which percentage of participating women believe they are better prepared to respond to natural and climate disasters
Intermediate Results Indicator
Roads rehabilitated - non-rural
Intermediate Results Indicator
Number of local job opportunities created by the project
Intermediate Results Indicator
of which women are beneficiaries
44000-P131659
World Bank
KM-Electricity Sect. Recovery Proj(FY14)
International Development Association
GOVERNMENT OF COMOROS
International Development Association
GOVERNMENT OF COMOROSPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Jan Friedrich Kappen
+1-202-473-1000jkappen@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COMOROS
Mwali
-12.3430 43.7360
Grande Comore
-11.5830 43.3330
Ndzuwani
-12.2500 44.4170
Public Administration - Energy and ExtractivesOther Energy and ExtractivesRegulation and Competition PolicyInvestment and Business ClimateBusiness Enabling EnvironmentPublic AdministrationState-owned Enterprise Reform and Privatization
0.00
0.00
0.00
0.00
33333.33
33333.33
33333.34
166666.66
166666.67
166666.67
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
241666.66
241666.67
241666.67
241666.66
241666.67
241666.67
241666.66
241666.67
241666.67
241666.66
241666.67
241666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
52842.40
52842.40
52842.40
52842.40
52842.40
52842.40
52842.40
52842.40
52842.40
52842.40
22893.67
22893.67
22893.67
22893.67
22893.67
22893.67
22893.67
22893.67
22893.67
22893.67
22893.67
22893.63
44610.83
44610.83
44610.83
44610.83
44610.83
44610.83
44610.83
44610.83
44610.83
44610.83
44610.83
44610.87
138413.00
138413.00
138413.00
138413.00
138413.00
138413.00
138413.00
138413.00
138413.00
138413.00
138413.00
138413.00
135049.08
135049.08
135049.08
135049.08
135049.08
135049.08
135049.08
135049.08
135049.08
135049.08
135049.08
135049.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5000000Total Commitment in Third Quarter of 2013
International Development Association528424Total Disbursement in Second Quarter of 2014
International Development Association23793Total Disbursement in Fourth Quarter of 2014
International Development Association55764Total Disbursement in First Quarter of 2015
International Development Association50062Total Disbursement in Second Quarter of 2015
International Development Association145104Total Disbursement in Second Quarter of 2015
International Development Association236391Total Disbursement in Fourth Quarter of 2015
International Development Association140142Total Disbursement in Second Quarter of 2016
International Development Association158797Total Disbursement in Second Quarter of 2016
International Development Association53696Total Disbursement in Third Quarter of 2016
International Development Association197753Total Disbursement in Third Quarter of 2016
International Development Association49899Total Disbursement in Fourth Quarter of 2016
International Development Association547234Total Disbursement in Fourth Quarter of 2016
International Development Association100622Total Disbursement in First Quarter of 2017
International Development Association249333Total Disbursement in First Quarter of 2017
International Development Association460624Total Disbursement in Second Quarter of 2017
International Development Association133590Total Disbursement in Third Quarter of 2017
International Development Association298738Total Disbursement in Third Quarter of 2017
International Development Association86628Total Disbursement in Fourth Quarter of 2017
International Development Association197338Total Disbursement in Fourth Quarter of 2017
International Development Association81985Total Disbursement in First Quarter of 2018
International Development Association305762Total Disbursement in First Quarter of 2018
International Development Association416533Total Disbursement in Second Quarter of 2018
International Development Association-22601Total Disbursement in Fourth Quarter of 2018
International Development Association-309504Total Commitment Cancellations in Second Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :FA, Schedule 2, Section 1, B | Description :Subsidiary AgreementThe Subsidiary Agreement has been executed onbehalf of the Recipient and the Project Implementing Entity. | Due Date :23-Dec-2013
Finance Agreement :FA, Schedule 2, Section 1, G | Description :Project Implementation ManualThe Project Implementing Entity hasdeveloped for the Project and adopted the Project Implementation Manual, in form and substance satisfactory to the Association. |Due Date :23-Dec-2013
Finance Agreement :FA, Schedule 2, Section 1, A.3 | Description :Project StaffThe Fiduciary Team has been established within theProject Implementing Entity and the Project Implementing Entity has recruited the following consultants, each with terms ofreference, qualifications and experience satisfactory to the Association to be posted in the Fiduciary Team: (i) a procurementspecialist; and (ii) a financial management specialist. | Due Date :10-Mar-2014
Finance Agreement :FA, Schedule 2, Section 1, A.4 | Description :AuditorThe Project Implementing Entity shall recruit an internalauditor, no later than six (6) months after the Effective Date. | Due Date :14-Sep-2014
Finance Agreement :FA, Schedule 2, Section II, B.1 | Description :Installation of Accounting SoftwareThe Project ImplementingEntity shall purchase and install accounting software acceptable to the Association no later than four (4)months after theEffective Date. | Due Date :14-Jul-2014
PDO Indicator
Collection rate of MA-MWE improved (sliding 12 mts average)
Intermediate Results Indicator
Intermediate indicator for Component 1: Commercial and Financial Recovery Plan implemented.
