44000-P113350
World Bank
Sector Support for Education Reform Project
International Development Association
MINISTRY OF EDUCATION AND SCIENCE
International Development Association
MINISTRY OF EDUCATION AND SCIENCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Gulmira Sultanova
+1-202-473-1000gsultanova@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Osh Oblasty
40.0000 73.0000
Osh Oblasty
40.0000 73.0000
Batken
39.8330 71.0000
Talas
42.3330 72.0000
Naryn
41.4330 75.9670
Issyk-Kul'skaya Oblast’
42.0000 78.0000
Gorod Bishkek
42.8670 74.6000
Jalal-Abad
41.5000 72.5000
Chuyskaya Oblast’
42.4170 74.5000
Public Administration - EducationSecondary EducationSub-National GovernmentPrimary EducationEducation FinancingAccess to EducationEducation
0.00
0.00
0.00
0.00
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
208333.33
208333.33
208333.34
291666.67
291666.67
291666.66
291666.67
291666.67
291666.66
291666.67
291666.67
291666.66
291666.67
291666.67
291666.66
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
416666.66
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
427575.10
427575.10
427575.12
0.00
0.00
0.00
0.00
0.00
0.00
40014.21
40014.21
40014.21
82728.39
82728.39
82728.38
68616.56
68616.56
68616.56
0.00
0.00
0.00
331282.83
331282.83
331282.84
331282.83
331282.83
331282.84
318307.68
318307.68
318307.66
318307.68
318307.68
318307.66
904550.58
904550.58
904550.59
904550.58
904550.58
904550.59
895379.88
895379.88
895379.89
877403.67
877403.67
877403.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9100000Total Commitment in First Quarter of 2013
International Development Association7400000Total Commitment in First Quarter of 2013
International Development Association882725Total Disbursement in Second Quarter of 2014
International Development Association400000Total Disbursement in Second Quarter of 2014
International Development Association-529Total Interest Repayment in Third Quarter of 2014
International Development Association53897Total Disbursement in First Quarter of 2015
International Development Association-3515Total Interest Repayment in First Quarter of 2015
International Development Association66146Total Disbursement in First Quarter of 2015
International Development Association148632Total Disbursement in Second Quarter of 2015
International Development Association99553Total Disbursement in Second Quarter of 2015
International Development Association113218Total Disbursement in Third Quarter of 2015
International Development Association-3227Total Interest Repayment in Third Quarter of 2015
International Development Association92632Total Disbursement in Third Quarter of 2015
International Development Association136641Total Disbursement in First Quarter of 2016
International Development Association250316Total Disbursement in First Quarter of 2016
International Development Association-4043Total Interest Repayment in First Quarter of 2016
International Development Association111807Total Disbursement in First Quarter of 2016
International Development Association204804Total Disbursement in First Quarter of 2016
International Development Association300028Total Disbursement in Second Quarter of 2016
International Development Association326080Total Disbursement in Second Quarter of 2016
International Development Association245478Total Disbursement in Second Quarter of 2016
International Development Association266793Total Disbursement in Second Quarter of 2016
International Development Association279589Total Disbursement in Third Quarter of 2016
International Development Association-6124Total Interest Repayment in Third Quarter of 2016
International Development Association228755Total Disbursement in Third Quarter of 2016
International Development Association213204Total Disbursement in Fourth Quarter of 2016
International Development Association178927Total Disbursement in Fourth Quarter of 2016
International Development Association116667Total Disbursement in First Quarter of 2017
International Development Association262294Total Disbursement in First Quarter of 2017
International Development Association-8477Total Interest Repayment in First Quarter of 2017
International Development Association95455Total Disbursement in First Quarter of 2017
International Development Association210117Total Disbursement in First Quarter of 2017
International Development Association226450Total Disbursement in Second Quarter of 2017
International Development Association185278Total Disbursement in Second Quarter of 2017
International Development Association198720Total Disbursement in Third Quarter of 2017
International Development Association329296Total Disbursement in Third Quarter of 2017
International Development Association-10777Total Interest Repayment in Third Quarter of 2017
International Development Association162592Total Disbursement in Third Quarter of 2017
International Development Association269430Total Disbursement in Third Quarter of 2017
International Development Association211433Total Disbursement in Fourth Quarter of 2017
International Development Association265782Total Disbursement in Fourth Quarter of 2017
International Development Association352781Total Disbursement in Fourth Quarter of 2017
International Development Association173002Total Disbursement in Fourth Quarter of 2017
International Development Association214824Total Disbursement in Fourth Quarter of 2017
International Development Association288639Total Disbursement in Fourth Quarter of 2017
International Development Association298265Total Disbursement in First Quarter of 2018
International Development Association-14862Total Interest Repayment in First Quarter of 2018
International Development Association226480Total Disbursement in First Quarter of 2018
International Development Association154534Total Disbursement in Second Quarter of 2018
International Development Association314710Total Disbursement in Second Quarter of 2018
International Development Association126437Total Disbursement in Second Quarter of 2018
International Development Association277690Total Disbursement in Second Quarter of 2018
International Development Association322064Total Disbursement in Third Quarter of 2018
International Development Association504404Total Disbursement in Third Quarter of 2018
International Development Association1368791Total Disbursement in Third Quarter of 2018
International Development Association-18886Total Interest Repayment in Third Quarter of 2018
International Development Association263507Total Disbursement in Third Quarter of 2018
International Development Association415421Total Disbursement in Third Quarter of 2018
International Development Association1119928Total Disbursement in Third Quarter of 2018
International Development Association176577Total Disbursement in Fourth Quarter of 2018
International Development Association96555Total Disbursement in Fourth Quarter of 2018
International Development Association148171Total Disbursement in Fourth Quarter of 2018
International Development Association-53000Total Disbursement in First Quarter of 2019
International Development Association87818Total Disbursement in First Quarter of 2019
International Development Association93836Total Disbursement in First Quarter of 2019
International Development Association-27238Total Interest Repayment in First Quarter of 2019
International Development Association51813Total Disbursement in First Quarter of 2019
International Development Association516600Total Disbursement in Second Quarter of 2019
International Development Association422599Total Disbursement in Second Quarter of 2019
International Development Association27422Total Disbursement in Third Quarter of 2019
International Development Association-29317Total Interest Repayment in Third Quarter of 2019
International Development Association12077Total Disbursement in Third Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :B-1-(b) | Description :No withdrawal shall be made for payments for Category (2) of the Eligible Expendituresdisbursement category until the GoK has adopted a sustainable financing mechanism acceptable to the Bank to ensure timelyreplacement of textbooks for all grades of general basic education.
Intermediate Results Indicator
Percentage of school directors and AO Heads and accountants who are certified as having successfully completed the course financed under the Project.
Intermediate Results Indicator
Percentage of schools where Per Capita Financing (PCF) was introduced starting in 2012/13 or later that annually produce a School Report Card.
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
Percentage of primary schools that received a package of essential teaching-learning materials.
Intermediate Results Indicator
Percentage of schools that received revised textbooks in Mother-tongue, Mathematics and Motherland Studies for Grade 3.
Intermediate Results Indicator
Percentage of schools that received revised textbooks in Mother-tongue, Mathematics and Motherland Studies for Grade 4.
Intermediate Results Indicator
Percentage of schools that received revised textbooks for Mathematics, Mother-tongue, and Natural Sciences for Grade 5.
Intermediate Results Indicator
Percentage of schools that received revised textbooks for Mathematics, Mother-tongue, and Natural Sciences for Grade 6.
Intermediate Results Indicator
Gender Parity Index for Primary Gross Enrollment Ratio.
Intermediate Results Indicator
System for learning assessment at the primary level
Intermediate Results Indicator
Direct project beneficiaries
Intermediate Results Indicator
Number of additional qualified primary teachers resulting from project interventions.
Intermediate Results Indicator
Utility of the learning assessment system
Intermediate Results Indicator
Total number of 5th and 6th grade textbook manuscripts approved by MoES.
PDO Indicator
Percentage of training-certified primary grade teachers who follow the revised curriculum and apply improved teaching-learning practices in Mother-tongue Language and Mathematics.
PDO Indicator
Percentage of students in grades 3-4 using a revised textbook for Mother-Tongue Language, Mathematics and Motherland Studies.
PDO Indicator
Percentage of schools where Per Capita Financing (PCF) is introduced starting in year 2012 or later that post the annual school budget and expenditures report.
44000-P157079
World Bank
Heat Supply Improvement Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Katharina B. Gassner
+1-202-473-1000kgassner@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Batkenskiy Rayon
39.7500 71.0000
Osh Oblasty
40.0000 73.0000
Naryn oblast
41.4330 75.9670
Issyk-Kul Region
42.0000 78.0000
Gorod Bishkek
42.8670 74.6000
Aktala
41.0870 75.6760
Chuyskaya Oblast'
42.4170 74.5000
Nookat
40.0700 72.6800
Talas
42.7600 71.4130
Talaa
40.0620 71.8980
Alay District
39.8590 73.5590
Naryn District
41.4330 76.0000
Public Administration - Energy and ExtractivesOther Energy and ExtractivesEnergy Transmission and DistributionEnergyClimate changeAccess to EnergyMitigationEnergy Efficiency
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
249274.00
249274.00
249274.00
249274.00
249274.00
249274.00
249274.00
249274.00
249274.00
249274.00
249274.00
249274.00
337751.17
337751.17
337751.17
337751.17
337751.17
337751.17
337751.17
337751.17
337751.17
837751.15
837751.16
837751.16
655477.00
655477.00
655477.00
655477.00
655477.00
655477.00
655477.00
655477.00
655477.00
655477.00
655477.00
655477.00
889528.83
889528.83
889528.83
889528.83
889528.83
889528.83
889528.83
889528.83
889528.83
889528.83
889528.83
889528.87
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
755820.67
755820.67
755820.67
755820.67
755820.67
755820.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
249274.00
249274.00
249274.00
249274.00
249274.00
249274.00
337751.00
337751.00
337751.00
837751.00
837751.00
837751.00
837751.00
837751.00
837751.00
837751.00
837751.00
837751.00
837751.00
837751.00
837751.00
837751.00
837751.00
837751.00
889528.66
889528.67
889528.67
889528.66
889528.67
889528.67
889528.66
889528.67
889528.67
889528.66
889528.67
889528.67
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
1198392.00
758204.66
758204.67
758204.67
0.00
23000000Total Commitment in Fourth Quarter of 2017
International Development Association23000000Total Commitment in Fourth Quarter of 2017
International Development Association1000000Total Disbursement in Third Quarter of 2019
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportGrant or Trust Fund AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Schedule 2, Section V of the Financing Agreement: Except as the Association shall otherwise agree, BTS shall not incur any debtunless a reasonable forecast of the revenues and expenditures of BTS shows that the estimated net revenues of BTS for each of itsfiscal years during the term of the debt to be incurred shall be at least one times the estimated debt service requirements of BTSin such year on all debt of BTS including the debt to be incurred.
Schedule, Section II.B of the BTS Project Agreement: Not later than 30 days from the Effective Date, BTS shall install anaccounting software specifically for the Project accounting, which will have a functionality of automatic generation of the Projectfinancial reports as well as Statements of Expenditures.
Schedule, Section II, paragraph 4 of the ARIS Project Agreement: ARIS shall, not later than two months from the Effective Date,develop a Project cycle database for Component 2 of the Project in order to track the implementation status and progress, includingwith regards to registered eligible households and respective household contributions, selected stove suppliers/ products andrelated payments, as well as the stove installation progress and related payments.
Schedule 2, Section I.A, paragraph 2.a) of the Financing Agreement: The Recipient shall cause ARIS, not later than 30 days from theEffective Date, to strengthen the capacity of the ARIS Project Implementation Unit and thereafter maintain it during the entireProject implementation period with the staff, functions, terms of references and resources acceptable to the Association, and asfurther described in the ARIS Project Operational Manual.
Schedule 2, Section I.A, paragraph 1 of the Financing Agreement: The Recipient, through the State Committee for Industry, Energyand Mining, shall establish, not later than six months after Effective Date, and maintain throughout the duration of the Project,the Project Advisory Committee (PAC) with a composition, roles, responsibilities, and resources satisfactory to the Association.The PAC shall be responsible for providing strategic guidance to the Project.
Schedule 2, Section IV, paragraph 2 of the Financing Agreement: No withdrawal shall be made for payments made prior to theSignature Date, except that withdrawals up to an aggregate amount not to exceed SDR 496,000 may be made for payments made prior tothis date but on or after July 30, 2017, for Eligible Expenditures from the Grant portion of the Financing under Category 1.
Intermediate Results Indicator
Number of individual substations installed/ rehabilitated (cummulated)
Intermediate Results Indicator
Number of stoves/ LPBs installed
Intermediate Results Indicator
Number of public buildings retrofitted
Intermediate Results Indicator
Number of installed heat and hot water meters (cummulative)
Intermediate Results Indicator
Direct project beneficiaries of Component 2
Intermediate Results Indicator
Direct project beneficiaries of Component 3
Intermediate Results Indicator
Direct project beneficiaries of Component 1
Intermediate Results Indicator
Female beneficiaries of Component 2
Intermediate Results Indicator
Female beneficiaries of Component 3
Intermediate Results Indicator
Female beneficiaries of Component 1
Intermediate Results Indicator
Length (trench) of DH pipeline installed
Intermediate Results Indicator
Projected lifetime energy savings (cummulative) of Component 2
Intermediate Results Indicator
Projected lifetime energy savings (cummulative) of Component 3
Intermediate Results Indicator
Projected lifetime energy savings (cummulative) of Component 1
Intermediate Results Indicator
Projected lifetime CO2 savings (cummulative) of Component 2
Intermediate Results Indicator
Projected lifetime CO2 savings (cummulative) of Component 3
Intermediate Results Indicator
Projected lifetime CO2 savings (cummulative) of Component 1
PDO Indicator
Percentage of Project beneficiaries reporting an improvement in quality of heating
PDO Indicator
Percentage of Project beneficiaries reporting an improvement in quality of heating for Component 1
PDO Indicator
Percentage of Project beneficiaries reporting an improvement in quality of heating for Component 2
PDO Indicator
Percentage of Project beneficiaries reporting an improvement in quality of heating for Component 3
44000-P108178
World Bank
Second Land and Real Estate Registration Project
International Development Association
GOSREGISTER (STATE REGISTRATION AGENCY)
International Development Association
GOSREGISTER (STATE REGISTRATION AGENCY)Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Malcolm D. Childress
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Osh
40.5280 72.7990
Issyk-Kul'skaya Oblast'
42.0000 78.0000
Bishkek
42.8700 74.5900
Alamedin
42.9060 74.6370
Banking InstitutionsOther Public AdministrationOther Non-bank Financial InstitutionsPersonal and Property RightsLandscape ManagementLand Administration and ManagementRural DevelopmentRule of LawRenewable Natural Resources Asset ManagementTransparency, Accountability and Good GovernanceHousing FinanceUrban PlanningBiodiversityPublic AdministrationFinance for DevelopmentUrban Development
0.00
0.00
0.00
0.00
0.00
0.00
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
175000.00
175000.00
175000.00
175000.00
175000.00
175000.00
175000.00
175000.00
175000.00
175000.00
175000.00
175000.00
145833.33
145833.33
145833.34
145833.33
145833.33
145833.34
145833.33
145833.33
145833.34
145833.33
145833.33
145833.34
66666.67
66666.67
66666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
219836.71
219836.71
219836.71
0.00
0.00
0.00
0.00
0.00
0.00
118628.61
118628.61
118628.61
0.00
0.00
0.00
18837.23
18837.23
18837.24
113613.48
113613.48
113613.48
62063.22
62063.22
62063.22
100451.05
100451.05
100451.07
108665.00
108665.00
108665.02
108333.34
108333.34
108333.32
162500.00
162500.00
162500.00
216666.66
216666.66
216666.68
216666.66
216666.66
216666.68
189583.34
189583.34
189583.32
135416.66
135416.66
135416.68
119166.66
119166.66
119166.68
59571.35
59571.35
59571.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5850000Total Commitment in Third Quarter of 2008
International Development Association600000Total Disbursement in First Quarter of 2009
International Development Association352697Total Disbursement in Fourth Quarter of 2009
International Development Association52852Total Disbursement in Second Quarter of 2010
International Development Association317825Total Disbursement in Third Quarter of 2010
International Development Association37838Total Disbursement in Fourth Quarter of 2010
International Development Association137449Total Disbursement in Fourth Quarter of 2010
International Development Association129965Total Disbursement in First Quarter of 2011
International Development Association160341Total Disbursement in First Quarter of 2011
International Development Association213755Total Disbursement in Second Quarter of 2011
International Development Association297595Total Disbursement in Second Quarter of 2011
International Development Association317551Total Disbursement in Second Quarter of 2011
International Development Association235619Total Disbursement in Third Quarter of 2011
International Development Association273451Total Disbursement in Fourth Quarter of 2011
International Development Association460486Total Disbursement in Fourth Quarter of 2011
International Development Association384251Total Disbursement in First Quarter of 2012
International Development Association173989Total Disbursement in Second Quarter of 2012
International Development Association162321Total Disbursement in Third Quarter of 2012
International Development Association295972Total Disbursement in Third Quarter of 2012
International Development Association139329Total Disbursement in Fourth Quarter of 2012
International Development Association693561Total Disbursement in Fourth Quarter of 2012
International Development Association55236Total Disbursement in Fourth Quarter of 2013
International Development Association55955Total Disbursement in Fourth Quarter of 2013
International Development Association-17815Total Disbursement in First Quarter of 2014
International Development Association2558Total Disbursement in First Quarter of 2014
International Development Association-21193Total Commitment Cancellations in Second Quarter of 2014
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Semi annual reports
MTR report
Changes in legal framework
Compliance with manuals and guidelines
PIU maintenance and staffing
Make available geographical data to public and institutions
aerial photography permits and licenses
no displacement of human settlements
Environmental management framework
Interim Financial Reports
Intermediate Results Indicator
1b. IT system upgraded, with arrangements established for post-project operational sustainability.
Achieved.
Intermediate Results Indicator
1c. Capacity developed in agency financial management and procurement
As modified in May 2013.
Internal audit unit established. Internal auditors selected and audit methodology developed.Achieved.
Intermediate Results Indicator
1d. Land and real estate registry records are more secure and accessible
As modified in May 2013.
Achieved.
Intermediate Results Indicator
3b Training for education and professional bodies
Target exceeded.
Intermediate Results Indicator
1e. Organizational structure and facilities are financially sustainable
As described in Restructuring Paper.
Achieved.
Intermediate Results Indicator
1f. Project implementation timely and well-coordinated
Achieved.
Intermediate Results Indicator
2a Novostroiki, lands registered on a systematic basis
Achieved.
Intermediate Results Indicator
2b. Cadastral maps in selected areas upgraded and accessible
Target exceeded.
Intermediate Results Indicator
2c. Valuation information accessible and being used.
Achieved.
Intermediate Results Indicator
3a Human resource developed within Gosregister
cumulative over project duration
Target exceeded.
Intermediate Results Indicator
Land parcels with use or ownership rights recorded as a result of the project
Land parcels registered in "new construction" (novastroiki) areas.
No end target defined
Most are preliminary registrations
Intermediate Results Indicator
Land parcels with use/ownership rights recorded as a result of project-female
Data not available
Approximately 39 % of the properties are owned by women. In 2013 the number of the transactions with women participation increasedto 1,6 % compare to 2012.
Intermediate Results Indicator
1a. Sustainable unit monitors Gosregister performance, provides strategic analysis, and supports improved communication
As described in Restucturing Paper.
Permanent monitoring unit of the GIS center has capacity and functions are financing from registry operations.Achieved.
PDO Indicator
Property rights clear, secure, and reflected in accessible information base
2,88 million REUs registered.Target achieved.
PDO Indicator
Sustainable system for land and real estate registration and cadastre
As described in Restructuring Paper.
Target achieved.
PDO Indicator
Growth in registered sales since 2007
43104 sales during calendar 2007.
% growth in cumulative number of sales since 2007 using baseline of 43104.
73200 sales in 2013.Target exceeded.
PDO Indicator
Growth in number of registered mortgage transactions since 2007
43,324 mortgage transactions during calendar 2007.
% growth in cumulative number of sales since 2007 using baseline of 43324.
Total number of mortgages 69, 500.Target exceeded.
PDO Indicator
Average Processing Time for Public Services (hours)
Assumes 8 hour work days. Average of 4 days to process sales transactions.
Average of 0.5 days (4 hours) to process sales transactions.
Reported by project as 0.5 days.Target achieved.
44000-P152440
World Bank
Energy Sector Development Policy Operation
]]>
International Development Association
MINISTRY OF ENERGY AND INDUSTRY OF THE KYRGYZ REPUBLIC
International Development Association
MINISTRY OF ENERGY AND INDUSTRY OF THE KYRGYZ REPUBLICPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Katharina B. Gassner
+1-202-473-1000kgassner@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTANOther Energy and ExtractivesBusiness Enabling EnvironmentSocial InclusionPublic Finance ManagementParticipation and Civic EngagementRegulation and Competition PolicyPublic Expenditure ManagementTransparency, Accountability and Good GovernancePublic Administration
0.00
0.00
13200000Total Commitment in First Quarter of 2015
International Development Association10800000Total Commitment in First Quarter of 2015
International Development Association12857845Total Disbursement in Fourth Quarter of 2015
International Development Association10455830Total Disbursement in Fourth Quarter of 2015
International Development Association-55224Total Interest Repayment in Second Quarter of 2016
International Development Association-47191Total Interest Repayment in Fourth Quarter of 2016
International Development Association-46055Total Interest Repayment in Second Quarter of 2017
International Development Association-48947Total Interest Repayment in Fourth Quarter of 2017
International Development Association-48738Total Interest Repayment in Second Quarter of 2018
International Development Association-47149Total Interest Repayment in Fourth Quarter of 2018
International Development Association-47172Total Interest Repayment in Second Quarter of 2019
International Development AssociationImplementation Completion and Results ReportImplementation Completion Report ReviewAgreementFinancing AgreementContract AwardsProject URLProcurement Notices44000-P151416
World Bank
Urban Development Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Tengiz Gogotishvili
+1-202-473-1000tgogotishvili@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Suluktu
39.9370 69.5680
Balykchy
42.4600 76.1870
Kerben
41.4940 71.7580
Toktogul
41.8740 72.9420
Other Public AdministrationOther Energy and ExtractivesOther Water Supply, Sanitation and Waste ManagementSub-National GovernmentWaste ManagementWater SupplyOther TransportationClimate changeMunicipal Institution BuildingUrban DevelopmentUrban Infrastructure and Service DeliveryMitigationServices and Housing for the PoorPublic AdministrationAdministrative and Civil Service Reform
0.00
0.00
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6600000Total Commitment in First Quarter of 2016
International Development Association5400000Total Commitment in First Quarter of 2016
International Development Association500000Total Disbursement in First Quarter of 2017
International Development Association192734Total Disbursement in Fourth Quarter of 2017
International Development Association184142Total Disbursement in Second Quarter of 2018
International Development Association497189Total Disbursement in Second Quarter of 2018
International Development Association703787Total Disbursement in Second Quarter of 2018
International Development Association220736Total Disbursement in Third Quarter of 2018
International Development Association274606Total Disbursement in Third Quarter of 2018
International Development Association789845Total Disbursement in Fourth Quarter of 2018
International Development Association500000Total Disbursement in First Quarter of 2019
International Development Association380905Total Disbursement in First Quarter of 2019
International Development Association461678Total Disbursement in Second Quarter of 2019
International Development Association-793Total Interest Repayment in Second Quarter of 2019
International Development Association499848Total Disbursement in Third Quarter of 2019
International Development Association699134Total Disbursement in Third Quarter of 2019
International Development Association466338Total Disbursement in Fourth Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Modification of existing accounting software | Description :The Recipient shall ensure that ARIS modifies theexisting accounting software for its accounting and financial reporting purposes acceptable to the Association, with capacity to,inter alia, generate IFRs, statement of expenditures, withdrawal applications and annual financial statements, in a manneracceptable to the Association. | Due Date :15-Oct-2016
Intermediate Results Indicator
Number of water utilities that the project is supporting
Intermediate Results Indicator
Electronic billing and collection system in place
Intermediate Results Indicator
Number of municipal infrastructure assets and facilities with increased Energy Efficiency
Intermediate Results Indicator
Number of towns with Energy Saving Plans
Intermediate Results Indicator
Utility Performance Improvement Plan developed and endorsed
Intermediate Results Indicator
Capacity of local governments/utilities improved through technical and managerial trainings
Intermediate Results Indicator
Percentage of beneficiaries reporting improvement in project results and processes (CE indicator)
Intermediate Results Indicator
Roadmap to improve urban planning and spatial development adopted by SAACCS and endorsed by the urban policy technical working group
Intermediate Results Indicator
Streets with improved street lightning
PDO Indicator
Projected lifetime energy savings
PDO Indicator
Number of people in urban areas provided with access to regular solid waste collection under the project
PDO Indicator
Number of social infrastructure with improved seismic resistance
PDO Indicator
Direct project beneficiaries
PDO Indicator
Female beneficiaries
PDO Indicator
Duration of water supplied to households in project affected areas
44000-P096993
World Bank
Agricultural Investments and Services Project
International Development Association
MINISTRY OF AGRICULTURE, WATER RESOURCES AND PROCESSING INDU
International Development Association
MINISTRY OF AGRICULTURE, WATER RESOURCES AND PROCESSING INDUPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Peter Goodman
+1-202-473-1000pgoodman@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTANFisheriesAgricultural Extension, Research, and Other Support ActivitiesCropsLivestockCentral Government (Central Agencies)Social InclusionRural DevelopmentRural Infrastructure and service deliveryParticipation and Civic EngagementRural MarketsFinance for DevelopmentJobsRenewable Natural Resources Asset ManagementLand Administration and ManagementAgriculture FinanceBiodiversityLandscape Management
233333.33
233333.33
233333.34
266666.67
266666.67
266666.66
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
266666.67
266666.67
266666.66
233333.33
233333.33
233333.34
200000.00
200000.00
200000.00
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
133333.33
133333.33
133333.34
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
66666.67
66666.67
66666.66
66666.67
66666.67
66666.66
66666.67
66666.67
66666.66
33333.33
33333.33
33333.34
441666.67
441666.67
441666.66
441666.67
441666.67
441666.66
441666.67
441666.67
441666.66
441666.67
441666.67
441666.66
358333.33
358333.33
358333.34
358333.33
358333.33
358333.34
358333.33
358333.33
358333.34
358333.33
358333.33
358333.34
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
91666.67
91666.67
91666.66
91666.67
91666.67
91666.66
91666.67
91666.67
91666.66
91666.67
91666.67
91666.66
88888.89
88888.89
88888.88
88888.89
88888.89
88888.89
88888.89
88888.89
88888.89
9000000Total Commitment in Second Quarter of 2008
International Development Association4000000Total Commitment in Second Quarter of 2008
International Development Association500000Total Disbursement in Third Quarter of 2008
International Development Association866389Total Disbursement in Third Quarter of 2008
International Development Association350000Total Disbursement in Third Quarter of 2008
International Development Association466012Total Disbursement in Third Quarter of 2008
International Development Association-11610Total Disbursement in Fourth Quarter of 2008
International Development Association250000Total Disbursement in First Quarter of 2009
International Development Association612029Total Disbursement in First Quarter of 2009
International Development Association621945Total Disbursement in First Quarter of 2009
International Development Association126711Total Disbursement in Second Quarter of 2009
International Development Association388558Total Disbursement in Second Quarter of 2009
International Development Association260409Total Disbursement in Third Quarter of 2009
International Development Association356273Total Disbursement in Third Quarter of 2009
International Development Association88109Total Disbursement in Fourth Quarter of 2009
International Development Association117111Total Disbursement in Fourth Quarter of 2009
International Development Association324229Total Disbursement in Fourth Quarter of 2009
International Development Association208018Total Disbursement in Fourth Quarter of 2009
International Development Association214332Total Disbursement in First Quarter of 2010
International Development Association408407Total Disbursement in First Quarter of 2010
International Development Association13126Total Disbursement in First Quarter of 2010
International Development Association625277Total Disbursement in Second Quarter of 2010
International Development Association267461Total Disbursement in Second Quarter of 2010
International Development Association42965Total Disbursement in Third Quarter of 2010
International Development Association71152Total Disbursement in Third Quarter of 2010
International Development Association338312Total Disbursement in Third Quarter of 2010
International Development Association342170Total Disbursement in Fourth Quarter of 2010
International Development Association163342Total Disbursement in Fourth Quarter of 2010
International Development Association264067Total Disbursement in Fourth Quarter of 2010
International Development Association38506Total Disbursement in First Quarter of 2011
International Development Association168768Total Disbursement in First Quarter of 2011
International Development Association169076Total Disbursement in First Quarter of 2011
International Development Association49067Total Disbursement in First Quarter of 2011
International Development Association362847Total Disbursement in Second Quarter of 2011
International Development Association373096Total Disbursement in Second Quarter of 2011
International Development Association394346Total Disbursement in Second Quarter of 2011
International Development Association99502Total Disbursement in Second Quarter of 2011
International Development Association323104Total Disbursement in Second Quarter of 2011
International Development Association349779Total Disbursement in Second Quarter of 2011
International Development Association101877Total Disbursement in Third Quarter of 2011
International Development Association120646Total Disbursement in Third Quarter of 2011
International Development Association925445Total Disbursement in Third Quarter of 2011
International Development Association94504Total Disbursement in Third Quarter of 2011
International Development Association259657Total Disbursement in Fourth Quarter of 2011
International Development Association116320Total Disbursement in First Quarter of 2012
International Development Association283799Total Disbursement in First Quarter of 2012
International Development Association133086Total Disbursement in Second Quarter of 2012
International Development Association42921Total Disbursement in Fourth Quarter of 2012
International Development Association27007Total Disbursement in First Quarter of 2013
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Funding to be allocated within the Recipient's budget for its FY 2011, to cover 50% of the cost for procuring vaccines for thebrucellosis control program in Naryn oblast in 2011, Part 2(c)(iii).
Intermediate Results Indicator
Number of Pasture User Unions with functioning Pasture Management Committees established and fully operational
Target exceeded
454 PUU have been legally registered. All were operational in 2011 having issued pasture use tickets to their members.
Intermediate Results Indicator
Number of Community Pasture Management Plans (CPMP) satisfactorily developed, implemented and enforced by Pasture User Associations
Fully acheived
400 full CPMPs were prepared in by June 1 2013.
Intermediate Results Indicator
Number of Farmers Koshuuns contracting advisory services using own funds
Target exceeded
456 FKs contributed the required 50% contribution to the cost of advisory service contracts (mainly in kind e.g demo materials).
Intermediate Results Indicator
SVD ratings based OIE/PVS criteria increase from 1 to 2
No information available. OIE PVS rating expected to be updated before end of 2103
SVD rating has not been updated yet by OIE.
Intermediate Results Indicator
Increase in the condition score of livestock of target farmers of at least 0.5 points on a scale 1-5 by end of project
No data available
No data available
Intermediate Results Indicator
Revised legal framework reflected in Aiyl Okmotus having management authority for intermediate and distant pastures
Target exceeded
Aiyl Okmotu have management authority and have delegated authority to PUUs in all 454 cases where PUUs have been established.
Intermediate Results Indicator
Targeted clients who are members of an association - male (number)
Male members of the PUUs
Target acheived
Under the pasture law and by PUU charters all adults in aiyl Okmotu are automatically members of the PUU. The number of adult malepeople in project areas is taken by ARIS from the National Statistical Committee data.
Intermediate Results Indicator
Targeted clients who are members of an association – female (number)
Female members of the PUUS
Under the pasture law and by PUU charters all adults in aiyl Okmotu are automatically members of the PUU. The number of adult malepeople in project areas is taken by ARIS from the National Statistical Committee data.
Intermediate Results Indicator
Targeted clients - male (number)
Target acheived
Intermediate Results Indicator
Targeted clients - female (number)
Target acheived
Intermediate Results Indicator
Percentage of pasture improvement micro-projects satisfactorily maintained
Target exceeded
A total of 993 microprojects have been completed of which 582 have been operational for 2 years or more and 411 have beenoperational for 1 year.
