44000-P102284
World Bank
International Development Association
MINISTRY OF HEALTH
International Development Association
MINISTRY OF HEALTHCAMBODIA
Cambodia Second Health Sector Support Program
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Somil Nagpal
snagpal@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - HealthSocial ProtectionHealthSub-National GovernmentCentral Government (Central Agencies)Child HealthAdministrative and Civil Service ReformParticipation and Civic EngagementReproductive and Maternal HealthHealth System StrengtheningHealth Systems and PoliciesSocial InclusionPublic Administration
International Development Association30000000Total Commitment in Second Quarter of 2008
International Development Association1558300Total Disbursement in First Quarter of 2009
International Development Association-2938Total Interest Repayment in Second Quarter of 2009
International Development Association1309843Total Disbursement in Fourth Quarter of 2009
International Development Association-6408Total Interest Repayment in Fourth Quarter of 2009
International Development Association660573Total Disbursement in First Quarter of 2010
International Development Association2044521Total Disbursement in Second Quarter of 2010
International Development Association-12350Total Interest Repayment in Second Quarter of 2010
International Development Association1509967Total Disbursement in Third Quarter of 2010
International Development Association1737110Total Disbursement in Fourth Quarter of 2010
International Development Association2760113Total Disbursement in Fourth Quarter of 2010
International Development Association-26256Total Interest Repayment in Fourth Quarter of 2010
International Development Association-47113Total Interest Repayment in Second Quarter of 2011
International Development Association-43723Total Interest Repayment in Fourth Quarter of 2011
International Development Association3402618Total Disbursement in Second Quarter of 2012
International Development Association-43881Total Interest Repayment in Second Quarter of 2012
International Development Association112774Total Disbursement in Third Quarter of 2012
International Development Association1230124Total Disbursement in Fourth Quarter of 2012
International Development Association-57025Total Interest Repayment in Fourth Quarter of 2012
International Development Association1209802Total Disbursement in First Quarter of 2013
International Development Association-64250Total Interest Repayment in Second Quarter of 2013
International Development Association199497Total Disbursement in Third Quarter of 2013
International Development Association-67391Total Interest Repayment in Fourth Quarter of 2013
International Development Association7728403Total Disbursement in Second Quarter of 2014
International Development Association-67990Total Interest Repayment in Second Quarter of 2014
International Development Association1860913Total Disbursement in Fourth Quarter of 2014
International Development Association-98865Total Interest Repayment in Fourth Quarter of 2014
International Development Association240583Total Disbursement in First Quarter of 2015
International Development Association-92572Total Interest Repayment in Second Quarter of 2015
International Development Association-96825Total Interest Repayment in Fourth Quarter of 2015
International Development Association124219Total Disbursement in First Quarter of 2016
International Development Association478758Total Disbursement in Second Quarter of 2016
International Development Association-95450Total Interest Repayment in Second Quarter of 2016
International Development Association-92853Total Interest Repayment in Fourth Quarter of 2016
International Development Association-94252Total Interest Repayment in Second Quarter of 2017
International Development Association-99687Total Interest Repayment in Fourth Quarter of 2017
International Development Association-97892Total Interest Repayment in Second Quarter of 2018
International Development Association-95667Total Interest Repayment in Fourth Quarter of 2018
International Development Association-255113Total Loan Repayment in Fourth Quarter of 2018
International Development Association-95009Total Interest Repayment in Second Quarter of 2019
International Development Association-255916Total Loan Repayment in Second Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementAgreementAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Kampong Cham
12.0500 105.2500
Kampong Chhnang
12.1670 104.5500
Kampong Speu
11.5000 104.3330
Kampong Thom
12.7110 104.8890
Kampot
10.8330 104.3330
Kandal
11.4170 105.0000
Koh Kong
11.5000 103.5000
Kep
10.5130 104.3170
Kratie
12.6670 106.0830
Môndól Kiri
12.4170 107.2830
Pailin
12.8670 102.6000
Phnom Penh
11.5750 104.9140
Prasat Preăh VihEar
14.3910 104.6810
Preah Vihear
13.7500 105.0000
Prey Veng
11.3670 105.4670
Ratanakiri
13.8330 107.1170
Ratanakiri
13.8330 107.1170
Ŏtâr MEanchey
14.1670 103.5000
Stung Treng
13.7500 106.2500
Svay Rieng
11.1670 105.8330
Srŏk Tbong Khmŭm
11.9170 105.8330
Battambang
12.9170 103.0830
Takeo
10.9830 104.7830
Banteay Meanchey
13.7500 103.0000
Sihanoukville
10.6670 103.7500
Intermediate Results Indicator
Health personnel receiving training (number)
Intermediate Results Indicator
People with access to a basic package of health, nutrition, or reproductive health services (number)
Intermediate Results Indicator
Health facilities constructed, renovated, and/or equipped (number)
Intermediate Results Indicator
Pregnant women receiving antenatal care during a visit to a health provider (number)
Intermediate Results Indicator
Number of cases receiving Health Equity Fund assistance
Intermediate Results Indicator
Consultations (new cases) per person per year for children under 5 years
Intermediate Results Indicator
OPD
Intermediate Results Indicator
IPD
Intermediate Results Indicator
Deliveries
Intermediate Results Indicator
Percentage of health centers having at least one secondary midwife
Intermediate Results Indicator
Dengue case fatality rate reported by public health facilities
Intermediate Results Indicator
Percent of health centers implementing Integrated Management Childhood Illnesses services
Intermediate Results Indicator
Percentage of referral hospitals implementing Health Equity Funds
Intermediate Results Indicator
Percent of Health Centers implementing Health Equity Funds
Intermediate Results Indicator
Percentage of pregnant women attending at least 2 antenatal care consultation
Intermediate Results Indicator
Proportion of Operational Districts (ODs) implementing serivce delivery grants (SDGs) and internal contracting meeting at least 80%of their performance targets
PDO Indicator
Percentage of deliveries by trained personnel
PDO Indicator
Percentage of birth deliveries by trained health personnel at health facility
PDO Indicator
Percentage (and number) of children under one year immunized with DPT-HepB3
PDO Indicator
Percentage (and number) of children age 6-59 months who receives two doses of Vitamin A supplement every 6 months.
PDO Indicator
Percentage of pregnant women receiving Iron Folate supplementation
PDO Indicator
Percent of poor population covered by Health Equity Funds
0.00
0.00
0.00
0.00
166666.67
166666.67
166666.66
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
541666.67
541666.67
541666.66
541666.67
541666.67
541666.66
541666.67
541666.67
541666.66
541666.67
541666.67
541666.66
541666.67
541666.67
541666.66
541666.67
541666.67
541666.66
541666.67
541666.67
541666.66
541666.67
541666.67
541666.66
541666.67
541666.67
541666.66
541666.67
541666.67
541666.66
541666.67
541666.67
541666.66
541666.67
541666.67
541666.66
541666.67
541666.67
541666.66
541666.67
541666.67
541666.66
541666.67
541666.67
541666.66
541666.67
541666.67
541666.66
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2207433.33
2207433.33
2207433.34
0.00
0.00
0.00
0.00
0.00
0.00
1855021.33
1855021.33
1855021.34
935638.33
935638.33
935638.34
939629.00
939629.00
939629.00
1360665.00
1360665.00
1360665.00
4007729.33
4007729.33
4007729.34
0.00
0.00
0.00
1876443.67
1876443.67
1876443.66
974639.67
974639.67
974639.66
2130151.67
2130151.67
2130151.66
2106109.33
2106109.33
2106109.34
2767900.00
2767900.00
2767900.00
1234804.00
1234804.00
1234804.00
3782582.03
3782582.03
3782582.03
5914881.33
5914881.33
5914881.34
0.00
0.00
0.00
1311884.67
1311884.67
1311884.66
0.00
0.00
0.00
3489079.78
3489079.78
3489079.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Finance Agreement :Schedule 2, section I.B.1.b | Description :Implement the project in accordance with the project operationalmanual, SDG manual, HEF manual, and MBPI manual. | Frequency :Yearly
Finance Agreement :Schedule 2, section I.B.2.a | Description :Joint Annual Performance Review to be conducted not later than Marchof every year. | Frequency :Yearly
Finance Agreement :Schedule 2, section I.B.2.b | Description :Joint Annual Operational Plan and Appraisal to be conducte not laterthat September of every year. | Frequency :Yearly
Finance Agreement :Schedule 2, section I.B.5.c | Description :The % share of the expenditure attributable to the financing isconsistent with the Association's previously agreed % share of the AOP and the Pooled Account. | Frequency :Yearly
Finance Agreement :Schedule 2, section I.B.7 | Description :Establish a Joint Program Management Group, whose mandate, membershipand TOR shall be acceptable to the Association, which shall meet on quarterly basis. | Frequency :Yearly
44000-P121075
World Bank
International Development Association
MINISTRY OF ECONOMY AND FINANCE
International Development Association
MINISTRY OF ECONOMY AND FINANCECAMBODIA
Ketsana Emergency Reconstruction and Rehabilitation Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Lixin Gu
lgu@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - Water, Sanitation and Waste ManagementDisaster Risk ManagementDisaster Risk ReductionClimate changeDisaster Response and RecoveryDisaster PreparednessAdaptationRural Infrastructure and service deliveryDisaster Risk FinanceRural DevelopmentFinance for Development
International Development Association20000000Total Commitment in Fourth Quarter of 2010
International Development Association20000000Total Commitment in Fourth Quarter of 2010
International Development Association100000Total Disbursement in First Quarter of 2011
International Development Association500000Total Disbursement in First Quarter of 2011
International Development Association25036Total Disbursement in Second Quarter of 2011
International Development Association1793Total Disbursement in Third Quarter of 2011
International Development Association-358Total Interest Repayment in Third Quarter of 2011
International Development Association8477Total Disbursement in Third Quarter of 2011
International Development Association26932Total Disbursement in Third Quarter of 2011
International Development Association136893Total Disbursement in Third Quarter of 2011
International Development Association64718Total Disbursement in Fourth Quarter of 2011
International Development Association16579Total Disbursement in Fourth Quarter of 2011
International Development Association16846Total Disbursement in Fourth Quarter of 2011
International Development Association278703Total Disbursement in Fourth Quarter of 2011
International Development Association-162459Total Disbursement in First Quarter of 2012
International Development Association-532Total Interest Repayment in First Quarter of 2012
International Development Association11713Total Disbursement in First Quarter of 2012
International Development Association16427Total Disbursement in First Quarter of 2012
International Development Association4341069Total Disbursement in First Quarter of 2012
International Development Association-4052Total Disbursement in Second Quarter of 2012
International Development Association123880Total Disbursement in Second Quarter of 2012
International Development Association173676Total Disbursement in Second Quarter of 2012
International Development Association295292Total Disbursement in Second Quarter of 2012
International Development Association-891Total Interest Repayment in Third Quarter of 2012
International Development Association10131Total Disbursement in Third Quarter of 2012
International Development Association117366Total Disbursement in Third Quarter of 2012
International Development Association217228Total Disbursement in Third Quarter of 2012
International Development Association46195Total Disbursement in Fourth Quarter of 2012
International Development Association160405Total Disbursement in Fourth Quarter of 2012
International Development Association503867Total Disbursement in Fourth Quarter of 2012
International Development Association80871Total Disbursement in First Quarter of 2013
International Development Association531772Total Disbursement in First Quarter of 2013
International Development Association550493Total Disbursement in First Quarter of 2013
International Development Association121230Total Disbursement in Second Quarter of 2013
International Development Association146626Total Disbursement in Second Quarter of 2013
International Development Association442308Total Disbursement in Second Quarter of 2013
International Development Association954527Total Disbursement in Third Quarter of 2013
International Development Association1511034Total Disbursement in Third Quarter of 2013
International Development Association1988277Total Disbursement in Third Quarter of 2013
International Development Association1011882Total Disbursement in Fourth Quarter of 2013
International Development Association1182928Total Disbursement in Fourth Quarter of 2013
International Development Association1246763Total Disbursement in Fourth Quarter of 2013
International Development Association1019887Total Disbursement in First Quarter of 2014
International Development Association620239Total Disbursement in First Quarter of 2014
International Development Association1022595Total Disbursement in First Quarter of 2014
International Development Association1751389Total Disbursement in First Quarter of 2014
International Development Association1982237Total Disbursement in Second Quarter of 2014
International Development Association2530524Total Disbursement in Second Quarter of 2014
International Development Association4154546Total Disbursement in Second Quarter of 2014
International Development Association30483Total Disbursement in Second Quarter of 2014
International Development Association31732Total Disbursement in Second Quarter of 2014
International Development Association1571253Total Disbursement in Third Quarter of 2014
International Development Association2273900Total Disbursement in Third Quarter of 2014
International Development Association5627150Total Disbursement in Third Quarter of 2014
International Development Association-25030Total Interest Repayment in Third Quarter of 2014
International Development Association-18005Total Disbursement in Fourth Quarter of 2014
International Development Association-13905Total Disbursement in Fourth Quarter of 2014
International Development Association414127Total Disbursement in Fourth Quarter of 2014
International Development Association-682642Total Commitment Cancellations in First Quarter of 2015
International Development Association-68908Total Interest Repayment in First Quarter of 2015
International Development Association-668Total Commitment Cancellations in First Quarter of 2015
International Development Association-2970Total Commitment Cancellations in Second Quarter of 2015
International Development Association-2970Total Disbursement in Second Quarter of 2015
International Development Association-66729Total Interest Repayment in Third Quarter of 2015
International Development Association-66658Total Interest Repayment in First Quarter of 2016
International Development Association-67041Total Interest Repayment in Third Quarter of 2016
International Development Association-64730Total Interest Repayment in First Quarter of 2017
International Development Association-66385Total Interest Repayment in Third Quarter of 2017
International Development Association-70015Total Interest Repayment in First Quarter of 2018
International Development Association-67894Total Interest Repayment in Third Quarter of 2018
International Development Association-66509Total Interest Repayment in First Quarter of 2019Project Information DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Khett Batdambang
12.9170 103.0830
Khett Siem Reab
13.5000 104.0000
Khett Kampong Thum
12.8330 105.0000
Khett Kampong Chhnang
12.1670 104.5500
Khett Kampong Cham
12.0500 105.2500
Khett Banteay Mean Choay
13.7500 103.0000
Intermediate Results Indicator
Cumulative percentage of reconstructed and rehabilitated affected rural roads in 6 selected provinces
Baseline surveys.
Rural road contracts completed.
Intermediate Results Indicator
Cumulative percentage of villages with dust controlled roads
Baseline surveys.
Target expected to be exceeded
Construction of dust control is substantially completed.
Intermediate Results Indicator
Percentage of water wells built for the target communities (with water quality in compliance with gov't standards)
Baseline surveys.
(over 75)
1220 met standard compared to 997 wells minimum
Intermediate Results Indicator
Percentage of family latrine facilities built to improve community sanitation in the target villages
Baseline surveys.
Most of the family latrines are completed.
Intermediate Results Indicator
Risk mapping, disaster information and early warning system and building and housing codes developed and applied
The international consultant substantially completed the tasks and is now handing over to the client
PDO Indicator
Roads rehabilitated, Rural
Baseline surveys.
All the roads are completed
PDO Indicator
Number of people in rural areas provided with access to Improved Water Sources under the project
Baseline surveys.
The wells are completed
PDO Indicator
Percentage of households with access to family latrine sanitation in the targeted villages
19.5% of HHs in target villages already had latrines as per theCommune Database 2010.
80%(50% with super-structure by July 31, 2014, and all with super-structure by December 31, 2014)
40% with super-structure
PDO Indicator
Percentage of project roads to be returned to pre-disaster levels
Baseline surveys
All the roads are completed and 100% achieved with better quality than the pre-disaster level
PDO Indicator
Percentage of community household access to improved water supply in the targeted villages
Baseline surveys.
The wells are completed. The number of villages increased from 150 to 180 due to some dry wells or water quality not compliancewith the standards.
PDO Indicator
Percentage of houshold access of family latrine sanitation in the targeted villages
Baseline surveys
Progress on June 20, 2014
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
500000.00
500000.00
500000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
500000.00
500000.00
500000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Maintain implementation unit, technical team, managing consultant and financial management consultant
Ensure that NCDM will maintain an implementation unit with sufficient resources, qualified, competent staff in adequate numbers,with project manager, procurement officer and FM specialist
Carry out project in conformity with FM manual agreed under the Avian and Influenza Control Project
Develop Operational Manual
Engage FM consultant with appropriate experience and qualifications
Adopt and disclose Environmental Management Framework
Carry out project with provisions of Anti-Corruption and Good Governance Frameworks
Carry out M&E using indicators specified
Prepare and furnish to IDA within 45 days after the end of each quarter, interim unaudited financial reports
Have Financial Statements audited annually and submit audited FS within 6 months of closing
44000-P106605
World Bank
International Development Association
International Development Association
CAMBODIA
Higher Education Quality and Capacity Improvement Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Tsuyoshi Fukao
tfukao@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Tertiary EducationPublic Administration - EducationScience and TechnologyEducationAccess to EducationStandards, Curriculum and TextbooksTeachers
International Development Association11500000Total Commitment in Third Quarter of 2010
International Development Association11500000Total Commitment in Third Quarter of 2010
International Development Association500000Total Disbursement in First Quarter of 2011
International Development Association500000Total Disbursement in First Quarter of 2011
International Development Association63408Total Disbursement in Second Quarter of 2011
International Development Association28673Total Disbursement in Third Quarter of 2011
International Development Association96991Total Disbursement in Third Quarter of 2011
International Development Association97119Total Disbursement in Third Quarter of 2011
International Development Association-1589Total Interest Repayment in Third Quarter of 2011
International Development Association53203Total Disbursement in Fourth Quarter of 2011
International Development Association88595Total Disbursement in Fourth Quarter of 2011
International Development Association45523Total Disbursement in First Quarter of 2012
International Development Association124317Total Disbursement in First Quarter of 2012
International Development Association127819Total Disbursement in First Quarter of 2012
International Development Association-3022Total Interest Repayment in First Quarter of 2012
International Development Association6260Total Disbursement in First Quarter of 2012
International Development Association93450Total Disbursement in First Quarter of 2012
International Development Association242265Total Disbursement in First Quarter of 2012
International Development Association125109Total Disbursement in Second Quarter of 2012
International Development Association155895Total Disbursement in Second Quarter of 2012
International Development Association95801Total Disbursement in Third Quarter of 2012
International Development Association159844Total Disbursement in Third Quarter of 2012
International Development Association197694Total Disbursement in Third Quarter of 2012
International Development Association-4597Total Interest Repayment in Third Quarter of 2012
International Development Association5325Total Disbursement in Third Quarter of 2012
International Development Association21820Total Disbursement in Third Quarter of 2012
International Development Association140700Total Disbursement in Third Quarter of 2012
International Development Association72577Total Disbursement in Fourth Quarter of 2012
International Development Association568184Total Disbursement in Fourth Quarter of 2012
International Development Association148911Total Disbursement in Fourth Quarter of 2012
International Development Association566015Total Disbursement in Fourth Quarter of 2012
International Development Association97598Total Disbursement in First Quarter of 2013
International Development Association108758Total Disbursement in First Quarter of 2013
International Development Association112396Total Disbursement in First Quarter of 2013
International Development Association-6680Total Interest Repayment in First Quarter of 2013
International Development Association15675Total Disbursement in First Quarter of 2013
International Development Association114429Total Disbursement in First Quarter of 2013
International Development Association196152Total Disbursement in First Quarter of 2013
International Development Association48087Total Disbursement in Second Quarter of 2013
International Development Association229228Total Disbursement in Second Quarter of 2013
International Development Association100515Total Disbursement in Second Quarter of 2013
International Development Association321261Total Disbursement in Second Quarter of 2013
International Development Association82004Total Disbursement in Third Quarter of 2013
International Development Association197592Total Disbursement in Third Quarter of 2013
International Development Association198610Total Disbursement in Third Quarter of 2013
International Development Association-10942Total Interest Repayment in Third Quarter of 2013
International Development Association283019Total Disbursement in Third Quarter of 2013
International Development Association614226Total Disbursement in Third Quarter of 2013
International Development Association617237Total Disbursement in Third Quarter of 2013
International Development Association94288Total Disbursement in Fourth Quarter of 2013
International Development Association150408Total Disbursement in Fourth Quarter of 2013
International Development Association507680Total Disbursement in Fourth Quarter of 2013
International Development Association640122Total Disbursement in Fourth Quarter of 2013
International Development Association129783Total Disbursement in First Quarter of 2014
International Development Association299461Total Disbursement in First Quarter of 2014
International Development Association-13485Total Interest Repayment in First Quarter of 2014
International Development Association54919Total Disbursement in First Quarter of 2014
International Development Association1166936Total Disbursement in First Quarter of 2014
International Development Association35893Total Disbursement in Second Quarter of 2014
International Development Association58543Total Disbursement in Second Quarter of 2014
International Development Association1095030Total Disbursement in Second Quarter of 2014
International Development Association5800Total Disbursement in Second Quarter of 2014
International Development Association329025Total Disbursement in Second Quarter of 2014
International Development Association1320458Total Disbursement in Second Quarter of 2014
International Development Association139341Total Disbursement in Third Quarter of 2014
International Development Association-15879Total Interest Repayment in Third Quarter of 2014
International Development Association722266Total Disbursement in Third Quarter of 2014
International Development Association149307Total Disbursement in Fourth Quarter of 2014
International Development Association241325Total Disbursement in Fourth Quarter of 2014
International Development Association463651Total Disbursement in Fourth Quarter of 2014
International Development Association663635Total Disbursement in Fourth Quarter of 2014
International Development Association128342Total Disbursement in First Quarter of 2015
International Development Association-20474Total Interest Repayment in First Quarter of 2015
International Development Association300377Total Disbursement in First Quarter of 2015
International Development Association231908Total Disbursement in Second Quarter of 2015
International Development Association554434Total Disbursement in Second Quarter of 2015
International Development Association79488Total Disbursement in Second Quarter of 2015
International Development Association735014Total Disbursement in Second Quarter of 2015
International Development Association168819Total Disbursement in Third Quarter of 2015
International Development Association-22018Total Interest Repayment in Third Quarter of 2015
International Development Association540801Total Disbursement in Third Quarter of 2015
International Development Association652913Total Disbursement in Fourth Quarter of 2015
International Development Association134806Total Disbursement in Fourth Quarter of 2015
International Development Association-25370Total Interest Repayment in First Quarter of 2016
International Development Association451986Total Disbursement in Second Quarter of 2016
International Development Association1946022Total Disbursement in Second Quarter of 2016
International Development Association295334Total Disbursement in Third Quarter of 2016
International Development Association-29358Total Interest Repayment in Third Quarter of 2016
International Development Association591495Total Disbursement in First Quarter of 2017
International Development Association-35628Total Interest Repayment in First Quarter of 2017
International Development Association535402Total Disbursement in Second Quarter of 2017
International Development Association352Total Disbursement in Third Quarter of 2017
International Development Association-40637Total Interest Repayment in Third Quarter of 2017
International Development Association-227016Total Commitment Cancellations in First Quarter of 2018
International Development Association-227016Total Disbursement in First Quarter of 2018
International Development Association-42561Total Interest Repayment in First Quarter of 2018
International Development Association-200360Total Commitment Cancellations in First Quarter of 2018
International Development Association-200774Total Disbursement in First Quarter of 2018
International Development Association-41567Total Interest Repayment in Third Quarter of 2018
International Development Association-39909Total Interest Repayment in First Quarter of 2019
International Development Association-39947Total Interest Repayment in Third Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Phnum Penh
11.5750 104.9140
Intermediate Results Indicator
Number and percentage of HEI academic staff in participating institutions completing training in research methodologies and design
Intermediate Results Indicator
Number and percentage of eligible HEIs submitting proposals to RGMC competing for funds
Intermediate Results Indicator
Number and percentage of complete research projects (competitively selected) funded by the project
Intermediate Results Indicator
Within RGMC/DHE, number and percentage of proposals awarded after review and evaluation in accordance with project processing timeline
Intermediate Results Indicator
Pass rate of retained scholarship recipients at each grade categorized by: female; rural; poor (not cumulative rate)
Intermediate Results Indicator
Drop out rate of scholarship recipients categorized by: female; rural; poor
Intermediate Results Indicator
Completion rate of scholarship recipients, categorized by: female; rural; poor
Intermediate Results Indicator
Number of staff (MoEYS and HEI) who participate in training courses which improved their professional competencies; fields related to: HE quality, management, assessment, and accreditation; English; o
Intermediate Results Indicator
Number of staff of (MoEYS and HEI) who were conferred with a Master or Doctor Degree in academic specialty, educational management or related fields
Intermediate Results Indicator
Higher Education Governance & Finance Policy Paper adopted by the MoEYS
Intermediate Results Indicator
Higher Education Vision and Strategy 2030 adopted by the MoEYS
Intermediate Results Indicator
HEMIS developed and piloted with at-least 4 HEIs
PDO Indicator
40 percent of HEIs supported under Components 1 and 2 showing an increased aggregate score against a modified subset of ACC accreditation criteria.
