44000-P110910
World Bank
South East Europe and Caucasus Catastrophe Risk Insurance Facility (Serbia and Macedonia)
International Bank for Reconstruction and Development
EUROPA RE
International Bank for Reconstruction and Development
EUROPA REPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Jose C. Joaquin Toro Landivar
+1-202-473-1000jtoro@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Europe, regional
Republic of Albania
41.0000 20.0000
Republic of Macedonia
41.6670 21.7500
Serbia
44.8190 20.4600
Insurance and PensionOther Water Supply, Sanitation and Waste ManagementClimate changeDisaster Response and RecoveryBusiness Enabling EnvironmentDisaster Risk ReductionFinancial Sector oversight and policy/banking regulation & restructuringInvestment and Business ClimateDisaster Risk FinanceAdaptationJobsDisaster PreparednessDisaster Risk ManagementFinancial StabilityFinance for DevelopmentMitigation
0.00
3333333.33
3333333.33
3333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3333333.33
3333333.33
3333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5000000Total Commitment in First Quarter of 2011
International Bank for Reconstruction and Development
5000000Total Commitment in First Quarter of 2011
International Bank for Reconstruction and Development
-12500Total Interest Repayment in Fourth Quarter of 2011
International Bank for Reconstruction and Development
5000000Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development
-21311Total Interest Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development
2812500Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development
-12500Total Interest Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development
2187500Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development
-7486Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development
-34058Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development
-25139Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development
-28058Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development
-20189Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development
-25671Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development
-18351Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development
-23761Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development
-17633Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development
-23383Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development
-18351Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development
-23761Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development
-21467Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development
-26433Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development
-26542Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development
-34313Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development
-35267Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development
-39142Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development
-44496Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development
-156500Total Loan Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development
-48028Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development
-49264Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development
-156500Total Loan Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development
-51342Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development
-51372Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development
-156500Total Loan Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development
-59656Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development
-5000000Total Loan Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development
-71552Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-156500Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development
-75871Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development
-156500Total Loan Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development
-68764Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-156500Total Loan Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-51532Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
-156500Total Loan Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2, Section I, A(1) | Description :Establish a program implementation group in the Ministry of Financeand appoint its Head. | Due Date :31-May-2011
Finance Agreement :Schedule 2, Section I, A(2) | Description :Appoint Borrower representative to Europa Re Advisory Board andannual shareholder meetings. | Due Date :30-Dec-2011
Finance Agreement :Schedule 2, Section I, A(3) | Description :Carry out all necessary policy and regulatory actions, as set forthin the Program, that would result in the increased level of catastrophe insurance penetration among the Borrower's population a |Frequency :Yearly
Finance Agreement :Schedule 2, Section I, A(1) | Description :Establish a program implementation group in the Ministry of Financeand appoint its Head. | Due Date :31-May-2011
Finance Agreement :Schedule 2, Section I, A(2) | Description :Appoint Borrower representative to Europa Re Advisory Board andannual shareholder meetings. | Due Date :30-Dec-2011
Finance Agreement :Schedule 2, Section I, A(3) | Description :he Borrower shall monitor and evaluate, or cause to be monitored andevaluated, the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the G |Frequency :Yearly
PDO Indicator
Increase in catastrophe insurance penetration
Intermediate Results Indicator
Number of countries that implement the minimum regulatory and policy framework required for CRIF.
Intermediate Results Indicator
CRIF Capital Amount
Intermediate Results Indicator
Grant Funding Mobilized.
Intermediate Results Indicator
Fulfillment of technical preconditions for launch of products (per country)
GEO Indicator
Increase in catastrophe insurance penetration
44000-P162043
World Bank
Western Balkans Trade and Transport Facilitation
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Alberto Criscuolo
+1-202-473-1000acriscuolo@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Europe, regional
Republic of Albania
41.0000 20.0000
Bosnia and Herzegovina
44.2500 17.8330
Republic of Bulgaria
42.6670 25.2500
Montenegro
42.7500 19.2500
Republic of Macedonia
41.6670 21.7500
Serbia
44.8190 20.4600
Republic of Kosovo
42.5830 20.9170
TradePublic Administration - TransportationRural and Inter-Urban RoadsPorts/WaterwaysRailwaysDisaster Risk ReductionPublic TransportClimate changeUrban DevelopmentRegional IntegrationAdaptationDisaster Risk ManagementTradeTrade FacilitationMitigationGenderTrade LogisticsTrade Policy
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.37
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.33
2333333.37
2166666.67
2166666.67
2166666.67
2166666.67
2166666.67