Intermediate Results Indicator
Percentage of Community Seed Banks stable or expanding
Target exceeded
The PUCSF indicate that in 2012, 223 CSFs (82%) were maintaining or growing, only 40 (15%) declining, and 9 (3%) were notfunctioning
Intermediate Results Indicator
Coverage of vaccination programs from FMD, anthrax, rabies, brucellosis, PPR, Sheep Pox, Echinococcus and Tubercullosis increases to at least 80% of target animals by end of year 2
Target exceeded for Brucellosis
Brucellosis vaccination has been implemented nationwide in 2011, 2012, 2013. A pilot echinococcosis program is being implementedintwo raions in 2013. Regionally targeted FMD, rabies, anthrax vaccination programs are being implemented in 2013.
Intermediate Results Indicator
Statistically significant decline in prevalence of animal and human cases of target diseases by end of project
Target achieved for Brucellosis
The number of human cases of Brucellosis in the first pilot region of Naryn halved from approximately 420 cases in 2008 to 210cases in 2011, in contrast to an increase in cases in regions were no sheep/ goat vaccination took place.
Intermediate Results Indicator
Targeted clients who are members of an association (percentage)
This indicator measures the membership of target clients in pasture users unions (PUU).
Target acheived
Under the pasture law and by PUU charters all adults in aiyl Okmotu are automatically members of the PUU. The number of adult malepeople in project areas is taken by ARIS from the National Statistical Committee data.
PDO Indicator
Improved livestock productivity
Breakdown for this indicator is provided below.
PDO Indicator
Number of lambs per 100 ewes surviving to age 4 months (in the program area)
Target Exceeded
The main positive impact on animal productivity is through the animal disease control activities. Pasture Committees are at anearly stage of development in terms of being able to control stocking rates and increase livestock productivity frompastures.Based onresults from Ak Tala district only, which showed a decrease in Brucellosis incidence in sheep of 2.45% from9.95% (2008) to 7.50% (2012) which translates into an equivalent increase in lambing rate.
PDO Indicator
Milk yields (liter/cow/lactation)
Target partially achieved.
1. National Milk YieldThe revised NSC baseline figure for 2008 is 2003 litres.Nationally, milk production has increased by 8.6percent. This is a result of increased head of cattle (10%) but a slight decrease (1.3%) in yield per cow.2. Milk Yield on FarmsBenefiting from Extension Advice: Milk yields on 804 farms participating in farmer field schools or demonstrations increased by 38percent from 1950 litres to 2700 lites per year.
PDO Indicator
Improved food supply for poor households in the program area
Target exceeded
Calorific food availability increased by 46% for the 8650 community seed fund members growing wheat with improved yields.
44000-P049724
World Bank
Agribusiness & Marketing Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Talaibek Torokulovich Koshmatov
+1-202-473-1000tkoshmatov@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTANCentral Government (Central Agencies)Banking InstitutionsAgricultural markets, commercialization and agri-businessFinancial StabilityTradeTrade FacilitationBusiness Enabling EnvironmentFinance for DevelopmentFinancial Sector oversight and policy/banking regulation & restructuringRural MarketsAgriculture FinanceInvestment and Business ClimateRural Development
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39272.73
39272.73
39272.72
78545.45
78545.45
78545.46
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
137454.54
137454.54
137454.56
137454.54
137454.54
137454.56
137454.54
137454.54
137454.56
147272.73
147272.73
147272.73
147272.73
147272.73
147272.73
171818.19
171818.19
171818.17
171818.19
171818.19
171818.17
171818.19
171818.19
171818.17
171818.19
171818.19
171818.17
147272.73
147272.73
147272.73
147272.73
147272.73
147272.73
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
68727.28
68727.28
68727.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39272.73
39272.73
39272.72
78545.45
78545.45
78545.46
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
137454.54
137454.54
137454.56
137454.54
137454.54
137454.56
137454.54
137454.54
137454.56
147272.73
147272.73
147272.73
147272.73
147272.73
147272.73
171818.19
171818.19
171818.17
171818.19
171818.19
171818.17
171818.19
171818.19
171818.17
171818.19
171818.19
171818.17
147272.73
147272.73
147272.73
147272.73
147272.73
147272.73
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
103090.91
68727.28
68727.28
68727.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8100000Total Commitment in Fourth Quarter of 2004
International Development Association250000Total Disbursement in Third Quarter of 2005
International Development Association11235Total Disbursement in Fourth Quarter of 2005
International Development Association-17142Total Interest Repayment in Fourth Quarter of 2005
International Development Association68624Total Disbursement in First Quarter of 2006
International Development Association200966Total Disbursement in Second Quarter of 2006
International Development Association-12388Total Interest Repayment in Second Quarter of 2006
International Development Association193000Total Disbursement in Third Quarter of 2006
International Development Association420091Total Disbursement in Third Quarter of 2006
International Development Association35001Total Disbursement in Fourth Quarter of 2006
International Development Association380468Total Disbursement in Fourth Quarter of 2006
International Development Association-14320Total Interest Repayment in Fourth Quarter of 2006
International Development Association78509Total Disbursement in First Quarter of 2007
International Development Association141564Total Disbursement in Second Quarter of 2007
International Development Association220435Total Disbursement in Second Quarter of 2007
International Development Association-12680Total Interest Repayment in Second Quarter of 2007
International Development Association76000Total Disbursement in Third Quarter of 2007
International Development Association336994Total Disbursement in Third Quarter of 2007
International Development Association120000Total Disbursement in Fourth Quarter of 2007
International Development Association418950Total Disbursement in Fourth Quarter of 2007
International Development Association-14710Total Interest Repayment in Fourth Quarter of 2007
International Development Association385000Total Disbursement in First Quarter of 2008
International Development Association471251Total Disbursement in First Quarter of 2008
International Development Association268915Total Disbursement in Second Quarter of 2008
International Development Association-16342Total Interest Repayment in Second Quarter of 2008
International Development Association391227Total Disbursement in Fourth Quarter of 2008
International Development Association-16864Total Interest Repayment in Fourth Quarter of 2008
International Development Association68696Total Disbursement in First Quarter of 2009
International Development Association-16191Total Interest Repayment in Second Quarter of 2009
International Development Association124489Total Disbursement in Third Quarter of 2009
International Development Association-18486Total Interest Repayment in Fourth Quarter of 2009
International Development Association85873Total Disbursement in First Quarter of 2010
International Development Association312704Total Disbursement in Second Quarter of 2010
International Development Association-17165Total Interest Repayment in Second Quarter of 2010
International Development Association20360Total Disbursement in Third Quarter of 2010
International Development Association165096Total Disbursement in Fourth Quarter of 2010
International Development Association-18810Total Interest Repayment in Fourth Quarter of 2010
International Development Association66407Total Disbursement in First Quarter of 2011
International Development Association-20810Total Interest Repayment in Second Quarter of 2011
International Development Association283062Total Disbursement in Third Quarter of 2011
International Development Association217900Total Disbursement in Fourth Quarter of 2011
International Development Association-21296Total Interest Repayment in Fourth Quarter of 2011
International Development Association124576Total Disbursement in First Quarter of 2012
International Development Association1042564Total Disbursement in First Quarter of 2012
International Development Association433888Total Disbursement in Second Quarter of 2012
International Development Association-24122Total Interest Repayment in Second Quarter of 2012
International Development Association94600Total Disbursement in Third Quarter of 2012
International Development Association285095Total Disbursement in Third Quarter of 2012
International Development Association-28389Total Interest Repayment in Fourth Quarter of 2012
International Development Association587120Total Disbursement in First Quarter of 2013
International Development Association45262Total Disbursement in Second Quarter of 2013
International Development Association-29158Total Interest Repayment in Second Quarter of 2013
International Development Association-35Total Commitment Cancellations in Third Quarter of 2013
International Development Association1978Total Disbursement in Third Quarter of 2013
International Development Association-31326Total Interest Repayment in Fourth Quarter of 2013
International Development Association-31996Total Interest Repayment in Second Quarter of 2014
International Development Association-30197Total Interest Repayment in Fourth Quarter of 2014
International Development Association-25796Total Interest Repayment in Second Quarter of 2015
International Development Association-77879Total Loan Repayment in Second Quarter of 2015
International Development Association-31593Total Interest Repayment in Fourth Quarter of 2015
International Development Association-76124Total Loan Repayment in Fourth Quarter of 2015
International Development Association-27223Total Interest Repayment in Second Quarter of 2016
International Development Association-77603Total Loan Repayment in Second Quarter of 2016
International Development Association-28532Total Interest Repayment in Fourth Quarter of 2016
International Development Association-74995Total Loan Repayment in Fourth Quarter of 2016
International Development Association-25580Total Interest Repayment in Second Quarter of 2017
International Development Association-75369Total Loan Repayment in Second Quarter of 2017
International Development Association-29286Total Interest Repayment in Fourth Quarter of 2017
International Development Association-77711Total Loan Repayment in Fourth Quarter of 2017
International Development Association-27690Total Interest Repayment in Second Quarter of 2018
International Development Association-78552Total Loan Repayment in Second Quarter of 2018
International Development Association-26502Total Interest Repayment in Fourth Quarter of 2018
International Development Association-75992Total Loan Repayment in Fourth Quarter of 2018
International Development Association-26230Total Interest Repayment in Second Quarter of 2019
International Development Association-76028Total Loan Repayment in Second Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportCredit AgreementContract AwardsProject URLProcurement Notices
The ABCC's Charter
The Agri-Credit guidelines
Activities of the ABCC, CLMU, PMAO not suspended
ABCC Director Hiring and termination only with IDA's consent
Intermediate Results Indicator
Volume (in US$) of trade deals facilitated
MDS was set up under the project
Assistance provided to 1,216 clients
Intermediate Results Indicator
Total volume of investments attracted to beneficiary agribusinesses
End target exceeded by almost 50%.
Intermediate Results Indicator
Volume of Bank Support: Lines of Credit - SME
Disbursements for agribusiness development. End target significantly exceeded.
Intermediate Results Indicator
Volume of Bank Support: Institutional Development - SME
Project-specific TA to the banking sector. End target significantly exceeded.
Intermediate Results Indicator
Number of agribusinesses receiving assistance from ABCC
No enterprises supported before the project
End target exceeded. 20 were supported under the first TA package; 24 (including 17 new) under the second TA package; 18(including 5 new) under the second package extension
Intermediate Results Indicator
Number of key business environment constraints identified and tackled
End target achieved. Two VAT calculation on agricultural produce issues (for exports to Kazakhstan and exports to Russia)tackled;one more issue - on illegal payments in key selected transit corridors being monitored
Intermediate Results Indicator
Number of public service staff trained
End target significantly exceeded. Public sector staff trained during seminars and presentations-discussions.
Intermediate Results Indicator
Number of loan officers trained in the banking sector
End target significantly exceeded. Including: 380 in Investment Lending and Leasing,337 in Structured Finance, 166 inEnvironmental Training
Intermediate Results Indicator
Number of Grants to producer organizations/cooperatives
58 grants have been disbursed in the total amount of US$800,000 equivalent. Target exceeded.
Intermediate Results Indicator
Number of market analysis reports prepared and disseminated
Market Conditions Analysis Unit, which prepares reports, set up under the project
End target significantly exceeded.
PDO Indicator
Increase in sales of agribusinesses supported by the Project, nominal
No agribusinesses were supported before the start of the project
Target exceeded more than 3 times.
PDO Indicator
Increase in profits of agribusinesses supprted by the Project, nominal
No agribusinesses supported before the project
Results are double the end target.
44000-P163983
World Bank
Kyrgyz Republic Economic Governance DPO
International Development Association
MINISTRY OF FINANCE
International Development Association
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Appolenia Mbowe
+1-202-473-1000ambowe@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTANOther Energy and ExtractivesAgricultural markets, commercialization and agri-businessOther Public AdministrationOther Industry, Trade and ServicesCentral Government (Central Agencies)MitigationPublic Finance ManagementJobsBusiness Enabling EnvironmentFood SecurityFiscal sustainabilityDomestic Revenue AdministrationE-Government, incl. e-servicesFiscal PolicyTransparency, Accountability and Good GovernanceInvestment and Business ClimateClimate changePublic AdministrationNutrition and Food SecurityPublic Expenditure Management
0.00
0.00
12000000Total Commitment in Fourth Quarter of 2018
International Development Association11464541Total Disbursement in Fourth Quarter of 2018
International Development Association12000000Total Commitment in Fourth Quarter of 2018
International Development Association11464541Total Disbursement in Fourth Quarter of 2018
International Development Association-36571Total Interest Repayment in Second Quarter of 2019
International Development AssociationFinancing AgreementContract AwardsProject URLProcurement Notices44000-P133446
World Bank
Electricity Supply Accountability and Reliability Improvement Project
International Development Association
JSC SEVERELECTRO
International Development Association
JSC SEVERELECTROPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Maksudjon Safarov
+1-202-473-1000msafarov@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTANPublic Administration - Energy and ExtractivesOther Energy and ExtractivesEnergy Transmission and DistributionJobsUrban Infrastructure and Service DeliveryJob CreationUrban DevelopmentRural Infrastructure and service deliveryRural Development
0.00
0.00
0.00
0.00
0.00
0.00
100000.00
100000.00
100000.00
233333.33
233333.33
233333.34
133333.33
133333.33
133333.34
133333.33
133333.33
133333.34
166666.66
166666.67
166666.67
233333.33
233333.33
233333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
833333.33
833333.33
833333.34
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36843.91
36843.91
36843.91
36843.91
36843.91
36843.91
36843.91
36843.91
36843.91
36843.91
36843.91
36843.92
393275.14
393275.14
393275.14
393275.14
393275.14
393275.14
393275.14
393275.14
393275.14
393275.14
393275.14
393275.19
940614.00
940614.00
940614.00
940614.00
940614.00
940614.00
940614.00
940614.00
940614.00
940614.00
940614.00
940614.00
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
185731.08
185731.08
185731.08
185731.08
185731.08
185731.08
185731.08
185731.08
185731.08
185731.08
185731.08
185731.12
13750000Total Commitment in Third Quarter of 2014
International Development Association11250000Total Commitment in Third Quarter of 2014
International Development Association400000Total Disbursement in Second Quarter of 2016
International Development Association1118400Total Disbursement in Fourth Quarter of 2016
International Development Association2132385Total Disbursement in Fourth Quarter of 2016
International Development Association833072Total Disbursement in Second Quarter of 2017
International Development Association524873Total Disbursement in Third Quarter of 2017
International Development Association5027836Total Disbursement in Third Quarter of 2017
International Development Association217240Total Disbursement in Fourth Quarter of 2017
International Development Association1628728Total Disbursement in Fourth Quarter of 2017
International Development Association2758693Total Disbursement in Fourth Quarter of 2017
International Development Association130000Total Disbursement in Fourth Quarter of 2017
International Development Association-8317Total Interest Repayment in First Quarter of 2018
International Development Association2302372Total Disbursement in Second Quarter of 2018
International Development Association283040Total Disbursement in Third Quarter of 2018
International Development Association354600Total Disbursement in Third Quarter of 2018
International Development Association-21139Total Interest Repayment in Third Quarter of 2018
International Development Association445501Total Disbursement in Fourth Quarter of 2018
International Development Association1039772Total Disbursement in Fourth Quarter of 2018
International Development Association-29975Total Interest Repayment in First Quarter of 2019
International Development Association-33207Total Interest Repayment in Third Quarter of 2019
International Development Association302752Total Disbursement in Fourth Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Subsidiary Agreement | Description :The Subsidiary Agreement is in place as set forth under Section I. B ofSchedule 2 to the Financing Agreement. | Due Date : 31-May-2015
Finance Agreement :Safeguards | Description :Safeguards provisions are implemented as set forth under Section I. D of Schedule 2 tothe Financing Agreement. | Frequency :Yearly
Finance Agreement :Financial Covenants | Description :Financial covenants are met as set forth under Section V of Schedule 2 to theFinancing Agreement. | Frequency :Yearly
Finance Agreement :Subsidiary Agreement | Description :The Subsidiary Agreement is in place as set forth under Section I. B ofSchedule 2 to the Financing Agreement. | Due Date : 31-May-2015
Finance Agreement :Safeguards | Description :Safeguards provisions are implemented as set forth under Section I. D of Schedule 2 tothe Financing Agreement. | Frequency :Yearly
Finance Agreement :Financial Covenants | Description :Financial covenants are met as set forth under Section V of Schedule 2 to theFinancing Agreement. | Frequency :Yearly
Intermediate Results Indicator
Meters installed
Intermediate Results Indicator
Direct project beneficiaries
Intermediate Results Indicator
MISs incorporated and operational
Intermediate Results Indicator
IFRS applied
Intermediate Results Indicator
Transparency and fairness in procurement improved
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
Capacity added
PDO Indicator
Reliable operational and financial data available to the management of SE and key external stakeholders
PDO Indicator
Average duration of outages in Secerelectro's network (minutes/1000 customers)
PDO Indicator
Electricity losses per year in Severeletro's distribution network
PDO Indicator
Share of customers satisfied with SE's services increased
PDO Indicator
Share of female customers satisfied with SE's services increased
PDO Indicator
Share of customers from low income groups satisfied with SE's services increased
44000-P087811
World Bank
Reducing Technical Barriers for Entrepreneurship and Trade
International Development Association
PRIME MINISTER'S OFFICE
International Development Association
PRIME MINISTER'S OFFICEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Sylvie K. Bossoutrot
+1-202-473-1000sbossoutrot@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTANAgricultural markets, commercialization and agri-businessCentral Government (Central Agencies)Other Industry, Trade and ServicesTrade FacilitationMSME FinanceFinancial Infrastructure and AccessRegulation and Competition PolicyMSME DevelopmentBusiness Enabling EnvironmentTradeEnterprise Development
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
100000.00
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.66
41666.66
41666.64
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33273.97
33273.97
33273.98
24673.63
24673.63
24673.64
24673.63
24673.63
24673.64
33099.62
33099.63
33099.63
18551.07
18551.07
18551.07
18842.49
18842.49
18842.50
19131.74
19131.75
19131.75
13596.67
13596.68
13596.68
10923.40
10923.40
10923.41
0.00
0.00
0.00
63723.93
63723.94
63723.94
244669.56
244669.57
244669.57
62197.27
62197.27
62197.28
30033.91
30033.92
30033.92
94567.54
94567.54
94567.55
38413.33
38413.33
38413.34
6125.67
6125.67
6125.68
9527.50
9527.50
9527.50
11461.24
11461.24
11461.25
16733.78
16733.79
16733.79
45383.87
45383.88
45383.88
218515.76
218515.76
218515.77
157136.75
157136.75
157136.75
157136.75
157136.75
157136.75
157136.75
157136.75
157136.75
157136.75
157136.75
157136.75
5000000Total Commitment in Third Quarter of 2006
International Development Association99822Total Disbursement in First Quarter of 2007
International Development Association30526Total Disbursement in Second Quarter of 2007
International Development Association43495Total Disbursement in Second Quarter of 2007
International Development Association25000Total Disbursement in Third Quarter of 2007
International Development Association45399Total Disbursement in Third Quarter of 2007
International Development Association42745Total Disbursement in Fourth Quarter of 2007
International Development Association56554Total Disbursement in Fourth Quarter of 2007
International Development Association55653Total Disbursement in First Quarter of 2008
International Development Association56527Total Disbursement in Second Quarter of 2008
International Development Association24383Total Disbursement in Third Quarter of 2008
International Development Association33013Total Disbursement in Third Quarter of 2008
International Development Association40790Total Disbursement in Fourth Quarter of 2008
International Development Association32770Total Disbursement in First Quarter of 2009
International Development Association47399Total Disbursement in Third Quarter of 2009
International Development Association143773Total Disbursement in Third Quarter of 2009
International Development Association66065Total Disbursement in Fourth Quarter of 2009
International Development Association667943Total Disbursement in Fourth Quarter of 2009
International Development Association24541Total Disbursement in First Quarter of 2010
International Development Association58314Total Disbursement in First Quarter of 2010
International Development Association103737Total Disbursement in First Quarter of 2010
International Development Association23187Total Disbursement in Second Quarter of 2010
International Development Association66915Total Disbursement in Second Quarter of 2010
International Development Association283703Total Disbursement in Third Quarter of 2010
International Development Association43570Total Disbursement in Fourth Quarter of 2010
International Development Association71670Total Disbursement in Fourth Quarter of 2010
International Development Association18377Total Disbursement in First Quarter of 2011
International Development Association28583Total Disbursement in Second Quarter of 2011
International Development Association34384Total Disbursement in Third Quarter of 2011
International Development Association20981Total Disbursement in Fourth Quarter of 2011
International Development Association29221Total Disbursement in Fourth Quarter of 2011
International Development Association27518Total Disbursement in First Quarter of 2012
International Development Association108634Total Disbursement in First Quarter of 2012
International Development Association65895Total Disbursement in Second Quarter of 2012
International Development Association226276Total Disbursement in Second Quarter of 2012
International Development Association363376Total Disbursement in Second Quarter of 2012
International Development Association26199Total Disbursement in Third Quarter of 2012
International Development Association60770Total Disbursement in Third Quarter of 2012
International Development Association226728Total Disbursement in Third Quarter of 2012
International Development Association106202Total Disbursement in Fourth Quarter of 2012
International Development Association125900Total Disbursement in Fourth Quarter of 2012
International Development Association543124Total Disbursement in Fourth Quarter of 2012
International Development Association16077Total Disbursement in First Quarter of 2013
International Development Association22480Total Disbursement in First Quarter of 2013
International Development Association392389Total Disbursement in First Quarter of 2013
International Development Association83211Total Disbursement in Second Quarter of 2013
International Development Association-689396Total Commitment Cancellations in Third Quarter of 2013
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportGrant or Trust Fund AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Increase in the number of measurement and calibration services with lower level of associated uncertainties.
The two state of the art labs in mass and temperature allowed CSM to meet its targets. Moreover, additional high-precisionlaboratories are currently being installed and the new labs will further increase CSM's capacity to provide measurement andcalibration services with lower level of associated uncertainties in a wider range of units.
Intermediate Results Indicator
At least two testing laboratories accredited according to international standards ISO/IEC 17025
Delays in the procurement and installation of microbiology testing equipment prevented the full accreditation process. Equipmentisfully installed and the laboratories will benefit from an international pre-audit that will produce a gap assessment andrecommendations for international accreditation to be completed after project closing.
Intermediate Results Indicator
At least 2 certifying bodies accredited according to the relevant standard
Two certification bodies with approximate compliance have been identified. Nevertheless, the accreditation of two certificationbodies will not be achieved by project closing due to timing issues and linkages with the accreditation process of the testinglaboratories. Nevertheless, certification bodies will benefit from an international pre-audit that will produce a gap assessmentand recommendations.
Intermediate Results Indicator
Technical Regulations developed and adopted
Intermediate Results Indicator
Increase in the percentage of national documentary standards harmonized with international standards
Intermediate Results Indicator
Accreditation body compliant with ISO/IEC 17011
ILAC final decision on KCA recognition is expected by end of March. Following the full audit carried out in September 2012, theKCAaddressed the gaps by providing detailed corrective measures in December 2012. The ILAC Audit Team requested a few integrationsin January 2013 that the KCA submitted in February 2013.
Intermediate Results Indicator
Companies certified under ISO 9001, ISO 22000 and/or HACCP
(+6 from original baseline). The economic crisis continues to undermine the interest of companies in quality and ISOcertification.However, at present, a number of companies in the KR sought and obtained international ISO accreditation: 12companies representingvarious sectors (service, manufacturing, food processing) have an international ISO certificate. Of these,three are from the food sector; only two companies so far benefited from the Matching Grant Facility envisioned in the RTBETProject. Nevertheless, there is growing demand among local SMEs – especially in the agribusiness sector – to seek ISO22000 andHACCP certification due to pressures from destination markets such as Russia and Kazakhstan.
Intermediate Results Indicator
Reduction in number of products subject to mandatory certification
The Government is currently considering a further reduction to 673 categories of goods pending approval of additional TechnicalRegulations.
Intermediate Results Indicator
NISM as a whole certified for Quality Management System (QMS)
PDO Indicator
Decrease in cost of regulatory compliance
44000-P145162
World Bank
Pasture and Livestock Management Improvement Project
International Development Association
MINISTRY OF AGRICULTURE AND MELIORATION
International Development Association
MINISTRY OF AGRICULTURE AND MELIORATIONPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
David Tuchschneider
+1-202-473-1000dtuchschneider@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTANFisheriesLivestockPublic Administration - Agriculture, Fishing & ForestryAgriculture FinanceRural MarketsRural Infrastructure and service deliveryRural DevelopmentFinance for Development
0.00
0.00
0.00
0.00
430336.93
430336.93
430336.94
430336.93
430336.93
430336.94
518294.53
518294.54
518294.54
518294.53
518294.54
518294.54
518294.53
518294.54
518294.54
518294.53
518294.54
518294.54
377124.72
377124.73
377124.73
377124.72
377124.73
377124.73
377124.72
377124.73
377124.73
377124.72
377124.73
377124.73
106705.46
106705.46
106705.47
106705.46
106705.46
106705.47
106705.46
106705.46
106705.47
106705.46
106705.46
106705.47
43609.07
43609.07
43609.08
43609.07
43609.07
43609.08
43609.08
43609.08
43609.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
430336.93
430336.93
430336.94
430336.93
430336.93
430336.94
518294.53
518294.54
518294.54
518294.53
518294.54
518294.54
518294.53
518294.54
518294.54
518294.53
518294.54
518294.54
377124.72
377124.73
377124.73
377124.72
377124.73
377124.73
377124.72
377124.73
377124.73
377124.72
377124.73
377124.73
106705.46
106705.46
106705.47
106705.46
106705.46
106705.47
106705.46
106705.46
106705.47
106705.46
106705.46
106705.47
43609.07
43609.07
43609.08
43609.07
43609.07
43609.08
43609.08
43609.08
43609.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8250000Total Commitment in Third Quarter of 2014
International Development Association6750000Total Commitment in Third Quarter of 2014
International Development Association500000Total Disbursement in Fourth Quarter of 2015
International Development Association200000Total Disbursement in Second Quarter of 2016
International Development Association78033Total Disbursement in Third Quarter of 2016
International Development Association500000Total Disbursement in Third Quarter of 2016
International Development Association750000Total Disbursement in Third Quarter of 2016
International Development Association172964Total Disbursement in Fourth Quarter of 2016
International Development Association339674Total Disbursement in First Quarter of 2017
International Development Association158111Total Disbursement in Second Quarter of 2017
International Development Association170469Total Disbursement in Fourth Quarter of 2017
International Development Association496800Total Disbursement in Fourth Quarter of 2017
International Development Association819371Total Disbursement in Second Quarter of 2018
International Development Association1594463Total Disbursement in Second Quarter of 2018
International Development Association850463Total Disbursement in Third Quarter of 2018
International Development Association257373Total Disbursement in Third Quarter of 2018
International Development Association616086Total Disbursement in Fourth Quarter of 2018
International Development Association700001Total Disbursement in Fourth Quarter of 2018
International Development Association155148Total Disbursement in Fourth Quarter of 2018
International Development Association-2791840Total Commitment Cancellations in First Quarter of 2019
International Development Association284733Total Disbursement in First Quarter of 2019
International Development Association420303Total Disbursement in First Quarter of 2019
International Development Association814803Total Disbursement in First Quarter of 2019
International Development Association-3882Total Interest Repayment in First Quarter of 2019
International Development Association808408Total Disbursement in Second Quarter of 2019
International Development Association27000Total Disbursement in Third Quarter of 2019
International Development Association200000Total Disbursement in Third Quarter of 2019
International Development Association-15203Total Interest Repayment in Third Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :4.01 Additional Events of Suspension | Description :The Additional Events of Suspension consist of thefollowing, namely, that ARIss Legislation has been amended, suspended, abrogated, repealed or waived so as to affect materiallyand adversely the ability of ARIS to perform any of its obligations under the Project Agreement. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I.A.1. Project Operational Manual | Description :The Recipient, through the APIU, shall andshall cause ARIS to implement, respective parts of the Project in accordance with the provisions of the Project Operational Manual.| Frequency :Yearly
Finance Agreement :Schedule 2, Section I.A.5. Disbursement Specialist | Description :The Recipient shall ensure that within sixty(60) days of the Effective Date, APIU and ARIS each retain the services of a disbursement specialist for the Project. | Frequency:Yearly
Finance Agreement :Schedule 2, Section I.B.1. Proceeds of the Financing | Description :To facilitate the carrying out of PartsI.A(iii) and (v), Part I.C(iv), Part II.A(i), Part II.B(ii) and (iv), and Part III(ii) of the Project by ARIS, the Recipient shallmake part of the proceeds of the Financing available to ARIS under a subsidiary agreement between the Recipient and ARIS, underterms and conditions agreed by the Association (“Subsidiary Agreement”). | Frequency :Yearly
Finance Agreement :Schedule 2, Section I.B.2. Exercise of the Rights | Description :The Recipient shall exercise its rights underthe Subsidiary Agreement in such manner as to protect the interests of the Recipient and the Association and to accomplish thepurposes of the Financing. Except as the Association shall otherwise agree, the Recipientshall not assign, amend, abrogate orwaive the Subsidiary Agreement or any of its provisions. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I.D.1. Sub-Grants | Description :The Recipient shall cause ARIS to make available Sub-Grantsto Beneficiaries and to carry out the Graduate Incentive Program under Parts I.A(v), I.C(iv), Part II.A(i), and Part II.B(ii) and(iv) of the Project in accordance with eligibility criteria and procedures set forth in the Project Operational Manual andacceptable to the Association. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I.D.2. Sub-Grants | Description :The Recipient shall ensure that said Sub-Grants are madeavailable to Beneficiaries by ARIS through Sub-Grant Agreements executed by ARIS and each Beneficiary on terms and conditionsacceptable to the Association, including those referred to in Section I.D.3 of Schedule 2. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I.D.3. Sub-Grants | Description :The Recipient shall ensure that the terms and conditions ofSub-Grant Agreements provide ARIS the right to: suspend or terminate the right of the Beneficiary as stated Section I.D.3 (a), andrequire each Beneficiary to carry out the statements referred to in Section I.D.3 (b)(i)-(vii) of Schedule 2. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I.D.4. Sub-Grants | Description :For PUU Sub-Grants implemented pursuant to Part I.A.(v),the Recipient shall ensure ARIS requires that any PUU receiving a PUU Sub-Grant has: (a) a community-based pasture management planapproved by its Aiyl Kenesh after approval by the Pasture Department; and (b) agreed in the Sub-Grant Agreement to contribute aminimum of 25% of the total value of the micro-project, including 5% in cash. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I.D.5. Sub-Grants | Description :For PUU Sub-Grants implemented pursuant to Part I.C.(iv) ofthe Project, the Recipient shall ensure that ARIS requires that: (a) noSub-Grant exceeds the equivalent of $10,000; and (b) any PUUreceiving a PUU Sub-Grant has done statements referred in Section I.D.5.(b)(i)-(iii). | Frequency :Yearly
Finance Agreement :Schedule 2, Section I.D.7. Sub-Grants | Description :For Private Veterinarians Sub-Grants implemented pursuantto Part II.B.(ii) of the Project, the Recipient shall ensure that ARIS requires that: (a) no Sub-Grant exceeds the equivalent of$1,500; and (b) Beneficiaries receiving a Private Veterinarians Sub-Grant statements referred in Section I.D.7.(b) (i)-(iv). |Frequency :Yearly
Finance Agreement :Schedule 2, Section I.D.6. Sub-Grants | Description :For PUU Sub-Grants implemented pursuant to Part II.A.(i) ofthe Project, the Recipient shall ensure that ARIS requires that: (a) noSub-Grant exceeds the equivalent of $1,400; and (b) the PUUSub-Grant is used only for contracting the services of private veterinarians selected by the PUU. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I.D.9. Sub-Grants | Description :The Recipient shall ensure that ARIS exercises its rightsunder each Sub-Grant Agreement in such manner as to protect the interestsof the Recipient and the Association and to accomplish thepurposes of the Financing. Except as the Association shall otherwise agree, the Recipient shall ensure that ARIS does not assign,amend, abrogate or waive any Sub-Grant Agreement or any of its provisions. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I.E.1. and 2. Safeguards | Description :The Recipient, through the APIU, shall and shallcause ARIS to carry out respective parts of the Project in accordance with the provisions of the Pest Management Framework andEnvironmental and Social Management Plan. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I.E.3. Safeguards | Description :The Recipient shall ensure that ARIS, prior to thecommencement of any works through Sub-Grants provided under Part I.A(v), Part I.C(iv), Part II.A(i), and Part II.B(ii) of theProject, prepares a Site-Specific ESMP in accordance with the PMF, ESMP, and the Project Operational Manual. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I.E.4. Safeguards | Description :The Recipient shall not undertake any Project activitiesthat involve involuntary land acquisition or resettlement of people or loss of assets or income. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I.E.6. Safeguards | Description :The Recipient shall ensure that prior to carrying outpasture boundary demarcation activities, it has established guidelines for public disclosure of complaints, dispute resolution, andmonitoring of dispute resolution mechanisms. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I.E.5. Safeguards | Description :The Recipient shall cause ARIS, prior to approval of anyPUU Sub-grants which involve temporary or permanent acquisition of privately-owned land, to require the respective PUU to providesatisfactory evidence that: (i) the terms of land acquisition have been properly negotiated with the land owner, and (ii) adequatecontractual arrangements have been entered into between the parties. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I.D.8. Sub-Grants | Description :For the Graduate Incentive Program implemented pursuant toPart II.B.(iv) of the Project, the Recipient shall ensure that ARIS provides no more than the equivalent of one thousand Dollars($1,000) in veterinary equipment and medicine to each veterinary graduate. | Frequency :Yearly
Intermediate Results Indicator
Number of Community Pasture Management Plans prepared by PUUs and approved by the Project.
