44000-P125799
World Bank
International Bank for Reconstruction and Development
MINISTRY OF JUSTICE
International Bank for Reconstruction and Development
MINISTRY OF JUSTICEMOROCCO
Judicial Performance Enhancement for Service to Citizen Project ("Mahkamati")
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Paul Scott Prettitore
pprettitore@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Law and JusticePersonal and Property RightsLegal Institutions for a Market EconomyRule of LawPublic AdministrationGenderE-Government, incl. e-servicesTransparency, Accountability and Good GovernanceJudicial and other Dispute Resolution MechanismsPublic Expenditure ManagementPublic Finance ManagementJobs
International Bank for Reconstruction and Development15800000Total Commitment in Second Quarter of 2012
International Bank for Reconstruction and Development38750Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development-38750Total Interest Repayment in First Quarter of 2013
International Bank for Reconstruction and Development-225Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development198198Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development-509Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development57210Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development-1087Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development231447Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development-807Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-1261Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development1562928Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development-1216Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-11515874Total Commitment Cancellations in Third Quarter of 2016
International Bank for Reconstruction and Development-3870Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-4013Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-4387Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-4186Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-4192Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-44738Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-4398Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-43851Total Loan Repayment in Second Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportContract AwardsProject URLProcurement Notices
REgion de Gharb-Chrarda-Beni Hssen
34.5000 -6.0000
REgion de Chaouia-Ouardigha
33.0000 -7.1670
REgion du Grand Casablanca
33.5330 -7.5830
Intermediate Results Indicator
COMPONENT 1 (Indicator1):The CdST approves strategic objectives and a court performance M&E framework
Intermediate Results Indicator
COMPONENT 1 (Indicator2):The SRA and PAPJs are satisfactorily implemented in the pilot courts according to the M&E framework
Intermediate Results Indicator
COMPONENT 1 (Indicator3):New physical layout for access to court services is fully operational in pilot courts
Intermediate Results Indicator
COMPONENT 1 (Indicator4):Automated Case Management System (CMS) fully implemented in pilot courts
Intermediate Results Indicator
COMPONENT 1 (Indicator 5):Electronic archiving and filing system established and operational
Intermediate Results Indicator
COMPONENT 2 (Indicator 1): MdJL's annual budget structured under performance budgeting principles
Intermediate Results Indicator
COMPONENT 2 (Indicator 4): Upgraded statistical system on pilot courts performance
Intermediate Results Indicator
COMPONENT 2 (Indicator 3): Training plan to support Project activities designed and operational
Intermediate Results Indicator
COMPONENT 3 (Indicator1): Mandatory operational documents generated with the required quality and timing
Intermediate Results Indicator
COMPONENT 1 (Indicator 6): Access to a central collateral information system
Intermediate Results Indicator
COMPONENT 1 (Indicator7): Information system connecting MdJL and the pilot courts is established and operational
Intermediate Results Indicator
COMPONENT 2 (Indicator 2): Standard performance evaluation system developed and operational
Intermediate Results Indicator
COMPONENT 2 (Indicator 5): ICT medium-term strategy for improved court performance
PDO Indicator
Increase in the awareness of the public in the selected judicial districts
PDO Indicator
Institutional capacity of MdJL to monitor the performance of pilot courts
PDO Indicator
Increased satisfaction of users and court personnel with service quality
PDO Indicator
Effectiveness in case processing.
156666.67
156666.67
156666.66
285000.00
285000.00
285000.00
285000.00
285000.00
285000.00
285000.00
285000.00
285000.00
285000.00
285000.00
285000.00
533333.33
533333.33
533333.34
533333.33
533333.33
533333.34
533333.33
533333.33
533333.34
533333.33
533333.33
533333.34
325833.33
325833.33
325833.34
325833.33
325833.33
325833.34
325833.33
325833.33
325833.34
325833.33
325833.33
325833.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
156666.67
156666.67
156666.66
285000.00
285000.00
285000.00
285000.00
285000.00
285000.00
285000.00
285000.00
285000.00
285000.00
285000.00
285000.00
533333.33
533333.33
533333.34
533333.33
533333.33
533333.34
533333.33
533333.33
533333.34
533333.33
533333.33
533333.34
325833.33
325833.33
325833.34
325833.33
325833.33
325833.34
325833.33
325833.33
325833.34
325833.33
325833.33
325833.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
44000-P093719
World Bank
International Bank for Reconstruction and Development
MINISTRY OF AGRICULTURE AND MARINE FISHERIES
International Bank for Reconstruction and Development
MINISTRY OF AGRICULTURE AND MARINE FISHERIESMOROCCO
MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Gabriella Izzi
gizzi@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - Agriculture, Fishing & ForestryIrrigation and DrainageWater Institutions, Policies and ReformRural Infrastructure and service deliveryWater Resource ManagementRural DevelopmentJobs
International Bank for Reconstruction and Development70000000Total Commitment in Second Quarter of 2010
International Bank for Reconstruction and Development165262Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development-165262Total Interest Repayment in Fourth Quarter of 2010
International Bank for Reconstruction and Development-1573Total Interest Repayment in Second Quarter of 2011
International Bank for Reconstruction and Development-1673Total Interest Repayment in Fourth Quarter of 2011
International Bank for Reconstruction and Development371321Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development3403807Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development-3229Total Interest Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development517048Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development4696399Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development119623Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development1259470Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development-22877Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development158157Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development4605397Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development-33477Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development642106Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development2319822Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development3221184Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development-42953Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development2251155Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development2982100Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development388767Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development1779727Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development-66334Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development1163371Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development1178931Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development105170Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development1305920Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development2309116Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development-96623Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development82407Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development4088644Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development99524Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development3255384Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development-65120Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development145399Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development2193945Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development646410Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development2056940Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development2425798Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development-80578Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-675027Total Loan Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development1397554Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development2206532Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development220800Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development240143Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development833693Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development-83360Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-791390Total Loan Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development316814Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development372130Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development2285234Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development-54135Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-855296Total Loan Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development211102Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development1373832Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development118728Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development1237994Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development1393920Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development-46118Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-896552Total Loan Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development14333Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development63682Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development80973Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development-55532Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-1109941Total Loan Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development44027Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-44582Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-1177321Total Loan Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-41387Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-1133311Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-44536Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-1128981Total Loan Repayment in Second Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementAgreementContract AwardsProject URLProcurement Notices
Safi
32.1670 -8.8330
El-Jadida
32.9000 -8.5000
Beni-Mellal
32.5000 -6.3330
Azilal
31.9170 -6.5000
Marrakech
31.6360 -8.0100
Al-Haouz
31.3410 -7.9110
Kelaa-Des-Sraghna
32.1670 -7.7500
Intermediate Results Indicator
Water users provided with new/improved irrigation and drainage services (number)
Intermediate Results Indicator
Water users provided with irrigation and drainage services - female (number)
Intermediate Results Indicator
in Tadla
Intermediate Results Indicator
in Haouz
Intermediate Results Indicator
in Doukkala
Intermediate Results Indicator
Area provided with irrigation and drainage services (ha)
Intermediate Results Indicator
Area provided with irrigation and drainage services - New (ha)
Intermediate Results Indicator
Area provided with irrigation and drainage services - Improved (ha)
Intermediate Results Indicator
Progress in the modernization of the irrigation network infrastructure
PDO Indicator
Female beneficiaries
PDO Indicator
Direct project beneficiaries
PDO Indicator
Clients who adopted an improved agr. technology promoted by project – female
PDO Indicator
Project area equipped with improved irrigation technology (mainly drip irrigation)
PDO Indicator
Clients who have adopted an improved agr. technology promoted by the project
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1166666.67
1166666.67
1166666.66
1166666.67
1166666.67
1166666.66
1166666.67
1166666.67
1166666.66
1166666.67
1166666.67
1166666.66
1166666.67
1166666.67
1166666.66
1433333.33
1433333.33
1433333.34
1433333.33
1433333.33
1433333.34
1433333.33
1433333.33
1433333.34
1533333.33
1533333.33
1533333.34
1533333.33
1533333.33
1533333.34
1433333.33
1433333.33
1433333.34
1433333.33
1433333.33
1433333.34
1433333.33
1433333.33
1433333.34
900000.00
900000.00
900000.00
866666.67
866666.67
866666.66
866666.67
866666.67
866666.66
866666.67
866666.67
866666.66
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
583333.33
583333.33
583333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
123773.73
123773.73
123773.73
1134602.27
1134602.27
1134602.28
1737815.80
1737815.80
1737815.80
459697.50
459697.51
459697.51
0.00
0.00
0.00
1587851.36
1587851.36
1587851.37
2061037.17
2061037.17
2061037.18
0.00
0.00
0.00
1744418.49
1744418.49
1744418.49
722831.24
722831.24
722831.25
780767.33
780767.33
780767.33
1240068.87
1240068.87
1240068.87
1390350.48
1390350.49
1390350.49
1118302.74
1118302.74
1118302.75
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
981816.32
981816.32
981816.33
Finance Agreement :LA sched 2 sectionI A4 | Description :Not later than 6 months after the Effective date the Borrower shll ensurethat an operational M&E system for the Project is in place. | Due Date :13-Mar-2011
Finance Agreement :PAs schedule C3 | Description :The Project Implementing Entity shall, prior to commencement of land acquisition,prepare, adopt, disclose and implement a Land Acquisition Plan, | Due Date :30-Jun-2011
44000-P167619
World Bank
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
MOROCCO
Education Support Program
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Fadila Caillaud
fcaillaud@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Early Childhood EducationPublic Administration - EducationPrimary EducationSecondary EducationEducation Governance, School-Based ManagementClimate changeAdaptationMitigationEducation FinancingStandards, Curriculum and TextbooksEducationTeachers
International Bank for Reconstruction and Development500000000Total Commitment in Second Quarter of 2019Project Information DocumentProject Appraisal Document Loan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
IRI 1.2 Number of preschool educators who completed an in-service training program approved by the MOE (disaggregated by gender)
Intermediate Results Indicator
IRI 1.3 Number of additional children age 4 and 5 enrolled in preprimary education, disaggregated by area (rural/urban) and gender
Intermediate Results Indicator
IRI 2.2: In-service teachers receive and access personalized professional development opportunities through their AREF, by gender
Intermediate Results Indicator
IRI 3.1 Number of AREF preparing their annual budget based on the performance contract approach (Circular No. 4509 on financial management parastatals)
Intermediate Results Indicator
IRI 3.2 Share of parents participating in the development and implementation of school improvement projects.
Intermediate Results Indicator
IRI 2.1: Increased average score of admitted CLE students, by gender
Intermediate Results Indicator
IRI 2.3. Improvement of learning outcomes, by gender
Intermediate Results Indicator
IRI 1.1 Criteria and process for approval of existing preprimary educator's professional development programs established
PDO Indicator
PDO#3: Implementation of performance contracts at AREF and DP level.
PDO Indicator
PDO#2: Improved teacher practices in the classroom for all active teachers in primary and secondary education
PDO Indicator
PDO#1:Number of classrooms for which data on quality of Early Childhood Education environment is collected and published by AREF
0.00
0.00
0.00
0.00
0.00
8083333.33
8083333.33
8083333.33
8083333.33
8083333.33
8083333.33
8083333.33
8083333.33
8083333.33
8083333.33
8083333.33
8083333.37
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
5666666.67
5666666.67
5666666.67
5666666.67
5666666.67
5666666.67
5666666.67
5666666.67
5666666.67
5666666.67
5666666.67
5666666.63
8666666.67
8666666.67
8666666.67
8666666.67
8666666.67
8666666.67
8666666.67
8666666.67
8666666.67
8666666.67
8666666.67
8666666.63
8583333.33
8583333.33
8583333.33
8583333.33
8583333.33
8583333.33
8583333.33
8583333.33
8583333.33
8583333.33
8583333.33
8583333.37
8666666.67
8666666.67
8666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8083333.33
8083333.33
8083333.33
8083333.33
8083333.33
8083333.33
8083333.33
8083333.33
8083333.33
8083333.33
8083333.33
8083333.37
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
8500000.00
5666666.67
5666666.67
5666666.67
5666666.67
5666666.67
5666666.67
5666666.67
5666666.67
5666666.67
5666666.67
5666666.67
5666666.63
8666666.67
8666666.67
8666666.67
8666666.67
8666666.67
8666666.67
8666666.67
8666666.67
8666666.67
8666666.67
8666666.67
8666666.63
8583333.33
8583333.33
8583333.33
8583333.33
8583333.33
8583333.33
8583333.33
8583333.33
8583333.33
8583333.33
8583333.33
8583333.37
8666666.67
8666666.67
8666666.66
0.00
0.00
0.00
0.00
0.00
44000-P151169
World Bank
International Bank for Reconstruction and Development
MINISTRY OF LABOR AND VOCATIONAL TRAINING
International Bank for Reconstruction and Development
MINISTRY OF LABOR AND VOCATIONAL TRAININGMOROCCO
Supporting the economic inclusion of youth
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Ana Paula Fialho Lopes
alopes@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Sub-National GovernmentSocial ProtectionPublic Administration - Industry, Trade and ServicesWorkforce Development and Vocational EducationCentral Government (Central Agencies)MSME DevelopmentOther Excluded GroupsYouth EmploymentLabor Market Policy and ProgramsAdaptationEntrepreneurshipClimate changeEnterprise DevelopmentSkills DevelopmentJobsMitigationGenderSocial Inclusion
International Bank for Reconstruction and Development55000000Total Commitment in Second Quarter of 2019
International Bank for Reconstruction and Development10859660Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-134990Total Interest Repayment in Second Quarter of 2019Project Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Safi
32.1670 -8.8330
Chichaoua
31.2640 -8.8440
Marrakech
31.6360 -8.0100
Al-Haouz
31.3410 -7.9110
El Kelaa Des Sraghna
32.0580 -7.4010
Rehamna
32.3140 -7.9520
Essaouira
31.5070 -9.7570
Marrakesh-Safi
31.6350 -7.9860
Youssoufia
32.2350 -8.5240
Intermediate Results Indicator
Beneficiaries of youth employment centers services
Intermediate Results Indicator
Beneficiaries of entrepreneurship support services within Entrepreneurship Centers
Intermediate Results Indicator
Beneficiaries of entrepreneurship post-creation program (business capacity and financial suppport)
Intermediate Results Indicator
Provinces and / or prefectures covered by at least one BDS provider selected, contracted and actively contribuiting to the deployment of the regional entrepreneurship support program of in MS
Intermediate Results Indicator
MSMEs or Cooperatives benefiting from the Value Chain Support Program in the Marrakech-Safi Region
Intermediate Results Indicator
Espaces Emploi Jeunes are operational in 8 provinces/Prefecture
Intermediate Results Indicator
Beneficiaries of entrepreneurship pre-creation support
Intermediate Results Indicator
Beneficiaries of apprenticeship training
Intermediate Results Indicator
New formal businesses established by project beneficiaries still operating after 12 months
Intermediate Results Indicator
Jobs created by new formal businesses established by project beneficiaries
Intermediate Results Indicator
Provinces with operational entrepreneurship and economic development centers
Intermediate Results Indicator
Beneficiaries of qualification and retraining
Intermediate Results Indicator
of which female
Intermediate Results Indicator
of which female
Intermediate Results Indicator
of which inhabitants of rural areas
Intermediate Results Indicator
of which female
Intermediate Results Indicator
of which inhabitants of rural areas
Intermediate Results Indicator
of which managed by women
Intermediate Results Indicator
of which female
Intermediate Results Indicator
of which female
Intermediate Results Indicator
of which NEET
Intermediate Results Indicator
Grievances are addressed and recorded
Intermediate Results Indicator
of which inhabitants of rural areas
Intermediate Results Indicator
of which female
Intermediate Results Indicator
Effective Grievance Redress Mechanism is available in all project locations
Intermediate Results Indicator
Market observation mechanisms are set up and operational
Intermediate Results Indicator
Focus groups with youth (project beneficiaires) are organized twice a year
Intermediate Results Indicator
Project data management system is operational
PDO Indicator
of which female
PDO Indicator
of which by female
PDO Indicator
of which inhabitants of rural ares
PDO Indicator
of which female
PDO Indicator
of which NEET
PDO Indicator
of which inhabitants of rural areas
PDO Indicator
Beneficiaries of training activities (apprenticeship and qualification/retraining) who are inserted after project intervention (number) (percentage of women, inhabitants of rural areas)
PDO Indicator
Formal enterprises created by project beneficiaries
PDO Indicator
Beneficiaries of youth employment centers services who are inserted after project intervention
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
64625.00
151195.00
177650.00
204050.00
111100.00
238755.00
261525.00
297000.00
160270.00
335885.00
346995.00
356125.00
368775.00
187220.00
375980.00
368060.00
362120.00
370040.00
192060.00
407220.00
423500.00
438240.00
468380.00
247390.00
510235.00
534985.00
572220.00
613470.00
313665.00
638935.00
671935.00
722700.00
377520.00
773025.00
813285.00
870595.00
932910.00
486145.00
1013045.00
1068375.00
1125135.00
1191575.00
616825.00
1269455.00
1306580.00
1353550.00
696960.00
1427745.00
1469160.00
1521190.00
1581250.00
806080.00
1631465.00
1651980.00
1670570.00
1704340.00
862620.00
1740365.00
1769735.00
1802790.00
1831665.00
2713920.00
2713920.00
2713920.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
64625.00
151195.00
177650.00
204050.00
111100.00
238755.00
261525.00
297000.00
160270.00
335885.00
346995.00
356125.00
368775.00
187220.00
375980.00
368060.00
362120.00
370040.00
192060.00
407220.00
423500.00
438240.00
468380.00
247390.00
510235.00
534985.00
572220.00
613470.00
313665.00
638935.00
671935.00
722700.00
377520.00
773025.00
813285.00
870595.00
932910.00
486145.00
1013045.00
1068375.00
1125135.00
1191575.00
616825.00
1269455.00
1306580.00
1353550.00
696960.00
1427745.00
1469160.00
1521190.00
1581250.00
806080.00
1631465.00
1651980.00
1670570.00
1704340.00
862620.00
1740365.00
1769735.00
1802790.00
1831665.00
2713920.00
2713920.00
2713920.00
Not applicable
44000-P127956
World Bank
International Bank for Reconstruction and Development
MINISTRY OF ECONOMIC AND FINANCE / DEPARTMENT OF ENVIRONMENT
International Bank for Reconstruction and Development
MINISTRY OF ECONOMIC AND FINANCE / DEPARTMENT OF ENVIRONMENTMOROCCO
MA-Inclusive Green Growth DPL
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Andrea Liverani
aliverani@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Other Agriculture, Fishing and ForestryOther Energy and ExtractivesOther Industry, Trade and ServicesIrrigation and DrainageJobsClimate changeWater Resource ManagementWater PollutionAir quality managementSoil PollutionWater Institutions, Policies and ReformRural Non-farm Income GenerationEnvironmental policies and institutionsMitigationAdaptationEnvironmental Health and Pollution ManagementRural Development
International Bank for Reconstruction and Development300000000Total Commitment in Fourth Quarter of 2013
International Bank for Reconstruction and Development302345126Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development-749864Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development-867969Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-1285231Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-858667Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-729034Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-696260Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-531089Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-481563Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-522872Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-505000Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-510767Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-533734Total Interest Repayment in Second Quarter of 2019Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
# of regional coastal zone management plans approved
ICZM Law will soon be discussed in parliamentary commission and the related Decree prepared in parallel. The National Coastal ZoneManagement Plan will then be adopted, and declined into Regional plans.
Intermediate Results Indicator
# of regional maritime fisheries control and enforcementplans approved
The Law on illegal fishing was promulgated by Parliament and published in the National Gazette on May 26, 2014. The NationalMonitoring Plan for Marine Fisheries is being prepared. Regional plans will follow.
Intermediate Results Indicator
# of aquifers (nappes) in which groundwater abstractionis regulated by an aquifer a greement among ‘large’ water consumers
2 aquifer agreements (in Dakhla and FEs-MeknEs) are in a very advanced stage.
Intermediate Results Indicator
# of products subject to green taxes
A dedicated working group between MoF and Department of Environment (with TA from the Bank) has met several times to narrow downthe list of products that would be candidates for green taxes.