PDO Indicator
An average annual retention rate of 95 percent of project-supported scholarship recipients
PDO Indicator
50 percent of Sub-projects approved under the first round of proposals completed by the Closing Date, and 70 percent of Sub-projects approved under the second round completed by the Closing Date.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
51964.18
51964.18
51964.18
51964.18
51964.18
51964.18
51964.18
51964.18
51964.18
51964.18
51964.20
61650.00
61650.00
61650.00
61650.00
61650.00
61650.00
61650.00
61650.00
61650.00
61650.00
61650.00
61650.00
354466.17
354466.17
354466.17
354466.17
354466.17
354466.17
354466.17
354466.17
354466.17
354466.17
354466.17
354466.13
672250.00
672250.00
672250.00
672250.00
672250.00
672250.00
672250.00
672250.00
672250.00
672250.00
672250.00
672250.00
256416.67
256416.67
256416.67
256416.67
256416.67
256416.67
256416.67
256416.67
256416.67
256416.67
256416.67
256416.63
167916.67
167916.67
167916.67
167916.67
167916.67
167916.67
167916.67
167916.67
167916.67
167916.67
167916.67
167916.63
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.33
33333.37
Finance Agreement :Schedule 2 - 6 a (i) | Description :Recruit an International Procurement Expert (individual consultant) toindependently carry out all procurement and conduct procurement training for MoEYS staff | Due Date :01-Mar-2011
Finance Agreement :Schedule 2 - 6 a (iii) | Description :Engage a qualified consulting firm to install computerized accountingsoftware and provide training to staff on the operation of the system | Due Date :01-Mar-2011
Finance Agreement :Schedule 2 - 6 (c) | Description :Submit annual work programs, including a procurement plan, for the followingyear, no later than October 31, starting in 2011 | Due Date :31-Oct-2010
Finance Agreement :Schedule 2 - 6 a (ii) | Description :Complete and adopt the supplementary financial management manual (FMM) andprovide training to financial staff on the supplementaryFMM and Standard Operating Procedures | Due Date :01-Mar-2011
Finance Agreement :Schedule 2 - 4 | Description :Establish the Scholarship Committee and the Research Grant Management Committee |Due Date :01-Mar-2011
Finance Agreement :Schedule 2 - 3 | Description :Maintain throughout the life of the project the Program Management Committee,Project Management Team, and Project Coordination Committee | Due Date :01-Mar-2011
Finance Agreement :Schedule 2- 9 | Description :Carry out the project in conformity with the agreed Project Implementation Manual,which sets out the criteria for the selection of sub-grantees, fellowship and scholarship beneficiaries | Due Date :01-Mar-2012
Finance Agreement :Schedule 2 - 7 | Description :Select sub-projects and administer sub-grants under Component 2 in accordance withthe guidelines, procedures and eligibility criteria set forth in the Project Implementation Manual and the FA | Due Date:01-Mar-2012
Finance Agreement :Schedule 3 | Description :Apply the Externally Assisted Project Procurement Manual to procurement conductedunder the project | Due Date :01-Mar-2012
Finance Agreement :Schedule 2 - 6 (b) | Description :Submit terms of reference, satisfactory to the Association, two years afterthe Effective Date, for a joint mid-term review for the third year of the project. | Due Date :01-Jan-2013
44000-P121809
World Bank
International Development Association
MINISTRY OF FINANCE AND ECONOMY
International Development Association
MINISTRY OF FINANCE AND ECONOMYCAMBODIA
Cambodia Agribusiness Access to Finance Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Paavo Eliste
peliste@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Other Non-bank Financial InstitutionsBanking InstitutionsAgricultural markets, commercialization and agri-businessRural MarketsEnterprise DevelopmentRural DevelopmentFinancial Infrastructure and AccessMSME DevelopmentMSME FinanceJobs
International Development Association2500000Total Commitment in Fourth Quarter of 2010
International Development Association2500000Total Commitment in Fourth Quarter of 2010
International Development Association500000Total Disbursement in Second Quarter of 2011
International Development Association2500000Total Disbursement in Second Quarter of 2011
International Development Association-1069Total Interest Repayment in Third Quarter of 2011
International Development Association-1791Total Interest Repayment in First Quarter of 2012
International Development Association-1762Total Interest Repayment in Third Quarter of 2012
International Development Association-1822Total Interest Repayment in First Quarter of 2013
International Development Association216127Total Disbursement in Second Quarter of 2013
International Development Association-3125Total Interest Repayment in Third Quarter of 2013
International Development Association-2654Total Interest Repayment in First Quarter of 2014
International Development Association-2261569Total Commitment Cancellations in Second Quarter of 2014
International Development Association-500000Total Disbursement in Second Quarter of 2014
International Development Association-2464180Total Commitment Cancellations in Second Quarter of 2014
International Development Association-2500000Total Disbursement in Second Quarter of 2014
International Development Association-947Total Interest Repayment in Third Quarter of 2014
International Development Association-664Total Interest Repayment in First Quarter of 2015
International Development Association-677Total Interest Repayment in Third Quarter of 2015
International Development Association-677Total Interest Repayment in First Quarter of 2016
International Development Association-681Total Interest Repayment in Third Quarter of 2016
International Development Association-657Total Interest Repayment in First Quarter of 2017
International Development Association-674Total Interest Repayment in Third Quarter of 2017
International Development Association-711Total Interest Repayment in First Quarter of 2018
International Development Association-689Total Interest Repayment in Third Quarter of 2018
International Development Association-675Total Interest Repayment in First Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementContract AwardsProject URLProcurement Notices
Battambang
12.9170 103.0830
Srŏk Tbong Khmŭm
11.9170 105.8330
Svay Rieng
11.1670 105.8330
Stung Treng
13.7500 106.2500
Ŏtâr MEanchey
14.1670 103.5000
Ratanakiri
13.8330 107.1170
Ratanakiri
13.8330 107.1170
Prey Veng
11.3670 105.4670
Preah Vihear
13.7500 105.0000
Prasat Preăh VihEar
14.3910 104.6810
Phnom Penh
11.5750 104.9140
Pailin
12.8670 102.6000
Môndól Kiri
12.4170 107.2830
Kratie
12.6670 106.0830
Kep
10.5130 104.3170
Koh Kong
11.5000 103.5000
Kandal
11.4170 105.0000
Kampot
10.8330 104.3330
Kampong Thom
12.7110 104.8890
Kampong Speu
11.5000 104.3330
Kampong Chhnang
12.1670 104.5500
Kampong Cham
12.0500 105.2500
Sihanoukville
10.6670 103.7500
Banteay Meanchey
13.7500 103.0000
Takeo
10.9830 104.7830
Intermediate Results Indicator
Average outstanding portfolio balance of agribusiness SME loans and amount
The data is specific to First PFI (ANZ Royal Bank)
Intermediate Results Indicator
Repayment/NPL
The baseline data is specific to First PFI (ANZ Royal Bank)
The data is specific to First PFI (ANZ Royal Bank)
Intermediate Results Indicator
Period Return on Assets (ROA) for PFIs
The baseline data is specific to First PFI (ANZ Royal Bank)
The data is specific to First PFI (ANZ Royal Bank)
PDO Indicator
Value of loans disbursed to agribusiness SMEs
The data is specific to First PFI (ANZ Royal Bank)
0.00
1500000.00
1500000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
666666.66
666666.67
666666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1500000.00
1500000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
666666.66
666666.67
666666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
The Risk Sharing Framework Agreement and at least one (1) Risk Sharing Facility
44000-P106603
World Bank
International Development Association
MINISTRY OF PUBLIC WORKS AND TRANSPORT
International Development Association
MINISTRY OF PUBLIC WORKS AND TRANSPORTCAMBODIA
Road Asset Management Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Veasna Bun
vbun@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Central Government (Central Agencies)Rural and Inter-Urban RoadsRural Infrastructure and service deliveryJob CreationTransparency, Accountability and Good GovernanceUrban Infrastructure and Service DeliveryPublic AdministrationAdministrative and Civil Service ReformRural DevelopmentJobsUrban Development
International Development Association30000000Total Commitment in Second Quarter of 2008
International Development Association100000Total Disbursement in Second Quarter of 2009
International Development Association930Total Disbursement in Fourth Quarter of 2009
International Development Association3110Total Disbursement in Fourth Quarter of 2009
International Development Association-329Total Interest Repayment in Fourth Quarter of 2009
International Development Association17638Total Disbursement in First Quarter of 2010
International Development Association-400Total Interest Repayment in Second Quarter of 2010
International Development Association7633Total Disbursement in Third Quarter of 2010
International Development Association40593Total Disbursement in Third Quarter of 2010
International Development Association81133Total Disbursement in Third Quarter of 2010
International Development Association11737Total Disbursement in Fourth Quarter of 2010
International Development Association-689Total Interest Repayment in Fourth Quarter of 2010
International Development Association75787Total Disbursement in First Quarter of 2011
International Development Association86796Total Disbursement in Second Quarter of 2011
International Development Association313637Total Disbursement in Second Quarter of 2011
International Development Association1066155Total Disbursement in Second Quarter of 2011
International Development Association-1236Total Interest Repayment in Second Quarter of 2011
International Development Association165580Total Disbursement in Third Quarter of 2011
International Development Association295915Total Disbursement in Third Quarter of 2011
International Development Association425780Total Disbursement in Third Quarter of 2011
International Development Association196672Total Disbursement in Fourth Quarter of 2011
International Development Association545049Total Disbursement in Fourth Quarter of 2011
International Development Association1533962Total Disbursement in Fourth Quarter of 2011
International Development Association-7958Total Interest Repayment in Fourth Quarter of 2011
International Development Association62549Total Disbursement in First Quarter of 2012
International Development Association236281Total Disbursement in First Quarter of 2012
International Development Association778312Total Disbursement in First Quarter of 2012
International Development Association345518Total Disbursement in Second Quarter of 2012
International Development Association735320Total Disbursement in Second Quarter of 2012
International Development Association2158446Total Disbursement in Second Quarter of 2012
International Development Association-19956Total Interest Repayment in Second Quarter of 2012
International Development Association388956Total Disbursement in Third Quarter of 2012
International Development Association1456516Total Disbursement in Third Quarter of 2012
International Development Association3555141Total Disbursement in Third Quarter of 2012
International Development Association489201Total Disbursement in Fourth Quarter of 2012
International Development Association535607Total Disbursement in Fourth Quarter of 2012
International Development Association828143Total Disbursement in Fourth Quarter of 2012
International Development Association-39302Total Interest Repayment in Fourth Quarter of 2012
International Development Association370757Total Disbursement in First Quarter of 2013
International Development Association808621Total Disbursement in First Quarter of 2013
International Development Association1320942Total Disbursement in First Quarter of 2013
International Development Association132519Total Disbursement in Second Quarter of 2013
International Development Association744691Total Disbursement in Second Quarter of 2013
International Development Association988741Total Disbursement in Second Quarter of 2013
International Development Association-66681Total Interest Repayment in Second Quarter of 2013
International Development Association363896Total Disbursement in Third Quarter of 2013
International Development Association611717Total Disbursement in Third Quarter of 2013
International Development Association823133Total Disbursement in Third Quarter of 2013
International Development Association106346Total Disbursement in Fourth Quarter of 2013
International Development Association606118Total Disbursement in Fourth Quarter of 2013
International Development Association1235089Total Disbursement in Fourth Quarter of 2013
International Development Association-80861Total Interest Repayment in Fourth Quarter of 2013
International Development Association132208Total Disbursement in First Quarter of 2014
International Development Association549344Total Disbursement in First Quarter of 2014
International Development Association301090Total Disbursement in Second Quarter of 2014
International Development Association317895Total Disbursement in Second Quarter of 2014
International Development Association522393Total Disbursement in Second Quarter of 2014
International Development Association-95541Total Interest Repayment in Second Quarter of 2014
International Development Association8416Total Disbursement in Third Quarter of 2014
International Development Association102879Total Disbursement in Third Quarter of 2014
International Development Association254761Total Disbursement in Third Quarter of 2014
International Development Association113099Total Disbursement in Fourth Quarter of 2014
International Development Association229366Total Disbursement in Fourth Quarter of 2014
International Development Association610580Total Disbursement in Fourth Quarter of 2014
International Development Association-95177Total Interest Repayment in Fourth Quarter of 2014
International Development Association170332Total Disbursement in First Quarter of 2015
International Development Association-105530Total Commitment Cancellations in Second Quarter of 2015
International Development Association-28345Total Disbursement in Second Quarter of 2015
International Development Association-93318Total Interest Repayment in Second Quarter of 2015
International Development Association-96601Total Interest Repayment in Fourth Quarter of 2015
International Development Association-95253Total Interest Repayment in Second Quarter of 2016
International Development Association-94024Total Interest Repayment in Fourth Quarter of 2016
International Development Association-92237Total Interest Repayment in Second Quarter of 2017
International Development Association-98084Total Interest Repayment in Fourth Quarter of 2017
International Development Association-97610Total Interest Repayment in Second Quarter of 2018
International Development Association-94428Total Interest Repayment in Fourth Quarter of 2018
International Development Association-251809Total Loan Repayment in Fourth Quarter of 2018
International Development Association-93529Total Interest Repayment in Second Quarter of 2019
International Development Association-251929Total Loan Repayment in Second Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Phnom Penh
11.5620 104.9160
Khett Svay Rieng
11.1670 105.8330
Skon
12.0570 105.0740
Khett Prey Veng
11.3670 105.4670
Pursat
12.5390 103.9190
Krong Phnum Penh
11.5750 104.9140
Kratie
12.4880 106.0190
Khett Kandal
11.4170 105.0000
Kampong Thum
12.7110 104.8890
Khett Kampong Chhnang
12.1670 104.5500
Kampong Chhnang
12.2500 104.6670
Kampong Chhnang
12.2600 104.6700
Phnom Penh
11.5590 104.9180
Stueng Saen
12.6300 104.8700
Svay Pao
13.0850 103.1800
Sangkae
13.0600 103.4200
Moung Ruessei
12.7800 103.4200
Bakan
12.7800 103.7900
Sampov Meas
12.4710 103.9180
Krakor
12.4800 104.1900
Baribour
12.4300 104.4700
Rolea B'ier
12.2100 104.6100
Kracheh
12.5700 106.2000
Cheung Prey
12.1000 105.0700
Baray
12.4200 105.0600
Santuk
12.6400 105.3200
Siem Reab
13.3100 103.8500
Batdambang
13.1030 103.1980
Intermediate Results Indicator
Roads in good and fair condition as a share of total classified roads
Focused on primary roads (2100 km)
New closing date
Significant improvement has been made since 2008.
Intermediate Results Indicator
Civil works performed by private contractors
% of the contracts performed by private contractors
25% of the contracts performed by private contractors.
Most of the Regional Offices have been outsourcing the road maintenance activities to private contractors. Performance BasedContracting approach is being increasingly introduced to replace force account.
Intermediate Results Indicator
Domestic revenue for routine and periodic maintenance and spot rehabilitation
New closing date
National budget for all types of maintenance for 2014 is kept at US$50 million.
Intermediate Results Indicator
RMDS fully operational with proper usage of software and project level analysis
New closing date
RDCMU is capable of using RMDS to update annual work plan, running economic and sensitive analyzes on candidate roads to berehabilitated or maintained.
Intermediate Results Indicator
Capacity building of GDPW staff improved in: (a) Design of surface treatments; (b) cost estimates; (c) M&E of road maintenance works; (d) supervision and maintenance works
New closing date
Out of 149 staff who trained on (i) design of surface treatments, (ii) cost estimates; (iii) M & E of road maintenance works, (iv)supervision and maintenance works, whose knowledge was briefly assessed by RAMO (fair=5%; good=25%, very good=70%).
Intermediate Results Indicator
MPWT prepares annual maintenance works plan using RMDS and submits budget requests to MEF by June based on medium term program
New closing date
The three year road maintenance program (2014 - 2016) was produced and it has been annually updated. As required for 2015 updating,the RDCMU is carrying out the road condition survey till May 2014 and the updating will complete in June 2014.(The first annualmaintenance plan was produced in 2013).
PDO Indicator
Travel time is maintained or reduced
Travel time for 100 km was 2 hours
New closing date
Travel time for 100 km was slightly increased from 1 hour and 20 minutes to 1 hour and 35 minutes.
PDO Indicator
Roads rehabilitated, Non-rural
New closing date
Additional 16 km are under rehabilitation.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
274439.99
274440.01
274440.01
411660.00
411660.00
411660.00
411660.00
411660.00
411660.00
686099.99
686100.01
686100.01
686099.99
686100.01
686100.01
686099.99
686100.01
686100.01
768431.99
768432.01
768432.01
768431.99
768432.01
768432.01
768431.99
768432.01
768432.01
686099.99
686100.01
686100.01
686099.99
686100.01
686100.01
686099.99
686100.01
686100.01
603767.99
603768.01
603768.01
411660.00
411660.00
411660.00
411660.00
411660.00
411660.00
411660.00
411660.00
411660.00
411660.00
411660.00
411660.00
274439.99
274440.01
274440.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
35592.78
35592.80
35592.80
0.00
0.00
0.00
1388.89
1388.89
1388.91
6333.24
6333.24
6333.24
0.00
0.00
0.00
47078.74
47078.74
47078.74
4073.61
4073.61
4073.61
27240.23
27240.25
27240.25
502192.98
502192.98
502192.99
304079.30
304079.30
304079.30
800287.62
800287.62
800287.64
383130.78
383130.79
383130.79
1171442.19
1171442.21
1171442.21
1943055.64
1943055.64
1943055.64
660039.69
660039.70
660039.70
899496.60
899496.60
899496.60
678485.27
678485.27
678485.27
653364.57
653364.59
653364.59
696939.97
696939.97
696939.98
243022.77
243022.79
243022.79
246996.00
246996.00
246996.00
274439.99
274440.01
274440.01
274439.99
274440.01
274440.01
164664.00
164664.00
164664.00
26719.04
26719.06
26719.06
Finance Agreement :Sch.2; Section I.A.2(e) | Description :Provide annual periodic maint. funding of no less than: (i) $300,000(2009); (ii) $2.5m (2010); (iii) $3.75m (2011); (iv) $4m (2012); (v) $4.25m (2013) | Due Date :15-Jan-2010
Finance Agreement :Sch.2; Section I.A.2(g) | Description :Have tech aud of civil works, goods & Serv fin by Proj & on work referredto in subpara(f) of this para undertaken annually by ind auditors acceptable to the Assoc. & furnish aud reports to Assoc. |Frequency :Yearly
Finance Agreement :Sch.2; Section I.A.2(m) | Description :Take such actions to establish a formal reporting relationship for theRoad Data Collection and Management Unit which shall be fully operational by December 31, 2010; | Due Date :31-Dec-2010
Finance Agreement :Sch.2; Section I.A.2(n) | Description :Adopt a strategic plan for divestiture of force account units; | Due Date:31-Dec-2010
44000-P157858
World Bank
International Development Association
MINISTRY OF EDUCATION YOUTH AND SPORT
International Development Association
MINISTRY OF EDUCATION YOUTH AND SPORTCAMBODIA
Secondary Education Improvement Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Simeth Beng
sbeng@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Secondary EducationPublic Administration - EducationStudent AssessmentEducation FacilitiesTeachersEducation Governance, School-Based ManagementEducation
International Development Association40000000Total Commitment in Second Quarter of 2017
International Development Association7814700Total Disbursement in Fourth Quarter of 2017
International Development Association3303966Total Disbursement in First Quarter of 2018
International Development Association-38394Total Interest Repayment in Second Quarter of 2018
International Development Association-40696Total Interest Repayment in Fourth Quarter of 2018
International Development Association5129626Total Disbursement in First Quarter of 2019
International Development Association5796000Total Disbursement in Second Quarter of 2019
International Development Association-40941Total Interest Repayment in Second Quarter of 2019Project Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Pursat
12.3330 103.6670
Battambang
12.9170 103.0830
Takeo
10.9170 104.8330
Svay Rieng
11.1670 105.8330
Stung Treng
13.7500 106.2500
Ŏtâr MEanchey
14.1670 103.5000
Siem Reap
13.5000 104.0000
Ratanakiri
13.8330 107.1170
Prey Veng
11.3670 105.4670
Preah Vihear
13.7500 105.0000
Phnom Penh
11.5750 104.9140
Pailin
12.8670 102.6000
Mondolkiri
12.7500 107.0000
Kratie
12.6670 106.0830
Kep
10.5130 104.3170
Koh Kong
11.5000 103.5000
Kandal
11.4170 105.0000
Kampot
10.8330 104.3330
Kampong Thom
12.8330 105.0000
Kampong Speu
11.5000 104.3330
Kampong Chhnang
12.1670 104.5500
Kampong Cham
12.0500 105.2500
Kingdom of Cambodia
13.0000 105.0000
Sihanoukville
10.6670 103.7500
Banteay Meanchey
13.7500 103.0000
Tboung Khmum
11.9800 105.6500
Intermediate Results Indicator
Number of schools that publicly display development plan
Intermediate Results Indicator
Number of schools that conduct teacher assessment based on Teacher Professional Standards
Intermediate Results Indicator
Number of school rehabilitated
Intermediate Results Indicator
Number of SSCs participating in decision making process of schools.