Intermediate Results Indicator
Number of Animal Health and Husbandry Plans prepared by PUUs and approved by the Project.
Intermediate Results Indicator
Number of new PUU microprojects implemented in accordance with the microproject framework agreements with ARIS.
Intermediate Results Indicator
Number of private vets trained
Intermediate Results Indicator
Client days of training provided (number)
Intermediate Results Indicator
Client days of training provided - Female (number)
Intermediate Results Indicator
Direct project beneficiaries
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
Targeted clients satisfied with agricultural services (percentage)
Intermediate Results Indicator
Targeted clients satisfied with agricultural services - male
Intermediate Results Indicator
Targeted clients satisfied with agricultural services - female
PDO Indicator
Number of Community Pasture Management Plans implemented satisfactorily based on Project PUU performance criteria.
PDO Indicator
Number of Animal Health and Husbandry Plans implemented satisfactorily based on based on Project PUU performance criteria.
PDO Indicator
Area of utilizable pastures increased
PDO Indicator
Percentage of pasture users satisfied with the management of pastures by PUUs
PDO Indicator
Percentage of pasture users satisfied with the quality of services provided by Private Vets
44000-P088671
World Bank
Water Management Improvement Project (WMIP)
International Development Association
MIN OF AGRICULTURE, WATER RESOURCES AND PROCESSING INDUSTRY
International Development Association
MIN OF AGRICULTURE, WATER RESOURCES AND PROCESSING INDUSTRYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Pieter David Meerbach
+1-202-473-1000dmeerbach@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Osh Oblasty
40.0000 73.0000
Batken Oblasty
39.8330 71.0000
Talas Oblasty
42.3330 72.0000
Naryn Oblasty
41.4330 75.9670
Issyk-Kul'skaya Oblast'
42.0000 78.0000
Jalal-Abad Oblasty
41.5000 72.5000
Chuy Oblasty
42.4170 74.5000
Central Government (Central Agencies)Irrigation and DrainageFinance for DevelopmentPublic AdministrationWater Institutions, Policies and ReformRural Infrastructure and service deliveryRural DevelopmentSocial InclusionAgriculture FinanceParticipation and Civic EngagementWater Resource ManagementRural MarketsAdministrative and Civil Service Reform
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23989.90
23989.90
23989.89
47979.79
47979.79
47979.81
71969.70
71969.70
71969.70
143939.39
143939.39
143939.39
191919.19
191919.19
191919.20
239898.99
239898.99
239898.98
359848.48
359848.48
359848.48
359848.48
359848.48
359848.48
383838.39
383838.39
383838.37
479797.98
479797.98
479797.99
479797.98
479797.98
479797.99
599747.48
599747.48
599747.47
599747.48
599747.48
599747.47
479797.98
479797.98
479797.99
479797.98
479797.98
479797.99
383838.39
383838.39
383838.37
287878.79
287878.79
287878.79
239898.99
239898.99
239898.98
191919.19
191919.19
191919.20
143939.39
143939.39
143939.39
95959.60
95959.60
95959.59
47979.79
47979.79
47979.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250000.00
250000.00
0.00
0.00
0.00
37055.15
37055.15
37055.14
10151.58
10151.58
10151.58
11951.14
11951.14
11951.15
6390.29
6390.29
6390.29
18882.45
18882.45
18882.45
111164.88
111164.89
111164.89
88226.05
88226.06
88226.06
247893.01
247893.02
247893.02
126458.33
126458.33
126458.34
244809.66
244809.66
244809.67
494098.62
494098.63
494098.63
282575.66
282575.66
282575.67
306092.97
306092.97
306092.97
321120.93
321120.93
321120.94
242498.29
242498.29
242498.29
175207.09
175207.10
175207.10
279880.38
279880.38
279880.39
333333.33
333333.33
333333.34
533333.33
533333.33
533333.34
533333.33
533333.33
533333.34
333333.33
333333.33
333333.34
266666.66
266666.67
266666.67
500000.00
500000.00
500000.00
466666.66
466666.67
466666.67
195543.46
195543.47
195543.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19000000Total Commitment in First Quarter of 2006
International Development Association500000Total Disbursement in Third Quarter of 2006
International Development Association52604Total Disbursement in First Quarter of 2007
International Development Association63569Total Disbursement in First Quarter of 2007
International Development Association30455Total Disbursement in Second Quarter of 2007
International Development Association35853Total Disbursement in Third Quarter of 2007
International Development Association19171Total Disbursement in Fourth Quarter of 2007
International Development Association56647Total Disbursement in First Quarter of 2008
International Development Association333495Total Disbursement in Second Quarter of 2008
International Development Association101883Total Disbursement in Third Quarter of 2008
International Development Association162795Total Disbursement in Third Quarter of 2008
International Development Association147555Total Disbursement in Fourth Quarter of 2008
International Development Association293589Total Disbursement in Fourth Quarter of 2008
International Development Association302534Total Disbursement in Fourth Quarter of 2008
International Development Association80664Total Disbursement in First Quarter of 2009
International Development Association137745Total Disbursement in First Quarter of 2009
International Development Association160966Total Disbursement in First Quarter of 2009
International Development Association140510Total Disbursement in Second Quarter of 2009
International Development Association286783Total Disbursement in Second Quarter of 2009
International Development Association307137Total Disbursement in Second Quarter of 2009
International Development Association415780Total Disbursement in Third Quarter of 2009
International Development Association436248Total Disbursement in Third Quarter of 2009
International Development Association630268Total Disbursement in Third Quarter of 2009
International Development Association92119Total Disbursement in Fourth Quarter of 2009
International Development Association198530Total Disbursement in Fourth Quarter of 2009
International Development Association557077Total Disbursement in Fourth Quarter of 2009
International Development Association241144Total Disbursement in First Quarter of 2010
International Development Association315953Total Disbursement in First Quarter of 2010
International Development Association361182Total Disbursement in First Quarter of 2010
International Development Association104892Total Disbursement in Second Quarter of 2010
International Development Association858471Total Disbursement in Second Quarter of 2010
International Development Association129572Total Disbursement in Third Quarter of 2010
International Development Association270537Total Disbursement in Third Quarter of 2010
International Development Association327386Total Disbursement in Third Quarter of 2010
International Development Association64888Total Disbursement in Fourth Quarter of 2010
International Development Association226298Total Disbursement in Fourth Quarter of 2010
International Development Association234436Total Disbursement in Fourth Quarter of 2010
International Development Association78896Total Disbursement in First Quarter of 2011
International Development Association261447Total Disbursement in First Quarter of 2011
International Development Association499299Total Disbursement in First Quarter of 2011
International Development Association442644Total Disbursement in Second Quarter of 2011
International Development Association483555Total Disbursement in Second Quarter of 2011
International Development Association150895Total Disbursement in Third Quarter of 2011
International Development Association648768Total Disbursement in Third Quarter of 2011
International Development Association114761Total Disbursement in Fourth Quarter of 2011
International Development Association463805Total Disbursement in Fourth Quarter of 2011
International Development Association492490Total Disbursement in Fourth Quarter of 2011
International Development Association248766Total Disbursement in First Quarter of 2012
International Development Association362047Total Disbursement in First Quarter of 2012
International Development Association462524Total Disbursement in First Quarter of 2012
International Development Association320469Total Disbursement in Second Quarter of 2012
International Development Association437691Total Disbursement in Second Quarter of 2012
International Development Association510195Total Disbursement in Second Quarter of 2012
International Development Association228430Total Disbursement in Third Quarter of 2012
International Development Association318629Total Disbursement in Third Quarter of 2012
International Development Association812333Total Disbursement in Third Quarter of 2012
International Development Association241615Total Disbursement in Fourth Quarter of 2012
International Development Association451635Total Disbursement in Fourth Quarter of 2012
International Development Association710414Total Disbursement in Fourth Quarter of 2012
International Development Association55177Total Disbursement in First Quarter of 2013
International Development Association444817Total Disbursement in First Quarter of 2013
International Development Association329030Total Disbursement in Second Quarter of 2013
International Development Association344086Total Disbursement in Second Quarter of 2013
International Development Association-10106Total Commitment Cancellations in Third Quarter of 2013
International Development Association165197Total Disbursement in Third Quarter of 2013
International Development Association224746Total Disbursement in Third Quarter of 2013
International Development Association316391Total Disbursement in Third Quarter of 2013
International Development Association136809Total Disbursement in Fourth Quarter of 2013
International Development Association230742Total Disbursement in Fourth Quarter of 2013
International Development Association641442Total Disbursement in Fourth Quarter of 2013
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportGrant or Trust Fund AgreementContract AwardsProject URLProcurement Notices
The Recipient, through DWR, shall prepare and furnish to IDA for its prior review and approval, a design report for each off-farmirrigation system or irrigation dam.
The Recipient shall maintain the National Water Council (NWC) which will provide policy guidance and oversight of the activitiesunder Part B of the Project.
The Recipient, through DWR, shall maintain, throughout the Project execution, the WUA SUs established under the IDA's On-FarmIrrigation Project.
Conducive legislation concerning water resources management and setting of irrigation fees shall be in place.
Intermediate Results Indicator
System readiness to supply the requested volumes of water at WUA offtakes (number of systems)
3 schemes to be completed by November 2013.
Intermediate Results Indicator
Number of WUA Federations which have prepared business plans, taken ownership of maintenance equipment and machinery with effectiveoperation.
Intermediate Results Indicator
No. of WUA federations which have signed an agreement with the RDWR on the transfer of MOM responsibility for off-farm systems.
Intermediate Results Indicator
Disbursement Rate - percentage of approved budget
Project is projected to fully disburse.
Intermediate Results Indicator
Government resolution on the temporary delegation of SWA authority to the DWR.
Intermediate Results Indicator
Pilot RBCs established and functioning, and basin plans prepared.
Intermediate Results Indicator
Ownership and MOM of minor irrigation schemes transferred to WUAs and WUAFs.
Intermediate Results Indicator
Number of farmers trained and applying knowledge of improved water management techniques.
No indications yet of farmers applying improved techniques.
Intermediate Results Indicator
SWA functions, staffing and budgets prepared and submitted to Ministry of Finance.
Approval of SWA staffing and budgets by gov't will be addressed under the follow-up NWRMP-1.
Intermediate Results Indicator
Project management capacity in implementing agency enhanced and project implemention schedule adhered to
Intermediate Results Indicator
National Water Strategy prepared and submitted to the NWC.
National Water Strategy has been revised and will be submitted to the NWC.
Intermediate Results Indicator
MOM plans prepared and operational
Implementation of MOM plans for 6 pilot schemes will be supported under the NWRMP-1.
Intermediate Results Indicator
Procedures for accounting and assessing performance at scheme level identified, tested and accepted by DWR.
Procedures are being applied but have not been formally accepted by the DWRLI.
Intermediate Results Indicator
Roadmap for implementation of the Water Code prepared, submitted to NWC and approved
PDO Indicator
Increase in crop production by at least 10 percent within four years after rehabilitation of the project schemes.
Survey results of 19 WUAs (of which 6 rehabilitated under OIP-1 or OIP-2) in the command area of 6 off-farm schemes rehabilitatedunder the WMIP in 2010, show that irrigated area increased from 18267 to 18345 ha (0.5%). Yield per ha changes are less evident,with significant increase (80%) in fodder crops, and decrease in cotton (5%) and vegetables (22%). Most notable change is adecrease in the area of winter wheat (-15%) to an increase towards more intensive irrigated crops. Therefore, preliminary resultsare mildly positive, but further analysis for the ICRR will provide clarity,
PDO Indicator
Area provided with irrigation and drainage services (ha)
According to design documentation
3 schemes with additional 9,000 ha to be completed by end November 2013.
PDO Indicator
Area provided with irrigation and drainage services - Improved (ha)
According to design documentation
3 schemes with additional 9,000 ha to be completed by end November 2013.
PDO Indicator
Evidence of high satisfaction rates among water users with the performance of the bulk water supply agency (DWR)
At least 80% of users satisfied
Survey results of 19 WUAs in the command area of 6 schemes rehabilitated in 2010, show that prior to rehabilitation, 68% weresatisfied, and following rehabilitation, 84% of water users were satisfied with bulk water supply,
PDO Indicator
Institutional structure for IWRM established and functioning with approved National Water Strategy and river basin plans.
In consultation with the task team there was consensus that the Roadmap for development of the water sector is for the momentpreferable over a National Water Strategy, compiled on the basis of an incomplete database.
PDO Indicator
Collection rates at least 90 percent of agreed tariff (based on annual O&M plan) within two years after completion of the project schemes rehabilitation works
Survey results of 19 WUAs (6 rehabilitated, 13 not rehabilitated) in the command area of 6 off-farm schemes rehabilitated in 2010,show that collection by the DWRLI of the agreed ISF increased from 74% before rehabilitation to 89% after rehabilitation. However,ISF-level are not set at levels sufficient for adequate O&M according to annual O&M plan. Partially achieved.
PDO Indicator
At least 80 percent of the project schemes judged to be properly operated and maintained following completion of rehabilitation works.
15 schemes completed, 3 schemes to be completed by end November 2013. Survey results of 19 WUAs in the command area of 6 schemesrehabilitated in 2010, show that water supply increased from 115 to 129 MCM per year, indicating that they are properly operated.However, expenditures on maintenance for 4 pilot schemes show that they are around 25% of what is required. Since no improvementsto maintenance procedures were achieved under Component 2, currently it is expected that none of the rehabilitated schemes will beproperly maintained.
PDO Indicator
Number of WUAs receiving water at the requested level in each period of delivery each year.
Additional 4 WUAs will receive once all schemes completed by November 2013. Survey results of 19 WUAs in the command area of 6schemes rehabilitated in 2010, show that 10% have unsatisfactory supply following rehabilitation.
PDO Indicator
Operational water user associations created and/or strengthened (number)
58 WUAs in rehabilitated irrigation schemes.
8 WUAs in 3 schemes remaining to complete rehabilitation.
PDO Indicator
Water users provided with new/improved irrigation and drainage services (number)
Water users and their household members
12000 users in 3 schemes remaining to complete rehabilitation.
PDO Indicator
Water users provided with irrigation and drainage services - female (number)
12 % of total number of water users
44000-P084977
World Bank
Health & Social Protection Project
International Development Association
MINISTRY OF HEALTH
International Development Association
MINISTRY OF HEALTHPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Susanna Hayrapetyan
+1-202-473-1000shayrapetyan@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Osh Oblasty
40.0000 73.0000
Batken
39.8330 71.0000
Osh
40.5280 72.7990
Naryn
41.4330 75.9670
Jalal-Abad
40.9330 73.0000
Gorod Bishkek
42.8670 74.6000
Chuyskaya Oblast’
42.4170 74.5000
Talas
42.7600 71.4130
Ysyk-Köl
42.6010 78.1500
Social ProtectionPublic Administration - HealthHealthCentral Government (Central Agencies)Disease ControlSocial ProtectionHIV/AIDSChild HealthSocial Safety NetsHealth Systems and PoliciesTuberculosisHealth System Strengthening
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
233333.33
233333.33
233333.34
233333.33
233333.33
233333.34
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
666666.66
666666.67
666666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
567266.66
567266.67
567266.67
528000.00
528000.00
528000.00
0.00
0.00
0.00
612873.33
612873.33
612873.34
500000.00
500000.00
500000.00
51601.66
51601.67
51601.67
208500.00
208500.00
208500.00
913333.33
913333.33
913333.34
298000.00
298000.00
298000.00
820166.66
820166.67
820166.67
420000.00
420000.00
420000.00
36333.33
36333.33
36333.34
166666.66
166666.67
166666.67
573666.66
573666.67
573666.67
0.00
0.00
0.00
0.00
0.00
0.00
493065.00
493065.00
493065.00
85703.45
85703.45
85703.46
19900.00
19900.00
19900.00
145600.00
145600.00
145600.00
31089.33
31089.33
31089.34
2350433.33
2350433.33
2350433.34
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
1344467.21
1344467.21
1344467.22
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
833333.33
833333.33
833333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15000000Total Commitment in Fourth Quarter of 2005
International Development Association2000000Total Disbursement in Third Quarter of 2006
International Development Association728800Total Disbursement in Third Quarter of 2007
International Development Association973000Total Disbursement in Third Quarter of 2007
International Development Association710500Total Disbursement in Fourth Quarter of 2007
International Development Association873500Total Disbursement in Fourth Quarter of 2007
International Development Association510560Total Disbursement in Second Quarter of 2008
International Development Association1328060Total Disbursement in Second Quarter of 2008
International Development Association6000000Total Commitment in Second Quarter of 2008
International Development Association1500000Total Disbursement in Third Quarter of 2008
International Development Association154805Total Disbursement in Fourth Quarter of 2008
International Development Association625500Total Disbursement in First Quarter of 2009
International Development Association2280000Total Disbursement in Second Quarter of 2009
International Development Association460000Total Disbursement in Second Quarter of 2009
International Development Association894000Total Disbursement in Third Quarter of 2009
International Development Association870000Total Disbursement in Fourth Quarter of 2009
International Development Association1590500Total Disbursement in Fourth Quarter of 2009
International Development Association1260000Total Disbursement in First Quarter of 2010
International Development Association109000Total Disbursement in Second Quarter of 2010
International Development Association500000Total Disbursement in Third Quarter of 2010
International Development Association1508000Total Disbursement in Fourth Quarter of 2010
International Development Association213000Total Disbursement in Fourth Quarter of 2010
International Development Association13200000Total Commitment in Second Quarter of 2011
International Development Association10800000Total Commitment in Second Quarter of 2011
International Development Association1307000Total Disbursement in Third Quarter of 2011
International Development Association172195Total Disbursement in Third Quarter of 2011
International Development Association160000Total Disbursement in Fourth Quarter of 2011
International Development Association97110Total Disbursement in Fourth Quarter of 2011
International Development Association59700Total Disbursement in First Quarter of 2012
International Development Association436800Total Disbursement in Second Quarter of 2012
International Development Association14000Total Disbursement in Third Quarter of 2012
International Development Association79268Total Disbursement in Third Quarter of 2012
International Development Association7051300Total Disbursement in Fourth Quarter of 2012
International Development Association400000Total Disbursement in Second Quarter of 2013
International Development Association80000Total Disbursement in Second Quarter of 2013
International Development Association234954Total Disbursement in Second Quarter of 2013
International Development Association400000Total Disbursement in Second Quarter of 2013
International Development Association3054549Total Disbursement in Second Quarter of 2013
International Development Association104000Total Disbursement in Third Quarter of 2013
International Development Association-755Total Interest Repayment in Third Quarter of 2013
International Development Association5200000Total Disbursement in Fourth Quarter of 2013
International Development Association150000Total Disbursement in First Quarter of 2014
International Development Association-9651Total Interest Repayment in First Quarter of 2014
International Development Association3894160Total Disbursement in Third Quarter of 2014
International Development Association-22015Total Interest Repayment in Third Quarter of 2014
International Development Association22000Total Disbursement in Fourth Quarter of 2014
International Development Association-33561Total Interest Repayment in First Quarter of 2015
International Development Association2782739Total Disbursement in Second Quarter of 2015
International Development Association-41391Total Interest Repayment in Third Quarter of 2015
International Development Association-43906Total Interest Repayment in First Quarter of 2016
International Development Association-44335Total Interest Repayment in Third Quarter of 2016
International Development Association-42203Total Interest Repayment in First Quarter of 2017
International Development Association-43866Total Interest Repayment in Third Quarter of 2017
International Development Association-45345Total Interest Repayment in First Quarter of 2018
International Development Association-44931Total Interest Repayment in Third Quarter of 2018
International Development Association-43438Total Interest Repayment in First Quarter of 2019
International Development Association-43530Total Interest Repayment in Third Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementGrant or Trust Fund AgreementGrant or Trust Fund AgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :SCHEDULE 4 3(a) | Description :Submit to the Bank an APW and amounts of transfers for this APW | Due Date:15-Aug-2006
Finance Agreement :SCHEDULE 4, 3(b) | Description :provide to the Association for its review, a report on the progress achieved inthe carrying out of the Project. | Due Date :15-Apr-2006
Finance Agreement :SCHEDULE 4, 6 | Description :Recipient through MoEF to approve financing for the health sector in the amountsagreed at annual sector review meeting held in Mayof each year | Due Date :23-Apr-2007
Finance Agreement :SCHEDULE 4, 9 | Description :Recipient to establish internal audit function including appointment of staff withToR acceptable to the Bank | Due Date :01-Apr-2006
Finance Agreement :SCHEDULE 4, 7 | Description :Submit to the Bank an APW for the next budget year and an updated Procurement Planfor its prior review and approval | Due Date :12-Oct-2009
Finance Agreement :SCHEDULE 2, Section II B | Description :Strengthen the Internal audit unites in MoH and MHIF through theprovision of technical assistance and maintain throughout project implementation, staffing levels adequate to ensure continuousrisk-based internal audit function consistent with recommendations of the international internal audit consultants. | Due Date:31-Dec-2011
Intermediate Results Indicator
Health personnel receiving training (number)
Intermediate Results Indicator
Health facilities constructed, renovated, and/or equipped (number)
Intermediate Results Indicator
Percent of adults and children with HIV receiving antiretroviral combination therapy
Intermediate Results Indicator
Increased percentage of pregnant women living with HIV who received antiretroviral (ARV) to reduce the risk of MTCT
Intermediate Results Indicator
Percent of population not seeking care when needed due to geographic and financial reasons
Intermediate Results Indicator
Improved fiduciary performance in measured by timely submission of financial statements and audits
Intermediate Results Indicator
Decreased percent of out-of-pocket health expenditures as a share of total household consumptionin two poorest quintiles
Intermediate Results Indicator
Increased percent of anemic pregnant women who are prescribed and receive iron-containing tablets
Intermediate Results Indicator
Automated management information system (national beneficiary database) designed, effectively implemented, and providing timely andaccurate data to analyze, design and monitor social policy
Intermediate Results Indicator
Reduced turn-around time for registering families for potential eligibility under the UMB program
Intermediate Results Indicator
Government spending on non-salary recurrent costs as a percentage of GDP
Intermediate Results Indicator
Immunization coverage by age 2+ with basic vaccines
Intermediate Results Indicator
Pilot community based mental health to contribute to strengthening social cohesion
Intermediate Results Indicator
Establish unified perinatal Center for all communities in the 3 south oblasts to increase efficiency and social reconcilation
Intermediate Results Indicator
Maintain or increase in total coverage of the UMB program
PDO Indicator
Decreased percent of anemic pregnant women
PDO Indicator
Maintain or increase total spending on the UMB as a share of the poverty gap
PDO Indicator
Health statistics show improvements on overall health status
PDO Indicator
Nutritional status measured a) as a percentage of anemic children age 6-24 by nutritional supplement; and b) children under 5 with Vitamin A defficiency improved
44000-P123044
World Bank
Emergency Recovery Project
International Development Association
MINISTRY OF FINANCE
International Development Association
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Evgenij Najdov
+1-202-473-1000enajdov@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Osh Oblasty
40.0000 73.0000
Osh
40.5280 72.7990
Jalal-Abad
40.9330 73.0000
Bishkek
42.8700 74.5900
Toktogul
41.8740 72.9420
Other Energy and ExtractivesOther TransportationOil and GasFiscal sustainabilityMacroeconomic ResilienceSocial Insurance and PensionsConflict PreventionMonetary and Credit PoliciesTax policyUrban Infrastructure and Service DeliveryPublic Expenditure PolicyExternal FinanceFragility, Conflict and ViolenceFiscal PolicyPost-conflict reconstructionSocial ProtectionUrban DevelopmentMacro-financial policies
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
38100000Total Commitment in Third Quarter of 2010
International Development Association31900000Total Commitment in Third Quarter of 2010
International Development Association15743173Total Disbursement in Fourth Quarter of 2010
International Development Association13093332Total Disbursement in Fourth Quarter of 2010
International Development Association1000000Total Disbursement in First Quarter of 2011
International Development Association-22410Total Interest Repayment in First Quarter of 2011
International Development Association1000000Total Disbursement in First Quarter of 2011
International Development Association-61874Total Interest Repayment in Third Quarter of 2011
International Development Association1612699Total Disbursement in Third Quarter of 2011
International Development Association692131Total Disbursement in Fourth Quarter of 2011
International Development Association2863506Total Disbursement in Fourth Quarter of 2011
International Development Association2992201Total Disbursement in Fourth Quarter of 2011
International Development Association6000000Total Disbursement in First Quarter of 2012
International Development Association-60584Total Interest Repayment in First Quarter of 2012
International Development Association1867825Total Disbursement in First Quarter of 2012
International Development Association1903321Total Disbursement in First Quarter of 2012
International Development Association4278219Total Disbursement in Second Quarter of 2012
International Development Association1639437Total Disbursement in Second Quarter of 2012
International Development Association-82624Total Interest Repayment in Third Quarter of 2012
International Development Association1878124Total Disbursement in Fourth Quarter of 2012
International Development Association2996314Total Disbursement in Fourth Quarter of 2012
International Development Association-101596Total Interest Repayment in First Quarter of 2013
International Development Association6585997Total Disbursement in Second Quarter of 2013
International Development Association1021773Total Disbursement in Second Quarter of 2013
International Development Association1234180Total Disbursement in Second Quarter of 2013
International Development Association2342296Total Disbursement in Third Quarter of 2013
International Development Association-105926Total Interest Repayment in Third Quarter of 2013
International Development Association-1318789Total Commitment Cancellations in Fourth Quarter of 2013
International Development Association-234013Total Disbursement in First Quarter of 2014
International Development Association-141082Total Interest Repayment in First Quarter of 2014
International Development Association-234728Total Commitment Cancellations in Second Quarter of 2014
International Development Association-141280Total Interest Repayment in Third Quarter of 2014
International Development Association-130257Total Interest Repayment in First Quarter of 2015
International Development Association-127302Total Interest Repayment in Third Quarter of 2015
International Development Association-126020Total Interest Repayment in First Quarter of 2016
International Development Association-126965Total Interest Repayment in Third Quarter of 2016
International Development Association-123078Total Interest Repayment in First Quarter of 2017
International Development Association-124819Total Interest Repayment in Third Quarter of 2017
International Development Association-130558Total Interest Repayment in First Quarter of 2018
International Development Association-129509Total Interest Repayment in Third Quarter of 2018
International Development Association-125849Total Interest Repayment in First Quarter of 2019
International Development Association-127057Total Interest Repayment in Third Quarter of 2019
International Development AssociationImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Number of restored gas connections
Connections of both restored and new houses/ apartments are in progress.
Intermediate Results Indicator
Fuel supply for Osh CHP (tons)
OCHP received 9.2 th. tons of fuel oil in December 2011-May 2012.
Intermediate Results Indicator
Arrears for teacher and doctor salaries, pensions, social allowances (UMB and MSB)
No accumulated arrears.
PDO Indicator
Restore access to power supply in the cities of Jalalabad and Osh regions as measured by number of re-connected households
A total of 19000 connections were destroyed.
All consumers are connected to electric power network.
All consumers are connected to electric power network.
PDO Indicator
Ensure adequate budget financing for education, health and social allowances for the poor, measured as percent of GDP
PDO Indicator
Maintain the heat supply availability in Osh in 2010/11 and 2011/12 winters at levels equivalent to corresponding periods in 2009 as measured by percentage of available heat output
Heat supply from OCHP started on November 3, 2011 in 2011/ 2012 winter. Total 2011/2012 winter heat supply is 153% of 2009/2010winter.