Intermediate Results Indicator
# of ecotourism sector jobs created (2013-2016) gender disaggregated
The MoU on the Qariati Program has been finalized and the financial commitment from several institutional partners confirmed. Thesignature should take place in September 2014. Given delays in the MOU signature, the end target will need to be revised downwards.
Intermediate Results Indicator
#of industries having submitted a funding request to the Voluntary Industrial Depollution Mechanism
2 projects have already been implemented (in Oujda and Ait-Melloul) and a third one is being implemented in Zaio.
Intermediate Results Indicator
# of aquaculture sector jobs created (2013-2016),gender disaggregated
The target is likely to be exceeded, as between 700 and 800 jobs are expected to be created before the end of 2015 through 10investments.
Intermediate Results Indicator
% of new buildings (hospitals, residential, tertiary) builtafter the publication of the Decree and integrating EE requirements
As the decree will enter into force one year after approval (November 2014, therefore no impact can be assessed at this stage).
Intermediate Results Indicator
Total subsidy envelope todiesel, gasoline and in dustrial fuel (in % of GDP)
The Government has implemented further subsidy reductions on gasoline, diesel and HFO.
Intermediate Results Indicator
Share of the envelope allocated to direct seeders in the total FDA envelope allocated to seeders (traditional and direct)
Intermediate Results Indicator
Share of DMN revenues from agro-meteorological services
It is possible that the end target will need to be revised down if the MOU between ag and meteo takes a more gradual approach totransferring of met services.
Intermediate Results Indicator
Total capacity of distributedmedium-and low-tensiongrid-connected photovoltaic systems (in MW)
The analytical studies underpinning the draft Law and the Decree will be shared with the Bank team by the end of July.
Intermediate Results Indicator
Reduction in industrial pollution (as measured by tons ofBOD5 abated yearly)
This value only takes the ABC project into account (the contribution from the GPC project will be added once performance testshavebeen carried out).
0.00
0.00
44000-P127038
World Bank
International Bank for Reconstruction and Development
GOVERNMENT OF MOROCCO
International Bank for Reconstruction and Development
GOVERNMENT OF MOROCCOMOROCCO
Economic Competitiveness Support Program DPL
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Philippe De Meneval
pdemeneval@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Central Government (Central Agencies)Other Industry, Trade and ServicesTrade FacilitationE-Government, incl. e-servicesRegulation and Competition PolicyPublic Finance ManagementTradeDomestic Revenue AdministrationTax policyJobsPublic AdministrationFiscal PolicyBusiness Enabling Environment
International Bank for Reconstruction and Development160000000Total Commitment in First Quarter of 2013
International Bank for Reconstruction and Development162656323Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development-413222Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development-468513Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development-708777Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-724807Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-484246Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-411140Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-392656Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-299508Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-271578Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-294874Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-284795Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-288048Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-301000Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-3021214Total Loan Repayment in Second Quarter of 2019Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
N/A
0.00
0.00
44000-P149747
World Bank
International Bank for Reconstruction and Development
MINISTRY OF FINANCE
International Bank for Reconstruction and Development
MINISTRY OF FINANCEMOROCCO
Morocco Inclusive Green Growth DPL2
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Maria Sarraf
msarraf@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Other Industry, Trade and ServicesOther Agriculture, Fishing and ForestryOther Energy and ExtractivesFisheriesSocial ProtectionMitigationLabor Market Policy and ProgramsAir quality managementWater PollutionSoil PollutionLabor Market InstitutionsEnvironmental Health and Pollution ManagementSocial Safety NetsSubnational Fiscal PoliciesYouth EmploymentMigration, Remittances and Diaspora EngagementEnvironmental policies and institutionsClimate changeFiscal PolicyJobsSocial ProtectionEconomic Growth and Planning
International Bank for Reconstruction and Development300000000Total Commitment in Fourth Quarter of 2015
International Bank for Reconstruction and Development300000000Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development-750000Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-2320588Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-2591333Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development0Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-3122250Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-4770000Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-4785000Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-4815000Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-4845000Total Interest Repayment in Third Quarter of 2019Loan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Indicator1: # of regional coastal zone management plans (Schemas Regionaux d'Amenagement du Littoral) approved
Intermediate Results Indicator
Indicator 2: # of regional maritime fisheries control plans approved
Intermediate Results Indicator
Indicator 3: # of aquifers (nappes) in which groundwater abstraction is regulated by a groundwater agreement among water consumers
Intermediate Results Indicator
Indicator 10: # of polluting products subject to green taxes or to conventions promoting recycling value chains
Intermediate Results Indicator
Indicator 14: # of ecotourism sector jobs created (gender disaggregated)
Intermediate Results Indicator
Indicator 8: #of industries having submitted a funding request to the Voluntary Mechanism for Industrial Depollution
Intermediate Results Indicator
Indicator 13: # of aquaculture sector jobs created (gender disaggregated)
Intermediate Results Indicator
Indicator 6: Total subsidy envelope to diesel, gasoline and in dustrial fuel (in % of GDP)
Intermediate Results Indicator
Indicator 11: Share of the envelope allocated to direct seeders in the total FDA envelope allocated to seeders (traditional and direct)
Intermediate Results Indicator
Indicator 7: Social Cohesion Funds allocation as share of the total budget (excluding debt service)
Intermediate Results Indicator
Indicator 12: Share of DMN revenues from agro-meteorological services
Intermediate Results Indicator
Indicator 5: Total capacity of distributed medium and low tension grid renewable energy systems (in MW)
Intermediate Results Indicator
Indicator 4: Area (in m2) of new buildings integrating EE requirements and respecting thermal regulations for new buildings
Intermediate Results Indicator
Indicator 9: Reduction in industrial pollution (as measured by tons of BOD5 abated yearly)
0.00
0.00
44000-P120566
World Bank
International Bank for Reconstruction and Development
MINISTRY OF LABOR AND MINISTRY OF EDUCATION
International Bank for Reconstruction and Development
MINISTRY OF LABOR AND MINISTRY OF EDUCATIONMOROCCO
Morocco First Skills and Employment DPL
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Nadine T. Poupart
npoupart@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Workforce Development and Vocational EducationTertiary EducationPublic Administration - Social ProtectionSocial ProtectionSocial ProtectionTeachersActive Labor Market ProgramsAccess to EducationSocial Insurance and PensionsMSME DevelopmentLabor Market Policy and ProgramsFinancial Infrastructure and AccessScience and TechnologyLabor Market InstitutionsStandards, Curriculum and TextbooksMSME FinanceJobsEnterprise DevelopmentEducation
International Bank for Reconstruction and Development100000000Total Commitment in Second Quarter of 2012
International Bank for Reconstruction and Development235504Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development96767899Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development-235504Total Interest Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development-271409Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development-404482Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development-394861Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development-413433Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-413817Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-281955Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-234672Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-217243Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-170312Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-166248Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-181725Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-173400Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-173647Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-1853179Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-182160Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-1816430Total Loan Repayment in Second Quarter of 2019Implementation Completion Report ReviewImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Total number of CIP beneficiaries, by gender
Intermediate Results Indicator
Number of ANAPEC local offices
Intermediate Results Indicator
Number of firms formerly operating in the informal sector, registered annually for professional tax
Intermediate Results Indicator
Number of non-salaried workers registered with the national Social Security Fund
Intermediate Results Indicator
University graduation rate in open-enrollment faculties, by gender
Intermediate Results Indicator
Insertion rate (term/open contract) for PCS beneficiaries, by gender, after 6 months
0.00
0.00
44000-P153603
World Bank
International Bank for Reconstruction and Development
MINISTRY OF ECONOMY AND FINANCE
International Bank for Reconstruction and Development
MINISTRY OF ECONOMY AND FINANCEMOROCCO
MA-Second Capital Market Development and SME Finance DPL
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Gabriel J D Sensenbrenner
sensenbrennerg@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Insurance and PensionPublic Administration - Financial SectorOther Non-bank Financial InstitutionsCapital MarketsBanking InstitutionsFinancial StabilityInfrastructure FinanceMSME FinanceFinancial Sector oversight and policy/banking regulation & restructuringFinancial inclusionFinance for DevelopmentFinancial Infrastructure and AccessCredit Infrastructure
International Bank for Reconstruction and Development350000000Total Commitment in Second Quarter of 2017
International Bank for Reconstruction and Development350000000Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development-875000Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-4945119Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-6160000Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-6195000Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-6230000Total Interest Repayment in Third Quarter of 2019Implementation Completion and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Total financing of eligible MSMES: from 0 in 2013 to MAD 6bn in 2018 (indicator in billion MAD)
Intermediate Results Indicator
MSME Loans with CCG Guarantees: from MAD 4.6 billion in 2013 to MAD 18 billion in 2018 (indicator in billion MAD)
Intermediate Results Indicator
MSME loans with CCG guarantees in Marrakesh and Oriental region (million MAD)
Intermediate Results Indicator
Total MSME loans with CCG guarantees to majority female-owned MSMEs (in MAD millions)
Intermediate Results Indicator
Total MSME VAT Credits paid (million MAD)
Intermediate Results Indicator
Total number of MSMEs with credit scores
Intermediate Results Indicator
Total number of non-bank payment service providers licensed
Intermediate Results Indicator
Systemically important banks file recover plans
Intermediate Results Indicator
Number of REITS managers licensed
Intermediate Results Indicator
Percentage of selected financial professionals certified by AMMC
Intermediate Results Indicator
Year in which actuarial calculations project CMU reserve depletion
0.00
0.00
44000-P131256
World Bank
International Bank for Reconstruction and Development
MOROCCAN AGENCY FOR SOLAR ENERGY SA
International Bank for Reconstruction and Development
MOROCCAN AGENCY FOR SOLAR ENERGY SAMOROCCO
MA- Noor Ouarzazate Concentrated Solar Power Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Moez Cherif
mcherif@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Renewable Energy SolarJobsPublic Private PartnershipsUrban Infrastructure and Service DeliveryClimate changeUrban DevelopmentRural Infrastructure and service deliveryMitigationInnovation and Technology PolicyJob CreationBusiness Enabling EnvironmentRegional IntegrationRural Development
International Bank for Reconstruction and Development400000000Total Commitment in Third Quarter of 2014
International Bank for Reconstruction and Development852291Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development-852291Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development16032236Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development-53678Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development5573000Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development29654291Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development0Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development-158255Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development1057114Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development16507936Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-342031Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-447649Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development29832121Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-499473Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development13727880Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development100000000Total Commitment in Second Quarter of 2018
International Bank for Reconstruction and Development0Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development17194482Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-613519Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development-889387Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development12591416Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development23372508Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development0Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-1090291Total Interest Repayment in Third Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementAgreementContract AwardsProject URLProcurement Notices
Midelt
32.6850 -4.7450
Intermediate Results Indicator
Progress of Overall Construction - Noor Ouarzazate II
Intermediate Results Indicator
Progress of Overall Construction - Noor Ouarzazate III
Intermediate Results Indicator
Progress of Overall Construction - Noor Midelt Phase I
Intermediate Results Indicator
Grievances registered related to delivery of project benefits addressed
Intermediate Results Indicator
Share of female job-recruits receiving information on training and skilled work in the Noor Midelt Phase I project
Intermediate Results Indicator
Generation capacity of energy constructed or rehabilitated
Intermediate Results Indicator
Renewable energy generation capacity (other than hydropower) constructed under the project
Intermediate Results Indicator
Noor Ouarzazate I Capacity constructed
Intermediate Results Indicator
Noor Ouarzazate II and III Capacity constructed
Intermediate Results Indicator
Noor Midelt Phase I Capacity constructed
Intermediate Results Indicator
Private Capital Mobilized
Intermediate Results Indicator
Number of hired workers on the Noor Midelt site
Intermediate Results Indicator
of which female
PDO Indicator
Female beneficiaries
PDO Indicator
People provided with new or improved electricity service
PDO Indicator
Noor Solar Projects Electricity Sales (GWh)
PDO Indicator
Noor Solar Projects Electricity Sales – Ouarzazate Complex (GWh)
PDO Indicator
Noor Solar Projects Electricity Sales – Midelt Complex (GWh)
PDO Indicator
Noor Solar Projects Electricity Sales during peak hours (GWh)
PDO Indicator
Noor Solar Projects Electricity Sales during peak hours – Ouarzazate Complex (GWh)
PDO Indicator
Noor Solar Projects Electricity Sales during peak hours – Midelt Complex (GWh)
PDO Indicator
Avoided global GHG pollution
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.17
2.17
2.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.03
27.03
27.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33.43
33.43
33.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
52.00
52.00
52.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18.70
18.70
18.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4271627.32
4271627.32
4271627.32
4271627.32
4271627.32
4271627.32
4271627.32
4271627.32
4271627.32
4271627.32
4271627.32
4271627.30
1463754.16
1463754.16
1463754.16
1463754.16
1463754.16
1463754.16
1463754.16
1463754.16
1463754.16
1463754.16
1463754.16
1463754.17
3318800.02
3318800.02
3318800.02
3318800.02
3318800.02
3318800.02
3318800.02
3318800.02
3318800.02
3318800.02
3318800.02
3318800.03
4919933.33
4919933.33
4919933.33
4919933.33
4919933.33
4919933.33
4919933.33
4919933.33
4919933.33
4919933.33
4919933.33
4919933.37
8112685.17
8112685.17
8112685.17
8112685.17
8112685.17
8112685.17
8112685.17
8112685.17
8112685.17
8112685.17
8112685.17
8112685.13
11040066.66
11040066.66
11040066.66
11040066.66
11040066.66
11040066.66
11040066.66
11040066.66
11040066.66
11040066.66
11040066.66
11040066.74
6456466.67
6456466.67
6456466.67
6456466.67
6456466.67
6456466.67
6456466.67
6456466.67
6456466.67
6456466.67
6456466.67
6456466.63
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
Finance Agreement :Schedule 2, Section I(A)(6) | Description :Not later than 9 months after the Effective Date, the Borrower shallcontract an independent verification expert [...], to carry out technical audits and prepare the technical audit reports regardingthe implementation of Part 1.A and Part 1.C of the Project, and of the Second Plant EPC Contract and the Third Plant EPC Contractreferred to in Section II.B.3 of this Schedule 2 to this Agreement.
Finance Agreement :Schedule 2, Section I(B)(1) | Description :To carry out of Part 1.A of the Project by the 2nd Plant ProjectImplementing Entity, the Borrower shall make the proceeds of the Loan allocated to Category 1 in Section IV.A.2 and the proceedsof the AfDB the EIB, and the KfW available to the 2nd Plant Project Implementing Entity as a loan or loans under one or moresubsidiary loan agreements between the Borrower and,
Finance Agreement :Schedule 2, Section I(B)(2) | Description :The Borrower shall exercise its rights under the Loan Agreements toaccomplish the purposes of the loan. The Borrower shall not assign, abrogate or waive any of the LAs or any of their respectiveprovisions; cause the Entity not to assign, abrogate or waive any LAs.The Borrower shall not amend, and shall cause the Entity notto amend any LAs without the prior approval of the Bank. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I(B)(3) | Description :Carrying out of Part 1.C by the 3rd Plant Project ImplementingEntity, the Borrower shall make the proceeds of the Loan allocated to Category 2 in Section IV.A.2.and the proceeds of the AFD,AfDB, EIB, and the KfW Co-financing available to the Entity as a loan between the Borrower and the Entity.
Finance Agreement :Schedule 2, Section I(B)(4) | Description :The Borrower shall exercise its rights under the 3rd Plant SubsidiaryLoan Agreements to accomplish the purposes of the Loan the Borrower shall: not assign, abrogate or waive any of the LAs; cause theEntity not to assign, abrogate or waive any of the LAs. The Borrower shall not amend, and shall cause the Entity not to amend anyofthe LAs without the prior approval of the Bank. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I(D)(1) | Description :The Borrower shall maintain within the Project Management Unit, anenvironmental and social safeguards unit, budget and material support adequate to supervise the implementation of, and compliancewith the FESIA; and (ii) cause each of the 2nd and 3rd Plant Project Implementing Entities to establish and maintain anenvironmental and social unit. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I(D)(2) | Description :The Borrower shall cause Entit[ies]: not to authorize commencement ofcivil works, before the SESIA is prepared, adopted and disclosed; to disclose safeguard-related documentation; to construct andoperate the Plants in compliance with SESIAs and the Plant-site LAPs; not to amend, suspend, abrogate, repeal or waive anyprovision of SESIA, Plant-site LAPs or any ESIAs. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I(D)(3) | Description :The Borrower shall (i) disclose safeguard-related documentation andany mitigation measures and/or environmental management plans, as appropriate; (ii) construct and operate the Plants at all timesin compliance with the relevant Common Infrastructure ESIAs and the Plant-site LAPs; and (iii) not amend, suspend, abrogate, repealor waive any provision of ESIAs or LAPs. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I(D)(4) | Description :The Borrower shall: (i) cause Associated Facilities ESIAs to bedeveloped in a manner consistent with the provisions of the FESIA; (ii) provide the Bank with the relevant draft AssociatedFacilities ESIA for its comments and feedback on such documents; and (iii) inform the Bank about the status of the preparation andadoption of the final Associated Facilities ESIA. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I(D)(5) | Description :The Borrower shall ensure to assess need for land acquisition and/orinvoluntary resettlement for a particular activity prior to commencing civil works. In case would be required ensure that LAPs beprepared; provide the Bank with copies of LAPs for review and concurrence; ensure all resettlement measures have been fullyexecuted; and LAPs are adopted and disclosed. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I(D)(6) | Description :The Borrower shall ensure that (i) the 2nd and 3rd Plant AssociatedFacilities shall be constructed, operated and implemented in accordance with the RPF, the Associated Facility ESIAs, and theAssociated Facility LAPs; and (ii) no provision of the RPF, the Associated Facility ESIAs and LAPs, shall be amended, suspended,abrogated, repealed or waived without prior approval of the Bank. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section I(D)(7) | Description :The Borrower shall: (i) cause each of the Second and the Third PlantProject Implementing Entity to prepare and submit to the Borrower an environmental and social management report on a bi-annualbasisduring the construction of the Plants, and on an annual basis during operation of the Plants; and (ii) include a summary ofsuch reports in the Project Report. | Frequency :SemiAnnual
Finance Agreement :Schedule 2, Section I(D)(8) | Description :Not later than six (6) months after the Effective Date, the Borrowershall prepare a progress report on the implementation of the SDP and provide such report to the Bank for its comments andrecommendations. | Due Date :01-Jul-2015
Finance Agreement :Schedule 2, Section V(A) | Description :Except as otherwise agreed by the Bank, the Borrower's Equity shallremain positive on a yearly basis commencing with the Borrower's fiscal year 2015, as evidenced by the Borrower's yearly auditedfinancial statements. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section V(B) | Description :Before the end of each fiscal year commencing with the Borrower'sFY2015, the Borrower shall furnish to the Bank a copy of the business plan and financial projections of the Borrower and itssubsidiaries for each upcoming FY, as adopted by the Management Board (Directoire) of the Borrower and prepared in accordance withconsistently applied accounting standards acceptable to the Bank. | Frequency :CONTINUOUS
44000-P154041
World Bank
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
MOROCCO
MA: Transparency and Accountability DPL2 (Hakama II)
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Anne-Lucie Lefebvre
alefebvre@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Central Government (Central Agencies)Sub-National GovernmentOther Public AdministrationSocial InclusionPublic Expenditure ManagementParticipation and Civic EngagementMunicipal Institution BuildingPublic Finance ManagementPublic AdministrationTransparency, Accountability and Good GovernancePublic Private Partnerships
International Bank for Reconstruction and Development200000000Total Commitment in Fourth Quarter of 2015
International Bank for Reconstruction and Development200000000Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development-500000Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-1705943Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-1727556Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development0Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-2081500Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-3180000Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-3190000Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-3210000Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-3230000Total Interest Repayment in Third Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal Document Loan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Number of parliamentary questions on performance
Intermediate Results Indicator
Statistics on the demand and supply of birth certificates online: Number of requests
Intermediate Results Indicator
Number of procuring entities subject to the new procurement rules
Intermediate Results Indicator
Score of the Open Budget Index (OBI) from the International Budget Partnership (IBP)
Intermediate Results Indicator
Score of the Open Government partnership's (OGP) on access to information
Intermediate Results Indicator
Number of SOEs and agencies subject to ex-ante financial controls
Intermediate Results Indicator
Number of draft laws and regulations made public on the SGG's website
Intermediate Results Indicator
Statistics on the demand and supply of birth certificates online: Number of certificates provided
Intermediate Results Indicator
Percentage of SoEs and agencies that have implemented critical elements of the governance code a) established a governance committee
Intermediate Results Indicator
Budget execution rate of the first 5 ministries adopting a 3 year rolling budget framework with programmatic allocations
Intermediate Results Indicator
Savings through the use of electronic procurement and reverse auctions
Intermediate Results Indicator
Percentage of SoEs and agencies that have implemented critical elements of the governance code b) adopted a risk framework
Intermediate Results Indicator
Percentage of SoEs and agencies that have published on their website (i) up to date financial statements and (ii) the members and activity of their governance structure
Intermediate Results Indicator
Percentage of municipalities with real time information on budget execution via GID
Intermediate Results Indicator
Budget execution rate of SOEs and agencies
Intermediate Results Indicator
PEFA indicators (PI) related to budget transparency (nº6), policy based budgeting (nº12) and external scrutiny (nº 26 and 27)
Intermediate Results Indicator
A unified legal and regulatory framework for PPPs fostering transparency and competition is operational
Intermediate Results Indicator
Gallup World Poll Survey indicator measuring citizen engagement in government affairs: “Have you voiced opinion to official in thepast month?”
