44000-P170676
World Bank
Ulaanbaatar Heating Sector Improvement Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Feng Liu
+1-202-473-1000fliu@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Mongolia
46.0000 105.0000
Public Administration - Energy and ExtractivesAccess to EnergyMitigationEnergyEnergy EfficiencyClimate change
0.00
0.00
48175.00
112709.00
132430.00
73718.00
161212.00
177981.00
194955.00
107338.00
233536.00
250387.00
128576.00
261621.00
270436.00
138416.00
279661.00
278185.00
136366.00
269944.00
275848.00
292207.00
154529.00
315700.00
161335.00
336323.00
362604.00
380357.00
196554.00
411435.00
443169.00
231527.00
469901.00
486588.00
254528.00
538740.00
566784.00
290895.00
606267.00
648989.00
695442.00
362399.00
755179.00
796425.00
413567.00
863747.00
909503.00
469122.00
961286.00
989002.00
509917.00
1047673.00
1080063.00
1111387.00
573918.00
1178750.00
1206958.00
610121.00
1231476.00
1245334.00
632220.00
1281332.00
1297363.00
656451.00
1331926.00
1354886.00
1375673.00
695483.00
1406751.00
1427907.00
722051.00
1126762.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48175.00
112709.00
132430.00
73718.00
161212.00
177981.00
194955.00
107338.00
233536.00
250387.00
128576.00
261621.00
270436.00
138416.00
279661.00
278185.00
136366.00
269944.00
275848.00
292207.00
154529.00
315700.00
161335.00
336323.00
362604.00
380357.00
196554.00
411435.00
443169.00
231527.00
469901.00
486588.00
254528.00
538740.00
566784.00
290895.00
606267.00
648989.00
695442.00
362399.00
755179.00
796425.00
413567.00
863747.00
909503.00
469122.00
961286.00
989002.00
509917.00
1047673.00
1080063.00
1111387.00
573918.00
1178750.00
1206958.00
610121.00
1231476.00
1245334.00
632220.00
1281332.00
1297363.00
656451.00
1331926.00
1354886.00
1375673.00
695483.00
1406751.00
1427907.00
722051.00
1126762.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41000000Total Commitment in Second Quarter of 2020
International Development Association0Total Disbursement in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportContract AwardsProject URLProcurement Notices
PDO Indicator
Transmission capacity added
PDO Indicator
Projected lifetime energy savings
PDO Indicator
Projected lifetime CO2 emissions reduction
Intermediate Results Indicator
Length of district heating pipeline replaced in the existing area
Intermediate Results Indicator
People trained on heating sector planning and sector planning, policy, regulation and institutional arrangement
Intermediate Results Indicator
Length of district heating pipeline to the new area
Intermediate Results Indicator
Internship program for female students established with the Heat Engineering Department of Energy School of the Mongolian University of Science and Technology
Intermediate Results Indicator
District heating pump/heat-exchange stations mordernized
Intermediate Results Indicator
Development of UBDHC's financial performance improvement plan
Intermediate Results Indicator
Percentage of people satisfied with the improvement in heating services
Intermediate Results Indicator
Majority of female employees report they feel the implementation of the non-discrimination and sexual harassment policy establishedhas improved the work environment
44000-P098426
World Bank
Governance Assistance Project
International Development Association
MINISTRY OF FINANCE
International Development Association
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Zahid Hasnain
+1-202-473-1000zhasnain@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Ulaanbaatar
47.9080 106.8830
Central Government (Central Agencies)Other Public AdministrationDebt ManagementTax policyBusiness Enabling EnvironmentPublic Finance ManagementFiscal PolicyRegulation and Competition PolicyFiscal sustainabilityTransparency, Accountability and Good GovernanceDomestic Revenue AdministrationPublic Expenditure ManagementPublic Administration
96505.51
96505.51
96505.51
0.00
0.00
0.00
0.00
0.00
0.00
25000.00
25000.00
25000.00
216273.38
216273.38
216273.40
262221.11
262221.11
262221.09
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.37
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.37
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
84172.66
84172.66
84172.66
84172.66
84172.66
84172.66
84172.66
84172.66
84172.66
84172.66
84172.66
84172.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
96505.51
96505.51
96505.51
0.00
0.00
0.00
0.00
0.00
0.00
25000.00
25000.00
25000.00
216273.38
216273.38
216273.40
262221.11
262221.11
262221.09
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.37
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.33
308333.37
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
84172.66
84172.66
84172.66
84172.66
84172.66
84172.66
84172.66
84172.66
84172.66
84172.66
84172.66
84172.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14000000Total Commitment in Second Quarter of 2006
International Development Association300000Total Disbursement in Third Quarter of 2006
International Development Association67703Total Disbursement in Fourth Quarter of 2006
International Development Association94464Total Disbursement in First Quarter of 2007
International Development Association179258Total Disbursement in Second Quarter of 2007
International Development Association223948Total Disbursement in Second Quarter of 2007
International Development Association465189Total Disbursement in Second Quarter of 2007
International Development Association85036Total Disbursement in Third Quarter of 2007
International Development Association236949Total Disbursement in Third Quarter of 2007
International Development Association455857Total Disbursement in Third Quarter of 2007
International Development Association130465Total Disbursement in Fourth Quarter of 2007
International Development Association230863Total Disbursement in Fourth Quarter of 2007
International Development Association299502Total Disbursement in Fourth Quarter of 2007
International Development Association119972Total Disbursement in First Quarter of 2008
International Development Association321379Total Disbursement in First Quarter of 2008
International Development Association480615Total Disbursement in First Quarter of 2008
International Development Association100319Total Disbursement in Second Quarter of 2008
International Development Association295148Total Disbursement in Second Quarter of 2008
International Development Association299820Total Disbursement in Second Quarter of 2008
International Development Association114278Total Disbursement in Third Quarter of 2008
International Development Association218369Total Disbursement in Third Quarter of 2008
International Development Association272055Total Disbursement in Third Quarter of 2008
International Development Association310831Total Disbursement in Fourth Quarter of 2008
International Development Association399767Total Disbursement in Fourth Quarter of 2008
International Development Association620284Total Disbursement in Fourth Quarter of 2008
International Development Association127528Total Disbursement in First Quarter of 2009
International Development Association285128Total Disbursement in First Quarter of 2009
International Development Association333952Total Disbursement in First Quarter of 2009
International Development Association183212Total Disbursement in Second Quarter of 2009
International Development Association252505Total Disbursement in Second Quarter of 2009
International Development Association124720Total Disbursement in Third Quarter of 2009
International Development Association227636Total Disbursement in Third Quarter of 2009
International Development Association268122Total Disbursement in Third Quarter of 2009
International Development Association275308Total Disbursement in Fourth Quarter of 2009
International Development Association427920Total Disbursement in Fourth Quarter of 2009
International Development Association133756Total Disbursement in First Quarter of 2010
International Development Association258786Total Disbursement in First Quarter of 2010
International Development Association285021Total Disbursement in First Quarter of 2010
International Development Association81967Total Disbursement in Second Quarter of 2010
International Development Association110412Total Disbursement in Second Quarter of 2010
International Development Association230771Total Disbursement in Second Quarter of 2010
International Development Association127633Total Disbursement in Third Quarter of 2010
International Development Association171904Total Disbursement in Third Quarter of 2010
International Development Association116619Total Disbursement in Fourth Quarter of 2010
International Development Association134255Total Disbursement in Fourth Quarter of 2010
International Development Association246915Total Disbursement in Fourth Quarter of 2010
International Development Association134664Total Disbursement in First Quarter of 2011
International Development Association376166Total Disbursement in First Quarter of 2011
International Development Association106755Total Disbursement in Second Quarter of 2011
International Development Association159347Total Disbursement in Second Quarter of 2011
International Development Association137811Total Disbursement in Third Quarter of 2011
International Development Association266793Total Disbursement in Third Quarter of 2011
International Development Association82906Total Disbursement in Fourth Quarter of 2011
International Development Association120850Total Disbursement in Fourth Quarter of 2011
International Development Association93981Total Disbursement in First Quarter of 2012
International Development Association106618Total Disbursement in First Quarter of 2012
International Development Association235356Total Disbursement in First Quarter of 2012
International Development Association49978Total Disbursement in Second Quarter of 2012
International Development Association87761Total Disbursement in Third Quarter of 2012
International Development Association165372Total Disbursement in Third Quarter of 2012
International Development Association72903Total Disbursement in Fourth Quarter of 2012
International Development Association40495Total Disbursement in First Quarter of 2013
International Development Association96891Total Disbursement in Second Quarter of 2013
International Development Association124173Total Disbursement in Second Quarter of 2013
International Development Association28732Total Disbursement in Third Quarter of 2013
International Development Association17884Total Disbursement in Fourth Quarter of 2013
International Development Association37300Total Disbursement in Fourth Quarter of 2013
International Development Association28037Total Disbursement in First Quarter of 2014
International Development Association734506Total Disbursement in Third Quarter of 2014
International Development Association41816Total Disbursement in Fourth Quarter of 2014
International Development Association218248Total Disbursement in Fourth Quarter of 2014
International Development Association706068Total Disbursement in Fourth Quarter of 2014
International Development Association-18159Total Disbursement in First Quarter of 2015
International Development Association-48740Total Commitment Cancellations in Second Quarter of 2015
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementProject Performance Assessment ReportContract AwardsProject URLProcurement Notices
Finance Agreement :Article IV, para. 4.01 (a) | Description :The Recipient shall have established the Project Coordination Unitpursuant to provisions of paragraph 1 of Section I of Schedule 2to this Agreement. | Due Date :21-Sep-2006
Finance Agreement :Article IV, para. 4.01 (b) | Description :The Recipient shall have adopted the Project Financial Manual pursuantto paragraph B.1 of Section II of Schedule 2 to this Agreement. | Due Date :21-Sep-2006
Finance Agreement :Schedule 2, Section I, para. 3 | Description :The Recipient shall by August 31, 2006, adopt and thereafter applyin the implementation manual, satisfactory to the Association. | Due Date :31-Aug-2006
Intermediate Results Indicator
Improvement in Public Access to Key Fiscal Information (PEFA PI-10).
The International Budget Partnership#s Open Budget Survey (OBI) assesses the availability and the comprehensiveness of budgetdocuments in each country based on expert opinion.
Not achieved
Mongolia's OBI ranking fell in the 2012 survey and the target was not achieved
Intermediate Results Indicator
GFMIS rollout and better control over budget execution.
Target Achieved.
Government funds connected remaining soums
Intermediate Results Indicator
Functional system of income and asset declaration and disclosure.
Target Achieved
100% compliance and new online system functional.
Intermediate Results Indicator
LSMS data readily available to the Public.
Target achieved
Intermediate Results Indicator
Improved and expanded disclosure of key GDNT data.
On track
Intermediate Results Indicator
Improved investment climate as evidenced by increased use of open competition in public procurement.
Off track
Significant increase in use of direct contracting for procurements financed by Chinggis bond proceeds
PDO Indicator
Improved efficiency and effectiveness of management of public finance framework as evidenced by more efficient monitoring of the debt situation based on the adoption of the debt strategy.
End target will be the effective implementation of the Debt management strategy (2012-2014)
First medium-term debt management strategy/MTDMS for2007-2009 developed and adopted by Finance minister order #144 which dated onMay 24, 2007. The strategy has been revised in every two years as set forth in the law of Mongolia and the MTDMS for 2010-2012 hasbeen adopted by Finance Minister order #219 dated on October 01, 2010 and the MTDMS for 2012-2014 adopted by Finance Minister order#26 dated on January 20, 2012. However, implementation is weak as the Chinggis bond was floated without reference to the MTDMS.
PDO Indicator
Improved public accountability as evidenced by:(i) reduced perception of corruption and (ii) an effective conflict of interest framework that complies with UNCAC.
The IAAC developed the Mongolian Corruption Index in 2009, based on quantitative (perception surveys) and qualitative indicatorstomonitor corruption. MCI is authorized in the Anti-corruption law and measured every 2 years. MCI is on scale of 0-1, with highernumber reflecting lower corruption
Reduced perception of corruption as measured by increase in the Mongolia Corruption Index
Small progress between 2011 and 2013 as measured by the MCI. The target of 0.8 was not achieved
Intermediate Results Indicator
Effective debt recording system developed
Target achieved
DMFAS 6.0 system functional
Intermediate Results Indicator
Efficient operation of the Mining Registry and Cadastre system
Target achieved
CMCS fully functional
PDO Indicator
Tax Administration Information System (TAIS) fully functional in two pilot sites
44000-P148110
World Bank
Mongolia Education Quality Reform Project
International Development Association
MINISTRY OF EDUCATION AND SCIENCE
International Development Association
MINISTRY OF EDUCATION AND SCIENCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Akiko Sawamoto
+1-202-473-1000asawamoto@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Ulaanbaatar Hot
47.9170 106.9170
Primary EducationAccess to EducationEducation FinancingRural DevelopmentRural Infrastructure and service deliveryEducation
0.00
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.37
633333.33
633333.33
633333.33
633333.33
633333.33
633333.33
633333.33
633333.33
633333.33
633333.33
633333.33
633333.37
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
325000.00
325000.00
325000.00
325000.00
325000.00
325000.00
325000.00
325000.00
325000.00
325000.00
325000.00
325000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
489233.33
489233.33
489233.33
489233.33
489233.33
489233.33
489233.33
489233.33
489233.33
489233.33
489233.33
489233.37
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.37
187500.00
187500.00
187500.00
187500.00
187500.00
187500.00
187500.00
187500.00
187500.00
187500.00
187500.00
187500.00
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
508350.00
508350.00
508350.00
508350.00
508350.00
508350.00
508350.00
508350.00
508350.00
508350.00
508350.00
508350.00
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.67
441666.63
173250.00
173250.00
173250.00
173250.00
173250.00
173250.00
173250.00
173250.00
173250.00
173250.00
173250.00
173250.00
30000000Total Commitment in Second Quarter of 2014
International Development Association3000000Total Disbursement in Fourth Quarter of 2015
International Development Association-13411Total Interest Repayment in First Quarter of 2016
International Development Association-30088Total Interest Repayment in Third Quarter of 2016
International Development Association270800Total Disbursement in First Quarter of 2017
International Development Association-28986Total Interest Repayment in First Quarter of 2017
International Development Association2600000Total Disbursement in Second Quarter of 2017
International Development Association3000000Total Disbursement in Second Quarter of 2017
International Development Association-65169Total Interest Repayment in Third Quarter of 2017
International Development Association400000Total Disbursement in Fourth Quarter of 2017
International Development Association-94714Total Interest Repayment in First Quarter of 2018
International Development Association2000000Total Disbursement in Third Quarter of 2018
International Development Association-95461Total Interest Repayment in Third Quarter of 2018
International Development Association250000Total Disbursement in Fourth Quarter of 2018
International Development Association-112751Total Interest Repayment in First Quarter of 2019
International Development Association-114278Total Interest Repayment in Third Quarter of 2019
International Development Association-440263Total Loan Repayment in Third Quarter of 2019
International Development Association5000000Total Disbursement in Fourth Quarter of 2019
International Development Association-145932Total Interest Repayment in First Quarter of 2020
International Development Association-441853Total Loan Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Verification of Achievement of DLI Target for the DLI Period | Description :No withdrawal shall be made inrespect of DLI Values allocated to DLIs for the DLI Period until and unless the Recipient has furnished evidence satisfactory tothe Association that the DLI Target for the respective DLI Period has been fully achieved or is in process of being achieved. |Frequency :Yearly
PDO Indicator
The average number of words read correctly with comprehension per minute at end of grade 2.
PDO Indicator
Of the total number of school financing recipient schools in the project, the percentage that have successfully achieved the schoolproposal objectives and targets agreed in the school financing
PDO Indicator
At the end of grade 2, the average number of correct additions and subtractions per minute.
Intermediate Results Indicator
Roll out of grade 5 National Assessment
Intermediate Results Indicator
Percentage of grade 2 teachers reporting native language assessments results
Intermediate Results Indicator
Of the total number of school financing recipient schools in the project, the percentage that use the proceeds for pedagogical-related activities (as defined in the School Support Handbook)
Intermediate Results Indicator
Direct project beneficiaries
Intermediate Results Indicator
System for learning assessment at the primary level
Intermediate Results Indicator
Percentage of grade 2 teachers reporting assessment results on: (a) additions and subtractions; and (b) identification of missing numbers in a sequence
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
Of the total number of grades 1 & 2 primary school teachers to be trained during the project life, the cumulative % that achieved intended competency levels in native language assessment methodology
Intermediate Results Indicator
Number of additional qualified primary teachers resulting from project interventions.
Intermediate Results Indicator
Utility of the learning assessment system
Intermediate Results Indicator
Of the total no. of grades 1 & 2 primary school teachers to be trained during the project life, the cumulative % that achieved intended competency levels in early grade mathematical skills assessment
Intermediate Results Indicator
Students benefiting from direct interventions to enhance learning
Intermediate Results Indicator
Average percentage of the school year allocated for instruction in the classroom.
Intermediate Results Indicator
Students benefiting from direct interventions to enhance learning - Female
44000-P118109
World Bank
MN-Mining Infrastructure Investment Supp (P118109)
International Development Association
MINISTRY OF FINANCE
International Development Association
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Yuriy Myroshnychenko
+1-202-473-1000ymyroshnychenko@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Omnogovi Aymag
43.0000 104.0000
Dundgovi Aymag
45.5000 106.5000
Dornogovi Aymag
44.5000 110.0000
Water SupplyOther Energy and ExtractivesOther TransportationUrban Infrastructure and Service DeliveryUrban DevelopmentRegulation and Competition PolicyJobsPublic Private PartnershipsRural DevelopmentJob CreationRural Infrastructure and service deliveryBusiness Enabling Environment
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
833333.33
833333.33
833333.34
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
67425.00
67425.00
67425.00
67425.00
67425.00
67425.00
67425.00
67425.00
67425.00
67425.00
67425.00
67425.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25000000Total Commitment in Second Quarter of 2011
International Development Association53458Total Disbursement in First Quarter of 2012
International Development Association2500000Total Disbursement in First Quarter of 2012
International Development Association-3787Total Interest Repayment in Second Quarter of 2012
International Development Association138126Total Disbursement in Third Quarter of 2012
International Development Association204787Total Disbursement in Fourth Quarter of 2012
International Development Association-9558Total Interest Repayment in Fourth Quarter of 2012
International Development Association49448Total Disbursement in First Quarter of 2013
International Development Association86296Total Disbursement in First Quarter of 2013
International Development Association17540Total Disbursement in Second Quarter of 2013
International Development Association22905Total Disbursement in Second Quarter of 2013
International Development Association-10900Total Interest Repayment in Second Quarter of 2013
International Development Association68043Total Disbursement in Third Quarter of 2013
International Development Association104991Total Disbursement in Third Quarter of 2013
International Development Association452174Total Disbursement in Fourth Quarter of 2013
International Development Association-11479Total Interest Repayment in Fourth Quarter of 2013
International Development Association376293Total Disbursement in First Quarter of 2014
International Development Association157148Total Disbursement in Second Quarter of 2014
International Development Association972524Total Disbursement in Second Quarter of 2014
International Development Association-14574Total Interest Repayment in Second Quarter of 2014
International Development Association95703Total Disbursement in Third Quarter of 2014
International Development Association686736Total Disbursement in Third Quarter of 2014
International Development Association228512Total Disbursement in Fourth Quarter of 2014
International Development Association427938Total Disbursement in Fourth Quarter of 2014
International Development Association-20138Total Interest Repayment in Fourth Quarter of 2014
International Development Association491041Total Disbursement in First Quarter of 2015
International Development Association537574Total Disbursement in First Quarter of 2015
International Development Association1183448Total Disbursement in First Quarter of 2015
International Development Association502296Total Disbursement in Second Quarter of 2015
International Development Association-24570Total Interest Repayment in Second Quarter of 2015
International Development Association151380Total Disbursement in Third Quarter of 2015
International Development Association269893Total Disbursement in Third Quarter of 2015
International Development Association239332Total Disbursement in Fourth Quarter of 2015
International Development Association917455Total Disbursement in Fourth Quarter of 2015
International Development Association-33282Total Interest Repayment in Fourth Quarter of 2015
International Development Association401258Total Disbursement in First Quarter of 2016
International Development Association190294Total Disbursement in Second Quarter of 2016
International Development Association1444112Total Disbursement in Second Quarter of 2016
International Development Association-38749Total Interest Repayment in Second Quarter of 2016
International Development Association759081Total Disbursement in Third Quarter of 2016
International Development Association293794Total Disbursement in Fourth Quarter of 2016
International Development Association869513Total Disbursement in Fourth Quarter of 2016
International Development Association-44393Total Interest Repayment in Fourth Quarter of 2016
International Development Association338023Total Disbursement in First Quarter of 2017
International Development Association753216Total Disbursement in Second Quarter of 2017
International Development Association-50948Total Interest Repayment in Second Quarter of 2017
International Development Association157542Total Disbursement in Third Quarter of 2017
International Development Association638766Total Disbursement in Third Quarter of 2017
International Development Association94075Total Disbursement in Fourth Quarter of 2017
International Development Association130848Total Disbursement in Fourth Quarter of 2017
International Development Association-58959Total Interest Repayment in Fourth Quarter of 2017
International Development Association309670Total Disbursement in First Quarter of 2018
International Development Association-65352Total Interest Repayment in Second Quarter of 2018
International Development Association233213Total Disbursement in Third Quarter of 2018
International Development Association77900Total Disbursement in Fourth Quarter of 2018
International Development Association188289Total Disbursement in Fourth Quarter of 2018
International Development Association-62093Total Interest Repayment in Fourth Quarter of 2018
International Development Association21175Total Disbursement in First Quarter of 2019
International Development Association-64692Total Interest Repayment in Second Quarter of 2019
International Development Association-5758453Total Commitment Cancellations in Third Quarter of 2019
International Development Association-700000Total Disbursement in Third Quarter of 2019
International Development Association-62528Total Interest Repayment in Fourth Quarter of 2019
International Development Association-519096Total Commitment Cancellations in Second Quarter of 2020
International Development Association-505829Total Disbursement in Second Quarter of 2020
International Development Association-60653Total Interest Repayment in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementGrant or Trust Fund AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Financing Agreement, Schedule 2, Section I, Part A, para 1 | Description :Establish and maintain a ProjectSteering Committee throughout the period of Project implementation. | Frequency :CONTINUOUS
Finance Agreement :Financing Agreement, Schedule 2, Section I, Part A, para 2 | Description :Establish and maintain a ProjectManagement Unit at the Ministry of Finance throughout the period of Project implementation. | Frequency :CONTINUOUS
Finance Agreement :Financing Agreement, Schedule 2, Section I, Part A, para 4 | Description :Ministry of Nature, Environment &Tourism will ensure that groundwater management councils and groundwater management administrations have sufficient resources andadequate staffing. | Frequency :CONTINUOUS
Finance Agreement :Financing Agreement, Schedule 2, Section I, Part B, para 1 | Description :Prepare Project Implementation Manualincluding Financial Management Manual, and carry out project in accordance with manual agreedwith IDA. | Due Date :01-Oct-2011
Finance Agreement :Financing Agreement Schedule 2, Section I, Part D, para 1(a) | Description :Carry out the Project in accordancewith the Environmental and Social Management Framework. | Frequency :CONTINUOUS
Finance Agreement :Financing Agreement, Schedule 2, Section II, Part A, para 1(a) | Description :Monitor and evaluate progress ofproject and prepare quarterly reports to be submitted within one month of period closing. | Frequency :Quarterly
Finance Agreement :Financing Agreement, Schedule 2, Section II, Part B, para 1(a) | Description :Carry out Mid-Term Review and takeall measures required to ensure efficient completion of the project. | Due Date :16-Dec-2013
Finance Agreement :Financing Agreement, Schedule 2, Section II, Part C, paras 1-2 | Description :Maintain financial managementsystem and prepare and furnish not later than 45 days after the end of each calendar quarter interim unaudited financial reports. |Frequency :Quarterly
PDO Indicator
At least two key infrastructure assets ready for tender
PDO Indicator
Good practice and procedures established to prepare projects for public and private financing
Intermediate Results Indicator
Direct project beneficiaries
Intermediate Results Indicator
Training programs and events
Intermediate Results Indicator
Ability to manage groundwater strengthened
Intermediate Results Indicator
Conferences to promote investment opportunities
Intermediate Results Indicator
Establishment of 3 RBA in Southern Gobi Region
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
Feasibility studies for infrastructure projects
Intermediate Results Indicator
Consultants provide hands-on training and help administer government-financed projects & PPP concessions
Intermediate Results Indicator
Promotion of appropriate organization structure for groundwater management established
Intermediate Results Indicator
Rapid response to address issues impacting private investment
Intermediate Results Indicator
Improved transparency and public awareness of groundwater resources and the impact of water use and abstraction
Intermediate Results Indicator
Agreement to implement important recommendations from water resource pricing studies
Intermediate Results Indicator
New Institutional structure financially sustainable
44000-P167485
World Bank
Second Economic Management Support Operation
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Jean-Pascal Nganou
+1-202-473-1000jnganou@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Ulan Bator
47.9077 106.883
Banking InstitutionsLivestockOther Industry, Trade and ServicesSocial ProtectionCentral Government (Central Agencies)Fiscal PolicySocial ProtectionRural DevelopmentTrade FacilitationPublic Finance ManagementRegulation and Competition PolicyDomestic Revenue AdministrationJobsPublic Expenditure ManagementBusiness Enabling EnvironmentRural Infrastructure and service deliveryPublic AdministrationTradeFiscal sustainabilityPublic Assets and Investment ManagementSocial Insurance and Pensions
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
80000000Total Commitment in Third Quarter of 2019
International Development Association
20000000Total Commitment in Third Quarter of 2019
International Bank for Reconstruction and Development
50000Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-50000Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
80251787Total Disbursement in First Quarter of 2020
International Development Association
19950000Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development
-449934Total Interest Repayment in Second Quarter of 2020
International Development Association
-172841Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
Project Appraisal DocumentProject Information DocumentLoan AgreementFinancing AgreementContract AwardsProject URLProcurement Notices 44000-P159215
World Bank
Mongolia Employment Support Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Maheshwor Shrestha
+1-202-473-1000mshrestha1@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Uvs Aymag
49.5000 93.0000
Hovd
47.0000 92.5000
Govi-Altay Aymag
45.5000 96.0000
Dzavhan Aymag
48.0000 96.0000
Bayan-OElgiy Aymag
48.5000 90.0000
Bayanhongor Aymag
45.5000 99.5000
Ulaanbaatar Hot
47.9170 106.9170
Tov Aymag
47.5000 106.5000
Suhbaatar Aymag
46.2500 113.5000
Selenge Aymag
49.6670 106.4170
OEmnoegovi Province
43.0000 104.0000
Hovsgol Aymag
50.0000 100.0000
Hentiy Aymag
48.0000 110.5000
Dundgovi Aymag
45.5000 106.5000
Dornogovi Aymag
44.5000 110.0000
Dornod Aymag
48.0000 115.0000
Bulgan
49.0000 103.5000
Arhangay Aymag
48.0000 101.5000
Darhan-Uul Aymag
49.2810 106.1190
Govi-Sumber
46.5000 108.5000
Orhon Aymag
49.0630 104.1630
Public Administration - Social ProtectionSocial ProtectionMSME DevelopmentEnterprise DevelopmentActive Labor Market ProgramsJobsLabor Market Policy and ProgramsGenderJob CreationSkills Development
0.00
0.00
0.00
0.00
0.00
0.00
196666.66
196666.67
196666.67
196666.66
196666.67
196666.67
196666.66
196666.67
196666.67
222500.00
222500.00
222500.00
222500.00
222500.00
222500.00
222500.00
222500.00
222500.00
222500.00
222500.00
222500.00
428333.33
428333.33
428333.33
428333.33
428333.33
428333.33
428333.33
428333.33
428333.33
428333.33
428333.33
428333.37
727500.00
727500.00
727500.00
727500.00
727500.00
727500.00
727500.00
727500.00
727500.00
727500.00
727500.00
727500.00
557500.00
557500.00
557500.00
557500.00
557500.00
557500.00
557500.00
557500.00
557500.00
557500.00
557500.00
557500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.33
208333.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
736749.10
736749.10
736749.10
736749.10
736749.10
736749.10
736749.10
736749.10
736749.10
736749.10
736749.10
736749.05
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
1125000.00
13250.90
13250.90
13250.90
13250.90
13250.90
13250.90
13250.90
13250.90
13250.90
13250.90
13250.90
13250.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25000000Total Commitment in Second Quarter of 2017
International Development Association2500000Total Disbursement in Second Quarter of 2018
International Development Association-12623Total Interest Repayment in Third Quarter of 2018
International Development Association-24095Total Interest Repayment in First Quarter of 2019
International Development Association3500000Total Disbursement in Third Quarter of 2019
International Development Association-24145Total Interest Repayment in Third Quarter of 2019
International Development Association-50791Total Interest Repayment in First Quarter of 2020
International Development Association5340989Total Disbursement in Second Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
The Recipient shall establish, and thereafter ensure, that the Project is implemented subject to the overall guidance, coordinationand oversight of the Project Steering Committee (Schedule 2 Section I.A.1(a) of the Financing Agreement).