44000-P110267
World Bank
Second Rural Water Supply & Sanitation
International Development Association
DEPARTMENT FOR RURAL WATER SUPPLY
International Development Association
DEPARTMENT FOR RURAL WATER SUPPLYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Pier Francesco Mantovani
+1-202-473-1000pmantovani@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Talas Oblasty
42.3330 72.0000
Naryn Oblasty
41.4330 75.9670
Issyk-Kul'skaya Oblast'
42.0000 78.0000
Ak-Kochkor
42.4240 78.2020
Chuy Oblasty
42.4170 74.5000
Jele Tobe
42.4500 78.1930
Public Administration - Water, Sanitation and Waste ManagementSanitationWater SupplyRural Infrastructure and service deliveryAgriculture FinanceRural DevelopmentRural MarketsFinance for Development
210000.00
210000.00
210000.00
195000.00
195000.00
195000.00
195000.00
195000.00
195000.00
195000.00
195000.00
195000.00
195000.00
195000.00
195000.00
205833.33
205833.33
205833.34
205833.33
205833.33
205833.34
205833.33
205833.33
205833.34
205833.33
205833.33
205833.34
195000.00
195000.00
195000.00
195000.00
195000.00
195000.00
195000.00
195000.00
195000.00
195000.00
195000.00
195000.00
167500.00
167500.00
167500.00
167500.00
167500.00
167500.00
167500.00
167500.00
167500.00
167500.00
167500.00
167500.00
17500.00
17500.00
17500.00
17500.00
17500.00
17500.00
17500.00
17500.00
17500.00
17500.00
17500.00
17500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
74229.78
74229.78
74229.78
74229.78
74229.78
74229.78
74229.78
74229.78
74229.78
74229.78
74229.78
74229.78
16256.52
16256.52
16256.52
16256.52
16256.52
16256.52
16256.52
16256.52
16256.52
16256.52
16256.52
16256.44
159012.97
159012.97
159012.97
159012.97
159012.97
159012.97
159012.97
159012.97
159012.97
159012.97
159012.97
159013.03
302883.10
302883.10
302883.10
302883.10
302883.10
302883.10
302883.10
302883.10
302883.10
302883.10
302883.10
302883.13
194607.05
194607.05
194607.05
194607.05
194607.05
194607.05
194607.05
194607.05
194607.05
194607.05
194607.05
194607.01
86335.53
86335.53
86335.53
86335.53
86335.53
86335.53
86335.53
86335.53
86335.53
86335.53
86335.53
86335.53
5500000Total Commitment in Second Quarter of 2009
International Development Association4500000Total Commitment in Second Quarter of 2009
International Development Association300000Total Disbursement in Third Quarter of 2009
International Development Association82790Total Disbursement in Third Quarter of 2009
International Development Association247123Total Disbursement in Third Quarter of 2009
International Development Association49050Total Disbursement in Fourth Quarter of 2009
International Development Association-455Total Interest Repayment in Fourth Quarter of 2009
International Development Association107010Total Disbursement in Fourth Quarter of 2009
International Development Association63139Total Disbursement in First Quarter of 2010
International Development Association110952Total Disbursement in First Quarter of 2010
International Development Association-1209Total Interest Repayment in Second Quarter of 2010
International Development Association103533Total Disbursement in Third Quarter of 2010
International Development Association-1268Total Interest Repayment in Fourth Quarter of 2010
International Development Association41963Total Disbursement in Fourth Quarter of 2010
International Development Association60259Total Disbursement in Fourth Quarter of 2010
International Development Association-260784Total Disbursement in Second Quarter of 2011
International Development Association-1345Total Interest Repayment in Second Quarter of 2011
International Development Association57506Total Disbursement in Third Quarter of 2011
International Development Association64691Total Disbursement in Third Quarter of 2011
International Development Association-19318Total Disbursement in Third Quarter of 2011
International Development Association154563Total Disbursement in Third Quarter of 2011
International Development Association61537Total Disbursement in Fourth Quarter of 2011
International Development Association74459Total Disbursement in Fourth Quarter of 2011
International Development Association138800Total Disbursement in Fourth Quarter of 2011
International Development Association-691Total Interest Repayment in Fourth Quarter of 2011
International Development Association16516Total Disbursement in Fourth Quarter of 2011
International Development Association270000Total Disbursement in Fourth Quarter of 2011
International Development Association103874Total Disbursement in First Quarter of 2012
International Development Association178873Total Disbursement in First Quarter of 2012
International Development Association337013Total Disbursement in First Quarter of 2012
International Development Association244075Total Disbursement in First Quarter of 2012
International Development Association90930Total Disbursement in Second Quarter of 2012
International Development Association284427Total Disbursement in Second Quarter of 2012
International Development Association-2908Total Interest Repayment in Second Quarter of 2012
International Development Association229127Total Disbursement in Second Quarter of 2012
International Development Association207191Total Disbursement in Third Quarter of 2012
International Development Association268360Total Disbursement in Third Quarter of 2012
International Development Association297194Total Disbursement in Third Quarter of 2012
International Development Association18000Total Disbursement in Third Quarter of 2012
International Development Association116936Total Disbursement in Third Quarter of 2012
International Development Association253990Total Disbursement in Third Quarter of 2012
International Development Association120564Total Disbursement in Fourth Quarter of 2012
International Development Association280913Total Disbursement in Fourth Quarter of 2012
International Development Association558867Total Disbursement in Fourth Quarter of 2012
International Development Association-7364Total Interest Repayment in Fourth Quarter of 2012
International Development Association232551Total Disbursement in Fourth Quarter of 2012
International Development Association401712Total Disbursement in Fourth Quarter of 2012
International Development Association113826Total Disbursement in First Quarter of 2013
International Development Association133557Total Disbursement in First Quarter of 2013
International Development Association145084Total Disbursement in First Quarter of 2013
International Development Association218754Total Disbursement in First Quarter of 2013
International Development Association114574Total Disbursement in Second Quarter of 2013
International Development Association227697Total Disbursement in Second Quarter of 2013
International Development Association278983Total Disbursement in Second Quarter of 2013
International Development Association-12578Total Interest Repayment in Second Quarter of 2013
International Development Association-200000Total Disbursement in Second Quarter of 2013
International Development Association36013Total Disbursement in Second Quarter of 2013
International Development Association141646Total Disbursement in Third Quarter of 2013
International Development Association141841Total Disbursement in Third Quarter of 2013
International Development Association205598Total Disbursement in Third Quarter of 2013
International Development Association22169Total Disbursement in Third Quarter of 2013
International Development Association75144Total Disbursement in Third Quarter of 2013
International Development Association127717Total Disbursement in Third Quarter of 2013
International Development Association198977Total Disbursement in Fourth Quarter of 2013
International Development Association321415Total Disbursement in Fourth Quarter of 2013
International Development Association-16397Total Interest Repayment in Fourth Quarter of 2013
International Development Association84292Total Disbursement in Fourth Quarter of 2013
International Development Association90214Total Disbursement in First Quarter of 2014
International Development Association41656Total Disbursement in First Quarter of 2014
International Development Association105185Total Disbursement in Second Quarter of 2014
International Development Association200490Total Disbursement in Second Quarter of 2014
International Development Association-20162Total Interest Repayment in Second Quarter of 2014
International Development Association86742Total Disbursement in Second Quarter of 2014
International Development Association117279Total Disbursement in Second Quarter of 2014
International Development Association25217Total Disbursement in Third Quarter of 2014
International Development Association74521Total Disbursement in Third Quarter of 2014
International Development Association112748Total Disbursement in Third Quarter of 2014
International Development Association145186Total Disbursement in Third Quarter of 2014
International Development Association169244Total Disbursement in Third Quarter of 2014
International Development Association76721Total Disbursement in Fourth Quarter of 2014
International Development Association-20346Total Interest Repayment in Fourth Quarter of 2014
International Development Association28110Total Disbursement in Fourth Quarter of 2014
International Development Association929574Total Disbursement in Fourth Quarter of 2014
International Development Association-8581Total Commitment Cancellations in First Quarter of 2015
International Development Association-8554Total Disbursement in First Quarter of 2015
International Development Association-19535Total Interest Repayment in Second Quarter of 2015
International Development Association-20351Total Interest Repayment in Fourth Quarter of 2015
International Development Association-19861Total Interest Repayment in Second Quarter of 2016
International Development Association-19668Total Interest Repayment in Fourth Quarter of 2016
International Development Association-19232Total Interest Repayment in Second Quarter of 2017
International Development Association-20439Total Interest Repayment in Fourth Quarter of 2017
International Development Association-20352Total Interest Repayment in Second Quarter of 2018
International Development Association-19689Total Interest Repayment in Fourth Quarter of 2018
International Development Association-19698Total Interest Repayment in Second Quarter of 2019
International Development Association-52529Total Loan Repayment in Second Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementGrant or Trust Fund AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
ARIS to submit project audits for the year ended June
Intermediate Results Indicator
New piped household water connections that are resulting from the project intervention
Revised by setting the target at 2000.
Intermediate Results Indicator
Improved community water points constructed or rehabilitated under the project
Revised by setting the target at 226. No more water points are envisaged for the rest of the project.
Intermediate Results Indicator
Number of equipment procured for operation and maintenance of the schemes
Revised by reducing end target from 100 to 10 because due to the project limited budget, priority is given to completion of civilworks over purchase of equipment.
97 units of equipment will be provided to CDWUUs by the end of October (7 excavators, 30 tricycles, and 60 sets of maintenanceequipment)
Intermediate Results Indicator
Number of schools in the project area with a functioning water supply connection as a result of the project
Wording clarified.
Intermediate Results Indicator
Piped household water connections that are benefiting from rehabilitation works undertaken by the project
Revised by setting the target at 1000.
In completed 27 schemes. 8 more schemes are at the final stage of completion.
Intermediate Results Indicator
Number of schools with hand-washing facilities in use with soap and water available near latrines, in communities that participate in the project
Harmonized with intermediate outcome 009 (near latrines). Target set at 35 (taken from 009, instead of 100 because it is measuredin project areas).
Different types of hand-washing facilities are installed in 52 schools.
Intermediate Results Indicator
Improved latrines constructed under the project
10 toilets are being newly constructed and 8 - rehabilitated. In total 18 toilets will be improved by the end of the project.
Intermediate Results Indicator
People trained to improve hygiene behavior/sanitation practices under the proj
including 74% of females
Intermediate Results Indicator
People provided with access to “improved sanitation facilities”- rural
Revised by setting the target at 5000.
New construction/ reconstruction works are being completed in 18 schools. Total number of pupils in these schools is 9,151.Moreover, as a result of project interventions on campaigns on sanitation and hygiene, 2,178 households have already improved theirtoiletsat own cost (or 10.5% of total target population). Total number of people in 2,178 households is roughly 10,000 people.
Intermediate Results Indicator
People trained to improve hygiene behavior/sanitation practices - female
Intermediate Results Indicator
Number of CDWUU staff trained in fee collection and management of the water and sanitation schemes
Revised by specifying in the wording of the indicator that it is "staff" of CDWUUs and not CDWUUs that are being trained.
Intermediate Results Indicator
Number of CDWUUs service agreements signed
Intermediate Results Indicator
Percentage of CDWUUs supported by the project with a woman holding one of the three most senior positions
Revised by clarifying the wording: data is measured only in CDWUUs supported by the project. Accordingly, the target is alsoclarified and fixed at 45%.
Intermediate Results Indicator
Number of villages with information on water supply and sanitation included in the national database
the consultant is preparing a software part of the database and GIS interface
Intermediate Results Indicator
Number of water utilities that the project is supporting
In the case of RWSSP2 a utility is a CDWUU.
Intermediate Results Indicator
People provided with access to "improved sanitation facilities” under the proj.
Revised by setting the target at 5000.
New construction/ reconstruction works are being completed in 18 schools. Total number of pupils in these schools is9,151.Moreover, as a result of project interventions on campaigns on sanitation and hygiene, 2,178 households have improved theirtoilets at own cost (or 10.5% of total target population). Total number of people in 2,178 households is roughly 10,000 people.
Intermediate Results Indicator
Percentage of households in the service area of the rehabilitated schemes reporting distance to the nearest improved water source at 500/1000 meters or less
Moved from PDO, “35” is removed to allow flexibility on number of schemes.
Intermediate Results Indicator
Average tariff collection rate in villages served by the project
Baseline taken ahead of commencement of works
Intermediate Results Indicator
Reduction in incidence of waterborne illnesses [acute intestinal infections and hepatitis A] in communities that participate in theproject
Indicator moved from PDO to IO. ARIS is collecting the baseline data from the local medical registry. The definition of theindicator is also revised because it can be measured on waterborne diseases for which data is recorded at the village level, andthese are hepatitis A and acute intestinal infections, only.
Cases of acute intestinal infections in 2012 - 428; Hepatitis A - 228 in target villages. Data for 6 months of 2014 shows thatthere are 126 cases of acute intestinal infection, and 69 of Hepatitis A. Total decrease ia about 62.5% (data for the half of 2012in comparison for data for half of 2014)
Intermediate Results Indicator
Number of water supply schemes rehabilitated by the project
Total number of schemes will be 37 instead of 35, as 2 schemes were split into 4.
Intermediate Results Indicator
Percentage of people reporting using soap for washing hands before food preparation/washing children's hands
Indicator measured in project areas.
PDO Indicator
State WSS strategy endorsed by the Government
This indicator is taken up from intermediate outcome indicators measure outcomes of Component C.
approved and signed by Prime Minister on September 24, 2014.
PDO Indicator
Average level of Operation and Maintenance cost recovered by utilities targeted by the project
Revised by adding the word "average" to the definition of the indicator.
PDO Indicator
Percentage of water quality tests in the service area of the rehabilitated schemes that meet national standards for drinking water
“35” is removed to allow flexibility on the number of schemes. Also “SES” is removed given that test may have to be carried outdirectly by the project if SES does not perform water analysis in the target villages.
PDO Indicator
Percentage of people reporting using soap for washing hands after using toilet, in communities that participate in the project
This indicator is taken up from intermediate outcome indicators to measure outcomes of Component B.
In average in three oblasts the indicator increased by 12.7%. In Issuk-Kul oblast from 80% to 91%, in Talas oblast form 41% to49%,and in Naryn oblast from 66% to 85%, as of November 2013 and July 2014, respectively .
PDO Indicator
Number of people in rural areas provided with access to improved water supply service under the project
New “custom” indicator introduced to count beneficiaries of rehabilitations.
Current number of beneficiaries for 29 completed schemes. Beneficiaries in remaining ongoing 8 schemes (20 villages) not yetaccounted (expected to exceed target).
44000-P148099
World Bank
Governance and Competitiveness Programmatic DPO
International Development Association
MINISTRY OF FINANCE
International Development Association
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Aurelien Kruse
+1-202-473-1000akruse@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTANOther Industry, Trade and ServicesCentral Government (Central Agencies)Energy Transmission and DistributionICT InfrastructurePublic Expenditure ManagementICT PoliciesBusiness Enabling EnvironmentPublic Finance ManagementTax policyEnergyEnergy Policies & ReformTrade PolicyTradeFiscal PolicyICTInvestment and Business Climate
0.00
0.00
13200000Total Commitment in Third Quarter of 2016
International Development Association10800000Total Commitment in Third Quarter of 2016
International Development Association12739350Total Disbursement in Fourth Quarter of 2016
International Development Association10435425Total Disbursement in Fourth Quarter of 2016
International Development Association-54010Total Interest Repayment in Second Quarter of 2017
International Development Association-50806Total Interest Repayment in Fourth Quarter of 2017
International Development Association-49740Total Interest Repayment in Second Quarter of 2018
International Development Association-48609Total Interest Repayment in Fourth Quarter of 2018
International Development Association-48762Total Interest Repayment in Second Quarter of 2019
International Development AssociationImplementation Completion and Results ReportImplementation Completion Report ReviewFinancing AgreementContract AwardsProject URLProcurement Notices44000-P126278
World Bank
Kyrgyz Second Health and Social Protection Project
International Development Association
MINISTRY OF HEALTH
International Development Association
MINISTRY OF HEALTHPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Agnes Couffinhal
+1-202-473-1000acouffinhal@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Batken
39.8330 71.0000
Talas
42.3330 72.0000
Osh
40.5280 72.7990
Naryn
41.4330 75.9670
Karakol
42.4910 78.3940
Karakol
42.4910 78.3940
Jalal-Abad
40.9330 73.0000
Bishkek
42.8700 74.5900
Bishkek
42.8700 74.5900
Public Administration - HealthSocial ProtectionHealthPublic Administration - Social ProtectionDisease ControlSocial protection delivery systemsTuberculosisHIV/AIDSHealth System StrengtheningSocial ProtectionSocial Insurance and PensionsHealth Systems and Policies
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
666666.67
666666.67
666666.66
291666.67
291666.67
291666.66
291666.67
291666.67
291666.66
291666.67
291666.67
291666.66
291666.67
291666.67
291666.66
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
375000.00
358333.33
358333.33
358333.34
358333.33
358333.33
358333.34
358333.33
358333.33
358333.34
358333.33
358333.33
358333.34
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
33333.33
33333.33
33333.34
33333.33
33333.33
33333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
564833.33
564833.33
564833.34
0.00
0.00
0.00
166666.66
166666.67
166666.67
666666.66
666666.67
666666.67
521666.67
521666.67
521666.67
521666.67
521666.67
521666.67
521666.67
521666.67
521666.67
521666.67
521666.67
521666.63
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
3791.67
3791.67
3791.67
3791.67
3791.67
3791.67
3791.67
3791.67
3791.67
3791.67
3791.67
3791.63
0.00
0.00
0.00
9070000Total Commitment in Second Quarter of 2013
International Development Association7430000Total Commitment in Second Quarter of 2013
International Development Association1694500Total Disbursement in Third Quarter of 2015
International Development Association500000Total Disbursement in First Quarter of 2016
International Development Association2000000Total Disbursement in Second Quarter of 2016
International Development Association2000000Total Disbursement in Fourth Quarter of 2016
International Development Association1000000Total Disbursement in First Quarter of 2017
International Development Association2000000Total Disbursement in Second Quarter of 2017
International Development Association630000Total Disbursement in Second Quarter of 2017
International Development Association-5729Total Interest Repayment in Third Quarter of 2017
International Development Association1870000Total Disbursement in Fourth Quarter of 2017
International Development Association29973Total Disbursement in Fourth Quarter of 2017
International Development Association-14339Total Interest Repayment in First Quarter of 2018
International Development Association2000000Total Disbursement in Second Quarter of 2018
International Development Association-22294Total Interest Repayment in Third Quarter of 2018
International Development Association940500Total Disbursement in Fourth Quarter of 2018
International Development Association-27045Total Interest Repayment in First Quarter of 2019
International Development Association164000Total Disbursement in Third Quarter of 2019
International Development Association-28927Total Interest Repayment in Third Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Annual Program of Works (APW) and Procurement Plan | Description :The Recipient shall not later than November 15of each year during implementation, or such later date as may be agreed by the Association, submit to the Association an APW andassociated Procurement Plan, satisfactory to the Association, prepared in accordance with the format included in the POM and whichshall include agreed amounts of transfers for APWs for the following fiscal year. | Frequency :Yearly
Finance Agreement :Health Policy Council | Description :The Recipient, through MoH, shall maintain the Health Policy Council,consisting of the state secretary, deputy ministers and headsof departments that will be responsible for coordination of Projectactivities, until completion of the Project. | Frequency :Yearly
Finance Agreement :Inter-Ministerial Coordination Committee | Description :The Recipient, through MoH, shall maintain theInter-Ministerial Coordination Committee, consisting of representatives of MoH, MoF and MSD, responsible for:- 1) coordination ofproject activities, including harmonization activities; and ii) review of the functioning of a complain mechanism for consideringcomplaints re misuse of funds and ensuring follow-up, until completion of the Project. | Frequency :Yearly
Finance Agreement :Evaluation Studies | Description :The Recipient, through MoH, shall ensure that evaluation studies are conductedat least twice during Project implementation separately for each of the four priority areas of the Program. | Frequency :Yearly
Finance Agreement :Progress Reports | Description :The Recipient shall not later than September 15 of each year during theimplementation of the Project or such later date as may be agreed by the Association, provide to the Association for its review, areport on the progress achieved in the carrying out of the Project during the period preceding the date of the report. | Frequency:Yearly
Finance Agreement :Joint Annual Review (JAR) | Description :The Recipient shall on an annual basis jointly undertake with theAssociation and other donors to Den Sooluk, review of the Projectactivities. | Frequency :Yearly
Finance Agreement :Technical Meetings | Description :The Recipient shall on an annual basis, participate in technical meetings withthe Association and other donors to Den Sooluk. | Frequency :Yearly
Finance Agreement :Multi-Year Strategy for Procurement System | Description :By no later than six months after the Effective Date,the Recipient, through MoH, shall prepare a multi-year strategy for the improvement of the public procurement system for the healthsector, including a capacity building needs analysis. | Due Date :16-Dec-2014
Finance Agreement :Fiduciary Capacity Building Plan | Description :By no later than one year after the Effective Date, theRecipient, through MoH, shall procure technical assistance to develop and implement a comprehensive fiduciary capacity buildingplan for the health sector, with a focus on all health facilities, with terms of reference satisfactory to the Association. | DueDate :16-Jun-2015
Finance Agreement :Internal Audit Function | Description :By no later than August 15, 2015, the Recipient, through MoH, shallprocure technical assistance to strengthen the internal audit function within MoH and MHIF, including automation of the auditworkflow, with terms of reference satisfactory to the Association. | Due Date :15-Aug-2015
The Recipient shall have its procurement at health facilities reviewed by an independent consultant as terms of reference agreedwith the Association. Each Procurement Post Review Report shall cover the period of one fiscal year of the Recipient. TheProcurement Post Review Report for each such period shall be furnished to the Association not later than twelve months after theend of such period.
Intermediate Results Indicator
Number of pregnant women receiving any antenatal care
Intermediate Results Indicator
Number of family doctors, feldshers, TB doctors and nurses trained on TB clinical protocols and guidelines
Intermediate Results Indicator
Number of providers trained in postnatal and postabortal IUD insertion and removal
Intermediate Results Indicator
Number of family doctors, feldshers and nurses trained on CVD
Intermediate Results Indicator
Children immunized (number)
Intermediate Results Indicator
Number of deliveries attended by skilled health personnel
Intermediate Results Indicator
Children immunized - under 12 months against DTP3 (number)
Intermediate Results Indicator
Children immunized - under 12 months against Polio (number)
Intermediate Results Indicator
Number of children treated with ORS for diarrhea or with antibiotic for pneumonia
Intermediate Results Indicator
Number of districts where the Social Registry Information System has been fully rolled out
Intermediate Results Indicator
People who have received essential health, nutrition, and population (HNP) services
Intermediate Results Indicator
Number of children immunized
Intermediate Results Indicator
Proportion of HIV infected pregnant women that received antiretroviral drugs to reduce risk of mother-to-child transmission
Intermediate Results Indicator
Percentage of negative deviations of the executed health budget from the initially approved budget and quarterly allocations and execution of the health budget
Intermediate Results Indicator
Proportion of electronically registered families with children receiving social assistance (MBPF) who are electronically registered
Intermediate Results Indicator
Number of facilities adequately equipped to provide emergency obstetric and neonatal care (cumulative)
Intermediate Results Indicator
Submission of IFRs satisfactory to IDA within due dates according to Financing Agreement
Intermediate Results Indicator
Roadmap to reform disability service developed
PDO Indicator
Births (deliveries) attended by skilled health personnel (number)
PDO Indicator
Proportion of normal deliveries in district (rayon) hospitals that received services following clinical protocols
PDO Indicator
Proportion of complicated deliveries in district (rayon) hospitals that received services following clinical protocols
PDO Indicator
Diarrhea treatment with oral rehydration therapy
PDO Indicator
Government health expenditure as % of total government expenditure
44000-P083235
World Bank
Disaster Hazard Mitigation Project
International Development Association
MINISTRY OF ENVIRONMENT AND EMERGENCY
International Development Association
MINISTRY OF ENVIRONMENT AND EMERGENCYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Katelijn Van den Berg
+1-202-473-1000kvandenberg@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Kara-Agach
41.5790 71.7390
Jalal-Abad Oblasty
41.5000 72.5000
MiningCentral Government (Central Agencies)Sub-National GovernmentDisaster PreparednessDisaster Risk ReductionAir quality managementEnvironmental Health and Pollution ManagementWater Resource ManagementDisaster Risk FinanceWater PollutionSoil PollutionWater Institutions, Policies and ReformDisaster Response and RecoveryDisaster Risk ManagementFinance for Development
0.00
0.00
0.00
0.00
48936.17
48936.17
48936.18
48936.17
48936.17
48936.18
78297.87
78297.87
78297.88
78297.87
78297.87
78297.88
127234.05
127234.05
127234.03
127234.05
127234.05
127234.03
127234.05
127234.05
127234.03
127234.05
127234.05
127234.03
146808.51
146808.51
146808.51
146808.51
146808.51
146808.51
146808.51
146808.51
146808.51
127234.05
127234.05
127234.03
127234.05
127234.05
127234.03
127234.05
127234.05
127234.03
127234.05
127234.05
127234.03
97872.35
97872.35
97872.33
97872.35
97872.35
97872.33
97872.35
97872.35
97872.33
97872.35
97872.35
97872.33
97872.35
97872.35
97872.33
48936.17
48936.17
48936.18
48936.17
48936.17
48936.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
83191.49
83191.49
83191.48
19574.46
19574.46
19574.48
22265.96
22265.96
22265.95
26180.85
26180.85
26180.86
11989.37
11989.37
11989.35
44042.55
44042.55
44042.55
36946.81
36946.81
36946.80
54808.51
54808.51
54808.52
44042.55
44042.55
44042.55
42329.78
42329.78
42329.80
77319.15
77319.15
77319.14
13457.45
13457.45
13457.44
106191.48
106191.48
106191.50
0.00
0.00
0.00
40861.70
40861.70
40861.71
71936.17
71936.17
71936.17
32542.56
32542.56
32542.54
75606.38
75606.38
75606.38
0.00
0.00
0.00
0.00
0.00
0.00
25446.80
25446.80
25446.82
17861.71
17861.71
17861.69
146808.51
146808.51
146808.51
244680.86
244680.86
244680.84
146808.51
146808.51
146808.51
97872.35
97872.35
97872.33
244680.86
244680.86
244680.84
293617.02
293617.02
293617.02
146808.51
146808.51
146808.51
73404.26
73404.26
73404.26
58723.40
58723.40
58723.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6900000Total Commitment in Second Quarter of 2004
International Development Association250000Total Disbursement in Fourth Quarter of 2004
International Development Association64440Total Disbursement in First Quarter of 2005
International Development Association19654Total Disbursement in Second Quarter of 2005
International Development Association47718Total Disbursement in Second Quarter of 2005
International Development Association30819Total Disbursement in Third Quarter of 2005
International Development Association46597Total Disbursement in Third Quarter of 2005
International Development Association34622Total Disbursement in Fourth Quarter of 2005
International Development Association15315Total Disbursement in First Quarter of 2006
International Development Association113206Total Disbursement in First Quarter of 2006
International Development Association24040Total Disbursement in Second Quarter of 2006
International Development Association85608Total Disbursement in Second Quarter of 2006
International Development Association43966Total Disbursement in Third Quarter of 2006
International Development Association122940Total Disbursement in Third Quarter of 2006
International Development Association132000Total Disbursement in Fourth Quarter of 2006
International Development Association47875Total Disbursement in First Quarter of 2007
International Development Association81832Total Disbursement in First Quarter of 2007
International Development Association66401Total Disbursement in Second Quarter of 2007
International Development Association173281Total Disbursement in Second Quarter of 2007
International Development Association42341Total Disbursement in Third Quarter of 2007
International Development Association169981Total Disbursement in Fourth Quarter of 2007
International Development Association174928Total Disbursement in Fourth Quarter of 2007
International Development Association137048Total Disbursement in Second Quarter of 2008
International Development Association232189Total Disbursement in Third Quarter of 2008
International Development Association97909Total Disbursement in Fourth Quarter of 2008
International Development Association229588Total Disbursement in First Quarter of 2009
International Development Association82965Total Disbursement in Fourth Quarter of 2009
International Development Association56639Total Disbursement in First Quarter of 2010
International Development Association303128Total Disbursement in Second Quarter of 2010
International Development Association76319Total Disbursement in Third Quarter of 2010
International Development Association174101Total Disbursement in Third Quarter of 2010
International Development Association341157Total Disbursement in Third Quarter of 2010
International Development Association67200Total Disbursement in Fourth Quarter of 2010
International Development Association93133Total Disbursement in Fourth Quarter of 2010
International Development Association146435Total Disbursement in Fourth Quarter of 2010
International Development Association116205Total Disbursement in First Quarter of 2011
International Development Association121365Total Disbursement in First Quarter of 2011
International Development Association158602Total Disbursement in First Quarter of 2011
International Development Association166722Total Disbursement in Second Quarter of 2011
International Development Association173874Total Disbursement in Second Quarter of 2011
International Development Association1000000Total Commitment in Second Quarter of 2011
International Development Association169085Total Disbursement in Third Quarter of 2011
International Development Association326116Total Disbursement in Third Quarter of 2011
International Development Association329482Total Disbursement in Third Quarter of 2011
International Development Association167076Total Disbursement in Fourth Quarter of 2011
International Development Association176754Total Disbursement in Fourth Quarter of 2011
International Development Association238194Total Disbursement in Fourth Quarter of 2011
International Development Association140610Total Disbursement in First Quarter of 2012
International Development Association100492Total Disbursement in Second Quarter of 2012
International Development Association250000Total Disbursement in Second Quarter of 2012
International Development Association59440Total Disbursement in Third Quarter of 2012
International Development Association77934Total Disbursement in Third Quarter of 2012
International Development Association79245Total Disbursement in Third Quarter of 2012
International Development Association240050Total Disbursement in Third Quarter of 2012
International Development Association36750Total Disbursement in Fourth Quarter of 2012
International Development Association105614Total Disbursement in Fourth Quarter of 2012
International Development Association125441Total Disbursement in Fourth Quarter of 2012
International Development Association83241Total Disbursement in Fourth Quarter of 2012
International Development Association162075Total Disbursement in Fourth Quarter of 2012
International Development Association71746Total Disbursement in First Quarter of 2013
International Development Association159888Total Disbursement in First Quarter of 2013
International Development Association41152Total Disbursement in First Quarter of 2013
International Development Association191868Total Disbursement in First Quarter of 2013
International Development Association2107Total Disbursement in Second Quarter of 2013
International Development Association284398Total Disbursement in Second Quarter of 2013
International Development Association-683Total Commitment Cancellations in Second Quarter of 2013
International Development Association92332Total Disbursement in Second Quarter of 2013
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementGrant or Trust Fund AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
The Recipient shall not make expenditures for moving tailing #3 until priority activities have been described in a feasibility anddesign study, agreed by IDA.
The Recipient shall establish and maintain a National Emergency Management Committee with membership from relevant ministries andagencies involved in disaster emergency management and response.
Intermediate Results Indicator
Progress towards improved isolation and protection of uranium wastes from disturbance by landslides, floods, and leaching and dispersal by ground- and surface-water drainage in the Mailuu Suu area.
Some delays encountered due to repeated flooding due to extreme precipitation, and a very harsh and long winter 2011/12
Intermediate Results Indicator
Ability to communicate within MES improved as a step towards effective emergency management.
Osh continues to be an effective and functioning communication hub, which performed well during the avalanche responsecoordinationby MES in March 2012.
PDO Indicator
Evidence that applicable parameters are below hazardous thresholds for humans and livestock in samples of soil, water and air from monitored sites in the Mailuu-Suu area.
Discontinuation ofpollution infiltration ofradionuclides andassociated heavy metalsinto the groundwaterfrom selectedhigh-riskmine tailings and wastedumps is used as a validproxy PDO indicator tomeasure the impact ofpublic healthoutcomeduring the lifeof theproject, as impact ofremediation measuresin groundwaterdownstream can onlybe measured aftertheproject closure.
Discontinuation ofpollution infiltration ofradionuclides andassociated heavy metalsinto the groundwaterfrom selectedhigh-riskmine tailings and wastedumps is used as a validproxy PDO indicator tomeasure the impact ofpublic healthoutcomeduring the lifeof theproject, as impact ofremediation measuresin groundwaterdownstream can onlybe measured aftertheproject closure.
PDO Indicator
Evidence that a disaster hazard monitoring, warning and response system is functioning and being used effectively by cooperating national, oblast, and raion authorities, and local communities.
Nat Agency for Tailings Management assumes full, responsibility, for O&M as well as early warning and emergency response.
National Radiation Safety Agency is progressively assuming responsibility for finalized objects under project.
PDO Indicator
Evidence that real-time landslide monitoring, warning and response systems are functioning and being used effectively by cooperating national, oblast, and rayon authorities, and local communities.
Costs per landslideexceeded the estimatedcosts due to highcomplexity of selectedhigh risk sites. Fivelandslide areaswereequipped.
Activity not expected to recover from severe setbacks during civil unrest (theft and vandalism) and related hiatus in projectmanagement. Focus now on community based low tech / low cost monitoring and maintenance.