Intermediate Results Indicator
Number of submitted POE improvement plans based on the SIF manual
Intermediate Results Indicator
Number of submitted DOE improvement plans based on the SIF manual
Intermediate Results Indicator
Number of enrolled teachers in TUP
Intermediate Results Indicator
Number of school directors/deputy who graduate LUP
Intermediate Results Indicator
Number of school directors /deputy directors who are enrolled in LUP
Intermediate Results Indicator
Number of classrooms constructed in new locations
Intermediate Results Indicator
PISA For Development Report completed
Intermediate Results Indicator
Results of an independent SIF program impact evaluation are discussed in a policy meeting with MoEYS, MEF, MoPW, and relevant DPs
Intermediate Results Indicator
School Improvement Fund Manual produced/revised for school based management activity
Intermediate Results Indicator
Training plans for POE, DOE and school levels produced for school based management activity
Intermediate Results Indicator
Annual status report for SIF produced
Intermediate Results Indicator
MoEYS formally adopted a Teacher Upgrading Strategy as well as a corresponding implementation plan and its Operational Manual
Intermediate Results Indicator
MOEYS formally adopted Leadership Upgrading Training Manual
PDO Indicator
Direct project beneficiaries
PDO Indicator
Number of target lower secondary schools that have achieved minimum standards
PDO Indicator
Number of teachers who graduate from TUP
PDO Indicator
Number of enrolled students in newly constructed lower secondary schools (total/female)
PDO Indicator
Female beneficiaries
0.00
0.00
0.00
975000.00
975000.00
975000.00
975000.00
975000.00
975000.00
975000.00
975000.00
975000.00
975000.00
975000.00
975000.00
1025000.00
1025000.00
1025000.00
1025000.00
1025000.00
1025000.00
1025000.00
1025000.00
1025000.00
1025000.00
1025000.00
1025000.00
708333.33
708333.33
708333.33
708333.33
708333.33
708333.33
708333.33
708333.33
708333.33
708333.33
708333.33
708333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
533333.33
91666.67
91666.67
91666.67
91666.67
91666.67
91666.67
91666.67
91666.67
91666.67
91666.67
91666.67
91666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
925000.00
925000.00
925000.00
925000.00
925000.00
925000.00
925000.00
925000.00
925000.00
925000.00
925000.00
925000.00
1333333.33
1333333.33
1333333.34
1200000.00
1200000.00
1200000.00
2633333.33
2633333.33
2633333.34
66666.67
66666.67
66666.66
700000.00
700000.00
700000.00
700000.00
700000.00
700000.00
700000.00
700000.00
700000.00
700000.00
700000.00
700000.00
358333.33
358333.33
358333.33
358333.33
358333.33
358333.33
358333.33
358333.33
358333.33
358333.33
358333.33
358333.37
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.63
0.00
0.00
0.00
0.00
Finance Agreement :Institutional Arrangements (Section I.A., Schedule 2 of the Financing Agreement) | Description :Obligation ofthe Recipient to maintain, at all times during the implementation of the Project, the Project Management Committee (PMC) and theProject Management Team (PMT), all with functions, composition, staffing and resources satisfactory to the Association. | Frequency:CONTINUOUS
Finance Agreement :Project Operational Manual(s)(Section I.B., Schedule 2 of the FA) | Description :Obligation of the Recipient tocarry out the Project in accordance with the Project Operational Manual (POM), and not amend, waive or abrogate any provisions ofthe manual unless the Association agrees otherwise in writing. | Frequency :CONTINUOUS
Finance Agreement :Annual Work Plans and Budgets (Section I.C., Schedule 2 of the FA) | Description :Obligation of the Recipient tofurnish to the Association, no later than December 1 of each year, an annual work plan and budget for the Project for the followingFiscal Year, in a manner and substance satisfactory to the Association, and thereafter implement the activities under the Projectduring the relevant Fiscal Year in accordance with such plan and budget. | Frequency :Yearly
Finance Agreement :Environmental and Social Safeguards (Section I.E., Schedule 2 of the FA) | Description :The Recipient shallensure that the project is carried out in accordance with the Environmental and Social Management Framework (ESMF), IndigenousPeoples Planning Framework (IPPF), the Resettlement Policy Framework (RPF), and ensure that any studies and TA activities to besupported by the project are carried out under TORs satisfactory to the Association and are consistent with the Associationâssafeguard policies. | Frequency :CONTINUOUS
Finance Agreement :Submission of Disbursement-Linked Indicators Reports (I.D.Schedule 2 of the FA) | Description :The Recipientshall: not later than June 30 and December 31 of each year during the implementation of this project furnish reports to theAssociation on the status of achievement of the relevant DLI targets. | Frequency :Yearly
Finance Agreement :Contingent Emergency Response (Section I.G., Schedule 2 of the FA) | Description :The Recipient shall adopt asatisfactory Emergency Response Manual (ERM) for Component 3 of the project and, in the event of an eligible crisis or emergency,ensure that the activities under said Component are carried out in accordance with such Manual and all relevant safeguardrequirements. | Frequency :CONTINUOUS
44000-P153591
World Bank
International Development Association
MINISTRY OF INTERIOR AND MINISTRY OF AGRICULTURE, FORESTRY A
International Development Association
MINISTRY OF INTERIOR AND MINISTRY OF AGRICULTURE, FORESTRY ACAMBODIA
KH - Livelihood Enhancement and Association of the Poor Project (LEAP)
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Erik Caldwell Johnson
ejohnson1@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Workforce Development and Vocational EducationTourismPublic Administration - Social ProtectionAgricultural markets, commercialization and agri-businessSocial ProtectionLabor Market Policy and ProgramsActive Labor Market ProgramsRural Infrastructure and service deliveryRural MarketsUrban DevelopmentSkills DevelopmentServices and Housing for the PoorRural Development
International Development Association20170000Total Commitment in First Quarter of 2017
International Development Association250000Total Disbursement in Third Quarter of 2017
International Development Association313223Total Disbursement in First Quarter of 2018
International Development Association57089Total Disbursement in Second Quarter of 2018
International Development Association202891Total Disbursement in Second Quarter of 2018
International Development Association-1063Total Interest Repayment in Second Quarter of 2018
International Development Association107592Total Disbursement in Third Quarter of 2018
International Development Association71454Total Disbursement in Fourth Quarter of 2018
International Development Association-3236Total Interest Repayment in Fourth Quarter of 2018
International Development Association73008Total Disbursement in First Quarter of 2019
International Development Association86310Total Disbursement in Second Quarter of 2019
International Development Association205780Total Disbursement in Second Quarter of 2019
International Development Association545977Total Disbursement in Second Quarter of 2019
International Development Association-3609Total Interest Repayment in Second Quarter of 2019
International Development Association198542Total Disbursement in Third Quarter of 2019Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Ta Siem
13.6270 104.2500
Srok Sotr Nikom
13.3330 104.0000
Siem Reap
13.3620 103.8610
Srok Puok
13.4440 103.6590
Phumi Yeang
13.6910 103.6390
Phumi Trei Nhor
13.5770 103.7140
Phumi Trapeang Thum
13.3170 104.0110
Khum Prek Leab
11.6370 104.9200
Khum Kouk Roka
11.5900 104.8200
Khum Khmuonh
11.6120 104.8690
Khum Chbar Ampou
11.5330 104.9360
Khum Chaomchau
11.5300 104.8410
Kampong Khleang
13.1030 104.1230
Kampong Kdei
13.1220 104.3410
Srok Chikreng
13.2500 104.4170
Svay Leu
13.6920 104.2740
Kralanh
13.5740 103.4880
Srok Angkor Thum
13.5790 103.8560
Khan Dangkao
11.5250 104.8390
Khan Chey Por Senchey
11.5630 104.7890
Khan Mean Chey
11.5200 104.9550
Khan Chamkar Mon
11.5440 104.9220
Khan 7 Makara
11.5630 104.9140
Khan Tuol Kouk
11.5670 104.9000
Khan Duon Penh
11.5760 104.9200
Khan Russey Keo
11.6190 104.9100
Srok Prasat Bakong
13.2100 103.9770
Phumi Svay Chek
13.5150 103.8160
Phumi Peak Sneng
13.5780 103.8810
Phumi Mukh Pen
13.4830 103.6160
Phumi Lvea (1)
13.7390 103.5790
Phumi Khna Krau Phnum
13.7430 104.1410
Phumi Khang Cheung Vott
13.2130 103.9740
Phumi Kdei Run
13.6200 103.6210
Phumi Kantreang
13.3460 104.0180
Phumi Don Kev
13.4890 103.7640
Phumi Chrouy Neang Nuon
13.8340 103.5140
Phumi Chong Kaoh Nea
13.2240 103.8200
Phum Beng Meatea
13.4680 104.2300
Phumi Balang
13.3790 104.0070
Phumi Spean Tnaot
13.0910 104.3980
Phumi Sleng Spean
13.8660 103.5480
Phumi Sarsar Sdam
13.5050 103.6100
Phumi Samraong Yea
13.4120 103.7290
Phumi Roluos
13.4090 103.7620
Phumi Reul
13.7050 103.5840
Phumi Prey Chruk
13.5330 103.5520
Intermediate Results Indicator
Participants receiving skills development training
Intermediate Results Indicator
SHGs supported (Number)
Intermediate Results Indicator
Client days of training provided (number)
Intermediate Results Indicator
Sub-projects that are expected to have a mechanism for post-completion operation
Intermediate Results Indicator
Client days of training provided - Female (number)
Intermediate Results Indicator
Total amount of savings mobilized (US$)
Intermediate Results Indicator
Completion community-identified small-scale infrastructure sub-projects assessed as good quality in technical audit
Intermediate Results Indicator
Sub-projects with post-project community engagement or O&M arrangements (%)
Intermediate Results Indicator
Agricultural producers receiving training who report improved returns to labor
PDO Indicator
Beneficiaries that feel project inv. reflected their needs - male (number)
PDO Indicator
Total beneficiaries - male (number)
PDO Indicator
Total beneficiaries - female (number)
PDO Indicator
Beneficiaries that feel project inv. reflected their needs - female (number)
PDO Indicator
Direct project beneficiaries
PDO Indicator
Participants receiving skills development training with new or improved employment or increased income (percentage)
PDO Indicator
Beneficiaries that feel project investments reflected their needs (percentage)
PDO Indicator
Self-Help Groups (SHGs) self-reliance rating is moderately satisfactory or better, (percentage)
PDO Indicator
Female beneficiaries
100000.00
100000.00
100000.00
100000.00
100000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
280833.33
280833.33
280833.33
280833.33
280833.33
280833.33
280833.33
280833.33
280833.33
280833.33
280833.33
280833.33
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
100000.00
100000.00
100000.00
100000.00
100000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
280833.33
280833.33
280833.33
280833.33
280833.33
280833.33
280833.33
280833.33
280833.33
280833.33
280833.33
280833.33
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
275000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
Finance Agreement: Institutional Arrangements (Section I.A, Schedule 2 of Financing Agreement) | Description: Obligation of theRecipient to maintain, throughout the implementation of the project, the SC, PCO and SMTs, all with composition, functions,staffing and resources satisfactory to IDA. | Frequency: CONTINUOUS
Finance Agreement: PIM (Section I.B, Schedule 2 of Financing Agreement) | Description: Obligation of the Recipient to carry out theproject in accordance with the Project Implementation Manual (PIM). | Frequency: CONTINUOUS
Finance Agreement: Annual Work Plans and Budgets (Section I.C, Schedule 2 of Financing Agreement) | Description: Obligation of theRecipient to prepare and furnish to IDA, for its approval, the annual work plans and budgets containing all activities and eligibleexpenditures to be included in the project in each fiscal year of the Recipient. Due date is November 30 of each year. | Frequency:Yearly
Finance Agreement: Sub-projects (Section I.D, Schedule 2 of Financing Agreement) | Description: Obligation of the Recipient toensure that all Community Grant sub-projects have been prepared, approved and implemented in accordance with the eligibilitycriteria, guidelines and procedures specified in the PIM, and under Grant Agreements with each beneficiary Commune Council on termsand conditions acceptable to IDA and set out in the Financing Agreement. | Frequency: CONTINUOUS
Finance Agreement: Environmental and Social Safeguards (Section I.E, Schedule 2 of FA) | Description: Obligation of the Recipientto carry out the project in accordance with the Environmental and Social Management Framework (ESMF) and Resettlement PolicyFramework (RPF) as specified in the safeguard provisions of the Financing Agreement. | Frequency: CONTINUOUS
44000-P089196
World Bank
International Development Association
MINISTRY OF COMMERCE
International Development Association
MINISTRY OF COMMERCECAMBODIA
Cambodia Trade Facilitation and Competitiveness (Julian Clark co-TTL)
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Huot Chea
+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Other Public AdministrationTradeRural Infrastructure and service deliveryUrban Infrastructure and Service DeliveryJob CreationBusiness Enabling EnvironmentJobsTransparency, Accountability and Good GovernanceInnovation and Technology PolicyTrade FacilitationPublic AdministrationRural DevelopmentUrban DevelopmentTrade
International Development Association10000000Total Commitment in Second Quarter of 2005
International Development Association169181Total Disbursement in Third Quarter of 2005
International Development Association-11483Total Disbursement in First Quarter of 2006
International Development Association200599Total Disbursement in First Quarter of 2006
International Development Association1000000Total Disbursement in Second Quarter of 2006
International Development Association52660Total Disbursement in Third Quarter of 2006
International Development Association200000Total Disbursement in Third Quarter of 2006
International Development Association8396Total Disbursement in Fourth Quarter of 2006
International Development Association14986Total Disbursement in First Quarter of 2007
International Development Association207581Total Disbursement in Second Quarter of 2007
International Development Association11222Total Disbursement in Third Quarter of 2007
International Development Association14357Total Disbursement in Fourth Quarter of 2007
International Development Association600000Total Disbursement in Fourth Quarter of 2007
International Development Association16009Total Disbursement in First Quarter of 2008
International Development Association10952Total Disbursement in Second Quarter of 2008
International Development Association200000Total Disbursement in Second Quarter of 2008
International Development Association550647Total Disbursement in Third Quarter of 2008
International Development Association33054Total Disbursement in Fourth Quarter of 2008
International Development Association80279Total Disbursement in First Quarter of 2009
International Development Association274702Total Disbursement in First Quarter of 2009
International Development Association85317Total Disbursement in Second Quarter of 2009
International Development Association136746Total Disbursement in Third Quarter of 2009
International Development Association265779Total Disbursement in Third Quarter of 2009
International Development Association76133Total Disbursement in Fourth Quarter of 2009
International Development Association210137Total Disbursement in Fourth Quarter of 2009
International Development Association129326Total Disbursement in First Quarter of 2010
International Development Association131607Total Disbursement in First Quarter of 2010
International Development Association124141Total Disbursement in Second Quarter of 2010
International Development Association200218Total Disbursement in Second Quarter of 2010
International Development Association235776Total Disbursement in Second Quarter of 2010
International Development Association72416Total Disbursement in Third Quarter of 2010
International Development Association169312Total Disbursement in Third Quarter of 2010
International Development Association60238Total Disbursement in Fourth Quarter of 2010
International Development Association82549Total Disbursement in Fourth Quarter of 2010
International Development Association88390Total Disbursement in Fourth Quarter of 2010
International Development Association70924Total Disbursement in First Quarter of 2011
International Development Association593891Total Disbursement in First Quarter of 2011
International Development Association153158Total Disbursement in Second Quarter of 2011
International Development Association402526Total Disbursement in Second Quarter of 2011
International Development Association35875Total Disbursement in Third Quarter of 2011
International Development Association62189Total Disbursement in Third Quarter of 2011
International Development Association289320Total Disbursement in Third Quarter of 2011
International Development Association52369Total Disbursement in Fourth Quarter of 2011
International Development Association69207Total Disbursement in Fourth Quarter of 2011
International Development Association239244Total Disbursement in Fourth Quarter of 2011
International Development Association54347Total Disbursement in First Quarter of 2012
International Development Association280164Total Disbursement in First Quarter of 2012
International Development Association309395Total Disbursement in First Quarter of 2012
International Development Association82965Total Disbursement in Second Quarter of 2012
International Development Association610523Total Disbursement in Second Quarter of 2012
International Development Association350155Total Disbursement in Third Quarter of 2012
International Development Association485862Total Disbursement in Third Quarter of 2012
International Development Association-315464Total Commitment Cancellations in Fourth Quarter of 2012
International Development Association6710Total Disbursement in Fourth Quarter of 2012Project Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportProject Performance Assessment ReportContract AwardsProject URLProcurement Notices
Phnom Penh
11.5620 104.9160
Sihanoukville
10.6090 103.5300
Kingdom of Cambodia
13.0000 105.0000
Intermediate Results Indicator
Share of Customs declaration processed through ASYCUDA system
2009 Project Restructuring
or above
Customs declaration processed through ASYCUDA for July 2012. GDCE
Intermediate Results Indicator
Customs automation system availability
2009 Project Restructuring
or above
Customs declaraton processed through ASYCUDA for July 2012. GDCE
Intermediate Results Indicator
Share of certificates of origin processed electronically
2009 Project Restructuring
or above
Ministry of Commerce
Intermediate Results Indicator
Share of non-donor revenues of Better Factories Cambodia
2009 Project Restructuring
Non-donor funding for BFC operations reached 55% in 2011 and 75% in 2012 (Committed Budget).
Intermediate Results Indicator
Number of documents required to clear imports.
2009 Project Restructuring
Doing Business 2012
Intermediate Results Indicator
Share of shipments selected for secondary inspection at the port of Sihanoukville
(Red channel) Risk-based selection. Risk Management System works along the line of ASYCUDA System
(Red channel) Risk-based selection. Risk Management System works along the line of ASYCUDA System
Intermediate Results Indicator
Time to clear import declarations.
5.1 days was set at the 2009 Project Restructuring and 6.5 days was the number of days spent during the project design.
Preliminary Investment Climate Assessment 2012
Intermediate Results Indicator
Number of firms preparing draft export development plans.
2009 Project Restructuring
EMAF Manager Final Report
Intermediate Results Indicator
Number of new exporters created.
2009 Project Restructuring
EMAF Manager Final Report
Intermediate Results Indicator
Number of PPI contracts piloted under the new Law on Concessions (including public disclosure and appropriate procurement process)
2009 Project Restructuring.
Council for the Development of Cambodia (CDC)
Intermediate Results Indicator
Ranking in Global Investment Promotion Benchmarking
2009 Project Restructuring
Global Investment Promotion Benchmarking (GIPB 2012)
Intermediate Results Indicator
Establishment of well-maintained website and accessible electronic dissemination covering 50% of judgements (Supreme Court and Court of Appeal)
2009 Project Restructuring
Estimated by Bank Staff. Electronic dissemination of some judgments are posted on the supreme court website
Intermediate Results Indicator
Establishment of Trade Information Website (TIW) compliant with WTO obligations (Ministry of Commerce)
2009 Project Restructuring
Ministry of Commerce
Intermediate Results Indicator
Establishment of Trade Information Website compliant with WTO obligations
Ministry of Commerce
Ministry of Commerce
PDO Indicator
Share of traders considering "Customs and Trade" as a severe or very severe constraint
July/September 2009 Cambodia Rapid Firm Survey (new baseline set during 2009 restructuring)
Preliminary Investment Climate Assessment 2012
PDO Indicator
Quality improvement in investment climate. The number of firms reporting corruption as a moderate, major or severe problem declinesby 10%
ICA 2003/2004
Preliminary Investment Climate Assessment 2012
0.00
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.37
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
119432.46
119432.46
119432.46
333333.33
333333.33
333333.34
84219.98
84219.98
84219.99
2798.78
2798.78
2798.79
4995.45
4995.45
4995.45
69193.80
69193.80
69193.80
3740.51
3740.51
3740.51
204785.62
204785.62
204785.62
5336.28
5336.29
5336.29
70317.35
70317.36
70317.36
183549.10
183549.11
183549.11
11017.93
11017.94
11017.94
118327.21
118327.21
118327.21
28438.91
28438.91
28438.92
156423.15
156423.15
156423.16
156423.15
156423.15
156423.16
156423.15
156423.15
156423.16
156423.15
156423.15
156423.16
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
116666.66
116666.67
116666.67
116666.66
116666.67
116666.67
116666.66
116666.67
116666.67
116666.66
116666.67
116666.67
108705.16
108705.16
108705.16
108705.16
108705.16
108705.16
108705.16
108705.16
108705.16
108705.15
108705.16
108705.16
44000-P148647
World Bank
International Development Association
CAMBODIA NATIONAL MEKONG COMMITTEE
International Development Association
CAMBODIA NATIONAL MEKONG COMMITTEECAMBODIA
Mekong Integrated Water Resources Management Project- Phase III
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Virak Chan
vchan1@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - Agriculture, Fishing & ForestryPublic Administration - Water, Sanitation and Waste ManagementFisheriesOther Agriculture, Fishing and ForestryRural Infrastructure and service deliveryWater Institutions, Policies and ReformRural DevelopmentWater Resource Management
International Development Association15000000Total Commitment in Second Quarter of 2016
International Development Association800000Total Disbursement in Fourth Quarter of 2016
International Development Association1000000Total Disbursement in Fourth Quarter of 2016
International Development Association33539Total Disbursement in Second Quarter of 2017
International Development Association-4480Total Interest Repayment in Second Quarter of 2017
International Development Association33975Total Disbursement in Third Quarter of 2017
International Development Association45769Total Disbursement in Third Quarter of 2017
International Development Association414580Total Disbursement in Fourth Quarter of 2017
International Development Association-7205Total Interest Repayment in Fourth Quarter of 2017
International Development Association62727Total Disbursement in First Quarter of 2018
International Development Association225491Total Disbursement in First Quarter of 2018
International Development Association119846Total Disbursement in Second Quarter of 2018
International Development Association148617Total Disbursement in Second Quarter of 2018
International Development Association-9243Total Interest Repayment in Second Quarter of 2018
International Development Association43600Total Disbursement in Third Quarter of 2018
International Development Association232813Total Disbursement in Third Quarter of 2018
International Development Association220265Total Disbursement in Fourth Quarter of 2018
International Development Association235131Total Disbursement in Fourth Quarter of 2018
International Development Association-10899Total Interest Repayment in Fourth Quarter of 2018
International Development Association119200Total Disbursement in First Quarter of 2019
International Development Association306621Total Disbursement in First Quarter of 2019
International Development Association409230Total Disbursement in Second Quarter of 2019
International Development Association-13512Total Interest Repayment in Second Quarter of 2019
International Development Association164914Total Disbursement in Third Quarter of 2019
International Development Association167649Total Disbursement in Third Quarter of 2019Project Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Tonle Sap
12.9240 103.9150
Prêk TE
12.4470 106.0290
Stung Treng
13.7500 106.2500
Ratanakiri
13.8330 107.1170
Prêk Preăh
13.0730 106.0790
Mondolkiri
12.7500 107.0000
Prêk Kriĕng
12.6520 105.9930
Kratie
12.6670 106.0830
Prêk Kămpir
12.6170 106.0210
Kingdom of Cambodia
13.0000 105.0000
Intermediate Results Indicator
Sub-national river basin committees established in the 3S and 4P sub-basins per Government of Cambodia regulations.