The Recipient shall carry out the Project, or cause the Project to be carried out, in accordance with the provisions of theEnvironmental and Social Management Framework, and except as the Association shall otherwise agree in writing, the Recipient shallnot amend, abrogate or waive, or permit to be amended, abrogated or waived, said instrument or any provision thereof (Schedule 2Section I.D.1 of the Financing Agreement).
In providing the Employment Promotion Piloting Grants under Part 2(c) of the Project, the Recipient shall ensure that allactivities are prepared, reviewed, approved and implemented on the basis of eligibility and selection criteria and in accordancewith guidelines and procedures, all acceptable to the Association and set forth in this Agreement, the Project Operations Manualand the Employment Promotion Fund Manual (Schedule 2 Section I.E.1 of the Financing Agreement).
In carrying out Part 2(b)(ii) of the Project, the Ministry of Finance and the Ministry of Labor and Social Protection shall enterinto an on-lending agreement (Schedule 2 Section I.A.5 of the Financing Agreement).
PDO Indicator
Beneficiaries who received temporary relief from their voluntary social insurance contributions
PDO Indicator
Beneficiaries of micro-entrepreneurship support whose micro-enterprise is still in business, at least 6 months after receiving a micro-loan
PDO Indicator
Beneficiaries who received temporary relief from their voluntary social insurance contributions (female)
PDO Indicator
Beneficiaries receiving labor intermediation services in an upgraded labor and social welfare office (overall)
PDO Indicator
Beneficiaries receiving labor intermediation services in a renovated labor and social welfare office (female)
Intermediate Results Indicator
Beneficiaries of micro-entrepreneurship support program (number)
Intermediate Results Indicator
Labor Demand Study released
Intermediate Results Indicator
Labor and social welfare offices renovated
Intermediate Results Indicator
Labor Market Monitoring Bulletins released
Intermediate Results Indicator
Beneficiaries of micro-entrepreneurship support program- Female (number)
Intermediate Results Indicator
Beneficiaries satisfied with project financed micro-entrepreneurship support
Intermediate Results Indicator
Volume of World Bank funding for lines of credit
Intermediate Results Indicator
Volume of micro-loans issued to end borrowers
Intermediate Results Indicator
Grants to labor and social welfare offices issued
44000-P092965
World Bank
Information and Communications Infrastructure Development Project
International Development Association
INFORMATION AND COMMUNICATION TECHNOLOGY AUTHORITY
International Development Association
INFORMATION AND COMMUNICATION TECHNOLOGY AUTHORITYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Peter Silarszky
+1-202-473-1000psilarszky@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Uvs Aymag
49.5000 93.0000
Hovd Aymag
47.0000 92.5000
Govi-Altay Aymag
45.5000 96.0000
Dzavhan Aymag
48.0000 96.0000
Bayan-Olgiy Aymag
48.5000 90.0000
Bayanhongor Aymag
45.5000 99.5000
Tov Aymag
47.5000 106.5000
Suhbaatar Aymag
46.2500 113.5000
Selenge Aymag
49.6670 106.4170
Ovorhangay Aymag
46.0000 102.5000
Omnogovi Aymag
43.0000 104.0000
Hovsgol Aymag
50.0000 100.0000
Hentiy Aymag
48.0000 110.5000
Dundgovi Aymag
45.5000 106.5000
Dornogovi Aymag
44.5000 110.0000
Dornod Aymag
48.0000 115.0000
Bulgan Aymag
49.0000 103.5000
Arhangay Aymag
48.0000 101.5000
Darhan-Uul Aymag
49.2810 106.1190
Govi-Sumber
46.5000 108.5000
Orhon Aymag
49.0630 104.1630
Ulaanbaatar
47.9080 106.8830
ICT InfrastructureOther Information and Communications TechnologiesCentral Government (Central Agencies)Urban Infrastructure and Service DeliveryRegulation and Competition PolicyJob CreationRural DevelopmentPublic Private PartnershipsInvestment and Business ClimateUrban DevelopmentJobsBusiness Enabling EnvironmentRural Infrastructure and service delivery
0.00
33386.11
33386.11
33386.11
33333.33
33333.33
33333.34
19973.62
19973.62
19973.63
19973.60
19973.60
19973.60
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
146666.67
146666.67
146666.66
146666.67
146666.67
146666.66
146666.67
146666.67
146666.66
146666.67
146666.67
146666.66
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
640000.00
640000.00
640000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33386.11
33386.11
33386.11
33333.33
33333.33
33333.34
19973.62
19973.62
19973.63
19973.60
19973.60
19973.60
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
146666.67
146666.67
146666.66
146666.67
146666.67
146666.66
146666.67
146666.67
146666.66
146666.67
146666.67
146666.66
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
640000.00
640000.00
640000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8000000Total Commitment in Second Quarter of 2006
International Development Association100158Total Disbursement in Third Quarter of 2006
International Development Association95005Total Disbursement in Fourth Quarter of 2006
International Development Association100000Total Disbursement in Fourth Quarter of 2006
International Development Association92791Total Disbursement in Second Quarter of 2007
International Development Association70987Total Disbursement in Third Quarter of 2007
International Development Association89815Total Disbursement in Third Quarter of 2007
International Development Association87446Total Disbursement in Fourth Quarter of 2007
International Development Association94091Total Disbursement in Second Quarter of 2008
International Development Association590065Total Disbursement in Second Quarter of 2008
International Development Association76427Total Disbursement in Fourth Quarter of 2008
International Development Association192730Total Disbursement in First Quarter of 2009
International Development Association2415419Total Disbursement in First Quarter of 2009
International Development Association75836Total Disbursement in Second Quarter of 2009
International Development Association163106Total Disbursement in Second Quarter of 2009
International Development Association285314Total Disbursement in Second Quarter of 2009
International Development Association104836Total Disbursement in Third Quarter of 2009
International Development Association292874Total Disbursement in Fourth Quarter of 2009
International Development Association60936Total Disbursement in First Quarter of 2010
International Development Association128158Total Disbursement in First Quarter of 2010
International Development Association253544Total Disbursement in First Quarter of 2010
International Development Association95105Total Disbursement in Second Quarter of 2010
International Development Association223313Total Disbursement in Second Quarter of 2010
International Development Association302371Total Disbursement in Third Quarter of 2010
International Development Association106472Total Disbursement in Fourth Quarter of 2010
International Development Association27363Total Disbursement in First Quarter of 2011
International Development Association336900Total Disbursement in First Quarter of 2011
International Development Association264241Total Disbursement in Second Quarter of 2011
International Development Association44196Total Disbursement in Third Quarter of 2011
International Development Association113359Total Disbursement in Fourth Quarter of 2011
International Development Association177500Total Disbursement in First Quarter of 2012
International Development Association134954Total Disbursement in Third Quarter of 2012
International Development Association86347Total Disbursement in Fourth Quarter of 2012
International Development Association17741Total Disbursement in First Quarter of 2013
International Development Association-140609Total Disbursement in Third Quarter of 2013
International Development Association-1306202Total Commitment Cancellations in Fourth Quarter of 2013
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementContract AwardsProject URLProcurement Notices
PIU: Maintain and fund throughout life of project.
PSC: Maintain throughout life of project.
Project Implementation Manual: Adopt and apply.
OBA Tender Process: Select
Enter into Universal Service Agreements
Certify Universal Service
Certification mechanism for financing (capital subsidies, Part A), approved by 12/31/06
Certification mechanism for financing (capital subsidies, Part A) applied
Implementation Completion Report
Intermediate Results Indicator
Component 1: Increased number of soum centers with about 1,000 or more inhabitants with access to digital telephony services
Intermediate Results Indicator
Component 1: Increased number of soum centers with about 1,000 or more inhabitants with access to Internet services
All soums have access to mobile data; 34 soums have access to high speed Internet
Intermediate Results Indicator
Component 1: Increased number of herder communities with access to telephony services
Intermediate Results Indicator
Component 1: Approve legislation to ensure funding for the Universal Service Obligation Fund (USOF)
Intermediate Results Indicator
Component 2: Increase in percentage of spectrum applications approved and assigned within 15 working days
Intermediate Results Indicator
Component 2: Regulatory public consultation process established
Intermediate Results Indicator
Component 2: Increase in percentage of regulatory decisions published
Intermediate Results Indicator
Component 3: Policy guidelines on PPPs approved
Intermediate Results Indicator
Component 3: Number of CIOs of ministries, agencies and aimags trained
Intermediate Results Indicator
Component 3: Establishment of Government Portal
Intermediate Results Indicator
Component 3: Percentage of target users using on-line e-Government services in the areas supported by the project
Intermediate Results Indicator
Component 3: Number of Government ministries/agencies with personnel trained in PPPs
PDO Indicator
Increased number of telephony minutes originated in soum centers with about 1,000 (or more) inhabitants
PDO Indicator
Increased number of Internet users in soum centers with about 1,000 (or more) inhabitants
PDO Indicator
Increased number of telephony minutes originated in rural areas outside of soum centers (herder network)
PDO Indicator
Continued additional annual investment in the ICT sector
PDO Indicator
Number of e-Government services provided in partnership with the private sector
PDO Indicator
Number of Government ministries and agencies willing to accept the PPP model for e-Government
44000-P131290
World Bank
E-Health Project
International Development Association
MINISTRY OF HEALTH AND SPORTS
International Development Association
MINISTRY OF HEALTH AND SPORTSPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Dinesh M. Nair
+1-202-473-1000dnair@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Ulaanbaatar Hot
47.9170 106.9170
Hovsgol Aymag
50.0000 100.0000
Ulaanbaatar
47.9080 106.8830
HealthPandemic ResponseMSME DevelopmentEnterprise DevelopmentHealth Systems and PoliciesDisease ControlHealth System Strengthening
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
66666.66
66666.67
66666.67
100000.00
100000.00
100000.00
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
500000.00
500000.00
500000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
333333.33
333333.33
333333.34
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
166666.66
166666.67
166666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8333.33
8333.33
8333.33
8333.33
8333.33
8333.33
8333.33
8333.33
8333.33
8333.33
8333.33
8333.37
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.63
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.37
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
241666.67
241666.67
241666.67
241666.67
241666.67
241666.67
241666.67
241666.67
241666.67
241666.67
241666.67
241666.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19500000Total Commitment in Second Quarter of 2014
International Development Association60000Total Disbursement in Third Quarter of 2016
International Development Association500000Total Disbursement in Third Quarter of 2016
International Development Association-5506Total Interest Repayment in First Quarter of 2017
International Development Association530507Total Disbursement in Second Quarter of 2017
International Development Association54957Total Disbursement in Third Quarter of 2017
International Development Association-9091Total Interest Repayment in Third Quarter of 2017
International Development Association18726Total Disbursement in Fourth Quarter of 2017
International Development Association-11995Total Interest Repayment in First Quarter of 2018
International Development Association-11906Total Interest Repayment in Third Quarter of 2018
International Development Association482426Total Disbursement in Fourth Quarter of 2018
International Development Association79919Total Disbursement in First Quarter of 2019
International Development Association191174Total Disbursement in First Quarter of 2019
International Development Association-14216Total Interest Repayment in First Quarter of 2019
International Development Association72718Total Disbursement in Second Quarter of 2019
International Development Association11443Total Disbursement in Third Quarter of 2019
International Development Association67501Total Disbursement in Third Quarter of 2019
International Development Association-19458Total Interest Repayment in Third Quarter of 2019
International Development Association-286736Total Loan Repayment in Third Quarter of 2019
International Development Association369003Total Disbursement in Fourth Quarter of 2019
International Development Association333904Total Disbursement in First Quarter of 2020
International Development Association-19737Total Interest Repayment in First Quarter of 2020
International Development Association-287771Total Loan Repayment in First Quarter of 2020
International Development Association812463Total Disbursement in Second Quarter of 2020
International Development Association1363351Total Disbursement in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Terms of Reference for the Key Technical Staff Positions for NHIC | Description :The Borrower shall, no laterthan six months after the Effective Date, prepare terms of reference acceptable to the Association forthe key technical staffpositions for NHIC. | The due date for this was changed to December 31, 2016 based on exchange of letters between the Governmentand the Bank.
PDO Indicator
(1) Percentage of statistical reports out of total reports produced by pilot facilities that are transmitted electronically throughHIEP to the National Centre for Health Development
PDO Indicator
(2) Percentage of electronic referrals out of total referrals at pilot facilities
PDO Indicator
(3) Number of project area soum and family health center facilities transmitting monthly e-health reports
PDO Indicator
(4) Improvements in IT literacy and health information management capacity among health professionals
Intermediate Results Indicator
Component 1: Health Data Standards are developed, validated and promulgated by MOH
Intermediate Results Indicator
Component 2: Training Center has been designed, implemented and is ready for use.
Intermediate Results Indicator
Component 2: Number of soum and family health centers connected to high speed internet highway
Intermediate Results Indicator
Component 1: Percentage of pilot facilities which design, develop, and implement successful piloting of eHealth Portal, Viewer and HIEP.
Intermediate Results Indicator
Component 1: Percentage of digital images generated in pilot facilities which are transmitted to the central PACS.
Intermediate Results Indicator
Component 1: Number of primary healthcare facilities (soum, FHC) having at least 1 upgraded and working computer
Intermediate Results Indicator
Component 2: E signatures used as a valid endorsement for health insurance claims
Intermediate Results Indicator
Component 1:Health data information storage capacities improved
Intermediate Results Indicator
Component 2: Beneficiary consultation outcomes and feedback integrated in project implementation
44000-P088816
World Bank
MN-Index-Based Livestock Insurance
International Development Association
MINISTRY OF FINANCE
International Development Association
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Stephane Forman
+1-202-473-1000sforman@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Uvs Aymag
49.5000 93.0000
Uvs Aymag
49.5000 93.0000
Govi-Altay Aymag
45.5000 96.0000
Dzavhan Aymag
48.0000 96.0000
Bayan-Olgiy Aymag
48.5000 90.0000
Bayanhongor Aymag
45.5000 99.5000
Ulaanbaatar Hot
47.9170 106.9170
Tov Aymag
47.5000 106.5000
Suhbaatar Aymag
46.2500 113.5000
Selenge Aymag
49.6670 106.4170
Ovorhangay Aymag
46.0000 102.5000
OEmnoegovi Province
43.0000 104.0000
Hovsgol Aymag
50.0000 100.0000
Hentiy Aymag
48.0000 110.5000
Dornogovi Aymag
44.5000 110.0000
Dornod Aymag
48.0000 115.0000
Bulgan Aymag
49.0000 103.5000
Arhangay Aymag
48.0000 101.5000
Darhan-Uul Aymag
49.2810 106.1190
Govi-Sumber
46.5000 108.5000
Orhon Aymag
49.0630 104.1630
Mongolia
46.0000 105.0000
Central Government (Central Agencies)Insurance and PensionOther Agriculture, Fishing and ForestryDisaster PreparednessSocial InclusionOther Excluded GroupsRegulation and Competition PolicyJobsDisaster Risk FinanceFragility, Conflict and ViolenceRural DevelopmentDisaster Response and RecoveryRural Infrastructure and service deliveryDisaster Risk ManagementInvestment and Business ClimateBusiness Enabling EnvironmentForced DisplacementDisaster Risk ReductionFinance for Development
75389.11
75389.11
50259.40
50259.40
50259.41
50259.40
50259.40
50259.41
50259.40
50259.40
50259.41
125648.50
125648.50
125648.52
125648.50
125648.50
125648.52
125648.50
125648.50
125648.52
125648.50
125648.50
125648.52
125648.50
125648.50
125648.52
125648.50
125648.50
125648.52
201037.61
201037.61
201037.62
296530.49
296530.49
296530.47
125648.50
125648.50
125648.52
251297.02
251297.02
251297.01
251297.02
251297.02
251297.01
251297.02
251297.02
251297.01
251297.02
251297.02
251297.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
51333.65
51333.65
51333.65
55677.48
55677.48
55677.48
0.00
0.00
0.00
123833.81
123833.81
123833.81
46682.05
46682.05
46682.05
0.00
0.00
0.00
38617.44
38617.44
38617.42
83743.56
83743.56
83743.54
13690.54
13690.54
13690.56
25064.59
25064.59
25064.59
79909.95
79909.95
79909.93
36468.73
36468.73
36468.74
86829.10
86829.10
86829.12
34274.00
34274.00
34274.01
0.00
0.00
0.00
56480.13
56480.13
56480.12
88053.87
88053.87
88053.89
57325.65
57325.65
57325.66
207.05
207.05
207.05
86959.31
86959.31
86959.33
505396.18
505396.18
505396.20
115620.03
115620.03
115620.02
52644.17
52644.17
52644.18
73138.20
73138.21
73138.21
107708.20
107708.22
107708.22
98784.08
98784.08
98784.08
88001.63
88001.64
88001.64
245867.02
245867.03
245867.03
48446.32
48446.34
48446.34
99731.46
99731.46
99731.48
102445.86
102445.86
102445.88
190024.06
190024.06
190024.06
57419.09
57419.09
57419.09
118643.02
118643.02
118643.02
126164.75
126164.75
126164.77
276426.71
276426.71
276426.73
301556.42
301556.42
301556.42
326686.11
326686.13
326686.13
326686.11
326686.13
326686.13
326686.11
326686.13
326686.13
326686.11
326686.13
326686.13
301556.42
301556.42
301556.42
281452.65
281452.66
281452.66
266650.22
266650.24
266650.24
0.00
7750000Total Commitment in Second Quarter of 2005
International Development Association150000Total Disbursement in Third Quarter of 2005
International Development Association56791Total Disbursement in Fourth Quarter of 2005
International Development Association101632Total Disbursement in Fourth Quarter of 2005
International Development Association-5539Total Interest Repayment in Fourth Quarter of 2005
International Development Association177697Total Disbursement in Second Quarter of 2006
International Development Association182470Total Disbursement in Second Quarter of 2006
International Development Association-11640Total Interest Repayment in Second Quarter of 2006
International Development Association-61Total Interest Repayment in Second Quarter of 2006
International Development Association137962Total Disbursement in Third Quarter of 2006
International Development Association-13500Total Interest Repayment in Fourth Quarter of 2006
International Development Association115348Total Disbursement in First Quarter of 2007
International Development Association85189Total Disbursement in Second Quarter of 2007
International Development Association167213Total Disbursement in Second Quarter of 2007
International Development Association-10230Total Interest Repayment in Second Quarter of 2007
International Development Association41789Total Disbursement in Third Quarter of 2007
International Development Association79102Total Disbursement in Fourth Quarter of 2007
International Development Association-11510Total Interest Repayment in Fourth Quarter of 2007
International Development Association58883Total Disbursement in First Quarter of 2008
International Development Association194478Total Disbursement in First Quarter of 2008
International Development Association49069Total Disbursement in Second Quarter of 2008
International Development Association69294Total Disbursement in Second Quarter of 2008
International Development Association-9376Total Interest Repayment in Second Quarter of 2008
International Development Association86364Total Disbursement in Third Quarter of 2008
International Development Association192809Total Disbursement in Third Quarter of 2008
International Development Association101865Total Disbursement in Fourth Quarter of 2008
International Development Association-9623Total Interest Repayment in Fourth Quarter of 2008
International Development Association80142Total Disbursement in Second Quarter of 2009
International Development Association90412Total Disbursement in Second Quarter of 2009
International Development Association-7401Total Interest Repayment in Second Quarter of 2009
International Development Association274075Total Disbursement in Third Quarter of 2009
International Development Association181550Total Disbursement in Fourth Quarter of 2009
International Development Association-9529Total Interest Repayment in Fourth Quarter of 2009
International Development Association648Total Disbursement in First Quarter of 2010
International Development Association10000000Total Commitment in First Quarter of 2010
International Development Association61203Total Disbursement in Second Quarter of 2010
International Development Association96882Total Disbursement in Second Quarter of 2010
International Development Association98094Total Disbursement in Second Quarter of 2010
International Development Association-9737Total Interest Repayment in Second Quarter of 2010
International Development Association36748Total Disbursement in Third Quarter of 2010
International Development Association264369Total Disbursement in Third Quarter of 2010
International Development Association1217691Total Disbursement in Third Quarter of 2010
International Development Association-13476Total Interest Repayment in Fourth Quarter of 2010
International Development Association360667Total Disbursement in Fourth Quarter of 2010
International Development Association17902Total Disbursement in First Quarter of 2011
International Development Association146038Total Disbursement in First Quarter of 2011
International Development Association-17680Total Interest Repayment in Second Quarter of 2011
International Development Association41693Total Disbursement in Second Quarter of 2011
International Development Association191330Total Disbursement in Second Quarter of 2011
International Development Association-1874Total Interest Repayment in Second Quarter of 2011
International Development Association65981Total Disbursement in Third Quarter of 2011
International Development Association278560Total Disbursement in Third Quarter of 2011
International Development Association-17479Total Interest Repayment in Fourth Quarter of 2011
International Development Association51035Total Disbursement in Fourth Quarter of 2011
International Development Association260185Total Disbursement in Fourth Quarter of 2011
International Development Association-3398Total Interest Repayment in Fourth Quarter of 2011
International Development Association45658Total Disbursement in First Quarter of 2012
International Development Association224023Total Disbursement in First Quarter of 2012
International Development Association-16868Total Interest Repayment in Second Quarter of 2012
International Development Association125553Total Disbursement in Second Quarter of 2012
International Development Association181203Total Disbursement in Second Quarter of 2012
International Development Association442686Total Disbursement in Second Quarter of 2012
International Development Association-5410Total Interest Repayment in Second Quarter of 2012
International Development Association145553Total Disbursement in Third Quarter of 2012
International Development Association-16816Total Interest Repayment in Fourth Quarter of 2012
International Development Association80049Total Disbursement in Fourth Quarter of 2012
International Development Association103704Total Disbursement in Fourth Quarter of 2012
International Development Association121591Total Disbursement in Fourth Quarter of 2012
International Development Association-9220Total Interest Repayment in Fourth Quarter of 2012
International Development Association80435Total Disbursement in First Quarter of 2013
International Development Association83867Total Disbursement in First Quarter of 2013
International Development Association144836Total Disbursement in First Quarter of 2013
International Development Association-16416Total Interest Repayment in Second Quarter of 2013
International Development Association71549Total Disbursement in Second Quarter of 2013
International Development Association247000Total Disbursement in Second Quarter of 2013
International Development Association249077Total Disbursement in Second Quarter of 2013
International Development Association-10726Total Interest Repayment in Second Quarter of 2013
International Development Association74248Total Disbursement in Third Quarter of 2013
International Development Association98860Total Disbursement in Third Quarter of 2013
International Development Association17354Total Disbursement in Fourth Quarter of 2013
International Development Association-16732Total Interest Repayment in Fourth Quarter of 2013
International Development Association155554Total Disbursement in Fourth Quarter of 2013
International Development Association189689Total Disbursement in Fourth Quarter of 2013
International Development Association-13990Total Interest Repayment in Fourth Quarter of 2013
International Development Association166022Total Disbursement in First Quarter of 2014
International Development Association220466Total Disbursement in First Quarter of 2014
International Development Association-17166Total Interest Repayment in Second Quarter of 2014
International Development Association73946Total Disbursement in Second Quarter of 2014
International Development Association107071Total Disbursement in Second Quarter of 2014
International Development Association247975Total Disbursement in Second Quarter of 2014
International Development Association-16569Total Interest Repayment in Second Quarter of 2014
International Development Association224813Total Disbursement in Third Quarter of 2014
International Development Association-16189Total Interest Repayment in Fourth Quarter of 2014
International Development Association53564Total Disbursement in Fourth Quarter of 2014
International Development Association121235Total Disbursement in Fourth Quarter of 2014
International Development Association-18359Total Interest Repayment in Fourth Quarter of 2014
International Development Association59799Total Disbursement in First Quarter of 2015
International Development Association24121Total Disbursement in Second Quarter of 2015
International Development Association24139Total Disbursement in Second Quarter of 2015
International Development Association74025Total Disbursement in Second Quarter of 2015
International Development Association-15159Total Interest Repayment in Second Quarter of 2015
International Development Association15417Total Disbursement in Second Quarter of 2015
International Development Association58598Total Disbursement in Second Quarter of 2015
International Development Association93041Total Disbursement in Second Quarter of 2015
International Development Association-18363Total Interest Repayment in Second Quarter of 2015
International Development Association22684Total Disbursement in Third Quarter of 2015
International Development Association23478Total Disbursement in Third Quarter of 2015
International Development Association23720Total Disbursement in Third Quarter of 2015
International Development Association151777Total Disbursement in Third Quarter of 2015
International Development Association-16372Total Interest Repayment in Fourth Quarter of 2015
International Development Association-71142Total Loan Repayment in Fourth Quarter of 2015
International Development Association-20168Total Interest Repayment in Fourth Quarter of 2015
International Development Association-39333Total Disbursement in Second Quarter of 2016
International Development Association-14886Total Interest Repayment in Second Quarter of 2016
International Development Association-72524Total Loan Repayment in Second Quarter of 2016
International Development Association-154335Total Disbursement in Second Quarter of 2016
International Development Association-20084Total Interest Repayment in Second Quarter of 2016
International Development Association-2924744Total Commitment Cancellations in Third Quarter of 2016
International Development Association-3577374Total Commitment Cancellations in Third Quarter of 2016
International Development Association-16082Total Interest Repayment in Fourth Quarter of 2016
International Development Association-40881Total Loan Repayment in Fourth Quarter of 2016
International Development Association-19382Total Interest Repayment in Fourth Quarter of 2016
International Development Association-14096Total Interest Repayment in Second Quarter of 2017
International Development Association-41085Total Loan Repayment in Second Quarter of 2017
International Development Association-18891Total Interest Repayment in Second Quarter of 2017
International Development Association-16125Total Interest Repayment in Fourth Quarter of 2017
International Development Association-42362Total Loan Repayment in Fourth Quarter of 2017
International Development Association-20077Total Interest Repayment in Fourth Quarter of 2017
International Development Association-15255Total Interest Repayment in Second Quarter of 2018
International Development Association-42820Total Loan Repayment in Second Quarter of 2018
International Development Association-19991Total Interest Repayment in Second Quarter of 2018
International Development Association-14602Total Interest Repayment in Fourth Quarter of 2018
International Development Association-41424Total Loan Repayment in Fourth Quarter of 2018
International Development Association-19340Total Interest Repayment in Fourth Quarter of 2018
International Development Association-14454Total Interest Repayment in Second Quarter of 2019
International Development Association-41444Total Loan Repayment in Second Quarter of 2019
International Development Association-19349Total Interest Repayment in Second Quarter of 2019
International Development Association-14163Total Interest Repayment in Fourth Quarter of 2019
International Development Association-41210Total Loan Repayment in Fourth Quarter of 2019
International Development Association-19221Total Interest Repayment in Fourth Quarter of 2019
International Development Association-13962Total Interest Repayment in Second Quarter of 2020
International Development Association-40756Total Loan Repayment in Second Quarter of 2020
International Development Association-19046Total Interest Repayment in Second Quarter of 2020
International Development Association-50740Total Loan Repayment in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportCredit AgreementAgreementAgreementAgreementAgreementAgreementAgreementAgreementGrant or Trust Fund AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 4.1 | Description :Establish a Project Steering Committee, a PIU, and aimag PIUs | Due Date :31-Dec-2005
Finance Agreement :Schedule 4.B.4 | Description :Conduct annual census' | Frequency :Yearly
Finance Agreement :Schedule 4.B.5.a | Description :Develop a "BIP Standard Policy Form" | Due Date :31-Dec-2005
Finance Agreement :Schedule 4.B.5.b | Description :Develop "Standard Stop-Loss Reinsurance Agreement" | Due Date :31-Dec-2005
Finance Agreement :Schedule 4.B.5.c | Description :Develop DRP indeminty arrangements | Due Date :31-Dec-2005
Finance Agreement :Schedule 4.C | Description :Develop strategy for for public awareness | Due Date :31-Dec-2005
Finance Agreement :Schedule 4.D | Description :Finalize baseline survey | Due Date :31-Dec-2005
Finance Agreement :Schedule 4.D.9.b.i | Description :Submit semi-annual progress reports | Frequency :Yearly
Finance Agreement :Schedule 4.D.10.a | Description :Prepare a "Post-Event Monitoring Framework" | Due Date :31-Dec-2006
Finance Agreement :Schedule 4.D.9.d | Description :Comprehensive final report | Due Date :30-Sep-2014
Finance Agreement :Schedule 4.B.4 | Description :Conduct annual livestock census | Frequency :Yearly
PDO Indicator
Insurance sector indicates its intention to continue to offer IBLI products beyond the lifetime of the project.