0.00
0.00
44000-P098459
World Bank
International Bank for Reconstruction and Development
OFFICE NATIONAL DE L'EAU POTABLE
International Bank for Reconstruction and Development
OFFICE NATIONAL DE L'EAU POTABLEMOROCCO
Morocco Oum Er Rbia Sanitation
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Jean-Martin Brault
jbrault@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - Water, Sanitation and Waste ManagementSanitationWater PollutionSoil PollutionServices and Housing for the PoorEnvironmental Health and Pollution ManagementAir quality managementUrban Development
International Bank for Reconstruction and Development43000000Total Commitment in Second Quarter of 2010
International Bank for Reconstruction and Development109142Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development-109142Total Interest Repayment in First Quarter of 2011
International Bank for Reconstruction and Development-883Total Interest Repayment in Third Quarter of 2011
International Bank for Reconstruction and Development-940Total Interest Repayment in First Quarter of 2012
International Bank for Reconstruction and Development-816Total Interest Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development170862Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development-382Total Interest Repayment in First Quarter of 2013
International Bank for Reconstruction and Development-87Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development169589Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development289713Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development-741Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development186652Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development499466Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development-1664Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development158315Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development1092207Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development382380Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development827781Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development865226Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development-7439Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development268838Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development563811Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development806260Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development257568Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development337914Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development633355Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development-12652Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development614721Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development873600Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development1066584Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development474344Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development972286Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development1051631Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development-20551Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-191175Total Loan Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development283717Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development1484297Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development1960068Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development613515Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development663088Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development988814Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development-36472Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-326318Total Loan Repayment in First Quarter of 2016
International Bank for Reconstruction and Development472501Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development591697Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development940393Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development474649Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development788172Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development-49064Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-405713Total Loan Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development118539Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development291522Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development709763Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development685461Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development840520Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development2980046Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-59297Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-447911Total Loan Repayment in First Quarter of 2017
International Bank for Reconstruction and Development323304Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development337424Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development505311Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development241029Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development413918Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development553154Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-75689Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-620419Total Loan Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development213192Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development315493Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development361712Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development104060Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development390026Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development558707Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-132301Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-684110Total Loan Repayment in First Quarter of 2018
International Bank for Reconstruction and Development83718Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development469963Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development5079674Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development-346903Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-800991Total Loan Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development3532Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-1156104Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development15821Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development-343392Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-780827Total Loan Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-2059825Total Commitment Cancellations in Second Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementAgreementContract AwardsProject URLProcurement Notices
Ouaouizarht
32.1630 -6.3480
Azilal
31.9620 -6.5710
El Ksiba
32.5730 -6.0190
Oued Zem
32.8630 -6.5740
Zouiat ech Cheïkh
32.6460 -5.9180
Youssoufia
32.2460 -8.5290
Sidi Bou Lanouar
32.8600 -6.8800
El Borouj
32.5060 -7.1920
Dechret Charfa
32.8390 -6.7840
Chemaia
32.0810 -8.6250
Boujad
32.7740 -6.3920
Aghbala
32.4820 -5.6430
Intermediate Results Indicator
Additional treatment capacity of WWTPs constructed under the Project (in population equivalent)
Intermediate Results Indicator
WWTPs associated with the project complying with national discharge standards
Intermediate Results Indicator
Total number of household connections built under the Project (new or rehabilitated)
Intermediate Results Indicator
Average BOD abatement rate of WWTPs constructed under the Project
Intermediate Results Indicator
Household sewer connections rehabilitated under the project
Intermediate Results Indicator
New household sewer connections constructed under the project
Intermediate Results Indicator
Length of newly installed or rehabilitated sewerage network
PDO Indicator
Volume(mass) of BOD pollution load removed by treatment plant under the project
PDO Indicator
WWTPs constructed under the Project complying with national standards
PDO Indicator
Percentage of population in Project area whose wastewater is collected
PDO Indicator
Female beneficiaries
PDO Indicator
Extremely poor beneficiaries
PDO Indicator
Percentage of population in Project area whose wastewater is appropriately treated
PDO Indicator
Number of people in urban areas provided with access to Improved Sanitation under the project
PDO Indicator
Direct project beneficiaries
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1666666.67
1666666.67
1666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2666666.67
2666666.67
2666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3333333.33
3333333.33
3333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3333333.33
3333333.33
3333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1666666.67
1666666.67
1666666.66
0.00
0.00
0.00
1666666.67
1666666.67
1666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14238.50
14238.50
14238.50
14238.50
14238.50
14238.50
14238.50
14238.50
14238.50
14238.50
14238.50
14238.51
199661.82
199661.82
199661.82
199661.82
199661.82
199661.82
199661.82
199661.82
199661.82
199661.82
199661.82
199661.83
624836.39
624836.39
624836.39
624836.39
624836.39
624836.39
624836.39
624836.39
624836.39
624836.39
624836.39
624836.42
874695.96
874695.96
874695.96
874695.96
874695.96
874695.96
874695.96
874695.96
874695.96
874695.96
874695.96
874695.97
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.67
666666.63
906567.33
906567.33
906567.33
906567.33
906567.33
906567.33
906567.33
906567.33
906567.33
906567.33
906567.33
906567.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Schedule 2, Section V: Except as the Bank shall otherwise agree, the Borrower shall take, in consultation with the Guarantor, allactions necessary to ensure that its Cumulative Debt to Equity shall be lower than 4.5 by closing of each fiscal year duringProject implementation. [As amended June 2014]
Schedule 2, Section I, Paragraph E, Article 2: The Borrower shall carry out the Project in accordance with the EnvironmentalLegislation, the Land Acquisition Legislation, as well as the Environmental and Social Guidelines for Civil Works in the City ofBejaad. [As amended June 2014]
44000-P150928
World Bank
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
MOROCCO
Financing Innovative Startups and Small and Medium Enterprises Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Alexandre Hugo Laure
alaure1@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - Financial SectorCapital MarketsBusiness Enabling EnvironmentInnovation and Technology PolicyMSME DevelopmentEntrepreneurshipEnterprise Development
International Bank for Reconstruction and Development50000000Total Commitment in First Quarter of 2017
International Bank for Reconstruction and Development25125000Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development-125000Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-226195Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development0Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development10200000Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development-331487Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-601884Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development8500000Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-655115Total Interest Repayment in Second Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Region de Rabat-Sale-Zemmour-Zaer
33.7500 -6.3330
Region du Grand Casablanca
33.5330 -7.5830
Chaouia-Ouardigha
33.0000 -7.1670
Oriental Region
33.6670 -2.5000
Region de Souss-Massa-Draa
30.6670 -7.5000
Taza-Al Hoceima-Taounate
34.5000 -4.1670
Region de Fes-Boulemane
33.3330 -4.2500
Marrakech-Tensift-Al Haouz
31.5000 -8.3330
Region de Meknes-Tafilalet
32.1670 -4.8000
Tan-Tan
28.0830 -11.0830
Sidi Ifni
29.3800 -10.1730
Guelmim
28.7500 -10.0000
Intermediate Results Indicator
Investment management company contracted to manage the Angel/Seed fund
Intermediate Results Indicator
Number of entrepreneurs receiving pre-seed grants and soft loans through the project
Intermediate Results Indicator
Private Fund Managers contracted to manage new public-private funds under the project
Intermediate Results Indicator
Public-private funds Shareholder Agreements completed
Intermediate Results Indicator
Entrepreneurs receiving mentoring and investment readiness support
Intermediate Results Indicator
Angel Network developed through the project
Intermediate Results Indicator
Angel network members who received training through the project
Intermediate Results Indicator
Percent female entrepreneurs receiving pre-seed grants through the project
Intermediate Results Indicator
Beneficiaries satisfied with services received and performance of PIs (%)
PDO Indicator
Private Capital Mobilized
PDO Indicator
Private Angel/Seed Stage Capital Mobilized Through the Project
PDO Indicator
Private Venture Capital Mobilized Through the Project
PDO Indicator
Beneficiaries that introduced a new or, improved on an existing, product, process, or service under the projects
PDO Indicator
SMEs receiving private equity financing through the project
PDO Indicator
SMEs receiving private Angel/Seed equity financing through the project
PDO Indicator
SMEs receiving private VC equity financing through the project
5000000.00
5000000.00
5000000.00
5000000.00
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25000000.00
850000.00
850000.00
850000.00
850000.00
850000.00
850000.00
850000.00
850000.00
850000.00
850000.00
850000.00
850000.00
591666.67
591666.67
591666.67
591666.67
591666.67
591666.67
591666.67
591666.67
591666.67
591666.67
591666.67
591666.63
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.37
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Finance Agreement :Section IV. B. 1 (b) of the Loan Agreement: Withdrawal Conditions | Description :Under Category (1), unless theProject Implementing Entity has signed at least one Administration Agreement with a Participating Financial Intermediary
Finance Agreement :Section IV. B. 1 (c) of the Loan Agreement: Withdrawal Conditions | Description :Under Category (2), unless theProject Implementing Entity has signed at least one Participation Agreement with a Participating Non-Financial Intermediary
44000-P094007
World Bank
International Bank for Reconstruction and Development
MINISTRY OF EQUIPMENT, DIRECTORATE OF ROADS
International Bank for Reconstruction and Development
MINISTRY OF EQUIPMENT, DIRECTORATE OF ROADSMOROCCO
Morocco - Second Rural Roads Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Vincent Vesin
vvesin@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Rural and Inter-Urban RoadsRural Infrastructure and service deliveryRural Development
International Bank for Reconstruction and Development60000000Total Commitment in Second Quarter of 2006
International Bank for Reconstruction and Development164869Total Disbursement in Fourth Quarter of 2006
International Bank for Reconstruction and Development-164869Total Interest Repayment in Fourth Quarter of 2006
International Bank for Reconstruction and Development17556075Total Disbursement in First Quarter of 2007
International Bank for Reconstruction and Development-336179Total Interest Repayment in Second Quarter of 2007
International Bank for Reconstruction and Development-527675Total Interest Repayment in Fourth Quarter of 2007
International Bank for Reconstruction and Development27065500Total Disbursement in Second Quarter of 2008
International Bank for Reconstruction and Development-612270Total Interest Repayment in Second Quarter of 2008
International Bank for Reconstruction and Development-1142382Total Interest Repayment in Fourth Quarter of 2008
International Bank for Reconstruction and Development13298000Total Disbursement in Second Quarter of 2009
International Bank for Reconstruction and Development-971380Total Interest Repayment in Second Quarter of 2009
International Bank for Reconstruction and Development-615435Total Interest Repayment in Fourth Quarter of 2009
International Bank for Reconstruction and Development-328866Total Interest Repayment in Second Quarter of 2010
International Bank for Reconstruction and Development81519000Total Commitment in Second Quarter of 2010
International Bank for Reconstruction and Development11276131Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development-376409Total Interest Repayment in Fourth Quarter of 2010
International Bank for Reconstruction and Development-538589Total Interest Repayment in Second Quarter of 2011
International Bank for Reconstruction and Development21182446Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development-211650Total Interest Repayment in Second Quarter of 2011
International Bank for Reconstruction and Development-661446Total Interest Repayment in Fourth Quarter of 2011
International Bank for Reconstruction and Development20600539Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development-185230Total Interest Repayment in Fourth Quarter of 2011
International Bank for Reconstruction and Development-604691Total Interest Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development-1929176Total Loan Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development25918989Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development-363660Total Interest Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development-377833Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development-2035283Total Loan Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development-458785Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development-157004Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development-2033248Total Loan Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development13472601Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development-165769Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development-147311Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development-2129887Total Loan Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development115585Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development-202127Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development-162535Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-2130200Total Loan Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-222980Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development96550000Total Commitment in Second Quarter of 2014
International Bank for Reconstruction and Development-168285Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-1949912Total Loan Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-239409Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-223011Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development11553975Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development-94170Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-1709137Total Loan Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-149072Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-25652Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-67314Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-1658665Total Loan Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-122837Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development11055592Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development-31850Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development11108495Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development-46769Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-1746227Total Loan Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-102096Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development11282860Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development22698766Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development-76764Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-21332Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-1662343Total Loan Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-68034Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-138019Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development8833595Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-9749Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-1757104Total Loan Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-64708Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development359284Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development-150774Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development14153Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-1862428Total Loan Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-58074Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-169566Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-1832693Total Loan Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-49731Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-161624Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-1779640Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-55493Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-161854Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-1744349Total Loan Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-54095Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-173556Total Interest Repayment in Second Quarter of 2019Project Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
REgion de Rabat-SalE-Zemmour-Zaër
33.7500 -6.3330
REgion de MeknEs-Tafilalet
32.1670 -4.8000
REgion de Marrakech-Tensift-Al Haouz
31.5000 -8.3330
Guelmim
28.7500 -10.0000
REgion de FEs-Boulemane
33.3330 -4.2500
REgion du Grand Casablanca
33.5330 -7.5830
REgion de Chaouia-Ouardigha
33.0000 -7.1670
REgion de Doukkala-Abda
32.5000 -8.7500
REgion de Gharb-Chrarda-Beni Hssen
34.5000 -6.0000
REgion de l’ Oriental
33.6670 -2.5000
REgion de Souss-Massa-Drâa
30.6670 -7.5000
REgion de Tadla-Azilal
32.1670 -6.4170
REgion de Tanger-TEtouan
35.2500 -5.4330
REgion de Taza-Al Hoceima-Taounate
34.5000 -4.1670
Intermediate Results Indicator
Roads in good and fair condition as a share of total classified roads
Intermediate Results Indicator
Kilometers of roads launched under CFR's road program (component A)
Intermediate Results Indicator
Kilometers of roads launched under DR's road program (component B)
Intermediate Results Indicator
Kilometers of roads launched under the overall Second National Program of Rural Roads
Intermediate Results Indicator
Dissemination and outreach program in place
Intermediate Results Indicator
Funding for classified roads maintenance equal to the minimum annual value determined by the DR in its national road maintenance strategy
Intermediate Results Indicator
Monitoring and evaluation system working efficiently
Intermediate Results Indicator
Strengthening of local consulting firms' capacities and improvement in the quality of detailed studies
Intermediate Results Indicator
Roads rehabilitated, Rural
Intermediate Results Indicator
Size of the total classified network
PDO Indicator
Direct project beneficiaries
PDO Indicator
National rural road accessibilty index
PDO Indicator
Accessibility differential index
PDO Indicator
Share of roads which have seen an improvement in intercity passenger transport services
0.00
0.00
0.00
0.00
0.00
2050000.00
2050000.00
2050000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3950000.00
3950000.00
3950000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4666666.67
4666666.67
4666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4666666.67
4666666.67
4666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4666666.67
4666666.67
4666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54956.25
54956.25
54956.25
5852025.00
5852025.00
5852025.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9021833.33
9021833.33
9021833.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4432666.67
4432666.67
4432666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3758710.42
3758710.42
3758710.41
0.00
0.00
0.00
0.00
0.00
0.00
7060815.39
7060815.39
7060815.39
0.00
0.00
0.00
6866846.19
6866846.19
6866846.20
0.00
0.00
0.00
2000000.00
2000000.00
2000000.00
0.00
0.00
0.00
2000000.00
2000000.00
2000000.00
0.00
0.00
0.00
2000000.00
2000000.00
2000000.00
0.00
0.00
0.00
2000000.00
2000000.00
2000000.00
0.00
0.00
0.00
2125146.75
2125146.75
2125146.75
0.00
0.00
0.00
3333333.33
3333333.33
3333333.34
0.00
0.00
0.00
6000000.00
6000000.00
6000000.00
0.00
0.00
0.00
6000000.00
6000000.00
6000000.00
0.00
0.00
0.00
8333333.33
8333333.33
8333333.34
0.00
0.00
0.00
8516666.66
8516666.67
8516666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Finance Agreement: schedule 2Description: preparation and submission of annual implementation reports and annual work plans beforeMarch 31 of each fiscal yearFrequency: yearly
Finance Agreement: schedule 5.CDescription: provision of a mid-term progress reportDue date: 3 June 2010
44000-P127822
World Bank
International Bank for Reconstruction and Development
AGENCE DE DEVELOPMENT AGRICOLE
International Bank for Reconstruction and Development
AGENCE DE DEVELOPMENT AGRICOLEMOROCCO
Second DPL in support of the Plan Maroc Vert
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Xavier Chauvot De Beauchene
xchauvot@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Irrigation and DrainageLivestockAgricultural Extension, Research, and Other Support ActivitiesFisheriesCropsOther Agriculture, Fishing and ForestryJobsBiodiversityLand Administration and ManagementLandscape ManagementRural MarketsAgriculture FinanceRural DevelopmentFinance for DevelopmentRural Infrastructure and service deliveryRenewable Natural Resources Asset Management
International Bank for Reconstruction and Development203200000Total Commitment in First Quarter of 2013
International Bank for Reconstruction and Development192942600Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development-487444Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development-762414Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development-813702Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-858740Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-582553Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-488045Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-464598Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-354903Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-330913Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-363308Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-341550Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-346947Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-363077Total Interest Repayment in Second Quarter of 2019Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Number of fruit and vegetable wholesale markets under new management model launched
TBD during supervision
Intermediate Results Indicator
Number of private slaughterhouses launched
TBD during supervision
Intermediate Results Indicator
Number of slaughterhouse concessions under new management model launched
TBD during supervision
Intermediate Results Indicator
Number of public-private partnerships for agricultural extension created
TBD during supervision
Intermediate Results Indicator
Number of training days per category of actor
TBD during supervision
Intermediate Results Indicator
Number of HACCP-certified agri-food processing establishments
TBD during supervision
Intermediate Results Indicator
Cumulated number of farmers participating in projects of collection reconversion to drip irrigation
TBD during supervision
Intermediate Results Indicator
Share of new Pillar II projects submitted by the OPA
TBD during supervision
Intermediate Results Indicator
Share of small farmers benefitting from Pillar II support
TBD during supervision
Intermediate Results Indicator
Share of research and extension projects funded through the competitive financing mechanism
No baseline available.
TBD during supervision
Intermediate Results Indicator
Percentage increase of the number of declarations and authorizations of water abstraction received / delivered
The baseline (number) of declarations and authorizations of water abstraction received / delivered was 2,500.