44000-P071063
World Bank
Governance Technical Assistance Project
International Development Association
ADMINISTRATION OF THE PRESIDENT/MINISTRY OF FINANCE
International Development Association
ADMINISTRATION OF THE PRESIDENT/MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
David Michael Nummy
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Gorod Bishkek
42.8670 74.6000
Central Government (Central Agencies)JobsOther Excluded GroupsSocial Safety NetsSocial InclusionTransparency, Accountability and Good GovernancePublic Expenditure ManagementData production, accessibility and useSocial ProtectionData Development and Capacity BuildingJob CreationPublic AdministrationPublic Finance ManagementAdministrative and Civil Service Reform
0.00
0.00
3335.65
3335.65
3335.66
8338.92
8338.92
8338.90
66709.50
66709.50
66709.50
88390.13
88390.13
88390.14
83386.88
83386.88
83386.88
133419.00
133419.00
133419.00
166773.75
166773.75
166773.75
216805.88
216805.88
216805.88
166773.75
166773.75
166773.75
266838.44
266838.44
266838.46
333547.94
333547.94
333547.96
300193.19
300193.19
300193.21
66709.50
66709.50
66709.50
83386.88
83386.88
83386.88
83386.88
83386.88
83386.88
90057.73
90057.73
90057.74
100065.15
100065.15
100065.13
100064.25
100064.25
100064.25
100064.25
100064.25
100064.25
133419.00
133419.00
133419.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23412.36
23412.36
23412.37
0.00
0.00
0.00
8468.65
8468.65
8468.66
28398.12
28398.13
28398.13
30016.18
30016.18
30016.18
12579.07
12579.07
12579.07
67457.70
67457.70
67457.70
98178.45
98178.45
98178.45
76573.11
76573.12
76573.12
26751.44
26751.44
26751.46
63067.64
63067.65
63067.65
8109.61
8109.62
8109.62
10996.26
10996.26
10996.28
12368.09
12368.09
12368.09
13250.36
13250.36
13250.37
18332.66
18332.66
18332.66
14641.33
14641.33
14641.33
33227.77
33227.77
33227.78
14191.18
14191.20
14191.20
20155.93
20155.93
20155.94
32417.13
32417.13
32417.14
1971.33
1971.33
1971.34
27947.67
27947.67
27947.66
29533.33
29533.33
29533.34
96000.00
96000.00
96000.00
103333.33
103333.33
103333.34
16333.33
16333.33
16333.34
123287.91
123287.91
123287.90
11000.00
11000.00
11000.00
269666.67
269666.67
269666.66
266666.67
266666.67
266666.66
266666.67
266666.67
266666.66
266666.67
266666.67
266666.66
266666.67
266666.67
266666.66
233333.33
233333.33
233333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7775000Total Commitment in Second Quarter of 2003
International Development Association75000Total Disbursement in Fourth Quarter of 2003
International Development Association27870Total Disbursement in Second Quarter of 2004
International Development Association-30542Total Interest Repayment in Second Quarter of 2004
International Development Association93181Total Disbursement in Third Quarter of 2004
International Development Association34467Total Disbursement in Fourth Quarter of 2004
International Development Association67918Total Disbursement in Fourth Quarter of 2004
International Development Association-21468Total Interest Repayment in Fourth Quarter of 2004
International Development Association43072Total Disbursement in First Quarter of 2005
International Development Association25000Total Disbursement in Second Quarter of 2005
International Development Association47747Total Disbursement in Second Quarter of 2005
International Development Association151231Total Disbursement in Second Quarter of 2005
International Development Association-15880Total Interest Repayment in Second Quarter of 2005
International Development Association90868Total Disbursement in Third Quarter of 2005
International Development Association231648Total Disbursement in Third Quarter of 2005
International Development Association67523Total Disbursement in Fourth Quarter of 2005
International Development Association79141Total Disbursement in Fourth Quarter of 2005
International Development Association99687Total Disbursement in Fourth Quarter of 2005
International Development Association-15855Total Interest Repayment in Fourth Quarter of 2005
International Development Association29016Total Disbursement in First Quarter of 2006
International Development Association57654Total Disbursement in First Quarter of 2006
International Development Association50196Total Disbursement in Second Quarter of 2006
International Development Association66115Total Disbursement in Second Quarter of 2006
International Development Association91502Total Disbursement in Second Quarter of 2006
International Development Association-14865Total Interest Repayment in Second Quarter of 2006
International Development Association26949Total Disbursement in Third Quarter of 2006
International Development Association37330Total Disbursement in Fourth Quarter of 2006
International Development Association-16062Total Interest Repayment in Fourth Quarter of 2006
International Development Association41812Total Disbursement in First Quarter of 2007
International Development Association44873Total Disbursement in Second Quarter of 2007
International Development Association-12798Total Interest Repayment in Second Quarter of 2007
International Development Association63629Total Disbursement in Third Quarter of 2007
International Development Association21320Total Disbursement in Fourth Quarter of 2007
International Development Association30176Total Disbursement in Fourth Quarter of 2007
International Development Association-13550Total Interest Repayment in Fourth Quarter of 2007
International Development Association49780Total Disbursement in First Quarter of 2008
International Development Association50305Total Disbursement in First Quarter of 2008
International Development Association50501Total Disbursement in Second Quarter of 2008
International Development Association-10672Total Interest Repayment in Second Quarter of 2008
International Development Association61510Total Disbursement in Third Quarter of 2008
International Development Association89918Total Disbursement in Fourth Quarter of 2008
International Development Association-11007Total Interest Repayment in Fourth Quarter of 2008
International Development Association83843Total Disbursement in Second Quarter of 2009
International Development Association-7402Total Interest Repayment in Second Quarter of 2009
International Development Association32060Total Disbursement in Third Quarter of 2009
International Development Association56539Total Disbursement in Third Quarter of 2009
International Development Association286418Total Disbursement in Fourth Quarter of 2009
International Development Association-8306Total Interest Repayment in Fourth Quarter of 2009
International Development Association309864Total Disbursement in First Quarter of 2010
International Development Association48698Total Disbursement in Second Quarter of 2010
International Development Association-9269Total Interest Repayment in Second Quarter of 2010
International Development Association309864Total Disbursement in Third Quarter of 2010
International Development Association32260Total Disbursement in Fourth Quarter of 2010
International Development Association-11174Total Interest Repayment in Fourth Quarter of 2010
International Development Association808233Total Disbursement in First Quarter of 2011
International Development Association213753Total Disbursement in Second Quarter of 2011
International Development Association-14365Total Interest Repayment in Second Quarter of 2011
International Development Association187203Total Disbursement in Third Quarter of 2011
International Development Association41177Total Disbursement in Fourth Quarter of 2011
International Development Association60928Total Disbursement in Fourth Quarter of 2011
International Development Association561487Total Disbursement in Fourth Quarter of 2011
International Development Association-16444Total Interest Repayment in Fourth Quarter of 2011
International Development Association155132Total Disbursement in First Quarter of 2012
International Development Association298981Total Disbursement in First Quarter of 2012
International Development Association478071Total Disbursement in First Quarter of 2012
International Development Association56987Total Disbursement in Second Quarter of 2012
International Development Association-18776Total Interest Repayment in Second Quarter of 2012
International Development Association51542Total Disbursement in Fourth Quarter of 2012
International Development Association-22999Total Interest Repayment in Fourth Quarter of 2012
International Development Association33599Total Disbursement in First Quarter of 2013
International Development Association47735Total Disbursement in First Quarter of 2013
International Development Association-23021Total Interest Repayment in Second Quarter of 2013
International Development Association24748Total Disbursement in Third Quarter of 2013
International Development Association-2500000Total Commitment Cancellations in Fourth Quarter of 2013
International Development Association47450Total Disbursement in Fourth Quarter of 2013
International Development Association127075Total Disbursement in Fourth Quarter of 2013
International Development Association-22244Total Interest Repayment in Fourth Quarter of 2013
International Development Association-88741Total Loan Repayment in Fourth Quarter of 2013
International Development Association-57657Total Commitment Cancellations in Second Quarter of 2014
International Development Association-14171Total Disbursement in Second Quarter of 2014
International Development Association-24321Total Interest Repayment in Second Quarter of 2014
International Development Association-64431Total Loan Repayment in Second Quarter of 2014
International Development Association-22716Total Interest Repayment in Fourth Quarter of 2014
International Development Association-61216Total Loan Repayment in Fourth Quarter of 2014
International Development Association-20591Total Interest Repayment in Second Quarter of 2015
International Development Association-56609Total Loan Repayment in Second Quarter of 2015
International Development Association-20251Total Interest Repayment in Fourth Quarter of 2015
International Development Association-58477Total Loan Repayment in Fourth Quarter of 2015
International Development Association-21445Total Interest Repayment in Second Quarter of 2016
International Development Association-57969Total Loan Repayment in Second Quarter of 2016
International Development Association-20042Total Interest Repayment in Fourth Quarter of 2016
International Development Association-56857Total Loan Repayment in Fourth Quarter of 2016
International Development Association-19058Total Interest Repayment in Second Quarter of 2017
International Development Association-56030Total Loan Repayment in Second Quarter of 2017
International Development Association-20219Total Interest Repayment in Fourth Quarter of 2017
International Development Association-58347Total Loan Repayment in Fourth Quarter of 2017
International Development Association-20894Total Interest Repayment in Second Quarter of 2018
International Development Association-59983Total Loan Repayment in Second Quarter of 2018
International Development Association-18659Total Interest Repayment in Fourth Quarter of 2018
International Development Association-57649Total Loan Repayment in Fourth Quarter of 2018
International Development Association-19715Total Interest Repayment in Second Quarter of 2019
International Development Association-57347Total Loan Repayment in Second Quarter of 2019
International Development Association-18871Total Interest Repayment in Fourth Quarter of 2019
International Development Association-56531Total Loan Repayment in Fourth Quarter of 2019
International Development AssociationProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportCredit AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Percentage of required declarations of high state officials published annually.
Both Parliament candidates and civil servants required to file income and asset declarations for themselves and their families.Number of declarations of high state officials in compliance with Declaration and Publication rules and published annually hadreached to 99% by 2008.
Both Parliament candidates and civil servants required to file income and asset declarations for themselves and their families.Number of declarations of high state officials in compliance with Declaration and Publication rules and published annually hadreached to 99% by 2008.
Intermediate Results Indicator
Independent Civil Service Agency established and operational.
SPS established as the GoK civil service agency and operates as an independent agency of Government. SPS is fully operational andis actively managing reforms in civil service to further demarcate between political and professional positions and to reform thewage structure to be more meritocratic.
SPS established as the GoK civil service agency and operates as an independent agency of Government. SPS is fully operational andis actively managing reforms in civil service to further demarcate between political and professional positions and to reform thewage structure to be more meritocratic.
Intermediate Results Indicator
Computerized Treasury System implemented.
The project supported partial automation as an interim solution but the full FMIS that meets international standards is not inplace as of the end of the project.
The project supported partial automation as an interim solution but the full FMIS that meets international standards is not inplace as of the end of the project.
Intermediate Results Indicator
Number of draft laws and regulations discussed with the private sector and civil society, prior to their adoption.
The MOJ website makes virtually all draft legislation available for any party to review. MoF has been holding budget hearingsandheld its first hearing outside of Bishkek in 2013.
The MOJ website makes virtually all draft legislation available for any party to review. MoF has been holding budget hearingsandheld its first hearing outside of Bishkek in 2013.
Intermediate Results Indicator
Coverage, quality and timeliness of audit reports of Chamber of Accounts (CoA).
Results of CoA Audit reports are widely discussed and referenced in the mass media. The reports are mostly related to legality,not effectiveness or efficiency of the use of public funds.
Results of CoA Audit reports are widely discussed and referenced in the mass media. The reports are mostly related to legality,not effectiveness or efficiency of the use of public funds.
Intermediate Results Indicator
Increased usefulness of the budget as a strategic policy instrument, as a result of improvements in its formulation process, content and presentation.
The budget is made available to the general public via web and budget execution reports are also posted on the web. MTBFinformation is only recently included as supplementary information to the annual budget and linkage between the MTBF and the annualbudget is extremely weak.
The budget is made available to the general public via web and budget execution reports are also posted on the web. MTBFinformation is only recently included as supplementary information to the annual budget and linkage between the MTBF and the annualbudget is extremely weak.
Intermediate Results Indicator
Government Public Information Center (GPIC) established and functioning.
The Government PIC was established and initially had a very active outreach program and high activity. With greater access andawareness of the web, this mode of accessing information has overtaken the GIT as a primary source of information.
The Government PIC was established and initially had a very active outreach program and high activity. With greater access andawareness of the web, this mode of accessing information has overtaken the GIT as a primary source of information.
Intermediate Results Indicator
Access to legal database of the Ministry of Justice available to the public on line.
Web-based database available for all Internet users.
Web-based database available for all Internet users.
Intermediate Results Indicator
Kyrgyzstandard reorganized to separate regulatory and enforcement functions.
No information available.
No information available
PDO Indicator
Public perception re transparency, responsiveness and integrity of public sector as measured by annual surveys.
No survey was conducted under the project
PDO Indicator
Improved access, reliability and timeliness of information about budget execution, to public officials and civil society.
PDO Indicator
Percentage of private firms participating in public procurement
There has been no systematic collection of this data and no apparent legal mandate to do so.
The available MOF capacity and the legal mandate do not provide for collection of such information
PDO Indicator
Percentage of "Main" and "Lead" civil servants recruited on competitive basis.
Generally civil service formally complies with requirement of competitive selection.
Generally civil service formally complies with requirement of competitive selection.
PDO Indicator
Increased predictability in budget allocations for health and education
In general, variability between the enacted budget and the final actual budget has decreased but the Government continues toadjustthe budget with some regularity and the Government still adjusts the budget post factum.
Health and education sectors have received technical assistance under the Bank's CB-PFM project with a specific focus on improvingmulti-year budgeting and improve execution.
44000-P167598
World Bank
Primary Health Care Quality Improvement Program
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Agnes Couffinhal
+1-202-473-1000acouffinhal@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTANICT ServicesPublic Administration - HealthHealthReproductive and Maternal HealthHealth Service DeliveryICTMitigationNon-communicable diseasesAdaptationClimate changeHealth System StrengtheningHealth Systems and PoliciesDisease ControlHealth FinanceICT Solutions
0.00
0.00
520833.33
520833.33
520833.33
520833.33
520833.33
520833.33
520833.33
520833.33
520833.33
520833.33
520833.33
520833.37
229166.67
229166.67
229166.67
229166.67
229166.67
229166.67
229166.67
229166.67
229166.67
229166.67
229166.67
229166.63
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.37
0.00
0.00
520833.33
520833.33
520833.33
520833.33
520833.33
520833.33
520833.33
520833.33
520833.33
520833.33
520833.33
520833.37
229166.67
229166.67
229166.67
229166.67
229166.67
229166.67
229166.67
229166.67
229166.67
229166.67
229166.67
229166.63
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.67
416666.63
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.37
10000000Total Commitment in Second Quarter of 2019
International Development Association10000000Total Commitment in Second Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
The Recipient shall maintain, throughout the implementation of the Program, an independent verification agent with qualificationsand experience and under term of reference acceptable to the Bank to verify the data and other evidence supporting the achievementof one or more DLIs
The Recipient, through MoF, MoH and MHIF, shall carry out the Program in accordance with the Program Operation Manual.
The Recipient, through MoH, shall furnish to the Association each Program Report not later than one month after the end of eachcalendar semester, covering the calendar semester.
Intermediate Results Indicator
Number of online learning curriculum on priority conditions (including MCH, CVD, diabetes) developed and approved for use in Continuous Professional Development (CPD) online platform
Intermediate Results Indicator
Number of meetings by the Coordination Committee of the QI unit to discuss quality issues and actions (at least quarterly)
Intermediate Results Indicator
Number of PHC physicians who meet requirement of credit hours for CPD to be obtained in online mode
Intermediate Results Indicator
Number of clinical guidelines revised or developed by the QI unit
Intermediate Results Indicator
Number of pregnant women who received hemoglobin test and urine analysis for bacteriuria during the first trimester in a public PHCfacility
Intermediate Results Indicator
Number of PHC facilities* receiving reports from the QI Unit on their own performance with benchmarking (at least quarterly)
Intermediate Results Indicator
Number of children immunized
Intermediate Results Indicator
Number of diabetic patients (type I and II) who received HbA1C test at least once a year in a public PHC facility
Intermediate Results Indicator
Number of PHC facilities* whose Quality Committee receives training on quality improvement (at least once a year)
Intermediate Results Indicator
Number of PHC facilities* that pilot a new mechanism to collect patient experience information regularly
Intermediate Results Indicator
Number of men
Intermediate Results Indicator
Number of women
Intermediate Results Indicator
People who have received essential health, nutrition, and population (HNP) services
Intermediate Results Indicator
The SGBP is revised to improve coverage for selected priority conditions at PHC
Intermediate Results Indicator
Revised payment mechanism is implemented that includes pay for quality and fee-for-service for selected priority services
Intermediate Results Indicator
The drugs list under the ADP program is revised to prioritize spending on evidence-based generic medications
PDO Indicator
PDO 1: Increase in the percentage of pregnant women who received hemoglobin test and urine analysis for bacteriuria during the first trimester in a public PHC facility
PDO Indicator
PDO 2: Increase in the percentage of diabetic patients (type I and II) who received recommended care (an HbA1C test at least once ayear) in a public PHC facility
PDO Indicator
PDO 3: Increase in drug coverage for priority conditions under the ADP, as measured by number of prescriptions reimbursed for (i) Test strips, (ii) Iron supplements and (iii) Hypertension drugs
PDO Indicator
PDO 4: A unit fully designated to quality improvement is established within the Ministry of Health and functioning
44000-P125689
World Bank
KG Financial Sector Development Project
International Development Association
NATIONAL BANK OF THE KYRGYZ REPUBLIC
International Development Association
NATIONAL BANK OF THE KYRGYZ REPUBLICPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Hermanus Johannes Marc Schrijver
+1-202-473-1000mschrijver@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Gorod Bishkek
42.8670 74.6000
Public Administration - Financial SectorBanking InstitutionsOther Non-bank Financial InstitutionsServicesBusiness Enabling EnvironmentFinancial Infrastructure and AccessE-Government, incl. e-servicesInvestment and Business ClimateState-owned Enterprise Reform and PrivatizationRegulation and Competition PolicyMSME DevelopmentEnterprise DevelopmentMSME FinancePublic Administration
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
333333.33
333333.33
333333.34
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37500.00
37500.00
37500.00
37500.00
37500.00
37500.00
37500.00
37500.00
37500.00
37500.00
37500.00
37500.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
25000.00
38916.67
38916.67
38916.67
38916.67
38916.67
38916.67
38916.67
38916.67
38916.67
38916.67
38916.67
38916.63
72916.67
72916.67
72916.67
72916.67
72916.67
72916.67
72916.67
72916.67
72916.67
72916.67
72916.67
72916.63
118750.00
118750.00
118750.00
118750.00
118750.00
118750.00
118750.00
118750.00
118750.00
118750.00
118750.00
118750.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
156916.67
156916.67
156916.67
156916.67
156916.67
156916.67
156916.67
156916.67
156916.67
156916.67
156916.67
156916.63
7150000Total Commitment in First Quarter of 2012
International Development Association5850000Total Commitment in First Quarter of 2012
International Development Association-3123827Total Commitment Cancellations in Third Quarter of 2013
International Development Association-931141Total Commitment Cancellations in Third Quarter of 2013
International Development Association450000Total Disbursement in First Quarter of 2014
International Development Association90838Total Disbursement in Third Quarter of 2014
International Development Association17100Total Disbursement in First Quarter of 2015
International Development Association68350Total Disbursement in First Quarter of 2015
International Development Association121747Total Disbursement in Second Quarter of 2015
International Development Association17100Total Disbursement in Third Quarter of 2015
International Development Association89068Total Disbursement in Fourth Quarter of 2015
International Development Association112481Total Disbursement in Fourth Quarter of 2015
International Development Association91377Total Disbursement in Second Quarter of 2016
International Development Association157564Total Disbursement in Second Quarter of 2016
International Development Association122878Total Disbursement in Third Quarter of 2016
International Development Association120000Total Disbursement in Fourth Quarter of 2016
International Development Association123665Total Disbursement in Fourth Quarter of 2016
International Development Association234941Total Disbursement in Fourth Quarter of 2016
International Development Association-236Total Interest Repayment in First Quarter of 2017
International Development Association174011Total Disbursement in First Quarter of 2017
International Development Association167786Total Disbursement in Second Quarter of 2017
International Development Association-453Total Interest Repayment in Third Quarter of 2017
International Development Association195440Total Disbursement in Third Quarter of 2017
International Development Association298704Total Disbursement in Fourth Quarter of 2017
International Development Association-470Total Interest Repayment in First Quarter of 2018
International Development Association175481Total Disbursement in First Quarter of 2018
International Development Association197570Total Disbursement in Second Quarter of 2018
International Development Association-465Total Interest Repayment in Third Quarter of 2018
International Development Association117284Total Disbursement in Third Quarter of 2018
International Development Association-450Total Interest Repayment in First Quarter of 2019
International Development Association59995Total Disbursement in First Quarter of 2019
International Development Association610100Total Disbursement in Second Quarter of 2019
International Development Association334160Total Disbursement in Second Quarter of 2019
International Development Association93116Total Disbursement in Third Quarter of 2019
International Development Association107226Total Disbursement in Third Quarter of 2019
International Development Association-1233Total Interest Repayment in Third Quarter of 2019
International Development Association106192Total Disbursement in Third Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Improved staff capacity, measured in terms of number of years of staff experience in supervision departments
Intermediate Results Indicator
Number of ICT-equipped Post Offices (with installed, operational front office cash terminals) connected to the central hub
Intermediate Results Indicator
Amended legal framework for moveable collateral and debt resolution regimes
Intermediate Results Indicator
Supervisory staff conducted spacialist training
Intermediate Results Indicator
Issued regulations for the well-functioning of the collateral registry
Intermediate Results Indicator
Number of dissemination and capacity-building and training events held
Intermediate Results Indicator
Number of cashiers, tellers, postmasters and other operational staff completed NBKR training to operate financial services at KPO
Intermediate Results Indicator
Revenues from non-government financial services transactions (payment, remittances, bank) as a share of total KPO revenues from financial services (including also pension pay out and social allowances
Intermediate Results Indicator
Enhanced competitive outreach for last mile delivery of remittances, measured in terms of market share of KPO in total remittances
Intermediate Results Indicator
Improved quality, reliability and cost-efficiency of small value payments operations, measured in terms of same day Straight Through Processing as a share of total transactions to&from bank accounts
Intermediate Results Indicator
Online system for registering collateral is operational and connected to other assets registrations (for example (registration of vehicle registration)
Intermediate Results Indicator
Enhanced transparent financial performance
Intermediate Results Indicator
Introduction of performance measurement, in terms of accounting reports with separated profitability and risk analysis for financial services and postal services
Intermediate Results Indicator
Increase in lending based on new registration of security interests in the registry, using moveable assets as collateral
Intermediate Results Indicator
Increase in the debt recovery rate for creditors
PDO Indicator
Number of changes to the legal, regulatory and supervisory framework are implemented
PDO Indicator
Number of financial services transactions going through KPO (e.g. payment transactions, remittances, bank transaction)
PDO Indicator
Number of new annual registrations in the secured transactions registry, using moveable assets as collateral (alone or in combination with immoveable collateral)
44000-P108525
World Bank
Capacity Building for Economic Management Grant
International Development Association
MINISTRY OF ECONOMIC DEVELOPMENT & TRADE OF KYRGYZ REPUBLIC
International Development Association
MINISTRY OF ECONOMIC DEVELOPMENT & TRADE OF KYRGYZ REPUBLICPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Bakyt Dubashov
+1-202-473-1000bdubashov@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Osh Oblasty
40.0000 73.0000
Osh Oblasty
40.0000 73.0000
Batken
39.8330 71.0000
Talas
42.3330 72.0000
Naryn
41.4330 75.9670
Issyk-Kul'skaya Oblast’
42.0000 78.0000
Gorod Bishkek
42.8670 74.6000
Jalal-Abad
41.5000 72.5000
Chuyskaya Oblast’
42.4170 74.5000
Central Government (Central Agencies)Public Expenditure PolicyEconomic Growth and PlanningMacro-financial policiesMacroeconomic ResiliencePublic Finance ManagementStructural Transformation and Economic DiversificationMonetary and Credit PoliciesExternal FinanceAdministrative and Civil Service ReformTransparency, Accountability and Good GovernanceTax policyPublic AdministrationFiscal PolicyFiscal sustainabilityRegulation and Competition PolicyInclusive GrowthBusiness Enabling EnvironmentPublic Expenditure ManagementGreen GrowthJobs
82549.66
82549.67
82549.67
82549.66
82549.67
82549.67
93621.83
93621.83
93621.84
93621.83
93621.83
93621.84
93621.83
93621.83
93621.84
93621.83
93621.83
93621.84
66516.25
66516.25
66516.25
66516.25
66516.25
66516.25
66516.25
66516.25
66516.25
66516.25
66516.25
66516.25
48587.08
48587.08
48587.09
48587.08
48587.08
48587.09
48587.08
48587.08
48587.09
48587.08
48587.08
48587.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
82549.66
82549.67
82549.67
82549.66
82549.67
82549.67
93621.83
93621.83
93621.84
93621.83
93621.83
93621.84
93621.83
93621.83
93621.84
93621.83
93621.83
93621.84
66516.25
66516.25
66516.25
66516.25
66516.25
66516.25
66516.25
66516.25
66516.25
66516.25
66516.25
66516.25
48587.08
48587.08
48587.09
48587.08
48587.08
48587.09
48587.08
48587.08
48587.09
48587.08
48587.08
48587.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3000000Total Commitment in Third Quarter of 2008
International Development Association100000Total Disbursement in First Quarter of 2009
International Development Association18521Total Disbursement in Third Quarter of 2009
International Development Association52274Total Disbursement in Fourth Quarter of 2009
International Development Association67254Total Disbursement in Fourth Quarter of 2009
International Development Association36221Total Disbursement in Second Quarter of 2010
International Development Association50843Total Disbursement in Second Quarter of 2010
International Development Association41855Total Disbursement in Third Quarter of 2010
International Development Association21409Total Disbursement in Fourth Quarter of 2010
International Development Association53450Total Disbursement in First Quarter of 2011
International Development Association37363Total Disbursement in Second Quarter of 2011
International Development Association39948Total Disbursement in Third Quarter of 2011
International Development Association135277Total Disbursement in Third Quarter of 2011
International Development Association59662Total Disbursement in Fourth Quarter of 2011
International Development Association73453Total Disbursement in Fourth Quarter of 2011
International Development Association124821Total Disbursement in Fourth Quarter of 2011
International Development Association21432Total Disbursement in First Quarter of 2012
International Development Association69925Total Disbursement in First Quarter of 2012
International Development Association47882Total Disbursement in Second Quarter of 2012
International Development Association63880Total Disbursement in Second Quarter of 2012
International Development Association139979Total Disbursement in Second Quarter of 2012
International Development Association62512Total Disbursement in Third Quarter of 2012
International Development Association74632Total Disbursement in Third Quarter of 2012
International Development Association115797Total Disbursement in Third Quarter of 2012
International Development Association77546Total Disbursement in Fourth Quarter of 2012
International Development Association78776Total Disbursement in Fourth Quarter of 2012
International Development Association86258Total Disbursement in Fourth Quarter of 2012
International Development Association24879Total Disbursement in First Quarter of 2013
International Development Association156597Total Disbursement in First Quarter of 2013
International Development Association27817Total Disbursement in Second Quarter of 2013
International Development Association36350Total Disbursement in Second Quarter of 2013
International Development Association24495Total Disbursement in Third Quarter of 2013
International Development Association39281Total Disbursement in Third Quarter of 2013
International Development Association59411Total Disbursement in Third Quarter of 2013
International Development Association34010Total Disbursement in Fourth Quarter of 2013
International Development Association47876Total Disbursement in Fourth Quarter of 2013
International Development Association70518Total Disbursement in Fourth Quarter of 2013
International Development Association27343Total Disbursement in First Quarter of 2014
International Development Association46893Total Disbursement in First Quarter of 2014
International Development Association52093Total Disbursement in First Quarter of 2014
International Development Association46147Total Disbursement in Second Quarter of 2014
International Development Association65441Total Disbursement in Second Quarter of 2014
International Development Association211082Total Disbursement in Second Quarter of 2014
International Development Association5236Total Disbursement in Third Quarter of 2014
International Development Association114565Total Disbursement in Third Quarter of 2014
International Development Association-84420Total Commitment Cancellations in Fourth Quarter of 2014
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Presidential Decree/govt Regulation which (a) clearly defines roles & responsibilities in economic policy design, implementation & evaluation at central level (b) establishes an effective coordination
Intermediate Results Indicator
Regular meetings of coordination group taking place, with appropriate agenda and relatively few major economic policy decisions being taken outside the mechanism.
Intermediate Results Indicator
Publication of macroeconomic and fiscal forecasts with evidence that these forecasts provide the basis for budget and economic policy discussions.
Intermediate Results Indicator
New structure of MEDT corresponds to that proposed in the SDP
Intermediate Results Indicator
Satisfactory implementation (according to private sector surveys) of significant measures to improve the business environment proposed by the investment council.
Intermediate Results Indicator
High quality policy papers are produced and subsequently translated into policy decisions.
Intermediate Results Indicator
Pay and grading reform group established
Intermediate Results Indicator
Options paper for pay reform is produced
PDO Indicator
Enhanced inter-ministerial coordination and capacity to ensure a coherent economic policy decision-making process.
PDO Indicator
Public institutions (and particularly the MEDT, through capacity building and restructuring) are enabled to formulate sound and analytically informed policy measure and proposals.