PDO Indicator
Government commitment to IBLI demonstrated by adoption of enabling legislation
Intermediate Results Indicator
Number of insurance companies participating in IBLIP
Intermediate Results Indicator
% of total soums in selected aimags offering IBLI
Intermediate Results Indicator
% of herders in contact with insurance agents offering LRI
Intermediate Results Indicator
Participating insurance companies provide contractual payments into LIIP and LRI reserves as contractually required.
Intermediate Results Indicator
% of due indemnity payments distributed to soum-level institutions (banks, etc.).
Intermediate Results Indicator
% of due indemnity payments received by herders.
Intermediate Results Indicator
% of herders in the selected area aware of the products.
Intermediate Results Indicator
% of herders in the pilot area receiving information from project public awareness activities .
Intermediate Results Indicator
Regulations for IBLI drafted.
Intermediate Results Indicator
Number of soums where cost effective new methods for NSO livestock data collection and statistics introduced
44000-P152343
World Bank
Second Energy Sector Project
International Development Association
MINISTRY OF ENERGY
International Development Association
MINISTRY OF ENERGYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Peter Johansen
+1-202-473-1000pjohansen@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Hovd
47.0000 92.5000
Bulgan
49.0000 103.5000
Arhangay Aymag
48.0000 101.5000
Govi-Sumber
46.5000 108.5000
Baganuur
47.7460 108.3670
Sumber Sum
46.5090 108.6200
Mayhanta
47.3500 109.5330
Erdenet
49.0330 104.0830
Hunt
47.8670 99.4670
Kharkhorin
47.1920 102.8130
Public Administration - Energy and ExtractivesEnergy Transmission and DistributionRenewable Energy SolarAccess to EnergyClimate changeMitigationEnergyEnergy Efficiency
0.00
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1200000.00
1200000.00
1200000.00
1200000.00
1200000.00
1200000.00
1200000.00
1200000.00
1200000.00
1200000.00
1200000.00
1200000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
600000.00
600000.00
600000.00
0.00
0.00
0.00
250000.00
250000.00
250000.00
0.00
0.00
0.00
83333.33
83333.33
83333.34
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1666666.67
1666666.67
1666666.66
2000000.00
2000000.00
2000000.00
2200000.00
2200000.00
2200000.00
2333333.33
2333333.33
2333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
42000000Total Commitment in Second Quarter of 2017
International Development Association1800000Total Disbursement in Second Quarter of 2018
International Development Association-13664Total Interest Repayment in Fourth Quarter of 2018
International Development Association-17463Total Interest Repayment in Second Quarter of 2019
International Development Association3200000Total Disbursement in Third Quarter of 2019
International Development Association-17230Total Interest Repayment in Fourth Quarter of 2019
International Development Association3000000Total Disbursement in Second Quarter of 2020
International Development Association-51288Total Interest Repayment in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportGrant or Trust Fund AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Project Steering Committee | Description :The Recipient shall maintain until the completion of the Project, aProject Steering Committee, to be responsible for providing overall strategic and policy guidance and facilitating coordinationamong different agencies on Project implementation, with a mandate, composition and terms of reference acceptable to theAssociation. | Frequency :CONTINUOUS
Finance Agreement :Project Management Office | Description :The Recipient shall maintain, until the completion of the Project, aProject Management Office, to be responsible for Project coordination and supervision of technical and safeguards related aspectsof Parts 1 and 2 of the Project, with a mandate, composition and terms of reference acceptable to the Association. | Frequency:CONTINUOUS
Finance Agreement :Project Implementing Units | Description :The Recipient shall cause to be maintained, until the completion ofthe Project, three Project Implementing Units, each under BSEDN, EBEDN and WES, to be responsible for day-to-day management,implementation, monitoring and reporting of the Project, with a mandate, composition and terms of reference acceptable to theAssociation. | Frequency :CONTINUOUS
Finance Agreement :Adequate funds and resources | Description :The Recipient shall ensure that each of the Project SteeringCommittee, the Project Management Office and Project Implementing Unit is provided at all times with adequate funds and otherresources and staffed by qualified personnel in adequate numbers as shall be necessary to accomplish the objective of the Project |Frequency :CONTINUOUS
PDO Indicator
Average interruption duration per year in the Project area - BSEDN
PDO Indicator
Generation Capacity of Renewable Energy (other than hydropower) constructed
PDO Indicator
Average interruption duration per year in the Project area - EBEDN
PDO Indicator
Generation Capacity of Renewable Energy constructed-Solar
Intermediate Results Indicator
Length of distribution line rehabilitated and/or constructed - BSEDN
Intermediate Results Indicator
Generated solar energy under the Project
Intermediate Results Indicator
Installation of the planning and management software
Intermediate Results Indicator
Length of distribution line rehabilitated and/or constructed - EBEDN
Intermediate Results Indicator
People provided with access to electricity under the project by household connection
Intermediate Results Indicator
Training man-days
Intermediate Results Indicator
Number of single phase meters installed - BSEDN
Intermediate Results Indicator
Estimated GHG emission reduction
Intermediate Results Indicator
Training man-days of women
Intermediate Results Indicator
Number of single phase meters installed - EBEDN
Intermediate Results Indicator
Distribution loss in the Project area - BSEDN
Intermediate Results Indicator
Distribution loss in the Project area - EBEDN
Intermediate Results Indicator
Site-specific consultations with citizens affected by the Project held
44000-P108768
World Bank
Mongolia Mining Sector Technical Assistance Project
International Development Association
MINERAL RESOURCES AND PETROLEUM AUTHORITY
International Development Association
MINERAL RESOURCES AND PETROLEUM AUTHORITYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Bryan Christopher Land
+1-202-473-1000bland@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Ulaanbaatar Hot
47.9170 106.9170
Tavan Tolgoy
42.8830 103.5330
Central Government (Central Agencies)MiningPublic AdministrationTax policyFiscal PolicyDomestic Revenue AdministrationRegulation and Competition PolicyPublic Finance ManagementTransparency, Accountability and Good GovernanceBusiness Enabling EnvironmentPublic Expenditure Management
0.00
108333.33
108333.33
108333.34
108333.33
108333.33
108333.34
108333.33
108333.33
108333.34
108333.33
108333.33
108333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
166666.66
166666.67
166666.67
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
0.00
0.00
0.00
0.00
0.00
0.00
5115000Total Commitment in Second Quarter of 2008
International Development Association4185000Total Commitment in Second Quarter of 2008
International Development Association500000Total Disbursement in Third Quarter of 2009
International Development Association445843Total Disbursement in First Quarter of 2010
International Development Association500000Total Disbursement in First Quarter of 2010
International Development Association432492Total Disbursement in Second Quarter of 2010
International Development Association-4154Total Interest Repayment in Third Quarter of 2010
International Development Association307681Total Disbursement in Fourth Quarter of 2010
International Development Association411376Total Disbursement in Fourth Quarter of 2010
International Development Association-5727Total Interest Repayment in First Quarter of 2011
International Development Association441863Total Disbursement in First Quarter of 2011
International Development Association283048Total Disbursement in Second Quarter of 2011
International Development Association207979Total Disbursement in Second Quarter of 2011
International Development Association275823Total Disbursement in Third Quarter of 2011
International Development Association-7315Total Interest Repayment in Third Quarter of 2011
International Development Association252476Total Disbursement in Third Quarter of 2011
International Development Association302044Total Disbursement in Fourth Quarter of 2011
International Development Association-9069Total Interest Repayment in First Quarter of 2012
International Development Association443324Total Disbursement in First Quarter of 2012
International Development Association206413Total Disbursement in Third Quarter of 2012
International Development Association-9085Total Interest Repayment in Third Quarter of 2012
International Development Association282781Total Disbursement in Third Quarter of 2012
International Development Association-10395Total Interest Repayment in First Quarter of 2013
International Development Association335481Total Disbursement in First Quarter of 2013
International Development Association204575Total Disbursement in Second Quarter of 2013
International Development Association401780Total Disbursement in Second Quarter of 2013
International Development Association-10225Total Interest Repayment in Third Quarter of 2013
International Development Association286708Total Disbursement in Fourth Quarter of 2013
International Development Association-2399Total Disbursement in Fourth Quarter of 2013
International Development Association354513Total Disbursement in Fourth Quarter of 2013
International Development Association-11778Total Interest Repayment in First Quarter of 2014
International Development Association292033Total Disbursement in Second Quarter of 2014
International Development Association243302Total Disbursement in Second Quarter of 2014
International Development Association490723Total Disbursement in Third Quarter of 2014
International Development Association-12951Total Interest Repayment in Third Quarter of 2014
International Development Association459695Total Disbursement in Fourth Quarter of 2014
International Development Association54077Total Disbursement in Fourth Quarter of 2014
International Development Association336381Total Disbursement in First Quarter of 2015
International Development Association-14488Total Interest Repayment in First Quarter of 2015
International Development Association-15608Total Disbursement in Third Quarter of 2015
International Development Association-16425Total Interest Repayment in Third Quarter of 2015
International Development Association-43366Total Disbursement in Third Quarter of 2015
International Development Association-16292Total Interest Repayment in First Quarter of 2016
International Development Association-38461Total Commitment Cancellations in Second Quarter of 2016
International Development Association-44235Total Commitment Cancellations in Second Quarter of 2016
International Development Association-16444Total Interest Repayment in Third Quarter of 2016
International Development Association-15877Total Interest Repayment in First Quarter of 2017
International Development Association-16283Total Interest Repayment in Third Quarter of 2017
International Development Association-17174Total Interest Repayment in First Quarter of 2018
International Development Association-16631Total Interest Repayment in Third Quarter of 2018
International Development Association-43804Total Loan Repayment in Third Quarter of 2018
International Development Association-16173Total Interest Repayment in First Quarter of 2019
International Development Association-43482Total Loan Repayment in First Quarter of 2019
International Development Association-15759Total Interest Repayment in Third Quarter of 2019
International Development Association-42882Total Loan Repayment in Third Quarter of 2019
International Development Association-15655Total Interest Repayment in First Quarter of 2020
International Development Association-43038Total Loan Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule II, Section V, 2 | Description :select and engage the services of an external independent auditor forthe Project under terms of reference and with experience and qualificationsacceptable to the Association | Due Date :31-Mar-2009
Finance Agreement :Schedule II, Section I, C | Description :thereafter, implement the study recommendations as discussed with theAssociation | Frequency :Yearly
Finance Agreement :Schedule II, Section V, 1 | Description :Erdenes MGL completed review of options and recommendations for therevision of its corporate systems, legal framework and structure with an objective to make its structure more consistent with thoseof a commercial entity operating according to OECD standards orsimilar as accepted by the Association for corporate governance. |Due Date :30-Jun-2014
Finance Agreement :Schedule II, Section I, C | Description :Recipient to cause MoF to develop and furnish to the Association a setof draft model Stabilization Agreement or equivalent for mining and draft model Production Sharing Agreement or equivalent forpetroleum, in form and substance satisfactory to the association. | Due Date :30-Jun-2014
Finance Agreement :Schedule II, Section I, C (a) | Description :Recipient to complete and furnish to the Association for discussionthe mining sector institutional assessment study in form and substance satisfactory to the Association | Due Date :31-Mar-2014
Finance Agreement :Schedule 2, Section D (a) | Description :Recipient to carry out & publicly disclose an assessment of complianceof ETT's operation of the East Tsankhi mine with Bank standards or similar standards acceptable to the Association practices forenvironmental & social safeguards and recommendations on updateto the EMS | Due Date :15-Dec-2014
Finance Agreement :-- IDA-44890, Schedule 2, Section D (b) | Description :Recipient to prepare and publicly disclose a RPF andRAP for the East Tsankhi Mine in form and substance acceptable to the Bank | Due Date :15-Dec-2014
Intermediate Results Indicator
Ministry of Mining policies reviewed and revised
Intermediate Results Indicator
Modern company reporting requirements regulations are prepared, promulgated, implemented, and monitored
Intermediate Results Indicator
Provision of management-related and governance related training events to build capabilities needed within Erdenes MGL.
Intermediate Results Indicator
Sovereign Wealth Fund or alternative revenue stabilisation mechanism established
Intermediate Results Indicator
Preparation of Draft Model Mineral Development Agreement
Intermediate Results Indicator
Support establishment of mechanisms for preparation and dissemination of independent professional mining sector economic and policyreports.
Intermediate Results Indicator
Modern Mining cadastre regulation adopted and promulgated
Intermediate Results Indicator
Income tax laws on mining amended and supporting regulations drafted
Intermediate Results Indicator
Options study prepared on double taxation treaties
Intermediate Results Indicator
GDNT tax audit staff trained and competent to carry out mining company tax audits
PDO Indicator
Annual Budget decisions to replenish or withdraw from newly established Sovereign Wealth Fund are made based on agreed Macroeconomic criteria
PDO Indicator
Level of mining related transfers from national government to Aimag and Soum authorities is known and publicly disclosed.
PDO Indicator
Mining Tax Audits are completed and assessments raised
PDO Indicator
Clear authority and responsibilities for Government mining sector management institutions, especially regarding environmental and social aspects associated with mining activities.
PDO Indicator
mineral licensing procedures streamlined and processing times reduced
PDO Indicator
Geological information is digitized and published and readily available in user friendly digital formats.
PDO Indicator
Companies and civil society participate in consultation for pieces of legislation and regulation for mining sector through public fora arranged by the government.
Intermediate Results Indicator
Modern occupation, health and safety regulations are prepared, promulgated, implemented and monitored.
Intermediate Results Indicator
Strategic environmental & social assessment undertaken, areas for improvement in social (including gender) & environmental regulation identified, recommendations made for updating laws
Intermediate Results Indicator
Modern mine closure and post closure regulations are prepared and promulgated
Intermediate Results Indicator
Erdenes MGL financial reports are provided quarterly to the Board of Directors.
Intermediate Results Indicator
Establishment of appropriate legal structure and preparation and adoption of suitable corporate charter and reporting arrangements for Erdenes MGL
Intermediate Results Indicator
Consultation with a range of stakeholders including civil society, community members and the private sector undertaken as part of asocial and environmental strategic assessment process.
44000-P130891
World Bank
MN: SMART Government
International Development Association
OFFICE OF THE CABINET SECRETARIAT
International Development Association
OFFICE OF THE CABINET SECRETARIATPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Siou Chew Kuek
+1-202-473-1000skuek@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Ulaanbaatar Hot
47.9170 106.9170
Other Information and Communications TechnologiesPublic Administration - Information and Communications TechnologiesPublic AdministrationE-Government, incl. e-services
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1000000.00
1000000.00
1000000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
683333.33
683333.33
683333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
283333.33
283333.33
283333.34
1000000.00
1000000.00
1000000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.37
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.37
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.37
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.37
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
483333.33
483333.33
483333.33
483333.33
483333.33
483333.35
19400000Total Commitment in Second Quarter of 2014
International Development Association1000000Total Disbursement in Fourth Quarter of 2015
International Development Association-5620Total Interest Repayment in First Quarter of 2016
International Development Association329377Total Disbursement in Third Quarter of 2016
International Development Association-10113Total Interest Repayment in Third Quarter of 2016
International Development Association216620Total Disbursement in Fourth Quarter of 2016
International Development Association-13630Total Interest Repayment in First Quarter of 2017
International Development Association571010Total Disbursement in Second Quarter of 2017
International Development Association270119Total Disbursement in Third Quarter of 2017
International Development Association-18892Total Interest Repayment in Third Quarter of 2017
International Development Association272846Total Disbursement in Fourth Quarter of 2017
International Development Association325404Total Disbursement in Fourth Quarter of 2017
International Development Association374036Total Disbursement in Fourth Quarter of 2017
International Development Association-30353Total Interest Repayment in First Quarter of 2018
International Development Association260556Total Disbursement in Second Quarter of 2018
International Development Association223139Total Disbursement in Third Quarter of 2018
International Development Association-36306Total Interest Repayment in Third Quarter of 2018
International Development Association110929Total Disbursement in Fourth Quarter of 2018
International Development Association85291Total Disbursement in First Quarter of 2019
International Development Association-38574Total Interest Repayment in First Quarter of 2019
International Development Association30058Total Disbursement in Second Quarter of 2019
International Development Association251242Total Disbursement in Second Quarter of 2019
International Development Association-41133Total Interest Repayment in Third Quarter of 2019
International Development Association-284478Total Loan Repayment in Third Quarter of 2019
International Development Association824330Total Disbursement in Fourth Quarter of 2019
International Development Association2737362Total Disbursement in Fourth Quarter of 2019
International Development Association233621Total Disbursement in First Quarter of 2020
International Development Association-56644Total Interest Repayment in First Quarter of 2020
International Development Association-285505Total Loan Repayment in First Quarter of 2020
International Development Association726309Total Disbursement in Second Quarter of 2020
International Development Association1118421Total Disbursement in Second Quarter of 2020
International Development Association1315122Total Disbursement in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Maintenance of Project Steering Committee and Project Implementation Unit | Description :Section I.A Schedule 2:Obligation of the Recipient to maintain the Project Steering Committee and Project Implementation Unit at all times during theimplementation of the Project. | Frequency :CONTINUOUS
Finance Agreement :Project Implementation Manual and Innovation Financing Manual | Description :Obligation of the Recipient tocarry out the Project in accordance to the Project Implementation Manual and the Innovation Financing Manual. | Frequency:CONTINUOUS
Finance Agreement :Project reports and IFRs | Description :Obligation of the Recipient to submit quarterly project progress reportsand interim unaudited financial reports within 45 days after each quarter. | Frequency :Quarterly
PDO Indicator
Availability of public services for citizens through digital channels
PDO Indicator
Availability of public services for businesses through digital channels
PDO Indicator
Citizens' access to information on the resolution process and status of their feedback to the Citizens' Feedback Centers
PDO Indicator
Volume of government data made publicly available as Open Data through central, searchable platform that are both updated and contain detailed data-related documentation
PDO Indicator
Average number of days to issue a property ownership certificate
Intermediate Results Indicator
Share of 11-11 queries resolved within three days
Intermediate Results Indicator
Number of Government ministries/agencies that adopt the National Enterprise Architecture
Intermediate Results Indicator
Number of datasets released
Intermediate Results Indicator
Number of contacts to the integrated 11-11 platforms
Intermediate Results Indicator
Number of agencies hosting databases at the National Data Center
Intermediate Results Indicator
A central, searchable National Open Data Portal established and data are available from at least 5 government ministries/agencies, enabling their data sharing with the public
Intermediate Results Indicator
Number of applications and services developed which includes women team members
Intermediate Results Indicator
Business analytics system established
Intermediate Results Indicator
Data standards and a common framework are established to allow data to be used in combination with other government agencies
Intermediate Results Indicator
Number of the Project's public services incorporating citizen consultation and feedback into its design
Intermediate Results Indicator
Number of provinces and UB districts where the e-Property Registration System has been rolled-out
Intermediate Results Indicator
Number of the Project's public services incorporating citizen consultation and feedback into its design; of which at least half of the beneficiaries consulted are female
44000-P096328
World Bank
Rural Education and Development (READ) Project (formerly Rural Education Support Project)
International Development Association
MINISTRY OF EDUCATION, CULTURE AND SCIENCE
International Development Association
MINISTRY OF EDUCATION, CULTURE AND SCIENCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Prateek Tandon
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Uvs Aymag
49.5000 93.0000
Hovd Aymag
47.0000 92.5000
Govi-Altay Aymag
45.5000 96.0000
Dzavhan Aymag
48.0000 96.0000
Bayan-Olgiy Aymag
48.5000 90.0000
Bayanhongor Aymag
45.5000 99.5000
Tov Aymag
47.5000 106.5000
Suhbaatar Aymag
46.2500 113.5000
Selenge Aymag
49.6670 106.4170
Ovorhangay Aymag
46.0000 102.5000
Omnogovi Aymag
43.0000 104.0000
Hovsgol Aymag
50.0000 100.0000
Hentiy Aymag
48.0000 110.5000
Dundgovi Aymag
45.5000 106.5000
Dornogovi Aymag
44.5000 110.0000
Dornod Aymag
48.0000 115.0000
Bulgan Aymag
49.0000 103.5000
Arhangay Aymag
48.0000 101.5000
Darhan-Uul Aymag
49.2810 106.1190
Govi-Sumber
46.5000 108.5000
Orhon Aymag
49.0630 104.1630
Mongolia
46.0000 105.0000
Primary EducationCentral Government (Central Agencies)EducationRural Infrastructure and service deliveryRural DevelopmentEducation FinancingAccess to Education
73517.99
73517.99
73517.99
0.00
0.00
0.00
14388.49
14388.49
14388.49
14388.49
14388.49
14388.49
83932.85
83932.85
83932.86
83932.85
83932.85
83932.86
83932.85
83932.85
83932.86
83932.85
83932.85
83932.86
83543.41
83543.41
83543.40
83543.41
83543.41
83543.40
83543.41
83543.41
83543.40
83543.41
83543.41
83543.40
83543.41
83543.41
83543.40
83543.41
83543.41
83543.40
83543.41
83543.41
83543.40
83543.41
83543.41
83543.40
24220.62
24220.62
24220.63
24220.62
24220.62
24220.63
23980.82
23980.82
23980.81
23980.82
23980.82
23980.81
23980.82
23980.82
23980.81
23980.82
23980.82
23980.81
23980.82
23980.82
23980.81
61971.70
61971.70
61971.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
110276.99
110276.98
0.00
0.00
0.00
14388.49
14388.49
14388.49
14388.49
14388.49
14388.49
83932.85
83932.85
83932.86
83932.85
83932.85
83932.86
83932.85
83932.85
83932.86
83932.85
83932.85
83932.86
83354.40
83354.41
83354.41
103335.87
103335.88
103335.88
105283.33
105283.33
105283.34
103333.33
103333.33
103333.34
103333.33
103333.33
103333.34
103333.33
103333.33
103333.34
103333.33
103333.33
103333.34
103333.33
103333.33
103333.34
83333.33
83333.33
83333.34
36666.66
36666.67
36666.67
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4000000Total Commitment in Second Quarter of 2006
International Development Association58343Total Disbursement in Third Quarter of 2006
International Development Association190000Total Disbursement in Third Quarter of 2006
International Development Association143034Total Disbursement in Fourth Quarter of 2006
International Development Association258629Total Disbursement in First Quarter of 2007
International Development Association174371Total Disbursement in Second Quarter of 2007
International Development Association183344Total Disbursement in Second Quarter of 2007
International Development Association559427Total Disbursement in Second Quarter of 2007
International Development Association85739Total Disbursement in Third Quarter of 2007
International Development Association348364Total Disbursement in Fourth Quarter of 2007
International Development Association158005Total Disbursement in First Quarter of 2008
International Development Association222885Total Disbursement in First Quarter of 2008
International Development Association155250Total Disbursement in Second Quarter of 2008
International Development Association191692Total Disbursement in Second Quarter of 2008
International Development Association1000000Total Commitment in Second Quarter of 2008
International Development Association212119Total Disbursement in Third Quarter of 2008
International Development Association143406Total Disbursement in Fourth Quarter of 2008
International Development Association167718Total Disbursement in Fourth Quarter of 2008
International Development Association75029Total Disbursement in First Quarter of 2009
International Development Association162840Total Disbursement in First Quarter of 2009
International Development Association46000Total Disbursement in First Quarter of 2009
International Development Association71371Total Disbursement in Third Quarter of 2009
International Development Association46000Total Disbursement in Third Quarter of 2009
International Development Association51600Total Disbursement in First Quarter of 2010
International Development Association87109Total Disbursement in First Quarter of 2010
International Development Association46000Total Disbursement in First Quarter of 2010
International Development Association204824Total Disbursement in Second Quarter of 2010
International Development Association105283Total Disbursement in Third Quarter of 2010
International Development Association52420Total Disbursement in Fourth Quarter of 2010
International Development Association112544Total Disbursement in Second Quarter of 2011
International Development Association463115Total Disbursement in Second Quarter of 2011
International Development Association-139663Total Disbursement in Third Quarter of 2011
International Development Association162408Total Disbursement in Third Quarter of 2011
International Development Association162408Total Disbursement in Third Quarter of 2011
International Development Association53137Total Disbursement in Second Quarter of 2012
International Development Association-243358Total Commitment Cancellations in Third Quarter of 2012
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Maintenance of the PMU under terms of reference acceptable to IDA; the PMU will maintain adequate facilities and staff and belocate d in the MECS complex during the life of the project.