TBD during supervision
Intermediate Results Indicator
Share of Operation and Maintenance costs covered by irrigation water tariffs in seven ORMVAs
TBD during supervision
Intermediate Results Indicator
No. of irrigation schemes located downstream of dams under construction or programmed with allocated resources / no. of dams with agricultural scope under construction or progr. with allocated resourc
TBD during supervision
Intermediate Results Indicator
Number of sanitary alerts notified by commercial partners (third countries) / number of shipment of products (number of certified produced)
TBD during supervision
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44000-P147257
World Bank
International Bank for Reconstruction and Development
MINISTRY OF FINANCE
International Bank for Reconstruction and Development
MINISTRY OF FINANCEMOROCCO
MA Capital Market Development & SME Finance DPL
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Gabriel J D Sensenbrenner
sensenbrennerg@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Capital MarketsCentral Government (Central Agencies)ServicesBanking InstitutionsOther Non-bank Financial InstitutionsFinancial StabilityMSME DevelopmentLegal Institutions for a Market EconomyMSME FinanceAdministrative and Civil Service ReformFinancial Sector oversight and policy/banking regulation & restructuringRule of LawFinancial Infrastructure and AccessPublic AdministrationJobsEnterprise Development
International Bank for Reconstruction and Development300000000Total Commitment in Second Quarter of 2014
International Bank for Reconstruction and Development728987Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development290344958Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development-728987Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development-588563Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-850460Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-722066Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-689604Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-526012Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-476960Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-517874Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-500173Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-505885Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-528632Total Interest Repayment in Second Quarter of 2019Implementation Completion and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
N/A
0.00
0.00
44000-P168587
World Bank
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
MOROCCO
Financial Inclusion and Digital Economy DPF
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Djibrilla Adamou Issa
dissa1@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
ICT InfrastructureBanking InstitutionsInsurance and PensionOther Non-bank Financial InstitutionsOther Industry, Trade and ServicesJob CreationAdaptationMitigationFinancial Infrastructure and AccessGenderMSME FinanceAgriculture FinancePayment & markets infrastructureFinancial inclusionICT SolutionsEntrepreneurshipClimate changeEnterprise DevelopmentFinance for DevelopmentICTJobs
International Bank for Reconstruction and Development700000000Total Commitment in First Quarter of 2019
International Bank for Reconstruction and Development685246669Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-1723025Total Interest Repayment in Second Quarter of 2019Project Information DocumentLoan AgreementContract AwardsProject URLProcurement Notices
0.00
0.00
44000-P128869
World Bank
International Bank for Reconstruction and Development
MINISTRY OF AGRICULTURE & ECONOMY(MAEG); MINISTRY OF FINANCE
International Bank for Reconstruction and Development
MINISTRY OF AGRICULTURE & ECONOMY(MAEG); MINISTRY OF FINANCEMOROCCO
Morocco Second Competitiveness DPL
]]>
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Philippe De Meneval
pdemeneval@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Other Industry, Trade and ServicesTrade FacilitationRegulation and Competition PolicyEconomic Growth and PlanningBusiness Enabling EnvironmentLabor Market InstitutionsYouth EmploymentInvestment and Business ClimateLabor Market Policy and ProgramsMigration, Remittances and Diaspora EngagementJobsSubnational Fiscal PoliciesTradeFiscal Policy
International Bank for Reconstruction and Development200000000Total Commitment in First Quarter of 2015
International Bank for Reconstruction and Development200000000Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development-500000Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-988059Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-1547000Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-1727556Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-2081500Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-2259111Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-3480000Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-3500000Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-3520000Total Interest Repayment in Third Quarter of 2019Implementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Number of simplifications and standardisations of administrative procedures made public on the governement website service-public.ma
Intermediate Results Indicator
Number of limited liabaility companies (SARL) formally registered.
Intermediate Results Indicator
Number of investment climate reforms accounted for in the Doing Business survey between 2013-2015 that have been initiated and coordinated by the National Committee for Business Environment.
Intermediate Results Indicator
Number of investigations formerly launched by the Competition Council under the new legal and regulatory framework
Intermediate Results Indicator
Rationalization of tariff structure on imports through a reduction of maximum tariff quota applicable to industrial products.
Intermediate Results Indicator
Percentage of products put on the market that are randomly controlled which complies with new security requirements
Intermediate Results Indicator
Reduction of the formalities and duration for registering property for business
Intermediate Results Indicator
Reduction by at least ten percent in average payment delay in sector where average payment delays is over 100 days.
Intermediate Results Indicator
Reduction in average transit time for goods at Casablanca airport.
Intermediate Results Indicator
Companies are reporting in their certified accounts their average payment delays as per the new regulations.
Intermediate Results Indicator
Improvement in the Doing Business indicator "protecting minority investor"
Intermediate Results Indicator
All newly created corporations identified through a unique business identification code
Intermediate Results Indicator
Petitions requesting the application of anti-dumping, anti-subsidy or safeguard measures are formally processed and published according to WTO rules and procedures
Intermediate Results Indicator
Assessment of costs and benefits grantes to investment projects is included in the annual activity report of the National Commission for Investments
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44000-P116201
World Bank
International Bank for Reconstruction and Development
MINISTRY OF INTERIOR
International Bank for Reconstruction and Development
MINISTRY OF INTERIORMOROCCO
MA-National Initiative for Human Development 2
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Mohamed Medouar
mmedouar@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Other Industry, Trade and ServicesSocial ProtectionOther Water Supply, Sanitation and Waste ManagementOther EducationSub-National GovernmentRural Infrastructure and service deliveryServices and Housing for the PoorRural DevelopmentGenderUrban DevelopmentMunicipal FinanceSocial InclusionJobsParticipation and Civic Engagement
International Bank for Reconstruction and Development300000000Total Commitment in Second Quarter of 2012
International Bank for Reconstruction and Development720214Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development-720214Total Interest Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development53553675Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development-140227Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development-223810Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development15523963Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development61275701Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development-228888Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development-586669Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-494858Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-377648Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development52837530Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development-317847Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development62944334Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development-577645Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development20684622Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development-443755Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-3447090Total Commitment Cancellations in First Quarter of 2017
International Bank for Reconstruction and Development-499898Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-509932Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-511470Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-513410Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-5479180Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-560894Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-5468741Total Loan Repayment in Second Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Infrastructure projects financed under the Program judged by the auditors as conforming to technical specifications, after final commissioning
Intermediate Results Indicator
Households in the targeted rural and urban areas who have participated in the participatory diagnostic and are satisfied with ILDH processes.
Intermediate Results Indicator
Women and youth (18-35 years old) in the following local governance bodies: CLDH and CPDH
Intermediate Results Indicator
Priority audit recommendations included in the action plans which are implemented.
Intermediate Results Indicator
Subproject sponsors mastering procurement and financial management procedures.
Intermediate Results Indicator
Women in the following local governance bodies: CLDH and CPDH
Intermediate Results Indicator
Youth (18–35 years old) in the following local governance bodies: CLDH & CPDH
Intermediate Results Indicator
Key actors (DAS & local facilitation teams) trained in the use of such guide in environmental and social safeguards.
Intermediate Results Indicator
Projects under the Rural and Urban Subprograms of the Program contracted by local government (communes and Conseils d’Arrondissement), associations, or cooperativ
Intermediate Results Indicator
IGAs implemented by cooperatives, associations, and private firms.
Intermediate Results Indicator
IGA implementing agencies receiving capacity building.
Intermediate Results Indicator
Partnership agreements with a technical assistance provision (measure to enhance procurement capacity)
Intermediate Results Indicator
Provinces and prefectorates in the Program Area which have put in place a plan of action to address audit recommendations
Intermediate Results Indicator
Update MIS, revise and simplify manual, add agreed data to reports and Make project info and reporting more accessible at local levels
Intermediate Results Indicator
Preparation of environmental and social guide related to the Program
Intermediate Results Indicator
Elaboration of a user-friendly fiduciary guide in Arabic and French
Intermediate Results Indicator
Update MIS, revise and simplify manual, add agreed data to reports
Intermediate Results Indicator
Make project info and reporting more accessible at local levels
Intermediate Results Indicator
Women benefitting from pre-natal care in Dar Al Oumouma.
PDO Indicator
Girls who reside in the educational dormitories (Dar Taliba) graduating to the next grade.
PDO Indicator
Income-generating activities implemented by cooperatives, associations or companies (societies de personnes) which are viable two years after having benefited from financing under the Program
PDO Indicator
Sampled population in the targeted areas saying that they have participated in the participatory diagnostic.
PDO Indicator
Population provided with access to improved water supply in targeted rural communes by the Program
PDO Indicator
Sampled population in the targeted areas saying that they have participated in the monitoring and evaluation of activities.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Finance Agreement :Schedule 2, section I-C-1 | Description :Program Institutions Without limitation on the generality of Part A ofthis Section I, the Borrower shall maintain the implementation arrangements for the Program as set forth in the INDH 2 Programduring the implementation of the Program, and, except as the Bank shall otherwise agree, the Borrower shall not amend or waive anyof such arrangements if, in the opinion of the Bank, such amendment or | Frequency :Yearly
Finance Agreement :Schedule 2, section I-C-2 | Description :Operations Manuals and GuidesThe Borrower shall carry out the Programin accordance with the Operations Manuals, the Environmental and Social Guide and the Fiduciary Guide, and, except as the Bankshallotherwise agree, the Borrower shall not amend or waive any provision of said Manuals and Guides if, in the opinion of theBank, such amendment or waiver may materially and adversely affect theca | Frequency :Yearly
Finance Agreement :Schedule 2, section I-C-3 | Description :Additional Program Implementation ArrangementsWithout limitation onthe generality of Part A of this Section I, the Borrower shall carry out the Action Plan in accordance with such schedule as shallhave been approved by the Bank. | Frequency :Yearly
44000-P127955
World Bank
International Bank for Reconstruction and Development
MOEF, MOI, SEEE
International Bank for Reconstruction and Development
MOEF, MOI, SEEEMOROCCO
Solid Waste Sector DPL3
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Jaafar Sadok Friaa
jsfriaa@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Sub-National GovernmentWaste ManagementEnvironmental policies and institutionsSoil PollutionWater PollutionServices and Housing for the PoorEnvironmental Health and Pollution ManagementUrban DevelopmentAir quality management
International Bank for Reconstruction and Development130000000Total Commitment in First Quarter of 2013
International Bank for Reconstruction and Development129837350Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development-326938Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development-180177Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development-556784Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development-588308Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development-484152Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-387825Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-334328Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-292779Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-228534Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-235297Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-238019Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-227937Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-239574Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-260835Total Interest Repayment in Third Quarter of 2019Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
annual amount of eco-taxes collected and allocated to FNE
Amount in MDA
Intermediate Results Indicator
Number of municipalities implementing Citizens Report Cards on MSW services
Intermediate Results Indicator
Number of inter-municipal/regional institutions (“Groupements d’AgglomEration et groupements de communes”) established
Intermediate Results Indicator
Number of recycling projects supported through Eco-tax revenues
Intermediate Results Indicator
Number of income generating opportunities in the recycling sector for waste pickers (disaggregated by gender)
Intermediate Results Indicator
Percentage of contracts signed with an extract disclosed on BOCT web platform
Intermediate Results Indicator
Percentage of MSW collected professionally and disposed of in sanitary landfills
Intermediate Results Indicator
Increase in aggregated municipal revenues compared to 2012
Intermediate Results Indicator
Decrease in the percentage of total volume of arrears (as declared by private operators) compared to the original annual total amount of MSW contracts
Intermediate Results Indicator
Percentage of MSW facilities regularly inspected
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44000-P144539
World Bank
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
MOROCCO
Integrated Disaster Risk Management and Resilience Program
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Augustin Maria
amaria@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Other Agriculture, Fishing and ForestryOther Water Supply, Sanitation and Waste ManagementOther Non-bank Financial InstitutionsUrban PlanningWater Resource ManagementFinance for DevelopmentFinancial Sector oversight and policy/banking regulation & restructuringFinancial StabilityHousing FinanceUrban Infrastructure and Service DeliveryUrban DevelopmentWater Institutions, Policies and Reform
International Bank for Reconstruction and Development200000000Total Commitment in Second Quarter of 2016
International Bank for Reconstruction and Development50500000Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development-500000Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development14500000Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development8000000Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-1036082Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development16000000Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-998567Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development44129118Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-1699833Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-2470930Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development8000000Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-2551859Total Interest Repayment in Third Quarter of 2019Project Appraisal DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Cumulative amount of FLCN funds allocated to eligible subprojects
Intermediate Results Indicator
Cumulative value of total funding of completed eligible subprojects achieving disaster risk reduction targets
Intermediate Results Indicator
Minimum percentage of entities responsible for the implementation of eligible subprojects having received technical assistance and/or training
Intermediate Results Indicator
Minimum percentage of FLCN funds allocated to eligible non-structural subprojects
Intermediate Results Indicator
Minimum percentage of total funding of eligible subprojects provided by the entities responsible for implementation and partners
Intermediate Results Indicator
Adoption of the catastrophic risk insurance legislative and regulatory framework
Intermediate Results Indicator
Improved risk assessment models developed and operational
PDO Indicator
Cumulative number of beneficiaries from eligible risk reduction subprojects (% women)
PDO Indicator
Minimum number of people in the Program Area insured for bodily injury against catastrophic events
PDO Indicator
The FLCN strategic orientation and governance structure are redesigned with a focus on disaster risk reduction
PDO Indicator
Establishment and operationalization of the FSEC to protect the uninsured
0.00
0.00
0.00
5416666.67
5416666.67
5416666.67
5416666.67
5416666.67
5416666.67
5416666.67
5416666.67
5416666.67
5416666.67
5416666.67
5416666.63
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.63
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.37
3083333.33
3083333.33
3083333.33
3083333.33
3083333.33
3083333.33
3083333.33
3083333.33
3083333.33
3083333.33
3083333.33
3083333.37
2416666.67
2416666.67
2416666.67
2416666.67
2416666.67
2416666.67
2416666.67
2416666.67
2416666.67
2416666.67
2416666.67
2416666.63
0.00
0.00
0.00
5416666.67
5416666.67
5416666.67
5416666.67
5416666.67
5416666.67
5416666.67
5416666.67
5416666.67
5416666.67
5416666.67
5416666.63
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.67
1666666.63
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.33
4083333.37
3083333.33
3083333.33
3083333.33
3083333.33
3083333.33
3083333.33
3083333.33
3083333.33
3083333.33
3083333.33
3083333.33
3083333.37
2416666.67
2416666.67
2416666.67
2416666.67
2416666.67
2416666.67
2416666.67
2416666.67
2416666.67
2416666.67
2416666.67
2416666.63
Finance Agreement :Article IV Section 4.01 | Description :The Program Operations Manual, in form and substance satisfactory to theBank, has been adopted by the Borrower. | Due Date :
44000-P144185
World Bank
International Bank for Reconstruction and Development
MINISTRIES OF LABOR,HIGHER EDUCATION,GENERAL AFF, FINANCE
International Bank for Reconstruction and Development
MINISTRIES OF LABOR,HIGHER EDUCATION,GENERAL AFF, FINANCEMOROCCO
MA-Second Skills and Employment DPL
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Diego Angel-Urdinola
dangelurdinola@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Workforce Development and Vocational EducationTertiary EducationSocial ProtectionOther Industry, Trade and ServicesStandards, Curriculum and TextbooksActive Labor Market ProgramsTeachersEducationAccess to EducationScience and TechnologyLabor Market InstitutionsMSME FinanceMSME DevelopmentFinancial Infrastructure and AccessJobsEnterprise DevelopmentLabor Market Policy and Programs
International Bank for Reconstruction and Development100000000Total Commitment in Third Quarter of 2014
International Bank for Reconstruction and Development93020495Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development-231683Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-417842Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-319336Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-311120Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-254094Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-242559Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-266305Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-254748Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-254312Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-259946Total Interest Repayment in Second Quarter of 2019Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Number of CIP beneficiaries, by gender
Intermediate Results Indicator
Number of new enrolments with ANAPEC, including proportion of non-graduates, per year, by gender
Intermediate Results Indicator
Number of beneficiaries of on-the-job vocational training
Intermediate Results Indicator
Number of ANAPEC local offices
Intermediate Results Indicator
Number of non-salaried workers registered with National Social Security Fund
Intermediate Results Indicator
Number of disadvantaged youth benefiting from NGOs-offered training programs
Intermediate Results Indicator
Number of beneficiaries of the State-funded social insurance coverage (Prise en charge par l’Etat de la couverture sociale or PCS) Program, by gender
Intermediate Results Indicator
Number of firms, formally operating in the informal sector, registered annually for professional tax (cumulative)
Intermediate Results Indicator
Number of Taehil beneficiaries, by gender
Intermediate Results Indicator
Number of publication of a labor market monitoring report (bulletin) by the National Employment Observatory.
Intermediate Results Indicator
percentage of women
Intermediate Results Indicator
Rate of internal efficiency of vocational training programs
Intermediate Results Indicator
University graduation rate (bachelor) in open-enrollment faculties, by gender
Intermediate Results Indicator
percentage of girls
Intermediate Results Indicator
percentage of non-graduates
Intermediate Results Indicator
percentage of women
Intermediate Results Indicator
percentage of women
Intermediate Results Indicator
percentage of female
Intermediate Results Indicator
Number of ALMPs that have been the subject of an evaluation
Intermediate Results Indicator
A program of surveys and studies, aimed at responding to the needs of the labor market and social protection, is carried out
0.00
0.00
44000-P148642
World Bank
International Bank for Reconstruction and Development
MINISTRY OF ECONOMY AND FINANCE
International Bank for Reconstruction and Development
MINISTRY OF ECONOMY AND FINANCEMOROCCO
MA-Solid Waste Sector DPL4
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Jaafar Sadok Friaa
jsfriaa@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Waste ManagementSub-National GovernmentCentral Government (Central Agencies)Air quality managementSoil PollutionServices and Housing for the PoorEnvironmental policies and institutionsUrban DevelopmentSocial InclusionParticipation and Civic EngagementPublic AdministrationMunicipal Institution BuildingAdministrative and Civil Service ReformWater PollutionEnvironmental Health and Pollution Management
International Bank for Reconstruction and Development130000000Total Commitment in First Quarter of 2015
International Bank for Reconstruction and Development280789Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development115759272Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development-280789Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-165548Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-406821Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-364094Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-295114Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-305272Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-313584Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-298697Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-310821Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-331193Total Interest Repayment in Third Quarter of 2019Implementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Total amount of eco-taxes collected and allocated to the National Environmental Fund
Intermediate Results Indicator
Number of municipalities implementing Citizens Report Cards on MSW services
Intermediate Results Indicator
Number of inter-municipal/regional institutions (“Groupements d’AgglomEration et groupements de communes”) established
Intermediate Results Indicator
Number of recycling projects supported through Eco-tax revenues
Intermediate Results Indicator
Number of income generating opportunities in the recycling sector for waste pickers (disaggregated by gender)
Intermediate Results Indicator
Percentage of contracts signed (after the issuance of Circular No. 8029) with an extract disclosed on BOCT web platform
Intermediate Results Indicator
Percentage of MSW collected professionally and disposed of in sanitary landfills
Intermediate Results Indicator
Percentage increase in aggregated municipal revenues compared to 2012
Intermediate Results Indicator
Decrease in the percentage of total volume of arrears (as declared by private operators and verified by DEA) compared to the original annual total amount of Municipal Solid Waste contracts
Intermediate Results Indicator
Percentage of MSW sanitary landfills regularly inspected
0.00
0.00
44000-P158346
World Bank
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
MOROCCO
Strengthening Agri-Food Value Chains
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
David Olivier Treguer
dtreguer@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Agricultural Extension, Research, and Other Support ActivitiesAgricultural markets, commercialization and agri-businessMitigationDisaster PreparednessAdaptationMSME FinanceFinancial Infrastructure and AccessEnterprise DevelopmentPublic Private PartnershipsMSME DevelopmentClimate changeRural DevelopmentGenderDisaster Risk ManagementRural Markets
International Bank for Reconstruction and Development200000000Total Commitment in Fourth Quarter of 2017
International Bank for Reconstruction and Development50500000Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development-500000Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development7290000Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-1066550Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development18000000Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-1252002Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development17670000Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development23000000Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-1665527Total Interest Repayment in Third Quarter of 2019Project Appraisal DocumentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Interprofessions with business plans approved and intra-branch agreements adopted to ensure sust.