PDO Indicator
Electricity losses per year in the project area (sliding 12 mts average)
Intermediate Results Indicator
Intermediate indicator for Component 1: Fuel metering equipment
Intermediate Results Indicator
Intermediate indicator for Component 1: Installation of prepaid meters
Intermediate Results Indicator
Intermediate indicator for Component 1: Commercial and Financial Software procured, installed and operational
PDO Indicator
Direct project beneficiaries
Intermediate Results Indicator
Intermediate indicator for Component 2: Subsidies and Tariff Study delivered
PDO Indicator
Electricity losses per year in the project area- Technical (sliding 12 mts average)
PDO Indicator
Electricity losses per year in the project area- Non-Technical
PDO Indicator
Female beneficiaries
44000-P122941
World Bank
Comoros Development Policy Grant 2
International Development Association
MINISTRY OF FINANCE
International Development Association
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Shireen Mahdi
+1-202-473-1000smahdi@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
COMOROS
Moroni
-11.7022 43.2551
Energy Transmission and DistributionCentral Government (Central Agencies)Irrigation and DrainageDisaster PreparednessJobsDisaster Risk FinanceDisaster Response and RecoveryFinance for DevelopmentPublic Finance ManagementDisaster Risk ManagementAdministrative and Civil Service ReformTransparency, Accountability and Good GovernanceDisaster Risk ReductionPublic Expenditure ManagementPublic Administration
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5000000Total Commitment in Fourth Quarter of 2012
International Development Association4964009Total Disbursement in First Quarter of 2013
International Development Association112363Total Disbursement in Second Quarter of 2013
International Development Association-104856Total Commitment Cancellations in First Quarter of 2014
International Development Association-89934Total Disbursement in First Quarter of 2014
International Development Association-14810Total Disbursement in First Quarter of 2014
International Development AssociationProject Appraisal DocumentProject Appraisal DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Timely transmission of budget circular to sector Ministries, Departments, and Agencies (MDAs)
In average ten days prior to the Budget conference
The first draft of Budget circular was transmitted in July 2012 for the preparation 2013 of the Budget law
Intermediate Results Indicator
Quarterly budget monitoring reports published, including data on social sectors not later than eight weeks after the end of the quarter.
8 weeks from the end of each semester
The quarterely budget execution report during the last quarter of 2012 has been published in end April 2013
Intermediate Results Indicator
Number of timely consolidated cash balance statements of the Union government produced by the DGCPT.
There is currently no information on government cash balance
No information available. The organigram of the new DGCTP has not been adopted to date
Intermediate Results Indicator
Information on staffing and wages in civil services.
Limited information on new civil service recruitment and their respective salary
The bi-monthly reports are not done on systematic basis, only the July-August 2012 report are the one available to the public
Intermediate Results Indicator
Public awareness of a legal basis for limiting corruption by high official
None
6 communication campaign including informing the governement, civil society and press article has been done so far
Intermediate Results Indicator
Public access to information on fishing licenses and agreements.
None
The information on fishing licenses and fishing agreements continue to be available on the CREF website
Intermediate Results Indicator
MAMWE's overall collection ratio to the value of electricity sold.
32% in 2011
58% (as of February-March 2013, including arrears recovery)
Intermediate Results Indicator
Mechanism for coordinating government's responses to disasters.
There is no coordination mechanism
Since the creation of the platform, there was no meeting to date