PDO Indicator
Capacity for carrying out a reform of wages and employment in the civil service, together with options developed
44000-P096409
World Bank
Second On-farm Irrigation Project
International Development Association
MINISTRY OF AGRICULTURE, WATER RESOURCES & PROCESSING INDUST
International Development Association
MINISTRY OF AGRICULTURE, WATER RESOURCES & PROCESSING INDUSTPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Pieter David Meerbach
+1-202-473-1000dmeerbach@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Kadamjaiskiy Raion
40.0000 71.5830
Batken Oblasty
39.8330 71.0000
Toru-Aygyr
42.4950 76.4270
Keminskiy Rayon
42.8330 76.3330
Kara-Suskiy Raion
40.6670 72.9170
Aravanskiy Rayon
40.5000 72.5000
Talas
42.3550 72.6570
"Ak-Tala, Kyrgyzstan
41.0630 74.7810
Jumgal
41.9490 74.4060
Moskovsky Raion
42.7450 74.1260
Uzgensky Raion
40.5500 73.3000
Sub-National GovernmentIrrigation and DrainageCentral Government (Central Agencies)Rural MarketsGenderBiodiversityWater Institutions, Policies and ReformFinance for DevelopmentRural Infrastructure and service deliveryRenewable Natural Resources Asset ManagementAgriculture FinanceWater Resource ManagementRural DevelopmentLand Administration and ManagementJobsLandscape Management
0.00
0.00
0.00
75471.70
75471.70
75471.70
75471.70
75471.70
75471.70
100628.92
100628.94
100628.94
251572.32
251572.33
251572.33
251572.32
251572.33
251572.33
251572.32
251572.33
251572.33
251572.32
251572.33
251572.33
377358.49
377358.49
377358.49
377358.49
377358.49
377358.49
503144.65
503144.65
503144.66
503144.65
503144.65
503144.66
503144.65
503144.65
503144.66
377358.49
377358.49
377358.49
377358.49
377358.49
377358.49
301886.79
301886.79
301886.79
251572.32
251572.33
251572.33
125786.16
125786.16
125786.17
125786.16
125786.16
125786.17
125786.16
125786.16
125786.17
75471.70
75471.70
75471.70
50314.46
50314.46
50314.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
333333.33
333333.33
333333.34
0.00
0.00
0.00
0.00
0.00
0.00
90959.60
90959.60
90959.60
76027.74
76027.74
76027.75
22817.20
22817.21
22817.21
355380.89
355380.90
355380.90
252721.63
252721.63
252721.64
428033.34
428033.34
428033.35
147559.20
147559.20
147559.20
316392.96
316392.96
316392.97
58047.88
58047.88
58047.89
390450.54
390450.55
390450.55
296786.96
296786.97
296786.97
202619.66
202619.66
202619.66
359314.17
359314.17
359314.18
277745.66
277745.66
277745.67
159350.69
159350.70
159350.70
499334.84
499334.84
499334.85
328510.01
328510.02
328510.02
56229.60
56229.60
56229.60
100000.00
100000.00
100000.00
133333.33
133333.33
133333.34
266666.66
266666.67
266666.67
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
666666.66
666666.67
666666.67
500000.00
500000.00
500000.00
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
500000.00
500000.00
500000.00
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16000000Total Commitment in Second Quarter of 2007
International Development Association1000000Total Disbursement in Fourth Quarter of 2007
International Development Association272879Total Disbursement in Third Quarter of 2008
International Development Association112797Total Disbursement in Fourth Quarter of 2008
International Development Association115286Total Disbursement in Fourth Quarter of 2008
International Development Association68452Total Disbursement in First Quarter of 2009
International Development Association258778Total Disbursement in Second Quarter of 2009
International Development Association286786Total Disbursement in Second Quarter of 2009
International Development Association520579Total Disbursement in Second Quarter of 2009
International Development Association281865Total Disbursement in Third Quarter of 2009
International Development Association476300Total Disbursement in Third Quarter of 2009
International Development Association325471Total Disbursement in Fourth Quarter of 2009
International Development Association476361Total Disbursement in Fourth Quarter of 2009
International Development Association482267Total Disbursement in Fourth Quarter of 2009
International Development Association196769Total Disbursement in First Quarter of 2010
International Development Association245909Total Disbursement in First Quarter of 2010
International Development Association265439Total Disbursement in Second Quarter of 2010
International Development Association683740Total Disbursement in Second Quarter of 2010
International Development Association174144Total Disbursement in Third Quarter of 2010
International Development Association250185Total Disbursement in Fourth Quarter of 2010
International Development Association412882Total Disbursement in Fourth Quarter of 2010
International Development Association508285Total Disbursement in Fourth Quarter of 2010
International Development Association344748Total Disbursement in First Quarter of 2011
International Development Association545613Total Disbursement in First Quarter of 2011
International Development Association8300000Total Commitment in Second Quarter of 2011
International Development Association607859Total Disbursement in Second Quarter of 2011
International Development Association6700000Total Commitment in Second Quarter of 2011
International Development Association208711Total Disbursement in Third Quarter of 2011
International Development Association409079Total Disbursement in Third Quarter of 2011
International Development Association460153Total Disbursement in Third Quarter of 2011
International Development Association263063Total Disbursement in Fourth Quarter of 2011
International Development Association570174Total Disbursement in Fourth Quarter of 2011
International Development Association107853Total Disbursement in First Quarter of 2012
International Development Association370199Total Disbursement in First Quarter of 2012
International Development Association154606Total Disbursement in Second Quarter of 2012
International Development Association443399Total Disbursement in Second Quarter of 2012
International Development Association900000Total Disbursement in Second Quarter of 2012
International Development Association253944Total Disbursement in Third Quarter of 2012
International Development Association275977Total Disbursement in Third Quarter of 2012
International Development Association455609Total Disbursement in Third Quarter of 2012
International Development Association237745Total Disbursement in Fourth Quarter of 2012
International Development Association308186Total Disbursement in Fourth Quarter of 2012
International Development Association125874Total Disbursement in Fourth Quarter of 2012
International Development Association168689Total Disbursement in Fourth Quarter of 2012
International Development Association50910Total Disbursement in First Quarter of 2013
International Development Association552317Total Disbursement in First Quarter of 2013
International Development Association68245Total Disbursement in First Quarter of 2013
International Development Association236375Total Disbursement in Second Quarter of 2013
International Development Association313897Total Disbursement in Second Quarter of 2013
International Development Association67783Total Disbursement in Second Quarter of 2013
International Development Association95339Total Disbursement in Second Quarter of 2013
International Development Association99329Total Disbursement in Third Quarter of 2013
International Development Association182789Total Disbursement in Third Quarter of 2013
International Development Association750400Total Disbursement in Third Quarter of 2013
International Development Association140713Total Disbursement in Third Quarter of 2013
International Development Association493120Total Disbursement in Third Quarter of 2013
International Development Association82815Total Disbursement in Fourth Quarter of 2013
International Development Association275699Total Disbursement in Fourth Quarter of 2013
International Development Association240041Total Disbursement in Fourth Quarter of 2013
International Development Association706942Total Disbursement in Fourth Quarter of 2013
International Development Association33120Total Disbursement in First Quarter of 2014
International Development Association130571Total Disbursement in First Quarter of 2014
International Development Association191310Total Disbursement in First Quarter of 2014
International Development Association-555569Total Commitment Cancellations in Second Quarter of 2014
International Development Association-171082Total Disbursement in Second Quarter of 2014
International Development Association335998Total Disbursement in Second Quarter of 2014
International Development Association687905Total Disbursement in Second Quarter of 2014
International Development Association269350Total Disbursement in Third Quarter of 2014
International Development Association389824Total Disbursement in Third Quarter of 2014
International Development Association410708Total Disbursement in Third Quarter of 2014
International Development Association770350Total Disbursement in Fourth Quarter of 2014
International Development Association245403Total Disbursement in Fourth Quarter of 2014
International Development Association738880Total Disbursement in Fourth Quarter of 2014
International Development Association197173Total Disbursement in First Quarter of 2015
International Development Association315275Total Disbursement in First Quarter of 2015
International Development Association467646Total Disbursement in First Quarter of 2015
International Development Association469242Total Disbursement in Second Quarter of 2015
International Development Association541096Total Disbursement in Second Quarter of 2015
International Development Association1008348Total Disbursement in Second Quarter of 2015
International Development Association398510Total Disbursement in Third Quarter of 2015
International Development Association448331Total Disbursement in Third Quarter of 2015
International Development Association606740Total Disbursement in Third Quarter of 2015
International Development Association-8244Total Interest Repayment in Third Quarter of 2015
International Development Association371449Total Disbursement in Fourth Quarter of 2015
International Development Association483617Total Disbursement in Fourth Quarter of 2015
International Development Association543157Total Disbursement in Fourth Quarter of 2015
International Development Association203477Total Disbursement in First Quarter of 2016
International Development Association475472Total Disbursement in First Quarter of 2016
International Development Association-19967Total Interest Repayment in First Quarter of 2016
International Development Association2275Total Disbursement in Second Quarter of 2016
International Development Association-27786Total Interest Repayment in Third Quarter of 2016
International Development Association-4460Total Disbursement in Fourth Quarter of 2016
International Development Association-26346Total Interest Repayment in First Quarter of 2017
International Development Association-4509Total Commitment Cancellations in Second Quarter of 2017
International Development Association-26705Total Interest Repayment in Third Quarter of 2017
International Development Association-27933Total Interest Repayment in First Quarter of 2018
International Development Association-27709Total Interest Repayment in Third Quarter of 2018
International Development Association-26926Total Interest Repayment in First Quarter of 2019
International Development Association-27184Total Interest Repayment in Third Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2, Section I.A.4 | Description :All rehabilitation and construction works shall be selected inaccordance with criteria and procedures acceptable to IDA. | Frequency :Quarterly
Finance Agreement :Schedule 2, Section I.A.5 | Description :Laws and regulations in force governing the setting of irrigationservice fees shall not be amended in a manner which will adversely affect the implementation of the Project activities. | Frequency:Quarterly
Finance Agreement :Schedule 2, Section I.A.8 | Description :WUA Support Units shall be maintained with adequate technical andfinancial resources. | Frequency :Quarterly
Intermediate Results Indicator
Number of WUAs with well informed water users actively interacting with WUA management through their zonal representatives.
Intermediate Results Indicator
Number of WUA Federations formed, operational, and effective.
Intermediate Results Indicator
Number of WUAs that are officially registered members of the Republican Union of WUAs.
Intermediate Results Indicator
Number of Water Councils formed, operational, and effective.
Intermediate Results Indicator
Number of WUAs that have revised their ISF fee level and are moving towards the agreed target level for ISF (as assessed from assetand maintenance studies)
Intermediate Results Indicator
Number of WUAs where asset management plans prepared, approved by the WUA Representative/General Assembly, and contributing to the setting of the ISF.
Intermediate Results Indicator
Number of WUAs where minimum maintenance expenditure for sustainable operation identified and used in setting the ISF.
Intermediate Results Indicator
Possibility of systems rehabilitated under OIP-2 to provide regulated volume of water in order to meet the demands of water users an remove excess of drainage water (measured according to WUA numbers,
Intermediate Results Indicator
90 percent of well-informed WUAs satisfactorily (or more higher) assess activity of WUA SUs
Intermediate Results Indicator
Number of WUAs where the seasonal water allocation plans are prepared according to the updated procedures.
Intermediate Results Indicator
Disbursement Rate – Percentage of approved budget.
Intermediate Results Indicator
Number of WUAs where the in-season scheduling and distribution procedures follow the updated procedures.
Intermediate Results Indicator
Duration (in days) WUA SU staff trained in new topics (water management, asset and maintenance management, etc.) and able to apply learning to training of WUA personnel (measured in number of person d
Intermediate Results Indicator
Strengthening capacity of Implementation Agency in part of project management and adherence of project implementation schedule
PDO Indicator
Evidence, in at least 80 percent of WUAs, of well-informed water users satisfied with the performance of the WUA management.
PDO Indicator
Area provided with irrigation and drainage services (ha)
PDO Indicator
Area provided with irrigation and drainage services - Improved (ha)
PDO Indicator
Operational water user associations created and/or strengthened (number)
PDO Indicator
Direct project beneficiaries
PDO Indicator
Water distribution to farmers within 80 percent of the rehabilitated systems closely matches the crops irrigation water demands.
PDO Indicator
Female beneficiaries
PDO Indicator
Water users provided with irrigation and drainage services - female (number)
PDO Indicator
Water users provided with new/improved irrigation and drainage services (number)
PDO Indicator
Collection rates by WUAs makes up at least 90 percent of total assessed fees (based on realistic annual O&M plans) from the third agricultural season after completion of rehabilitation works
PDO Indicator
At least 80 percent of WUAs judged to be representative, transparent, and accountable to their members.
PDO Indicator
Temporary employment (number of man-months) generated by rehabilitation works
PDO Indicator
Evidence, for the WUA as a whole and tail-end farmers in particular, of increased agricultural productivity in at least 90 percent of OIP-2 schemes from the third agricultural season after completion
44000-P146970
World Bank
Third Village Investment Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Janelle Plummer
+1-202-473-1000jplummer1@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Talas
42.3330 72.0000
Naryn
41.4330 75.9670
Issyk-Kul'skaya Oblast'
42.0000 78.0000
Chuyskaya Oblast'
42.4170 74.5000
Public Administration - Social ProtectionSub-National GovernmentOther Public AdministrationParticipation and Civic EngagementRural DevelopmentSocial InclusionRural Infrastructure and service delivery
0.00
0.00
133333.33
133333.33
133333.33
133333.33
133333.33
133333.33
133333.33
133333.33
133333.33
133333.33
133333.33
133333.37
241666.67
241666.67
241666.67
241666.67
241666.67
241666.67
241666.67
241666.67
241666.67
241666.67
241666.67
241666.63
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.67
291666.63
225000.00
225000.00
225000.00
225000.00
225000.00
225000.00
225000.00
225000.00
225000.00
225000.00
225000.00
225000.00
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.33
108333.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25000.00
25000.00
45833.33
45833.33
45833.33
45833.33
45833.33
45833.33
45833.33
45833.33
45833.33
45833.33
45833.33
45833.37
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
150000.00
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.63
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.67
316666.63
233333.33
233333.33
233333.33
233333.33
233333.33
233333.33
233333.33
233333.33
233333.33
233333.33
233333.33
233333.37
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.37
6600000Total Commitment in First Quarter of 2015
International Development Association5400000Total Commitment in First Quarter of 2015
International Development Association500000Total Disbursement in Second Quarter of 2016
International Development Association500000Total Disbursement in Third Quarter of 2016
International Development Association371731Total Disbursement in Fourth Quarter of 2016
International Development Association382525Total Disbursement in First Quarter of 2017
International Development Association494002Total Disbursement in First Quarter of 2017
International Development Association445530Total Disbursement in Second Quarter of 2017
International Development Association237531Total Disbursement in Fourth Quarter of 2017
International Development Association963015Total Disbursement in Fourth Quarter of 2017
International Development Association236274Total Disbursement in Second Quarter of 2018
International Development Association546300Total Disbursement in Second Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Execution of the Subsidiary Agreement | Description :The Recipient shall exercise its rights and carry out itsobligations under the Subsidiary Agreement in such manner as to protect the interests of the Recipient and the Association and toaccomplish the purposes of the Financing. Except as the Association shall otherwise agree, the Recipient shall not assign, amend,abrogate, waive, terminate or fail to enforce the Subsidiary Agreement or any of | Frequency :CONTINUOUS
Finance Agreement :Sub-grants and small grants | Description :The Recipient shall: (a) cause the Project Implementing Entity tomake Sub-Grants and Small Grants selected in accordance with detailed criteria set forth in the Project Operations Manual; and (b)enter into an agreement (Framework Agreement) with an eligible Ayil Okmotu on terms and conditions approved by the Association. |Frequency :Yearly
Finance Agreement :Safeguards instruments | Description :Except as the Association shall otherwise agree, the Recipient shall causethe Project Implementing Entity not to assign, amend, abrogate, waive or fail to enforce the RPF and/or EMF, or any of theirprovisions. | Frequency :Yearly
Finance Agreement :Project reporting | Description :The Recipient shall cause the Project Implementing Entity to monitor andevaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the GeneralConditions and on the basis of the indicators agreed with the Association. | Frequency :Yearly
Intermediate Results Indicator
Number of grants for micro-projects implemented (cumulative)
Intermediate Results Indicator
Number of sub-projects completed
Intermediate Results Indicator
Number of AAs that have submitted proposals to compete for grants (cumulative)
Intermediate Results Indicator
Ratio between operating expenditures and total project budget
Intermediate Results Indicator
Percentage of beneficiaries with increased knowledge of local governance topics covered under project trainings
Intermediate Results Indicator
Percentage of beneficiaries that perceive their role has increased in decision-making
Intermediate Results Indicator
Percentage of actually allocated vs. planned funds for O&M
Intermediate Results Indicator
Percentage of beneficiaries that feel that community investments funded by the project reflected their priority needs
Intermediate Results Indicator
Percentage of female beneficiaries that perceive their role has increased in decision-making
Intermediate Results Indicator
Satisfaction rate of beneficiaries who attended exchange visits (peer to peer learning)
Intermediate Results Indicator
Percentage of people that participated in public hearings at the village level
PDO Indicator
Number of municipal districts (AAs) with Local Development Strategy developed involving community
PDO Indicator
Direct project beneficiaries
PDO Indicator
Number of AAs conducting public hearings annually, where information is disclosed to the public on budget formulation and executionin accessible formats (cumulative)
PDO Indicator
Beneficiaries that report improved access to infrastructure services as a result of project activities
PDO Indicator
Female beneficiaries that report improved access to infrastructure services as a result of project activities
PDO Indicator
Number of AAs with access to improved quality infrastructure services (non-subsidized/subsidized)
PDO Indicator
Female beneficiaries
44000-P107608
World Bank
National Road Rehabilitation (Osh-Batken-Isfana)
International Development Association
MINISTRY OF TRANSPORT AND COMMUNICATIONS
International Development Association
MINISTRY OF TRANSPORT AND COMMUNICATIONSPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Serdar Jepbarov
+1-202-473-1000sdjepbarov@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Isfana
39.8390 69.5280
Osh Oblasty
40.0000 73.0000
Batken Oblasty
39.8330 71.0000
Osh
40.5280 72.7990
Pulgon
40.1470 71.7300
Public Administration - TransportationRural and Inter-Urban RoadsRural DevelopmentTrade FacilitationJobsRegional IntegrationRural Infrastructure and service deliveryTrade
400657.50
400657.50
267105.01
267105.01
267104.99
2136840.00
2136840.00
2136840.01
1068420.01
1068420.01
1068419.99
1068420.01
1068420.01
1068419.99
1602630.00
1602630.00
1602630.00
1602630.00
1602630.00
1602630.00
534209.99
534209.99
534210.01
534209.99
534209.99
534210.01
1602630.00
1602630.00
1602630.00
1602630.00
1602630.00
1602630.00
267105.01
267105.01
267104.99
267105.01
267105.01
267104.99
267105.01
267105.01
267104.99
267105.01
267105.01
267104.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
400657.50
400657.50
0.00
400657.51
400657.50
2136840.00
2136840.00
2136840.01
1068420.00
1068420.00
1068420.01
1068420.00
1068420.00
1068420.01
1935963.33
1935963.33
1935963.34
1935963.33
1935963.33
1935963.34
784209.99
784210.00
784210.00
784209.99
784210.00
784210.00
319296.66
319296.67
319296.67
319296.66
319296.67
319296.67
475438.33
475438.34
475438.34
475438.33
475438.34
475438.34
475438.33
475438.34
475438.34
423355.00
423355.00
423355.02
416666.66
416666.67
416666.67
416666.66
416666.67
416666.67
1300000.00
1300000.00
1300000.00
72916.66
72916.67
72916.67
1098958.33
1098958.33
1098958.34
989583.33
989583.33
989583.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13750000Total Commitment in Fourth Quarter of 2009
International Development Association11250000Total Commitment in Fourth Quarter of 2009
International Development Association576259Total Disbursement in First Quarter of 2010
International Development Association220000Total Disbursement in Second Quarter of 2010
International Development Association5500000Total Commitment in Third Quarter of 2010
International Development Association62000Total Disbursement in Third Quarter of 2010
International Development Association4500000Total Commitment in Third Quarter of 2010
International Development Association192244Total Disbursement in Fourth Quarter of 2010
International Development Association2574240Total Disbursement in Fourth Quarter of 2010
International Development Association931409Total Disbursement in First Quarter of 2011
International Development Association450000Total Disbursement in First Quarter of 2011
International Development Association8800000Total Commitment in Second Quarter of 2011
International Development Association108592Total Disbursement in Second Quarter of 2011
International Development Association332648Total Disbursement in Second Quarter of 2011
International Development Association171126Total Disbursement in Second Quarter of 2011
International Development Association7200000Total Commitment in Second Quarter of 2011
International Development Association147724Total Disbursement in Third Quarter of 2011
International Development Association838229Total Disbursement in Third Quarter of 2011
International Development Association1079409Total Disbursement in Third Quarter of 2011
International Development Association333052Total Disbursement in Third Quarter of 2011
International Development Association436618Total Disbursement in Third Quarter of 2011
International Development Association260000Total Disbursement in Fourth Quarter of 2011
International Development Association524408Total Disbursement in Fourth Quarter of 2011
International Development Association91831Total Disbursement in Fourth Quarter of 2011
International Development Association440684Total Disbursement in Fourth Quarter of 2011
International Development Association1096507Total Disbursement in Fourth Quarter of 2011
International Development Association290588Total Disbursement in Fourth Quarter of 2011
International Development Association324183Total Disbursement in Fourth Quarter of 2011
International Development Association406226Total Disbursement in Fourth Quarter of 2011
International Development Association-352Total Interest Repayment in First Quarter of 2012
International Development Association86826Total Disbursement in First Quarter of 2012
International Development Association246527Total Disbursement in First Quarter of 2012
International Development Association191541Total Disbursement in First Quarter of 2012
International Development Association368965Total Disbursement in First Quarter of 2012
International Development Association167600Total Disbursement in Second Quarter of 2012
International Development Association164505Total Disbursement in Second Quarter of 2012
International Development Association143880Total Disbursement in Second Quarter of 2012
International Development Association450000Total Disbursement in Second Quarter of 2012
International Development Association2990085Total Disbursement in Third Quarter of 2012
International Development Association3039139Total Disbursement in Third Quarter of 2012
International Development Association-3468Total Interest Repayment in Third Quarter of 2012
International Development Association79528Total Disbursement in Third Quarter of 2012
International Development Association128636Total Disbursement in Third Quarter of 2012
International Development Association406253Total Disbursement in Third Quarter of 2012
International Development Association445426Total Disbursement in Third Quarter of 2012
International Development Association1219744Total Disbursement in Fourth Quarter of 2012
International Development Association1381806Total Disbursement in Fourth Quarter of 2012
International Development Association550000Total Disbursement in Fourth Quarter of 2012
International Development Association68102Total Disbursement in Fourth Quarter of 2012
International Development Association125378Total Disbursement in Fourth Quarter of 2012
International Development Association32658Total Disbursement in Fourth Quarter of 2012
International Development Association263502Total Disbursement in Fourth Quarter of 2012
International Development Association395391Total Disbursement in Fourth Quarter of 2012
International Development Association1489518Total Disbursement in First Quarter of 2013
International Development Association-24626Total Interest Repayment in First Quarter of 2013
International Development Association454550Total Disbursement in First Quarter of 2013
International Development Association1868742Total Disbursement in First Quarter of 2013
International Development Association224880Total Disbursement in Second Quarter of 2013
International Development Association221259Total Disbursement in Second Quarter of 2013
International Development Association177378Total Disbursement in Second Quarter of 2013
International Development Association606283Total Disbursement in Second Quarter of 2013
International Development Association-40444Total Interest Repayment in Third Quarter of 2013
International Development Association-4061Total Interest Repayment in Third Quarter of 2013
International Development Association1842371Total Disbursement in Third Quarter of 2013
International Development Association252296Total Disbursement in Fourth Quarter of 2013
International Development Association1492028Total Disbursement in Fourth Quarter of 2013
International Development Association357285Total Disbursement in Fourth Quarter of 2013
International Development Association55241Total Disbursement in Fourth Quarter of 2013
International Development Association477851Total Disbursement in Fourth Quarter of 2013
International Development Association-58088Total Disbursement in First Quarter of 2014
International Development Association1240079Total Disbursement in First Quarter of 2014
International Development Association-41766Total Interest Repayment in First Quarter of 2014
International Development Association437537Total Disbursement in First Quarter of 2014
International Development Association-5249Total Interest Repayment in First Quarter of 2014
International Development Association2026377Total Disbursement in First Quarter of 2014
International Development Association301801Total Disbursement in First Quarter of 2014
International Development Association-7020Total Disbursement in Second Quarter of 2014
International Development Association72980Total Disbursement in Second Quarter of 2014
International Development Association116088Total Disbursement in Second Quarter of 2014
International Development Association34277Total Disbursement in Second Quarter of 2014
International Development Association-46461Total Interest Repayment in Third Quarter of 2014
International Development Association-6609Total Interest Repayment in Third Quarter of 2014
International Development Association491894Total Disbursement in Third Quarter of 2014
International Development Association865465Total Disbursement in Third Quarter of 2014
International Development Association1094224Total Disbursement in Third Quarter of 2014
International Development Association-13794Total Interest Repayment in Third Quarter of 2014
International Development Association154693Total Disbursement in Third Quarter of 2014
International Development Association-1072955Total Commitment Cancellations in Fourth Quarter of 2014
International Development Association138023Total Disbursement in Fourth Quarter of 2014
International Development Association153047Total Disbursement in Fourth Quarter of 2014
International Development Association899227Total Disbursement in Fourth Quarter of 2014
International Development Association1294981Total Disbursement in Fourth Quarter of 2014
International Development Association733673Total Disbursement in Fourth Quarter of 2014
International Development Association244386Total Disbursement in Fourth Quarter of 2014
International Development Association417445Total Disbursement in Fourth Quarter of 2014
International Development Association-43273Total Interest Repayment in First Quarter of 2015
International Development Association-7231Total Interest Repayment in First Quarter of 2015
International Development Association-21518Total Interest Repayment in First Quarter of 2015
International Development Association1627Total Disbursement in First Quarter of 2015
International Development Association-5135Total Commitment Cancellations in Second Quarter of 2015
International Development Association-699283Total Commitment Cancellations in Second Quarter of 2015
International Development Association2457016Total Disbursement in Second Quarter of 2015
International Development Association-25924Total Commitment Cancellations in Second Quarter of 2015
International Development Association234466Total Disbursement in Second Quarter of 2015
International Development Association-16012Total Commitment Cancellations in Second Quarter of 2015
International Development Association140115Total Disbursement in Second Quarter of 2015
International Development Association-42262Total Interest Repayment in Third Quarter of 2015
International Development Association-12371Total Interest Repayment in Third Quarter of 2015
International Development Association-29337Total Interest Repayment in Third Quarter of 2015
International Development Association-41836Total Interest Repayment in First Quarter of 2016
International Development Association-16617Total Interest Repayment in First Quarter of 2016
International Development Association-28536Total Interest Repayment in First Quarter of 2016
International Development Association-42150Total Interest Repayment in Third Quarter of 2016
International Development Association-16742Total Interest Repayment in Third Quarter of 2016
International Development Association-28750Total Interest Repayment in Third Quarter of 2016
International Development Association-40860Total Interest Repayment in First Quarter of 2017
International Development Association-16229Total Interest Repayment in First Quarter of 2017
International Development Association-27870Total Interest Repayment in First Quarter of 2017
International Development Association-41438Total Interest Repayment in Third Quarter of 2017
International Development Association-16459Total Interest Repayment in Third Quarter of 2017
International Development Association-28264Total Interest Repayment in Third Quarter of 2017
International Development Association-43343Total Interest Repayment in First Quarter of 2018
International Development Association-17216Total Interest Repayment in First Quarter of 2018
International Development Association-29563Total Interest Repayment in First Quarter of 2018
International Development Association-42994Total Interest Repayment in Third Quarter of 2018
International Development Association-17077Total Interest Repayment in Third Quarter of 2018
International Development Association-29326Total Interest Repayment in Third Quarter of 2018
International Development Association-41780Total Interest Repayment in First Quarter of 2019
International Development Association-16595Total Interest Repayment in First Quarter of 2019
International Development Association-28497Total Interest Repayment in First Quarter of 2019
International Development Association-42181Total Interest Repayment in Third Quarter of 2019
International Development Association-16754Total Interest Repayment in Third Quarter of 2019
International Development Association-28771Total Interest Repayment in Third Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2, Section I., A. | Description :The Recipient, through MoTC, shall no later than December 15 of eachcalendar year, during the implementation of the Project, starting December 15, 2009, submit to the Association an Annual Work Progr| Frequency :Yearly
Finance Agreement :Schedule 2, Section I., A | Description :The Recipient, through the MoTC, shall no later than June 1 of eachcalendar year, during the implementation of Part A of the Project, starting June 1, 2011. | Frequency :Yearly
Finance Agreement :Schedule 2, Section IV., B. | Description :Notwithstanding the provisions of Part A of this Section, nowithdrawal shall be made under category 1 unless the EMP and RAP have been prepared. | Due Date :26-Feb-2010
Finance Agreement :Schedule 2, Section I, A3 | Description :The Recipient, through the MOTC, shall submit an Annual Work Programfor the following calendar year. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I, A.4 | Description :The Recipient, shall, not later than June 1 of each calendar year,provide support for an independent audit and action on findings. | Frequency :Yearly
Finance Agreement :Schedule 2, Section I, A.5 | Description :For the purposes of carrying out the Project, the Recipient shallcause MOTC to update in form and substance satisfactory to the Association, the Project Operational Manual. | Due Date :30-Dec-2010
Finance Agreement :Schedule 2, Section I, A.6 | Description :For the purposes of carrying out Part A.2 of the Project, theRecipient shall, through MOTC enter into and thereafter maintain, implementation arrangements with the Municipality of Osh. | DueDate :31-Oct-2010
Finance Agreement :Schedule 2, Section II, A.2 | Description :The Recipient shall carry out jointly with the Association, a midtermreview of the progress made in carrying out the Project. | Due Date :01-Sep-2011
Finance Agreement :Schedule 2, Section II, A,.3 | Description :The Recipient shall furnish to the Association, a separate reportdescribing the status of implementation of each component of the Project and a summary report of Project implementation. | Due Date:15-Aug-2011
Finance Agreement :Schedule 2, Section II, B.2 | Description :The Recipient shall prepare and furnish to the Association interimunaudited financial reports for the Project covering the quarter, in form and substance satisfactory to the Association. |Frequency :Quarterly
Finance Agreement :Schedule 2, Section IV, B.1 | Description :No withdrawal shall be made for payments made prior to the date ofthis Agreements, except that withdrawals up to an aggregate amount not to exceed SDR 1,200,000 out of the Grant may be made. | DueDate :31-Oct-2010
Finance Agreement :Schedule 2, Section II, A.1 | Description :The Recipient shall monitor and evaluate the progress of the Projectand prepare Project Reports covering one calendar semester, within 45 days after end of period. | Frequency :Quarterly
Finance Agreement :Schedule 2, Section I., A.4 | Description :The Recipient, through MoTC, shall no later than December 15 of eachcalendar year, during the implementation of the Project, starting December 15, 2011, submit to the Association an Annual Work Pro |Frequency :Yearly
Finance Agreement :Schedule 2, Section I., A.5 | Description :The Recipient, shall, not later than June 1 of each calendar year,provide support for an independent audit and action on findings. | Frequency :Yearly
Intermediate Results Indicator
Percentage of total classified road network in the project area in good and fair condition
Intermediate Results Indicator
Number of kilometers of roads rehabilitated along the Osh-Batken-Isfana road corridor
Intermediate Results Indicator
Number of kilometers of urban roads repaired within the city of Osh
Intermediate Results Indicator
Number of kilometers of roads repaired in and around the greater Osh and Jalal-Abad city vicinities
Intermediate Results Indicator
Road safety audit undertaken at pre-opening stage of project road sections
Intermediate Results Indicator
Collected road condition data transferred into road database
Intermediate Results Indicator
Pilot demonstration projects on road safety along the corridor developed
PDO Indicator
Number of person-months of employment created
PDO Indicator
Direct project beneficiaries
PDO Indicator
Proportional increase in the number of rural people along the OBI road corridor who live within 2 km of an all-season road
PDO Indicator
Female beneficiaries
PDO Indicator
National road safety program developed and launched
PDO Indicator
Reduction in travel time for road users by car along the project road sections of the Osh-Batken-Isfana Road corridor: Pulgon-Burgandy (32km)
PDO Indicator
Reduction in travel time for road users by car along the project road sections of the Osh-Batken-Isfana Road corridor: Nookat Pass (18km)
PDO Indicator
Road condition surveyed (roughness)
PDO Indicator
Reduction in transport costs for road users, by car, along the project road section of the Osh-Batken-Isfana road corridor: Pulgon-Burgandy (32 km)
PDO Indicator
Reduction in transport costs for road users by car along the project road sections of the Osh-Batken-Isfana Road corridor - Nookat Pass (18km)
PDO Indicator
Proportional increase in traffic one year after project road section of the Osh-Batken-Isfana Road corridor has been improved or rehabilitated: Pulgon-Burgandy (32km)
PDO Indicator
Proportional increase in traffic one year after project road section of the Osh-Batken-Isfana Road corridor has been improved or rehabilitated: Nookat Pass (18km)
44000-P126274
World Bank
Programmatic Development Policy Operation 2
International Development Association
MINISTRY OF FINANCE
International Development Association
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Kamer Karakurum-Ozdemir
+1-202-473-1000kozdemir@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTANOther Industry, Trade and ServicesLaw and JusticeBanking InstitutionsOther Energy and ExtractivesOther Public AdministrationFinancial StabilityRegulation and Competition PolicyRule of LawPublic AdministrationFinancial Sector IntegrityJudicial and other Dispute Resolution MechanismsFinancial Sector oversight and policy/banking regulation & restructuringPublic Expenditure ManagementPublic Finance ManagementBusiness Enabling EnvironmentTransparency, Accountability and Good Governance
0.00
0.00
13890000Total Commitment in Second Quarter of 2014
International Development Association11110000Total Commitment in Second Quarter of 2014
International Development Association13858714Total Disbursement in Third Quarter of 2014
International Development Association11083888Total Disbursement in Third Quarter of 2014
International Development Association-55408Total Interest Repayment in First Quarter of 2015
International Development Association-47320Total Interest Repayment in Third Quarter of 2015
International Development Association-46989Total Interest Repayment in First Quarter of 2016
International Development Association-47449Total Interest Repayment in Third Quarter of 2016
International Development Association-45167Total Interest Repayment in First Quarter of 2017
International Development Association-46947Total Interest Repayment in Third Quarter of 2017
International Development Association-48530Total Interest Repayment in First Quarter of 2018
International Development Association-48087Total Interest Repayment in Third Quarter of 2018
International Development Association-46489Total Interest Repayment in First Quarter of 2019
International Development Association-46587Total Interest Repayment in Third Quarter of 2019
International Development AssociationProject Information DocumentFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Worldwide Governance Indicator Control of Corruption - percentile rank
Intermediate Results Indicator
Improve the investor protection index (sub-indicator of DB)
Intermediate Results Indicator
Increased confidence in banks as evidenced by increasing deposits to GDP ratio
Intermediate Results Indicator
Risk-based inspection by MoE and pilot agencies reduces inspection burden
Intermediate Results Indicator
Effectiveness of internal audit increased (PEFA P1-21)
Intermediate Results Indicator
MoF Public Procurement Report shows increasing compliance with PPL
Intermediate Results Indicator
Key operational and financial performance indicators and key decisions of the power sector are regularly disclosed
Intermediate Results Indicator
Increase in the budget for the judiciary
Intermediate Results Indicator
NBKR regularly collects credit information from banks and microfinance institutions and enhances supervision
Intermediate Results Indicator
Composition of expenditure out-turns compared to original approved budget
44000-P154778
World Bank
Sustainable Rural Water Supply and Sanitation Project
International Development Association
COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY
International Development Association
COMMUNITY DEVELOPMENT AND INVESTMENT AGENCYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Susanna Smets
+1-202-473-1000ssmets@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Osh Oblasty
40.0000 73.0000
Issyk-Kul
42.0000 78.0000
Chuyskaya Oblastâ
42.4170 74.5000
Water SupplyPublic Administration - Water, Sanitation and Waste ManagementSanitationMitigationWater Institutions, Policies and ReformEducationRural Water and SanitationGenderWater Resource ManagementEducation FacilitiesClimate changeRural Development
220000.00
220000.00
220000.00
220000.00
220000.00
220000.00
220000.00
220000.00
220000.00
220000.00
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
691666.67
566666.67
566666.67
566666.67
566666.67
566666.67
566666.67
566666.67
566666.67
566666.67
566666.67
566666.67
566666.67
341666.67
341666.67
341666.67
341666.67
341666.67
341666.67
341666.67
341666.67
341666.67
341666.67
341666.67
341666.67
66666.67
66666.67
66666.67
66666.67
66666.67
66666.67
66666.67
66666.67
66666.67
66666.67
66666.67
66666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120000.00
120000.00
120000.00
120000.00
120000.00
120000.00
120000.00
120000.00
120000.00
120000.00
191666.67
191666.67
191666.67
191666.67
191666.67
191666.67
191666.67
191666.67
191666.67
191666.67
191666.67
191666.63
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.33
558333.37
708333.33
708333.33
708333.33
708333.33
708333.33
708333.33
708333.33
708333.33
708333.33
708333.33
708333.33
708333.37
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.63
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.67
791666.63
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.33
483333.37
0.00
12920000Total Commitment in Third Quarter of 2016
International Development Association10580000Total Commitment in Third Quarter of 2016
International Development Association1000000Total Disbursement in First Quarter of 2017
International Development Association19800000Total Commitment in Second Quarter of 2017
International Development Association16200000Total Commitment in Second Quarter of 2017
International Development Association383032Total Disbursement in Fourth Quarter of 2017
International Development Association408768Total Disbursement in Fourth Quarter of 2017
International Development Association971471Total Disbursement in Fourth Quarter of 2017
International Development Association682923Total Disbursement in First Quarter of 2018
International Development Association1382605Total Disbursement in Second Quarter of 2018
International Development Association599458Total Disbursement in Second Quarter of 2018
International Development Association641428Total Disbursement in Second Quarter of 2018
International Development Association860567Total Disbursement in Second Quarter of 2018
International Development Association1338208Total Disbursement in Third Quarter of 2018
International Development Association-2692Total Interest Repayment in Third Quarter of 2018
International Development Association370245Total Disbursement in Third Quarter of 2018
International Development Association986429Total Disbursement in First Quarter of 2019
International Development Association-10033Total Interest Repayment in First Quarter of 2019
International Development Association540457Total Disbursement in Second Quarter of 2019
International Development Association557902Total Disbursement in Second Quarter of 2019
International Development Association508350Total Disbursement in Second Quarter of 2019
International Development Association2000000Total Disbursement in Second Quarter of 2019
International Development Association608612Total Disbursement in Third Quarter of 2019
International Development Association648080Total Disbursement in Third Quarter of 2019
International Development Association-15993Total Interest Repayment in Third Quarter of 2019
International Development Association558057Total Disbursement in Fourth Quarter of 2019
International Development Association1000000Total Disbursement in Fourth Quarter of 2019
International Development Association677653Total Disbursement in Fourth Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
New piped household water connections resulting from the project intervention
Intermediate Results Indicator
Number of social institutions in project areas benefiting from improved sanitation facilities
Intermediate Results Indicator
Number of services contracts signed
Intermediate Results Indicator
Number of villages with updated information on the water supply and sanitation national database
Intermediate Results Indicator
Number of social institutions in project areas connected to the water supply network
Intermediate Results Indicator
Number of households received incentive grant to upgrade sanitation facilities
Intermediate Results Indicator
Commercial systems operating in project areas
Intermediate Results Indicator
Number of service providers with signed agreements with SES Department
Intermediate Results Indicator
Number of people trained to improve hygiene behavior and sanitation practices.