Intermediate Results Indicator
Small and/or medium enterprises agri-food authorized by ONSSA
Intermediate Results Indicator
Private investments in conditioning, cold storage and/or processing units (olive, citrus) generated
Intermediate Results Indicator
Producers with an input register in the Souss-Massa region
Intermediate Results Indicator
Additional producers aggregated (olives, citrus)
Intermediate Results Indicator
SDOQ Products certified by the OCC
Intermediate Results Indicator
Small- and/or medium-size producers and/or enterprises assisted by the Agri-food Innovation Center
Intermediate Results Indicator
Use of market information services for mobile phones and of the application Publi-Asaar
Intermediate Results Indicator
Projects using green practices and technologies implemented by beneficiaries of the Program
Intermediate Results Indicator
Amended Law no. 4-12 on agricultural aggregation dated 2012 is under implementation
Intermediate Results Indicator
At least one wholesale market is operating and applying the new management model
Intermediate Results Indicator
At least one public consultation on the Program carried out each year by MAMPDREF
Intermediate Results Indicator
Area treated for Mediterranean fruit fly through the new Center
PDO Indicator
Volume of conditioned and exported citrus
PDO Indicator
Volume of conditioned and exported olives
PDO Indicator
Volume of high quality olive oil commercialized (i.e. quality is higher than lampante)
0.00
0.00
235000.00
549800.00
310600.00
695000.00
786400.00
424200.00
906400.00
488600.00
1080000.00
1186600.00
617600.00
1261800.00
641600.00
1319200.00
1356000.00
683400.00
1357000.00
665200.00
1316800.00
1345600.00
698400.00
1480800.00
1540000.00
787000.00
1640600.00
869200.00
1818400.00
1895400.00
986600.00
2080800.00
1101400.00
2270000.00
2323400.00
1201800.00
2531000.00
1338600.00
2764800.00
2874800.00
1501600.00
3165800.00
1672400.00
3487800.00
3683800.00
1917600.00
3984800.00
2074000.00
4333000.00
4531400.00
2327800.00
4751200.00
2434600.00
5021800.00
5191800.00
2653000.00
5421400.00
2799600.00
5750000.00
5887600.00
2976200.00
6007200.00
3023200.00
6135600.00
6250400.00
3154800.00
6376000.00
3233200.00
6555600.00
6660600.00
3367600.00
6811000.00
3443800.00
6965400.00
9018600.00
0.00
0.00
235000.00
549800.00
310600.00
695000.00
786400.00
424200.00
906400.00
488600.00
1080000.00
1186600.00
617600.00
1261800.00
641600.00
1319200.00
1356000.00
683400.00
1357000.00
665200.00
1316800.00
1345600.00
698400.00
1480800.00
1540000.00
787000.00
1640600.00
869200.00
1818400.00
1895400.00
986600.00
2080800.00
1101400.00
2270000.00
2323400.00
1201800.00
2531000.00
1338600.00
2764800.00
2874800.00
1501600.00
3165800.00
1672400.00
3487800.00
3683800.00
1917600.00
3984800.00
2074000.00
4333000.00
4531400.00
2327800.00
4751200.00
2434600.00
5021800.00
5191800.00
2653000.00
5421400.00
2799600.00
5750000.00
5887600.00
2976200.00
6007200.00
3023200.00
6135600.00
6250400.00
3154800.00
6376000.00
3233200.00
6555600.00
6660600.00
3367600.00
6811000.00
3443800.00
6965400.00
9018600.00
44000-P100397
World Bank
International Bank for Reconstruction and Development
MINISTRY OF FINANCE
International Bank for Reconstruction and Development
MINISTRY OF FINANCEMOROCCO
MA-Regional Potable Water Supply Systems Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Stephane Raphael Dahan
sdahan@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - Water, Sanitation and Waste ManagementWater SupplyUrban Infrastructure and Service DeliveryRural Infrastructure and service deliveryRural DevelopmentUrban Development
International Bank for Reconstruction and Development175000000Total Commitment in Second Quarter of 2010
International Bank for Reconstruction and Development443484Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development-443484Total Interest Repayment in First Quarter of 2011
International Bank for Reconstruction and Development-3970Total Interest Repayment in Third Quarter of 2011
International Bank for Reconstruction and Development-3792Total Interest Repayment in First Quarter of 2012
International Bank for Reconstruction and Development1721623Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development1218849Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development-8745Total Interest Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development292343Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development224037Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development593143Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development-13374Total Interest Repayment in First Quarter of 2013
International Bank for Reconstruction and Development592071Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development636289Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development385100Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development802017Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development806584Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development-310Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development443866Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development571307Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development-14933Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development95298Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development160110Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development4989887Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development-24859Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development368289Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development560339Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development1821866Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development104692Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development1204195Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development4696661Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development-51041Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development1879536Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development2146456Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development3063069Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development495108Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development840170Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development5798397Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development-188230Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development2198538Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development2348892Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development3862688Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development1752587Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development3184381Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development5720359Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development-237600Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-835624Total Loan Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development2280710Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development2508834Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development2998694Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development1867847Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development3358080Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development4054635Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development-285646Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-1242812Total Loan Repayment in First Quarter of 2016
International Bank for Reconstruction and Development1266646Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development4725124Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development4769564Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development92966Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development979758Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development2787145Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development-321294Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-1633441Total Loan Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development2635243Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development5869023Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development-57606574Total Commitment Cancellations in First Quarter of 2017
International Bank for Reconstruction and Development-354854Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-1820545Total Loan Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-397933Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-1997817Total Loan Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-636516Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-2052788Total Loan Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-1036178Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-1964486Total Loan Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-989801Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-1913456Total Loan Repayment in First Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementContract AwardsProject URLProcurement Notices
Safi
32.1670 -8.8330
Errachidia
31.7500 -4.5000
Erfoud
31.4350 -4.2380
El-Jadida
32.9000 -8.5000
Chemaïa
32.0810 -8.6250
Sidi Bennour
32.6610 -8.4280
Aoufous
31.7300 -4.1310
Afsou
34.8240 -3.1420
Ouardana
35.0640 -3.4390
Oualidia
32.7340 -9.0310
Hassi Berkane
34.8390 -2.8670
Errachidia
31.9310 -4.4270
Nador
35.0000 -3.0000
Sebt des Gzoula
32.1080 -9.0840
Driouch
34.9770 -3.3790
Ben Tieb
35.0440 -3.4540
Sidi Smail
32.8860 -8.5420
Oulad Daoud Zkhanine
34.9810 -2.6010
Iferni
35.0020 -3.6410
Driouch
34.8670 -3.4220
Moulay Ali Cherif
31.2730 -4.2700
Ait Mait
35.0740 -3.3520
Amejjaou
35.1370 -3.2460
Tafersit
35.0190 -3.5680
Zmamra
31.9040 -7.0890
Tiztoutine
34.9720 -3.1530
Tafilalt
32.3850 -4.4960
Oulad Boubker
31.3610 -8.3570
Dar Kebdani
35.1220 -3.3310
Jorf
31.4940 -4.4060
Jema Sahim
32.3470 -8.8420
Intermediate Results Indicator
Percentage of villages located in the Nador and Driouch provinces visited to assess demand for standpipe or house connection service through a demand-driven and participatory approach.
Intermediate Results Indicator
Percentage of rural communities located in the Nador and Driouch provinces which signed the co-financing agreement corresponding tostandpipe and/or house connection service provision.
Intermediate Results Indicator
Percentage of rural communities located in the Nador and Driouch provinces which have paid the initial up-front fee.
Intermediate Results Indicator
Percentage of villages located in project areas of Nador and Driouch provinces where operation and maintenance arrangements of the village SP orHC systems are in place.
Intermediate Results Indicator
Percentage of households served by individual HC located in Nador and Driouch provinces which have adequate grey water collection facilities.
Intermediate Results Indicator
Percentage of households served by individual HC located in Safi Youssoufia or Sidi Bennour provinces which have adequate grey water collection facilities.
Intermediate Results Indicator
Percentage of villages located in the Safi Youssoufia or Sidi Bennour provinces visited to assess demand for standpipe or house connection service through a demand-driven and participatory approach
Intermediate Results Indicator
Percentage of rural communities located in the Safi Youssoufia or Sidi Bennour provinces which signed the co-financing agreement corresponding to standpipe and/or house connection service provision.
Intermediate Results Indicator
Percentage of rural communities located in the Safi Youssoufia or Sidi Bennour provinces which have paid the initial up-front fee.
Intermediate Results Indicator
Percentage of municipalities located in project areas of Safi Youssoufia or Sidi Bennour provinces where operation and maintenance arrangements of the SP or HC system are in place.
PDO Indicator
Percentage of people in selected local communities located in project areas in the Safi Youssoufia or Sidi Bennour provinces servedby house connection.
PDO Indicator
Additional average volume of water supplied through the Tafilalet trunk line.
PDO Indicator
Number of people in selected villages of project areas in the Nador and Driouch provinces with access to potable water through standpipe or house connection service
PDO Indicator
OLD Version of Indicator: People in project areas with access to Improved Water Sources
PDO Indicator
Average volume of water supplied through standpipes (in liters per capita per day) in selected local communities in project areas located in the Nador and Driouch provinces.
PDO Indicator
Average volume of water supplied through house connections (in liters per capita per day) in selected local communities in project areas located in the Nador and Driouch provinces.
PDO Indicator
Number of people in selected local communities located in project areas in the Safi Youssoufia or Sidi Bennour provinces with access to potable water through standpipe or house connection service.
PDO Indicator
Average volume of water supplied through standpipes (in liters per capita per day) in selected local communities in project areas located in the Safi Youssoufia or Sidi Bennour provinces.
PDO Indicator
Average volume of water supplied through house connections (in liters per capita per day) in selected local communities in project areas located in the Safi Youssoufia or Sidi Bennour provinces.
PDO Indicator
Percentage of people in selected villages of project areas in the Nador and Driouch provinces served by house connection
0.00
0.00
0.00
0.00
437000.00
437000.00
437000.00
1486333.33
1486333.33
1486333.34
2743333.33
2743333.33
2743333.34
4193333.33
4193333.33
4193333.34
4506666.67
4506666.67
4506666.66
4666666.67
4666666.67
4666666.66
5300000.00
5300000.00
5300000.00
4930000.00
4930000.00
4930000.00
4426666.67
4426666.67
4426666.66
4233333.33
4233333.33
4233333.34
4410000.00
4410000.00
4410000.00
3786666.67
3786666.67
3786666.66
3813333.33
3813333.33
3813333.34
3663333.33
3663333.33
3663333.34
3070000.00
3070000.00
3070000.00
1126666.67
1126666.67
1126666.66
780000.00
780000.00
780000.00
433333.33
433333.33
433333.34
326666.67
326666.67
326666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2666666.67
2666666.67
2666666.66
2333333.33
2333333.33
2333333.34
2666666.67
2666666.67
2666666.66
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
4000000.00
4000000.00
4000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5666666.67
5666666.67
5666666.66
5666666.67
5666666.67
5666666.66
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
5000000.00
4000000.00
4000000.00
4000000.00
2333333.33
2333333.33
2333333.34
2333333.33
2333333.33
2333333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Finance Agreement :Manual of Operations | Description :The adoption by the Borrower of a Manual of Operations satisfactory to theBank will be an Additional Condition of Effectiveness | Due Date :15-Sep-2010
Finance Agreement :8. Financial Covenant | Description :For each fiscal year throughout Project implementation, the Borrowerundertakes that its estimated Net Revenues shall be at least 1.2 times the estimated Principal Debt Service Requirements. |Frequency :Yearly
44000-P104265
World Bank
International Bank for Reconstruction and Development
OFFICE NATIONAL DE L'ELECTRICITE
International Bank for Reconstruction and Development
OFFICE NATIONAL DE L'ELECTRICITEMOROCCO
MA-Support to ONE (Office National de l'Electricité)
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Daniel Camos Daurella
+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Renewable Energy WindRenewable Energy BiomassEnergy Transmission and DistributionRenewable Energy SolarRenewable Energy GeothermalOther Energy and ExtractivesState-owned Enterprise Reform and PrivatizationPublic Administration
International Bank for Reconstruction and Development150000000Total Commitment in Second Quarter of 2008
International Bank for Reconstruction and Development326541Total Disbursement in Third Quarter of 2008
International Bank for Reconstruction and Development-326541Total Interest Repayment in Third Quarter of 2008
International Bank for Reconstruction and Development1345858Total Disbursement in Fourth Quarter of 2008
International Bank for Reconstruction and Development-3475Total Interest Repayment in Fourth Quarter of 2008
International Bank for Reconstruction and Development1364772Total Disbursement in First Quarter of 2009
International Bank for Reconstruction and Development2676088Total Disbursement in Second Quarter of 2009
International Bank for Reconstruction and Development-54049Total Interest Repayment in Second Quarter of 2009
International Bank for Reconstruction and Development1504298Total Disbursement in Third Quarter of 2009
International Bank for Reconstruction and Development-62917Total Interest Repayment in Fourth Quarter of 2009
International Bank for Reconstruction and Development324773Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development-35628Total Interest Repayment in Second Quarter of 2010
International Bank for Reconstruction and Development1959207Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development129742Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development2099369Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development-45650Total Interest Repayment in Fourth Quarter of 2010
International Bank for Reconstruction and Development1075798Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development1131043Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development5645519Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development108329Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development5942714Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development-107484Total Interest Repayment in Second Quarter of 2011
International Bank for Reconstruction and Development1362653Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development4990368Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development1846707Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development3264464Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development4403021Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development-244778Total Interest Repayment in Fourth Quarter of 2011
International Bank for Reconstruction and Development1156963Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development3409633Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development3538859Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development875344Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development1691649Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development3533369Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development-370856Total Interest Repayment in Second Quarter of 2012
International Bank for Reconstruction and Development4178870Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development6223060Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development11501256Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development595750Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development1194223Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development1743661Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development-344701Total Interest Repayment in Fourth Quarter of 2012
International Bank for Reconstruction and Development749277Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development768080Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development4340935Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development740142Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development931736Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development3321141Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development-133443Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development248226Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development2422670Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development1118792Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development1703960Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development-132409Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development-2438969Total Loan Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development40500000Total Commitment in Fourth Quarter of 2013
International Bank for Reconstruction and Development1665895Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development1775315Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development6921055Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development-102450Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development225107Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development309481Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development6408408Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development-172093Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-2598440Total Loan Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development1819550Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development4303529Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development-18668Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development315063Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development444436Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development4603315Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development-221758Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-2694200Total Loan Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development645925Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development1361576Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development5809897Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development-18411Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-102405Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-2489150Total Loan Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development498538Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development586264Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development1401567Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development1070340Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development2603727Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development-29146Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-53059Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-2415645Total Loan Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development357533Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development1690698Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development558552Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development931673Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development-42450Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development2004600Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development-9051Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-2543168Total Loan Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development116336Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development171357Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development36552Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development129501Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development-38059Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-45181Total Commitment Cancellations in Fourth Quarter of 2016
International Bank for Reconstruction and Development-2478673Total Loan Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-9516499Total Commitment Cancellations in Fourth Quarter of 2016
International Bank for Reconstruction and Development-25781Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-673365Total Loan Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-2619968Total Loan Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-25025Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-717692Total Loan Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-2777014Total Loan Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-22621Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-768056Total Loan Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-2732677Total Loan Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-21658Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-730896Total Loan Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-2653571Total Loan Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-23157Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-718824Total Loan Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-2600950Total Loan Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-26895Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-709110Total Loan Repayment in Third Quarter of 2019Project Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementAgreementContract AwardsProject URLProcurement Notices
Tansift
31.6900 -6.6480
Safi
32.1670 -8.8330
Mediouna
35.7700 -5.9140
Essaouira
31.5070 -9.7570
El-Jadida
32.9000 -8.5000
Dar Ould Zidouh
32.3120 -6.9050
Dar Bouazza
33.5150 -7.8170
Chemaïa
32.0810 -8.6250
Beni-Mellal
32.5000 -6.3330
Chichaoua
31.2640 -8.8440
Marrakech
31.6360 -8.0100
Casablanca
33.5880 -7.5580
Agadir
30.4200 -9.5980
Settat
33.0830 -7.4170
Tahandourt
30.6000 -9.0050
Intermediate Results Indicator
One line 400 kV (double circuit) Mediouna-Ghanem (120 km)
Intermediate Results Indicator
Two lines 400 kV (single circuit) Safi-Essaouira-Chemaia ( 2x55 km) and connection of 400 kV line (double circuit) Ghanem-Chichaouato substation Chamaia
Intermediate Results Indicator
One line 225 kV (double circuit) Chemaia-Tensift II (1*70 km) and connection of lines 225 kV (single circuit) Chichaoua - Jorf Lasar and Chichaoua - Bougedra to substation Chemaia
Intermediate Results Indicator
Substation 60 / 22 kV in Dar Ouled Zidouh
Intermediate Results Indicator
Substation 60 / 22 kV in Tamansourt
Intermediate Results Indicator
VER Study completed
Intermediate Results Indicator
Tariff study completed
Intermediate Results Indicator
Number of CFLs placed
Intermediate Results Indicator
Construction of one 400 KV line (double circuit) between Chichaoua & Agadir (160 km)
Intermediate Results Indicator
Construction of Chamaia 400/225 kV substation & extension of Mediouna & Tensif II substations
PDO Indicator
Reduction in electric transmission losses
PDO Indicator
Electricity savings due to CFLs deployment (in GWh)
PDO Indicator
Reduction of Unserved energy (in MWh)
PDO Indicator
Direct project beneficiaries
PDO Indicator
Electric transmission losses in Southern Morocco
PDO Indicator
Female beneficiaries
PDO Indicator
Transmission lines constructed or rehabilitated under the project
PDO Indicator
Transmission lines constructed under the project
PDO Indicator
Peak power savings due to CFLs deployment
0.00
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1333333.33
1333333.33
1333333.34
2100000.00
2100000.00
2100000.00
2000000.00
2000000.00
2000000.00
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
4666666.67
4666666.67
4666666.66
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
4900000.00
4900000.00
4900000.00
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
448619.44
448619.44
448619.45
454923.94
454923.94
454923.95
892029.31
892029.31
892029.32
501432.57
501432.57
501432.57
0.00
0.00
0.00
108257.82
108257.83
108257.83
0.00
0.00
0.00
653069.15
653069.16
653069.16
743037.04
743037.04
743037.04
2617453.40
2617453.41
2617453.41
2017014.15
2017014.16
2017014.16
2117673.52
2117673.53
2117673.53
3171397.47
3171397.47
3171397.47
2701818.51
2701818.52
2701818.52
2033453.87
2033453.87
2033453.88
7301061.79
7301061.79
7301061.79
1177877.92
1177877.92
1177877.92
1952764.40
1952764.41
1952764.41
1664339.86
1664339.86
1664339.87
890298.54
890298.54
890298.55
940917.51
940917.51
940917.52
3419938.55
3419938.55
3419938.55
1666666.66
1666666.67
1666666.67
3333333.33
3333333.33
3333333.34
3333333.33
3333333.33
3333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1333333.33
1333333.33
1333333.34
1859287.83
1859287.84
1859287.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Finance Agreement :7564-MA (Schedule 2, Section V) | Description :Ensure that Cumulative Debt to Equity Ratio < 5 (end of 2010); <4.5 after that. | Frequency :Yearly
Finance Agreement :Section II.A | Description :The Borrower shall monitor and evaluate the progress of the Project and prepareProject Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of indicators agreedwith the Bank. Each Project Report shall cover the period of one calendar semester.Each report shall be furnished to the Bank notlater than forty five (45) days after the end of period. | Frequency :Yearly
Finance Agreement :Section V | Description :Except as the Bank shall otherwise agree, the Borrower shall take, in consultation withthe Guarantor, all actions necessary to ensure that its Cumulative Debt to equity shall be than 4.5 by closing of each fiscalyear.This will be assessed at the end of each fiscal year (June 30). | Frequency :Yearly
44000-P120541
World Bank
International Bank for Reconstruction and Development
MINISTRY OF EDUCATION
International Bank for Reconstruction and Development
MINISTRY OF EDUCATIONMOROCCO
Second Education Development Policy Loan
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Kamel Braham
kbraham@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Secondary EducationTertiary EducationOther EducationPrimary EducationSub-National GovernmentAccess to EducationTransparency, Accountability and Good GovernancePublic AdministrationMunicipal Institution BuildingPublic Expenditure ManagementEducation FinancingEducationPublic Finance Management
International Bank for Reconstruction and Development100000000Total Commitment in Second Quarter of 2013
International Bank for Reconstruction and Development101731771Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development-253044Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development-434916Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development-459469Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development-378123Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-302891Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-261110Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-228661Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-178485Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-183767Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-185893Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-178019Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-187108Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-203712Total Interest Repayment in Third Quarter of 2019Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Number of new social support methodologies developed
This target was not met, however, MENFP is currently working on improving the targeting of current programs. The Bank team and theMENFP are discussing the TA they will need to make more progress on this front.