Implementation of the project will be carried out in a manner consistent with the Berne Convention on copyright protection towhichM ongolia is a signatory.
An independent audit firm, acceptable to IDA, to undertake audits of project accounts, will be appointed by December 31, 2006.
The Recipient should have its financial statement audited and furnish the report to the Bank not later than six months after theend of one fiscal year after the recipient.
PDO Indicator
The number of teachers, librarians, school directors and ECD primary methodologists in rural bagh and soum schools who have participated in project professional development activities
The baseline is 0 because the indicator is measuring the increase.
Data from the PMU records as to the number of educational professionals participated in the training.
Intermediate Results Indicator
System for learning assessment at the primary level
Mongolia currently has a national examination at end of basic education. However, every school set its own examination. MECS iscurrently considering reforming this system in light of its Cambridge curricular reform.
EEC has developed national primary assessment tool and started conducting assessments as a pilot.
Intermediate Results Indicator
Number of additional qualified primary teachers resulting from project interventions.
4000 were targeted, but that number was exceeded.
Task completed
4000 were targeted, but that number was exceeded.
Intermediate Results Indicator
Utility of the learning assessment system
PDO Indicator
Number of students in grades 1-5 in rural bagh and soum schools who have access to learning materials and improved teaching practices
The baseline is 0 because the indicator is measuring the increase.
Data from the PMU records as to the number of project beneficiaries
PDO Indicator
No. of teachers in selected rural bagh & soum primary schools that received integrated training in effective use of XO laptop computers and ICDL software incl basic hardware & software troubleshooting
Indicator measures the change/increase.
Determined from PMU records. Value remains the same after target met in Dec. 2011.
PDO Indicator
Number of students in selected rural bagh and soum schools that received laptops connected to servers and with the improved Mongolian adapted version of ICDL software installed
The baseline is 0 because the indicator is measuring the increase.
Determined from PMU records. Value remains the same after target met in May 2011.
PDO Indicator
Completion of baseline and follow-up of teacher and classrooms surveys.
Indicator measures the change/increase.
Determined from Monitoring and Evaluation surveys of original READ and of additional financing. READ surveys were conducted andresults are available as a report.
Intermediate Results Indicator
Number of new children's books available on the local market, either written by local authors or translated into Mongolian from international publishers.
Indicator measures the change/increase.
Determined from the survey on availability of local reading material.
Intermediate Results Indicator
Percentage of classrooms covered by the project that increase students classroom reading time per week.
Indicator measures the change/increase.
Determined from M&E surveys of original READ and of additional financing.
Intermediate Results Indicator
Percentage of teachers covered by the project that increase classroom literacy activities per week.
Indicator measures the change/increase.
Determined from M&E surveys of original READ and of additional financing.
Intermediate Results Indicator
Number of classroom libraries established in grade 1-5 classrooms in 383 schools. (number of classrooms is 4029 in total.)
Indicator measures the change/increase.
Determined from M&E surveys of original READ and of additional financing.
Intermediate Results Indicator
Number of books students read per year and engage in activities connected to the books.
Indicator measures the change/increase.
Determined from M&E surveys of original READ and of additional financing.
Intermediate Results Indicator
Percentage of teachers that maintain student writing portfolios in project classrooms.
Indicator measures the change/increase.
Determined from M&E surveys of original READ and of additional financing.
Intermediate Results Indicator
Number of teachers from 105 core schools trained and supported as peer mentors.
Indicator measures the change/increase.
Determined from M&E surveys of original READ and of additional financing.
Intermediate Results Indicator
Visits per school from 315 peer mentors to 3714 classrooms in 383 schools.
Indicator measures the change/increase.
Determined from PMU records.
Intermediate Results Indicator
School managers, principals, and librarians that participate in 2-5 days of professional development in core schools.
Indicator measures the change/increase.
Intermediate Results Indicator
Primary ECD methodologists trained in initial core schools.
Indicator measures the change/increase.
Determined from PMU records.
Intermediate Results Indicator
Full page ads appear in newspapers (ads about benefits of reading)
Indicator measures the change/increase.
Determined from PMU records.
Intermediate Results Indicator
Airtime minutes on TV promoting reading.
Indicator measures the change/increase.
Determined from PMU records.
Intermediate Results Indicator
Test design used to develop writing rubrics that can be used widely by teachers to promote better writing.
Indicator measures the change/increase.
Determined from M&E surveys of original READ and of additional financing.
Intermediate Results Indicator
Target schools receive and participate in delivery confirmation to monitor libraries arrive to their classrooms.
Indicator measures the change/increase.
Determined from PMC records.
Intermediate Results Indicator
Complete baseline & follow-up literacy assessments.
Determined from the IE study. Student assessment conducted as a part of IE. Target met since September 2011.
Intermediate Results Indicator
Number of hours (per teacher and per week) that teachers use the XO laptop computers for planning and designing class related activities.
Indicator measures the change/increase.
Determined from the IE study. Student assessment conducted as a part of IE. Target met since September 2011.
Intermediate Results Indicator
Number of hours per teacher a week that teachers use ICDL for in-class activities.
Indicator measures the change/increase.
Determined from the IE study. Student assessment conducted as a part of IE. Target met since September 2011.
Intermediate Results Indicator
Number of hours per teacher a week that teachers use the XO laptop computers for non-academic activities related to school work (assessing students, e.g.)
Indicator measures the change/increase.
Determined from the IE study. Student assessment conducted as a part of IE. Target met since September 2011.
Intermediate Results Indicator
Number of hours (per teacher and per week) that teacher use the XO laptop computers for non-class related activities but for their own activities.
Indicator measures the change/increase.
Determined from the IE study. Student assessment conducted as a part of IE. Target met since September 2011.
Intermediate Results Indicator
Number of hours a week of laptop and/or UCDL use in basic subjects.
Indicator measures the change/increase.
Determined from the IE study. Student assessment conducted as a part of IE. Target met since September 2011.
Intermediate Results Indicator
Number of hours (per student and per week) that sutdents effectively use the laptops and ICDL for school related work.
Indicator measures the change/increase.
Determined from the IE study. Student assessment conducted as a part of IE. Target met since September 2011.
Intermediate Results Indicator
Number of hours (per student and per week) that effectively use the XO laptop computers and ICDL for non-school related work (outside school hours).
Indicator measures the change/increase.
Determined from the IE study. Student assessment conducted as a part of IE. Target met since September 2011.
Intermediate Results Indicator
Number of students that reported shared-use of XO laptop computer/ICDL with their family.
Indicator measures the change/increase.
Determined from the IE study. Student assessment conducted as a part of IE. Target met since September 2011.
PDO Indicator
Classroom teaching practices reflect enhanced knowledge in reading instruction and use of learning materials
The baseline is No because the indicator is measuring the change.
Determined from M&E surveys of original READ and of additional financing - READ teacher training had positive impact on 98 percentof the teachers in terms of their knowledge of reading and writing evaluation.
PDO Indicator
Classroom teaching practices in selected rural bagh and soum reflect enhancement of knowledge in reading instruction and use of XO laptop computers and ICDL as learning materials
Indicator measures the change/increase.
Determined by the surveys of the IE and additional financing.
PDO Indicator
Use of student assessment data and reports to inform policy decisions.
Indicator measures the change/increase.
Determined from M&E surveys of original READ and of additional financing – policy studies conducted and disseminated. For example,policy for teacher training was changed.
PDO Indicator
Use of outcome based contracts that reflect teaching practices linked to child friendly schools
The baseline is No because the indicator is measuring the change.
Determined from M&E surveys of original READ and of additional financing, and project policy study.
Intermediate Results Indicator
Increased opportunity for teachers to meet with and observe instruction of teachers from other schools.
Indicator measures the change/increase.
Determined from M&E survey of original READ and of additional financing. Reported increase of teachers' peer interaction from 2007to 2008.
Intermediate Results Indicator
Provide support to develop technical capacity for schools to have digital libraries (visits)
Indicator measures the change/increase.
Determined from PMU records.
PDO Indicator
Completion of baseline and follow-up assessments of students in terms of literacy, math, ICT skills and behavioral skills (criticalthinking, discipline, motivation, etc)
Determined from IE of additional financing.
Intermediate Results Indicator
Number of titles related to teaching practices in lower grades translated and distributed to universities and classroom teachers.
Indicator measures the change/increase.
Determined from survey on availability of local reading material.
Intermediate Results Indicator
Satisfactions results of all professional development participants.
Indicator measures the change/increase.
Determined from M&E surveys of original READ and of additional financing.
Intermediate Results Indicator
Number of children book titles published in Mongolian and available in the local market (excludes pirated translations)
Indicator measures the change/increase.
Data collected through survey on availability of local reading material.
PDO Indicator
Students' literacy skills improved
Indicator measures the change/increase.
Determined from READ students assessment.
Intermediate Results Indicator
Teaching practices and in-class time spent in reading activities (eg no. hrs/wk teachers spent on lit activities - reading books orwrtg activities; no. hrs/wk students spending reading on their own)
Indicator measures the change/increase.
Teaching and learning of reading activities in-class was monitored. READ classroom questionnaire included questions on number ofhours spent on such activities.
Intermediate Results Indicator
Number of educators that revieve professional development in reading and writing
Indicator measures the change/increase.
Data collected through survey of teacher professional development providers and reports from professional development provider.
Intermediate Results Indicator
Number of books delivered to classrooms by READ
Indicator measures the change/increase.
YR1 target 210,000; YR 2 target 410,000; and YR 4 target 50,000.
Data collected through OMU records and delivery confirmations.
Intermediate Results Indicator
Number of titles related to teaching practices in lower grades translated and distributed to unversities and teachers
Indicator measures the change/increase.
Data collected through survey of availability of local reading material.
Intermediate Results Indicator
Number of research and policy publications prepared by institutions other than the EEC using the data generated and disseminated bythe EEC.
Indicator measures the change/increase.
Data collected through EEC records.
Intermediate Results Indicator
Digital libraries delivered
Indicator measures the change/increase.
Midterm
Determined from PMU records and delivery confirmations.
Intermediate Results Indicator
Maps delivered to schools
Indicator measures the change/increase.
Determined from PMU records and delivery confirmations.
Intermediate Results Indicator
Number of students tested in reading, writing and math (5th grade TIMSS)
Indicator measures the change/increase.
Data collected through Education Evaluation Center (EEC) records. Year 1 target is 2,000, Year 2 target 10,000, and Year 3 target4,500. These figures aggregate: 2,000 students in TIMSS pilot for YR1, 9,000 students in TIMSS and 1,000 students in grade-5assessment pilot in YR2, and 4,500 students in grade-5 assessments in YR3.
Intermediate Results Indicator
Number of computers delivered to schools for digital libraries
Indicator measures the change/increase.
Data collected through PMU records.
Intermediate Results Indicator
Maps in schools
Indicator measures the change/increase.
Data collected through PMU records.
Intermediate Results Indicator
Book shelves in school
Indicator measures the change/increase.
Data collected through PMU records.
Intermediate Results Indicator
Grade 1 furniture sets
Indicator measures the change/increase.
Data collected through PMU records. End target is 400 in Year 1.
Data collected through PMU records.
Intermediate Results Indicator
Percentage of the number of children participating in other reading-related activities sponsored by READ
Indicator measures the change/increase.
Data collected through PMU records and follow-up surveys.
Intermediate Results Indicator
Number of student assessments scored and processed (5th grade and TIMSS)
Indicator measures the change/increase.
Data collected through Education Evaluation Center (EEC) records. Year 1 target is 2,000, Year 2 target 10,000, and Year 3 target4,500. These figures aggregate: 2,000 students in TIMSS pilot for YR1, 9,000 students in TIMSS and 1,000 students in grade-5assessment pilot in YR2, and 4,500 students in grade-5 assessments in YR3.
Intermediate Results Indicator
Number of student assessments scored and processed by the ECC (and their circulation).
Indicator measures the change/increase.
YR 1 target - one per subject and text, YR 2 target - one per subject and text, YR 3 target - one per subject and text, YR 4target- one per subject and text, and YR 5 target - one per subject and text.
Determined by ECC records.
Intermediate Results Indicator
Number of policy notes and dissemination events sponsored by READ
Indicator measures the change/increase.
Data collected through PMU records.
Intermediate Results Indicator
Number of students in grades 2-5 in selected rural schools, along with teachers and heads of schools, who have received XO Laptop Computers connected to servers with customized ICDL installed by closg
Indicator measures the change/increase.
Data collected through PMU records.
Intermediate Results Indicator
Number of teachers in selected rural primary schools have recieved integratred training in effective use of the XO Laptop Computersand IDCL Software, incl. basic hardware and software troubleshooting
Indicator measures the change/increase.
Data collected through PMU records.
Intermediate Results Indicator
5 hours of usage per week of the XO Laptop Computers by students for classroom-related activities and exploration by Closing Date
Indicator measures the change/increase.
Data collected through PMU records.
Intermediate Results Indicator
Number of presentations given by the EEC staff at other national and international institutions
Indicator measures the change/increase.
Data collected through EEC records.
Intermediate Results Indicator
Number of press articles and other publications making reference to the results of the work of the EEC
Indicator measures the change/increase.
Data collected through Education Evaluation Center (EEC) records. YR1 - 5, YR2 - 10, YR3 - 12, YR4 -15, and YR5 - 15
Data collected through EEC records.
Intermediate Results Indicator
Books delivered to rural schools
Indicator measures the change/increase.
Midterm (end if year 3) - 620,000, Project completion target (end of year 5) - 50,000
Determined from PMU records and delivery confirmations.
Intermediate Results Indicator
Book shelves delivered to schools
Indicator measures the change/increase.
Determined from PMU records and delivery confirmations.
Intermediate Results Indicator
Grade 1 furniture sets delivered to schools
Indicator measures the change/increase.
Determined from PMU records and delivery confirmations.
Intermediate Results Indicator
Use of reading material in schools (frequency in hours per week, as measured in survey assessment)
Indicator measures the change/increase.
Determined from PMU records and delivery confirmations.
Intermediate Results Indicator
Educators trained
Indicator measures the change/increase.
Determined from PMU records.
Intermediate Results Indicator
Teaching practices and in-class time spent in reading activities (as measured in survey assessment)
Indicator measures the change/increase.
Determined from READ M&E surveys.
Intermediate Results Indicator
TIMSS (participation)
Mongolia participated in the data collection of TIMSS but due to the date quality, Mongolia was not benchmarked.
Intermediate Results Indicator
5th grade assessment (completion of)
Indicator measures the change/increase.
National 5th grade assessment on literacy and math was conducted in 2008.
Intermediate Results Indicator
Policy notes disseminated
Indicator measures the change/increase.
Determined by ECC records. Policy studies on teacher compensation, school funding, performance outcome contracts, and developmentof training and learning materials completed.
PDO Indicator
Students in grades 1-5 bagh and soum schools will increase their reading time in class and demonstrate improvements in their literacy skills
Indicator measures the change/increase.
Target of 100% increase in reading time was met according to the impact evaluation.
Intermediate Results Indicator
Hours of usage per week of the XO Laptop Computers by teachers for classroom-related activities by Closing Date
Indicator measures the change/increase.
Determined from IE of additional financing.
Intermediate Results Indicator
Study of teacher compensation structure and effect on low performing students and rural schools.
Indicator measures the change/increase.
Determined from EEC records.
Intermediate Results Indicator
Test materials used by teacher professional development cluster.
Indicator measures the change/increase.
Determined from M&E surveys of original READ and of additional financing.
Intermediate Results Indicator
Study on policies that hinder participation of disabled students in schooling.
Indicator measures the change/increase.
Determined from EEC records.
Intermediate Results Indicator
READ's training of local officers on efficient targeting scheme for child benefits.
Indicator measures the change/increase.
Determined from EEC records.
Intermediate Results Indicator
Students from nationally representative sample of schools participate in National Assessment of Student Progress for Mongolian language and Mathematics and TIMSS.
Mongolian students had not participated in TIMSS before the project.
Determined from M&E surveys of original READ and of additional financing. Target met since 2007 when 4,500 students participatedin the assessment.
Intermediate Results Indicator
Completion of baseline & follow-up teacher/classroom surveys.
M&E surveys of original READ and of additional financing was conducted in 2007 and in 2008.
Intermediate Results Indicator
Use of rubrics to evaluate student writing becomes part of teaching practice.
Indicator measures the change/increase.
Determined from M&E surveys of original READ and of additional financing.
Intermediate Results Indicator
Study on use of Outcomes Based Contracts.
Indicator measures the change/increase.
Determined from EEC records.
Intermediate Results Indicator
Review of effect of funding formula on small schools.
Indicator measures the change/increase.
Determined from EEC records.
44000-P161048
World Bank
Strengthening Fiscal and Financial Stability Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Carolina Luisa Vaira
+1-202-473-1000cvaira@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Mongolia
46.0000 105.0000
Central Government (Central Agencies)Banking InstitutionsPublic Administration - Financial SectorSocial ProtectionPublic AdministrationSocial ProtectionEconomic Growth and PlanningSocial protection delivery systemsMacroeconomic & Structural Policy ModellingPublic Finance ManagementFinancial StabilitySocial Safety NetsDebt ManagementPublic Expenditure ManagementFinancial Sector oversight and policy/banking regulation & restructuringFiscal sustainabilityPublic Assets and Investment ManagementSocial Insurance and PensionsFiscal Policy
0.00
14100.00
32988.00
38760.00
44520.00
49692.00
54384.00
60732.00
68352.00
73284.00
75708.00
77700.00
80460.00
182563.33
182563.33
182563.33
182563.33
182563.33
182563.33
182563.33
182563.33
182563.33
182563.33
182563.33
182563.37
262431.33
262431.33
262431.33
262431.33
262431.33
262431.33
262431.33
262431.33
262431.33
262431.33
262431.33
262431.37
354916.67
354916.67
354916.67
354916.67
354916.67
354916.67
354916.67
354916.67
354916.67
354916.67
354916.67
354916.63
144198.67
144198.67
144198.67
144198.67
144198.67
144198.67
144198.67
144198.67
144198.67
144198.67
144198.67
144198.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14100.00
32988.00
38760.00
44520.00
49692.00
54384.00
60732.00
68352.00
73284.00
75708.00
77700.00
80460.00
182563.33
182563.33
182563.33
182563.33
182563.33
182563.33
182563.33
182563.33
182563.33
182563.33
182563.33
182563.37
262431.33
262431.33
262431.33
262431.33
262431.33
262431.33
262431.33
262431.33
262431.33
262431.33
262431.33
262431.37
354916.67
354916.67
354916.67
354916.67
354916.67
354916.67
354916.67
354916.67
354916.67
354916.67
354916.67
354916.63
144198.67
144198.67
144198.67
144198.67
144198.67
144198.67
144198.67
144198.67
144198.67
144198.67
144198.67
144198.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8200000Total Commitment in Second Quarter of 2017
International Development Association3800000Total Commitment in Second Quarter of 2017
International Development Association400000Total Disbursement in Fourth Quarter of 2017
International Development Association-1778Total Interest Repayment in First Quarter of 2018
International Development Association71796Total Disbursement in Second Quarter of 2018
International Development Association818599Total Disbursement in Second Quarter of 2018
International Development Association235331Total Disbursement in Third Quarter of 2018
International Development Association-6978Total Interest Repayment in Third Quarter of 2018
International Development Association112489Total Disbursement in Fourth Quarter of 2018
International Development Association120294Total Disbursement in First Quarter of 2019
International Development Association214878Total Disbursement in First Quarter of 2019
International Development Association279816Total Disbursement in First Quarter of 2019
International Development Association-13853Total Interest Repayment in First Quarter of 2019
International Development Association142721Total Disbursement in Second Quarter of 2019
International Development Association403057Total Disbursement in Second Quarter of 2019
International Development Association403794Total Disbursement in Third Quarter of 2019
International Development Association-21314Total Interest Repayment in Third Quarter of 2019
International Development Association268685Total Disbursement in Fourth Quarter of 2019
International Development Association440336Total Disbursement in Fourth Quarter of 2019
International Development Association-30323Total Interest Repayment in First Quarter of 2020
International Development Association500000Total Disbursement in Second Quarter of 2020
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Section 1, A, 1. (a). The recipient shall establish, and thereafter maintain throughout the implementation of the Project, aninter-ministerial Project Steering Committee, chaired by the Deputy Minister of MOF, and comprised of the representatives of theMOF, MLSP, BOM, and FRC, and assigned with such functions, powers, resources and competencies, satisfactory to the Association, asshall be required for the overall policy guidance and general oversight of Project implementation, including inter-ministerialcoordination, Project monitoring and evaluation, and the liaison with the Association. The Project Steering Committee shall meet atleast once every calendar quarter.
Section 1, A, 1 (b) The recipient shall establish, and thereafter maintain, throughout the implementation of the Project, theProject Implementation Unit (“PIU”), vested with the responsibility of the overall management and coordination of Project fiduciaryobligations, said PIU to be: (i) headed by the State Secretary of MOF as Project Director, assisted by a qualified and experiencedProject Manager, procurement officer and financial officer, all of whom shall have experience and qualifications acceptable to theAssociation and contracted under terms of reference satisfactory to the Association; and (ii) assigned with such functions, powers,resources and competencies, satisfactory to the Association, as shall be required to achieve its purposes, including the fiduciaryresponsibilities for procurement, financial management, record keeping, disbursement and compliance with monitoring and reportingrequirements.
Section I, A, 1 (c) The recipient shall cause each of MOF, MLSP, BOM, DBM, DICOM and FRC to appoint, and thereafter maintainthroughout the implementation of the Project, a coordinator in each of MOF, MLSP, BOM, DBM, DICOM and FRC for the purposes ofhandling the day-to-day technical aspects of the Project activities (other than the fiduciary responsibilities assigned to the PIU)in each of their respective parts of the Project and technical coordination with the PIU, under terms of reference satisfactory tothe Association.
Section II, C 1. The Recipient shall carry out the Project in accordance with the Project Implementation Manual.
Section II, B. The Recipient shall: (a) not later than January 31, 2020 (or such other date as the Association may agree), carryout a mid-term review of the Project and, prepare and furnish to the Association a mid-term report, in such detail as theAssociation shall reasonably request, documenting progress achieved in the carrying out of the Project during the period precedingthe date of such report, taking into account the monitoring and evaluation activities performed pursuant to paragraph 1 of thisSection II.A, and setting out the measures recommended to ensure the continued efficient carrying out the Project and theachievement of its objective during the period following such date; and (b) review with the Association, such mid-term report, onor about the date one month after its submission, and thereafter take all measures required to ensure the continued efficientimplementation of the Project and the achievement of its objective, based on the conclusions and recommendations of the mid-termreport and the Association's views on the matter.
PDO Indicator
Aggregate deviation of expenditures is reduced to 15% or less and commitment controls are in place.
PDO Indicator
Financial sector stability improved by decreasing percentage of non-performing loans
PDO Indicator
Aggregate poverty-targeted social welfare support going to the poorest 20% is increased
Intermediate Results Indicator
Component A1: Fully operational comprehensive revenue forecasting model and financial model for mega-projects.
Intermediate Results Indicator
Component B1: GFMIS upgraded to version 7 and accounting and financial reporting functionality operationalized to support IPSAS implementation.
Intermediate Results Indicator
Component C1: Financial Sector Medium-term Development Strategy: 2017-2025 is prepared and submitted to Parliament.
Intermediate Results Indicator
Component D1: Amendments for social insurance legislation in line with the State Policy on Pension Reform (2015-2030) are submittedto the Parliament.
Intermediate Results Indicator
Component A2: Government Debt management strategy and action plan are updated and approved by MoF.
Intermediate Results Indicator
Component B2: Policy document on budget control and risk management is drafted and approved by MoF.
Intermediate Results Indicator
Component C2:DBM's corporate governance structure is compliant with international standards.
Intermediate Results Indicator
Component D2: A plan for consolidation of the existing social welfare programs has been adopted by the MLSP.
Intermediate Results Indicator
Component B3: Public outreach activities on proposed changes to legislation conducted.
Intermediate Results Indicator
Component C3: Laws/regulations are revised to ensure that DICOM is properly mandated, operated resourced, and governed, with propermeans to reimburse insured deposits of failed banks.
Intermediate Results Indicator
Component B4:The PIM Guideline for regulating the procedures and responsibilities of PIM project strategy/planning, appraisal, selection/prioritization and budgeting developed. and endorsed by MoF.
Intermediate Results Indicator
Component C4: Regulatory legislation for the non-bank financial sector prepared and submitted to Parliament.
Intermediate Results Indicator
Component C5 Operational macro-prudential framework designed and web-based database system operationalized.