Intermediate Results Indicator
Citizens involved in planning/implementation/evaluation of development programs through participation in partially or fully functional CFis.
Intermediate Results Indicator
CFis with an approved management plan
Intermediate Results Indicator
River Basins stakeholders trained in water resource management processes and benefits (Number of Workshops)
Intermediate Results Indicator
River Sub-Basin Profiles Updated in the 3S and 4P sub-basins (seven sub-basins in total)
Intermediate Results Indicator
River sub-basin profiles updated in the 3S and 4P sub-basins
Intermediate Results Indicator
Hydro-meteorological monitoring stations newly established or improved in and functioning the 3S and 4P sub-basin
Intermediate Results Indicator
Number of approved CFi Fisheries Management Plans with Gender Action Plans
Intermediate Results Indicator
Standard indicators and methodology to monitor fishery and management performance is designed by IFReDI/FiA
Intermediate Results Indicator
Operation of a hatchery in the project area
Intermediate Results Indicator
Eligibility criteria and disbursement mechanisms for livelihood enhancement packages are developed and agreed.
PDO Indicator
Exchange of WRM data between Vietnam and Cambodia as a result of Transboundary Cooperation.
PDO Indicator
Direct project beneficiaries
PDO Indicator
3S/ 4P sub-basin with functional water resources management models has been developed
PDO Indicator
Fully functioning CFis
PDO Indicator
Female beneficiaries
0.00
62500.00
62500.00
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
291666.66
291666.67
291666.67
291666.66
291666.67
291666.67
291666.66
291666.67
291666.67
291666.66
291666.67
291666.67
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
152500.00
152500.00
152500.00
152500.00
152500.00
152500.00
152500.00
152500.00
152500.00
152500.00
152500.00
152500.00
87500.00
87500.00
87500.00
87500.00
87500.00
87500.00
87500.00
87500.00
87500.00
87500.00
87500.00
87500.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
166666.67
166666.67
166666.66
366666.67
366666.67
366666.66
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
76666.67
76666.67
76666.67
76666.67
76666.67
76666.67
76666.67
76666.67
76666.67
76666.67
76666.67
76666.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Finance Agreement :Institutional Arrangements (FA, Schedule 2, Section I.A.1-3) | Description :The Recipient shall: (a) maintain,at all times during the implementation of the Regional Project Steering Committee, the Project Management Unit, and a Component 1Management Unit; and (b) establish, no later than one month after the effectiveness of the Financing Agreement, and thereaftermaintain the National Project Steering Committee. | Frequency :CONTINUOUS
Finance Agreement :Project Operational Manual (FA, Schedule 2, Section I.A.4) | Description :The Recipient shall carry out theProject in accordance with the Project operational manual. | Frequency :CONTINUOUS
Finance Agreement :Annual Work Plans and Budgets (FA, Schedule 2, Section I.C) | Description :The Recipient shall prepare andfurnish to the Association for its approval not later than December 1 of each calendar year, starting December 1, 2016, during theimplementation of the Project (or such later date as the Association may agree), a consolidated Annual Work Plan and Budgetcontaining all Project activities and Eligible Expenditures proposed to be included in the Project in the following calendar year,including a specification of the sources of financing for all Eligible Expenditures, and environmental and social safeguardmeasures taken or planned to be taken. | Frequency :Yearly
Finance Agreement :Livelihood Sub-Projects (FA, Schedule 2, Section I.D.2) | Description :The Recipient shall make availableLivelihood Sub-grant to eligible Livelihood Sub-projects under a Livelihood Sub-grant Agreement with the proposed Beneficiary onterms and conditions satisfactory to the Association. | Frequency :CONTINUOUS
Finance Agreement :Environmental and Social Safeguards (FA, Schedule 2, Section I.E.2) | Description :The Recipient shall implementthe Safeguards Instruments (the ESMF, the EMP, any ECOP, the RPF, any RAP, the IPPF, and any IPDP) in a manner and substancesatisfactory to the Association. | Frequency :CONTINUOUS
Finance Agreement :Mid-term Review (FA, Schedule 2, Section II.A.2) | Description :The Recipient shall carry out jointly with theAssociation a midterm review to assess the status of the Project, as measured against the performance indicators. | Due Date:31-Dec-2018
Finance Agreement :Cooperation with MRC (FA, Schedule 2, Section I.A.6) | Description :The Recipient shall fully cooperate on atimely basis with the MRC in its role in coordinating and facilitating the implementation of the Project to maintain the coherenceand consistency of the activities under the Project. | Frequency :CONTINUOUS
44000-P100084
World Bank
International Development Association
MINISTRY OF AGRICULTURE/MINISTRY OF HEALTH
International Development Association
MINISTRY OF AGRICULTURE/MINISTRY OF HEALTHCAMBODIA
Avian and Human Influenza Control and Preparedness Emergency Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Mudita Chamroeun
cmudita@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
FisheriesAgricultural Extension, Research, and Other Support ActivitiesCentral Government (Central Agencies)LivestockHealthSub-National GovernmentDisaster Response and RecoveryDisaster PreparednessDisaster Risk FinanceRural DevelopmentDisaster Risk ReductionDisaster Risk ManagementRural Infrastructure and service deliveryFinance for DevelopmentDisease Control
International Development Association6000000Total Commitment in First Quarter of 2008
International Development Association105000Total Disbursement in Fourth Quarter of 2008
International Development Association525000Total Disbursement in Fourth Quarter of 2008
International Development Association61944Total Disbursement in First Quarter of 2009
International Development Association18410Total Disbursement in Second Quarter of 2009
International Development Association3509Total Disbursement in Third Quarter of 2009
International Development Association10527Total Disbursement in Fourth Quarter of 2009
International Development Association166321Total Disbursement in Fourth Quarter of 2009
International Development Association67568Total Disbursement in First Quarter of 2010
International Development Association283667Total Disbursement in First Quarter of 2010
International Development Association21050Total Disbursement in Second Quarter of 2010
International Development Association69953Total Disbursement in Second Quarter of 2010
International Development Association92389Total Disbursement in Third Quarter of 2010
International Development Association584821Total Disbursement in Third Quarter of 2010
International Development Association30276Total Disbursement in Fourth Quarter of 2010
International Development Association348132Total Disbursement in Fourth Quarter of 2010
International Development Association24986Total Disbursement in First Quarter of 2011
International Development Association271754Total Disbursement in First Quarter of 2011
International Development Association42033Total Disbursement in Second Quarter of 2011
International Development Association170027Total Disbursement in Second Quarter of 2011
International Development Association353567Total Disbursement in Second Quarter of 2011
International Development Association33675Total Disbursement in Third Quarter of 2011
International Development Association43978Total Disbursement in Third Quarter of 2011
International Development Association185388Total Disbursement in Third Quarter of 2011
International Development Association52959Total Disbursement in Fourth Quarter of 2011
International Development Association190857Total Disbursement in Fourth Quarter of 2011
International Development Association14663Total Disbursement in First Quarter of 2012
International Development Association53710Total Disbursement in First Quarter of 2012
International Development Association4268Total Disbursement in Second Quarter of 2012
International Development Association522014Total Disbursement in Second Quarter of 2012
International Development Association50456Total Disbursement in Third Quarter of 2012
International Development Association80000Total Disbursement in Third Quarter of 2012
International Development Association114007Total Disbursement in Third Quarter of 2012
International Development Association72537Total Disbursement in Fourth Quarter of 2012
International Development Association172225Total Disbursement in Fourth Quarter of 2012
International Development Association20828Total Disbursement in First Quarter of 2013
International Development Association297537Total Disbursement in First Quarter of 2013
International Development Association47597Total Disbursement in Second Quarter of 2013
International Development Association119621Total Disbursement in Second Quarter of 2013
International Development Association173582Total Disbursement in Third Quarter of 2013
International Development Association271241Total Disbursement in Third Quarter of 2013
International Development Association-58101Total Disbursement in First Quarter of 2014
International Development Association584Total Disbursement in First Quarter of 2014
International Development Association96368Total Disbursement in Third Quarter of 2014
International Development Association-228Total Disbursement in Fourth Quarter of 2014
International Development Association14400Total Disbursement in Fourth Quarter of 2014
International Development Association-27353Total Commitment Cancellations in Second Quarter of 2015
International Development Association-13801Total Disbursement in Second Quarter of 2015Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementAgreementAgreementAgreementAgreementGrant or Trust Fund AgreementGrant or Trust Fund AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
a.1. Animal Health: Number of new VAHWs trained using the revised curriculum and percentage of these providing disease reports at commune meetings.
Exceeded the target
2122 new VAHW were trained, of which 83% provided disease reports. Refresher courses also provided to 3230 VAHW on avian and humaninfluenza. New training materials printed. Kits containing basic equipment for VAHWs provided to all those trained and certified.
Intermediate Results Indicator
a.2. Number of reports of suspected HPAI from VAHWs.
Exceeded the target
180 suspected cases were reported during the project implementation period. 174 of suspected HPAI cases were investigated within24hours.
Intermediate Results Indicator
a.3. Target for training in emergency vaccination met and government advised for findings.
An additional 90 vets were trained under Healthy Livestock Healthy Village, Better Life program.
Intermediate Results Indicator
a.4. Percentage of farms or markets on which recommended risk mitigation measures to prevent AI is fully implemented.
Exceeded the target
85% of farms provided with recommendations had adopted the measures. 648 farmers and 211 traders trained in basic bio-securitymeasures.
Intermediate Results Indicator
b.1. Human Health: Percentage of provincial and district rapid response teams trained.
Exceeded as of this date. Refresher training courses also provided to all members of the Rapid Response Teams.
Intermediate Results Indicator
b.2. Percentage of VHV trained in AI monitoring, reporting and control measures.
HSSP2 program database. Semiannual reported by HSSP2
Component moved to HSSP2. The ICR will be assessed only up to August 3, 2012.
There are about 9,000 VHVs in the country. WHO has been contracted to train them.
Intermediate Results Indicator
(ii) Percentage of investigated cases from which samples were collected.
60% in 2011
142 cases were typical of AI and had samples collected out of 174 investigated in 2013.
Intermediate Results Indicator
(iii) Percentage of cases from which testing for Avian Influenza and Newcastle Disease are done.
95% in 2011
All samples collected were transported and tested in NaVRI.
Intermediate Results Indicator
c.2. PPRRP prepared and tested.
Achieved. PPRRP developed and tested in targeted high risk provinces.
Intermediate Results Indicator
c.3. NCDM emergency MIS and M&E systems designed, developed and established.
Achieved. Emergency MIS and M&E systems designed, developed and established.
Intermediate Results Indicator
(i) Percentage of suspect cases investigated and time from report to investigation.
70% in 2011
Exceeded the target
439 (96%) out of 465 suspected HPAI cases were investigated within 24 hours.
Intermediate Results Indicator
b.3. Percentage of warning signals detection of cluster of patients with clinical symptoms of influenza, closely related in time and place followed by field investigation within 24 hours.
Most of outbreak detections have been made from indicator based and event based surveillance, sentinel surveillance and zoonosissurveillance.
Intermediate Results Indicator
b.4. Percentage of sentinel sites that generate ILI surveillance reports on time.
Exceeded. MOH extended the ILI sites from 6 to 10 and also conducted Severe Acute Respiratory Infection detection at 4 sites tocomplement the ILI surveillance to get the most accurate data for seasonal influenza and new strains of pandemic influenza.
Intermediate Results Indicator
b.5. Percent of targeted hospital staff trained for infection control and case management.
HSSP2 program database. Semi-annual reported by HSSP2 in 2012
Component moved to HSSP2, but the ICR will be measured till June 30, 2013.
Achieved.
Intermediate Results Indicator
b.6. Percentage of suspected patients treated according to infection control and case management guideline.
This target to 100% in May 2011.
Exceeded original target based on self-reported data. As per the joint press release of MoH and WHO on 56th H5N1 cases).
Intermediate Results Indicator
b.7. Pandemic preparedness plan developed and desk-top exercise implemented.
Achieved. A rapid containment plan was also developed but will no longer be tested through a desk-top exercise (consistent withthe recent shift of global health emphasis and WHO technical advice).
Intermediate Results Indicator
c.1. Inter-ministerial Cooperation for Pandemic Preparedness: NCDM's TOR modified to include inter-ministerial cooperation for pandemic preparedness.
Achieved (in Year 5 instead of Year 1 of the project).
PDO Indicator
Technologies demonstrated in the project areas (number)
A technology package on the proper cleaning of villages, vaccination of poultry according to plan, and cage rearing of chicks hasbeen demonstrated in the project villages.
PDO Indicator
Clients who have adopted an improved agr. technology promoted by the project
30 villages with 30 households adopting the measure per village.
1443.00 households have adopted improved poultry raising technologies promoted by the project.
PDO Indicator
Clients who adopted an improved agr. technology promoted by project – female
Exceeded the target
4990 women have attended training and they are raising poultry in their backyards following the training advice.
PDO Indicator
No case of H5N1 HPAI in periurban commercial poultry flocks once control and preventive measures are implemented.
This indicator is irrelevant as all cases were in rural areas.
PDO Indicator
Evidence of improved effectiveness of participating animal and human health services in responding to the risk of avian influenza in poultry and a human pandemic of influenza.
Through data on reporting of and response to disease outbreaks, field studies on farms and villages before and afterimplementationof preventive measures (earlier access to treatment would be a useful way of measuring this for all suspect cases).
Improved effectiveness is measured by the speed of response to reportedoutbreaks in poultry and humans by both animal and humanhealth response teams.
PDO Indicator
Number of villages adopting two or more disease preventive measures recommended under the "Healthy Livestock, Healthy Village, Better Life" scheme.
Accomplished.
In all 30 villages more than two measures were being implemented. 5885 households have benefited from this scheme.
0.00
0.00
0.00
163157.89
163157.89
163157.91
142105.26
142105.26
142105.26
142105.26
142105.26
142105.26
142105.26
142105.26
142105.26
168421.04
168421.06
168421.06
215789.46
215789.48
215789.48
215789.46
215789.48
215789.48
205263.16
205263.16
205263.16
178947.36
178947.36
178947.38
168421.04
168421.06
168421.06
131578.94
131578.94
131578.96
63157.89
63157.89
63157.89
63157.89
63157.89
63157.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
163157.89
163157.89
163157.91
142105.26
142105.26
142105.26
142105.26
142105.26
142105.26
142105.26
142105.26
142105.26
168421.04
168421.06
168421.06
215789.46
215789.48
215789.48
215789.46
215789.48
215789.48
205263.16
205263.16
205263.16
178947.36
178947.36
178947.38
168421.04
168421.06
168421.06
131578.94
131578.94
131578.96
63157.89
63157.89
63157.89
63157.89
63157.89
63157.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Environmental Management Plan (EMP) and Ethnic Minorities Planning Framework (EMPF) are both satisfactory to IDA, are approved byRecipient and properly disclosed in country.
The Project Implementation Plan, satisfactory to IDA, has been prepared by NCDM in coordination with the IAs, incl. arrangementsfor implementation, procurement, accounting, and FM.
MAFF and NCDM will establish complete financial management systems acceptable to IDA, including the establishment of computerizedaccounting software.
Annual work plans (with budgets) for each calendar year, will be presented not later than September 30th of the previous year fordiscussion with IDA.
Annual physical progress reports and financial statements for each preceding calendar year will be presented for discussion withIDA.
Mid-Term Progress and Assessment Report will be presented by NCDM, in collaboration with the IA, for discussion with IDA, at theend of the second year of implementation.
Annual Audit Reports, prepared by independent auditors, should be submitted to the Bank not later than June 30 every year.
44000-P157291
World Bank
International Development Association
MINISTRY OF HEALTH
International Development Association
MINISTRY OF HEALTHCAMBODIA
Cambodia Health Equity and Quality Improvement Project (H-EQIP)
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Ziauddin Hyder
zhyder@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - HealthSocial ProtectionHealthAdministrative and Civil Service ReformChild HealthReproductive and Maternal HealthHealth System StrengtheningPublic AdministrationHealth Systems and Policies
International Development Association30000000Total Commitment in Second Quarter of 2016
International Development Association375000Total Disbursement in Second Quarter of 2017
International Development Association3709628Total Disbursement in Second Quarter of 2017
International Development Association389133Total Disbursement in Third Quarter of 2017
International Development Association-13073Total Interest Repayment in Fourth Quarter of 2017
International Development Association-17793Total Interest Repayment in Second Quarter of 2018
International Development Association4548902Total Disbursement in Third Quarter of 2018
International Development Association435867Total Disbursement in Fourth Quarter of 2018
International Development Association-25142Total Interest Repayment in Fourth Quarter of 2018
International Development Association898545Total Disbursement in First Quarter of 2019
International Development Association-34823Total Interest Repayment in Second Quarter of 2019
International Development Association637500Total Disbursement in Third Quarter of 2019
International Development Association2633064Total Disbursement in Third Quarter of 2019Project Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementGrant or Trust Fund AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Kingdom of Cambodia
13.0000 105.0000
Intermediate Results Indicator
Number of women screened for cervical cancer screening with VIA (cumulative)
Intermediate Results Indicator
Number of University of Health Sciences courses that adopt competency-based curricula with trained faculty and use of skills laboratory (DLI 1).
Intermediate Results Indicator
Outpatient Department (OPD) consultations (new cases only) per person per year.
Intermediate Results Indicator
People who have received essential health, nutrition, and population (HNP) services
Intermediate Results Indicator
People who have received essential health, nutrition, and population (HNP) services - Female (RMS requirement)
Intermediate Results Indicator
Number of children immunized
Intermediate Results Indicator
Number of women and children who have received basic nutrition services
Intermediate Results Indicator
Number of deliveries attended by skilled health personnel
Intermediate Results Indicator
Percentage of health center, CPA-1, CPA-2, and CPA-3 facilities that receive payments based on performance that includes quality scores within 90 days of the end of the quarter.
Intermediate Results Indicator
Percentage of health centers, hospitals and OD/PHD receiving HEF and SDG payments within specified timelines (DLI 6).
Intermediate Results Indicator
Number of operational districts reporting an increase of over 10 percent in current LTFP service users over the previous 12 months(DLI 9)
Intermediate Results Indicator
Reduction in the variance in score on Health Center quality assessment.
Intermediate Results Indicator
Percentage of CPA-1, CPA-2 and CPA-3 facilities having a 60% quality score in the previous quality assessments.
Intermediate Results Indicator
Proportion of health centers with functioning health center management committees.
PDO Indicator
Increase in the number of health centers exceeding 60% score on the quality assessment of health facilities.
PDO Indicator
Increase in the number of outpatient services (episodes) covered by HEF
PDO Indicator
Reduction in the share of households that experienced impoverishing health spending during the year.
PDO Indicator
Reduction in out of pocket health expenditure as percentage of the total health expenditure.