Intermediate Results Indicator
Number of Regional Assessment and Testing Centers established
Intermediate Results Indicator
Urban/Rural ratio of the female-male teacher ratio (primary)
Intermediate Results Indicator
Urban/Rural ratio of female-male teacher ratio (lower secondary)
Intermediate Results Indicator
Enrolment in RegionalTeacher Training Centers
The MdF only granted 7000 positions, when MENFP requested 8000.
Intermediate Results Indicator
Urban/Rural ratio of student-teacher ratio (primary)
Intermediate Results Indicator
Urban/Rural ratio of student-teacher ratio (lower secondary)
Intermediate Results Indicator
Graduates assigned to teaching
Intermediate Results Indicator
Ratio of new rural schools to total new schools planned in the previous year
Baseline (2010/11): Rural 2 (2 schools and nocolleges) / Urban 101 (78 schools and 23 colleges)
Target (2013/14): Rural65 (25 community schoolsand 40 colleges) / Urban 0
2013-2014 : 41 Rural (20 schools and 21 colleges); 57 Urbain (32 schools and 25 colleges)
Intermediate Results Indicator
Proportion of humanresource management decisions taken by AREFs
Intermediate Results Indicator
Regional internal audit units producing an annual report during the previous year
These units still need to be reinforced with qualified personnel.
Intermediate Results Indicator
Proportion of Regional Assessment and Testing Centers producing an annual report during the previous year
Intermediate Results Indicator
Revised guidelines for school charter development and funding sent to all schools
The guidelines are currently under revision and are expected to be distributed to all schools for the 2014-2015 school year.
0.00
0.00
44000-P086877
World Bank
International Bank for Reconstruction and Development
ONEP
International Bank for Reconstruction and Development
ONEPMOROCCO
Rural Water Supply and Sanitation Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Xavier Chauvot De Beauchene
xchauvot@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SanitationWater SupplyEnvironmental Health and Pollution ManagementHealth Service DeliveryAir quality managementWater PollutionGenderAdolescent HealthRural Infrastructure and service deliveryChild HealthParticipation and Civic EngagementRural DevelopmentSocial InclusionHealth Systems and PoliciesSoil Pollution
International Bank for Reconstruction and Development60000000Total Commitment in Fourth Quarter of 2005
International Bank for Reconstruction and Development151687Total Disbursement in Second Quarter of 2006
International Bank for Reconstruction and Development-151687Total Interest Repayment in Second Quarter of 2006
International Bank for Reconstruction and Development-87927Total Interest Repayment in Third Quarter of 2006
International Bank for Reconstruction and Development156407Total Disbursement in First Quarter of 2007
International Bank for Reconstruction and Development-115815Total Interest Repayment in First Quarter of 2007
International Bank for Reconstruction and Development65879Total Disbursement in Second Quarter of 2007
International Bank for Reconstruction and Development92317Total Disbursement in Second Quarter of 2007
International Bank for Reconstruction and Development495459Total Disbursement in Third Quarter of 2007
International Bank for Reconstruction and Development758388Total Disbursement in Third Quarter of 2007
International Bank for Reconstruction and Development-123709Total Interest Repayment in Third Quarter of 2007
International Bank for Reconstruction and Development1375172Total Disbursement in Fourth Quarter of 2007
International Bank for Reconstruction and Development1756937Total Disbursement in Fourth Quarter of 2007
International Bank for Reconstruction and Development353954Total Disbursement in First Quarter of 2008
International Bank for Reconstruction and Development1273875Total Disbursement in First Quarter of 2008
International Bank for Reconstruction and Development1415631Total Disbursement in First Quarter of 2008
International Bank for Reconstruction and Development-178036Total Interest Repayment in First Quarter of 2008
International Bank for Reconstruction and Development687124Total Disbursement in Second Quarter of 2008
International Bank for Reconstruction and Development2157345Total Disbursement in Second Quarter of 2008
International Bank for Reconstruction and Development268826Total Disbursement in Third Quarter of 2008
International Bank for Reconstruction and Development370481Total Disbursement in Third Quarter of 2008
International Bank for Reconstruction and Development848121Total Disbursement in Third Quarter of 2008
International Bank for Reconstruction and Development-345469Total Interest Repayment in Third Quarter of 2008
International Bank for Reconstruction and Development284100Total Disbursement in Fourth Quarter of 2008
International Bank for Reconstruction and Development466440Total Disbursement in Fourth Quarter of 2008
International Bank for Reconstruction and Development1769391Total Disbursement in Fourth Quarter of 2008
International Bank for Reconstruction and Development213780Total Disbursement in First Quarter of 2009
International Bank for Reconstruction and Development1289169Total Disbursement in First Quarter of 2009
International Bank for Reconstruction and Development1947596Total Disbursement in First Quarter of 2009
International Bank for Reconstruction and Development-435082Total Interest Repayment in First Quarter of 2009
International Bank for Reconstruction and Development156304Total Disbursement in Second Quarter of 2009
International Bank for Reconstruction and Development471102Total Disbursement in Second Quarter of 2009
International Bank for Reconstruction and Development860385Total Disbursement in Second Quarter of 2009
International Bank for Reconstruction and Development0Total Disbursement in Third Quarter of 2009
International Bank for Reconstruction and Development1123028Total Disbursement in Third Quarter of 2009
International Bank for Reconstruction and Development2651980Total Disbursement in Third Quarter of 2009
International Bank for Reconstruction and Development-322907Total Interest Repayment in Third Quarter of 2009
International Bank for Reconstruction and Development1173954Total Disbursement in Fourth Quarter of 2009
International Bank for Reconstruction and Development191344Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development304797Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development2121640Total Disbursement in First Quarter of 2010
International Bank for Reconstruction and Development-459206Total Interest Repayment in First Quarter of 2010
International Bank for Reconstruction and Development476191Total Disbursement in Second Quarter of 2010
International Bank for Reconstruction and Development2093166Total Disbursement in Second Quarter of 2010
International Bank for Reconstruction and Development57605Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development146526Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development997342Total Disbursement in Third Quarter of 2010
International Bank for Reconstruction and Development-422961Total Interest Repayment in Third Quarter of 2010
International Bank for Reconstruction and Development100462Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development588755Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development1360072Total Disbursement in Fourth Quarter of 2010
International Bank for Reconstruction and Development567335Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development699893Total Disbursement in First Quarter of 2011
International Bank for Reconstruction and Development-479584Total Interest Repayment in First Quarter of 2011
International Bank for Reconstruction and Development489371Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development1274262Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development1291472Total Disbursement in Second Quarter of 2011
International Bank for Reconstruction and Development91782Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development102883Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development467890Total Disbursement in Third Quarter of 2011
International Bank for Reconstruction and Development-534055Total Interest Repayment in Third Quarter of 2011
International Bank for Reconstruction and Development454826Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development774479Total Disbursement in Fourth Quarter of 2011
International Bank for Reconstruction and Development72863Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development320312Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development851970Total Disbursement in First Quarter of 2012
International Bank for Reconstruction and Development-566289Total Interest Repayment in First Quarter of 2012
International Bank for Reconstruction and Development-1159282Total Loan Repayment in First Quarter of 2012
International Bank for Reconstruction and Development80919Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development235947Total Disbursement in Second Quarter of 2012
International Bank for Reconstruction and Development119675Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development331197Total Disbursement in Third Quarter of 2012
International Bank for Reconstruction and Development-576407Total Interest Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development-1134871Total Loan Repayment in Third Quarter of 2012
International Bank for Reconstruction and Development318319Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development329065Total Disbursement in Fourth Quarter of 2012
International Bank for Reconstruction and Development407671Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development415308Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development1072026Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development-615964Total Interest Repayment in First Quarter of 2013
International Bank for Reconstruction and Development-1296936Total Loan Repayment in First Quarter of 2013
International Bank for Reconstruction and Development183039Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development202517Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development560526Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development339567Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development477371Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development820583Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development-578317Total Interest Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development-1349986Total Loan Repayment in Third Quarter of 2013
International Bank for Reconstruction and Development178216Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development214538Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development1147701Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development246574Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development442625Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development680296Total Disbursement in First Quarter of 2014
International Bank for Reconstruction and Development-576384Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development-1463482Total Loan Repayment in First Quarter of 2014
International Bank for Reconstruction and Development500251Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development508052Total Disbursement in Second Quarter of 2014
International Bank for Reconstruction and Development192971Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development343306Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development574809Total Disbursement in Third Quarter of 2014
International Bank for Reconstruction and Development-560527Total Interest Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development-1574993Total Loan Repayment in Third Quarter of 2014
International Bank for Reconstruction and Development50052Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development225157Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development594827Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development155827Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development473319Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development3015842Total Disbursement in First Quarter of 2015
International Bank for Reconstruction and Development-510456Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-1391441Total Loan Repayment in First Quarter of 2015
International Bank for Reconstruction and Development-7992235Total Commitment Cancellations in Second Quarter of 2015
International Bank for Reconstruction and Development302178Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development410456Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development594600Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development-476921Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-1529691Total Loan Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development-444480Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-1530676Total Loan Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-431013Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-1572365Total Loan Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-396090Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-1521380Total Loan Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-411716Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-1663561Total Loan Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development0Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-411887Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-1751799Total Loan Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-385151Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-1645955Total Loan Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development-358005Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-1615181Total Loan Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-325252Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and Development-1553985Total Loan Repayment in Third Quarter of 2019Project Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementLoan AgreementAgreementContract AwardsProject URLProcurement Notices
Youssoufia
32.2460 -8.5290
Safi
32.1670 -8.8330
Safi
32.2990 -9.2370
Essaouira
31.5070 -9.7570
El-Jadida
32.9000 -8.5000
El Jadida
33.2550 -8.5060
Doukkala-Abda
32.5000 -8.7500
Youssoufia
32.2540 -8.5340
Sidi Bennour
32.6610 -8.4280
Sidi Bennour
32.6520 -8.4280
Taounate
34.5000 -4.8330
Taza
34.2500 -3.7500
Intermediate Results Indicator
Percentage of the amount of MAD 500 beneficiary contribution from households to access potable water standpoint actually recovere din the province of Safi
Intermediate Results Indicator
Percentage of the amount of MAD 500 beneficiary contribution from households to access potable water standpoint actually recoveredin the province of El Jadida
Intermediate Results Indicator
Percentage of local governments' contributions to capital costs recovered in the province of Safi
Intermediate Results Indicator
Percentage of local governments' contributions to capital costs recovered in the province of El Jadida
Intermediate Results Indicator
Villages in the project given access to house connections through project
Intermediate Results Indicator
% of the villages contributing to capital costs for production and conveyance
Intermediate Results Indicator
% of WUAs with female members
Intermediate Results Indicator
% of households with adequate water quality in household water storage facilities
Intermediate Results Indicator
Percentage of villages provided with house connections that have adequate mitigation measures for increased wasterwater flows
Intermediate Results Indicator
Percentage of local governments making required financial contribution
Intermediate Results Indicator
Percentage of local governments located in the province of El Jadida making required financial contribution
Intermediate Results Indicator
Percentage of local governments located in the province of Safi making required financial contribution
PDO Indicator
Number of people in rural areas provided with access to Improved Water Sources under the project
PDO Indicator
At least 90% of water supply and wastewater facilities built under the project have functioning and sustainable management structures.
PDO Indicator
At least 20% of project beneficiaries have adopted improved hygiene practices
0.00
0.00
0.00
0.00
0.00
0.00
0.00
673333.33
673333.33
673333.33
673333.33
673333.33
673333.33
673333.33
673333.33
673333.33
673333.33
673333.33
673333.37
1382500.00
1382500.00
1382500.00
1382500.00
1382500.00
1382500.00
1382500.00
1382500.00
1382500.00
1382500.00
1382500.00
1382500.00
1510000.00
1510000.00
1510000.00
1510000.00
1510000.00
1510000.00
1510000.00
1510000.00
1510000.00
1510000.00
1510000.00
1510000.00
908333.33
908333.33
908333.33
908333.33
908333.33
908333.33
908333.33
908333.33
908333.33
908333.33
908333.33
908333.37
340833.33
340833.33
340833.33
340833.33
340833.33
340833.33
340833.33
340833.33
340833.33
340833.33
340833.33
340833.37
139166.67
139166.67
139166.67
139166.67
139166.67
139166.67
139166.67
139166.67
139166.67
139166.67
139166.67
139166.63
45833.33
45833.33
45833.33
45833.33
45833.33
45833.33
45833.33
45833.33
45833.33
45833.33
45833.33
45833.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50562.19
50562.19
50562.18
0.00
0.00
0.00
0.00
0.00
0.00
52135.76
52135.76
52135.76
52732.25
52732.25
52732.24
417948.91
417948.91
417948.92
1044036.10
1044036.10
1044036.11
1014486.63
1014486.63
1014486.64
948156.22
948156.22
948156.23
495809.56
495809.56
495809.55
839976.89
839976.89
839976.89
1150181.98
1150181.98
1150181.97
495930.23
495930.23
495930.22
1258336.14
1258336.14
1258336.14
391317.98
391317.98
391317.98
872593.84
872593.84
872593.85
856452.41
856452.41
856452.40
400491.04
400491.04
400491.03
683096.18
683096.18
683096.19
422409.26
422409.26
422409.27
491420.70
491420.70
491420.70
266666.67
266666.67
266666.66
409768.24
409768.24
409768.25
415048.30
415048.30
415048.30
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
366666.67
366666.67
366666.66
603775.85
603775.85
603775.86
0.00
0.00
0.00
0.00
0.00
0.00
Finance Agreement :Section 4.03 | Description :Self financing ratio of 15% | Frequency :Yearly
Finance Agreement :Section 4.04 | Description :Recording of water produced and sold by ONEP under component A | Frequency :Yearly
Finance Agreement :Section 4.04 | Description :Upgrade of the billing and collection system | Due Date :30-Jun-2008
Finance Agreement :Section 4.04 | Description :Extend the cost accounting system to RWS schemes | Due Date :31-Dec-2008
Finance Agreement :Schedule 5 para 5 | Description :Eligibility criteria for sub-projects to be financed under component A |Frequency :Yearly
Finance Agreement :Schedule 5 para 6 | Description :Eligibility criteria for sub-projects under component B | Frequency :Yearly
Finance Agreement :Schedule 5 para 7 | Description :Eligibility criteria for subprojects under components A and B | Frequency:Yearly
44000-P148017
World Bank
International Bank for Reconstruction and Development
MINISTRY OF HEALTH
International Bank for Reconstruction and Development
MINISTRY OF HEALTHMOROCCO
MA-Health Sector Support
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Aissatou Diack
adiack@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
HealthJobsNon-communicable diseasesHealth System StrengtheningHealth Systems and PoliciesDisease Control
International Bank for Reconstruction and Development100000000Total Commitment in Second Quarter of 2015
International Bank for Reconstruction and Development250000Total Disbursement in Third Quarter of 2015
International Bank for Reconstruction and Development-250000Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development25000000Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development-94505Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development-270401Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-312072Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development0Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development10883470Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-355459Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development15360182Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development-572191Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-852383Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development11268797Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development17380625Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development-991884Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development-1350627Total Interest Repayment in Third Quarter of 2019Project Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementContract AwardsProject URLProcurement Notices
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8333333.33
8333333.33
8333333.34
0.00
0.00
0.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
1666666.67
1666666.67
1666666.66
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2333333.33
2333333.33
2333333.34
2666666.67
2666666.67
2666666.66
2666666.67
2666666.67
2666666.66
2666666.67
2666666.67
2666666.66
1000000.00
1000000.00
1000000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8333333.33
8333333.33
8333333.34
0.00
0.00
0.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
1666666.67
1666666.67
1666666.66
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2333333.33
2333333.33
2333333.34
2666666.67
2666666.67
2666666.66
2666666.67
2666666.67
2666666.66
2666666.67
2666666.67
2666666.66
1000000.00
1000000.00
1000000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Schedule 2, Section 1(C): The Borrower shall by no later than 4 months after the Effective Date, establish in form and substancesatisfactory to the Bank and thereafter maintain throughout the Program (i) a steering committee which shall be chaired by theSecretary General of the MoH and include directors of each of the relevant MoH departments, and (ii) a technical committee chairedby the director of DPRF and composed of representatives of each of the relevant MoH departments.
44000-P143689
World Bank
International Bank for Reconstruction and Development
OFFICE NATIONAL DE L’ELECTRICITE ET DE L’EAU POTABLE (ON
International Bank for Reconstruction and Development
OFFICE NATIONAL DE L’ELECTRICITE ET DE L’EAU POTABLE (ONMOROCCO
Clean and Efficient Energy Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Manaf Touati
mtouati@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Renewable Energy SolarJob CreationRural Infrastructure and service deliveryMitigationUrban Infrastructure and Service DeliveryClimate changeUrban DevelopmentRural DevelopmentJobs
International Bank for Reconstruction and Development125000000Total Commitment in Second Quarter of 2015
International Bank for Reconstruction and Development312500Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development-312500Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development2063558Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development-210157Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-171438Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development31811881Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development-173889Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-507563Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development10923678Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development29819367Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development-553544Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-1197061Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-1414555Total Interest Repayment in Second Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Zagora
30.3320 -5.8380
Missour
33.0490 -3.9890
Erfoud
31.4350 -4.2380
Intermediate Results Indicator
Citizen Engagement - Consultation Process
Intermediate Results Indicator
Number of Solar PV Plants commissioned
Intermediate Results Indicator
Number of clients equipped with Smart Meters
Intermediate Results Indicator
Grievances related to delivery of project benefits that are addressed (number)
Intermediate Results Indicator
Reduction of ONEE's total electricity losses
Intermediate Results Indicator
Citizen Engagement - Grievances registered related to delivery of project benefits addressed (%)
Intermediate Results Indicator
Ratio of readjusted original bills for customers with Smart Meters
Intermediate Results Indicator
Lessons on operating grids with large RE shares or other topics of relevance for ONEE RE development documented and applied (following training/study tours)
Intermediate Results Indicator
Study on additional energy efficiency and demand-side management programs completed.
Intermediate Results Indicator
Feedback from customers with smart meters collected
Intermediate Results Indicator
Benchmark study on private sector participation in Solar PV projects completed.