44000-P096439
World Bank
MN-Sustainable Livelihoods II
International Development Association
HOUSEHOLD LIVELIHOODS SUPPORT PROGRAM OFFICE
International Development Association
HOUSEHOLD LIVELIHOODS SUPPORT PROGRAM OFFICEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Charles Annor-Frempong
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Uvs Aymag
49.5000 93.0000
Hovd Aymag
47.0000 92.5000
Govi-Altay Aymag
45.5000 96.0000
Dzavhan Aymag
48.0000 96.0000
Bayan-Olgiy Aymag
48.5000 90.0000
Bayanhongor Aymag
45.5000 99.5000
Tov Aymag
47.5000 106.5000
Suhbaatar Aymag
46.2500 113.5000
Selenge Aymag
49.6670 106.4170
Ovorhangay Aymag
46.0000 102.5000
Omnogovi Aymag
43.0000 104.0000
Hovsgol Aymag
50.0000 100.0000
Hentiy Aymag
48.0000 110.5000
Dundgovi Aymag
45.5000 106.5000
Dornogovi Aymag
44.5000 110.0000
Dornod Aymag
48.0000 115.0000
Bulgan Aymag
49.0000 103.5000
Arhangay Aymag
48.0000 101.5000
Darhan-Uul Aymag
49.2810 106.1190
Govi-Sumber
46.5000 108.5000
Orhon Aymag
49.0630 104.1630
Jargalthaan
47.4890 109.4730
Tsagaannuur
51.3390 99.3450
Erdenet
49.0330 104.0830
Darhan
49.4870 105.9230
Ulaanbaatar
47.9080 106.8830
Other EducationLivestockFisheriesOther Public AdministrationOther Non-bank Financial InstitutionsSocial ProtectionBanking InstitutionsBiodiversitySocial ProtectionRenewable Natural Resources Asset ManagementSocial Safety NetsRural DevelopmentSocial InclusionLandscape ManagementLand Administration and ManagementJobsRural MarketsParticipation and Civic Engagement
0.00
410000.00
410000.00
410000.00
410000.00
410000.00
410000.00
410000.00
410000.00
410000.00
410000.00
410000.00
410000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
616666.67
616666.67
616666.66
616666.67
616666.67
616666.66
616666.67
616666.67
616666.66
616666.67
616666.67
616666.66
473333.33
473333.33
473333.34
473333.33
473333.33
473333.34
473333.33
473333.33
473333.34
473333.33
473333.33
473333.34
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
500000.00
500000.00
500000.00
333333.33
333333.33
333333.34
454313.44
454313.44
454313.44
465147.43
465147.43
465147.43
133597.25
133597.25
133597.25
85084.52
85084.52
85084.52
535458.26
535458.26
535458.27
400334.06
400334.06
400334.06
823579.05
823579.05
823579.05
1288225.22
1288225.22
1288225.22
1290171.10
1290171.10
1290171.11
459634.18
459634.18
459634.19
715147.73
715147.73
715147.74
2091379.16
2091379.16
2091379.16
1127607.02
1127607.02
1127607.03
342731.26
342731.27
342731.27
1100000.00
1100000.00
1100000.00
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
666666.66
666666.67
666666.67
187590.29
187590.30
187590.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19800000Total Commitment in Second Quarter of 2007
International Development Association13200000Total Commitment in Second Quarter of 2007
International Development Association500000Total Disbursement in Second Quarter of 2008
International Development Association1000000Total Disbursement in Second Quarter of 2008
International Development Association1000000Total Disbursement in Third Quarter of 2008
International Development Association287912Total Disbursement in Fourth Quarter of 2008
International Development Association394869Total Disbursement in Fourth Quarter of 2008
International Development Association-15447Total Interest Repayment in Fourth Quarter of 2008
International Development Association160776Total Disbursement in Fourth Quarter of 2008
International Development Association519384Total Disbursement in Fourth Quarter of 2008
International Development Association492395Total Disbursement in First Quarter of 2009
International Development Association336316Total Disbursement in First Quarter of 2009
International Development Association566732Total Disbursement in First Quarter of 2009
International Development Association176678Total Disbursement in Second Quarter of 2009
International Development Association-8306Total Interest Repayment in Second Quarter of 2009
International Development Association224113Total Disbursement in Second Quarter of 2009
International Development Association112159Total Disbursement in Third Quarter of 2009
International Development Association143095Total Disbursement in Third Quarter of 2009
International Development Association125538Total Disbursement in Fourth Quarter of 2009
International Development Association237772Total Disbursement in Fourth Quarter of 2009
International Development Association449247Total Disbursement in Fourth Quarter of 2009
International Development Association-10633Total Interest Repayment in Fourth Quarter of 2009
International Development Association312168Total Disbursement in Fourth Quarter of 2009
International Development Association481649Total Disbursement in Fourth Quarter of 2009
International Development Association145065Total Disbursement in First Quarter of 2010
International Development Association184195Total Disbursement in First Quarter of 2010
International Development Association150207Total Disbursement in First Quarter of 2010
International Development Association167356Total Disbursement in First Quarter of 2010
International Development Association554178Total Disbursement in First Quarter of 2010
International Development Association286864Total Disbursement in Second Quarter of 2010
International Development Association773437Total Disbursement in Second Quarter of 2010
International Development Association-13467Total Interest Repayment in Second Quarter of 2010
International Development Association410436Total Disbursement in Second Quarter of 2010
International Development Association1000000Total Disbursement in Second Quarter of 2010
International Development Association309481Total Disbursement in Third Quarter of 2010
International Development Association482816Total Disbursement in Third Quarter of 2010
International Development Association1465165Total Disbursement in Third Quarter of 2010
International Development Association315406Total Disbursement in Third Quarter of 2010
International Development Association551784Total Disbursement in Third Quarter of 2010
International Development Association740025Total Disbursement in Third Quarter of 2010
International Development Association497253Total Disbursement in Fourth Quarter of 2010
International Development Association746378Total Disbursement in Fourth Quarter of 2010
International Development Association1377657Total Disbursement in Fourth Quarter of 2010
International Development Association-20489Total Interest Repayment in Fourth Quarter of 2010
International Development Association254167Total Disbursement in Fourth Quarter of 2010
International Development Association391967Total Disbursement in Fourth Quarter of 2010
International Development Association603091Total Disbursement in Fourth Quarter of 2010
International Development Association351462Total Disbursement in First Quarter of 2011
International Development Association398991Total Disbursement in First Quarter of 2011
International Development Association302005Total Disbursement in First Quarter of 2011
International Development Association326444Total Disbursement in First Quarter of 2011
International Development Association80189Total Disbursement in Second Quarter of 2011
International Development Association250174Total Disbursement in Second Quarter of 2011
International Development Association900800Total Disbursement in Second Quarter of 2011
International Development Association-38831Total Interest Repayment in Second Quarter of 2011
International Development Association11000000Total Commitment in Second Quarter of 2011
International Development Association365096Total Disbursement in Second Quarter of 2011
International Development Association549184Total Disbursement in Second Quarter of 2011
International Development Association446378Total Disbursement in Third Quarter of 2011
International Development Association1858878Total Disbursement in Third Quarter of 2011
International Development Association2046734Total Disbursement in Third Quarter of 2011
International Development Association210740Total Disbursement in Third Quarter of 2011
International Development Association463710Total Disbursement in Third Quarter of 2011
International Development Association1247699Total Disbursement in Third Quarter of 2011
International Development Association684619Total Disbursement in Fourth Quarter of 2011
International Development Association764325Total Disbursement in Fourth Quarter of 2011
International Development Association1680647Total Disbursement in Fourth Quarter of 2011
International Development Association-49561Total Interest Repayment in Fourth Quarter of 2011
International Development Association253231Total Disbursement in Fourth Quarter of 2011
International Development Association416750Total Disbursement in First Quarter of 2012
International Development Association266742Total Disbursement in First Quarter of 2012
International Development Association344701Total Disbursement in First Quarter of 2012
International Development Association80347Total Disbursement in Second Quarter of 2012
International Development Association-72287Total Interest Repayment in Second Quarter of 2012
International Development Association805292Total Disbursement in Second Quarter of 2012
International Development Association1500000Total Disbursement in Second Quarter of 2012
International Development Association148714Total Disbursement in Second Quarter of 2012
International Development Association250000Total Disbursement in Third Quarter of 2012
International Development Association621401Total Disbursement in Third Quarter of 2012
International Development Association1576425Total Disbursement in Third Quarter of 2012
International Development Association3815344Total Disbursement in Third Quarter of 2012
International Development Association57000Total Disbursement in Third Quarter of 2012
International Development Association-72302Total Interest Repayment in Fourth Quarter of 2012
International Development Association208729Total Disbursement in Fourth Quarter of 2012
International Development Association283300Total Disbursement in Fourth Quarter of 2012
International Development Association650907Total Disbursement in Fourth Quarter of 2012
International Development Association-14866Total Interest Repayment in Fourth Quarter of 2012
International Development Association21000Total Disbursement in First Quarter of 2013
International Development Association315000Total Disbursement in First Quarter of 2013
International Development Association563340Total Disbursement in First Quarter of 2013
International Development Association4500Total Disbursement in First Quarter of 2013
International Development Association-75148Total Interest Repayment in Second Quarter of 2013
International Development Association-36816Total Interest Repayment in Second Quarter of 2013
International Development Association-52619Total Commitment Cancellations in Fourth Quarter of 2013
International Development Association-52454Total Disbursement in Fourth Quarter of 2013
International Development Association-73884Total Interest Repayment in Fourth Quarter of 2013
International Development Association-107658Total Commitment Cancellations in Fourth Quarter of 2013
International Development Association-105636Total Disbursement in Fourth Quarter of 2013
International Development Association-38705Total Interest Repayment in Fourth Quarter of 2013
International Development Association-8926Total Commitment Cancellations in Fourth Quarter of 2013
International Development Association-8817Total Disbursement in Fourth Quarter of 2013
International Development Association-75565Total Interest Repayment in Second Quarter of 2014
International Development Association-39339Total Interest Repayment in Second Quarter of 2014
International Development Association-72232Total Interest Repayment in Fourth Quarter of 2014
International Development Association-37578Total Interest Repayment in Fourth Quarter of 2014
International Development Association-66624Total Interest Repayment in Second Quarter of 2015
International Development Association-34639Total Interest Repayment in Second Quarter of 2015
International Development Association-68130Total Interest Repayment in Fourth Quarter of 2015
International Development Association-35422Total Interest Repayment in Fourth Quarter of 2015
International Development Association-68912Total Interest Repayment in Second Quarter of 2016
International Development Association-35828Total Interest Repayment in Second Quarter of 2016
International Development Association-66917Total Interest Repayment in Fourth Quarter of 2016
International Development Association-34791Total Interest Repayment in Fourth Quarter of 2016
International Development Association-65522Total Interest Repayment in Second Quarter of 2017
International Development Association-34066Total Interest Repayment in Second Quarter of 2017
International Development Association-67788Total Interest Repayment in Fourth Quarter of 2017
International Development Association-183122Total Loan Repayment in Fourth Quarter of 2017
International Development Association-35743Total Interest Repayment in Fourth Quarter of 2017
International Development Association-71247Total Interest Repayment in Second Quarter of 2018
International Development Association-188254Total Loan Repayment in Second Quarter of 2018
International Development Association-36897Total Interest Repayment in Second Quarter of 2018
International Development Association-63931Total Interest Repayment in Fourth Quarter of 2018
International Development Association-180932Total Loan Repayment in Fourth Quarter of 2018
International Development Association-34911Total Interest Repayment in Fourth Quarter of 2018
International Development Association-67313Total Interest Repayment in Second Quarter of 2019
International Development Association-179982Total Loan Repayment in Second Quarter of 2019
International Development Association-35353Total Interest Repayment in Second Quarter of 2019
International Development Association-64564Total Interest Repayment in Fourth Quarter of 2019
International Development Association-177421Total Loan Repayment in Fourth Quarter of 2019
International Development Association-34690Total Interest Repayment in Fourth Quarter of 2019
International Development Association-63016Total Interest Repayment in Second Quarter of 2020
International Development Association-176888Total Loan Repayment in Second Quarter of 2020
International Development Association-34487Total Interest Repayment in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Establish and maintain a Project Steering Committee for general oversight and policy coordination (throughout implementation)
Maintain the SLPO and its related offices with competent personnel satisfactory to the Association.
Establish and maintain the Technical Working Groups with membership acceptable to the Association
Maintain the Sustainable Livelihoods Project Councils and the Soum Governor Office to coordinate and implement activities underParts A and B of the project.
Provide semi annual reports on April 1 and Oct 1 each year
Provide completion report and plan
Intermediate Results Indicator
Component 1: Number of soums preparing, financing and implementing annual pasture-land management plans.
Re-set when Additional Financing approved by the Board in June 2011.
Target achieved
Intermediate Results Indicator
Component 2: Percentage of soums utlizing at least 80% of annual CIF allocation
Re-set when Additional Financing approved by the Board in June 2011.
Target achieved
Intermediate Results Indicator
Component 3: Total number of PFIs operating at soum level or below
Re-set when Additional Financing approved by the Board in June 2011.
Target achieved
PDO Indicator
Percentage of herders and soum governments taking actions to mitigate pastoral risk (i.e., pasture land management and risk response plans developed and implemented).
Re-set when Additional Financing approved by the Board in June 2011.
The end target has been achieved
PDO Indicator
Percentage of herders and local officers perceiving improvement in pasture land condition attributable to project interventions.
Re-set when Additional Financing approved by the Board in June 2011.
The end target has been achieved
PDO Indicator
Percentage of citizens satisfied with the outcomes of CIF investment
Re-set when Additional Financing approved by the Board in June 2011.
The end target has been achieved
PDO Indicator
Increased number of loan beneficiaries at soum level and below.
Re-set when Additional Financing approved by the Board in June 2011.
The end target has been achieved
PDO Indicator
Increased income of loan beneficiaries at soum level and below.
Re-set when Additional Financing approved by the Board in June 2011.
Data is being collected and will be available for the ICR
Intermediate Results Indicator
Health facilities constructed, renovated, and/or equipped (number)
This is a CDD component. Communities decide which investments will be supported. There is no requirement to use resource forhealthfacilities. The target value is therefore not applicable.
Intermediate Results Indicator
Improved community water points constructed or rehabilitated under the project
There is no target value. This is a CDD project and project types are not pre-determined.
Intermediate Results Indicator
Number of people in rural areas provided with access to Improved Water Sources under the project
Intermediate Results Indicator
% active loans to women - Microfinance
Unavailable
No end of target was established for the indicator
Intermediate Results Indicator
Percentage of project-supported institutions that are reporting on this indicator
Intermediate Results Indicator
Good Practices in pastoral livelihood improvement demonstrated in different agro-ecological zones
Target achieved
Intermediate Results Indicator
Percentage of citizens who agree that CIF investments are aligned with their priorities
Target Achieved
Intermediate Results Indicator
Increased number of loan products accessible by poor rural citizens at soum level and below
35 percent increase in the number of sub-borrowers at soum level and below
68.4 percent increased attained
Intermediate Results Indicator
Percentage of aimag and soum governments and herders receiving information from LEWS which is both regular and perceived useful
Target achieved. In addition to targeted audience for specific areas, LEWS information is also made available through radio andtelevision and also on a website
Intermediate Results Indicator
Percentage of PFIs with non-performing loans of less than or equal to 5%
Target achieved
Intermediate Results Indicator
Multi-level institutional framework for pastoral risk management established nationwide
The target is partially achieved as the framework should have been established nationwide
Intermediate Results Indicator
Percentage of bagh citizens participating in bagh meetings
Target achieved
Intermediate Results Indicator
Percentage of public facility improvement sub-projects evaluated and accepted as good quality by State Inspection Agency
Target achieved
44000-P165945
World Bank
Livestock Commercialization Project
International Development Association
MINISTRY OF FOOD AND AGRICULTURE
International Development Association
MINISTRY OF FOOD AND AGRICULTUREPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Sitaramachandra Machiraju
+1-202-473-1000smachiraju@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Uvs Aymag
49.5000 93.0000
Hovd
47.0000 92.5000
Govi-Altay Aymag
45.5000 96.0000
Dzavhan Aymag
48.0000 96.0000
Bayan-OElgiy Aymag
48.5000 90.0000
Bayanhongor Aymag
45.5000 99.5000
Tov Aymag
47.5000 106.5000
Suhbaatar Aymag
46.2500 113.5000
OEvoerhangay Aymag
46.0000 102.5000
Hovsgol Aymag
50.0000 100.0000
Hentiy Aymag
48.0000 110.5000
Bulgan
49.0000 103.5000
Arhangay Aymag
48.0000 101.5000
Orhon Aymag
49.0630 104.1630
ICT InfrastructurePublic Administration - Agriculture, Fishing & ForestryLivestockRural Infrastructure and service deliveryICT SolutionsMitigationRural DevelopmentClimate changeAdaptationJobsRural MarketsICTGender
0.00
0.00
0.00
0.00
74700.00
89610.00
50310.00
111300.00
124230.00
135960.00
151830.00
83460.00
177990.00
186720.00
191430.00
197880.00
101280.00
204630.00
203550.00
198510.00
198690.00
101940.00
213810.00
227910.00
234210.00
246090.00
130380.00
272760.00
284310.00
301050.00
159060.00
334620.00
343830.00
356040.00
379650.00
200790.00
414720.00
431220.00
458310.00
492660.00
258000.00
537660.00
567720.00
597720.00
311100.00
649950.00
679710.00
703380.00
723660.00
373110.00
766590.00
790290.00
813210.00
847920.00
434520.00
883140.00
896250.00
904740.00
920340.00
467040.00
943740.00
956400.00
974580.00
991380.00
501450.00
1014030.00
1029330.00
1044810.00
528330.00
824460.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
74700.00
89610.00
50310.00
111300.00
124230.00
135960.00
151830.00
83460.00
177990.00
186720.00
191430.00
197880.00
101280.00
204630.00
203550.00
198510.00
198690.00
101940.00
213810.00
227910.00
234210.00
246090.00
130380.00
272760.00
284310.00
301050.00
159060.00
334620.00
343830.00
356040.00
379650.00
200790.00
414720.00
431220.00
458310.00
492660.00
258000.00
537660.00
567720.00
597720.00
311100.00
649950.00
679710.00
703380.00
723660.00
373110.00
766590.00
790290.00
813210.00
847920.00
434520.00
883140.00
896250.00
904740.00
920340.00
467040.00
943740.00
956400.00
974580.00
991380.00
501450.00
1014030.00
1029330.00
1044810.00
528330.00
824460.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30000000Total Commitment in Fourth Quarter of 2019
International Development Association0Total Disbursement in First Quarter of 2020
International Development AssociationProject Information DocumentProject Appraisal Document Implementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Institutional Arrangements Financing Agreement: Schedule 2, Section I.A.2Recurrent, ContinuousThe Recipient shall: (i)maintain a Project Steering Committee and a Project Implementation Unit throughout the Project implementation period, both withfunctions, staffing and resources satisfactory to the Association; and (ii) no later than three (3) months after the EffectiveDate, appoint at least one (1) implementation advisor, and thereafter appoint other implementation advisors as needed; all on termsof reference and with qualifications acceptable to the Association to provide support for the implementation of the Project; andmaintain the engagement with the said implementation advisor(s) in a manner acceptable to the Association.
Project Implementation ManualFinancing Agreement: Schedule 2, Section I.BRecurrent, ContinuousThe Recipient shall carry out theProject in accordance with the Project Implementation Manual, and not amend, waive or abrogate any provisions of the manual unlessthe Association agrees otherwise in writing.
Annual Work Plans and BudgetsFinancing Agreement: Schedule 2, Section I.CRecurrent, AnnualThe Recipient shall prepare andfurnish to the Association for its no-objection no later than December 31 of each fiscal year an annual work plan and budget duringthe implementation of the Project containing relevant Project activities and expenditures proposed to be included in the Project inthe following fiscal year, including a specification of the sources of financing and the Recipient's proposed counterpart share inthe cost of the AWPB.
Productive PartnershipsFinancing Agreement: Schedule 2, Section I.DRecurrent, ContinuousThe Recipient shall makePerformance-based Incentives available to a Productive Partnership in accordance with the eligibility criteria and administrationarrangements set out in the Project Implementation Manual.
Environmental and Social Safeguards Financing Agreement: Schedule 2, Section I.ERecurrent, Continuous The Recipient shallensure that the Project is carried out in accordance with the provisions of the Safeguards Instruments and the site-specificsafeguard plans, not amend, abrogate, repeal, suspend or waive any of their provisions unless the Association agrees otherwise, andreport on their status of implementation as part of the project reports.
Contingent Emergency Response Financing Agreement: Schedule 2, Section I.FIn case of an Eligible Crisis or EmergencyTheRecipient shall adopt a satisfactory Emergency Response Manual for Part 4 of the Project and, in the event of an eligible crisis oremergency, ensure that the activities under said part are carried out in accordance with such manual and all relevant safeguardrequirements.
Mid-term ReviewFinancing Agreement: Schedule 2, Section II.BOnce, 30 months after the Effective DateThe Recipient shall prepareand furnish to the Association a mid-term report in form and substance satisfactory to the Association.
