44000-P166187
World Bank
Competitiveness and Sector Diversification
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Tugba Gurcanlar
+1-202-473-1000tgurcanlar@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SURINAME
Republic of Suriname
4.0000 -56.0000
MiningAgricultural markets, commercialization and agri-businessPublic Administration - Industry, Trade and ServicesTourismOther Industry, Trade and ServicesCapital MarketsFinancial Infrastructure and AccessGenderTrade FacilitationData production, accessibility and useBusiness Enabling EnvironmentEnergyEnergy Policies & ReformClimate changeAdaptationTradeMSME FinanceMitigationInvestment and Business ClimateData Development and Capacity Building
0.00
0.00
0.00
0.00
100651.83
100651.83
100651.83
100651.83
100651.83
100651.83
100651.83
100651.83
100651.83
100651.83
100651.83
100651.87
149101.33
149101.33
149101.33
149101.33
149101.33
149101.33
149101.33
149101.33
149101.33
149101.33
149101.33
149101.37
265538.83
265538.83
265538.83
265538.83
265538.83
265538.83
265538.83
265538.83
265538.83
265538.83
265538.83
265538.87
444595.75
444595.75
444595.75
444595.75
444595.75
444595.75
444595.75
444595.75
444595.75
444595.75
444595.75
444595.75
641013.83
641013.83
641013.83
641013.83
641013.83
641013.83
641013.83
641013.83
641013.83
641013.83
641013.83
641013.87
947295.25
947295.25
947295.25
947295.25
0.00
0.00
0.00
0.00
100651.83
100651.83
100651.83
100651.83
100651.83
100651.83
100651.83
100651.83
100651.83
100651.83
100651.83
100651.87
149101.33
149101.33
149101.33
149101.33
149101.33
149101.33
149101.33
149101.33
149101.33
149101.33
149101.33
149101.37
265538.83
265538.83
265538.83
265538.83
265538.83
265538.83
265538.83
265538.83
265538.83
265538.83
265538.83
265538.87
444595.75
444595.75
444595.75
444595.75
444595.75
444595.75
444595.75
444595.75
444595.75
444595.75
444595.75
444595.75
641013.83
641013.83
641013.83
641013.83
641013.83
641013.83
641013.83
641013.83
641013.83
641013.83
641013.83
641013.87
947295.25
947295.25
947295.25
947295.25
23000000Total Commitment in Third Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Appraisal Document Implementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
The Borrower, through the Ministry of Natural Resources and the Ministry of Trade, Industry and Tourism, shall establish andthereafter operate and maintain a Project Coordination Committee throughout the implementation of the Project to ensurecoordination between the MNR PIU and the MTIT PIU in the implementation of the Project and assist with reporting obligations to theBank, based on terms of reference satisfactory to the Bank and further described in the Project Operations Manual. (Per SectionI.A.4 of Schedule 2 of the Loan Agreement.)
The Borrower, through the Ministry of Trade, Industry and Tourism, shall hire, not later than 180 days after the Signature Date, aService Provider in accordance with Section 5.13 of the General Conditions to: (i) provide business development services toBeneficiaries; and (ii) carry out the provision of Grants, pursuant to an agreement (the “Subsidiary and Services Agreement”) to beentered into between MTIT and the Service Provider, under terms and conditions satisfactory to the Bank. (Per Section I.A.5 ofSchedule 2 of the Loan Agreement.)
No withdrawal shall be made for payments made prior to the Signature Date, except that withdrawals up to an aggregate amount not toexceed $1,000,000 may be made for payments made prior to this date but on or after March 1, 2019, for Eligible Expenditures. (PerSection III.B.1.(a) of the Loan Agreement.)