Intermediate Results Indicator
Volume of direct finance leveraged through CTF funding
PDO Indicator
Direct project beneficiaries
PDO Indicator
Generation Capacity of Renewable Energy (other than hydropower) constructed
PDO Indicator
Generation Capacity of Renewable Energy constructed-Solar
PDO Indicator
Green-House Gas (GHG) emissions avoided
PDO Indicator
Renewable Energy dispatch system installed and operational
PDO Indicator
Female beneficiaries
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1680000.00
1680000.00
1680000.00
2797500.00
2797500.00
2797500.00
2797500.00
2797500.00
2797500.00
2797500.00
2797500.00
2797500.00
2797500.00
2797500.00
2797500.00
5594166.67
5594166.67
5594166.67
5594166.67
5594166.67
5594166.67
5594166.67
5594166.67
5594166.67
5594166.67
5594166.67
5594166.63
1398333.33
1398333.33
1398333.33
1398333.33
1398333.33
1398333.33
1398333.33
1398333.33
1398333.33
1398333.33
1398333.33
1398333.37
206666.67
206666.67
206666.67
206666.67
206666.67
206666.67
206666.67
206666.67
206666.67
206666.67
206666.67
206666.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
171963.17
171963.17
171963.17
171963.17
171963.17
171963.17
171963.17
171963.17
171963.17
171963.17
171963.17
171963.13
2650990.08
2650990.08
2650990.08
2650990.08
2650990.08
2650990.08
2650990.08
2650990.08
2650990.08
2650990.08
2650990.08
2650990.12
3395253.83
3395253.83
3395253.83
3395253.83
3395253.83
3395253.83
3395253.83
3395253.83
3395253.83
3395253.83
3395253.83
3395253.87
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.33
833333.37
865125.00
865125.00
865125.00
865125.00
865125.00
865125.00
865125.00
865125.00
865125.00
865125.00
865125.00
865125.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1500000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
0.00
0.00
0.00
0.00
Finance Agreement :Schedule 2, Section 1. C.1. of the Loan Agreements | Description :The Borrower shall implement the Project inaccordance with the ESMF, the RPF, the ESIAs, the EMPs and the RAPs, and shall not amend, suspend, abrogate, repeal or waive anyprovision of the ESMF, the EMPs, the RPF and the RAPs, without prior written approval of the Bank and subject to compliance withapplicable consultation and public disclosure requirements of the Bank. | Frequency :CONTINUOUS
Finance Agreement :Schedule 2, Section 1. C.2. of the Loan Agreement | Description :The Borrower shall ensure that all measuresidentified and described in the ESMF, the ESIAs, the EMPs, the RAPs and the RPF are taken in a timely manner. | Frequency:CONTINUOUS
44000-P149995
World Bank
International Bank for Reconstruction and Development
MINISTRY OF INTERIOR
International Bank for Reconstruction and Development
MINISTRY OF INTERIORMOROCCO
Casablanca Municipal Support Program
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Augustin Maria
amaria@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Other Industry, Trade and ServicesSanitationSub-National GovernmentUrban TransportWater SupplyMitigationAdaptationPublic Finance ManagementServices and Housing for the PoorUrban Infrastructure and Service DeliveryPublic Assets and Investment ManagementDomestic Revenue AdministrationJob CreationInvestment and Business ClimateUrban DevelopmentPublic AdministrationJobsPublic Private PartnershipsClimate changeBusiness Enabling Environment
International Bank for Reconstruction and Development200000000Total Commitment in Fourth Quarter of 2017
International Bank for Reconstruction and Development53456418Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-536318Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development17911214Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development-196905Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development24173223Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-331733Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-379107Total Interest Repayment in Second Quarter of 2019Project Appraisal DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Female of households in disadvantaged neighborhoods provided with improved access to basic services
Intermediate Results Indicator
Increase in revenues administered by the municipality
Intermediate Results Indicator
Annual rate of execution of the Municipality's investment budget
Intermediate Results Indicator
Increase in operating surplus on the municipal budget
Intermediate Results Indicator
Simplification and digitalization of administrative transactions for the issuance of: (i) authorizat
Intermediate Results Indicator
Deployment of a system to manage citizen requests
Intermediate Results Indicator
Number of kilometers of comprehensive street upgrading
PDO Indicator
Percentage Increase in Municipal Revenues excluding transfers from a baseline of 0% in CY 2015
PDO Indicator
Reduction in average number of days required for issuance of a building permit at the Municipality
PDO Indicator
Households in disadvantaged neighborhoods provided with improved access to basic services (at least
PDO Indicator
Private capital mobilized for investments through new or additional value of PPP contracts
0.00
0.00
235000.00
263000.00
597400.00
335400.00
742000.00
404000.00
424200.00
906400.00
488600.00
1080000.00
582800.00
603800.00
1244800.00
634600.00
641600.00
1319200.00
675200.00
1364200.00
683800.00
673200.00
1323400.00
658600.00
1345600.00
698400.00
727000.00
1519400.00
774400.00
787000.00
1640600.00
869200.00
1818400.00
936600.00
958800.00
2007000.00
1060400.00
2230800.00
1140600.00
1151600.00
2373600.00
1241600.00
1289400.00
2711400.00
1392000.00
2874800.00
1501600.00
1553800.00
3284400.00
1720000.00
1767800.00
3683800.00
1917600.00
3984800.00
2074000.00
2139400.00
4436600.00
2288400.00
4689200.00
2389800.00
2434600.00
5021800.00
2576200.00
2615600.00
5342400.00
2732000.00
5652800.00
2896800.00
2931200.00
5932600.00
2998800.00
6031600.00
3051600.00
3084000.00
6250400.00
3154800.00
3173800.00
6435400.00
3264000.00
6609200.00
3343000.00
3367600.00
6811000.00
3443800.00
6965400.00
3522200.00
5496400.00
0.00
0.00
235000.00
263000.00
597400.00
335400.00
742000.00
404000.00
424200.00
906400.00
488600.00
1080000.00
582800.00
603800.00
1244800.00
634600.00
641600.00
1319200.00
675200.00
1364200.00
683800.00
673200.00
1323400.00
658600.00
1345600.00
698400.00
727000.00
1519400.00
774400.00
787000.00
1640600.00
869200.00
1818400.00
936600.00
958800.00
2007000.00
1060400.00
2230800.00
1140600.00
1151600.00
2373600.00
1241600.00
1289400.00
2711400.00
1392000.00
2874800.00
1501600.00
1553800.00
3284400.00
1720000.00
1767800.00
3683800.00
1917600.00
3984800.00
2074000.00
2139400.00
4436600.00
2288400.00
4689200.00
2389800.00
2434600.00
5021800.00
2576200.00
2615600.00
5342400.00
2732000.00
5652800.00
2896800.00
2931200.00
5932600.00
2998800.00
6031600.00
3051600.00
3084000.00
6250400.00
3154800.00
3173800.00
6435400.00
3264000.00
6609200.00
3343000.00
3367600.00
6811000.00
3443800.00
6965400.00
3522200.00
5496400.00
44000-P129326
World Bank
International Bank for Reconstruction and Development
MINISTRY OF ECONOMY AND FINANCE
International Bank for Reconstruction and Development
MINISTRY OF ECONOMY AND FINANCEMOROCCO
MA MSME Development Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Valeriya Goffe
vgoffe@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Banking InstitutionsOther Non-bank Financial InstitutionsFinancial Infrastructure and AccessMSME DevelopmentJobsEnterprise DevelopmentMSME Finance
International Bank for Reconstruction and Development50000000Total Commitment in Second Quarter of 2012
International Bank for Reconstruction and Development126733Total Disbursement in First Quarter of 2013
International Bank for Reconstruction and Development-126733Total Interest Repayment in First Quarter of 2013
International Bank for Reconstruction and Development10875834Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development-236Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development38205895Total Disbursement in Third Quarter of 2013
International Bank for Reconstruction and Development-139094Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development-204412Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-215726Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-146344Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-122603Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-116713Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-89156Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-83129Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-91267Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-85801Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-255792Total Commitment Cancellations in Third Quarter of 2018
International Bank for Reconstruction and Development-87157Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-91209Total Interest Repayment in Second Quarter of 2019
International Bank for Reconstruction and Development-936585Total Loan Repayment in Second Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Kingdom of Morocco
32.0000 -6.0000
Intermediate Results Indicator
Increase in nr of MSME loans covered by guarantees
Intermediate Results Indicator
Increase in volume of MSME loans covered by guarantees
Intermediate Results Indicator
Increase in nr of loans for SME start-ups covered by guarantees
Intermediate Results Indicator
Increase in nr of loans for existing SMEs covered by guarantees
Intermediate Results Indicator
Increase in volume of loans for existing SMEs covered by guarantees
Intermediate Results Indicator
Increase in nr of loans for very small enterprises covered by guarantees
Intermediate Results Indicator
Increase in volume of loans for very small enterprises covered by guarantees
Intermediate Results Indicator
Increase in volume of loans for SME start-ups covered by guarantees
PDO Indicator
Increase in total no of MSME loans of PFIs
PDO Indicator
Increase in the total volume of outstanding MSME portfolio of PFIs. ($ million)
0.00
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Finance Agreement :Institutional Arrangements | Description :Borrower to cause the Project Implementing Entity (PIE) to carry outthe Project through the Project Implementing Unit (PIU) and Environmental and Social Screening Unit (ESSU) and in accordance withthe Project Agreement, Operations Manual (OM), Environmental andSocial Management Framework (ESMF) and not to amend the same, andto maintain the PIU and ESSU | Frequency :Monthly
Finance Agreement :Subsidiary Agreement | Description :Borrower to make loan proceeds available to PIE under Subsidiary Agreementunder terms and conditions acceptable to the World Bank | Due Date :15-Apr-2013
Finance Agreement :PCG Issuance | Description :Selection of Eligible Financial Institutions (EFIs), MSMEs, Sub-loans, andSub-projects, and issuance of Partial Credit Guarantees (PCGs) in accordance with the ESMF, OM, Loan Agreement and ProjectAgreement | Frequency :Monthly
Finance Agreement :Safeguards | Description :Borrower and PIE to comply with ESMF and exclusions listed therein | Frequency :Monthly
Finance Agreement :Mid-term Review | Description :Carrying out of mid-term review and preparation of reports before and after suchreview | Due Date :31-Mar-2015
Finance Agreement :PCG Account | Description :Maintenance of the PCG Account and ensuring that loan proceeds are made in and out ofsaid account | Frequency :Monthly
Finance Agreement :PCG Account | Description :Reaching agreement on the use of loan proceeds prior to the closing date for fundsremaining in the PCG Account at closing
44000-P149653
World Bank
International Bank for Reconstruction and Development
MINISTRY OF INTERIOR
International Bank for Reconstruction and Development
MINISTRY OF INTERIORMOROCCO
Morocco Urban Transport Project (P4R)
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Nabil Samir
nsamir@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Urban TransportUrban DevelopmentMunicipal FinanceAdministrative and Civil Service ReformUrban Infrastructure and Service DeliveryMunicipal Institution BuildingPublic Administration
International Bank for Reconstruction and Development200000000Total Commitment in Fourth Quarter of 2015
International Bank for Reconstruction and Development50500000Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development-500000Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development27840000Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development-510980Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development-783834Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development0Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development25830000Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-966149Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development-1624332Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development-1711176Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development28500000Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development-1807549Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development30830000Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-2432024Total Interest Repayment in Third Quarter of 2019Project Appraisal DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2295454.55
2295454.55
2295454.55
2295454.55
2295454.55
2295454.55
2295454.55
2295454.55
2295454.55
2295454.55
2295454.55
2295454.45
928000.00
928000.00
928000.00
928000.00
928000.00
928000.00
928000.00
928000.00
928000.00
928000.00
928000.00
928000.00
861000.00
861000.00
861000.00
861000.00
861000.00
861000.00
861000.00
861000.00
861000.00
861000.00
861000.00
861000.00
1913870.97
1913870.97
1913870.97
1913870.97
1913870.97
1913870.97
1913870.97
1913870.97
1913870.97
1913870.97
1913870.97
1913870.90
1206896.55
1206896.55
1206896.55
1206896.55
1206896.55
1206896.55
1206896.55
1206896.55
1206896.55
1206896.55
1206896.55
1206896.60
65217.39
65217.39
65217.39
65217.39
65217.39
65217.39
65217.39
65217.39
65217.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44000-P130903
World Bank
International Bank for Reconstruction and Development
MINISTRY OF FINANCE
International Bank for Reconstruction and Development
MINISTRY OF FINANCEMOROCCO
MA Accountability and Transparency DPL
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Fabian Seiderer
fseiderer@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Other Public AdministrationSub-National GovernmentCentral Government (Central Agencies)Public Expenditure ManagementParticipation and Civic EngagementTransparency, Accountability and Good GovernanceE-Government, incl. e-servicesPublic AdministrationPublic Finance ManagementPublic Private PartnershipsSocial Inclusion
International Bank for Reconstruction and Development200000000Total Commitment in Fourth Quarter of 2013
International Bank for Reconstruction and Development206729014Total Disbursement in Fourth Quarter of 2013
International Bank for Reconstruction and Development-518367Total Interest Repayment in Fourth Quarter of 2013
International Bank for Reconstruction and Development-653519Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-865037Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-586825Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-491624Total Interest Repayment in Fourth Quarter of 2015
International Bank for Reconstruction and Development-468005Total Interest Repayment in Second Quarter of 2016
International Bank for Reconstruction and Development-357505Total Interest Repayment in Fourth Quarter of 2016
International Bank for Reconstruction and Development-333340Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-365972Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development-344055Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-349492Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development-365740Total Interest Repayment in Second Quarter of 2019Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Number of parliamentary questions on performance
Increase in the internal and external accountability on the use of public resources, through formalized performance M&E andevidenced by parliamentary questions on performance
Intermediate Results Indicator
Statistics on the demand and supply of birth certificates online: Number of requests
Improve access and reduce corruption in the provision of administrative services through e-government.
Intermediate Results Indicator
Statistics on the demand and supply of birth certificates online: Number of certificates provided
Intermediate Results Indicator
Number of procuring entities subject to the new procurement rules
3345 public entities, including 180 public agencies and 2500 local governments
Intermediate Results Indicator
Score of the Open Budget Index (OBI) from the International Budget Partnership (IBP)
Increasing fiscal transparency and access to information
Intermediate Results Indicator
Score of the Open Government partnership's (OGP) on access to information
Increasing fiscal transparency and access to information.2 out of 4
4 out of 4
Intermediate Results Indicator
Number of SOEs and agencies subject to ex-ante financial controls
Intermediate Results Indicator
Number of draft laws and regulations made public on the SGG's website
45 draft legal texts, mainly focusing on trade and investment have been published between 2009-2012
Expansion of draft legal texts published by 30%.
Intermediate Results Indicator
Percentage of SoEs and agencies that have implemented critical elements of the governance code a) established a governance committee
Intermediate Results Indicator
Budget execution rate of the first 5 ministries adopting a 3 year rolling budget framework with programmatic allocations
Intermediate Results Indicator
Savings through the use of electronic procurement and reverse auctions
Savings on the supplies purchased through reverse auctions
Intermediate Results Indicator
Percentage of SoEs and agencies that have implemented critical elements of the governance code b) adopted a risk framework
Intermediate Results Indicator
Percentage of SoEs and agencies that have published on their website (i) up to date financial statements and (ii) the members and activity of their governance structure
Intermediate Results Indicator
Percentage of municipalities with real time information on budget execution via GID
Intermediate Results Indicator
Budget execution rate of SOEs and agencies
Intermediate Results Indicator
PEFA indicators (PI) related to budget transparency (nº6), policy based budgeting (nº12) and external scrutiny (nº 26 and 27)
Budget transparency, link with policies, and oversight improved as evidenced by a one notch increase in PEFA scores (PI 6, 12, 26and 27)
PEFA update is expected to be conducted mid-2015 based on the new methodology. This might implicate an adjustment for someindicators.
Intermediate Results Indicator
A unified legal and regulatory framework for PPPs fostering transparency and competition is operational
Intermediate Results Indicator
Gallup World Poll Survey indicator measuring citizen engagement in government affairs: “Have you voiced opinion to official in thepast month?”