PDO Indicator
Increased yield of livestock products (meat and diary)
PDO Indicator
Reduced prevalence of priority diseases in project intervention areas
PDO Indicator
Increase in live animal weight of small ruminants
PDO Indicator
Increase in milk output
PDO Indicator
Increased inflation-adjusted value of livestock products
Intermediate Results Indicator
Number of veterinarian and veterinary paraprofessionals trained
Intermediate Results Indicator
Farmers reached with agricultural assets or services
Intermediate Results Indicator
Number of herders participating in training
Intermediate Results Indicator
Adoption of improved post disaster impact assessment practices and procedures, as reflected in the improved quality and comprehensiveness of assessments
Intermediate Results Indicator
If the CERC is triggered, number of beneficiaries benefiting from emergency response and recovery activities
Intermediate Results Indicator
of which are female beneficialries
Intermediate Results Indicator
Number of veterinarian and veterinary professionals trained - Female
Intermediate Results Indicator
Farmers reached with agricultural assets or services - Female
Intermediate Results Indicator
Increased coverage of quality animal health services in the project intervention areas
Intermediate Results Indicator
At at least 50 percent women are hired for all ‘Project’ funded professional positions
Intermediate Results Indicator
Number of private breeding units established
Intermediate Results Indicator
Number of veterinary laboratories accredited to national or international standards
Intermediate Results Indicator
Grievances registered related to delivery of project benefits addressed
Intermediate Results Indicator
Productive Partnerships established and functioning
Intermediate Results Indicator
Improved detection of suspect transboundary diseases (time to report/confirmation)
Intermediate Results Indicator
Citizen's feedback received via ICT applications on services provided by Project
Intermediate Results Indicator
of which are women led or women owned enterprises
Intermediate Results Indicator
Increased coverage of animal tracking system in project intervention areas
Intermediate Results Indicator
Primary producers (herders) mobilized and benefited through productive partnerships
Intermediate Results Indicator
Participatory animal health risk management pilots implemented
Intermediate Results Indicator
Share of animal products marketed through commercial channels
44000-P173799
World Bank
MONGOLIA COVID-19 EMERGENCY RESPONSE AND HEALTH SYSTEM PREPAREDNESS PROJECT
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Dinesh M. Nair
+1-202-473-1000dnair@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Mongolia
46.0000 105.0000
Public Administration - HealthHealth Facilities and ConstructionHealthHealth Systems and PoliciesHealth System StrengtheningDisease ControlPandemic Response
1350908.63
1350908.63
1350908.63
1350908.61
1144532.17
1144532.17
1144532.17
1144532.17
1144532.17
1144532.17
1144532.17
1144532.17
1144532.17
1144532.17
1144532.17
1144532.13
405306.85
405306.85
405306.85
405306.85
405306.85
405306.85
405306.85
405306.85
405306.85
405306.85
405306.85
405306.84
483049.55
483049.55
483049.55
483049.55
483049.55
483049.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1144532.17
1144532.17
1144532.17
1144532.17
1144532.17
1144532.17
1144532.17
1144532.17
1144532.17
1144532.17
1144532.17
1144532.13
855609.72
855609.72
855609.72
855609.72
855609.72
855609.72
855609.72
855609.72
855609.72
855609.72
855609.72
855609.77
483049.55
483049.55
483049.55
483049.55
483049.55
483049.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13100000Total Commitment in Second Quarter of 2020
International Development Association
13800000Total Commitment in Second Quarter of 2020
International Bank for Reconstruction and Development
34500Total Disbursement in Second Quarter of 2020
International Bank for Reconstruction and Development
-34500Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
0Total Disbursement in First Quarter of 2020
International Development Association
Project Information DocumentProject Appraisal Document Loan AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
PDO Indicator
Number of hospitals meeting MOH established standards to manage Severe Acute Respiratory Infections (SARI) patients including intensive care
PDO Indicator
Proportion of laboratory-confirmed cases of COVID-19 responded to within 48 hours
PDO Indicator
Number of designated laboratories with COVID-19/SARI diagnostic capacities established per MOH guidelines
PDO Indicator
Share of females
PDO Indicator
Samples from suspected cases of COVID-19 / SARI that are confirmed within the stipulated WHO standard time
Intermediate Results Indicator
Number mass media messages disseminated on emerging infectious diseases, six monthly
Intermediate Results Indicator
Number of ventilators provided to hospitals
Intermediate Results Indicator
Independent review of equipment purchase and utilization carried out annually
Intermediate Results Indicator
Proportion of identified contacts who are successfully traced
Intermediate Results Indicator
Percentage of Aimag/district hospitals with pandemic preparedness and response plans per Ministry of Health Guidelines
Intermediate Results Indicator
Six monthly reports prepared and circulated in a timely manner
Intermediate Results Indicator
Number of “One Health”-based simulation exercises conducted and certified by Ministry of Health/ Agriculture at national and sub-national levels
Intermediate Results Indicator
Percentages of provincial and district general hospitals with personal protective equipment and infection control products and supplies, without stock-outs in preceding two weeks
Intermediate Results Indicator
Number of health staff trained in infection prevention and control per MOH-approved protocols
44000-P077778
World Bank
TA : Economic Capacity Building TA
International Development Association
MINISTRY OF FINANCE AND ECONOMY
International Development Association
MINISTRY OF FINANCE AND ECONOMYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Zahid Hasnain
+1-202-473-1000zhasnain@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Ulan Bator
47.9077 106.883
Central Government (Central Agencies)Sub-National GovernmentMacro-financial policiesExternal FinanceTax policyPublic Finance ManagementTransparency, Accountability and Good GovernanceFiscal PolicyMacroeconomic ResilienceJobsPublic Expenditure PolicyFiscal sustainabilityPublic AdministrationAdministrative and Civil Service ReformPublic Expenditure ManagementMonetary and Credit Policies
381818.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1486363.64
1486363.64
1486363.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
477272.73
477272.73
477272.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
190909.09
190909.09
190909.09
0.00
0.00
0.00
145454.55
145454.55
145454.54
0.00
0.00
0.00
72727.27
72727.27
72727.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
92513.28
92513.28
92513.26
6387.10
6387.10
6387.10
134092.70
134092.70
134092.70
130203.74
130203.74
130203.74
258907.02
258907.02
258907.04
63221.10
63221.10
63221.09
4232.90
4232.90
4232.89
58180.50
58180.50
58180.49
36738.30
36738.30
36738.29
88000.60
88000.60
88000.58
27348.78
27348.78
27348.78
26874.46
26874.46
26874.48
176288.84
176288.84
176288.82
95114.71
95114.71
95114.71
113177.90
113177.90
113177.92
17100.12
17100.12
17100.11
66437.58
66437.58
66437.59
64525.42
64525.42
64525.40
105152.24
105152.24
105152.22
36721.75
36721.75
36721.75
31923.35
31923.35
31923.37
84149.88
84149.88
84149.89
139434.76
139434.76
139434.75
14750.21
14750.21
14750.21
121189.46
121189.46
121189.45
66666.67
66666.67
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
66666.66
33333.33
33333.33
33333.34
20000.00
20000.00
20000.00
16666.67
16666.67
16666.66
237333.34
237333.34
237333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7500000Total Commitment in Second Quarter of 2003
International Development Association300000Total Disbursement in Second Quarter of 2004
International Development Association-21300Total Interest Repayment in Second Quarter of 2004
International Development Association20617Total Disbursement in Third Quarter of 2004
International Development Association174024Total Disbursement in Fourth Quarter of 2004
International Development Association276321Total Disbursement in Fourth Quarter of 2004
International Development Association-20590Total Interest Repayment in Fourth Quarter of 2004
International Development Association79498Total Disbursement in First Quarter of 2005
International Development Association356894Total Disbursement in First Quarter of 2005
International Development Association36701Total Disbursement in Second Quarter of 2005
International Development Association222391Total Disbursement in Second Quarter of 2005
International Development Association586072Total Disbursement in Second Quarter of 2005
International Development Association-16972Total Interest Repayment in Second Quarter of 2005
International Development Association86076Total Disbursement in Third Quarter of 2005
International Development Association117533Total Disbursement in Third Quarter of 2005
International Development Association13224Total Disbursement in Fourth Quarter of 2005
International Development Association-17680Total Interest Repayment in Fourth Quarter of 2005
International Development Association56294Total Disbursement in First Quarter of 2006
International Development Association128942Total Disbursement in First Quarter of 2006
International Development Association30914Total Disbursement in Second Quarter of 2006
International Development Association34990Total Disbursement in Second Quarter of 2006
International Development Association52467Total Disbursement in Second Quarter of 2006
International Development Association-17028Total Interest Repayment in Second Quarter of 2006
International Development Association61477Total Disbursement in Third Quarter of 2006
International Development Association225299Total Disbursement in Third Quarter of 2006
International Development Association90445Total Disbursement in Fourth Quarter of 2006
International Development Association-18900Total Interest Repayment in Fourth Quarter of 2006
International Development Association89005Total Disbursement in First Quarter of 2007
International Development Association57787Total Disbursement in Second Quarter of 2007
International Development Association530144Total Disbursement in Second Quarter of 2007
International Development Association-17010Total Interest Repayment in Second Quarter of 2007
International Development Association65749Total Disbursement in Third Quarter of 2007
International Development Association254580Total Disbursement in Third Quarter of 2007
International Development Association73248Total Disbursement in Fourth Quarter of 2007
International Development Association136215Total Disbursement in Fourth Quarter of 2007
International Development Association183645Total Disbursement in Fourth Quarter of 2007
International Development Association-19900Total Interest Repayment in Fourth Quarter of 2007
International Development Association61475Total Disbursement in First Quarter of 2008
International Development Association238710Total Disbursement in Second Quarter of 2008
International Development Association-20477Total Interest Repayment in Second Quarter of 2008
International Development Association71395Total Disbursement in Third Quarter of 2008
International Development Association157820Total Disbursement in Third Quarter of 2008
International Development Association72159Total Disbursement in Fourth Quarter of 2008
International Development Association272430Total Disbursement in Fourth Quarter of 2008
International Development Association-19561Total Interest Repayment in Fourth Quarter of 2008
International Development Association119650Total Disbursement in First Quarter of 2009
International Development Association109015Total Disbursement in Second Quarter of 2009
International Development Association-19399Total Interest Repayment in Second Quarter of 2009
International Development Association104211Total Disbursement in Third Quarter of 2009
International Development Association186950Total Disbursement in Third Quarter of 2009
International Development Association124445Total Disbursement in Fourth Quarter of 2009
International Development Association126000Total Disbursement in Fourth Quarter of 2009
International Development Association238392Total Disbursement in Fourth Quarter of 2009
International Development Association-22609Total Interest Repayment in Fourth Quarter of 2009
International Development Association50713Total Disbursement in First Quarter of 2010
International Development Association111989Total Disbursement in Second Quarter of 2010
International Development Association126052Total Disbursement in Second Quarter of 2010
International Development Association157500Total Disbursement in Second Quarter of 2010
International Development Association-23448Total Interest Repayment in Second Quarter of 2010
International Development Association100478Total Disbursement in Third Quarter of 2010
International Development Association131768Total Disbursement in Third Quarter of 2010
International Development Association29916Total Disbursement in Fourth Quarter of 2010
International Development Association114513Total Disbursement in Fourth Quarter of 2010
International Development Association-25616Total Interest Repayment in Fourth Quarter of 2010
International Development Association55157Total Disbursement in First Quarter of 2011
International Development Association58490Total Disbursement in First Quarter of 2011
International Development Association20934Total Disbursement in Second Quarter of 2011
International Development Association80202Total Disbursement in Second Quarter of 2011
International Development Association380000Total Disbursement in Second Quarter of 2011
International Development Association-27670Total Interest Repayment in Second Quarter of 2011
International Development Association7978Total Disbursement in Third Quarter of 2011
International Development Association55452Total Disbursement in Third Quarter of 2011
International Development Association62139Total Disbursement in Third Quarter of 2011
International Development Association24348Total Disbursement in Fourth Quarter of 2011
International Development Association36241Total Disbursement in Fourth Quarter of 2011
International Development Association81176Total Disbursement in Fourth Quarter of 2011
International Development Association-30153Total Interest Repayment in Fourth Quarter of 2011
International Development Association14576Total Disbursement in First Quarter of 2012
International Development Association18115Total Disbursement in Second Quarter of 2012
International Development Association-29266Total Interest Repayment in Second Quarter of 2012
International Development Association30888Total Disbursement in Third Quarter of 2012
International Development Association-29957Total Interest Repayment in Fourth Quarter of 2012
International Development Association40482Total Disbursement in First Quarter of 2013
International Development Association-29393Total Interest Repayment in Second Quarter of 2013
International Development Association-439034Total Commitment Cancellations in Third Quarter of 2013
International Development Association-41276Total Disbursement in Third Quarter of 2013
International Development Association-30041Total Interest Repayment in Fourth Quarter of 2013
International Development Association-79983Total Loan Repayment in Fourth Quarter of 2013
International Development Association-29795Total Interest Repayment in Second Quarter of 2014
International Development Association-80257Total Loan Repayment in Second Quarter of 2014
International Development Association-28022Total Interest Repayment in Fourth Quarter of 2014
International Development Association-76249Total Loan Repayment in Fourth Quarter of 2014
International Development Association-25700Total Interest Repayment in Second Quarter of 2015
International Development Association-72332Total Loan Repayment in Second Quarter of 2015
International Development Association-26373Total Interest Repayment in Fourth Quarter of 2015
International Development Association-71580Total Loan Repayment in Fourth Quarter of 2015
International Development Association-26036Total Interest Repayment in Second Quarter of 2016
International Development Association-73084Total Loan Repayment in Second Quarter of 2016
International Development Association-24854Total Interest Repayment in Fourth Quarter of 2016
International Development Association-70507Total Loan Repayment in Fourth Quarter of 2016
International Development Association-23198Total Interest Repayment in Second Quarter of 2017
International Development Association-72145Total Loan Repayment in Second Quarter of 2017
International Development Association-27129Total Interest Repayment in Fourth Quarter of 2017
International Development Association-73908Total Loan Repayment in Fourth Quarter of 2017
International Development Association-25583Total Interest Repayment in Second Quarter of 2018
International Development Association-73856Total Loan Repayment in Second Quarter of 2018
International Development Association-24322Total Interest Repayment in Fourth Quarter of 2018
International Development Association-72065Total Loan Repayment in Fourth Quarter of 2018
International Development Association-23954Total Interest Repayment in Second Quarter of 2019
International Development Association-71772Total Loan Repayment in Second Quarter of 2019
International Development Association-22850Total Interest Repayment in Fourth Quarter of 2019
International Development Association-71526Total Loan Repayment in Fourth Quarter of 2019
International Development Association-23689Total Interest Repayment in Second Quarter of 2020
International Development Association-71440Total Loan Repayment in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportCredit AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Budget Preparation System implemented and fully functional
With operational acceptance in February 2013, and training of staff from December 2012 to May 2013, 2014 budget can commence onBPISin June 2013.
Failed. Only 60 percent of the core modules were deemed to have passed, against a target of 90 percent
Intermediate Results Indicator
A Human Resource Management Information System implemented and fully functional
Unlikely to be achieved
A functional design of a centralized payroll and HR database completed and accepted by CSC and MoF. Further software developmentissubject to available funding, either from the Government budget or other development partners
PDO Indicator
Budget ceilings shared with all cabinet members at most two months after start of budget process
This is an original PAD indicator that has not been used.
MTFF approved June 1 and budget ceilings distributed July 1. This target has therefore been met.
PDO Indicator
Credible sector ceilings for sector ministry budgets
This is an original PAD indicator that has not been used. This however, is a good sub-indicator of the MTEF indicator
Sector ceilings, while distributed annually, are non-binding and are not credible as line ministry proposals exceed these bysignificant amounts
PDO Indicator
More accurate medium term projection of staffing, needs, skills, costs aligned to MTEF
Original PAD indicator that was not used
Not achieved as there is no functioning MTEF
Intermediate Results Indicator
A system for appraising public investment projects developed
Limited capacity in the MoF and the planning ministry to implement IBL provisions in 2012
PDO Indicator
Fully functional Government Financial Management Information System operating
The PDO has been achived
This PDO has been achieved
PDO Indicator
Improved quality of data on civil servants, mproved compensation structure and HR performance management framework
No progress to date on simplifying the pay structure or basing civil service pay increases to pay comparator surveys
PDO Indicator
Comprehensive MTFF implemented based on fiscal rules
The 2013 budget is pro-cyclical based on overly ambitious revenue targets. Significant off-budget spending by the DevelopmentBank,and through the Bank of Mongolia, violate the FSL in spirit.
PDO Indicator
Budget preparation process streamlined and clear timetable adopted
This was an original indicator in the PAD that was not used for monitoring during implementation since it is not linked to projectactivities
There is a clear budget timetable in the Budget Law that is being implemented
PDO Indicator
Time elapsed between beginning of budget preparation and cabinet level involvement involvement is reduced to two months
This was an original indicator in the PAD that was not used for monitoring during implementation since it is not linked to projectactivities
There are no issues of delays in budget preparation. The process begins in June 1 with the approval of MTFF, with submission ofbudget to cabinet on Sept 15.
PDO Indicator
Arrears systematically reduced
Original PAD indicator that was not used but is a good indicator of the impact of the GFMIS
Arrears are not a problem and are less than 1% of total expenditures
Intermediate Results Indicator
Comprehensive MTEF developed
Not achieved
Intermediate Results Indicator
Sector MTEF's consistent with sector ceilings
Not achieved as there is no functioning MTEF
PDO Indicator
Budget execution reports available on a quarterly basis
Original indicator that was not used. It is however a useful indicator on the effectiveness of the GFMIS
Monthly and quarterly budget execution reports have been prepared for quite some time
PDO Indicator
Procurement lead time reduced to below three months
Original PAD indicator that was not used for monitoring as it is not linked to project activities
Achieved. But this has no implication on the quality of the procurement
PDO Indicator
Sector MTEF consistent with ceilings and policy priorities
Not achieved. There is no functional MTEF in Mongolia
PDO Indicator
Sector MTEF reflect recommendations for Country Gender Assessments
Original PAD indicator that was not used as it is not very clear
Not achieved
PDO Indicator
Audit reports presented to parliament within period described by Law and decisions of parliament made public
Original PAD indicator that was not used in regular ISR monitoring as it was not linked to project activities
Partially achieved. Audits are done on time but audit findings not regularly made public
Intermediate Results Indicator
Implementing rules and regulations for procurement law developed
Original PAD indicators that was not used as it is not particularly meaningful
This has not been an issue in public procurement.
Intermediate Results Indicator
Key reports on agency performance available to the public
Original PAD indicator that was not tracked as it is not linked to project activities
Intermediate Results Indicator
Internal audit mandate and internal audit methodology adopted
Intermediate Results Indicator
Results based monitoring framework in selected ministries adopted
Original PAD indicator that was not tracked
Intermediate Results Indicator
Less deviation between projected and actual personnel costs
Original PAD indicator that was not tracked in regular ISRs as this was not a major problem in Mongolia
Achieved. GFMIS has enhanced fiscal controls and personnel expenditures are generally within budget limits
Intermediate Results Indicator
Greater satisfaction among users of services with organizational performanceand integrity
Original PAD indicator that was not tracked as it was not linked to activities funded in the project
Intermediate Results Indicator
Development and implementation of a medium term civil service reform strategy
Not achieved
Intermediate Results Indicator
Implementation of a strategic plan for institutional strengthening of the Civil Service Council
Not achieved. No progress in strengthening the Civil Service Council
Intermediate Results Indicator
Civil service census completed
Original PAD indicator that was not tracked as absent an HRMIS the use of the census was not clear.
A civil service census was completed in 2007. However, it is unclear what purpose this served as there was no HRMIS in place at thetime to make use of the data
Intermediate Results Indicator
Implementation of a severance/retrenchment policy
Original PAD indicator that was not used in ISRs as overstaffing is not a problem in the civil service. On the contrary, keyministries are understaffed
Intermediate Results Indicator
Feedbacl on public service delivery surveys on organizational performance made public
Original PAD indicator that was not tracked as it was not linked to activities funded in the project
Intermediate Results Indicator
Development of pilot regulations for organizational and individual performance evaluation
Original PAD indicator that was not tracked in the ISRs as it is not particularly meaningful
Achieved
44000-P113160
World Bank
MONSTAT: Strengthening the National Statistical System of Mongolia
International Development Association
NATIONAL STATISTICAL OFFICE
International Development Association
NATIONAL STATISTICAL OFFICEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Altantsetseg Shiilegmaa
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Ulaanbaatar Hot
47.9170 106.9170
Central Government (Central Agencies)Economic Growth and PlanningMSME DevelopmentSubnational Fiscal PoliciesPublic AdministrationEnterprise DevelopmentData production, accessibility and useMigration, Remittances and Diaspora EngagementLabor Market InstitutionsJobsYouth EmploymentLabor Market Policy and ProgramsData Development and Capacity BuildingAdministrative and Civil Service ReformFiscal PolicyTransparency, Accountability and Good Governance
0.00
0.00
0.00
0.00
16666.66
16666.67
16666.67
16666.66
16666.67
16666.67
16666.66
16666.67
16666.67
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
50000.00
50000.00
50000.00
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
66666.66
66666.67
66666.67
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16666.66
16666.67
16666.67
16666.66
16666.67
16666.67
16666.66
16666.67
16666.67
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
50000.00
50000.00
50000.00
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
66666.66
66666.67
66666.67
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
0.00
0.00
0.00
0.00
0.00
0.00
2000000Total Commitment in Second Quarter of 2009
International Development Association100000Total Disbursement in Fourth Quarter of 2009
International Development Association-349Total Interest Repayment in Second Quarter of 2010
International Development Association-356Total Interest Repayment in Fourth Quarter of 2010
International Development Association-378Total Interest Repayment in Second Quarter of 2011
International Development Association46248Total Disbursement in Third Quarter of 2011
International Development Association34408Total Disbursement in Fourth Quarter of 2011
International Development Association53391Total Disbursement in Fourth Quarter of 2011
International Development Association85739Total Disbursement in Fourth Quarter of 2011
International Development Association-375Total Interest Repayment in Fourth Quarter of 2011
International Development Association49017Total Disbursement in First Quarter of 2012
International Development Association118455Total Disbursement in First Quarter of 2012
International Development Association160102Total Disbursement in First Quarter of 2012
International Development Association46355Total Disbursement in Second Quarter of 2012
International Development Association103582Total Disbursement in Second Quarter of 2012
International Development Association-1576Total Interest Repayment in Second Quarter of 2012
International Development Association20021Total Disbursement in Third Quarter of 2012
International Development Association20079Total Disbursement in Third Quarter of 2012
International Development Association240536Total Disbursement in Third Quarter of 2012
International Development Association43894Total Disbursement in Fourth Quarter of 2012
International Development Association85713Total Disbursement in Fourth Quarter of 2012
International Development Association-3319Total Interest Repayment in Fourth Quarter of 2012
International Development Association81505Total Disbursement in First Quarter of 2013
International Development Association98796Total Disbursement in First Quarter of 2013
International Development Association26964Total Disbursement in Second Quarter of 2013
International Development Association-4678Total Interest Repayment in Second Quarter of 2013
International Development Association24198Total Disbursement in Third Quarter of 2013
International Development Association78679Total Disbursement in Fourth Quarter of 2013
International Development Association94220Total Disbursement in Fourth Quarter of 2013
International Development Association-5349Total Interest Repayment in Fourth Quarter of 2013
International Development Association47110Total Disbursement in First Quarter of 2014
International Development Association329771Total Disbursement in First Quarter of 2014
International Development Association-7079Total Interest Repayment in Second Quarter of 2014
International Development Association44415Total Disbursement in Third Quarter of 2014
International Development Association113531Total Disbursement in Third Quarter of 2014
International Development Association1038Total Disbursement in Fourth Quarter of 2014
International Development Association5206Total Disbursement in Fourth Quarter of 2014
International Development Association-7424Total Interest Repayment in Fourth Quarter of 2014
International Development Association-51Total Commitment Cancellations in Second Quarter of 2015
International Development Association-7196Total Interest Repayment in Second Quarter of 2015
International Development Association-7497Total Interest Repayment in Fourth Quarter of 2015
International Development Association-7317Total Interest Repayment in Second Quarter of 2016
International Development Association-7246Total Interest Repayment in Fourth Quarter of 2016
International Development Association-7085Total Interest Repayment in Second Quarter of 2017
International Development Association-7530Total Interest Repayment in Fourth Quarter of 2017
International Development Association-7498Total Interest Repayment in Second Quarter of 2018
International Development Association-7254Total Interest Repayment in Fourth Quarter of 2018
International Development Association-7257Total Interest Repayment in Second Quarter of 2019
International Development Association-7190Total Interest Repayment in Fourth Quarter of 2019
International Development Association-19243Total Loan Repayment in Fourth Quarter of 2019
International Development Association-7091Total Interest Repayment in Second Quarter of 2020
International Development Association-19031Total Loan Repayment in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
PDO Indicator
User satisfaction
PDO Indicator
Access to data
PDO Indicator
Data coverage, accuracy and reliability
PDO Indicator
Timeliness
Intermediate Results Indicator
Inter-agency coordination and user-producer dialogue
Intermediate Results Indicator
Human resource capacity
Intermediate Results Indicator
Statistical Infrastructure
Intermediate Results Indicator
Physical infrastructure
44000-P122320
World Bank
Ulaanbaatar Clean Air Project
International Development Association
ULAANBAATAR CITY
International Development Association
ULAANBAATAR CITYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Feng Liu
+1-202-473-1000fliu@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Ulaanbaatar
47.9080 106.8830
Sub-National GovernmentPublic Administration - Energy and ExtractivesOther Energy and ExtractivesHousing ConstructionEnvironmental Health and Pollution ManagementFinance for DevelopmentUrban DevelopmentEnvironmental policies and institutionsHousing FinanceMitigationWater PollutionServices and Housing for the PoorAir quality managementUrban PlanningSoil PollutionClimate change
0.00
20000.00
20000.00
40000.00
30000.00
60000.00
60000.00
30000.00
70000.00
40000.00
80000.00
100000.00
50000.00
100000.00
50000.00
100000.00
100000.00
50000.00
100000.00
50000.00
100000.00
100000.00
50000.00
120000.00
60000.00
120000.00
130000.00
70000.00
140000.00
70000.00
150000.00
160000.00
80000.00
180000.00
90000.00
180000.00
200000.00
100000.00
210000.00
110000.00
230000.00
250000.00
130000.00
270000.00
140000.00
290000.00
310000.00
160000.00
330000.00
170000.00
350000.00
360000.00
190000.00
380000.00
400000.00
200000.00
410000.00
210000.00
440000.00
220000.00
440000.00
460000.00
230000.00
460000.00
480000.00
240000.00
480000.00
240000.00
500000.00
500000.00
250000.00
520000.00
260000.00
520000.00
270000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.63
425629.96
425629.96
425629.96
425629.96
425629.96
425629.96
425629.96
425629.96
425629.96
425629.96
425629.96
425629.94
270300.63
270300.63
270300.63
270300.63
270300.63
270300.63
270300.63
270300.63
270300.63
270300.63
270300.63
270300.61
162259.27
162259.27
162259.27
162259.27
162259.27
162259.27
162259.27
162259.27
162259.27
162259.27
162259.27
162259.30
31253.74
31253.74
31253.74
31253.74
31253.74
31253.74
31253.74
31253.74
31253.74
31253.74
31253.74
31253.77
146363.82
146363.82
146363.82
146363.82
146363.82
146363.82
146363.82
146363.82
146363.82
146363.82
146363.82
146363.87
97055.33
97055.33
97055.33
97055.33
97055.33
97055.33
97055.33
97055.33
97055.33
97055.33
97055.33
97055.28
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
400000.00
15000000Total Commitment in Second Quarter of 2012
International Development Association500000Total Disbursement in First Quarter of 2013
International Development Association302895Total Disbursement in Third Quarter of 2013
International Development Association190853Total Disbursement in Fourth Quarter of 2013
International Development Association588122Total Disbursement in Fourth Quarter of 2013
International Development Association610690Total Disbursement in Fourth Quarter of 2013
International Development Association-6389Total Interest Repayment in Fourth Quarter of 2013
International Development Association705862Total Disbursement in First Quarter of 2014
International Development Association779298Total Disbursement in First Quarter of 2014
International Development Association1153542Total Disbursement in First Quarter of 2014
International Development Association776298Total Disbursement in Second Quarter of 2014
International Development Association-27550Total Interest Repayment in Second Quarter of 2014
International Development Association714245Total Disbursement in Third Quarter of 2014
International Development Association834041Total Disbursement in Third Quarter of 2014
International Development Association679426Total Disbursement in Fourth Quarter of 2014
International Development Association-59049Total Interest Repayment in Fourth Quarter of 2014
International Development Association441886Total Disbursement in First Quarter of 2015
International Development Association574009Total Disbursement in First Quarter of 2015
International Development Association-71116Total Interest Repayment in Second Quarter of 2015
International Development Association898509Total Disbursement in Third Quarter of 2015
International Development Association-87079Total Interest Repayment in Fourth Quarter of 2015
International Development Association611974Total Disbursement in First Quarter of 2016
International Development Association436629Total Disbursement in Second Quarter of 2016
International Development Association-92266Total Interest Repayment in Second Quarter of 2016
International Development Association164250Total Disbursement in Fourth Quarter of 2016
International Development Association-99961Total Interest Repayment in Fourth Quarter of 2016
International Development Association210794Total Disbursement in Second Quarter of 2017
International Development Association-98012Total Interest Repayment in Second Quarter of 2017
International Development Association-217442Total Loan Repayment in Second Quarter of 2017
International Development Association256838Total Disbursement in Third Quarter of 2017
International Development Association243892Total Disbursement in Fourth Quarter of 2017
International Development Association577589Total Disbursement in Fourth Quarter of 2017
International Development Association-104682Total Interest Repayment in Fourth Quarter of 2017
International Development Association-226434Total Loan Repayment in Fourth Quarter of 2017
International Development Association325057Total Disbursement in First Quarter of 2018
International Development Association352990Total Disbursement in Second Quarter of 2018
International Development Association-116513Total Interest Repayment in Second Quarter of 2018
International Development Association-232780Total Loan Repayment in Second Quarter of 2018
International Development Association541974Total Disbursement in Fourth Quarter of 2018
International Development Association-110913Total Interest Repayment in Fourth Quarter of 2018
International Development Association-223726Total Loan Repayment in Fourth Quarter of 2018
International Development Association156460Total Disbursement in Second Quarter of 2019
International Development Association466230Total Disbursement in Second Quarter of 2019
International Development Association-120643Total Interest Repayment in Second Quarter of 2019
International Development Association-222551Total Loan Repayment in Second Quarter of 2019
International Development Association12000000Total Commitment in Third Quarter of 2019
International Development Association126527Total Disbursement in Fourth Quarter of 2019
International Development Association-121112Total Interest Repayment in Fourth Quarter of 2019
International Development Association-219385Total Loan Repayment in Fourth Quarter of 2019
International Development Association-93344Total Commitment Cancellations in Second Quarter of 2020
International Development Association-93119Total Disbursement in Second Quarter of 2020
International Development Association-119246Total Interest Repayment in Second Quarter of 2020
International Development Association-218726Total Loan Repayment in Second Quarter of 2020
International Development Association2000000Total Disbursement in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :FA Sch. 2, Sec. I. A. Provision of Financing to the Project Implementing Entity | Description :The obligation ofthe Recipient to make the entire proceeds of the IDA credit available to the UB municipality (Project Implementing Entity) underterms and conditions approved by the Association | Frequency :Yearly
Finance Agreement :PA, Sch., Sec. I. A. Institutional Arrangements, Para. 1 & 2 | Description :The Project Implementing Entityshall maintain a Steering Committee and a Project Management Unit with responsibilities for ProjectImplementation. | Frequency:Yearly
Finance Agreement :FA Sch. 2, Sec. II. A Quarterly report | Description :The Project Implementing Entity shall prepare and furnishquarterly project reports not later than 30 days after the end of the period of the report. | Frequency :Quarterly
Finance Agreement :FA Sch. 2, Sec. II. B. Quarterly interim unaudited financial reports | Description :The Project ImplementingEntity shall have prepare and furnish interim unaudited financial statements 45 days after the end of eachcalendar quarter. |Frequency :Quarterly
Finance Agreement :FA Sch. 2, Sec. II. B. Audited Financial Statements | Description :The Project Implementing Entity shall furnishaudits and audited financial statements for a period of one fiscal year not later than s6 months after the end of the period. |Frequency :Yearly
Finance Agreement :PA. Sch., Sec. I. E. Operations Manual and Institutional Manual | Description :The Project Implementing Entityshall carry out the Project in accordance with the Operations Manual and the Institutional Manual. | Frequency :Yearly
PDO Indicator
Coverage of targeted households with eligible services