1000000.00
1000000.00
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
1375553.33
1375553.33
1375553.34
1375553.33
1375553.33
1375553.34
1375553.33
1375553.33
1375553.34
1375553.33
1375553.33
1375553.34
1375553.33
1375553.33
1375553.34
1375553.33
1375553.33
1375553.34
1375553.33
1375553.33
1375553.34
1375553.33
1375553.33
1375553.34
1375553.33
1375553.33
1375553.34
1375553.33
1375553.33
1375553.34
1375553.33
1375553.33
1375553.34
1375553.33
1375553.33
1375553.34
1375553.33
1375553.33
1375553.34
2261491.11
2261491.11
2261491.11
2261491.11
2261491.11
2261491.11
2261491.11
2261491.11
2261491.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
724500.17
724500.17
724500.17
724500.17
724500.17
724500.17
724500.17
724500.17
724500.17
724500.17
724500.17
724500.13
921039.83
921039.83
921039.83
921039.83
921039.83
921039.83
921039.83
921039.83
921039.83
921039.83
921039.83
921039.87
1955166.67
1955166.67
1955166.67
1955166.67
1955166.67
1955166.67
1955166.67
1955166.67
1955166.67
1955166.67
1955166.67
1955166.63
1945162.50
1945162.50
1945162.50
1945162.50
1945162.50
1945162.50
1945162.50
1945162.50
1945162.50
1945162.50
1945162.50
1945162.50
1317260.33
1317260.33
1317260.33
1317260.33
1317260.33
1317260.33
1317260.33
1317260.33
1317260.33
1317260.33
1317260.33
1317260.37
728489.20
728489.20
728489.20
728489.20
728489.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Finance Agreement :Institutional Arrangements (Schedule 2 Section I.A) | Description :Obligation of the Recipient to maintain,throughout the Project implementation period, a health sector steering committee, technical working group and Projectimplementation team in the Ministry of Health, all with functions, staffing and resources satisfactory to the Association. | DueDate :
Finance Agreement :Project Operational Manual (Schedule 2 Section I.B) | Description :Obligation of the Recipient to carry out theProject in accordance with the Project Operational Manual, and not amend, waive or abrogate any provisions of the manual unless theAssociation agrees otherwise in writing. | Due Date :
Finance Agreement :Annual Operational Plans (AOPs) (Schedule 2 Section I.C) | Description :Obligation of the Recipient shallfurnish to the Association, not later than September 30 of each year, an annual operational plan for Project for the followingfiscal year, in substance satisfactory to the Association, covering the activities and expenditures proposed for the subsequentyear of Project implementation, including the Government, IDA and trust fund (TF) relative shares in the cost of the AOP. | DueDate :
Finance Agreement :Environmental and Social Safeguards (Schedule 2 Section I.F (b) and (c)) | Description :Obligation of theRecipient to ensure that the Project is carried out in accordance with the provisions of the Environmental Management Framework(EMF), Resettlement Policy Framework (RPF) and Indigenous Peoples Planning Framework (IPPF), not amend, abrogate or waive any oftheir provisions unless the Association agrees otherwise, and report on their status of implementation as part of the annualprogress reports. | Due Date :
Finance Agreement :DLI Reporting and Verification (Schedule 2 Section I.E) | Description :Obligation of the Recipient to submitannual reports by the MOH on the status of achievement of the Disbursement Linked Indicator (DLI) targets by July 31 of each year.| Due Date :
Finance Agreement :Contingent Emergency Response (Schedule 2 Section I.H) | Description :Obligation of the Recipient to adopt asatisfactory Emergency Response Manual for Component 4 of the Project and, in the event of an eligible crisis or emergency, ensurethat the activities under said component are carried out in accordance with such plan and all relevant safeguard requirements. |Due Date :
44000-P084787
World Bank
International Development Association
THE MINISTRY OF LAND MANAGEMENT, URBAN PLANNING AND CONSTRUC
International Development Association
THE MINISTRY OF LAND MANAGEMENT, URBAN PLANNING AND CONSTRUCCAMBODIA
Land Allocation for Social and Economic Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Mudita Chamroeun
cmudita@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Sub-National GovernmentOther Agriculture, Fishing and ForestryLandscape ManagementLand Administration and ManagementBiodiversityRenewable Natural Resources Asset ManagementRural DevelopmentSocial InclusionParticipation and Civic Engagement
International Development Association2800000Total Commitment in Second Quarter of 2008
International Development Association8700000Total Commitment in Second Quarter of 2008
International Development Association200000Total Disbursement in Fourth Quarter of 2008
International Development Association750000Total Disbursement in Fourth Quarter of 2008
International Development Association-781Total Interest Repayment in Second Quarter of 2009
International Development Association1533Total Disbursement in Second Quarter of 2009
International Development Association7012Total Disbursement in Second Quarter of 2009
International Development Association149943Total Disbursement in Third Quarter of 2009
International Development Association163001Total Disbursement in Third Quarter of 2009
International Development Association-819Total Interest Repayment in Fourth Quarter of 2009
International Development Association1932Total Disbursement in Fourth Quarter of 2009
International Development Association2642Total Disbursement in Fourth Quarter of 2009
International Development Association3997Total Disbursement in Fourth Quarter of 2009
International Development Association2640Total Disbursement in First Quarter of 2010
International Development Association351820Total Disbursement in First Quarter of 2010
International Development Association1884Total Disbursement in Second Quarter of 2010
International Development Association-743Total Interest Repayment in Second Quarter of 2010
International Development Association79941Total Disbursement in Second Quarter of 2010
International Development Association111165Total Disbursement in Second Quarter of 2010
International Development Association1955Total Disbursement in Third Quarter of 2010
International Development Association85641Total Disbursement in Third Quarter of 2010
International Development Association-764Total Interest Repayment in Fourth Quarter of 2010
International Development Association12354Total Disbursement in Fourth Quarter of 2010
International Development Association147880Total Disbursement in Fourth Quarter of 2010
International Development Association447151Total Disbursement in First Quarter of 2011
International Development Association-812Total Interest Repayment in Second Quarter of 2011
International Development Association996Total Disbursement in Second Quarter of 2011
International Development Association10925Total Disbursement in Second Quarter of 2011
International Development Association515039Total Disbursement in Second Quarter of 2011
International Development Association1975Total Disbursement in Third Quarter of 2011
International Development Association3581Total Disbursement in Third Quarter of 2011
International Development Association100458Total Disbursement in Third Quarter of 2011
International Development Association475405Total Disbursement in Third Quarter of 2011
International Development Association24174Total Disbursement in Fourth Quarter of 2011
International Development Association-805Total Interest Repayment in Fourth Quarter of 2011
International Development Association5210Total Disbursement in Fourth Quarter of 2011
International Development Association509594Total Disbursement in Fourth Quarter of 2011
International Development Association36209Total Disbursement in First Quarter of 2012
International Development Association29188Total Disbursement in First Quarter of 2012
International Development Association272733Total Disbursement in First Quarter of 2012
International Development Association48596Total Disbursement in Second Quarter of 2012
International Development Association75381Total Disbursement in Second Quarter of 2012
International Development Association-908Total Interest Repayment in Second Quarter of 2012
International Development Association202718Total Disbursement in Second Quarter of 2012
International Development Association557780Total Disbursement in Second Quarter of 2012
International Development Association7159Total Disbursement in Third Quarter of 2012
International Development Association262454Total Disbursement in Third Quarter of 2012
International Development Association276949Total Disbursement in Third Quarter of 2012
International Development Association425298Total Disbursement in Third Quarter of 2012
International Development Association72263Total Disbursement in Fourth Quarter of 2012
International Development Association249681Total Disbursement in Fourth Quarter of 2012
International Development Association-1674Total Interest Repayment in Fourth Quarter of 2012
International Development Association21712Total Disbursement in Fourth Quarter of 2012
International Development Association104278Total Disbursement in Fourth Quarter of 2012
International Development Association323774Total Disbursement in Fourth Quarter of 2012
International Development Association15532Total Disbursement in First Quarter of 2013
International Development Association418840Total Disbursement in First Quarter of 2013
International Development Association247568Total Disbursement in First Quarter of 2013
International Development Association254973Total Disbursement in First Quarter of 2013
International Development Association187820Total Disbursement in Second Quarter of 2013
International Development Association189794Total Disbursement in Second Quarter of 2013
International Development Association193000Total Disbursement in Second Quarter of 2013
International Development Association-4137Total Interest Repayment in Second Quarter of 2013
International Development Association149278Total Disbursement in Second Quarter of 2013
International Development Association149312Total Disbursement in Second Quarter of 2013
International Development Association211436Total Disbursement in Second Quarter of 2013
International Development Association60208Total Disbursement in Third Quarter of 2013
International Development Association117401Total Disbursement in Third Quarter of 2013
International Development Association9137Total Disbursement in Third Quarter of 2013
International Development Association63042Total Disbursement in Third Quarter of 2013
International Development Association175056Total Disbursement in Third Quarter of 2013
International Development Association59934Total Disbursement in Fourth Quarter of 2013
International Development Association78969Total Disbursement in Fourth Quarter of 2013
International Development Association-7709Total Interest Repayment in Fourth Quarter of 2013
International Development Association102599Total Disbursement in Fourth Quarter of 2013
International Development Association267028Total Disbursement in Fourth Quarter of 2013
International Development Association32073Total Disbursement in First Quarter of 2014
International Development Association64152Total Disbursement in First Quarter of 2014
International Development Association1991Total Disbursement in First Quarter of 2014
International Development Association116658Total Disbursement in First Quarter of 2014
International Development Association171508Total Disbursement in First Quarter of 2014
International Development Association26251Total Disbursement in Second Quarter of 2014
International Development Association125708Total Disbursement in Second Quarter of 2014
International Development Association-9130Total Interest Repayment in Second Quarter of 2014
International Development Association69992Total Disbursement in Second Quarter of 2014
International Development Association32993Total Disbursement in Third Quarter of 2014
International Development Association-9205Total Interest Repayment in Fourth Quarter of 2014
International Development Association-8740Total Interest Repayment in Second Quarter of 2015
International Development Association-6634Total Commitment Cancellations in Third Quarter of 2015
International Development Association-6586Total Disbursement in Third Quarter of 2015
International Development Association-814Total Commitment Cancellations in Third Quarter of 2015
International Development Association-808Total Disbursement in Third Quarter of 2015
International Development Association-9003Total Interest Repayment in Fourth Quarter of 2015
International Development Association-8861Total Interest Repayment in Second Quarter of 2016
International Development Association-8746Total Interest Repayment in Fourth Quarter of 2016
International Development Association-8580Total Interest Repayment in Second Quarter of 2017
International Development Association-9124Total Interest Repayment in Fourth Quarter of 2017
International Development Association-9080Total Interest Repayment in Second Quarter of 2018
International Development Association-8784Total Interest Repayment in Fourth Quarter of 2018
International Development Association-23424Total Loan Repayment in Fourth Quarter of 2018
International Development Association-8700Total Interest Repayment in Second Quarter of 2019
International Development Association-23435Total Loan Repayment in Second Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Sambok
12.5870 106.0240
Khett Kracheh
12.6670 106.0830
Khett Kampong Thum
12.8330 105.0000
Khett Kampong Cham
12.0500 105.2500
Choam Kravien
11.7700 106.3340
Phumi Changkrang
12.5960 106.0910
Intermediate Results Indicator
7 communes submit approved SLC plans.
Eight SLC plans from the seven communes have been approved by the respective Provincial Land Use Allocation Committees.7 communesapproved at the RP in October 2012.
Intermediate Results Indicator
10,000 hectares of appropriate state land registered as state private land for SLCs under LASED.
A total of 10,273.13 hectares of land from 7 communes (103% of target) have been registered as state private land.
Intermediate Results Indicator
At least 3,000 eligible families receive SLCs under LASED.
A total of 3,148 (104% of target) land recipients have been selected in which 74 families have received residential land, 658families received agriculture land and 2,416 families received both.
Intermediate Results Indicator
SLCs based on land from at least three sources (cancelled economic land concessions, recovered illegally occupied lands, & degradedforest lands) tested, experiences documented and guidelines updated.
There were two main sources of land for LASED-SLC: (a) 94.5% from degraded forest; and (b) 5.5% from recovered illegally occupiedland. No land has been sourced from economic concessions.
Intermediate Results Indicator
Target popln with use or ownership rights recorded as a result of the project
This indicator is being added as a new CSI.
End target number (at least 90%). Census in 2008: Average size of household (excluding institutional, homeless, boat andtransient household) has 4.7 in 2008 in rural areas.
A total of 15,226 persons (of which 52% are female) with use or ownership rights recorded as a result of the project.
Intermediate Results Indicator
100 percent eligible households receive appropriate private settling in support as agreed in SLC plan.
100% of installed households in the eight SLC sites have been provided with housing and agricultural packages.
Intermediate Results Indicator
80 percent of public infrastructure and other services provided as elaborated in SLC plan.
About 86.66% of the planned infrastructure facilities have been completed in the SLC sites. In addition, 90.87% of the plannedservices and training have been extended to project beneficiaries.
Intermediate Results Indicator
Women as share of participants in training, workshops and as applicants (head of households or cosignatory).
Of the 3,148 land recipients, 1,079 (34%) are female-headed households; while 52% (23, 285) of the training participants were women.
Intermediate Results Indicator
90 percent of MBPI recipients assessed as effectively carrying out LASED responsibilities.
The provision of POC ended on June 30, 2013.
Intermediate Results Indicator
100 percent of procurement activities implemented consistent with guidelines.
100% of the prior and post procurement reviews have complied with WB Procurement Guidelines.
Intermediate Results Indicator
Reporting to NCSLC and Bank on time.
Reports are prepared regularly from sub-national level and then sent to NCDDs and GSSLC for consolidation. Report timeliness hasgenerally improved, but could improve further.
Intermediate Results Indicator
Broad knowledge of LASED supported SLC approach, procedures and experiences amongst RGC, local authorities, civil society organizations and donors.
Knowledge and experience of LASED stakeholders have continuously improved specifically the legal, technical and operationalprocedures.
Intermediate Results Indicator
Financial audit confirms implementation consistent with agreed procedures.
The audit report for Fy13 is expected in second quarter 2014.
Intermediate Results Indicator
Target land area with use or ownership rights recorded as a result of project
This indicator is being added as a new CSI. It is the same as in the indicator above on #120.
A total of 10,273.13 hectares of land from 7 communes (102.73% of target) have been used or ownership rights recorded as a resultof project.
PDO Indicator
At least 60% of land recipients adopt improved soil management and agricultural production systems.
1,723 families occupied their agricultural land received from project. There were 3,547 ha of agricultural land prepared forfarming and 2,234 ha have cultivated with annual and permanent crops.
PDO Indicator
At least 90% of land recipients selected matched the selection criteria agreed for those specific SLCs.
All 3,148 land recipients were selected based on the agreed selection criteria.
PDO Indicator
At least 70% of challenges to land recipients selection were reviewed and decision taken through the program dispute resolution mechanism.
100% of the 678 complaints received have been reviewed. 35% of them have been addressed/fully resolved while the rest weredismissed. No further complaints have been received.
PDO Indicator
Technologies demonstrated in the project areas (number)
This indicator is being added as a new CSI.
A package of agricultural training, support services and advice has been provided to the land recipients to help them plan andmanage their agricultural lands and backyard gardens. To date, a total of 493 courses were provided.
0.00
0.00
0.00
0.00
0.00
0.00
666666.67
666666.67
666666.66
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
133333.33
133333.33
133333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
346034.13
346034.13
346034.15
0.00
0.00
0.00
3120.11
3120.11
3120.13
109369.07
109369.07
109369.09
2960.35
2960.35
2960.35
126253.97
126253.97
126253.98
71915.41
71915.41
71915.41
31843.42
31843.43
31843.43
56073.93
56073.93
56073.93
157353.37
157353.38
157353.38
180598.22
180598.23
180598.23
200223.23
200223.25
200223.25
190411.50
190411.51
190411.51
119810.07
119810.07
119810.09
316785.69
316785.70
316785.70
349885.99
349885.99
349886.01
274864.08
274864.08
274864.08
339071.22
339071.22
339071.24
394043.75
394043.77
394043.77
153313.79
153313.79
153313.79
181417.95
181417.97
181417.97
137506.52
137506.52
137506.54
33957.55
33957.56
33957.56
13690.47
13690.47
13690.49
13690.47
13690.47
13690.49
13690.47
13690.47
13690.49
15448.43
15448.44
15448.44
0.00
0.00
0.00
Finance Agreement :Section V.5.(a) (ii) | Description :Engage a consulting firm to carry out quantitative impact evaluation withterms of reference satisfactory to IDA | Due Date :30-Sep-2008
Finance Agreement :Section V.5.(a) (iii) | Description :Install accounting software | Due Date :30-Sep-2008
Finance Agreement :Section V.5.(b) (i) | Description :Complete a communications strategy to support public understanding of SLCs |Due Date :31-Dec-2008
44000-P101156
World Bank
International Development Association
MINISTRY OF INTERIOR
International Development Association
MINISTRY OF INTERIORCAMBODIA
Demand for Good Governance Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Janelle Plummer
jplummer1@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Sub-National GovernmentSocial ProtectionOther Public AdministrationOther Information and Communications TechnologiesLaw and JusticeParticipation and Civic EngagementPublic AdministrationSocial InclusionTransparency, Accountability and Good Governance
International Development Association20000000Total Commitment in Fourth Quarter of 2008
International Development Association31689Total Disbursement in Third Quarter of 2009
International Development Association32580Total Disbursement in Third Quarter of 2009
International Development Association551541Total Disbursement in Third Quarter of 2009
International Development Association71576Total Disbursement in Fourth Quarter of 2009
International Development Association451444Total Disbursement in Fourth Quarter of 2009
International Development Association1041404Total Disbursement in Fourth Quarter of 2009
International Development Association113774Total Disbursement in First Quarter of 2010
International Development Association127811Total Disbursement in First Quarter of 2010
International Development Association196989Total Disbursement in First Quarter of 2010
International Development Association50852Total Disbursement in Second Quarter of 2010
International Development Association83344Total Disbursement in Second Quarter of 2010
International Development Association399182Total Disbursement in Second Quarter of 2010
International Development Association149479Total Disbursement in Third Quarter of 2010
International Development Association161743Total Disbursement in Third Quarter of 2010
International Development Association296465Total Disbursement in Third Quarter of 2010
International Development Association186336Total Disbursement in Fourth Quarter of 2010
International Development Association203615Total Disbursement in Fourth Quarter of 2010
International Development Association396146Total Disbursement in Fourth Quarter of 2010
International Development Association148382Total Disbursement in First Quarter of 2011
International Development Association483010Total Disbursement in First Quarter of 2011
International Development Association629266Total Disbursement in First Quarter of 2011
International Development Association97611Total Disbursement in Second Quarter of 2011
International Development Association308820Total Disbursement in Second Quarter of 2011
International Development Association336571Total Disbursement in Second Quarter of 2011
International Development Association171844Total Disbursement in Third Quarter of 2011
International Development Association426868Total Disbursement in Third Quarter of 2011
International Development Association473693Total Disbursement in Third Quarter of 2011
International Development Association127214Total Disbursement in Fourth Quarter of 2011
International Development Association353433Total Disbursement in Fourth Quarter of 2011
International Development Association435737Total Disbursement in Fourth Quarter of 2011
International Development Association134378Total Disbursement in First Quarter of 2012
International Development Association262389Total Disbursement in First Quarter of 2012
International Development Association545757Total Disbursement in First Quarter of 2012
International Development Association319513Total Disbursement in Second Quarter of 2012
International Development Association473689Total Disbursement in Second Quarter of 2012
International Development Association888799Total Disbursement in Second Quarter of 2012
International Development Association283538Total Disbursement in Third Quarter of 2012
International Development Association697135Total Disbursement in Third Quarter of 2012
International Development Association1213349Total Disbursement in Third Quarter of 2012
International Development Association199209Total Disbursement in Fourth Quarter of 2012
International Development Association402210Total Disbursement in Fourth Quarter of 2012
International Development Association687810Total Disbursement in Fourth Quarter of 2012
International Development Association124065Total Disbursement in First Quarter of 2013
International Development Association291826Total Disbursement in First Quarter of 2013
International Development Association949432Total Disbursement in First Quarter of 2013
International Development Association387948Total Disbursement in Second Quarter of 2013
International Development Association537776Total Disbursement in Second Quarter of 2013
International Development Association189089Total Disbursement in Third Quarter of 2013
International Development Association389139Total Disbursement in Third Quarter of 2013
International Development Association398560Total Disbursement in Third Quarter of 2013
International Development Association26693Total Disbursement in Fourth Quarter of 2013
International Development Association327393Total Disbursement in Fourth Quarter of 2013
International Development Association174908Total Disbursement in First Quarter of 2014
International Development Association283155Total Disbursement in First Quarter of 2014
International Development Association59782Total Disbursement in Second Quarter of 2014
International Development Association65472Total Disbursement in Second Quarter of 2014
International Development Association188022Total Disbursement in Second Quarter of 2014
International Development Association83674Total Disbursement in Third Quarter of 2014
International Development Association92217Total Disbursement in Third Quarter of 2014
International Development Association118971Total Disbursement in Third Quarter of 2014
International Development Association-4063Total Disbursement in Fourth Quarter of 2014
International Development Association73845Total Disbursement in Fourth Quarter of 2014
International Development Association137181Total Disbursement in Fourth Quarter of 2014
International Development Association25840Total Disbursement in First Quarter of 2015
International Development Association-136056Total Commitment Cancellations in Second Quarter of 2015
International Development Association-22308Total Disbursement in Second Quarter of 2015Project Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementProject Performance Assessment ReportContract AwardsProject URLProcurement Notices
Khett Pouthisat
12.3330 103.6670
Phnom Penh
11.5620 104.9160
Khett Batdambang
12.9170 103.0830
Khett Takev
10.9170 104.8330
Khett Svay Rieng
11.1670 105.8330
Khett Stoeng Treng
13.7500 106.2500
Otar Meanchey
14.1670 103.5000
Khett Siem Reab
13.5000 104.0000
Khett Rotanokiri
13.8330 107.1170
Khett Prey Veng
11.3670 105.4670
Khett Preah Vihear
13.7500 105.0000
Khett Pailin
12.8670 102.6000
Khett Mondol Kiri
12.7500 107.0000
Khett Kracheh
12.6670 106.0830
Khett Keb
10.5130 104.3170
Khett Kaoh Kong
11.5000 103.5000
Khett Kandal
11.4170 105.0000
Khett Kampot
10.8330 104.3330
Khett Kampong Thum
12.8330 105.0000
Khett Kampong Spoe
11.5000 104.3330
Khett Kampong Chhnang
12.1670 104.5500
Khett Kampong Cham
12.0500 105.2500
Khett Banteay Mean Choay
13.7500 103.0000
Intermediate Results Indicator
IO1.3: Number of line agencies/service delivery functions assigned to OWSOs.
ADD
Target - 10 line ministries delegating 125 functions.
Target met.10 line ministries delegating 193 functions.
Intermediate Results Indicator
IO2.2: % of citizens reporting that engagement in decision making processes of communes / local service delivery agents (clinics, schools, communes / districts) has been enhanced through subprojects.
New indicator.
Target met.
Intermediate Results Indicator
IO2.3: % of NSAC sub-grantees whose sub-projects reflect good practice in social accountability design and implementation.
New indicator.
Endline evaluation.Refined target:design = 90%of which, 70% implemented effectively.
81.82% design81.48% implementation
Intermediate Results Indicator
IO3.4: % of participants in Learning (3B) events given rating as meeting participant needs
Intermediate Results Indicator
IO1.2: Revenue generated through tri-partite contributions by AC as % of operating costs
Target met.30.9% of operating costs generated over life of project.
Intermediate Results Indicator
IO1.1: % of Arbitration Council awards considered to be of satisfactory quality or better.
Audit conducted of 2009 awards.
Target met. Measured through independent quality audit of awards, against 2009 baseline.
Target met.
Intermediate Results Indicator
IO1.4: Reduced cost and time taken for processing OWSO transactions (cf. line agency service standards).
No data currently available.
Target = 50% < baseline
Target partially met. Results are not definitive. Target not well defined.40-144% less cost.33-75% less time.Not consistent inall provinces.
Intermediate Results Indicator
IO1.5: Average cost recovery ratio (in %) of OWSOs (i.e., service fee revenue as proportion of operating costs)
After establishment of offices:current year=20%year 1=50%year 2=70%
Target met (on average)a. 825%b. 309%c. 227%d. 161%
Intermediate Results Indicator
IO1.6: Steps taken to integrate district complaints mechanism (DO) in IP3 sub-national accountability system.
new indicator.
Now incorporated in next stage of SNDD implementation plan.
Target not met.
Intermediate Results Indicator
IO2.1: Increase in social accountability related knowledge, skills, and capacity to implement in participating NSAs.
Revised indicator. self assessment of SAc skills no longer measured.
Target met.85.46% average of:65.5% (Knowledge)100% (Skills)90.9% (Capacity)
Intermediate Results Indicator
IO3.1: MOI, through PCO, plans and establishes a resource centre for good governance and provides learning services in collaboration with technical support from TAF/ACF/OWSO.
New indicator.
Target met.Governance resource and learning center now opened and functioning. Learning events geared toward SAF.
Intermediate Results Indicator
IO3.2: Local social accountability community of practice including a cadre of trainers, networks, who are able to undertake ongoing training and capacity-building in the area of SAc.
Revised indicator.
Target partially met.2 NGOs support each learning theme. 92 partner NGOs
Intermediate Results Indicator
IO3.3: Lessons (cases, reports, studies) and experiences from within the project are documented, and used in training and capacity building programs
Target: 3-4 lessons will be developed each quarter until the end of the project
Target only partially met according to end evaluation. All IAs have documented lessons in/after QPRs, and worked with bank onpublication of LNs. Lessons have been incorporated in policy change.
Intermediate Results Indicator
IO3.5: Increased trust and constructive engagement between NSAs and government agencies.
Endorsement of SAF by both sides. Re-endorsement of ACF MOU. NSAC constructive engagement at local level. Good documentation.
Intermediate Results Indicator
IO3.6: Positive evaluation of the contribution of partnerships to the project development objective.
Revised indicator.
Endline evaluations by TAF and PCO. It has been agreed that the Partnership indicator will not be quantified due to thedistortions created by counting partnerships in the first half of the project]
OWSO efforts to work with NGOs on exit surveys.ACF MoU between employers and unions.NSAC evaluation of Subnational Authorities.