Enhancing Citizen's Voice and public participation
0.00
0.00
44000-P155198
World Bank
International Bank for Reconstruction and Development
NISTRIES OF INTERIOR EDUCATION,GL AFF, FINANCE, SOCIAL AFF,
International Bank for Reconstruction and Development
NISTRIES OF INTERIOR EDUCATION,GL AFF, FINANCE, SOCIAL AFF,MOROCCO
Identity and Targeting for Social Protection Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Emil Daniel Tesliuc
etesliuc@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - Social ProtectionICT ServicesSocial Safety NetsICTSocial protection delivery systemsICT SolutionsCivil Registration and IdentificationSocial ProtectionPublic Administration
International Bank for Reconstruction and Development100000000Total Commitment in First Quarter of 2017
International Bank for Reconstruction and Development28820000Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development-250000Total Interest Repayment in Second Quarter of 2017
International Bank for Reconstruction and Development-284633Total Interest Repayment in Fourth Quarter of 2017
International Bank for Reconstruction and Development0Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development6000000Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development-433107Total Interest Repayment in Second Quarter of 2018
International Bank for Reconstruction and Development-676171Total Interest Repayment in Fourth Quarter of 2018
International Bank for Reconstruction and Development23000000Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development-708233Total Interest Repayment in Second Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Tan-Tan
28.0830 -11.0830
Region de Rabat-Sale-Zemmour-Zaer
33.7500 -6.3330
Region de Meknes-Tafilalet
32.1670 -4.8000
Marrakech-Tensift-Al Haouz
31.5000 -8.3330
Guelmim
28.7500 -10.0000
Region du Grand Casablanca
33.5330 -7.5830
Gharb-Chrarda-Beni Hssen
34.5000 -6.0000
Oriental Region
33.6670 -2.5000
Region de Souss-Massa-Draa
30.6670 -7.5000
Region de Tanger-Tetouan
35.2500 -5.4330
Taza-Al Hoceima-Taounate
34.5000 -4.1670
Sidi Ifni
29.3710 -10.1630
Intermediate Results Indicator
Share of new applicants to RAMED, DAAM, and Tayssir programs registered in the SR
Intermediate Results Indicator
Share of the civil registry office (Bureaux d'Etat Civil, BEC) connected to a UIN generator
Intermediate Results Indicator
Share of beneficiaries of RAMED/DAAM in SR
Intermediate Results Indicator
Share of new individuals registered in year t (MASSAR, CNIE and Register of foreign residents) are communicated electronically to the NPR and attributed a UIN
Intermediate Results Indicator
Share of beneficiaries of Tayssir in the SR
Intermediate Results Indicator
Share of claims and grievances of SR beneficiaries documented, processed, and resolved within 30 days
Intermediate Results Indicator
Share of new individuals registered in year t (MASSAR, CNIE and Register of foreign residents) are communicated electronically to the NPR and attributed a UIN - Female
Intermediate Results Indicator
Operational audit conducted
Intermediate Results Indicator
Capacity building
Intermediate Results Indicator
Survey on a random sample beneficiaries of Tayssir, DAAM, and RAMED
Intermediate Results Indicator
Number of beneficiaries of RAMED, Tayssir, and DAAM (Million)
Intermediate Results Indicator
Number of programs/services that have included the UIN in their MIS
PDO Indicator
Share of beneficiaries of the RAMED, Tayssir, and DAAM programs registered in the Social Registry (SR) and who are in the first consumption quintile in the project area
PDO Indicator
Share of beneficiaries of the RAMED, Tayssir, and DAAM programs registered in the Social Registry (SR) and who are in the first consumption quintile in the project area - Female
PDO Indicator
Population (six years old and above) for which a UIN has been attributed in the project area (Milion)
PDO Indicator
Population (six years old and above) for which a UIN has been attributed in the project area (Milion) - Female
5000000.00
5000000.00
5000000.00
5000000.00
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5000000.00
5000000.00
5000000.00
5000000.00
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1916666.67
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
1750000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Finance Agreement: SR Technical Committee | Description :No later than two (2) months after the Effective Date, the Borrower shallestablish the SR Technical Committee with terms of reference and composition satisfactory to the Bank. | Due Date :30-Aug-2017
Finance Agreement: Financial management, monitoring and evaluation, legal, Procurement Specialists | Description :No later than two(2) months after the Effective Date, the Project Management Unit shall recruit a financial management specialist, a monitoring andevaluation specialist, a legal specialist and a procurement specialist in compliance with the provisions of Section III.C ofSchedule 2 to this Agreement. | Due Date :30-Aug-2017
44000-P145529
World Bank
International Bank for Reconstruction and Development
OFFICE NATIONAL DE L'ELECTRICITE ET DE L'EAU POTABLE (ONEE)
International Bank for Reconstruction and Development
OFFICE NATIONAL DE L'ELECTRICITE ET DE L'EAU POTABLE (ONEE)MOROCCO
MA-Rural Water Supply
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Carolina Dominguez Torres
cdominguez1@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Public Administration - Water, Sanitation and Waste ManagementWater SupplyRural Infrastructure and service deliveryRural Development
International Bank for Reconstruction and Development158615000Total Commitment in Second Quarter of 2014
International Bank for Reconstruction and Development362545Total Disbursement in Fourth Quarter of 2014
International Bank for Reconstruction and Development-362545Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-555Total Interest Repayment in First Quarter of 2015
International Bank for Reconstruction and Development1030435Total Disbursement in Second Quarter of 2015
International Bank for Reconstruction and Development-2840Total Interest Repayment in Third Quarter of 2015
International Bank for Reconstruction and Development399237Total Disbursement in Fourth Quarter of 2015
International Bank for Reconstruction and Development-5408Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development25609Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development1136556Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development291631Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development331746Total Disbursement in Third Quarter of 2016
International Bank for Reconstruction and Development-7283Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development406447Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development709380Total Disbursement in Fourth Quarter of 2016
International Bank for Reconstruction and Development777311Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development2488351Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development2732591Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-11575Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development1852325Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development3107003Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development15249575Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development583228Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development621947Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-66343Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development6869771Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development95511Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development5312033Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-115633Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development70821Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development788665Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development9058415Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development16895Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development57583Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development57927Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-235495Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development337831Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development34821Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development932785Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development5328169Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development-251571Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development7518987Total Disbursement in Second Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Tiznit
29.6970 -9.7320
Sidi Bennour
32.6520 -8.4280
Nador
35.1680 -2.9340
Meddouza
32.5500 -9.2800
Taghazout
30.5430 -9.7110
Ait Baha
29.5480 -8.9710
Skhour des Rehamna
32.4820 -7.9150
Intermediate Results Indicator
Sub-projects that are expected to have a mechanism for post-completion operation
Intermediate Results Indicator
Improved community water points constructed or rehabilitated under the project
Intermediate Results Indicator
New piped household water connections that are resulting from the project intervention
Intermediate Results Indicator
Sub-projects with post-project community engagement or O&M arrangements
Intermediate Results Indicator
Length of access water pipes laid out or rehabilitated
Intermediate Results Indicator
Additional reservoir capacity
PDO Indicator
Villages served under the Project that receive drinking water on a continuous basis (reliability)
PDO Indicator
Female beneficiaries
PDO Indicator
Extremely poor beneficiaries
PDO Indicator
Villages served under the Project that receive drinking water of appropriate quality (safety)
PDO Indicator
Villages served under the Project that receive drinking water of appropriate quality (safety)
PDO Indicator
Annual increase of the consolidated access rate in selected provinces
PDO Indicator
Number of people in rural areas benefiting from upgraded water systems
PDO Indicator
Villages in rural areas provided with access to Improved Water Sources under the project
PDO Indicator
Number of people in rural areas provided with access to improved water sources under the project
PDO Indicator
Number of people in rural areas benefitting from new water systems
PDO Indicator
Direct project beneficiaries
PDO Indicator
Sub-projects that are expected to have a mechanism for post-completion operation
PDO Indicator
Villages in rural areas provided with access to Improved Water Sources under the project
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1666666.67
1666666.67
1666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5000000.00
5000000.00
5000000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6666666.67
6666666.67
6666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10000000.00
10000000.00
10000000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10000000.00
10000000.00
10000000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11666666.67
11666666.67
11666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7866666.67
7866666.67
7866666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
215986.39
215986.39
215986.39
215986.39
215986.39
215986.39
215986.39
215986.39
215986.39
215986.39
215986.39
215986.44
1875000.00
1875000.00
1875000.00
1875000.00
1875000.00
1875000.00
1875000.00
1875000.00
1875000.00
1875000.00
1875000.00
1875000.00
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.67
4166666.63
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.33
3333333.37
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.33
2083333.37
1550000.00
1550000.00
1550000.00
1550000.00
1550000.00
1550000.00
1550000.00
1550000.00
1550000.00
1550000.00
1550000.00
1550000.00
Finance Agreement :Agreements with Rural Municipalities | Description :See Schedule 2, Section I (B) to the Loan Agreement. |Frequency :CONTINUOUS
Finance Agreement :Conditions for Water Users | Description :See Schedule 2, Section I (C) to the Loan Agreement. | Frequency:CONTINUOUS
Finance Agreement :Financial Covenant | Description :See Schedule 2, Section V (a) to the Loan Agreement:Except as the Bank shallotherwise agree, the Borrower shall take, in consultation with the Guarantor, all actions necessary to ensure that its CumulativeDebt to equity shall be lower than 4.5 by closing of each fiscal year during Project implementation. | Frequency :Yearly
44000-P150930
World Bank
International Bank for Reconstruction and Development
MINISTRY OF AGRICULTURE AND MARITIME FISHERIES (MAPM)
International Bank for Reconstruction and Development
MINISTRY OF AGRICULTURE AND MARITIME FISHERIES (MAPM)MOROCCO
MA-Large Scale Irrigation Modernization Project
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Francois Onimus
fonimus@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Irrigation and DrainagePublic Administration - Agriculture, Fishing & ForestryAgricultural Extension, Research, and Other Support ActivitiesRural DevelopmentRural Infrastructure and service deliveryClimate changeAdaptationJobs
International Bank for Reconstruction and Development150000000Total Commitment in Third Quarter of 2015
International Bank for Reconstruction and Development375000Total Disbursement in First Quarter of 2016
International Bank for Reconstruction and Development-375000Total Interest Repayment in First Quarter of 2016
International Bank for Reconstruction and Development29982Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development683305Total Disbursement in Second Quarter of 2016
International Bank for Reconstruction and Development-209892Total Interest Repayment in Third Quarter of 2016
International Bank for Reconstruction and Development77953Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development2692700Total Disbursement in First Quarter of 2017
International Bank for Reconstruction and Development-197810Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development-232Total Interest Repayment in First Quarter of 2017
International Bank for Reconstruction and Development510638Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development520112Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development1005555Total Disbursement in Second Quarter of 2017
International Bank for Reconstruction and Development2785863Total Disbursement in Third Quarter of 2017
International Bank for Reconstruction and Development-222103Total Interest Repayment in Third Quarter of 2017
International Bank for Reconstruction and Development1579562Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development1891461Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development3010244Total Disbursement in Fourth Quarter of 2017
International Bank for Reconstruction and Development2296320Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development2618423Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development3441838Total Disbursement in First Quarter of 2018
International Bank for Reconstruction and Development-275930Total Interest Repayment in First Quarter of 2018
International Bank for Reconstruction and Development801606Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development1106310Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development1818213Total Disbursement in Second Quarter of 2018
International Bank for Reconstruction and Development569133Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development688805Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development1433882Total Disbursement in Third Quarter of 2018
International Bank for Reconstruction and Development-470796Total Interest Repayment in Third Quarter of 2018
International Bank for Reconstruction and Development2107666Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development2440604Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development4236252Total Disbursement in Fourth Quarter of 2018
International Bank for Reconstruction and Development823192Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development2532234Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development12648314Total Disbursement in First Quarter of 2019
International Bank for Reconstruction and Development-690851Total Interest Repayment in First Quarter of 2019
International Bank for Reconstruction and Development52721Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development1404596Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development7415674Total Disbursement in Second Quarter of 2019
International Bank for Reconstruction and Development1259070Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development2535054Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-1087573Total Interest Repayment in Third Quarter of 2019Project Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Sidi-Kacem
34.5830 -5.7500
Oued Sebou
34.2730 -6.6450
Safi
32.1670 -8.8330
Kenitra Province
34.5830 -6.3330
Kelaa-Des-Sraghna
32.1670 -7.7500
El-Jadida
32.9000 -8.5000
Azilal
31.9640 -6.5740
Skhour Rhamna
32.4810 -7.9770
Sidi Bennour
32.6610 -8.4280
Marrakech
31.6360 -8.0100
Al-Haouz
31.3410 -7.9110
Fquih Ben Salah
32.5070 -6.6890
Oued Oum er Rbia
33.3190 -8.3370
Sidi Slimane
34.2650 -5.9260
Intermediate Results Indicator
Client days of training provided (number)
Intermediate Results Indicator
Client days of training provided (number)
Intermediate Results Indicator
Clients per metering system
Intermediate Results Indicator
Client days of training provided - Female (number)
Intermediate Results Indicator
Client days of training provided - Female (number)
Intermediate Results Indicator
Interruptions in water service in peak period exceeding 48 hours
Intermediate Results Indicator
Progress of works on irrigation network
Intermediate Results Indicator
Outlets with flow in line with technical specifications in peak period
Intermediate Results Indicator
Clients that have formalized their request for improved irrigation technologies
Intermediate Results Indicator
Clients that have signed a delivery agreement with the ORMVA
Intermediate Results Indicator
Clients using the irrigation information system
Intermediate Results Indicator
Average time required for treating grievances related to water service
PDO Indicator
Area with a request for improved irrigation technologies approved
PDO Indicator
Direct project beneficiaries
PDO Indicator
Female beneficiaries
PDO Indicator
Area with access to water on-demand in peak period
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
1250000.00
3166666.67
3166666.67
3166666.66
3166666.67
3166666.67
3166666.66
3166666.67
3166666.67
3166666.66
3166666.67
3166666.67
3166666.66
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
3750000.00
2666666.67
2666666.67
2666666.66
2666666.67
2666666.67
2666666.66
2666666.67
2666666.67
2666666.66
2666666.67
2666666.67
2666666.66
1083333.33
1083333.33
1083333.34
1083333.33
1083333.33
1083333.34
1083333.33
1083333.33
1083333.34
1083333.33
1083333.33
1083333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
237942.40
237942.40
237942.41
0.00
0.00
0.00
0.00
0.00
0.00
923550.70
923550.70
923550.70
678768.28
678768.28
678768.28
928620.87
928620.87
928620.87
2160422.27
2160422.27
2160422.28
2785526.90
2785526.90
2785526.91
1242043.36
1242043.36
1242043.36
897273.28
897273.29
897273.29
2928174.16
2928174.17
2928174.17
5334580.31
5334580.31
5334580.32
2250000.00
2250000.00
2250000.00
3400000.00
3400000.00
3400000.00
3933333.33
3933333.33
3933333.34
1716666.66
1716666.67
1716666.67
1716666.66
1716666.67
1716666.67
1716666.66
1716666.67
1716666.67
1716666.66
1716666.67
1716666.67
1716666.66
1716666.67
1716666.67
1716666.66
1716666.67
1716666.67
1716666.66
1716666.67
1716666.67
1716666.66
1716666.67
1716666.67
1716666.66
1716666.67
1716666.67
1716666.66
1716666.67
1716666.67
1716666.66
1716666.67
1716666.67
1716666.66
1716666.67
1716666.67
1666666.66
1666666.67
1666666.67
33097.44
33097.44
33097.45
Finance Agreement :Staffing of ORMVA of Haouz | Description :The ORMVA of Haouz shall recruit two engineers and two technicians |Due Date :31-Mar-2017
44000-P122028
World Bank
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
MOROCCO
MA-Ouarzazate Concentrated Solar Power
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Manaf Touati
mtouati@worldbank.org+1-202-473-1000
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
Renewable Energy SolarMitigationPublic Private PartnershipsClimate change
International Bank for Reconstruction and Development200000000Total Commitment in Fourth Quarter of 2011
International Bank for Reconstruction and Development468257Total Disbursement in Second Quarter of 2013
International Bank for Reconstruction and Development-468257Total Interest Repayment in Second Quarter of 2013
International Bank for Reconstruction and Development-3386Total Interest Repayment in First Quarter of 2014
International Bank for Reconstruction and Development-3435Total Interest Repayment in Second Quarter of 2014
International Bank for Reconstruction and Development-3113Total Interest Repayment in Fourth Quarter of 2014
International Bank for Reconstruction and Development-162984403Total Commitment Cancellations in Second Quarter of 2015
International Bank for Reconstruction and Development-3577Total Interest Repayment in Second Quarter of 2015
International Bank for Reconstruction and Development-391861Total Loan Repayment in Second Quarter of 2015Project Information DocumentProject Information DocumentProject Information DocumentProject Appraisal DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportLoan AgreementAgreementAgreementAgreementContract AwardsProject URLProcurement Notices
Ouarzazat
30.9190 -6.8930
Intermediate Results Indicator
PPP acceptable to the World Bank and co-financiers
Intermediate Results Indicator
Transaction financial close
Intermediate Results Indicator
Beginning construction of the plant
Intermediate Results Indicator
Commissioning of the plant
Intermediate Results Indicator
Private Capital Mobilized
PDO Indicator
Direct project beneficiaries
PDO Indicator
Female beneficiaries
PDO Indicator
Generation Capacity of Renewable Energy (other than hydropower) constructed
PDO Indicator
Installed capacity of CSP power generation
PDO Indicator
Generation Capacity of Renewable Energy constructed-Solar
PDO Indicator
Electricity production
PDO Indicator
Avoided local air pollution (NOx)
PDO Indicator
Avoided global GHG pollution
PDO Indicator
Avoided local air pollution (SOx)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
2500000.00
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
0.00
0.00
0.00
0.00
0.00
0.00
Finance Agreement :Schedule 2,Section IDof CTF LoanAgreement | Description :The Borrower shall: (i) maintain within the ProjectManagement Unit, anenvironmental and social safeguards unit including an environmental and socialsafeguard coordinator |Frequency:Quarterly
Finance Agreement :Schedule 2,Section IDof CTF LoanAgreement | Description :The Borrower shall: (ii) (ii) cause the ProjectImplementing Entity to establish and maintain anenvironmental and social unit adequate to supervise the preparation of theESIA,further implement | Frequency :Quarterly
Finance Agreement :Schedule 2,Section IDof CTF LoanAgreement | Description :The Borrower shall cause the Project ImplementingEntity not to authorize anycommencement of civil works to build the Plant beforean ESIA is prepared, adoptedand disclosed | DueDate :12-Jun-2013
Finance Agreement :Schedule 2,Section IDof CTF LoanAgreement | Description :The Borrower shall: (i) cause the ESIA including anESMP for the AssociatedFacilities to be developed in a manner consistent with the provisions of the FESIA; | Due Date :01-Sep-2014
Finance Agreement :Schedule 2,Section IDof CTF LoanAgreement | Description :The Borrower shall: ii) provide the World Bank withthe relevant draft ESIA for any of theAssociated Facilities, allow the World Bank one month to provide its comments andfeedback |Due Date :01-Sep-2014
Finance Agreement :Schedule 2,Section IDof CTF Loan | Description :The Borrower shall disclose, and shall cause the ProjectImplementing Entity todisclose all relevant safeguard-related documentation regarding the Part 1 of theProject | Due Date:01-Sep-2014
Finance Agreement :Schedule 2,Section IDof CTF Loan | Description :The Borrower shall cause the Project Implementing Entity: (i)to construct andoperate the Plant at all times in compliance with the ESIA and the LAP | Frequency :Yearly
Finance Agreement :Schedule 2,Section IDof CTF Loan | Description :The Borrower shall cause ii) not toamend, suspend, abrogate,repeal or waive any provision of the ESIA or the LAPwithout prior consultation with, and approval of the World Bank. | Frequency:Yearly
Finance Agreement :Schedule 2,Section IDof CTF Loan | Description :The Borrower shall: (i) cause the Project Implementing Entityto prepare and disclosean environmental and social management reporton a bi-annual basis during theconstruction of the Plant |Frequency :SemiAnnual
Finance Agreement :Schedule 2,Section IDof CTF Loan | Description :The Borrower shall: (ii) include suchreport in the ProjectReports referred to in Section II.A of this Schedule 2 | Frequency :Quarterly
Finance Agreement :Schedule 2,Section IDof CTF Loan | Description :Not later than three (3) months after the Effective Date, theBorrower shall providethe World Bank with a draft of the SDP for itscomments and recommendations . | Due Date :12-Sep-2013
Finance Agreement :Schedule 2,Section IDof CTF Loan | Description :Notlater than eighteen (18) months after the Effective Date,the Borrower shall prepare areport on the implementation of the SDP and provide such report to the World Bankfor its comments andr | Due Date :12-Dec-2014
Finance Agreement :Schedule 2,Section IDof CTF Loan | Description :The Borrower shall ensure that no works shall commence for anyAssociated Facilitybefore the implementation of a due diligence to assess any need for land acquisitionand/or involuntaryresettle | Due Date :12-Jun-2013
Finance Agreement :Schedule 2,Section Vof CTF LoanAgreement | Description :Except agreed by the World Bank, the BorrowerâÂÂsEquity shall remainpositive on a yearly basis commencing with the BorrowerâÂÂs fiscal year 2012 | Frequency :Yearly
Finance Agreement :Schedule 2,Section Vof CTF Loan | Description :Not later than the end of each fiscal year commencing with theBorrowerâÂÂs fiscalyear 2013, the Borrower shall furnish to the World Bank a copy of the business planand financialprojections| Frequency :Yearly
Finance Agreement :Article Vsection 5.01 of CTF Loan Agreement | Description :The Project Implementing Entity has been legallyestablished in a manner satisfactory to the World Bank | Due Date :12-Jun-2013
Finance Agreement :Article Vsection 5.01 of CTF Loan Agreement | Description :The subsidiary of MASEN, MASEN Capital, has beenlegally established in a manner satisfactory to the World Bank | Due Date :12-Jun-2013
Finance Agreement :Article Vsection 5.01 of CTF Loan Agreement | Description :The Borrower and the Project Implementing Entityhave adopted the Financial Management and Disbursement Manual, satisfactory to theWorld Bank and the Co-financiers | Due Date:12-Jun-2013
Finance Agreement :Article Vsection 5.01 of CTF Loan Agreement | Description :The Borrower and the Project Implementing Entityhave established an accounting and financial management system satisfactory to theWorld Bank | Due Date :12-Jun-2013
Finance Agreement :Article Vsection 5.01 of CTF Loan Agreement | Description :The Borrower and the Project Implementing Entityhave adopted the Governance Framework, satisfactory to the World Bank | Due Date :12-Jun-2013
Finance Agreement :Article Vsection 5.01 of CTF Loan Agreement | Description :The Subsidiary Loan Agreements have been executedon behalf of the Borrower and the Project Implementing Entity and all conditions precedent to their effectiveness and to the rightof the Project Implementing Entity to make withdrawals under them (other than the effectiveness of this Agreement) have beensatisfied or waived | Due Date :12-Jun-2013
Finance Agreement :Article Vsection 5.01 of CTF Loan Agreement | Description :The IBRD Loan Agreement has been executed anddelivered and all conditions precedent to its effectiveness and to the right of the Borrower to make withdrawals under it (otherthan the effectiveness of this Agreement) have been satisfied or waived | Due Date :12-Jun-2013
Finance Agreement :Article Vsection 5.01 of CTF Loan Agreement | Description :The Borrower and the Kingdom of Morocco haveentered into the Project Specific Convention | Due Date :12-Jun-2013
Finance Agreement :Article Vsection 5.01 of CTF Loan Agreement | Description :Execution and satisfaction of all conditionsprecedent to the effectiveness and, to the extent applicable, to the right of the Borrower to make withdrawals under them (otherthan the effectiveness of this Agreement), of all the following co-financing agreements with:1. the AFD;2. the AfDB;3. theEC;4. the EIB;5. the KfW. | Due Date :12-Jun-2013
Finance Agreement :Article Vsection 5.01 of CTF Loan Agreement | Description :All other agreements, to be found satisfactory bythe World Bank in form and substance within reasonable time, required to finance,construct, own, and operate the Plant, including,but not limited to:1. the EPC Contract;2. the O&M Agreement;3. the PPA;4. thePower Sale Agreement;5. the Shareholders'Agreement;6. the Transmission Interconnection Agreement; and7. the Grid Access Agreement. | Due Date :12-Jun-2013
Finance Agreement :Schedule 2,Section IA,paragraph 4of CTF Loan Agreement | Description :The Borrower shall contract anindependent verification expert, satisfactory to the World Bank, under terms of reference satisfactory to the World Bank, to carryout technical audits and prepare the technical audit reports regarding the implementation of Part 1.Aof the Project, and of the EPCContract referred to in Section II.B.3 of this Schedule 2 to this Agreement. | Due Date :01-Nov-2013
Finance Agreement :Schedule 2,Section IB,paragraph 1of CTF Loan Agreement | Description :The Borrower shall make the proceeds ofthe Loan allocated from time to time to Category 1 of the table in Section IV.A.2 of this Schedule and the proceeds of the AFDCo-financing, the AfDB Co-financing I, the AfDB Co-financing II, the EIB Co-financing, and the KfW Co-financing I available to theProject Implementing Entity as a loan or loans under one or more subsidiary loan agreements | Frequency :Yearly