Intermediate Results Indicator
Standard operating procedures and associated documentation of key mining functions within the Minerals Institute produced
Intermediate Results Indicator
Number of SMEs benefitting from capacity upgrading support
Intermediate Results Indicator
Number of government staff trained to manage, regulate, and monitor the mining sector (disaggregated by gender and function)
Intermediate Results Indicator
Of which women-owned
Intermediate Results Indicator
Number of SMEs receiving matching grants
Intermediate Results Indicator
Number of mining concessions monitored and inspected by the Mines Inspectorate Department in collaboration with other relevant agencies
Intermediate Results Indicator
Of which women-owned
Intermediate Results Indicator
Number of recommended business environment regulations, codes, policies, or procedures adopted
Intermediate Results Indicator
Volume of private co-investment in competitive upgrading
Intermediate Results Indicator
Beneficiaries satisfied with quality of services provided under Component 2
Intermediate Results Indicator
Establishment of a system for transparent assessment and collection of revenues from the mining sector
PDO Indicator
Number of regulatory or policy reforms adopted to strengthen governance and competitiveness in targeted industries
PDO Indicator
Percentage of mining concessions subject to formal inspections following good international practices
PDO Indicator
Increase in revenue of SMEs benefitting from project support
PDO Indicator
Increase in revenue of SMEs benefitting from project support that are women-owned or that employ a majority of female workers
44000-P165973
World Bank
Saramacca Canal System Rehabilitation Project
International Bank for Reconstruction and Development
International Bank for Reconstruction and Development
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Hadji Huseynov
+1-202-473-1000hhuseynov@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
SURINAME
Distrikt Wanica
5.7500 -55.2500
Republic of Suriname
4.0000 -56.0000
Saramacca Rivier
5.8500 -55.8830
Distrikt Saramacca
5.6670 -55.5830
Paramaribo
5.8660 -55.1670
Distrikt Nickerie
5.6670 -56.8330
Irrigation and DrainagePublic Administration - Agriculture, Fishing & ForestryAdaptationUrban Infrastructure and Service DeliveryWater Resource ManagementUrban DevelopmentDisaster PreparednessDisaster Risk ReductionWater Institutions, Policies and ReformClimate changeDisaster Risk Management
0.00
0.00
0.00
0.00
0.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.37
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
1714285.71
1714285.71
1714285.71
1714285.71
1714285.71
1714285.71
1714285.74
0.00
0.00
0.00
0.00
0.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.33
333333.37
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.33
583333.37
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
875000.00
1714285.71
1714285.71
1714285.71
1714285.71
1714285.71
1714285.71
1714285.74
35000000Total Commitment in First Quarter of 2019
International Bank for Reconstruction and Development87500Total Disbursement in Third Quarter of 2019
International Bank for Reconstruction and Development-87500Total Interest Repayment in Third Quarter of 2019
International Bank for Reconstruction and DevelopmentProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportLoan AgreementContract AwardsProject URLProcurement Notices
Schedule 2, Section I, A,1: Institutional Arrangements: The Borrower, through the MoPWTC, shall establish, not later than two (2)months after the Effective Date, and thereafter operate and maintain at all times during Project implementation, a Projectimplementation unit (the “Saramacca Canal Unit”) with a structure, functions, responsibilities, staff and adequate resources, allsatisfactory to the Bank.
Schedule 2, Section I, A, 2: Institutional Arrangements: Not later than one year after the Effective Date, the Borrower, throughthe MoPWTC, shall: (a) establish, and thereafter operate and maintain throughout the implementation ofthe Project, a ProjectCommittee to be in charge of coordinating Project activities among the Borrower's agencies and administrative authorities, and toinform stakeholders on Project activities and overall progress, with terms of reference satisfactory to the Bank; and (b) organizethe first meeting of the Project Committee.
Intermediate Results Indicator
Number of engaging information events on the implementation of the activities to improve the Saramacca Canal conveyance
Intermediate Results Indicator
Number of beneficiaries consulted on the proposed project designs, associated environmental and social impacts, and envisaged mitigation measures
Intermediate Results Indicator
Improved capacity of the Saramacca Canal to discharge water into the Suriname and Saramacca Rivers
Intermediate Results Indicator
Number of female beneficiaries consulted on the proposed project designs
Intermediate Results Indicator
Engineering design completed for the works for the improved capacity of the Saramacca Canal to discharge water into the Suriname and Saramacca Rivers
Intermediate Results Indicator
Updated guidelines and operational procedures for managing flood control and navigation of the Saramacca Canal drainage system
Intermediate Results Indicator
Endorsement of the feasibility study toward the establishment of a Saramacca Canal System management platform (or similar mechanismresponsible) for the system sustainability
Intermediate Results Indicator
Secondary and Tertiary canal system baseline and prioritization for pilot works developed
Intermediate Results Indicator
Interventions for the selected pilot works to improve localized drainage completed
Intermediate Results Indicator
Area with increased drainage capacity for a 10-year return period
Intermediate Results Indicator
Improved functioning of the Saramacca Canal for navigation
PDO Indicator
Introduction of a risk-based maintenance system for the drainage of the Saramacca Canal System
PDO Indicator
Number of people benefitting from reduced flood risk for a 10-year return period.
PDO Indicator
Increased flood forecast lead time for the Saramacca Canal System
PDO Indicator
Number of female beneficiaries benefitting from reduced flood risk for a 10-year return period.