PDO Indicator
3.3 Project activities trigger changes in policy or practice that enhance transparency, accountability and civil society partnerships in participating SIs
revised
Qualitative mid and end evaluation by TAF and PCO needed to finalize qualitative indicators. to be complete Jan 2014.
Target met.SAF signed as policy in July 2013; included in NSDP.OWSO institutionalized in MOI, both at district and nationallevel. The GLRC is institutionalized in MOI.Nonstate actors indicate and document practice changes at subnational level
PDO Indicator
2.1: Number of labor dispute cases handled by Arbitration Council (cumulative)
Original target was 514 cases. Revised target = Actual value
Target met.
PDO Indicator
2.3: Number of local disputes or complaints received and mediated by DOs (citizens offices) across all target districts,
Target = actual value.This indicator provides information on the use of the DO as a complaints handling system. This indicator isproblematic because it is not possible to attribute an increase in complaints to be an increase in problems. It can be either anincrease in problems or an increase in the confidence in the complaints handling system. Hence only actual values are tracked.
865 cumulative total.
PDO Indicator
3.1: Number of citizen service delivery transactions completed in OWSOs across targeted districts.
a. BAT and SRP b. OWSOs established in 2010 (Y2)c. OWSOs established in 2011 (Y3)d. OWSOs established in 2012 (Y4)
Target met. a. 238778b. 103755c. 71161d. 21868
PDO Indicator
4.1: Number of SIs / local authorities and service delivery agencies whose performance is monitored through social accountability activities under the project.
End target value dependent on the quantity and value of grants.Refined targets:commune level = 100district = 20health clinic =80schools = 175OWSO = 6
Target met.By agencies:commune level = 226district = 33health clinics = 153schools = 330OWSO = 9
PDO Indicator
Grievances registered related to delivery of project benefits addressed (%)
Baseline (mid 2010)72 complaints out of 83,000 trasnactions
Previous reporting on OWSO transactions. OWSO completed end March. Zero complaints under ACF and PCO.
PDO Indicator
of which percentage resolved (cumulative).
PDO Indicator
of which percentage resolved.
PDO Indicator
4.2: % of SIs monitored under the project for which monitoring is determined to have a positive impact on SI performance.
99% (Health Centers)100% (Schools)100% (OWSOs)
PDO Indicator
4.3: % of OWSO clients who report paying unofficial fees.
Baseline % of clients reporting paying unofficial fees based on payments made to Line Ministries prior to establishment of OWSOapproach.
TARGET NOT MET.Final data provided by independent surveys.
In OWSO, 19% of clients reported paying more than the fee posted. this is significantly higher than the DO quarterly reporting.forthe other 14/15 OWSos surveyed, informal payments were reported in by about 5% of respondents.
PDO Indicator
4.3 (a): % of AC clients who report paying unofficial fees.
No baseline information available.
No reports of unofficial payments to date.
PDO Indicator
Grievances related to delivery of project benefits that are addressed-(number)
PDO Indicator
1.1: % of union and employer organization leaders and representatives aware of the Arbitration Council and labor arbitration process .
Target met.
PDO Indicator
1.2: % of citizens aware of and understanding services provided by OWSO, and DO (once established) in targeted districts.
Target = baseline + 10%Midline can be used as baseline in new districts.Refined target account for the time taken to buildcitizen awareness after a new OWSO is established. % awareness after year establishedyear 1 = 30%year 2 = 50%year 3 = 60%
Found by 5 NGOs in 15 districts:a: 57-97% b:31-86% c: 44-95% d: 52-56%
PDO Indicator
1.3 % of citizens (in target areas) aware of and understanding non-state actors facilitation of social accountability
new indicator
Endline evaluation TAF.Refined targets: Awareness:Village level =70%Commune level = 50%Understanding:70% ofawarenessImpact on governance70% of understanding
Target met.78.62% awareness78.59% understanding75.0% positive resultsCompiled at the commune level only.
PDO Indicator
2.2: % of union and employer group representatives and other stakeholders that report a high confidence in the independence, credibility and effectiveness of the AC.
ACF target is an increase 5% from the midline results. See methodology qualifications in end evaluation.
Target met.
PDO Indicator
2.4: % of DO clients who report a high confidence in the independence, credibility and effectiveness of the district complaints handling system.
Baseline 201174% Independence86% Credibility83% Effectiveness
Target = baseline + 10%[Independence = 84% Credibility = 93%Effectiveness = 96%]
Target met.All final NGO surveys84% (Independence)93% (Credibility)96% (Effectiveness)
PDO Indicator
3.2: % of clients/local elected officials satisfied with quality of services provided at OWSOs across targeted districts.
clients 93%elected officials 97%
Target = baseline + 5%This end target was too high.These end results are satisfactory.
Satisfactory result; as baseline was high at 93%, target was set too high.90.33 Clients98.00 Officialsfrom NGO surveys
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
200000.00
200000.00
200000.00
653333.33
653333.33
653333.34
856666.66
856666.67
856666.67
856666.66
856666.67
856666.67
384166.66
384166.67
384166.67
384166.66
384166.67
384166.67
384166.66
384166.67
384166.67
384166.66
384166.67
384166.67
355833.33
355833.33
355833.34
355833.33
355833.33
355833.34
355833.33
355833.33
355833.34
355833.33
355833.33
355833.34
380000.00
380000.00
380000.00
380000.00
380000.00
380000.00
380000.00
380000.00
380000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
205270.05
205270.06
205270.06
521474.57
521474.58
521474.58
146191.21
146191.21
146191.21
177792.54
177792.54
177792.55
202562.42
202562.42
202562.42
262032.31
262032.31
262032.32
420219.36
420219.36
420219.37
247667.68
247667.68
247667.68
357468.35
357468.35
357468.35
305461.35
305461.35
305461.36
314174.67
314174.67
314174.68
560666.93
560666.93
560666.94
731340.89
731340.89
731340.90
429743.08
429743.08
429743.08
455107.89
455107.89
455107.90
308574.47
308574.47
308574.48
325596.03
325596.04
325596.04
118028.82
118028.82
118028.83
152687.77
152687.77
152687.77
155157.25
155157.26
155157.26
166666.66
166666.67
166666.67
100000.00
100000.00
100000.00
2782.30
2782.30
2782.30
0.00
0.00
0.00
A PCG, PMT, and PCO, with adequately qualified membership, shall meet on a regular basis and carry out its functions, inaccordancewith the approved PIM, throughout project implementation
Recipient, through MOI, shall ensure that by Dec 31, 2009, baselines and other relevant M&E systems, acceptable to theAssociation,are established for each RIA and PIE
Recipient, through the MOI, shall ensure that by September 30 of each year, starting 2009, the RIAs and PIEs prepare, annual workplans for the next calendar year
Recipient, through the MOI, shall ensure that by March 30 of each year, starting 2009, the RIAs and the PIEs prepare annualprogress reports
For sustainability of ACF and AC, Recipient shall make best efforts to ensure financial contributions from partners for 2.5% in2009, 5% in 2010, 10% in 2011, and 15% in 2012.
Recipient, through NCDDS, to ensure recurrent costs for the operations of the OWSOs are transferred to Recipient at the rate of50%in Year 3 and 100% in Year 4
Recipient, under Part C of the Project, cause the MOI, to organize a learning program for state institutions and NSAs
Recipient, shall adopt a PIM and carry out the project in accordance with the provisions of the manual including the GoodGovernance Framework.
44000-P162675
World Bank
International Development Association
International Development Association
CAMBODIA
Cambodia Nutrition Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Ziauddin Hyder
zhyder@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - HealthHealthNutrition and Food SecurityHealth Service DeliveryHealth FinanceNutritionChild HealthReproductive and Maternal HealthHealth System StrengtheningHealth Systems and Policies
International Development Association15000000Total Commitment in Second Quarter of 2019Implementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Stung Treng
13.7500 106.2500
Siem Reap
13.3620 103.8610
Ratanakiri
13.8330 107.1170
Preah Vihear
13.7500 105.0000
Phnom Penh
11.5750 104.9140
Mondolkiri
12.7500 107.0000
Kratie
12.6670 106.0830
Koh Kong
11.5000 103.5000
Kampong Chhnang
12.1670 104.5500
Kingdom of Cambodia
13.0000 105.0000
Intermediate Results Indicator
People who have received essential health, nutrition, and population (HNP) services
Intermediate Results Indicator
Number of public health providers trained in MIYCN package (cumulative)
Intermediate Results Indicator
Number of citizens in target areas providing feedback on commune services for women and children (cumulative)
Intermediate Results Indicator
Utilization of outpatient HEF services in target areas in the last calendar year (annual)
Intermediate Results Indicator
Number of VHSGs in target areas trained by the project to implement CPWC and HEF promotion (cumulative)
Intermediate Results Indicator
Number of coaching sessions conducted in target areas with participation of NMCHC (cumulative)
Intermediate Results Indicator
Number of VHSGs trained by the project to implement CPWC and HEF promotion-female (cumulative)
Intermediate Results Indicator
Number of community health and nutrition events for women and children under 2 convened in target areas (cumulative)
Intermediate Results Indicator
Number of caregivers of children age 0-2 years participating in any CPWC event in the last calendar year (annual)
Intermediate Results Indicator
Number of integrated outreach sessions in target areas supported by the project (cumulative)
Intermediate Results Indicator
Of which female
Intermediate Results Indicator
Number of children immunized
Intermediate Results Indicator
Number of communes in target areas incorporating C/S-SDG beneficiary feedback in Commune Investment Program (annual)
Intermediate Results Indicator
Number of deliveries attended by skilled health personnel
Intermediate Results Indicator
Number of villages in target areas with active VHSGs trained according to guidelines (annual)
Intermediate Results Indicator
Number of women and children who have received basic nutrition services
Intermediate Results Indicator
Percent of health facilities receiving MCHN scorecard SDG payment within specified timelines
Intermediate Results Indicator
Average health center staff score (%) on GMP vignette in target areas (annual)
Intermediate Results Indicator
Percent of commune/sangkats in target areas receiving C/S-SDG payment within specified timelines
Intermediate Results Indicator
Percent of children 12-23 months in target areas fully immunized
Intermediate Results Indicator
Bottom 40% of households
Intermediate Results Indicator
Upper 60% of households
PDO Indicator
Number of children under 12 months of age in target areas receiving DPT-HepB-Hib 3 in the last calendar year (annual)
PDO Indicator
Number of health facilities in target areas scoring over 60 percent on their Maternal and Child Health and Nutrition Scorecards (annual)
PDO Indicator
Number of commune/sangkats in target areas receiving Commune/Sangkat Service Delivery Grants (C/S-SDGs) for women and children (annual)
PDO Indicator
Percent of children 6-23 months of age in target provinces who receive foods from 4 or more food groups, by gender
PDO Indicator
Percent of children born in the last 24 months who were put to the breast within one hour of birth
PDO Indicator
Female
PDO Indicator
Males
PDO Indicator
Percent of pregnant women in target areas receiving micronutrient supplementation in accordance with national guidelines (annual)
0.00
0.00
37350.00
44805.00
52125.00
28680.00
62115.00
67980.00
75915.00
85440.00
45285.00
93360.00
95715.00
98940.00
50640.00
102315.00
101775.00
99255.00
99345.00
50970.00
106905.00
113955.00
117105.00
123045.00
65190.00
136380.00
142155.00
150525.00
162135.00
84705.00
171915.00
178020.00
189825.00
203355.00
104400.00
215610.00
229155.00
246330.00
129000.00
268830.00
283860.00
298860.00
316005.00
164520.00
339855.00
351690.00
361830.00
376635.00
193215.00
395145.00
406605.00
423960.00
217260.00
441570.00
448125.00
452370.00
460170.00
233520.00
471870.00
478200.00
487290.00
495690.00
250725.00
507015.00
514665.00
522405.00
676395.00
0.00
0.00
37350.00
44805.00
52125.00
28680.00
62115.00
67980.00
75915.00
85440.00
45285.00
93360.00
95715.00
98940.00
50640.00
102315.00
101775.00
99255.00
99345.00
50970.00
106905.00
113955.00
117105.00
123045.00
65190.00
136380.00
142155.00
150525.00
162135.00
84705.00
171915.00
178020.00
189825.00
203355.00
104400.00
215610.00
229155.00
246330.00
129000.00
268830.00
283860.00
298860.00
316005.00
164520.00
339855.00
351690.00
361830.00
376635.00
193215.00
395145.00
406605.00
423960.00
217260.00
441570.00
448125.00
452370.00
460170.00
233520.00
471870.00
478200.00
487290.00
495690.00
250725.00
507015.00
514665.00
522405.00
676395.00
Institutional Arrangements (Sections I.A.1 and I.A.2 of Schedule 2 of the Financing Agreement). Obligation of the Recipient tomaintain, throughout the period of implementation of the Project, Project implementation structures with composition, functions,staffing and resources satisfactory to the Association and as set out in the Project Operations Manual, including (a) a SteeringCommittee with terms of reference and composition acceptable to the Association to be responsible, inter alia, for providingoverall policy direction, strategic guidance, and general oversight of the Project; and (b) Project coordination focal points ineach NCDDS and MOH to be responsible, inter alia, for the overall Project coordination.
Project Operations Manual, SDG Operational Manual, HEF Operational Manual, and C/S-SDG Operational Manual - Sections I.B and I.D.1of Schedule 2 to the Financing Agreement). Obligation of the Recipient to ensure that the Project is carried out in accordance withthe arrangements and procedures set out in the Project Operational Manuals (provided, however, that in the case of any conflictbetween the arrangements and procedures set out in the said manual and the provisions of this Agreement, the provisions of thisAgreement shall prevail) and, except as the Association shall otherwise agree, shall not amend, abrogate or waive any provision ofthe said manuals.The Recipient shall ensure that all SDGs, HEF Grants, and C/S-SDGs financed out of the proceeds of the Financingand the Grant are made and administered in accordance with the guidelines, procedures and criteria set forth in the SDG OperationalManual, HEF Operational Manual, and C/S-SDG Operational Manual and the additional terms and conditions set forth in Part D.
Mid-term Review (Section II.B.of Schedule 2 to the Financing Agreement). Obligation of the recipient to prepare and furnish to theAssociation a mid-term report within 30 months after the Effective Date, in such detail as the Association shall reasonablyrequest,documenting progress achieved in the carrying out of the Project during the period preceding the date of such report,taking into account the monitoring and evaluation activities performed pursuant to this Part A, and setting out the measuresrecommended to ensure the continued efficient carrying out of the Project and the achievement of its objectives during the periodfollowing such date; and review with the Association such mid-term report, on or about the date forty-five (45) days after itssubmission, and thereafter take all measures required to ensure the continued efficient implementation of the Project and theachievement of its objectives, based on the conclusions and recommendations of the mid-term report and the Association's views onthe matter.
DLI Reporting and Verification (Sections I.E.1.(a) of Schedule 2 to the Financing Agreement). Obligation of the Recipient throughMOH and NCDDS, shall, not later than September 30 of each year during the Project implementation period, furnish reports to theAssociation on the status of achievement of the relevant DLI Targets, in accordance with the Verification Protocols and proceduresset out in the Project Operational Manuals and the DLI Manual.
Annual Work Plan and Budget (Section I.C of Schedule 2 to the Financing Agreement). Obligation of the Recipient to prepare andfurnish to the Association for its no-objection not later than December 15 of each year during the implementation of the Project(or such later date as the Association may agree), an Annual Work Plan and Budget (“AWPB”) for the Project as approved by MOH andNCDDS respectively, containing all Project activities and Eligible Expenditures proposed to be included in the Project in thefollowing FY, including the Financing's and the Grant's respective shares of financing of the Eligible Expenditures. Obligation ofthe recipient to ensure the Project is implemented in accordance with the AWPB accepted by the Association for the respective FY;provided, however, that in the event of any conflict between the AWPB and the provisions of this Agreement, the provisions of thisAgreement shall prevail.
Safeguards (Section I. F.1.(a) of Schedule 2 to the Financing Agreement. Obligation of the recipient to ensure that the Project iscarried out with due regard to appropriate health, safety, social, and environmental practices and standards, and in accordancewiththe Safeguards Instruments.
44000-P163876
World Bank
International Development Association
International Development Association
CAMBODIA
Water Supply and Sanitation Improvement Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Phyrum Kov
pkov@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - Water, Sanitation and Waste ManagementSanitationWater SupplyUrban DevelopmentWater Institutions, Policies and ReformFlood and Drought Risk ManagementAdaptationMitigationUrban Water and SanitationWater Resource ManagementClimate changeDisaster Risk Management
International Development Association55000000Total Commitment in First Quarter of 2019Project Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Siem Reap
13.3620 103.8610
Senmonourom
12.4560 107.1880
Mondol Kiri
12.4170 107.2830
Kaoh Nhek
13.0900 107.0680
Kampong Cham
11.9930 105.4640
Chbar
12.7720 107.1530
Battambang
13.1030 103.1980
Stoung
12.9400 104.5710
Intermediate Results Indicator
Female staff working in the water supply providers supported by the Project in core roles
Intermediate Results Indicator
Activities identified in joint action plan through social accountability framework for Siem Reap Sewerage and Wastewater Treatment Plant Unit implemented
Intermediate Results Indicator
Activities identified in joint action plan through social accountability framework for public water supply operators supported by the Project implemented
Intermediate Results Indicator
Female participants in community scorecards who provide service quality feedback to Siem Reap Sewerage and Wastewater Treatment Plant Unit through social accountability framework
Intermediate Results Indicator
Female participants in community scorecards who provide service quality feedback to water supply service providers through social accountability framework
Intermediate Results Indicator
Villages provided with piped water supply under the Project covered by nutrition-sensitve behavior change communication campaign for water and sanitation
Intermediate Results Indicator
A national wastewater development strategy (including a tariff policy for wastewater services) developed
Intermediate Results Indicator
Mondul Kiri Waterworks and Stoung Waterworks achieve financial readiness to be made autonomous
Intermediate Results Indicator
Length of water supply pipeline constructed
Intermediate Results Indicator
Sewer network constructed in Siem Reap City
Intermediate Results Indicator
Daily volume of water production capacity constructed
Intermediate Results Indicator
Daily volume of wastewater collected and transported to wastewater treatment plant in Siem Reap City
Intermediate Results Indicator
Communes with identified joint interventions for water supply, sanitation and nutrition
PDO Indicator
Selected water supply service providers supported by the Project achieving operational cost recovery
PDO Indicator
Level of operational costs of Siem Reap Sewerage and Wastewater Treatment Plant Unit covered by revenue collected from customers
PDO Indicator
People provided with access to improved sanitation services through connection to sewer network in Siem Reap City
PDO Indicator
People provided with access to improved water sources through piped household water connections in target areas
PDO Indicator
People provided with access to improved sanitation services through connection to sewer network in Siem Reap City - Female
PDO Indicator
People provided with access to improved water sources through piped household water connections in target areas - Female
PDO Indicator
People provided with access to improved water sources through piped household water connections in target areas - Poor
PDO Indicator
Households with young children (under 2 years old) provided with access to improved water sources through piped household water connections
0.00
0.00
0.00
0.00
100485.00
64020.00
144705.00
166540.00
186725.00
100430.00
215490.00
244035.00
131725.00
276870.00
287980.00
146245.00
297000.00
306350.00
158070.00
324940.00
317350.00
319220.00
168575.00
370920.00
411510.00
210430.00
440605.00
492250.00
271810.00
574915.00
616495.00
329175.00
710215.00
769890.00
817300.00
429715.00
903100.00
965030.00
504845.00
1051710.00
1106875.00
572825.00
1194380.00
1269565.00
657525.00
1343870.00
1369170.00
709170.00
1465420.00
1492645.00
742885.00
1474770.00
1504855.00
1522070.00
758120.00
1499080.00
1511675.00
759220.00
1515635.00
1502930.00
743325.00
1475650.00
1470260.00
1463330.00
727650.00
1451340.00
1446775.00
720885.00
1436160.00
1428680.00
711700.00
1418285.00
2706605.00
0.00
0.00
0.00
0.00
0.00
0.00
100485.00
64020.00
144705.00
166540.00
186725.00
100430.00
215490.00
244035.00
131725.00
276870.00
287980.00
146245.00
297000.00
306350.00
158070.00
324940.00
317350.00
319220.00
168575.00
370920.00
411510.00
210430.00
440605.00
492250.00
271810.00
574915.00
616495.00
329175.00
710215.00
769890.00
817300.00
429715.00
903100.00
965030.00
504845.00
1051710.00
1106875.00
572825.00
1194380.00
1269565.00
657525.00
1343870.00
1369170.00
709170.00
1465420.00
1492645.00
742885.00
1474770.00
1504855.00
1522070.00
758120.00
1499080.00
1511675.00
759220.00
1515635.00
1502930.00
743325.00
1475650.00
1470260.00
1463330.00
727650.00
1451340.00
1446775.00
720885.00
1436160.00
1428680.00
711700.00
1418285.00
2706605.00
0.00
0.00
Remedies of the Association (ARTICLE IV, Para 4.01 of Financing Agreement): The Additional Event of Suspension consists of thefollowing, namely, the Regulation on Determination of the Water Tariff has been amended, suspended, abrogated, repealed or waivedso as to effect materially and adversely the ability of the Recipient to perform any of its obligations under this Agreement.
Institutional Arrangements (Section I.A.2(a), Schedule 2 of Financing Agreement): The Recipient shall establish, not later thanthree (03) months after the Effective Date, and thereafter maintain a Steering Committee, chaired by a senior official of MPWT andincluding representatives of MPWT, MIH, MOH, MRD, MEF, NCDD-S, and other relevant ministries and agencies involved in theimplementation of the Project, which shall be responsible, inter alia, for: (i) monitoring the overall progress of the Project andproviding strategic guidance on its implementation and the achievement of its objectives; and (ii) facilitating coordination ofProject activities, policy discussions among the members of the committee, and removal of any obstacles to the timely and effectiveimplementation of the Project; and (2) to this end, ensure that the Steering Committee shall meet at least once every six (06)months during the implementation of the Project.
Institutional Arrangements (Section I.A.2(b), Schedule 2 of Financing Agreement): The Recipient shall maintain a ComponentManagement Unit within MIH, to be responsible, inter alia, for carrying out Part 1 of the Project's day-to-day implementation andmanagement, preparation of relevant Annual Work Plans and Budgets and procurement plans(s), monitoring and evaluation, andmanagement of relevant environmental and social safeguards with the oversight of the IRC / MEF on any resettlement matters.
Institutional Arrangements (Section I.A.2(c), Schedule 2 of Financing Agreement): The Recipient shall maintain a ComponentManagement Unit within MPWT to be responsible, inter alia, for: (i) overall Project coordination, including arrangement for Projectaudits, and consolidation of Project reports; and (ii) for carrying out Part 2 of the Project's: day-to-day implementation andmanagement, preparation of relevant Annual Work Plans and Budgets and procurement plan(s), monitoring and evaluation, andmanagement of relevant environmental and social safeguards with the oversight of the IRC / MEF on any resettlement matters.