2166666.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30000000Total Commitment in Second Quarter of 2019
International Bank for Reconstruction and Development
40000000Total Commitment in Second Quarter of 2019
International Bank for Reconstruction and Development
20000000Total Commitment in Second Quarter of 2019
International Bank for Reconstruction and Development
72161Total Disbursement in Fourth Quarter of 2019
International Bank for Reconstruction and Development
-72161Total Interest Repayment in Fourth Quarter of 2019
International Bank for Reconstruction and Development
1114800Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development
96998Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development
-96998Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
48897Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development
-48897Total Interest Repayment in First Quarter of 2020
International Bank for Reconstruction and Development
-52837Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
-81246Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
1080250Total Disbursement in Second Quarter of 2020
International Bank for Reconstruction and Development
-35271Total Interest Repayment in Second Quarter of 2020
International Bank for Reconstruction and Development
347040Total Disbursement in Third Quarter of 2020
International Bank for Reconstruction and Development
Project Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementLoan AgreementContract AwardsProject URLProcurement Notices
PDO Indicator
Total annual costs to export and import for all shipments of Albania, North Macedonia, and Serbia
PDO Indicator
Cost to export
PDO Indicator
Cost to export in Albania
PDO Indicator
Cost to export in North Macedonia
PDO Indicator
Cost to export in Serbia
PDO Indicator
Cost to import
PDO Indicator
Cost to import in Albania
PDO Indicator
Cost to import in North Macedonia
PDO Indicator
Cost to import in Serbia
PDO Indicator
Average freight transport time on targeted corridors
PDO Indicator
Average freight transport time on corridor Durres Skopje
PDO Indicator
Average freight transport time on corridor Skopje Belgrade
Intermediate Results Indicator
Deployment of Intelligent Traffic Systems (ITS)
Intermediate Results Indicator
Capacity of authorities to examine barriers in trade in services through the production of an action plan to remove barriers
Intermediate Results Indicator
Average time to import
Intermediate Results Indicator
Preparation and submission to Parliament of ITS Law (North Macedonia)
Intermediate Results Indicator
Average time to export
Intermediate Results Indicator
Capacity of authorities to examine gender-differentiated barriers in trade in services through the production of an action plan to remove barriers
Intermediate Results Indicator
Number of recommended border regulations that are adopted
Intermediate Results Indicator
Number of firms that benefit from reformed custom/border services
Intermediate Results Indicator
Percentage of cargo inspected by border agencies
Intermediate Results Indicator
Stakeholders reporting that the design/blueprint of the NWS is aligned with their needs and their contributions in the planning process (citizen engagement)
44000-P168862
World Bank
Sava and Drina Rivers Corridors Integrated Development Program
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Berina Uwimbabazi
+1-202-473-1000buwimbabazi@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Europe, regionalPorts/WaterwaysOther Water Supply, Sanitation and Waste ManagementPublic Administration - Water, Sanitation and Waste ManagementWater Institutions, Policies and ReformGenderWatershed ManagementDisaster Risk ManagementTrade LogisticsFlood and Drought Risk ManagementClimate changeWater Resource ManagementAdaptationRenewable Natural Resources Asset ManagementMitigationTrade
0.00
0.00
0.00
0.00
0.00
0.00
657500.00
657500.00
657500.00
657500.00
657500.00
657500.00
657500.00
657500.00
657500.00
657500.00
657500.00
657500.00
2091666.67
2091666.67
2091666.67
2091666.67
2091666.67
2091666.67
2091666.67
2091666.67
2091666.67
2091666.67
2091666.67
2091666.63
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2321666.67
2321666.67
2321666.67
2321666.67
2321666.67
2321666.67
2321666.67
2321666.67
2321666.67
2321666.67
2321666.67
2321666.63
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
0.00
0.00
0.00
0.00
0.00
0.00
657500.00
657500.00
657500.00
657500.00
657500.00
657500.00
657500.00
657500.00
657500.00
657500.00
657500.00
657500.00
2091666.67
2091666.67
2091666.67
2091666.67
2091666.67
2091666.67
2091666.67
2091666.67
2091666.67
2091666.67
2091666.67
2091666.63
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2087500.00
2321666.67
2321666.67
2321666.67
2321666.67
2321666.67
2321666.67
2321666.67
2321666.67
2321666.67
2321666.67
2321666.67
2321666.63
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
1257500.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
0Total Disbursement in First Quarter of 2020
International Bank for Reconstruction and Development
85000000Total Commitment in Third Quarter of 2020
International Bank for Reconstruction and Development
32600000Total Commitment in Third Quarter of 2020
International Bank for Reconstruction and Development
16300000Total Commitment in Third Quarter of 2020
International Bank for Reconstruction and Development
Project Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportContract AwardsProject URLProcurement Notices
PDO Indicator
River basin management plan reflecting integrated measures updated and endorsed by countries
PDO Indicator
People protected from 1 in 100-year flood event in the Sava and Drina River Basins under the project (of which female)
PDO Indicator
Of which female
PDO Indicator
Area protected by flood risk mitigation measures under the project
Intermediate Results Indicator
Length of embankments or dykes constructed or rehabilitated
Intermediate Results Indicator
Enhanced monitoring/ data sharing protocols and schedules developed
Intermediate Results Indicator
Freight throughput at the Sava river port of Sremska Mitrovica in Serbia
Intermediate Results Indicator
Flood monitoring and forecasting system upgraded in a participatory manner, publicly disclosed and adjusted based on citizen engagement
Intermediate Results Indicator
Priority regional investments prepared
Intermediate Results Indicator
Percentage of grievances responded and resolved within an agreed time frame
Intermediate Results Indicator
Stakeholders consulted (of which female) and engaged during planning and preparation of project interventions
Intermediate Results Indicator
of which female
Intermediate Results Indicator
Waterway improved through demining
Intermediate Results Indicator
Regional tourism master plan for the Sava and Drina Corridor that includes the establishment of a forum for women-headed SMEs is developed and endorsed..
Intermediate Results Indicator
Number of annual multi-national stakeholder workshops held