PDO Indicator
Approval by relevant counterparts of principle recommendations and action plans developed by the Project for selected medium term abatement measures (no. of action plans approved)
PDO Indicator
Additional number of households provided with access to clean heating appliances
PDO Indicator
Inter-agency and donor coordination framework for air pollution abatement measures developed and functioning (cumulative no. of years)
PDO Indicator
Percentage of Project beneficiaries reporting an improvement in quality of heating
Intermediate Results Indicator
City greening preparatory study prepared
Intermediate Results Indicator
Monitoring and analysis equipment supplied (cumulative number of bid packages)
Intermediate Results Indicator
Additional capacity of clean heating appliances provided to targeted households under Component D
Intermediate Results Indicator
Laboratory tests supported by UBCAP
Intermediate Results Indicator
City greening pilot implemented
Intermediate Results Indicator
Effective project management and reporting established (No. of project progress reports per year)
Intermediate Results Indicator
Subsidy mechanism disbursing (% of available funds)
Intermediate Results Indicator
Estimated GHG emission reduction under Component D
Intermediate Results Indicator
Number of stoves declared eligible for UBCAP support
Intermediate Results Indicator
Persons trained in air quality monitoring, analysis and management (cumulative number)
Intermediate Results Indicator
Power plant emissions control feasibility study prepared
Intermediate Results Indicator
Quarterly reports on coordination activities prepaed by the municipality (No. of reports annually)
Intermediate Results Indicator
Number of stove models proposed for participation
Intermediate Results Indicator
Housing policy study prepared
Intermediate Results Indicator
Consultants for supporting coordination hired (cumulative number)
Intermediate Results Indicator
Persons/ local producers trained in clean stove development, ceramic molding and production
Intermediate Results Indicator
District heating preparatory study prepared
Intermediate Results Indicator
Number of kindergartens that receive high-efficiency particulate (HEPA) filters
Intermediate Results Indicator
Communications plan for collecting air quality program information across donors and agencies, satisfactory to the PMU, is preparedby the municipality (No. annual plans)
Intermediate Results Indicator
Number of public buildings in ger area benefited from energy efficiency and retrofitting work
Intermediate Results Indicator
Share of communications targets (e.g., meetings with agencies and donors, information collected) in approved communications plan achieved by the municipality (% share of target)
Intermediate Results Indicator
Number of households benefited from energy efficiency demonstration work and retrofitted their detached houses
Intermediate Results Indicator
Number of HOBs replaced by non-coal heating appliances
Intermediate Results Indicator
Number of complementary activities piloted at selected service center
Intermediate Results Indicator
Number of female trained on clean heating options and air quality monitoring and analysis
44000-P162402
World Bank
Economic Management Support Operation First DPF
International Development Association
MINISTRY OF FINANCE
International Development Association
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Jean-Pascal Nganou
+1-202-473-1000jnganou@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Ulan Bator
47.9077 106.883
Other Industry, Trade and ServicesLivestockCentral Government (Central Agencies)Social ProtectionOther Non-bank Financial InstitutionsFiscal PolicySocial ProtectionRural DevelopmentTrade FacilitationPublic Finance ManagementDomestic Revenue AdministrationRegulation and Competition PolicyPublic Expenditure ManagementRural Infrastructure and service deliveryBusiness Enabling EnvironmentTradeFiscal sustainabilitySocial Insurance and Pensions
0.00
0.00
120000000Total Commitment in Fourth Quarter of 2017
International Development Association122742924Total Disbursement in Fourth Quarter of 2017
International Development Association-1175804Total Interest Repayment in Second Quarter of 2018
International Development Association-1195584Total Interest Repayment in Fourth Quarter of 2018
International Development Association-1199347Total Interest Repayment in Second Quarter of 2019
International Development Association-1188423Total Interest Repayment in Fourth Quarter of 2019
International Development Association-1194235Total Interest Repayment in Second Quarter of 2020
International Development AssociationProject Appraisal DocumentProject Information DocumentFinancing AgreementContract AwardsProject URLProcurement Notices 44000-P147438
World Bank
Mongolia Export Development Project
International Development Association
MINISTRY OF ECONOMIC DEVELOPMENT
International Development Association
MINISTRY OF ECONOMIC DEVELOPMENTPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Ulle Lohmus
+1-202-473-1000ulohmus@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Ulaanbaatar Hot
47.9170 106.9170
Mongolia
46.0000 105.0000
TradePublic Administration - Financial SectorOther Non-bank Financial InstitutionsTrade FacilitationJobsTradeMSME FinanceJob CreationFinancial Infrastructure and AccessGender
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
400000.00
400000.00
400000.00
26999.23
26999.23
26999.22
49581.47
49581.47
49581.47
49581.47
49581.47
49581.47
49581.47
49581.47
49581.47
49581.47
49581.47
49581.51
100000.00
100000.00
100000.00
333333.33
333333.33
333333.34
1100000.00
1100000.00
1100000.00
300000.00
300000.00
300000.00
166666.67
166666.67
166666.66
266666.67
266666.67
266666.66
1100000.00
1100000.00
1100000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
1100000.00
1100000.00
1100000.00
500000.00
500000.00
500000.00
408000.00
408000.00
408000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20000000Total Commitment in Third Quarter of 2016
International Development Association1200000Total Disbursement in First Quarter of 2017
International Development Association80998Total Disbursement in Second Quarter of 2017
International Development Association19284Total Disbursement in Third Quarter of 2017
International Development Association36743Total Disbursement in Third Quarter of 2017
International Development Association-10382Total Interest Repayment in Third Quarter of 2017
International Development Association40974Total Disbursement in Fourth Quarter of 2017
International Development Association46552Total Disbursement in Fourth Quarter of 2017
International Development Association59581Total Disbursement in First Quarter of 2018
International Development Association91845Total Disbursement in First Quarter of 2018
International Development Association-14455Total Interest Repayment in First Quarter of 2018
International Development Association72041Total Disbursement in Second Quarter of 2018
International Development Association296464Total Disbursement in Second Quarter of 2018
International Development Association109324Total Disbursement in Third Quarter of 2018
International Development Association-17962Total Interest Repayment in Third Quarter of 2018
International Development Association135489Total Disbursement in Fourth Quarter of 2018
International Development Association149369Total Disbursement in First Quarter of 2019
International Development Association178936Total Disbursement in First Quarter of 2019
International Development Association-21150Total Interest Repayment in First Quarter of 2019
International Development Association-25368Total Interest Repayment in Third Quarter of 2019
International Development Association-24882Total Interest Repayment in First Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Project Implementation Unit | Description :Recipient to maintain a Project Implementation Unit within MOF with amandate, resources composition, and staffing satisfactory to the Association. | Frequency :CONTINUOUS
Finance Agreement :Project steering committee | Description :Recipient to establish one month after the Effectiveness date, thelatest, and maintain a Project steering committee with a mandate, composition, staffing and resources satisfactory to theAssociation. | Frequency :CONTINUOUS
Finance Agreement :Safeguards | Description :Recipient and Project Implementing Entity to carry out the Project in accordance withthe environmental and social standards, mitigation arrangements, assessments, plans, and other requirements set forth in theEnvironmental and Social Management Framework. | Frequency :CONTINUOUS
Finance Agreement :Mid Term Review | Description :The Recipient and the Project Implementing Entity to (i) carry out a mid-termreview of the Project and prepare and furnish to the Association a mid-term report documenting progress achieved in the carryingout of the Project and setting out the measures recommended to ensure the continued efficient carrying out of the Project and theachievement of its objective; and (ii) review with the Association such mid-term report. | Due Date :30-Sep-2018
Finance Agreement :Use of Facility outstanding balance | Description :Recipient and the Association to begin consultations to reachan agreement in writing on the terms and conditions for the use of any remaining balance in the Facility pursuant to Section IV.Cof Schedule 2 to the Financing Agreement. | Due Date :28-Feb-2021
Finance Agreement :Matching Grants implementation | Description :Recipient to screen the Export Development Plans and select forfinancing those Export Development Plans that meet the eligibility criteria set forth in the Matching Grants Implementation Manual.| Frequency :CONTINUOUS
Finance Agreement :Operation of the Export Insurance Facility | Description :Project Implementing Entity to ensure that theproceeds of the Financing are used solely for the purposes of operating the Facility and for the payment of Eligible Claims, inconformity with appropriate administrative, technical, financial, economic, environmental and social standards and practicesacceptable to the Association and in accordance with the provisions of the Project Agreement and the Financing Agreement. |Frequency :CONTINUOUS
Finance Agreement :Separate audit reports of the Facility | Description :Project Implementing Entity to cause the Export InsuranceSubsidiary to furnish a separate audit financial statement on the operation of the Facility, submitted to the Association in 6months after the end of the fiscal year. | Frequency :Yearly
Finance Agreement :Annual Report on Operation of Facility | Description :Project Implementation Entity to cause the ExportInsurance Subsidiary to furnish to the Recipient and the Association an annual report of the activities of the Facility, in a formacceptable to the Association, showing inter alia: (i) statements of outstanding Export Credit Insurance liabilities; (ii)statements of any Export Credit Insurance policy(ies) issued; (iii) a report on the risk profile of the ECI products supported bythe Facility. | Frequency :Yearly
PDO Indicator
Increase in export volume (by price) by the Project beneficiaries (average)
PDO Indicator
Number of firms that obtain internationally-recognized quality certification following support from the Matching Grant Facility(cumulative, disaggregated by the number of firms owned by women)
PDO Indicator
Number of firms that start exporting following participation in project activities (cumulative, disaggregated by the number of firms owned by women)
PDO Indicator
Export Credit Insurance Products
Intermediate Results Indicator
Number of firms benefitting from export insurance and guarantee contracts issued by Subsidiary of AgRe (cumulative)
Intermediate Results Indicator
MGF beneficiaries
Intermediate Results Indicator
Beneficiaries aware of project info. and project investments
Intermediate Results Indicator
Increase in export revenues for firms benefitting from export insurance products issued by Subsidiary of AgRe (average)
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
Beneficiaries aware of project info. and project investments - female
Intermediate Results Indicator
Increase in export revenues for MGF beneficiaries (average)
Intermediate Results Indicator
Beneficiaries aware of project info. and project investments –male
Intermediate Results Indicator
Volume of Bank Support: Institutional Development - SME
Intermediate Results Indicator
Beneficiaries that feel project investments reflected their needs
Intermediate Results Indicator
Growth in non-China exports by Project beneficiaries (percentage, average)
44000-P125232
World Bank
Third Sustainable Livelihoods Project
International Development Association
MINISTRY OF FINANCE
International Development Association
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Ingo Wiederhofer
+1-202-473-1000iwiederhofer@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Uvs Aymag
49.5000 93.0000
Hovd
47.0000 92.5000
Govĭ-Altay Aymag
45.5000 96.0000
Bayan-Ölgiy Aymag
48.5000 90.0000
Bayanhongor Aymag
45.5000 99.5000
Töv Aymag
47.5000 106.5000
Sühbaatar Aymag
46.2500 113.5000
Selenge Aymag
49.6670 106.4170
Övörhangay Aymag
46.0000 102.5000
Ömnögovi Province
43.0000 104.0000
Hövsgöl Aymag
50.0000 100.0000
Hentiy Aymag
48.0000 110.5000
Dundgovĭ Aymag
45.5000 106.5000
Dornogovĭ Aymag
44.5000 110.0000
Dornod Aymag
48.0000 115.0000
Bulgan
49.0000 103.5000
Arhangay Aymag
48.0000 101.5000
Darhan-Uul Aymag
49.2810 106.1190
Govĭ-Sumber
46.5000 108.5000
Orhon Aymag
49.0630 104.1630
Sub-National GovernmentSocial ProtectionOther Agriculture, Fishing and ForestrySoil PollutionSocial ProtectionPublic AdministrationSocial Safety NetsParticipation and Civic EngagementMunicipal Institution BuildingAir quality managementWater PollutionRural DevelopmentSocial InclusionRural Infrastructure and service deliveryJobsEnvironmental Health and Pollution Management
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
470000.00
470000.00
470000.00
320000.00
320000.00
320000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
593333.33
593333.33
593333.34
991666.66
991666.67
991666.67
991666.66
991666.67
991666.67
991666.66
991666.67
991666.67
991666.66
991666.67
991666.67
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
33333.33
33333.33
33333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
66878.33
66878.33
66878.34
0.00
0.00
0.00
318392.64
318392.65
318392.65
86126.33
86126.33
86126.34
1029333.33
1029333.33
1029333.34
0.00
0.00
0.00
246752.75
246752.76
246752.76
0.00
0.00
0.00
1113791.97
1113791.97
1113791.98
1166666.66
1166666.67
1166666.67
389921.27
389921.27
389921.28
0.00
0.00
0.00
172889.08
172889.08
172889.08
0.00
0.00
0.00
2318509.38
2318509.39
2318509.39
0.00
0.00
0.00
156931.32
156931.32
156931.32
0.00
0.00
0.00
1291893.50
1291893.50
1291893.50
131913.39
131913.40
131913.40
666666.66
666666.67
666666.67
500000.00
500000.00
500000.00
1500000.00
1500000.00
1500000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
500000.00
500000.00
500000.00
1500000.00
1500000.00
1500000.00
266666.66
266666.67
266666.67
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
24800000Total Commitment in Second Quarter of 2014
International Development Association200635Total Disbursement in Fourth Quarter of 2015
International Development Association-1506Total Interest Repayment in First Quarter of 2016
International Development Association255178Total Disbursement in Second Quarter of 2016
International Development Association114031Total Disbursement in Third Quarter of 2016
International Development Association-3406Total Interest Repayment in Third Quarter of 2016
International Development Association3088000Total Disbursement in Fourth Quarter of 2016
International Development Association-17545Total Interest Repayment in First Quarter of 2017
International Development Association189181Total Disbursement in Second Quarter of 2017
International Development Association-38501Total Interest Repayment in Third Quarter of 2017
International Development Association3108749Total Disbursement in Fourth Quarter of 2017
International Development Association3500000Total Disbursement in First Quarter of 2018
International Development Association-53627Total Interest Repayment in First Quarter of 2018
International Development Association571004Total Disbursement in Second Quarter of 2018
International Development Association-107216Total Interest Repayment in Third Quarter of 2018
International Development Association-109240Total Interest Repayment in First Quarter of 2019
International Development Association5748000Total Disbursement in Second Quarter of 2019
International Development Association-139155Total Interest Repayment in Third Quarter of 2019
International Development Association-363500Total Loan Repayment in Third Quarter of 2019
International Development Association139601Total Disbursement in Fourth Quarter of 2019
International Development Association-162067Total Interest Repayment in First Quarter of 2020
International Development Association-364812Total Loan Repayment in First Quarter of 2020
International Development Association3875681Total Disbursement in Second Quarter of 2020
International Development Association12000000Total Commitment in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementGrant or Trust Fund AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement: Safeguards (Section I; E) | Description :The Recipient shall implement, and cause to be implemented, theIndigenous Peoples Plan and the Environmental and Social Management Plan in a manner satisfactory to IDA. | Frequency :CONTINUOUS
Finance Agreement :Good Governance Performance-Based Financing (Section I; D) | Description :Good Governance Performance-BasedFinancing shall be provided to Soums under Part 2 (a) of the Project in accordance with the criteria and on the terms andconditions set out in the Project Implementation Manual. | Frequency :Yearly
Finance Agreement :Good Governance Performance Assessment Teams (Section I; B, 3) | Description :The Recipient shall, by December 1in each year, contract independent Good Governance Performance Assessment Teams to carry the annual performance assessment of Soumsunder Part 2 (b) of the Project, and shall ensure that all members of such teams receive adequate training before carrying outsuch assessments. | Frequency :Yearly
Finance Agreement: Local Development Fund (Section V) | Description :If the legal framework for the Local Development Fund isproposed to be changed in a manner that may materially and adversely affect the operation of the Local Development Fund, theRecipient shall promptly inform and exchange views with the Association. | Frequency :CONTINUOUS
Finance Agreement :Implementation Arrangements (Section I; A. a & b) | Description :The Recipient shall establish and maintaining,throughout the period of the implementation of the Project the Steering Committee; the Project Implementation Unit shall beprovidedwith sufficient resources and staffed with qualified personnel in adequate numbers. | Frequency :CONTINUOUS
Finance Agreement :Project Monitoring, Reporting and Evaluations – Project Reports (Section II; A) | Description :The recipientshall monitor and evaluate the progress of the Project and prepare Project Reports. Each project Report shall cover the period ofone calendar semester, and shall be furnished to the Association not later than one month after the end of the period covered bysuch report. | Frequency :CONTINUOUS
Finance Agreement :Financing management, Financial Reports and Audits (Section II; B) | Description :The Recipient shall prepareand furnish to the Association not later than one month after the end of each calendar quarter, interim audited financial reportsfor the Project covering the quarter; The Recipient shall have its Financial Statements audited. Each audit shall cover the periodof one fiscal year, to be furnished not later than six months after the end of such period. | Frequency :CONTINUOUS
Finance Agreement: Project Implementation Manual (Section I; B, 1 &2) | Description :The Recipient shall prepare and adopt theProject Implementation Manual in substance and form satisfactory to the Association. | Due Date :01-Aug-2015
Institutional Arrangements Financing Agreement: Schedule 2, Section I.ARecurrent, ContinuousThe Recipient shall (i) maintain aSteering Committee throughout the Project implementation period, with functions, staffing and resources satisfactory to theAssociation; and (ii) designate a project director, and at the Aimag-level, local project officers; all on terms of reference andwith qualifications acceptable to the Association to provide support for the implementation of the Project.
Project Implementation Financing Agreement: Schedule 2, Section I.ARecurrent, ContinuousThe Recipient shall carry out theProject in accordance with the Project Implementation Manual, and not amend, waive or abrogate any provisions of the manual unlessthe Association agrees otherwise in writing.
Project Implementation Financing Agreement: Schedule 2, Section I.ABy December 1, AnnuallyThe Recipient shall contractindependent Good Governance Performance Assessment Team to carry out the annual performance assessment of the Soums.
Good Governance Performance-based FinancingFinancing Agreement: Schedule 2, Section I.BRecurrent, ContinuousThe Recipient shallmake Good Governance Performance-based Financing available to an eligible Soum in accordance with the eligibility criteria andadministration arrangements set out in the Financing Agreement and the Project Implementation Manual.
Environmental and Social Safeguards Financing Agreement: Schedule 2, Section I.CRecurrent, Continuous The Recipient shallensure that the Project is carried out in accordance with the provisions of the Safeguards Instruments; and shall not amend,abrogate, repeal, suspend or waive any of their provisions unless the Association agrees otherwise, and report on their status ofimplementation as part of the project reports.
PDO Indicator
Average soums' Annual Performance Assessment score
PDO Indicator
Percentage of soums' citizens surveyed reporting that LDF financed investments reflect their priority needs.
PDO Indicator
Female
PDO Indicator
Participation: Percentage of bagh households participating in public bagh meetings
Intermediate Results Indicator
Percentage of trained Aimag Level Support Team and national government staff applying skills learned through the project (planning,procurement, financial management, community participation and M&E)
Intermediate Results Indicator
Percentage of bagh citizens who know the approximate current annual LDF allocation for their soum
Intermediate Results Indicator
Percentage of soums government staff trained by Aimag Level Support Team with improved capacity (applying learned skills in planning, procurement, FM, community participation and M&E
Intermediate Results Indicator
Female
Intermediate Results Indicator
Number of Aimag Level Support Team, national government staff, and soums government staff trained
Intermediate Results Indicator
Number of subprojects completed
Intermediate Results Indicator
Direct project beneficiaries
Intermediate Results Indicator
Number of LDF-related or other MoF regulations, which have been submitted for MoF review, with SLP3 support
Intermediate Results Indicator
Female
44000-P040907
World Bank
Energy Sector Project
International Development Association
ENERGY AUTHORITY
International Development Association
ENERGY AUTHORITYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Peter Johansen
+1-202-473-1000pjohansen@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Baganuur
47.7460 108.3670
Mongolia
46.0000 105.0000
Egiyn Gol
49.4000 103.6000
Uliastay
47.7420 96.8440
Altai
46.3720 96.2580
Murun-kuren
49.6340 100.1630
Erdenet
49.0330 104.0830
Darhan
49.4870 105.9230
Dalandzadgad
43.5710 104.4250
Choybalsan
48.0730 114.5330
Bayanhongor
46.1940 100.7180
Baruun-Urt
46.6810 113.2790
Ulaanbaatar
47.9080 106.8830
Other Energy and ExtractivesEnergy Transmission and DistributionCentral Government (Central Agencies)Urban DevelopmentRegulation and Competition PolicyRural DevelopmentUrban Infrastructure and Service DeliveryJobsRural Infrastructure and service deliveryJob CreationBusiness Enabling EnvironmentInvestment and Business Climate
0.00
0.00
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.33
1083333.37
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.63
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
121865.88
121865.90
121865.90
76127.46
76127.46
76127.46
944842.83
944842.83
944842.83
379152.90
379152.90
379152.91
1690196.09
1690196.10
1690196.10
660392.92
660392.92
660392.92
117859.41
117859.42
117859.42
277553.18
277553.18
277553.19
81049.26
81049.26
81049.27
73844.72
73844.72
73844.73
96677.64
96677.64
96677.65
96013.78
96013.79
96013.79
161737.68
161737.68
161737.68
152760.09
152760.10
152760.10
228636.86
228636.86
228636.86
260826.71
260826.71
260826.72
365778.58
365778.58
365778.59
116461.96
116461.97
116461.97
254285.82
254285.82
254285.82
280725.67
280725.67
280725.67
526045.68
526045.68
526045.68
346645.58
346645.59
346645.59
186813.13
186813.13
186813.13
378142.73
378142.73
378142.73
204060.49
204060.50
204060.50
459556.04
459556.05
459556.05
346208.56
346208.56
346208.56
47636.36
47636.36
47636.36
384615.38
384615.38
384615.38
384615.38
384615.38
384615.38
384615.38
384615.38
384615.38
384615.38
384615.38
384615.38
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
160256.41
160256.41
160256.41
160256.41
160256.41
160256.41
160256.41
160256.41
160256.41
160256.41
160256.41
160256.41
160256.41
160256.41
160256.41
160256.41
160256.41
160256.41
149298.47
149298.47
149298.47
0.00
0.00
0.00
30000000Total Commitment in Second Quarter of 2001
International Development Association200000Total Disbursement in Third Quarter of 2003
International Development Association200593Total Disbursement in Third Quarter of 2003
International Development Association262900Total Disbursement in Fourth Quarter of 2003
International Development Association-300Total Interest Repayment in Fourth Quarter of 2003
International Development Association122210Total Disbursement in First Quarter of 2004
International Development Association724208Total Disbursement in First Quarter of 2004
International Development Association2415436Total Disbursement in First Quarter of 2004
International Development Association293760Total Disbursement in Second Quarter of 2004
International Development Association997557Total Disbursement in Second Quarter of 2004
International Development Association-86891Total Interest Repayment in Second Quarter of 2004
International Development Association523663Total Disbursement in Third Quarter of 2004
International Development Association2306878Total Disbursement in Third Quarter of 2004
International Development Association2982572Total Disbursement in Third Quarter of 2004
International Development Association435334Total Disbursement in Fourth Quarter of 2004
International Development Association537600Total Disbursement in Fourth Quarter of 2004
International Development Association1369510Total Disbursement in Fourth Quarter of 2004
International Development Association-94039Total Interest Repayment in Fourth Quarter of 2004
International Development Association128518Total Disbursement in First Quarter of 2005
International Development Association291134Total Disbursement in First Quarter of 2005
International Development Association346047Total Disbursement in Second Quarter of 2005
International Development Association622212Total Disbursement in Second Quarter of 2005
International Development Association-89429Total Interest Repayment in Second Quarter of 2005
International Development Association274746Total Disbursement in Third Quarter of 2005
International Development Association250799Total Disbursement in Fourth Quarter of 2005
International Development Association-87704Total Interest Repayment in Fourth Quarter of 2005
International Development Association324134Total Disbursement in First Quarter of 2006
International Development Association166152Total Disbursement in Second Quarter of 2006
International Development Association169201Total Disbursement in Second Quarter of 2006
International Development Association-83578Total Interest Repayment in Second Quarter of 2006
International Development Association95938Total Disbursement in Third Quarter of 2006
International Development Association464807Total Disbursement in Third Quarter of 2006
International Development Association531553Total Disbursement in Fourth Quarter of 2006
International Development Association-88336Total Interest Repayment in Fourth Quarter of 2006
International Development Association150482Total Disbursement in First Quarter of 2007
International Development Association652108Total Disbursement in First Quarter of 2007
International Development Association115564Total Disbursement in Second Quarter of 2007
International Development Association811143Total Disbursement in Second Quarter of 2007
International Development Association-82374Total Interest Repayment in Second Quarter of 2007
International Development Association371799Total Disbursement in Third Quarter of 2007
International Development Association387148Total Disbursement in Third Quarter of 2007
International Development Association558520Total Disbursement in Third Quarter of 2007
International Development Association122847Total Disbursement in Fourth Quarter of 2007
International Development Association303453Total Disbursement in Fourth Quarter of 2007
International Development Association-90980Total Interest Repayment in Fourth Quarter of 2007
International Development Association157805Total Disbursement in First Quarter of 2008
International Development Association785075Total Disbursement in First Quarter of 2008
International Development Association507502Total Disbursement in Second Quarter of 2008
International Development Association557379Total Disbursement in Second Quarter of 2008
International Development Association-91170Total Interest Repayment in Second Quarter of 2008
International Development Association779732Total Disbursement in Third Quarter of 2008
International Development Association1190859Total Disbursement in Third Quarter of 2008
International Development Association317589Total Disbursement in Fourth Quarter of 2008
International Development Association918662Total Disbursement in Fourth Quarter of 2008
International Development Association-98440Total Interest Repayment in Fourth Quarter of 2008
International Development Association272403Total Disbursement in First Quarter of 2009
International Development Association382628Total Disbursement in First Quarter of 2009
International Development Association439276Total Disbursement in Second Quarter of 2009
International Development Association898387Total Disbursement in Second Quarter of 2009
International Development Association-96359Total Interest Repayment in Second Quarter of 2009
International Development Association131400Total Disbursement in Third Quarter of 2009
International Development Association147527Total Disbursement in Third Quarter of 2009
International Development Association468436Total Disbursement in Third Quarter of 2009
International Development Association330327Total Disbursement in Fourth Quarter of 2009
International Development Association1377360Total Disbursement in Fourth Quarter of 2009
International Development Association-108397Total Interest Repayment in Fourth Quarter of 2009
International Development Association241347Total Disbursement in First Quarter of 2010
International Development Association427963Total Disbursement in First Quarter of 2010
International Development Association582991Total Disbursement in First Quarter of 2010
International Development Association12000000Total Commitment in First Quarter of 2010
International Development Association303664Total Disbursement in Second Quarter of 2010
International Development Association899775Total Disbursement in Second Quarter of 2010
International Development Association-116456Total Interest Repayment in Second Quarter of 2010
International Development Association194233Total Disbursement in Third Quarter of 2010
International Development Association820867Total Disbursement in Third Quarter of 2010
International Development Association38821Total Disbursement in Fourth Quarter of 2010
International Development Association427190Total Disbursement in Fourth Quarter of 2010
International Development Association508805Total Disbursement in Fourth Quarter of 2010
International Development Association-122282Total Interest Repayment in Fourth Quarter of 2010
International Development Association-503732Total Commitment Cancellations in First Quarter of 2011
International Development Association-118179Total Disbursement in First Quarter of 2011
International Development Association409214Total Disbursement in First Quarter of 2011
International Development Association560000Total Disbursement in First Quarter of 2011
International Development Association-139473Total Interest Repayment in Second Quarter of 2011
International Development Association-22143Total Commitment Cancellations in Fourth Quarter of 2011
International Development Association-22143Total Disbursement in Fourth Quarter of 2011
International Development Association-139666Total Interest Repayment in Fourth Quarter of 2011
International Development Association-362857Total Loan Repayment in Fourth Quarter of 2011
International Development Association299526Total Disbursement in Fourth Quarter of 2011
International Development Association448743Total Disbursement in Fourth Quarter of 2011
International Development Association823521Total Disbursement in Fourth Quarter of 2011
International Development Association-2271Total Interest Repayment in Fourth Quarter of 2011
International Development Association348840Total Disbursement in First Quarter of 2012
International Development Association359114Total Disbursement in First Quarter of 2012
International Development Association910041Total Disbursement in First Quarter of 2012
International Development Association-132165Total Interest Repayment in Second Quarter of 2012
International Development Association-355940Total Loan Repayment in Second Quarter of 2012
International Development Association144136Total Disbursement in Second Quarter of 2012
International Development Association576210Total Disbursement in Second Quarter of 2012
International Development Association-8405Total Interest Repayment in Second Quarter of 2012
International Development Association136376Total Disbursement in Third Quarter of 2012
International Development Association443867Total Disbursement in Third Quarter of 2012
International Development Association905287Total Disbursement in Third Quarter of 2012
International Development Association-120105Total Interest Repayment in Fourth Quarter of 2012
International Development Association-355297Total Loan Repayment in Fourth Quarter of 2012
International Development Association2992363Total Disbursement in Fourth Quarter of 2012
International Development Association-18422Total Interest Repayment in Fourth Quarter of 2012
International Development Association868288Total Disbursement in First Quarter of 2013
International Development Association926372Total Disbursement in First Quarter of 2013
International Development Association-136714Total Interest Repayment in Second Quarter of 2013
International Development Association-347686Total Loan Repayment in Second Quarter of 2013
International Development Association141491Total Disbursement in Second Quarter of 2013
International Development Association-32016Total Interest Repayment in Second Quarter of 2013
International Development Association387324Total Disbursement in Third Quarter of 2013
International Development Association-123337Total Interest Repayment in Fourth Quarter of 2013
International Development Association-352946Total Loan Repayment in Fourth Quarter of 2013
International Development Association118800Total Disbursement in Fourth Quarter of 2013
International Development Association133409Total Disbursement in Fourth Quarter of 2013
International Development Association-40172Total Interest Repayment in Fourth Quarter of 2013
International Development Association182408Total Disbursement in First Quarter of 2014
International Development Association-129747Total Interest Repayment in Second Quarter of 2014
International Development Association-357103Total Loan Repayment in Second Quarter of 2014
International Development Association-44074Total Interest Repayment in Second Quarter of 2014
International Development Association-121887Total Interest Repayment in Fourth Quarter of 2014
International Development Association-342408Total Loan Repayment in Fourth Quarter of 2014
International Development Association-42411Total Interest Repayment in Fourth Quarter of 2014
International Development Association-110426Total Interest Repayment in Second Quarter of 2015
International Development Association-316634Total Loan Repayment in Second Quarter of 2015
International Development Association-39119Total Interest Repayment in Second Quarter of 2015
International Development Association-108414Total Interest Repayment in Fourth Quarter of 2015
International Development Association-327087Total Loan Repayment in Fourth Quarter of 2015
International Development Association-40004Total Interest Repayment in Fourth Quarter of 2015
International Development Association-115040Total Interest Repayment in Second Quarter of 2016
International Development Association-324242Total Loan Repayment in Second Quarter of 2016
International Development Association-40463Total Interest Repayment in Second Quarter of 2016
International Development Association-107334Total Interest Repayment in Fourth Quarter of 2016
International Development Association-318025Total Loan Repayment in Fourth Quarter of 2016
International Development Association-39291Total Interest Repayment in Fourth Quarter of 2016
International Development Association-101927Total Interest Repayment in Second Quarter of 2017
International Development Association-313400Total Loan Repayment in Second Quarter of 2017
International Development Association-38472Total Interest Repayment in Second Quarter of 2017
International Development Association-108192Total Interest Repayment in Fourth Quarter of 2017
International Development Association-326360Total Loan Repayment in Fourth Quarter of 2017
International Development Association-40366Total Interest Repayment in Fourth Quarter of 2017
International Development Association-111811Total Interest Repayment in Second Quarter of 2018
International Development Association-335506Total Loan Repayment in Second Quarter of 2018
International Development Association-41669Total Interest Repayment in Second Quarter of 2018
International Development Association-99578Total Interest Repayment in Fourth Quarter of 2018
International Development Association-322457Total Loan Repayment in Fourth Quarter of 2018
International Development Association-39426Total Interest Repayment in Fourth Quarter of 2018
International Development Association-105424Total Interest Repayment in Second Quarter of 2019
International Development Association-320764Total Loan Repayment in Second Quarter of 2019
International Development Association-39926Total Interest Repayment in Second Quarter of 2019
International Development Association-100797Total Interest Repayment in Fourth Quarter of 2019
International Development Association-316201Total Loan Repayment in Fourth Quarter of 2019
International Development Association-39178Total Interest Repayment in Fourth Quarter of 2019
International Development Association-98122Total Interest Repayment in Second Quarter of 2020
International Development Association-315250Total Loan Repayment in Second Quarter of 2020
International Development Association-38948Total Interest Repayment in Second Quarter of 2020
International Development Association-103862Total Loan Repayment in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportCredit AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Prepare & furnish to the Assoc. a time-bound action plan for restruc. its electric power & heat supply sector.