Project Operational Manual (Section I.B, Schedule 2 of Financing Agreement): The Recipient shall ensure that the Project is carriedout in accordance with the arrangements and procedures set out in the Project Operation Manual (provided, however, that in theevent of any conflict between the arrangements and procedures set out in the Project Operation Manual and the provisions of thisAgreement, the provisions of this Agreement shall prevail) and shall not amend, abrogate or waive any provision of ProjectOperation Manual unless the Association has provided its prior approval thereof in writing.
Annual Work Plan and Budget (Section I.C.1 and 2, Schedule 2 of Financing Agreement): The Recipient shall prepare and furnish tothe Association for its no-objection not later than November 30 of each Fiscal Year during the implementation of the Project (orsuch later date as the Association may agree), an Annual Work Plan and Budget (“AWPB”) for each Respective Part of the Project asapproved by the MEF, containing relevant Project activities and expenditures proposed to be included in the Respective Part of theProject in the following Fiscal Year, and shall ensure that the Project is implemented in accordance with the AWPB accepted by theAssociation for the respective Fiscal Year.
Safeguards (Section I.D.1(a), Schedule 2 of Financing Agreement): The Recipient shall ensure that the Project is carried out withdue regard to appropriate health, safety, social, and environmental standards and practices, and in accordance with the SafeguardsInstruments.
Mid-term Review (Section II.B, Schedule 2 of Financing Agreement): The Recipient shall on or about the date thirty (30) monthsafter the Effective Date, prepare and furnish to the Association a mid-term report, in such detail as the Association shallreasonably request, review with the Association such mid-term report, on or about the date forty-five (45) days after itssubmission, and thereafter take all measures required to ensure the continued efficient implementation of the Project and theachievement of its objectives, based on the conclusions and recommendations of the mid-term report and the Association's views onthe matter.
44000-P163264
World Bank
International Development Association
International Development Association
CAMBODIA
Cambodia Agricultural Sector Diversification Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Mudita Chamroeun
cmudita@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ICT ServicesPublic Administration - Agriculture, Fishing & ForestryIrrigation and DrainageOther Agriculture, Fishing and ForestryAgricultural markets, commercialization and agri-businessDisaster PreparednessAdaptationRural Infrastructure and service deliveryMitigationFood SecurityClimate changeAgriculture FinanceRural DevelopmentNutrition and Food SecurityDisaster Risk ManagementRural MarketsGenderFinance for DevelopmentJobs
International Development Association91670000Total Commitment in First Quarter of 2019Project Appraisal Document Implementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Battambang
12.9170 103.0830
Stung Treng
13.7500 106.2500
Siem Reap
13.5000 104.0000
Ratanakiri
13.8330 107.1170
Preah Vihear
13.7500 105.0000
Phnom Penh
11.5750 104.9140
Mondolkiri
12.7500 107.0000
Kratie
12.6670 106.0830
Kandal
11.4170 105.0000
Kampong Speu
11.5000 104.3330
Kampong Chhnang
12.1670 104.5500
Kampong Cham
12.0500 105.2500
Tboung Khmum
11.9800 105.6500
Intermediate Results Indicator
Number of diversification proposals submitted and evaluated
Intermediate Results Indicator
Number of users of agriculture information system
Intermediate Results Indicator
Number of business plans under implementation
Intermediate Results Indicator
Number of producers and processers trained in GAP implementation rules
Intermediate Results Indicator
Number of nutrition sensitive business plans under implementation
Intermediate Results Indicator
Beneficiaries reached with financial services
Intermediate Results Indicator
Number of SMAs with a line of credit.
Intermediate Results Indicator
Number of quality controls confirmed GAP compliance
Intermediate Results Indicator
Number of female-owned SMAs with a line of credit.
Intermediate Results Indicator
Percentage of complaints solved by the Grievance Redress Mechanism of the project
Intermediate Results Indicator
Users satisfied with information quality
Intermediate Results Indicator
Producers and processers trained in GAP implementation rules - Female (percentage)
Intermediate Results Indicator
Percentage of previously unbanked adults reached with transaction accounts - female.
Intermediate Results Indicator
Beneficiaries that feel project investments reflected their needs
Intermediate Results Indicator
Roads rehablitated
Intermediate Results Indicator
Roads rehabilitated - rural
Intermediate Results Indicator
Area provided with new/improved irrigation or drainage services
Intermediate Results Indicator
Area provided with improved irrigation or drainage services
Intermediate Results Indicator
Area provided with new irrigation or drainage services
PDO Indicator
Increase in the value of gross sales at benefitting farms
PDO Indicator
Increase in the value of gross sales at benefitting female owned farms
PDO Indicator
Increased in the volume of gross sale of benefitting farms
PDO Indicator
Increased in the volume of gross sales of benefitting female owned farms
PDO Indicator
Increase in the value of gross sales of benefitting agribusinesses
PDO Indicator
Increase in the volume and value of gross sales of benefiting female owned agribusinesses
PDO Indicator
Share of non-rice production area of participating farmers
55555.56
55555.56
55555.56
55555.56
55555.56
55555.56
55555.56
55555.56
55555.52
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.37
605509.36
605509.36
605509.36
605509.36
605509.36
605509.36
605509.36
605509.36
605509.36
605509.36
605509.36
605509.35
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2535408.86
1307764.22
2671263.80
2719207.21
2753400.12
1385683.72
2812252.26
2864870.84
1446002.58
2922439.60
2977991.62
1508704.86
83333.33
83333.33
83333.33
83333.33
83333.33
83333.35
55555.56
55555.56
55555.56
55555.56
55555.56
55555.56
55555.56
55555.56
55555.52
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.33
458333.37
605509.36
605509.36
605509.36
605509.36
605509.36
605509.36
605509.36
605509.36
605509.36
605509.36
605509.36
605509.35
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
1666580.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2535408.86
1307764.22
2671263.80
2719207.21
2753400.12
1385683.72
2812252.26
2864870.84
1446002.58
2922439.60
2977991.62
1508704.86
83333.33
83333.33
83333.33
83333.33
83333.33
83333.35
Institutional Arrangements (Section I.A, Schedule 2 of Financing Agreement): The Recipient shall maintain throughout the period ofimplementation of the project the following structure, all with functions, composition, staffing and resources acceptable to theAssociation: (1) the Project Steering Committee; (2) the Project Coordination Office (PCO) / Team at MAFF; (3) Project Teams withinMAFF, MRD, MoWRAM and MEF.
Project Operational Manual (POM) (Section I.B, Schedule 2 of Financing Agreement): The Recipients shall ensure that the Project iscarried out in accordance with the arrangements and procedures set out in the POM (provided, however, that in the case of anyconflict between the arrangements and procedures set out in the said manual and the provisions of this Agreement, the provisions ofthis Agreement shall prevail), and as the Association shall otherwise agree in writing, shall not amend, abrogate or waive anyprovision of the said manual.
Annual Works Plans and Budgets (AWPB)(Section I.C.1 and 2, Schedule 2 of Financing Agreement): The Recipient shall furnish to theAssociation, no later than December 1 of each year, an annual work plan and budget for the Project for the following Fiscal Year,in a manner and substance satisfactory to the Association, and thereafter implement the activities under the Project during therelevant Fiscal Year in accordance with such plan and budget.
Contingent Emergency Response (CER) (Section F. 1, Schedule 2 of Financing Agreement). In order to ensure the proper implementationof contingent emergency response activities under Part 5 of the Project (“Emergency Response Part”), the Recipient shall prepareand furnish to the Association for its review and no-objection, an Emergency Response Manual (“ERM”) which shall set forth detailedimplementation arrangements for the Emergency Response Part; afford the Association a reasonable opportunity to review the proposedERM; promptly adopt the ERM for the Emergency Response Part as accepted by the Association; and ensure that the Emergency ResponsePart is carried out in accordance with the ERM; provided, however, that in the event of any inconsistency between the provisions ofthe ERM and this Agreement, the provisions of this Agreement shall prevail.
Subprojects (Section I.D, Schedule 2 of Financing Agreement): No Subproject shall be eligible for financing out of the proceeds ofthe Financing unless such Subproject has been prepared, approved and implemented in accordance with the criteria, guidelines andprocedures set forth in the POM.
Safeguards (Section I.E.1, Schedule 2 of Financing Agreement): The Recipient shall implement or cause the Safeguards Instruments tobe implemented in a manner and substance satisfactory to the Association.
44000-P150631
World Bank
International Development Association
MINISTRY OF LAND MANAGEMENT, URBAN PLANNING AND CONSTRUCTION
International Development Association
MINISTRY OF LAND MANAGEMENT, URBAN PLANNING AND CONSTRUCTIONCAMBODIA
KH-Land Allocation for Social and Economic Development Project II
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Mudita Chamroeun
cmudita@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - Agriculture, Fishing & ForestryPublic Administration - Social ProtectionOther Agriculture, Fishing and ForestrySocial ProtectionLand Administration and ManagementRural Infrastructure and service deliveryParticipation and Civic EngagementSocial InclusionRural DevelopmentJobs
International Development Association25060000Total Commitment in Second Quarter of 2016
International Development Association150000Total Disbursement in Fourth Quarter of 2016
International Development Association1600000Total Disbursement in Fourth Quarter of 2016
International Development Association50000Total Disbursement in First Quarter of 2017
International Development Association11695Total Disbursement in Second Quarter of 2017
International Development Association35898Total Disbursement in Second Quarter of 2017
International Development Association-5654Total Interest Repayment in Second Quarter of 2017
International Development Association368818Total Disbursement in Third Quarter of 2017
International Development Association123398Total Disbursement in Fourth Quarter of 2017
International Development Association201016Total Disbursement in Fourth Quarter of 2017
International Development Association-7066Total Interest Repayment in Fourth Quarter of 2017
International Development Association48733Total Disbursement in First Quarter of 2018
International Development Association261159Total Disbursement in First Quarter of 2018
International Development Association14406Total Disbursement in Second Quarter of 2018
International Development Association280349Total Disbursement in Second Quarter of 2018
International Development Association1921750Total Disbursement in Second Quarter of 2018
International Development Association-9867Total Interest Repayment in Second Quarter of 2018
International Development Association290099Total Disbursement in Third Quarter of 2018
International Development Association305023Total Disbursement in Third Quarter of 2018
International Development Association1062990Total Disbursement in Third Quarter of 2018
International Development Association400392Total Disbursement in Fourth Quarter of 2018
International Development Association403262Total Disbursement in Fourth Quarter of 2018
International Development Association516264Total Disbursement in Fourth Quarter of 2018
International Development Association-17482Total Interest Repayment in Fourth Quarter of 2018
International Development Association283638Total Disbursement in First Quarter of 2019
International Development Association566589Total Disbursement in First Quarter of 2019
International Development Association151797Total Disbursement in Second Quarter of 2019
International Development Association629732Total Disbursement in Second Quarter of 2019
International Development Association632082Total Disbursement in Second Quarter of 2019
International Development Association-29823Total Interest Repayment in Second Quarter of 2019
International Development Association187420Total Disbursement in Third Quarter of 2019
International Development Association594468Total Disbursement in Third Quarter of 2019Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Sambok
12.5870 106.0240
Phumi Peam
12.1310 104.5040
Phumi Dar
12.4850 106.1120
Cheamboeung
12.8690 105.1590
Phumi Changkrang
12.5960 106.0910
Khum Krang Lvea
11.9700 104.5680
Kampong Thom
12.8330 105.0000
Kampong Speu
11.5000 104.3330
Kampong Chhnang
12.1670 104.5500
Choam Kravien
11.7700 106.3340
Chambak
12.2770 105.8050
Santuk
12.6400 105.3200
Prasat Balangk
13.0710 104.8450
Phumi Thmei
12.4950 106.2420
Intermediate Results Indicator
Target popln with use or ownership rights recorded as a result of the project
Intermediate Results Indicator
Reporting to NCDD, NCSLC and Bank on time (Number)
Intermediate Results Indicator
Clients who have adopted an improved agr. technology promoted by the project
Intermediate Results Indicator
Clients who adopted an improved agr. technology promoted by project – female
Intermediate Results Indicator
Targeted clients who are members of an association - male (number)
Intermediate Results Indicator
Targeted clients who are members of an association – female (number)
Intermediate Results Indicator
Beneficiaries that feel project investment reflected their needs - female (number - sub-type)
Intermediate Results Indicator
Beneficiaries that feel project inv. reflected their needs - male (number)
Intermediate Results Indicator
Land prepared and planted with cover crop
Intermediate Results Indicator
Land under productive agriculture
Intermediate Results Indicator
Targeted clients who are members of an association (percentage)
Intermediate Results Indicator
Beneficiaries that feel project investments reflectd their needs (percentage)
Intermediate Results Indicator
MIS system developed and information regularly updated and publicly available
Intermediate Results Indicator
Household Food Insecurity Access Scale (HFIAS) (Index) (Self-assessment of beneficiaries? food and nutrition security)
Intermediate Results Indicator
Land area where sustainable land mgt. practices were adopted as a result of proj
PDO Indicator
Targeted clients satisfied with agricultural services - male (number)
PDO Indicator
Targeted clients satisfied with agricultural services - female (number)
PDO Indicator
Targeted clients- male (number)
PDO Indicator
Targeted clients – female (number)
PDO Indicator
Eligible families that have received support for land tenure security
PDO Indicator
Public infrastructure and other services provided as elaborated in AWPB
PDO Indicator
Targeted clients satisfied with agricultural services (percentage)
0.00
12500.00
12500.00
8333.33
8333.33
8333.34
8333.33
8333.33
8333.34
8333.33
8333.33
8333.34
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
496666.67
496666.67
496666.67
496666.67
496666.67
496666.67
496666.67
496666.67
496666.67
153966.11
153966.11
153966.11
153966.11
153966.11
153966.11
153966.11
153966.11
153966.11
153966.11
153966.11
153966.11
268302.47
268302.47
268302.47
268302.47
268302.47
268302.47
268302.47
268302.47
268302.47
268302.47
268302.47
268302.44
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.37
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.33
58333.37
328888.89
328888.89
328888.89
328888.89
328888.89
328888.89
328888.89
328888.89
328888.88
Finance Agreement: Institutional Arrangements (Section I.A, Schedule 2 of Financing Agreement) | Description: Obligation of theRecipient to maintain, throughout the implementation of the Project, the NCSLC, GDH, NCDD, NCDD-S, MAFF-GDA, Provincial Land Useand Allocation Committees (PLUACs), LASED II Provincial Teams, Provincial Administrations, District Working Groups (DWGs) andCommune Councils, all with composition, functions, staffing and resources satisfactory to IDA.
Finance Agreement: SLC Sub-decree and PIMs (Section I.B, Schedule 2 of Financing Agreement) | Description: Obligation of theRecipient to carry out the Project in accordance with the SLC Sub-decree and the Project Implementation Manual (PIM).
Finance Agreement: Annual Work Plans and Budgets (Section I.C, Schedule 2 of Financing Agreement) | Description: Obligation of theRecipient to prepare and furnish to IDA, for its approval, the annual work plans and budgets containing all activities and eligibleexpenditures to be included in the Project in each fiscal year of the Recipient. Due date is November 30 of each year.
Finance Agreement: Sub-projects (Section I.D, Schedule 2 of Financing Agreement) | Description: Obligation of the Recipient toensure that all Community Grants for SLC sub-projects have been prepared, approved and implemented in accordance with theeligibility criteria, guidelines and procedures specified in the PIM, and under Community Grant Agreements with each beneficiarycommune council on terms and conditions acceptable to IDA and set out in the Financing Agreement.
Finance Agreement: Environmental and Social Safeguards (Section I.E, Schedule 2 of Financing Agree) | Description: Obligation ofthe Recipient to carry out the Project in accordance with the Environmental Assessment and Environmental Management Plan (EA-EMP),and Resettlement Policy Framework (RPF), as specified in the safeguard provisions of the Financing Agreement.
44000-P162971
World Bank
International Development Association
International Development Association
CAMBODIA
Cambodia Higher Education Improvement Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Simeth Beng
sbeng@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - EducationTertiary EducationGenderClimate changeTeachersEducation Governance, School-Based ManagementScience and TechnologyMitigationAdaptationPrivate Sector Delivery of EducationEducationStandards, Curriculum and Textbooks
International Development Association90000000Total Commitment in Second Quarter of 2018
International Development Association6733728Total Disbursement in First Quarter of 2019
International Development Association-12431Total Interest Repayment in Second Quarter of 2019Project Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Phnom Penh
11.5620 104.9160
Kingdom of Cambodia
13.0000 105.0000
Intermediate Results Indicator
Number of IQA units that submit report with recommendatins to BoD
Intermediate Results Indicator
number of laboratories constructed or rehabilitated
Intermediate Results Indicator
Number of dormitories built
Intermediate Results Indicator
Number of HEIs that produce consolidated FM reports
Intermediate Results Indicator
Number of target HEIs that complete tracer studies
Intermediate Results Indicator
Number of HEIs that collect, record and report on the grievances from students
Intermediate Results Indicator
Signed agreements for higher education partnership programs
Intermediate Results Indicator
Number of submitted articles to peer-reviewed international journals
Intermediate Results Indicator
Faculty members who receive advanced degree
Intermediate Results Indicator
Number of HEIs that input data into HEMIS
Intermediate Results Indicator
Number of female faculty members who receive advanced degree
Intermediate Results Indicator
Number of classroom built
Intermediate Results Indicator
Share of female students living in newly constructed dormitories under the project
Intermediate Results Indicator
Draft legislation on HEI autonomy submitted to Council of Ministers
Intermediate Results Indicator
Human resource development master plan approved
PDO Indicator
Students benefiting from direct interventions to enhance learning
PDO Indicator
Number of HEIs that complete accreditation process
PDO Indicator
Students benefiting from direct interventions to enhance learning - Female
PDO Indicator
Number of HE partnership programs evaluated as modest or higher by expert panels
PDO Indicator
Number of research projects in collaboratin with industry completed
PDO Indicator
Number of research projects in collaboratin with industry completed, led by female faculty
31200.00
31200.00
31200.00
566940.00
566940.00
566940.00
566940.00
566940.00
566940.00
566940.00
566940.00
566940.00
566940.00
566940.00
566940.00
982860.00
982860.00
982860.00
982860.00
982860.00
982860.00
982860.00
982860.00
982860.00
982860.00
982860.00
982860.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
80190.00
80190.00
80190.00
80190.00
0.00
0.00
0.00
300000.00
300000.00
300000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
1000000.00
1000000.00
1000000.00
982860.00
982860.00
982860.00
982860.00
982860.00
982860.00
982860.00
982860.00
982860.00
982860.00
982860.00
982860.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1311825.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1520955.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1565850.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
1517040.00
79220.00
79220.00
79220.00
79220.00
Institutional Arrangements (Section I.A): The Recipient shall maintain, and cause to be maintained, throughout the period ofimplementation of the Project, the following structures, all with functions, composition, staffing and resources acceptable to theAssociation: (1) the Project management committee; (2) the Project management team in the MoEYS; (3) Project teams within the DGHE,the ACC, and each HEI participating in the Project; (4) a partnerships and research committee; and (5) a private sector advisorycommittee.
Project Operational Manual (Section I.B): The Recipient shall ensure that the Project is carried out in accordance with thearrangements and procedures set out in the Project Operational Manual (provided, however, that in the case of any conflict betweenthe arrangements and procedures set out in the said manual and the provisions of this Agreement, the provisions of this Agreementshall prevail) and, except as the Association shall otherwise agree in writing, shall not amend, abrogate or waive any provision ofthe said manual. The Recipient shall, not later than June 30, 2019, finalize and adopt a sub-manual (as part of the overall ProjectOperational Manual) in form and substance satisfactory to the Association, detailing the eligibility criteria and approval andadministration arrangements for Grants to eligible private HEIs.
Annual Works Plans and Budgets (Section I.C.1 and 2): The Recipient shall furnish to the Association, no later than December 1 ofeach year, an annual work plan and budget for the Project for the following Fiscal Year, in a manner and substance satisfactory tothe Association, and thereafter implement the activities under the Project during the relevant Fiscal Year in accordance with suchplan and budget.
Safeguards (Section I.E.1): The Recipient shall implement or cause the Safeguards Instruments to be implemented in a manner andsubstance satisfactory to the Association.
Contingent Emergency Response (Section I.F.1): The Recipient shall adopt a satisfactory Emergency Response Manual (ERM) forComponent 4 of the project and, in the event of an eligible crisis or emergency, ensure that the activities under said Componentare carried out in accordance with such Manual and all relevant safeguard requirements.
Subprojects (Section I.D): No Subproject shall be eligible for financing out of the proceeds of the Financing unless suchSubproject has been prepared, approved and implemented in accordance with the criteria, guidelines and procedures set forth in theProject Operational Manual, and Grant Agreements have been signed between MoEYS and each selected HEI in accordance with the termsand conditions specified in the Financing Agreement and the Project Operational Manual.