Intermediate Results Indicator
Connection plan for low income households in project areas.
Intermediate Results Indicator
Percentage of beneficiaries satisfied with the participatory process in the project
Intermediate Results Indicator
percentage female (of people trained to improve hygiene behavior and sanitation practices
Intermediate Results Indicator
Implementation of professional and vocational program
Intermediate Results Indicator
Legal creation of aggregated water service provider (pilot)
Intermediate Results Indicator
Preparation of standard designs and guidelines for on-site household sanitation
PDO Indicator
Number of people in rural areas provided with access to Improved Water Sources under the project
PDO Indicator
Number of people in project areas provided with access to improved sanitation through social institutions.
PDO Indicator
Number of people in project areas provided with access to improved sanitation through incentive grant
PDO Indicator
Average hours of water supply per day in project areas
PDO Indicator
Institutional Support Plan for DDWSWD developed and approved
PDO Indicator
Operating Cost Coverage Ratio in project areas
PDO Indicator
Percentage of female (of People provided with access to an improved water source under the project)
PDO Indicator
Percentage of female (of People provided with with access to improved sanitation through social institutions
44000-P162635
World Bank
Enhancing Resilience in Kyrgyzstan Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Ko Takeuchi
+1-202-473-1000ktakeuchi@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Osh Oblasty
40.0000 73.0000
Batken
39.8330 71.0000
Talas
42.3330 72.0000
Naryn oblast
41.4330 75.9670
Kyrgyz Republic
41.5000 75.0000
Jalal-Abad oblast
41.5000 72.5000
Osh City
40.5440 72.7940
Other Public AdministrationICT InfrastructureInsurance and PensionOther EducationDisaster PreparednessICT SolutionsICTEducation FacilitiesEducationAdaptationEducation Governance, School-Based ManagementDisaster Risk FinanceMitigationClimate changeDisaster Risk ManagementDisaster Risk ReductionFinance for Development
0.00
0.00
15900.00
31820.00
76340.00
93300.00
52820.00
117400.00
132820.00
72800.00
160880.00
87340.00
185780.00
97360.00
202440.00
214120.00
111600.00
231280.00
119740.00
246260.00
253900.00
131240.00
274400.00
145060.00
304040.00
318620.00
165340.00
343700.00
362700.00
189620.00
393440.00
202160.00
411340.00
208700.00
430820.00
445840.00
224680.00
448560.00
456280.00
232040.00
468160.00
234740.00
467840.00
473100.00
239140.00
480140.00
239040.00
473020.00
475660.00
238460.00
472500.00
231680.00
454140.00
451140.00
223740.00
438780.00
213380.00
417900.00
410300.00
201760.00
395680.00
193600.00
377780.00
366320.00
179760.00
355000.00
175520.00
345320.00
337160.00
165660.00
325660.00
160080.00
314780.00
307320.00
121820.00
381440.00
0.00
0.00
15900.00
31820.00
76340.00
93300.00
52820.00
117400.00
132820.00
72800.00
160880.00
87340.00
185780.00
97360.00
202440.00
214120.00
111600.00
231280.00
119740.00
246260.00
253900.00
131240.00
274400.00
145060.00
304040.00
318620.00
165340.00
343700.00
362700.00
189620.00
393440.00
202160.00
411340.00
208700.00
430820.00
445840.00
224680.00
448560.00
456280.00
232040.00
468160.00
234740.00
467840.00
473100.00
239140.00
480140.00
239040.00
473020.00
475660.00
238460.00
472500.00
231680.00
454140.00
451140.00
223740.00
438780.00
213380.00
417900.00
410300.00
201760.00
395680.00
193600.00
377780.00
366320.00
179760.00
355000.00
175520.00
345320.00
337160.00
165660.00
325660.00
160080.00
314780.00
307320.00
121820.00
381440.00
10000000Total Commitment in Second Quarter of 2018
International Development Association10000000Total Commitment in Second Quarter of 2018
International Development Association250000Total Disbursement in First Quarter of 2019
International Development Association1372445Total Disbursement in First Quarter of 2019
International Development Association94857Total Disbursement in Second Quarter of 2019
International Development Association88057Total Disbursement in Second Quarter of 2019
International Development Association94882Total Disbursement in Second Quarter of 2019
International Development Association246280Total Disbursement in Third Quarter of 2019
International Development Association246280Total Disbursement in Third Quarter of 2019
International Development Association-1234Total Interest Repayment in Fourth Quarter of 2019
International Development AssociationImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
The Recipient shall establish no later than one (1) month after Effective Date and thereafter operate and maintain during theProject implementation, a Project Coordination Council with terms of reference, composition and resources acceptable to theAssociation, including, inter alia, the responsibility for Project-level decision making. (Section I. A.1 in Schedule 2)
Intermediate Results Indicator
Grievances raised by stakeholders are addressed and closed
Intermediate Results Indicator
Monitoring equipment are purchased, installed and operationalized by staff
Intermediate Results Indicator
Percentage of schools with school monitoring committees established and functioning as planned throughout project cycle (Citizen Engagement)
Intermediate Results Indicator
Landslide monitoring tasks & needs are defined, and staff trained
Intermediate Results Indicator
Percentage of school monitoring committees established and functioning which include at least 50% of women
Intermediate Results Indicator
Grievances raised by women stakeholders are addressed and closed
Intermediate Results Indicator
ICT equipment required to cover the whole country is purchased and installed for improved emergency preparedness and response
Intermediate Results Indicator
Web-based insurance production system is developed
Intermediate Results Indicator
Web-based platform is setup and becomes operational
Intermediate Results Indicator
Intervention and investment plan for the implementation of State Program on Safe Schools and Preschools of the Kyrgyz Republic for the period of 2015 – 2024 is defined
Intermediate Results Indicator
School infrastructure module integrated in the Ministry of Education's Information System, and made accessible to other relevant stakeholders
Intermediate Results Indicator
Claims assessment methodology improved
Intermediate Results Indicator
Search and rescue equipment are purchased and being used by teams
Intermediate Results Indicator
Risk management system of the SIO is in place
Intermediate Results Indicator
Distant Learning System for educating the public is setup and becomes operational
Intermediate Results Indicator
Local engineers trained on advanced seismic risk techniques and design of new school buildings
Intermediate Results Indicator
Number of regional offices of the SIO equipped
PDO Indicator
Out of which are girls
PDO Indicator
Population covered by improved emergency preparedness and response systems in the country
PDO Indicator
Landslides of highest risks are monitored and have an associated emergency plan
PDO Indicator
School facilities with improvements in functional conditions (fraction of total number of school facilities with improved safety and resilience)
PDO Indicator
Students (disaggregated by gender) having access to safer and resilient school facilities
PDO Indicator
Out of which are women
PDO Indicator
Reinsurance program introduced
44000-P074881
World Bank
Payments & Banking System Modernization Project
International Development Association
GOVERNMENT OF KYRGYZ REPUBLIC
International Development Association
GOVERNMENT OF KYRGYZ REPUBLICPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Sylvie K. Bossoutrot
+1-202-473-1000sbossoutrot@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTANServicesOther Non-bank Financial InstitutionsBanking InstitutionsLegal Institutions for a Market EconomyFinancial StabilityFinancial Sector oversight and policy/banking regulation & restructuringRule of LawFinancial Sector IntegrityBusiness Enabling EnvironmentRegulation and Competition Policy
0.00
66666.67
66666.67
66666.66
266666.67
266666.67
266666.66
200000.00
200000.00
200000.00
100000.00
100000.00
100000.00
200000.00
200000.00
200000.00
233333.33
233333.33
233333.34
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
266666.67
266666.67
266666.66
166666.67
166666.67
166666.66
333333.33
333333.33
333333.34
33333.33
33333.33
33333.34
166666.67
166666.67
166666.66
183333.33
183333.33
183333.34
216666.67
216666.67
216666.66
166666.67
166666.67
166666.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9033.46
9033.47
9033.47
10097.79
10097.80
10097.80
113107.77
113107.77
113107.77
0.00
0.00
0.00
206315.25
206315.26
206315.26
125000.00
125000.00
125000.00
209745.75
209745.76
209745.76
389000.47
389000.47
389000.48
175726.63
175726.64
175726.64
28990.00
28990.00
28990.00
100718.66
100718.67
100718.67
52607.13
52607.13
52607.13
0.00
0.00
0.00
133699.98
133699.98
133699.98
29883.03
29883.03
29883.04
82816.69
82816.69
82816.69
0.00
0.00
0.00
40883.33
40883.33
40883.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
169166.66
169166.67
169166.67
169166.66
169166.67
169166.67
169166.66
169166.67
169166.67
169166.66
169166.67
169166.67
153926.83
153926.84
153926.84
153926.83
153926.84
153926.84
153926.83
153926.84
153926.84
153926.83
153926.84
153926.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9000000Total Commitment in First Quarter of 2004
International Development Association5000Total Disbursement in Fourth Quarter of 2004
International Development Association22100Total Disbursement in Fourth Quarter of 2004
International Development Association10464Total Disbursement in First Quarter of 2005
International Development Association19829Total Disbursement in First Quarter of 2005
International Development Association-14000Total Interest Repayment in First Quarter of 2005
International Development Association139323Total Disbursement in Second Quarter of 2005
International Development Association200000Total Disbursement in Second Quarter of 2005
International Development Association-16105Total Interest Repayment in Third Quarter of 2005
International Development Association76584Total Disbursement in Fourth Quarter of 2005
International Development Association542362Total Disbursement in Fourth Quarter of 2005
International Development Association375000Total Disbursement in First Quarter of 2006
International Development Association-13885Total Interest Repayment in First Quarter of 2006
International Development Association300320Total Disbursement in Second Quarter of 2006
International Development Association328917Total Disbursement in Second Quarter of 2006
International Development Association440184Total Disbursement in Third Quarter of 2006
International Development Association726817Total Disbursement in Third Quarter of 2006
International Development Association-17500Total Interest Repayment in Third Quarter of 2006
International Development Association219552Total Disbursement in Fourth Quarter of 2006
International Development Association307628Total Disbursement in Fourth Quarter of 2006
International Development Association2720Total Disbursement in First Quarter of 2007
International Development Association84250Total Disbursement in First Quarter of 2007
International Development Association-17210Total Interest Repayment in First Quarter of 2007
International Development Association302156Total Disbursement in Second Quarter of 2007
International Development Association157821Total Disbursement in Third Quarter of 2007
International Development Association-20320Total Interest Repayment in Third Quarter of 2007
International Development Association117600Total Disbursement in First Quarter of 2008
International Development Association283500Total Disbursement in First Quarter of 2008
International Development Association-20060Total Interest Repayment in First Quarter of 2008
International Development Association89649Total Disbursement in Second Quarter of 2008
International Development Association78200Total Disbursement in Third Quarter of 2008
International Development Association170250Total Disbursement in Third Quarter of 2008
International Development Association-21517Total Interest Repayment in Third Quarter of 2008
International Development Association122650Total Disbursement in First Quarter of 2009
International Development Association-18544Total Interest Repayment in First Quarter of 2009
International Development Association-20042Total Interest Repayment in Third Quarter of 2009
International Development Association-20608Total Interest Repayment in First Quarter of 2010
International Development Association-18905Total Interest Repayment in Third Quarter of 2010
International Development Association-20267Total Interest Repayment in First Quarter of 2011
International Development Association-20406Total Interest Repayment in Third Quarter of 2011
International Development Association205241Total Disbursement in Fourth Quarter of 2011
International Development Association447975Total Disbursement in Fourth Quarter of 2011
International Development Association485013Total Disbursement in First Quarter of 2012
International Development Association-20046Total Interest Repayment in First Quarter of 2012
International Development Association133994Total Disbursement in Second Quarter of 2012
International Development Association49543Total Disbursement in Third Quarter of 2012
International Development Association118966Total Disbursement in Third Quarter of 2012
International Development Association-23010Total Interest Repayment in Third Quarter of 2012
International Development Association-2242642Total Commitment Cancellations in Fourth Quarter of 2012
International Development Association-502436Total Commitment Cancellations in First Quarter of 2013
International Development Association-68775Total Disbursement in First Quarter of 2013
International Development Association-24719Total Interest Repayment in First Quarter of 2013
International Development Association-24381Total Interest Repayment in Third Quarter of 2013
International Development Association-24838Total Interest Repayment in First Quarter of 2014
International Development Association-24919Total Interest Repayment in Third Quarter of 2014
International Development Association-66599Total Loan Repayment in Third Quarter of 2014
International Development Association-22993Total Interest Repayment in First Quarter of 2015
International Development Association-61533Total Loan Repayment in First Quarter of 2015
International Development Association-22139Total Interest Repayment in Third Quarter of 2015
International Development Association-60243Total Loan Repayment in Third Quarter of 2015
International Development Association-21693Total Interest Repayment in First Quarter of 2016
International Development Association-59637Total Loan Repayment in First Quarter of 2016
International Development Association-21630Total Interest Repayment in Third Quarter of 2016
International Development Association-60084Total Loan Repayment in Third Quarter of 2016
International Development Association-20750Total Interest Repayment in First Quarter of 2017
International Development Association-58244Total Loan Repayment in First Quarter of 2017
International Development Association-19955Total Interest Repayment in Third Quarter of 2017
International Development Association-59935Total Loan Repayment in Third Quarter of 2017
International Development Association-21569Total Interest Repayment in First Quarter of 2018
International Development Association-61766Total Loan Repayment in First Quarter of 2018
International Development Association-22004Total Interest Repayment in Third Quarter of 2018
International Development Association-60431Total Loan Repayment in Third Quarter of 2018
International Development Association-19735Total Interest Repayment in First Quarter of 2019
International Development Association-60144Total Loan Repayment in First Quarter of 2019
International Development Association-20878Total Interest Repayment in Third Quarter of 2019
International Development Association-59545Total Loan Repayment in Third Quarter of 2019
International Development AssociationProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportCredit AgreementAgreementAgreementGrant or Trust Fund AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Bulk Clearing System: total number of batches of transactions processed through the system
This data is for half a year (Jan 1-June 30, 2012). Target expected to be met by end year.
Intermediate Results Indicator
Direct project beneficiaries
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
Inter-bank card system: Total number of cards
Targeted exceeded
Intermediate Results Indicator
Inter-bank card system: Average monthly volume of transactions processed with bank cards compatible with the shared system.
Intermediate Results Indicator
RTGS: Total value of individual transactions (yearly) (Som mln)
This data is for half year Jan 1-June 30, 2012. Target expected to be met by end year.
Intermediate Results Indicator
Status of procuring and operations of the improved General Ledger of the NBKR
PDO Indicator
General ledger of the NBKR automated and integrated with the RTGS and BCS
Done in testing and pilot mode
PDO Indicator
Total value of transactions channeled through and processed by the national payments system (in Som mlns)
This data is for half a year (Jan 1-June 30, 2012). Target expected to be met by end year.
PDO Indicator
Total number of bank accounts
Targeted exceeded
44000-P163592
World Bank
CASA1000 Community Support Project - Kyrgyz Republic
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Janelle Plummer
+1-202-473-1000jplummer1@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Osh Oblasty
40.0000 73.0000
Batken
39.8330 71.0000
Jalal-Abad oblast
41.5000 72.5000
Energy Transmission and DistributionSub-National GovernmentEarly Childhood EducationOther Agriculture, Fishing and ForestryOther Water Supply, Sanitation and Waste ManagementRural Infrastructure and service deliveryParticipation and Civic EngagementGenderRural DevelopmentAccess to EnergyFragility, Conflict and ViolenceOther Excluded GroupsYouth EmploymentEnergyConflict PreventionClimate changeAdaptationMitigationJobsSocial Inclusion
0.00
0.00
0.00
0.00
145833.33
145833.33
145833.33
145833.33
145833.33
145833.33
145833.33
145833.33
145833.33
145833.33
145833.33
145833.37
270833.33
270833.33
270833.33
270833.33
270833.33
270833.33
270833.33
270833.33
270833.33
270833.33
270833.33
270833.37
312500.00
312500.00
312500.00
312500.00
312500.00
312500.00
312500.00
312500.00
312500.00
312500.00
312500.00
312500.00
183333.33
183333.33
183333.33
183333.33
183333.33
183333.33
183333.33
183333.33
183333.33
183333.33
183333.33
183333.37
4166.67
4166.67
4166.67
4166.67
4166.67
4166.67
4166.67
4166.67
4166.67
4166.67
4166.67
4166.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
145833.33
145833.33
145833.33
145833.33
145833.33
145833.33
145833.33
145833.33
145833.33
145833.33
145833.33
145833.37
270833.33
270833.33
270833.33
270833.33
270833.33
270833.33
270833.33
270833.33
270833.33
270833.33
270833.33
270833.37
312500.00
312500.00
312500.00
312500.00
312500.00
312500.00
312500.00
312500.00
312500.00
312500.00
312500.00
312500.00
183333.33
183333.33
183333.33
183333.33
183333.33
183333.33
183333.33
183333.33
183333.33
183333.33
183333.33
183333.37
4166.67
4166.67
4166.67
4166.67
4166.67
4166.67
4166.67
4166.67
4166.67
4166.67
4166.67
4166.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5000000Total Commitment in Second Quarter of 2018
International Development Association5000000Total Commitment in Second Quarter of 2018
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
IO1: Percentage of villages with improved electricity supply for household and/or productive purposes as a result of project support
Intermediate Results Indicator
103. Percentage of target communities empowering young women and men to facilitate community mobilization
Intermediate Results Indicator
IO7: Percentage of target communities demonstrating an understanding of CSP objectives and parameters
Intermediate Results Indicator
IO4: Percentage of target communities completing enhanced (youth-led) community mobilization processes
Intermediate Results Indicator
IO5: Percentage of target AOs expanding the Local Development Strategy with youth development and livelihood activities
Intermediate Results Indicator
IO6: Percentage of target communities selecting their highest priority subproject
Intermediate Results Indicator
IO2: Percentage of livelihoods facilities that reach intended target beneficiaries by year 4
Intermediate Results Indicator
IO8: Percentage of relevant subprojects that support climate change adaptation or mitigation
PDO Indicator
PDO2: Percentage of beneficiaries in target communities who report that their engagement in decision making over village investments was effective
PDO Indicator
PDO1: Percentage of beneficiaries in target communities who report that village/AA investments met their needs
PDO Indicator
PDO3: Percentage of young (women and men) beneficiaries who report that their role/voice in local decision making has been enhancedas a result of project support
PDO Indicator
PDO4: Percentage of target communities with improved access to social infrastructure and/or livelihoods facilities as a result of project support
PDO Indicator
PDO6: Percentage of beneficiaries in target communities who report enhanced trust in community relations as a result of project support
PDO Indicator
PDO5: Percentage of beneficiaries in target communities who report that the CSP is an effective solution to the local impacts of the CASA1000 transmission line
44000-P155412
World Bank
Integrated Dairy Productivity Improvement Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Artavazd Hakobyan
+1-202-473-1000ahakobyan@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Kyrgyz Republic
41.5000 75.0000
Issyk-Kul Region
42.0000 78.0000
Karakol
42.6040 78.5260
Agricultural markets, commercialization and agri-businessLivestockAgricultural Extension, Research, and Other Support ActivitiesJob CreationClimate changeYouth EmploymentGenderJobsMitigationRural MarketsRural Development
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
166666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2494.67
2494.67
2494.67
2494.67
2494.67
2494.67
2494.67
2494.67
2494.67
2494.67
2494.67
2494.61
117705.34
117705.34
117705.34
117705.34
117705.34
117705.34
117705.34
117705.34
117705.34
117705.34
117705.34
117705.28
175000.00
175000.00
175000.00
175000.00
175000.00
175000.00
175000.00
175000.00
175000.00
175000.00
175000.00
175000.00
121466.67
121466.67
121466.67
121466.67
121466.67
121466.67
121466.67
121466.67
121466.67
121466.67
121466.67
121466.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2750000Total Commitment in Fourth Quarter of 2016
International Development Association2250000Total Commitment in Fourth Quarter of 2016
International Development Association150000Total Disbursement in Second Quarter of 2018
International Development Association74629Total Disbursement in Third Quarter of 2018
International Development Association200000Total Disbursement in Fourth Quarter of 2018
International Development Association87525Total Disbursement in Fourth Quarter of 2018
International Development Association-398Total Interest Repayment in First Quarter of 2019
International Development Association95274Total Disbursement in First Quarter of 2019
International Development Association-743Total Interest Repayment in Third Quarter of 2019
International Development Association99372Total Disbursement in Third Quarter of 2019
International Development Association115476Total Disbursement in Fourth Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Establish and maintain the Steering Committee | Description :For the purposes of overall Project oversight andcoordination the Recipient shall establish, not later than 60 days after the Effective Date, and thereafter maintain untilcompletion of the Project the Steering Committee with the composition, terms of reference and resources adequate for theimplementation of its functions. | Due Date :29-Aug-2017
Finance Agreement :Project Operational Manual including Revolving Fund Operational Manual | Description :The Recipient, throughABCC and CLMU, shall: (a) adopt the Project Operational Manual, including the Revolving Fund Operational Manual, and carry out theProject in accordance with the Manuals; and (b) not amend, suspend, abrogate, repeal or waive any provision of said Manuals withoutthe prior written approval of the Association. | Due Date :30-Jun-2017
Finance Agreement :Sub-projects | Description :The Recipient, through CLMU, shall provide Sub-financing under a SubfinancingAgreement on terms and conditions to DBGs in accordance with eligibility criteria and procedures acceptable to the Association, andset forth in the Revolving Fund Operational Manual. | Frequency :Yearly
Finance Agreement :Safeguards | Description :The Recipient, through ABCC, shall implement the Project in accordance with ESMF andany relevant Supplemental Social and Environmental Safeguard Instrument, as may be required. | Frequency :Yearly
Finance Agreement :Project Reports | Description :The Recipient shall monitor and evaluate the progress of the Project and prepareProject Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicatorsacceptable to the Association. Each Project Report shall cover the period of one calendar semester, and shall be furnished to theAssociation not later than one month after the end of the period covered by such report. | Frequency :Quarterly
Finance Agreement :Interim Financial Reports | Description :The Recipient shall prepare and furnish to the Association not laterthan 45 days after the end of each calendar quarter, interim unaudited financial reports for the Project covering the quarter, inform and substance satisfactory to the Association. | Frequency :Quarterly
Finance Agreement :Financial and Reporting Software | Description :Not later than 30 days after the Effective Date, CLMU shallupdate of its accounting and financial reporting software in accordance with the technical requirements and specificationsacceptable to the Association and set forth in the Project Operational Manual. | Due Date :29-Aug-2017
Finance Agreement :Financial Statements audited | Description :The Recipient shall have its Financial Statements audited inaccordance with the provisions of Section 4.09 (b) of the General Conditions. Each audit of the Financial Statements shall coverthe period of one fiscal year of the Recipient. The audited Financial Statements for each such period shall be furnished to theAssociation not later than six months after the end of such period. | Frequency :Yearly
Intermediate Results Indicator
Number of beneficiaries who received sub-financing from the Revolving Fund
Intermediate Results Indicator
Increase in the average milk output per household in the beneficiary farms
Intermediate Results Indicator
Percentage of male beneficiaries satisfied with project activities
Intermediate Results Indicator
Repayment of sub-financing
Intermediate Results Indicator
Percentage of female beneficiaries satisfied with project activities
Intermediate Results Indicator
Grievances registered related to delivery of project benefits that are actually addressed (%)
Intermediate Results Indicator
Beneficiary dairy producers who have adopted improved animal feeding, and/or health, and/or breeding, and/or management practices
Intermediate Results Indicator
The milk procurement platform is established
PDO Indicator
Increase in the average lactation period milk yield per cow in the beneficiary farms (baseline: 1,585 kg)
PDO Indicator
Increase in the percentage of milk produced on the participating farms that meets or exceeds processor quality requirements
PDO Indicator
Female beneficiaries
PDO Indicator
Direct Youth (18 to 29 years old) beneficiaries
PDO Indicator
Direct project beneficiaries
PDO Indicator
Farmers adopting improved agricultural technology
PDO Indicator
Farmers adopting improved agricultural technology - Female
44000-P104994
World Bank
Bishkek and Osh Urban Infrastructure Project
International Development Association
ARIS
International Development Association
ARISPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Kremena M. Ionkova
+1-202-473-1000kionkova@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Sulyukta
39.9370 69.5680
Isfana
39.8390 69.5280
Balykchy
42.4600 76.1870
Tokmok
42.8420 75.3010
Talas
42.5230 72.2430
Osh
40.5280 72.7990
Naryn
41.4290 75.9910
Karakol
42.4910 78.3940
Jalal-Abad
40.9330 73.0000
Cholpon-Ata
42.6490 77.0820
Bishkek
42.8700 74.5900
Batken
40.0630 70.8190
Urban TransportCentral Government (Central Agencies)Sub-National GovernmentWater SupplyWaste ManagementUrban Infrastructure and Service DeliveryPublic AdministrationMunicipal Institution BuildingAdministrative and Civil Service ReformUrban DevelopmentServices and Housing for the Poor
166666.66
166666.67
166666.67
233333.33
233333.33
233333.34
266666.66
266666.67
266666.67
300000.00
300000.00
300000.00
325000.00
325000.00
325000.00
325000.00
325000.00
325000.00
325000.00
325000.00
325000.00
325000.00
325000.00
325000.00
308333.33
308333.33
308333.34
308333.33
308333.33
308333.34
308333.33
308333.33
308333.34
308333.33
308333.33
308333.34
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
102902.25
102902.26
102902.26
0.00
0.00
0.00
113447.95
113447.97
113447.97
124553.92
124553.92
124553.94
50819.02
50819.02
50819.02
272156.70
272156.70
272156.70
312962.21
312962.21
312962.21
164730.17
164730.17
164730.19
262512.44
262512.46
262512.46
207227.49
207227.49
207227.51
204667.25
204667.26
204667.26
143398.50
143398.50
143398.52
753359.92
753359.92
753359.94
197167.48
197167.50
197167.50
80388.09
80388.09
80388.09
0.00
0.00
0.00
322358.86
322358.86
322358.86
79988.35
79988.35
79988.37
100000.00
100000.00
100000.00
166666.66
166666.67
166666.67
500000.00
500000.00
500000.00
666666.66
666666.67
666666.67
491228.07
491228.07
491228.08
833333.33
833333.33
833333.34
929824.55
929824.56
929824.56
926666.65
926666.67
926666.67
571920.70
571920.71
571920.71
684210.52
684210.52
684210.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12000000Total Commitment in First Quarter of 2008
International Development Association500000Total Disbursement in Third Quarter of 2008
International Development Association100743Total Disbursement in First Quarter of 2009
International Development Association219931Total Disbursement in First Quarter of 2009
International Development Association98776Total Disbursement in Second Quarter of 2009
International Development Association263316Total Disbursement in Second Quarter of 2009
International Development Association150530Total Disbursement in Third Quarter of 2009
International Development Association122212Total Disbursement in Fourth Quarter of 2009
International Development Association252596Total Disbursement in Fourth Quarter of 2009
International Development Association442235Total Disbursement in Fourth Quarter of 2009
International Development Association118439Total Disbursement in First Quarter of 2010
International Development Association336056Total Disbursement in First Quarter of 2010
International Development Association463865Total Disbursement in First Quarter of 2010
International Development Association122998Total Disbursement in Second Quarter of 2010
International Development Association337053Total Disbursement in Second Quarter of 2010
International Development Association373667Total Disbursement in Third Quarter of 2010
International Development Association378551Total Disbursement in Third Quarter of 2010
International Development Association139522Total Disbursement in Fourth Quarter of 2010
International Development Association177002Total Disbursement in Fourth Quarter of 2010
International Development Association291064Total Disbursement in Fourth Quarter of 2010
International Development Association134466Total Disbursement in First Quarter of 2011
International Development Association471091Total Disbursement in First Quarter of 2011
International Development Association151652Total Disbursement in Second Quarter of 2011
International Development Association280586Total Disbursement in Second Quarter of 2011
International Development Association343411Total Disbursement in Third Quarter of 2011
International Development Association877577Total Disbursement in Third Quarter of 2011
International Development Association1061883Total Disbursement in Third Quarter of 2011
International Development Association575140Total Disbursement in Fourth Quarter of 2011
International Development Association8700000Total Commitment in First Quarter of 2012
International Development Association235087Total Disbursement in First Quarter of 2012
International Development Association7100000Total Commitment in First Quarter of 2012
International Development Association423683Total Disbursement in Third Quarter of 2012
International Development Association500000Total Disbursement in Third Quarter of 2012
International Development Association233257Total Disbursement in Fourth Quarter of 2012
International Development Association680531Total Disbursement in First Quarter of 2013
International Development Association181381Total Disbursement in First Quarter of 2013
International Development Association407257Total Disbursement in First Quarter of 2013
International Development Association897162Total Disbursement in Second Quarter of 2013
International Development Association384220Total Disbursement in Second Quarter of 2013
International Development Association251572Total Disbursement in Third Quarter of 2013
International Development Association281455Total Disbursement in Third Quarter of 2013
International Development Association869772Total Disbursement in Third Quarter of 2013
International Development Association210865Total Disbursement in Fourth Quarter of 2013
International Development Association352172Total Disbursement in Fourth Quarter of 2013
International Development Association500000Total Disbursement in Fourth Quarter of 2013
International Development Association398650Total Disbursement in Fourth Quarter of 2013
International Development Association995769Total Disbursement in Fourth Quarter of 2013
International Development Association259689Total Disbursement in First Quarter of 2014
International Development Association377875Total Disbursement in First Quarter of 2014
International Development Association-858Total Interest Repayment in First Quarter of 2014
International Development Association585746Total Disbursement in First Quarter of 2014
International Development Association145628Total Disbursement in Second Quarter of 2014
International Development Association252171Total Disbursement in Second Quarter of 2014
International Development Association811434Total Disbursement in Second Quarter of 2014
International Development Association649755Total Disbursement in Third Quarter of 2014
International Development Association827440Total Disbursement in Third Quarter of 2014
International Development Association-6116Total Interest Repayment in Third Quarter of 2014
International Development Association328680Total Disbursement in Third Quarter of 2014
International Development Association666731Total Disbursement in Third Quarter of 2014
International Development Association339344Total Disbursement in Fourth Quarter of 2014
International Development Association359258Total Disbursement in Fourth Quarter of 2014
International Development Association500000Total Disbursement in Fourth Quarter of 2014
International Development Association1019Total Disbursement in Fourth Quarter of 2014
International Development Association293500Total Disbursement in Fourth Quarter of 2014
International Development Association397954Total Disbursement in First Quarter of 2015
International Development Association499999Total Disbursement in First Quarter of 2015
International Development Association-12138Total Interest Repayment in First Quarter of 2015
International Development Association127559Total Disbursement in First Quarter of 2015
International Development Association324841Total Disbursement in Second Quarter of 2015
International Development Association418155Total Disbursement in Third Quarter of 2015
International Development Association641924Total Disbursement in Third Quarter of 2015
International Development Association-18869Total Interest Repayment in Third Quarter of 2015
International Development Association-300000Total Commitment Cancellations in Fourth Quarter of 2015
International Development Association276514Total Disbursement in Fourth Quarter of 2015
International Development Association597851Total Disbursement in Fourth Quarter of 2015
International Development Association-66403Total Disbursement in First Quarter of 2016
International Development Association-24393Total Interest Repayment in First Quarter of 2016
International Development Association-125323Total Commitment Cancellations in Second Quarter of 2016
International Development Association-22072Total Commitment Cancellations in Second Quarter of 2016
International Development Association-21977Total Disbursement in Second Quarter of 2016
International Development Association-27655Total Interest Repayment in Third Quarter of 2016
International Development Association-26323Total Interest Repayment in First Quarter of 2017
International Development Association-26695Total Interest Repayment in Third Quarter of 2017
International Development Association-27923Total Interest Repayment in First Quarter of 2018
International Development Association-27698Total Interest Repayment in Third Quarter of 2018
International Development Association-26915Total Interest Repayment in First Quarter of 2019
International Development Association-27174Total Interest Repayment in Third Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2-Section II. B | Description :ARIS to submit project audits for the year ended June | Frequency :Yearly
Intermediate Results Indicator
Piped household water connections that are benefiting from rehabilitation works undertaken by the project
Intermediate Results Indicator
Number of people in urban areas provided with access to regular solid waste collection under the project
Intermediate Results Indicator
Number of Bishkek Municipal Territorial Administrations that introduced the system of electronic registration and database.