Borrower will furnish the Assoc. for its review and comments a time-bound action plan to ensure financing of the full cost ofelectricity services in the various Aimags participating in the project
Borrwr to furnish the Assoc. for its review and comments a time-bound action plan to restructure residential electricity tariff
The Borrower, through MOFE and Dornod Aimag Utility, and each of the Phase 1 Selected Aimag Utilities in regard respectively toPart A, Part B.1 and Part B.2 of the Project have been duly executed.
The subsidiary loan agreements must be duly executed and legally binding on the parties prior to effectiveness
Energy Authority to arrange the carrying out operations and conduct affairs in accordance with sound mgmt. financial, engineering,environmental and power utilities practices
Energy Authority shall maintain the PIU with functions and resources acceptable to the Association
Energy Authority to establish & maintain throughout the period of Project Implementation project working groups with adequatefunctions and responsibilities
Energy Authority shall arrange that machinery and equipment is operated and maintained with sound engineering, technical &environm. practices
Energy Authority shall arrange for insurance in such amounts as shall be consistent with appropriate practice
Energy Authority shall enter into arrangements with PIUs to ensure that proceeds of the credit are used exclusively to carry outtheir respective parts of the project
Energy Authority will asist PIUs to review the report referred to in sub-para. (c) of para .5 and take measures required to ensureefficient completion of the project
Energy Authority shall assist PIUs to maintain policies and procedures adequate to enable the monitoring and evaluation of thecarrying out of the project and achievement of objectives
Energy Authority shall assist PIUs to prepare semi annual monitoring & evaluation reports by June 15 & Dec. 15 each yearcommencing Dec. 15, 2002
PDO Indicator
Percentage of Losses
Data from UBEDN. Target exceeded.
PDO Indicator
Reduce Average Losses at Aimag Utilities
Target exceeded.
PDO Indicator
Reduce Technical Losses at Aimag Utilities
Target exceeded.
PDO Indicator
Additional Customer Sales per Annum (Gwh)
The value of 146 GWh per year is the incremental value from 2012 to 2013.
PDO Indicator
Electricity losses per year in the project area
Target exceeded.
Intermediate Results Indicator
New Meters Connected
From Dec 2012 to July 2013, 23,717 new customers were connected. Target exceeded.
Intermediate Results Indicator
Receivables
Data from UBEDN. Target already exceeded.
PDO Indicator
Total net injected generation
PDO Indicator
Electricity losses per year in the project area- Technical
PDO Indicator
Electricity losses per year in the project area- Non-Technical
44000-P101446
World Bank
Enhanced Justice Sector Services Project - Mongolia
International Development Association
MINISTRY OF JUSTICE AND HOME AFFAIRS/SUPREME COURT
International Development Association
MINISTRY OF JUSTICE AND HOME AFFAIRS/SUPREME COURTPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Heike P. Gramckow
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Ulaanbaatar Hot
47.9170 106.9170
Law and JusticeJudicial and other Dispute Resolution MechanismsRule of LawPersonal and Property RightsLegal Institutions for a Market Economy
0.00
0.00
0.00
0.00
29611.66
29611.66
29611.67
32524.27
32524.27
32524.27
135517.79
135517.79
135517.81
135517.79
135517.79
135517.81
162621.36
162621.36
162621.36
162621.36
162621.36
162621.36
195145.63
195145.63
195145.63
162621.36
162621.36
162621.36
162621.36
162621.36
162621.36
162621.36
162621.36
162621.36
195145.63
195145.63
195145.63
32524.27
32524.27
32524.27
32524.27
32524.27
32524.27
32524.27
32524.27
32524.27
32524.27
32524.27
32524.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18415.54
18415.54
18415.55
3613.42
3613.42
3613.42
3675.52
3675.52
3675.53
7877.09
7877.09
7877.09
13997.31
13997.31
13997.32
28598.21
28598.21
28598.22
22769.00
22769.00
22769.01
69442.02
69442.02
69442.02
409605.40
409605.40
409605.39
156090.11
156090.11
156090.10
48536.13
48536.13
48536.12
486218.15
486218.15
486218.17
306903.94
306903.94
306903.96
24257.61
24257.61
24257.61
66667.23
66667.23
66667.21
0.00
0.00
0.00
0.00
0.00
3350000Total Commitment in Second Quarter of 2008
International Development Association1650000Total Commitment in Second Quarter of 2008
International Development Association335000Total Disbursement in Third Quarter of 2009
International Development Association165000Total Disbursement in Third Quarter of 2009
International Development Association-1450Total Interest Repayment in Second Quarter of 2010
International Development Association-1204Total Interest Repayment in Fourth Quarter of 2010
International Development Association150552Total Disbursement in First Quarter of 2011
International Development Association-1293Total Interest Repayment in Second Quarter of 2011
International Development Association129521Total Disbursement in Third Quarter of 2011
International Development Association225457Total Disbursement in Fourth Quarter of 2011
International Development Association980839Total Disbursement in Fourth Quarter of 2011
International Development Association-1286Total Interest Repayment in Fourth Quarter of 2011
International Development Association78225Total Disbursement in Fourth Quarter of 2011
International Development Association167260Total Disbursement in First Quarter of 2012
International Development Association315201Total Disbursement in First Quarter of 2012
International Development Association-5376Total Interest Repayment in Second Quarter of 2012
International Development Association139837Total Disbursement in Third Quarter of 2012
International Development Association159446Total Disbursement in Third Quarter of 2012
International Development Association198474Total Disbursement in Third Quarter of 2012
International Development Association36516Total Disbursement in Third Quarter of 2012
International Development Association59255Total Disbursement in Third Quarter of 2012
International Development Association74141Total Disbursement in Fourth Quarter of 2012
International Development Association146571Total Disbursement in Fourth Quarter of 2012
International Development Association-8110Total Interest Repayment in Fourth Quarter of 2012
International Development Association16450Total Disbursement in Fourth Quarter of 2012
International Development Association28868Total Disbursement in Fourth Quarter of 2012
International Development Association75865Total Disbursement in First Quarter of 2013
International Development Association87427Total Disbursement in First Quarter of 2013
International Development Association10648Total Disbursement in First Quarter of 2013
International Development Association137674Total Disbursement in First Quarter of 2013
International Development Association-10249Total Interest Repayment in Second Quarter of 2013
International Development Association51532Total Disbursement in Second Quarter of 2013
International Development Association116152Total Disbursement in Second Quarter of 2013
International Development Association209373Total Disbursement in Second Quarter of 2013
International Development Association87967Total Disbursement in Third Quarter of 2013
International Development Association75167Total Disbursement in Third Quarter of 2013
International Development Association120222Total Disbursement in Third Quarter of 2013
International Development Association-184527Total Commitment Cancellations in Fourth Quarter of 2013
International Development Association-7391Total Disbursement in Fourth Quarter of 2013
International Development Association30000Total Disbursement in Fourth Quarter of 2013
International Development Association-10790Total Interest Repayment in Fourth Quarter of 2013
International Development Association-48253Total Commitment Cancellations in Fourth Quarter of 2013
International Development Association-1935Total Disbursement in Fourth Quarter of 2013
International Development Association154653Total Disbursement in Fourth Quarter of 2013
International Development Association-11359Total Interest Repayment in Second Quarter of 2014
International Development Association-10863Total Interest Repayment in Fourth Quarter of 2014
International Development Association-10020Total Interest Repayment in Second Quarter of 2015
International Development Association-10246Total Interest Repayment in Fourth Quarter of 2015
International Development Association-10364Total Interest Repayment in Second Quarter of 2016
International Development Association-10064Total Interest Repayment in Fourth Quarter of 2016
International Development Association-9854Total Interest Repayment in Second Quarter of 2017
International Development Association-10339Total Interest Repayment in Fourth Quarter of 2017
International Development Association-10673Total Interest Repayment in Second Quarter of 2018
International Development Association-9817Total Interest Repayment in Fourth Quarter of 2018
International Development Association-27211Total Loan Repayment in Fourth Quarter of 2018
International Development Association-10328Total Interest Repayment in Second Quarter of 2019
International Development Association-27068Total Loan Repayment in Second Quarter of 2019
International Development Association-9911Total Interest Repayment in Fourth Quarter of 2019
International Development Association-26683Total Loan Repayment in Fourth Quarter of 2019
International Development Association-9677Total Interest Repayment in Second Quarter of 2020
International Development Association-26603Total Loan Repayment in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Establish Steering Committee
Establish PIU
Draft Annual Implementation Plan
PDO Indicator
(i) Data and statistics on enforcement of court decisions is shared regularly between the CDEA and GCC
End target expected to be achieved by September.
Both agencies exchange data irregularly. The new software will provide required information to both agencies.
Intermediate Results Indicator
Improved law school syllabi implemented
Partially met.
8 syllabi, 23 handbooks completed and used in all 13 law schools; 1 syllabi and 8 handbooks dropped by the client due to changesinthe relevant laws.
PDO Indicator
(ii) Local Courts submit electronic case data to the GCC
Target met.
With the new software and fiber optic linkages, real time case management will be possible.
Intermediate Results Indicator
Development of standards for Legal Clinics Implemented
Target met.
Intermediate Results Indicator
Increased access to legal information and legal advice
Target partially met. More date expected in September.
The paralegal program was discontinued in early 2013; activities expected to be picked up in the state budget.
PDO Indicator
(iii) court decision enforcement processes are unified and monitored for effective enforcement
Enforcement effectiveness data should be available by September 2013.
Once 18 out of 21 Aimags are fully connected, more than 60% of the locations will be able to use the new system.Enforcement datacollection is done manually currently.
Intermediate Results Indicator
Connect Courts, CDEA, prosecutors via fiber optic cable
Target met.
PDO Indicator
(iv) Access to legal information and advice increased across all UB districts and Aimags
Intermediate Results Indicator
Improvement of court enforcement agency facilities
Target to be met.
Intermediate Results Indicator
Improvement of court facilities
Target to be met.
Intermediate Results Indicator
Development of case management software for administrative courts
Target to be met by September.
Intermediate Results Indicator
Training of CDEA staff
Target met.
44000-P119825
World Bank
Mongolia Multi-Sectoral Technical Assistance Project
International Development Association
BANK OF MONGOLIA
International Development Association
BANK OF MONGOLIAPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Taehyun Lee
+1-202-473-1000tlee4@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Uvs Aymag
49.5000 93.0000
Hovd
47.0000 92.5000
Govĭ-Altay Aymag
45.5000 96.0000
Dzavhan Aymag
48.0000 96.0000
Bayan-Ölgiy Aymag
48.5000 90.0000
Bayanhongor Aymag
45.5000 99.5000
Töv Aymag
47.5000 106.5000
Sühbaatar Aymag
46.2500 113.5000
Selenge Aymag
49.6670 106.4170
Övörhangay Aymag
46.0000 102.5000
Ömnögovi Province
43.0000 104.0000
Hövsgöl Aymag
50.0000 100.0000
Hentiy Aymag
48.0000 110.5000
Dundgovĭ Aymag
45.5000 106.5000
Dornogovĭ Aymag
44.5000 110.0000
Dornod Aymag
48.0000 115.0000
Bulgan
49.0000 103.5000
Arhangay Aymag
48.0000 101.5000
Darhan-Uul Aymag
49.2810 106.1190
Govĭ-Sumber
46.5000 108.5000
Orhon Aymag
49.0630 104.1630
Public Administration - Social ProtectionBanking InstitutionsCentral Government (Central Agencies)State-owned Enterprise Reform and PrivatizationPublic Expenditure ManagementSocial ProtectionTransparency, Accountability and Good GovernanceFinancial StabilityDebt ManagementSocial Safety NetsPublic Finance ManagementJobsFinancial Sector oversight and policy/banking regulation & restructuringFiscal sustainabilityFinancial Sector IntegrityFiscal PolicyPublic Administration
0.00
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32853.22
32853.22
32853.22
32853.22
32853.22
32853.22
32853.22
32853.22
32853.22
32853.22
32853.22
32853.18
220966.21
220966.21
220966.21
220966.21
220966.21
220966.21
220966.21
220966.21
220966.21
220966.21
220966.21
220966.21
178481.51
178481.51
178481.51
178481.51
178481.51
178481.51
178481.51
178481.51
178481.51
178481.51
178481.51
178481.48
234696.33
234696.33
234696.33
234696.33
234696.33
234696.33
234696.33
234696.33
234696.33
234696.33
234696.33
234696.30
127108.02
127108.02
127108.02
127108.02
127108.02
127108.02
127108.02
127108.02
127108.02
127108.02
127108.02
127108.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
205894.72
205894.72
205894.72
205894.72
205894.72
205894.72
205894.72
205894.72
205894.72
205894.72
205894.72
205894.66
0.00
0.00
0.00
12000000Total Commitment in Second Quarter of 2010
International Development Association1000000Total Disbursement in Second Quarter of 2011
International Development Association100952Total Disbursement in Third Quarter of 2011
International Development Association107599Total Disbursement in Fourth Quarter of 2011
International Development Association185688Total Disbursement in Fourth Quarter of 2011
International Development Association-3908Total Interest Repayment in Fourth Quarter of 2011
International Development Association104913Total Disbursement in First Quarter of 2012
International Development Association195912Total Disbursement in First Quarter of 2012
International Development Association295115Total Disbursement in First Quarter of 2012
International Development Association82555Total Disbursement in Second Quarter of 2012
International Development Association219572Total Disbursement in Second Quarter of 2012
International Development Association246238Total Disbursement in Second Quarter of 2012
International Development Association-5012Total Interest Repayment in Second Quarter of 2012
International Development Association122465Total Disbursement in Third Quarter of 2012
International Development Association234286Total Disbursement in Third Quarter of 2012
International Development Association305465Total Disbursement in Third Quarter of 2012
International Development Association161372Total Disbursement in Fourth Quarter of 2012
International Development Association303492Total Disbursement in Fourth Quarter of 2012
International Development Association380210Total Disbursement in Fourth Quarter of 2012
International Development Association-9698Total Interest Repayment in Fourth Quarter of 2012
International Development Association68325Total Disbursement in First Quarter of 2013
International Development Association96366Total Disbursement in First Quarter of 2013
International Development Association192491Total Disbursement in First Quarter of 2013
International Development Association68633Total Disbursement in Second Quarter of 2013
International Development Association147293Total Disbursement in Second Quarter of 2013
International Development Association225097Total Disbursement in Second Quarter of 2013
International Development Association-15204Total Interest Repayment in Second Quarter of 2013
International Development Association190313Total Disbursement in Third Quarter of 2013
International Development Association202589Total Disbursement in Third Quarter of 2013
International Development Association217600Total Disbursement in Fourth Quarter of 2013
International Development Association224912Total Disbursement in Fourth Quarter of 2013
International Development Association508160Total Disbursement in Fourth Quarter of 2013
International Development Association-17789Total Interest Repayment in Fourth Quarter of 2013
International Development Association220727Total Disbursement in First Quarter of 2014
International Development Association251576Total Disbursement in First Quarter of 2014
International Development Association424918Total Disbursement in First Quarter of 2014
International Development Association176862Total Disbursement in Second Quarter of 2014
International Development Association292241Total Disbursement in Second Quarter of 2014
International Development Association339597Total Disbursement in Second Quarter of 2014
International Development Association-23854Total Interest Repayment in Second Quarter of 2014
International Development Association141386Total Disbursement in Third Quarter of 2014
International Development Association203605Total Disbursement in Third Quarter of 2014
International Development Association216945Total Disbursement in Third Quarter of 2014
International Development Association166529Total Disbursement in Fourth Quarter of 2014
International Development Association171740Total Disbursement in Fourth Quarter of 2014
International Development Association210229Total Disbursement in Fourth Quarter of 2014
International Development Association-29125Total Interest Repayment in Fourth Quarter of 2014
International Development Association105759Total Disbursement in First Quarter of 2015
International Development Association176942Total Disbursement in First Quarter of 2015
International Development Association188700Total Disbursement in First Quarter of 2015
International Development Association79468Total Disbursement in Second Quarter of 2015
International Development Association125242Total Disbursement in Second Quarter of 2015
International Development Association139911Total Disbursement in Second Quarter of 2015
International Development Association-30310Total Interest Repayment in Second Quarter of 2015
International Development Association90665Total Disbursement in Third Quarter of 2015
International Development Association126048Total Disbursement in Third Quarter of 2015
International Development Association132091Total Disbursement in Third Quarter of 2015
International Development Association101336Total Disbursement in Fourth Quarter of 2015
International Development Association122377Total Disbursement in Fourth Quarter of 2015
International Development Association136756Total Disbursement in Fourth Quarter of 2015
International Development Association-33921Total Interest Repayment in Fourth Quarter of 2015
International Development Association102716Total Disbursement in First Quarter of 2016
International Development Association130414Total Disbursement in First Quarter of 2016
International Development Association215712Total Disbursement in First Quarter of 2016
International Development Association85565Total Disbursement in Second Quarter of 2016
International Development Association128579Total Disbursement in Second Quarter of 2016
International Development Association167500Total Disbursement in Second Quarter of 2016
International Development Association-37134Total Interest Repayment in Second Quarter of 2016
International Development Association101743Total Disbursement in Third Quarter of 2016
International Development Association102719Total Disbursement in Third Quarter of 2016
International Development Association113667Total Disbursement in Third Quarter of 2016
International Development Association52709Total Disbursement in Fourth Quarter of 2016
International Development Association56932Total Disbursement in Fourth Quarter of 2016
International Development Association81326Total Disbursement in Fourth Quarter of 2016
International Development Association-39505Total Interest Repayment in Fourth Quarter of 2016
International Development Association46505Total Disbursement in First Quarter of 2017
International Development Association75114Total Disbursement in First Quarter of 2017
International Development Association-40085Total Interest Repayment in Second Quarter of 2017
International Development Association-273580Total Disbursement in Third Quarter of 2017
International Development Association-270414Total Commitment Cancellations in Fourth Quarter of 2017
International Development Association-42540Total Interest Repayment in Fourth Quarter of 2017
International Development Association-42621Total Interest Repayment in Second Quarter of 2018
International Development Association-40503Total Interest Repayment in Fourth Quarter of 2018
International Development Association-41016Total Interest Repayment in Second Quarter of 2019
International Development Association-40247Total Interest Repayment in Fourth Quarter of 2019
International Development Association-40012Total Interest Repayment in Second Quarter of 2020
International Development AssociationProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementAgreementGrant or Trust Fund AgreementGrant or Trust Fund AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Effectiveness condition | Description :Subsidiary Agreement has been executed on behalf of the Recipient and BOM| Due Date :17-Mar-2011
Finance Agreement :Effectiveness condition: Section I.A.1(a) | Description :Project Steering Committee has been established | DueDate :17-Mar-2011
Finance Agreement :Effectiveness condition: Section I.A.1(c) | Description :Technical Working Groups in MoF, MoSWL, and BoM havebeen established | Due Date :17-Mar-2011
Finance Agreement :Effectiveness condition | Description :Project Implementation Manual and Financial Management Manual have beenprepared | Due Date :17-Mar-2011
PDO Indicator
By the Closing Date, the Recipient shall have reduced its structural deficit according to the deficit ceilings set forth in the Fiscal Stability Law.
Intermediate Results Indicator
Strengthened fiscal planning and management capacity through improving budget planning mechanism
PDO Indicator
The Government shall have submitted to the Parliament for passing the draft laws on accounting and auditing that would create the legal environment for ensuring that Mongolia's accounting and auditing
Intermediate Results Indicator
Strengthened legal framework for prudent natural resource revenue management.
PDO Indicator
MPDSP has prepared a poor households database, on the basis of the Proxy Means Test survey.
Intermediate Results Indicator
Fiscal transfer formula for local government financing improved to increase predictability of resources and to reduce horizontal inequities between local governments and facilities
PDO Indicator
New deposit insurance agency is fully operational.
Intermediate Results Indicator
Improve the templates used for financial reporting in accordance with IFRS and create a consolidated database system for allowing electronic filing of financial statements by firms
Intermediate Results Indicator
Capacity enhancement for setting and enforcing international financial reporting standards (IFRS)
Intermediate Results Indicator
MoPDSP and GOSWS have created an adequate IT infrastructure for designated users on the basis of the PMT database for poor households and citizens or targeting purposes for social programs, assist
Intermediate Results Indicator
Percentage of staff trained in the Ministry of Population Development and Social Protection, General Office for Social Welfare Service and local governments
Intermediate Results Indicator
Accounting standards introduced
Intermediate Results Indicator
Bespoke Macro-prudential policy framework developed
Intermediate Results Indicator
State Bank is restructured and its privatization announced.
Intermediate Results Indicator
Transparency on procurement process managed by the GPA will be enhanced according to the revised Public Procurement Law
Intermediate Results Indicator
A strategy paper, policy options and main concept driving the pension reform agenda have been submitted to the Government , and animplementation plan has been developed
44000-P174116
World Bank
Mongolia Emergency Relief and Employment Support Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Maheshwor Shrestha
+1-202-473-1000mshrestha1@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
MONGOLIA
Ulaanbaatar Hot
47.9170 106.9170
Mongolia
46.0000 105.0000
Public Administration - Social ProtectionSocial ProtectionDisease ControlAdaptationGenderJobsPandemic ResponseMSME FinanceJob CreationClimate changeActive Labor Market ProgramsLabor Market Policy and ProgramsSkills DevelopmentSocial Insurance and PensionsFinancial Infrastructure and AccessSocial Protection
20000000Total Commitment in Second Quarter of 2020
International Development Association0Total Disbursement in First Quarter of 2020
International Development AssociationProject Information DocumentProject Appraisal Document Contract AwardsProject URLProcurement Notices