44000-P087945
World Bank
International Development Association
MINISTRY OF ECONOMY AND FINANCE
International Development Association
MINISTRY OF ECONOMY AND FINANCECAMBODIA
Cambodia Public Financial Management and Accountability
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Leah April
lapril@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Central Government (Central Agencies)Judicial and other Dispute Resolution MechanismsRule of LawTransparency, Accountability and Good GovernancePublic Finance ManagementPersonal and Property RightsAdministrative and Civil Service ReformLegal Institutions for a Market EconomyDomestic Revenue AdministrationPublic Expenditure ManagementPublic AdministrationTax policyFiscal Policy
International Development Association14000000Total Commitment in Second Quarter of 2006
International Development Association800000Total Disbursement in Third Quarter of 2007
International Development Association140509Total Disbursement in Fourth Quarter of 2007
International Development Association35475Total Disbursement in First Quarter of 2008
International Development Association216003Total Disbursement in Second Quarter of 2008
International Development Association90549Total Disbursement in Third Quarter of 2008
International Development Association341363Total Disbursement in Fourth Quarter of 2008
International Development Association197843Total Disbursement in First Quarter of 2009
International Development Association497432Total Disbursement in First Quarter of 2009
International Development Association371954Total Disbursement in Second Quarter of 2009
International Development Association498848Total Disbursement in Second Quarter of 2009
International Development Association224336Total Disbursement in Third Quarter of 2009
International Development Association367705Total Disbursement in Third Quarter of 2009
International Development Association228606Total Disbursement in Fourth Quarter of 2009
International Development Association415262Total Disbursement in Fourth Quarter of 2009
International Development Association105043Total Disbursement in First Quarter of 2010
International Development Association412705Total Disbursement in First Quarter of 2010
International Development Association161632Total Disbursement in Second Quarter of 2010
International Development Association218163Total Disbursement in Second Quarter of 2010
International Development Association239969Total Disbursement in Second Quarter of 2010
International Development Association93423Total Disbursement in Third Quarter of 2010
International Development Association259909Total Disbursement in Third Quarter of 2010
International Development Association7913Total Disbursement in Fourth Quarter of 2010
International Development Association86389Total Disbursement in Fourth Quarter of 2010
International Development Association52903Total Disbursement in First Quarter of 2011
International Development Association944580Total Disbursement in First Quarter of 2011
International Development Association165701Total Disbursement in Second Quarter of 2011
International Development Association284589Total Disbursement in Second Quarter of 2011
International Development Association258747Total Disbursement in Third Quarter of 2011
International Development Association293786Total Disbursement in Third Quarter of 2011
International Development Association216040Total Disbursement in Fourth Quarter of 2011
International Development Association302952Total Disbursement in Fourth Quarter of 2011
International Development Association610188Total Disbursement in Fourth Quarter of 2011
International Development Association323988Total Disbursement in First Quarter of 2012
International Development Association702135Total Disbursement in First Quarter of 2012
International Development Association796280Total Disbursement in First Quarter of 2012
International Development Association124933Total Disbursement in Second Quarter of 2012
International Development Association252761Total Disbursement in Second Quarter of 2012
International Development Association252615Total Disbursement in Third Quarter of 2012
International Development Association310485Total Disbursement in Third Quarter of 2012
International Development Association408621Total Disbursement in Third Quarter of 2012
International Development Association181622Total Disbursement in Fourth Quarter of 2012
International Development Association429835Total Disbursement in Fourth Quarter of 2012
International Development Association541051Total Disbursement in Fourth Quarter of 2012
International Development Association76443Total Disbursement in First Quarter of 2013
International Development Association225935Total Disbursement in First Quarter of 2013
International Development Association333006Total Disbursement in First Quarter of 2013
International Development Association160891Total Disbursement in Second Quarter of 2013
International Development Association186904Total Disbursement in Second Quarter of 2013
International Development Association239757Total Disbursement in Second Quarter of 2013
International Development Association93076Total Disbursement in Third Quarter of 2013
International Development Association315633Total Disbursement in Third Quarter of 2013
International Development Association-41911Total Commitment Cancellations in Second Quarter of 2014
International Development Association-41911Total Disbursement in Second Quarter of 2014Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results Report AgreementAgreementAgreementAgreementAgreementAgreementAgreementAgreementFinancing AgreementProject Performance Assessment ReportContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Policy agenda implemented through implementation of MTBF and MTEF/Programe Budgeting in Line Ministries
Intermediate Results Indicator
MEF provides line ministries with a framework for budgeting that strengthens links between resource inputs and outputs/results.
Intermediate Results Indicator
More reliable and comprehensive Budget Monitoring and Accounting data reported. MEF's & LM management can use data for better decision making.
Intermediate Results Indicator
Improved accountability and internal control systems result in strengthened compliance and transparency in the mobilization and useof public resources.
Inconsistencies between the final TOFE and interim report have been reduced. But TOEF report has been somehow delayed longer.
Intermediate Results Indicator
Strengthen the regulatory framework for internal audit and build internal audit capacity.
Preparation for IT-based audit is underway in preparation for FMIS implementation. Software IDEA has been provided to IAD of MEF.Policy paper for internal management to support FMIS was developed.
PDO Indicator
Strengthened mobilization of public resources as measured by increases in tax and non-tax revenues as a percentage of GDP.
Improved revenue administration enable better collection of both tax and non-tax revenues.
PDO Indicator
Strengthened management of public resources as measured by more credible budget formulation & implementation and reduced fiduciary risk.
Further improved commitment and payment processes.
PDO Indicator
Strengthened management and utilisation of MEF HR as measured by improved productivity. performance and conditions of service for skilled personnel.
The government revised pay scale of the lowest category of civil servant (D) in Royal Decree NS/RKT/0113/120.
PDO Indicator
Strengthened management of external audit capacity by the extent of audit coverage in line with international audit standards and no. of audit reports submitted to the National Assembly.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
66666.66
66666.67
66666.67
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
500000.00
500000.00
500000.00
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
766666.66
766666.67
766666.67
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
66666.66
66666.67
66666.67
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
500000.00
500000.00
500000.00
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
766666.66
766666.67
766666.67
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Implementation of MBPI Manual
44000-P165344
World Bank
International Development Association
International Development Association
CAMBODIA
Cambodia Sustainable Landscape and Ecotourism Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Werner L. Kornexl
wkornexl@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
TourismForestryRural and Inter-Urban RoadsAgricultural markets, commercialization and agri-businessPublic Administration - Agriculture, Fishing & ForestryRenewable Natural Resources Asset ManagementAdaptationRural Infrastructure and service deliveryBiodiversityLandscape ManagementGenderGeospatial ServicesMitigationJob CreationEnvironmental policies and institutionsClimate changeRural DevelopmentJobs
International Development Association50660000Total Commitment in Second Quarter of 2019Project Appraisal Document Implementation Status and Results ReportContract AwardsProject URLProcurement Notices
Pursat
12.3330 103.6670
Battambang
12.9170 103.0830
Siem Reap
13.5000 104.0000
Koh Kong
11.5000 103.5000
Kampong Thom
12.8330 105.0000
Kampong Speu
11.5000 104.3330
Kampong Chhnang
12.1670 104.5500
Kingdom of Cambodia
13.0000 105.0000
Chi Pat
11.3280 103.5230
Intermediate Results Indicator
1.1 Cloud-based geospatial platform for integrating data and information for PAs planning and enforcement operational
Intermediate Results Indicator
2.1 Potential tourist sites in selected PAs with infrastructure operational
Intermediate Results Indicator
1.2 Protected Areas enforcement strategy operational
Intermediate Results Indicator
2.2 New tourism enterprises with sufficient capacity
Intermediate Results Indicator
2.3 NTFP value chains improved with new infrastructure, technology, and market access
Intermediate Results Indicator
1.4 Protected areas management plans adopted
Intermediate Results Indicator
1.3 Share of targeted communities using innovative technologies in PAs monitoring
Intermediate Results Indicator
1.5. Share of targeted CPAs with at least one woman in the CPA management committee
Intermediate Results Indicator
3.1 Average travel time to potential tourism sites in selected PAs
PDO Indicator
Protected areas under improved management
PDO Indicator
Visitors in selected community-based ecotourism sites
PDO Indicator
Proportion of beneficiaries of of BDS that are women
PDO Indicator
Targeted community members satisfied with benefits of the project
PDO Indicator
Community groups with an increase of one or more on index of natural resources value addition
0.00
0.00
0.00
0.00
0.00
59525.50
66617.90
151321.42
84956.82
187948.60
102333.20
219915.06
117125.92
256390.26
140936.12
300565.78
156438.08
319613.94
162517.28
334153.36
343474.80
173105.22
343728.10
168495.16
333545.44
168697.80
349047.40
184149.10
384864.02
196155.52
403658.88
211252.20
448037.04
232732.04
480104.82
249905.78
527066.64
278984.62
574991.00
291700.28
601232.88
314497.28
665672.40
347730.24
712026.30
749109.42
393577.54
831938.52
435676.00
907928.52
472961.76
984070.50
511007.42
1067254.22
555638.88
1147803.62
589631.74
1203478.96
616684.18
1272021.94
652551.46
1334536.38
681225.02
1401154.28
722715.56
1476232.40
1502727.58
759596.04
1527804.28
772970.28
1569852.08
794551.44
1603034.38
811117.26
1645740.76
833762.28
1687129.98
853013.08
1725226.30
872314.54
1764335.82
892173.26
1392238.12
0.00
0.00
0.00
0.00
0.00
59525.50
66617.90
151321.42
84956.82
187948.60
102333.20
219915.06
117125.92
256390.26
140936.12
300565.78
156438.08
319613.94
162517.28
334153.36
343474.80
173105.22
343728.10
168495.16
333545.44
168697.80
349047.40
184149.10
384864.02
196155.52
403658.88
211252.20
448037.04
232732.04
480104.82
249905.78
527066.64
278984.62
574991.00
291700.28
601232.88
314497.28
665672.40
347730.24
712026.30
749109.42
393577.54
831938.52
435676.00
907928.52
472961.76
984070.50
511007.42
1067254.22
555638.88
1147803.62
589631.74
1203478.96
616684.18
1272021.94
652551.46
1334536.38
681225.02
1401154.28
722715.56
1476232.40
1502727.58
759596.04
1527804.28
772970.28
1569852.08
794551.44
1603034.38
811117.26
1645740.76
833762.28
1687129.98
853013.08
1725226.30
872314.54
1764335.82
892173.26
1392238.12
44000-P150572
World Bank
International Development Association
MINISTRY OF PUBLIC WORKS AND TRANSPORT
International Development Association
MINISTRY OF PUBLIC WORKS AND TRANSPORTCAMBODIA
KH - Road Asset Management Project II
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Veasna Bun
vbun@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - TransportationRural and Inter-Urban RoadsTrade FacilitationRural Infrastructure and service deliveryTransparency, Accountability and Good GovernanceUrban Infrastructure and Service DeliveryRural DevelopmentJob CreationJobsTradeUrban DevelopmentPublic Administration
International Development Association60000000Total Commitment in Second Quarter of 2016
International Development Association200000Total Disbursement in Fourth Quarter of 2016
International Development Association35900Total Disbursement in First Quarter of 2017
International Development Association21228Total Disbursement in Second Quarter of 2017
International Development Association23905Total Disbursement in Second Quarter of 2017
International Development Association-592Total Interest Repayment in Second Quarter of 2017
International Development Association45314Total Disbursement in Third Quarter of 2017
International Development Association69748Total Disbursement in Third Quarter of 2017
International Development Association28297Total Disbursement in Fourth Quarter of 2017
International Development Association38498Total Disbursement in Fourth Quarter of 2017
International Development Association-1045Total Interest Repayment in Fourth Quarter of 2017
International Development Association22086Total Disbursement in First Quarter of 2018
International Development Association26309Total Disbursement in First Quarter of 2018
International Development Association2243330Total Disbursement in First Quarter of 2018
International Development Association39517Total Disbursement in Second Quarter of 2018
International Development Association99897Total Disbursement in Second Quarter of 2018
International Development Association-1853Total Interest Repayment in Second Quarter of 2018
International Development Association110000000Total Commitment in Second Quarter of 2018
International Development Association150336Total Disbursement in Third Quarter of 2018
International Development Association270831Total Disbursement in Third Quarter of 2018
International Development Association1905862Total Disbursement in Third Quarter of 2018
International Development Association206941Total Disbursement in Fourth Quarter of 2018
International Development Association321329Total Disbursement in Fourth Quarter of 2018
International Development Association908011Total Disbursement in Fourth Quarter of 2018
International Development Association-13695Total Interest Repayment in Fourth Quarter of 2018
International Development Association700000Total Disbursement in Fourth Quarter of 2018
International Development Association959568Total Disbursement in First Quarter of 2019
International Development Association2120849Total Disbursement in First Quarter of 2019
International Development Association3517119Total Disbursement in First Quarter of 2019
International Development Association2165633Total Disbursement in Second Quarter of 2019
International Development Association4202689Total Disbursement in Second Quarter of 2019
International Development Association4670937Total Disbursement in Second Quarter of 2019
International Development Association-24806Total Interest Repayment in Second Quarter of 2019
International Development Association127827Total Disbursement in Second Quarter of 2019
International Development Association-1580Total Interest Repayment in Second Quarter of 2019
International Development Association905926Total Disbursement in Third Quarter of 2019
International Development Association1020652Total Disbursement in Third Quarter of 2019Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Phnom Penh
11.5620 104.9160
Suŏng
11.9120 105.6580
Snuŏl
12.0720 106.4220
Skon
12.0570 105.0740
Phumi Veal Renh
10.7090 103.8200
Phumi Tuol Kandaol
11.8640 105.6330
Phumi Sangke Pong
12.0750 105.0740
Phumi Khna
12.1040 105.0330
Phumi Khna
11.8640 105.7390
Phumi Kanthaor
10.5770 104.5090
Phumi Anlong Thma
13.6400 103.2030
Phumi Andong Chham Chha
12.2170 105.2330
MEmót
11.8290 106.1820
Kratie
12.6670 106.0830
Kampot
10.6100 104.1810
Kampong Cham
12.0500 105.2500
Sihanoukville
10.6670 103.7500
Tboung Khmum
11.9800 105.6500
Phumi Popel
11.8430 105.8700
Thnal Totung
11.4980 104.6650
Thnal Totung
11.4980 104.6650
Tonle Bet
11.9830 105.4670
Prek Tnaot
10.5880 103.9460
Intermediate Results Indicator
Personnel trainied in Gender Based Violence (GBV) and Violence Against Children (VAC)
Intermediate Results Indicator
Employment of women by contractors
Intermediate Results Indicator
Beneficiaries satisfied with road condition, safety, and climate resilience of rehabilitated and maintained roads
Intermediate Results Indicator
Road safety awareness training provided to residents along project roads - Male
Intermediate Results Indicator
Roads maintained under performance-based maintenance contracts as share of total 1-digit road network
Intermediate Results Indicator
Timely preparation and submission of annual maintenance work plans and budgets using Road Management Decision Support (RMDS), including climate resilience
Intermediate Results Indicator
Road safety audits are used to inform the design and construction of roads financed under the project
Intermediate Results Indicator
Availability of report on vehicle exceeding speed limits
Intermediate Results Indicator
Road safety awareness training provided to residents along project roads
Intermediate Results Indicator
Overloading trucks with load exceeding 5% of allowable limit
Intermediate Results Indicator
Annual road fatalities, severe and minor injuries
Intermediate Results Indicator
Annual road fatalities, severe and minor injuries (of which men)
Intermediate Results Indicator
Annual road fatalities, severe and minor injuries - Male
Intermediate Results Indicator
Length of roads maintained under performance-based maintenance contracts
PDO Indicator
Roads rehabilitated with disaster resilience measures
PDO Indicator
Roads in good and fair condition as a share of total classified paved roads
PDO Indicator
Size of the total classified network (National, Provincial, paved and un-paved)
PDO Indicator
Length of road sections on which Road Safety Measures are implemented
PDO Indicator
Roads rehabilitated
0.00
0.00
149400.00
86040.00
193800.00
222600.00
121200.00
260460.00
285300.00
157080.00
341760.00
366420.00
188160.00
382860.00
395760.00
406800.00
205020.00
407100.00
397020.00
197580.00
403680.00
427620.00
226140.00
462000.00
478080.00
250200.00
530640.00
556620.00
583620.00
306120.00
648540.00
681000.00
345480.00
712080.00
759300.00
401580.00
829440.00
862440.00
450480.00
949740.00
1017720.00
1075320.00
560160.00
1165500.00
1227420.00
641820.00
1330980.00
1384860.00
708420.00
1447320.00
1506540.00
772860.00
1580580.00
1626420.00
1695840.00
869040.00
1766280.00
1792500.00
902520.00
1822440.00
1859280.00
941040.00
1898580.00
1930620.00
979200.00
1982760.00
2013180.00
2043300.00
1033140.00
2089620.00
2705580.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
133333.33
133333.33
133333.34
23933.60
23933.60
23933.60
30088.96
30088.97
30088.97
76708.29
76708.29
76708.30
44529.83
44529.83
44529.84
780040.73
780040.73
780040.74
46471.13
46471.14
46471.14
966666.66
966666.67
966666.67
1500000.00
1500000.00
1500000.00
1300000.00
1300000.00
1300000.00
4300000.00
4300000.00
4300000.00
6454778.43
6454778.43
6454778.43
6454778.43
6454778.43
6454778.43
6454778.43
6454778.43
6454778.43
6454778.43
6454778.43
6454778.43
3692278.43
3692278.43
3692278.43
3692278.43
3692278.43
3692278.43
3692278.43
3692278.43
3692278.43
3692278.42
3692278.43
3692278.43
723333.33
723333.33
723333.33
723333.33
723333.33
723333.33
723333.33
723333.33
723333.33
723333.33
723333.33
723333.37
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.37
303333.33
303333.33
303333.33
303333.33
303333.33
303333.33
303333.33
303333.33
303333.33
303333.33
303333.33
303333.37
302500.00
302500.00
302500.00
302500.00
302500.00
302500.00
302500.00
302500.00
302500.00
302500.00
302500.00
302500.00
56666.67
56666.67
56666.67
56666.67
56666.67
56666.67
56666.67
56666.67
56666.67
56666.67
56666.67
56666.63
0.00
0.00
0.00
0.00
Finance Agreement :Institutional Arrangements, Schedule 2, Section I.A.1-3 | Description :Obligation of the Recipient to maintain,throughout the Project implementation period, the ICRRM, Technical Committee, GDPW, GDAP and MPWT Project management team, all withfunctions, staffing and resources satisfactory to the Association. | Frequency :CONTINUOUS
Finance Agreement :Project Operation Manual, Schedule 2, Section I.B | Description :Obligation of the Recipient to carry out theProject in accordance with the Project Operation Manual, and not amend, waive or abrogate any provisions of the manual unless theAssociation agrees otherwise in writing. | Frequency :CONTINUOUS
Finance Agreement :Environmental and Social Safeguards, Schedule 2, Section I.C | Description :Obligation of the Recipient toensure that the Project is carried out in accordance with the provisions of the Environmental and Social Safeguards Framework andthe site-specific Safeguard Plans (EMPs and ARAPs), not amend, abrogate or waive any of their provisions unless the Associationagrees otherwise, and report on their status of implementation as part of the semi-annual progress reports. | Frequency :CONTINUOUS
Finance Agreement :Contingent Emergency Response, Schedule 2, Section I.E | Description :Obligation of the Recipient to adopt asatisfactory Emergency Response Manual for Part C of the Project and, in the event of an eligible crisis or emergency, ensure thatthe activities under said part are carried out in accordance with such manual and all relevant safeguard requirements. | Frequency:In case of an Eligible Crisis or Emergency
44000-P160929
World Bank
International Development Association
International Development Association
CAMBODIA
Cambodia Southeast Asia Disaster Risk Management Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Zuzana Stanton-Geddes
zstantongeddes@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - TransportationRural and Inter-Urban RoadsRoad SafetyAdaptationDisaster Risk ReductionFlood and Drought Risk ManagementDisaster Risk ManagementDisaster Response and RecoveryClimate change
International Development Association60000000Total Commitment in Second Quarter of 2017
International Development Association520000Total Disbursement in Third Quarter of 2017
International Development Association127480Total Disbursement in Second Quarter of 2018
International Development Association151592Total Disbursement in Second Quarter of 2018
International Development Association-2450Total Interest Repayment in Second Quarter of 2018
International Development Association72678Total Disbursement in Third Quarter of 2018
International Development Association180659Total Disbursement in Third Quarter of 2018
International Development Association335237Total Disbursement in Fourth Quarter of 2018
International Development Association-3187Total Interest Repayment in Fourth Quarter of 2018
International Development Association129771Total Disbursement in First Quarter of 2019
International Development Association203224Total Disbursement in First Quarter of 2019
International Development Association105469Total Disbursement in Second Quarter of 2019
International Development Association318877Total Disbursement in Second Quarter of 2019
International Development Association-4735Total Interest Repayment in Second Quarter of 2019
International Development Association108469Total Disbursement in Third Quarter of 2019Project Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportGrant or Trust Fund AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Boeng Traeuy Mekongk
12.4250 104.8860
Stung Treng
13.7500 106.2500
Siem Reap
13.5000 104.0000
Kratie
12.6670 106.0830
Kandal
11.4170 105.0000
Kampong Cham
12.0500 105.2500
Kingdom of Cambodia
13.0000 105.0000
Tboung Khmum
11.9800 105.6500
Intermediate Results Indicator
Proportion of beneficiaries satisfied with road condition, safety, and climate resilience of rehabilitated and maintained roads
Intermediate Results Indicator
of which women
Intermediate Results Indicator
Grievances registered related to delivery of project benefits addressed (%)
Intermediate Results Indicator
National disaster risk finance strategy developed
Intermediate Results Indicator
Guidelines on mainstreaming disaster and climate resilience into public investment planning developed
Intermediate Results Indicator
Rural road maintenance plan developed in project provinces, incorporating road disaster vulnerability
Intermediate Results Indicator
Length of rural roads strengthened
Intermediate Results Indicator
Number of schools and health facilities connected by resilient rural roads
PDO Indicator
of which are women
PDO Indicator
Number of beneficiaries benefitting from all-season rural roads
PDO Indicator
Cambodia has information and capacity to access sovereign disaster risk insurance
PDO Indicator
Public investment planning takes into account disaster and climate risks
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1666666.66
1666666.67
1666666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5000000.00
5000000.00
5000000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6666666.66
6666666.67
6666666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6333333.33
6333333.33
6333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
173333.33
173333.33
173333.34
0.00
0.00
0.00
0.00
0.00
0.00
93333.33
93333.33
93333.34
60000.00
60000.00
60000.00
106666.66
106666.67
106666.67
100000.00
100000.00
100000.00
200000.00
200000.00
200000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
766666.66
766666.67
766666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1766666.66
1766666.67
1766666.67
1166666.66
1166666.67
1166666.67
1833333.33
1833333.33
1833333.34
1833333.33
1833333.33
1833333.34
5800000.00
5800000.00
5800000.00
100000.00
100000.00
100000.00
0.00
0.00
0.00
0.00
0.00
Institutional ArrangementsFinancing Agreement: Schedule 2, Section I.A Recurrent, ContinuousObligation of the Recipient tomaintain, throughout the Project implementation period, the project steering committee, project management unit in MRD, the GDICDM,and a national disaster risk financing and insurance working group all with functions, staffing and resources satisfactory to theAssociation.
Project Operation ManualFinancing Agreement: Schedule 2, Section I.BRecurrent, ContinuousObligation of the Recipient to carryout the Project (other than Component 4) in accordance with the Project Operation Manual; and not amend, waive or abrogate anyprovisions of the manual unless the Association agrees otherwise in writing.
Environmental and Social SafeguardsFinancing Agreement: Schedule 2, Section I.CRecurrent, ContinuousObligation of the Recipientto ensure that the Project is carried out in accordance with the safeguards instruments (as defined in the Financing Agreement);andnot amend, abrogate, or waive any of the safeguard instruments unless the Association agrees otherwise, and report on theirstatus of implementation as part of the semiannual progress reports.
Contingent Emergency ResponseFinancing Agreement: Schedule 2, Section I.ERecurrent, ContinuousObligation of the Recipient toadopt a satisfactory Emergency Response Manual for Component 4 of the Project and, in the event of an eligible crisis oremergency, ensure that the activities under said component are carried out in accordance with such manual and all relevantsafeguard requirements.
Mid-term ReviewFinancing Agreement: Schedule 2, Section II.A.2Due date: 20 months after EffectivenessObligation of the Recipientto prepare and furnish a mid-term report, documenting progress achieved in the carrying out of the Project during the periodpreceding the date of such report; review with the Association such mid-term report; and thereafter take all measures required toensure the continued efficient implementation of the Project and the achievement of its objectives, based on the conclusions andrecommendations of the mid-term report and the Association's views on the matter.