Intermediate Results Indicator
Number of active users of electronic document management system in Osh municipality
Intermediate Results Indicator
Number of working trucks of the Solid Waste Management Utility (Spetsavtobaza) in Osh equipped with GPS-trackers by the Project
Intermediate Results Indicator
Number of customers recorded in the billing system introduced for the first time by the Project in the Solid Waste Management Utility (Spetsavtobaza) in Osh
Intermediate Results Indicator
Number of departments in the Solid Waste Management Utility (Spetsavtobaza) in Osh operating automated accounting system 1C introduced by the Project
Intermediate Results Indicator
Number of customers recorded in the billing system introduced by the Project in the municipal housing and utility department (MHUD)of Osh
Intermediate Results Indicator
Number of water utilities that the project is supporting
Intermediate Results Indicator
Improved community water points constructed or rehabilitated under the project
Intermediate Results Indicator
New piped household water connections that are resulting from the project intervention
Intermediate Results Indicator
Number of community investments successfully completed in Bishkek, Osh and small towns.
Intermediate Results Indicator
Number of direct beneficiaries of community investments
Intermediate Results Indicator
Number of Microproject Committees established in benefiting communities.
Intermediate Results Indicator
Number of km of pipeline recorded in the system
Intermediate Results Indicator
Percentage of households in project areas with access to improved water sources within 150 m or less
Intermediate Results Indicator
Percentage of residents that have attended a participatory forum under the project.
Intermediate Results Indicator
Percentage of participants to forums that are women, youth
Intermediate Results Indicator
Percentage of beneficiaries that are women, youth, and vulnerable (lowest-income, female-headed households).
Intermediate Results Indicator
Ratio of ARIS operating expenses to investments for basic infrastructure
Intermediate Results Indicator
Length of urban roads constructed and/or rehabilitated in km
PDO Indicator
Number of people in urban areas provided with access to Improved Water Sources under the project
PDO Indicator
Female beneficiaries
PDO Indicator
Percentage of population in project areas with 24 hour access to potable water (Bishkek)
PDO Indicator
Percentage of population in project areas with at least 12 hour access to potable water
PDO Indicator
Number of communities (as administrative entities of municipalities) with improved social infrastructure
PDO Indicator
Number of people in urban areas provided with access to all-season roads within a 500 meter range under the project
PDO Indicator
Direct project beneficiaries
44000-P151102
World Bank
Integrated Forest Ecosystem Management
International Development Association
STATE AGENCY FOR ENVIRONMENTAL PROTECTION AND FORESTRY
International Development Association
STATE AGENCY FOR ENVIRONMENTAL PROTECTION AND FORESTRYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Drite Dade
+1-202-473-1000ddade@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Balykchy
42.4600 76.1870
Frunze
42.7670 78.1860
Nookat
40.2660 72.6180
Achi
41.1000 73.0830
Kyzyl
40.3060 72.6410
ForestryOther Agriculture, Fishing and ForestryPublic Administration - Agriculture, Fishing & ForestryBiodiversityAir quality managementClimate changeJobsWater PollutionRenewable Natural Resources Asset ManagementSoil PollutionEnvironmental Health and Pollution ManagementMitigationAdaptationEnvironmental policies and institutions
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.37
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.37
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.37
175833.33
175833.33
175833.33
175833.33
175833.33
175833.33
175833.33
175833.33
175833.33
175833.33
175833.33
175833.37
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.33
83333.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50000.00
50000.00
50000.00
50000.00
50000.00
50000.00
28205.39
28205.39
28205.39
28205.39
28205.39
28205.39
12489.14
12489.14
12489.14
12489.14
12489.14
12489.16
21876.75
21876.75
21876.75
21876.75
21876.75
21876.74
83333.33
83333.33
83333.33
83333.33
83333.33
83333.35
108333.33
108333.33
108333.33
108333.33
108333.33
108333.35
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
200000.00
233333.33
233333.33
233333.34
0.00
6600000Total Commitment in Fourth Quarter of 2015
International Development Association5400000Total Commitment in Fourth Quarter of 2015
International Development Association300000Total Disbursement in Second Quarter of 2017
International Development Association169232Total Disbursement in Fourth Quarter of 2017
International Development Association74935Total Disbursement in Second Quarter of 2018
International Development Association47984Total Disbursement in Third Quarter of 2018
International Development Association83277Total Disbursement in Fourth Quarter of 2018
International Development Association97627Total Disbursement in First Quarter of 2019
International Development Association61929Total Disbursement in Second Quarter of 2019
International Development Association300000Total Disbursement in Third Quarter of 2019
International Development Association69210Total Disbursement in Third Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Schedule 2, Section V - Accounting System Installation | Description :Within thirty (30) days from theEffective Date, the Recipient, through SAEPF, shall install an automated accounting system acceptable to the Association, withcapacity to, inter alia, generate IFRs, statement of expenditures and annual financial statements, and in a manner acceptable tothe Association | Due Date :01-Oct-2016
Finance Agreement :Schedule 2, Section I.F.4 - Projects on International Waterways OP/BP 7.50 | Description :The Recipient shallensure that no activities are carried out in connection with the Project that may involve the use or potential pollution ofinternational waterways or the tributaries of any such international waterways, as determined by the Association. | Frequency:Yearly
Intermediate Results Indicator
Direct project beneficiaries
Intermediate Results Indicator
Number of participating leskhozes collecting baseline resource data and making it available for management plans (Number)
Intermediate Results Indicator
Number of lezhozes conducting semi-annual/annual public hearings where information about leskhoz ecosystem management plans and budgets are disclosed
Intermediate Results Indicator
Male forest resource user participation at public hearings at leskhoz level
Intermediate Results Indicator
Female forest resource user participation at public hearings at leskhoz level
Intermediate Results Indicator
Number of participating leskhozes reinvesting self-generated income into sustainable ecosystem management
Intermediate Results Indicator
Female beneficiaries
Intermediate Results Indicator
Reforms in forest policy, legislation or other regulations supported
Intermediate Results Indicator
National forest inventory updated for Kyrgyz Republic
Intermediate Results Indicator
Citizens and/or communities involved in planning/implementation/evaluation of integrated ecosystem management plans
Intermediate Results Indicator
Area restored or re/afforested
Intermediate Results Indicator
Area re/afforested
Intermediate Results Indicator
Area restored
PDO Indicator
Govt institutions provided w/ capacity buildg to improve mgt of forest resources
PDO Indicator
Land area where sustainable land mgt. practices were adopted as a result of proj
PDO Indicator
Forest area brought under management plans
44000-P160230
World Bank
Digital CASA - Kyrgyz Republic
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Juan Navas-Sabater
+1-202-473-1000jnavassabater@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Nukus Tumani
42.4800 59.6910
Muynakskiy Zaliv
43.7170 58.7500
Beyneu Audany
45.5000 54.8330
Quetta District
30.1750 66.7620
Peshawar District
33.9850 71.5580
Chitral District
36.2580 72.2430
Bukhara
39.7750 64.4290
Olot
39.4150 63.8030
Mary
37.5940 61.8300
Turkmenabat
39.0730 63.5790
Republic of Tajikistan
39.0000 71.0000
Qurghonteppa
37.8340 68.7820
Khorugh
37.4900 71.5530
Dushanbe
38.5730 68.7790
Suluktu
39.9370 69.5680
Aydarken
39.9430 71.3420
Isfana
39.8390 69.5280
Samarqand Shahri
39.6540 66.9600
Qarshi Shahri
38.8530 65.8190
Termiz Shahri
37.2390 67.2760
Denov Shahri
38.2670 67.9000
Osh Oblasty
40.0000 73.0000
Qal`ah
36.0300 70.7740
Batken
39.8330 71.0000
Baghlan
36.2210 68.7740
Republic of Uzbekistan
41.6670 63.8330
Urgenchi
40.8000 70.9170
Uchkuduk District
42.1370 63.5680
Turtkul
41.5540 61.0010
Tashkent
41.2650 69.2160
Navoiy Tumani
40.0200 65.2160
Faizabad
37.2160 70.6130
Ghazni
33.5340 68.4370
Lashkar Gah
31.4560 64.5400
Zaranj
30.9110 62.0370
Taluqan
36.7410 69.6090
Charikar
34.9880 69.1420
Kunduz
36.7930 68.8440
Farah
32.2180 62.2600
Qalat
32.2190 66.9770
Mazar-e Sharif
36.7100 67.1170
People's Republic of China
35.0000 105.0000
Balykchy
42.4600 76.1870
Tyup
42.7280 78.3650
Torkent
41.8360 73.1470
Tokmok
42.8420 75.3010
Tash-Kumyr
41.3460 72.2170
Talas
42.5230 72.2430
Uzgen
40.7700 73.3010
Naryn oblast
41.4330 75.9670
Akterek
42.2260 77.7100
Kara-Kul'
41.6280 72.6700
Kara-Kol
42.7230 78.4330
Kara-Balta
42.8140 73.8480
Kanysh-Kyya
41.7650 71.0920
Gul'cha
40.3140 73.4440
Gorod Bishkek
42.8670 74.6000
Cholpon-Ata
42.6490 77.0820
Chayek
41.9280 74.5170
Kemin
42.7850 75.6890
Barskoon
42.1580 77.6040
At-Bashi
41.1700 75.8010
Ala-Buka
41.4110 71.4860
Jalal-Abad oblast
41.5000 72.5000
Toktogul
41.8740 72.9420
Ozgorush
42.5250 72.0390
Kyzyl-Jyldyz
42.7520 71.5450
Kara-Balta
43.0090 73.9000
Tunuk
42.2020 73.9530
Jetigen
41.6270 73.3330
Sary-Tash
40.3790 72.2210
Uchter
42.2530 74.8630
Kulundu
40.1060 69.6410
Karamyk
39.4860 71.7930
Kyzyl-Kiya
40.3690 74.3160
Taraz
42.9000 71.3670
Merke
42.8680 73.1760
Kirovka
54.2580 67.2900
Almaty Qalasy
43.2670 76.9000
Shymkent Qalasy
42.3170 69.5830
Chaldovar
42.8380 73.4830
Jalalabad
34.3600 73.4800
Kabul Khel Banda
32.8810 71.0060
Khujand
40.2830 69.6220
Dushanbe
38.5580 68.7800
Namangan Tumani
40.9200 71.6470
Qo`ng`irot
40.6070 72.1630
Fergana
40.3840 71.7840
Andijon
40.7820 72.3440
Zarafshan
41.5800 64.1950
Jizzax Shahri
40.1160 67.8420
Andijon Shahri
40.7860 72.3510
Gulistan
40.9920 72.1840
Herat District
34.3420 62.2030
Kandahar District
31.6380 65.7960
Mailuu-Suu
41.2600 72.4500
Public Administration - Information and Communications TechnologiesICT InfrastructureICT ServicesOther Information and Communications TechnologiesDisaster PreparednessGenderICT SolutionsDisaster Risk ManagementICT PoliciesDisaster Response and RecoveryBusiness Enabling EnvironmentAdaptationE-Government, incl. e-servicesInvestment and Business ClimateClimate changePublic AdministrationICT
0.00
0.00
0.00
0.00
0.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.63
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.63
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.67
916666.63
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.67
1166666.63
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.33
1333333.37
0.00
0.00
0.00
0.00
0.00
0.00
25000000Total Commitment in First Quarter of 2018
International Development Association25000000Total Commitment in First Quarter of 2018
International Development Association200000Total Disbursement in First Quarter of 2019
International Development Association800000Total Disbursement in Third Quarter of 2019
International Development AssociationImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Contingent financing and disbursement conditions: financing for the regional backbone under subcomponent 1.1 has been structured asCategory 2, and for the Eurasia Cloud under subcomponent 1.2 as Category 3. These Categories are subject to disbursement conditionscontained in Schedule 2, Section III.B.2 of the FA. Furthermore, these two categories are subject to additional contingentfinancing conditions contained in Schedule 2, Section IV, paragraphs 1 and 2, as follows: 1. If the conditions set forth inSection III, Part B, paragraph 2 have not been met within one (1) year after the Effective Date, or at a later date as agreed bythe Association, the Recipient may, pursuant to Section 2.06 of the General Conditions, request the Association to reallocate theFinancing proceeds allocated under Categories (2) and/or (3) to address an estimated shortfall under Category (1), provided thatthe Association determines that such amount is needed to meet an estimated shortfall to finance Eligible Expenditures underCategory (1).2. In the event that the reallocation mentioned in paragraph 1 (above) is not requested immediately after thedeadline referred to in said paragraph, or if requested, the criteria mentioned therein is not met as determined by theAssociation, the Recipient shall be deemed, pursuant to this provision of the Financing Agreement, to have effected by notice tothe Association a request to immediately cancel the amount of the Financing allocated to Categories (2) and/or (3) pursuant toSection 8.01 of the General Conditions.
Dated covenant contained in Schedule 2, Section IV, paragraph 3, as follows: The Recipient shall, by not later than 12 monthsfollowing the Effective Date, have adopted a Digital Transformation Strategy consistent with the objectives of the Project andthereafter the Recipient shall implement said strategy in a manner that would enable the Recipient to perform any of itsobligations under this Agreement.
Intermediate Results Indicator
Number of government agencies using the G-Cloud shared infrastructure
Intermediate Results Indicator
Policy, legal and regulatory documents developed and submitted to the Government under the project (new and amended)
Intermediate Results Indicator
M&E Surveys
Intermediate Results Indicator
of which government officials
Intermediate Results Indicator
Of which female (%)
Intermediate Results Indicator
"Smart” data-driven solutions developed under the project
Intermediate Results Indicator
Institutions and Government agencies connected to the Government Network (G-Net)
Intermediate Results Indicator
Partnerships formed under the project
Intermediate Results Indicator
Communication and public outreach events
Intermediate Results Indicator
Number of cross-border fiber-optic links
Intermediate Results Indicator
Number of visitors per year to State Portal of E-Services
Intermediate Results Indicator
People trained under the project
Intermediate Results Indicator
Direct project beneficiaries
Intermediate Results Indicator
Internet bandwidth pre-purchased by Government (Gbps)
Intermediate Results Indicator
Digital transactions conducted on the State Portal of E-Services per year
Intermediate Results Indicator
Wholesale Transit Pricing per Mbps per month
Intermediate Results Indicator
of which female
Intermediate Results Indicator
Users satisfied with digital services supported by the project
Intermediate Results Indicator
of which satisfied with broadband services
Intermediate Results Indicator
of which satisfied with e-services
Intermediate Results Indicator
Length of fiber-optic network
PDO Indicator
People provided with access to the Internet
PDO Indicator
E-Services and applications utilizing the shared services platforms
PDO Indicator
International Internet bandwidth per capita (kilobit per second per person)
PDO Indicator
Private sector investments committed through the project (US$)
PDO Indicator
Average retail price for 1 GB prepaid mobile data package (US$)
PDO Indicator
Internet penetration (%)
44000-P098949
World Bank
Second Village Investment Project
International Development Association
COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY
International Development Association
COMMUNITY DEVELOPMENT AND INVESTMENT AGENCYPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Aly Zulficar Rahim
+1-202-473-1000arahim@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTAN
Osh Oblasty
40.0000 73.0000
Osh Oblasty
40.0000 73.0000
Batken
39.8330 71.0000
Talas
42.3330 72.0000
Naryn
41.4330 75.9670
Issyk-Kul'skaya Oblast’
42.0000 78.0000
Gorod Bishkek
42.8670 74.6000
Jalal-Abad
41.5000 72.5000
Chuyskaya Oblast’
42.4170 74.5000
Social ProtectionWater SupplySub-National GovernmentEnergy Transmission and DistributionOther EducationMunicipal Institution BuildingSocial Safety NetsRural DevelopmentJobsRural Non-farm Income GenerationRural Infrastructure and service deliveryParticipation and Civic EngagementSocial ProtectionSocial InclusionPublic Administration
666666.67
666666.67
666666.66
833333.33
833333.33
833333.34
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
333333.33
333333.33
333333.34
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
166666.67
166666.67
166666.66
83333.33
83333.33
83333.34
83333.33
83333.33
83333.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
145913.13
145913.13
145913.13
2299062.75
2299062.75
2299062.75
212281.98
212281.98
212281.97
156128.92
156128.92
156128.92
1576970.65
1576970.65
1576970.64
635787.38
635787.38
635787.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2053.44
2053.44
2053.43
0.00
0.00
0.00
166666.67
166666.67
166666.66
401163.30
401163.30
401163.29
1176846.96
1176846.96
1176846.97
741956.24
741956.24
741956.23
37220.31
37220.31
37220.31
0.00
0.00
0.00
105938.54
105938.54
105938.54
8676.41
8676.41
8676.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15000000Total Commitment in Third Quarter of 2006
International Development Association70000Total Disbursement in First Quarter of 2007
International Development Association367739Total Disbursement in Second Quarter of 2007
International Development Association1996708Total Disbursement in Third Quarter of 2007
International Development Association1998730Total Disbursement in Third Quarter of 2007
International Development Association2901750Total Disbursement in Third Quarter of 2007
International Development Association224589Total Disbursement in Fourth Quarter of 2007
International Development Association412257Total Disbursement in Fourth Quarter of 2007
International Development Association66994Total Disbursement in First Quarter of 2008
International Development Association179375Total Disbursement in First Quarter of 2008
International Development Association222018Total Disbursement in First Quarter of 2008
International Development Association1088764Total Disbursement in Second Quarter of 2008
International Development Association1515052Total Disbursement in Second Quarter of 2008
International Development Association2127096Total Disbursement in Second Quarter of 2008
International Development Association1907362Total Disbursement in Third Quarter of 2008
International Development Association4400000Total Commitment in Fourth Quarter of 2009
International Development Association3600000Total Commitment in Fourth Quarter of 2009
International Development Association6160Total Disbursement in First Quarter of 2010
International Development Association500000Total Disbursement in Third Quarter of 2010
International Development Association82524Total Disbursement in Fourth Quarter of 2010
International Development Association213130Total Disbursement in Fourth Quarter of 2010
International Development Association188059Total Disbursement in Fourth Quarter of 2010
International Development Association719777Total Disbursement in Fourth Quarter of 2010
International Development Association880000Total Disbursement in First Quarter of 2011
International Development Association1759986Total Disbursement in First Quarter of 2011
International Development Association76447Total Disbursement in First Quarter of 2011
International Development Association94143Total Disbursement in First Quarter of 2011
International Development Association719966Total Disbursement in First Quarter of 2011
International Development Association701258Total Disbursement in Second Quarter of 2011
International Development Association1247861Total Disbursement in Second Quarter of 2011
International Development Association95973Total Disbursement in Second Quarter of 2011
International Development Association180777Total Disbursement in Second Quarter of 2011
International Development Association-16140Total Interest Repayment in Third Quarter of 2011
International Development Association111661Total Disbursement in Third Quarter of 2011
International Development Association-16622Total Interest Repayment in First Quarter of 2012
International Development Association114657Total Disbursement in First Quarter of 2012
International Development Association317816Total Disbursement in First Quarter of 2012
International Development Association148538Total Disbursement in Second Quarter of 2012
International Development Association-16346Total Interest Repayment in Third Quarter of 2012
International Development Association38760Total Disbursement in Third Quarter of 2012
International Development Association114481Total Disbursement in Third Quarter of 2012
International Development Association2300000Total Commitment in Fourth Quarter of 2012
International Development Association71234Total Disbursement in Fourth Quarter of 2012
International Development Association97562Total Disbursement in Fourth Quarter of 2012
International Development Association409953Total Disbursement in Fourth Quarter of 2012
International Development Association1900000Total Commitment in Fourth Quarter of 2012
International Development Association-16906Total Interest Repayment in First Quarter of 2013
International Development Association87689Total Disbursement in First Quarter of 2013
International Development Association-16300Total Interest Repayment in Third Quarter of 2013
International Development Association500000Total Disbursement in Third Quarter of 2013
International Development Association495698Total Disbursement in Fourth Quarter of 2013
International Development Association-16908Total Interest Repayment in First Quarter of 2014
International Development Association350000Total Disbursement in First Quarter of 2014
International Development Association161295Total Disbursement in First Quarter of 2014
International Development Association491747Total Disbursement in First Quarter of 2014
International Development Association333034Total Disbursement in Second Quarter of 2014
International Development Association351492Total Disbursement in Second Quarter of 2014
International Development Association17828Total Disbursement in Second Quarter of 2014
International Development Association324559Total Disbursement in Second Quarter of 2014
International Development Association-16485Total Interest Repayment in Third Quarter of 2014
International Development Association122902Total Disbursement in Third Quarter of 2014
International Development Association341288Total Disbursement in Third Quarter of 2014
International Development Association420000Total Disbursement in Third Quarter of 2014
International Development Association-1909Total Interest Repayment in Third Quarter of 2014
International Development Association32837Total Disbursement in Fourth Quarter of 2014
International Development Association86592Total Disbursement in Fourth Quarter of 2014
International Development Association249221Total Disbursement in Fourth Quarter of 2014
International Development Association-14909Total Interest Repayment in First Quarter of 2015
International Development Association-7739Total Interest Repayment in First Quarter of 2015
International Development Association-31Total Commitment Cancellations in First Quarter of 2015
International Development Association-15199Total Interest Repayment in Third Quarter of 2015
International Development Association-7895Total Interest Repayment in Third Quarter of 2015
International Development Association-15183Total Interest Repayment in First Quarter of 2016
International Development Association-7840Total Interest Repayment in First Quarter of 2016
International Development Association-15271Total Interest Repayment in Third Quarter of 2016
International Development Association-7917Total Interest Repayment in Third Quarter of 2016
International Development Association-14744Total Interest Repayment in First Quarter of 2017
International Development Association-7536Total Interest Repayment in First Quarter of 2017
International Development Association-15121Total Interest Repayment in Third Quarter of 2017
International Development Association-7833Total Interest Repayment in Third Quarter of 2017
International Development Association-15948Total Interest Repayment in First Quarter of 2018
International Development Association-8097Total Interest Repayment in First Quarter of 2018
International Development Association-15465Total Interest Repayment in Third Quarter of 2018
International Development Association-8023Total Interest Repayment in Third Quarter of 2018
International Development Association-15150Total Interest Repayment in First Quarter of 2019
International Development Association-7757Total Interest Repayment in First Quarter of 2019
International Development Association-14933Total Interest Repayment in Third Quarter of 2019
International Development Association-7773Total Interest Repayment in Third Quarter of 2019
International Development AssociationProject Information DocumentProject Information DocumentProject Information DocumentProject Information DocumentProject Appraisal Document Implementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementFinancing AgreementProject Performance Assessment ReportContract AwardsProject URLProcurement Notices
Finance Agreement :Project Agreement: Schedule, Section II, B, para 3 (a) | Description :Operational Review to be carried outtowards the end of the first year of project implementation | Due Date :09-Oct-2009
Finance Agreement :Project Agreement: Schedule, Section II, B, para 3 (a) | Description :Operational Review to be carried outtowards the end of the third year of project implementation | Due Date :14-Oct-2011
Intermediate Results Indicator
Total community contribution (US$)
Intermediate Results Indicator
Improved community water points constructed or rehabilitated under the project
Intermediate Results Indicator
New piped household water connections that are resulting from the project intervention
Intermediate Results Indicator
Piped household water connections that are benefiting from rehabilitation works undertaken by the project
Intermediate Results Indicator
Health facilities constructed, renovated, and/or equipped (number)
Intermediate Results Indicator
Direct project beneficiaries
Intermediate Results Indicator
Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions.
Intermediate Results Indicator
Participants in consultation activities during project implementation (number)
Intermediate Results Indicator
Participants in consultation activities during project implementation - female
Intermediate Results Indicator
Community contribution in the total project costs (percentage)
Intermediate Results Indicator
Number of aiyl okmotu officials and community members trained in budgeting and planning principles and procedures.
Intermediate Results Indicator
Number of aiyl okmotus and LICs publicizing community budgets and adopting other mechanisms for financial transparency.
Intermediate Results Indicator
Number of aiyl keneshs, VICs and LICs conducting open public budgeting and planning meetings and community hearings.
Intermediate Results Indicator
Number of financially viable micro-projects consistent with local development priorities.
Intermediate Results Indicator
Number of direct beneficieries of improved communal infrastructure.
Intermediate Results Indicator
Ratio of ARIS operating expenses to expenditures on village investments and capacity building (annual).
Intermediate Results Indicator
Roads rehabilitated, Rural
PDO Indicator
Villages with access to improved social and economic infrastructure (VIP 2 only).
44000-P126034
World Bank
Programmatic Development Policy Operation 1
International Development Association
MINISTRY OF FINANCE
International Development Association
MINISTRY OF FINANCEPlanned start date of the activity
Actual start date of the activity
Planned end date of the activityActual end date of the activity
The World Bank
Afsaneh Sedghi
+1-202-473-1000asedghi@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
KYRGYZSTANCentral Government (Central Agencies)Other Energy and ExtractivesOther Industry, Trade and ServicesLaw and JusticeOther Non-bank Financial InstitutionsRegulation and Competition PolicyTransparency, Accountability and Good GovernancePublic AdministrationJobsPublic Expenditure ManagementPublic Finance ManagementBusiness Enabling Environment
0.00
0.00
13750000Total Commitment in Third Quarter of 2013
International Development Association11250000Total Commitment in Third Quarter of 2013
International Development Association14196612Total Disbursement in Fourth Quarter of 2013
International Development Association11727636Total Disbursement in Fourth Quarter of 2013
International Development Association-27350Total Interest Repayment in First Quarter of 2014
International Development Association-52025Total Interest Repayment in Third Quarter of 2014
International Development Association-47296Total Interest Repayment in First Quarter of 2015
International Development Association-48218Total Interest Repayment in Third Quarter of 2015
International Development Association-48168Total Interest Repayment in First Quarter of 2016
International Development Association-48445Total Interest Repayment in Third Quarter of 2016
International Development Association-46775Total Interest Repayment in First Quarter of 2017
International Development Association-47971Total Interest Repayment in Third Quarter of 2017
International Development Association-50594Total Interest Repayment in First Quarter of 2018
International Development Association-49061Total Interest Repayment in Third Quarter of 2018
International Development Association-48061Total Interest Repayment in First Quarter of 2019
International Development Association-47374Total Interest Repayment in Third Quarter of 2019
International Development AssociationImplementation Completion and Results ReportImplementation Completion Report ReviewImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Intermediate Results Indicator
Global Competitiveness Index - Institutions Pillar Rank
Rank of 137 out of 144 on the institutions with a score of 2.9 out of 1-7. Higher score indicates an improvement.
133 out of 148 on the institutions pillar with a score of 3.1.
Intermediate Results Indicator
Appointment of local court judges completed
35 judges of supreme court and 11 judges of constitutional chamber in place
Intermediate Results Indicator
PEFA PI-2
Intermediate Results Indicator
Semi-annual report on implementation of the anti-corruption action plan
The order on methodology has been approved by the ministry of economy. Plan is to get it approved by the government so otherministries provide info to ministry of economy.
Intermediate Results Indicator
PEFA PI-21
Intermediate Results Indicator
Quality of Public Procurement Law