44000-P156505
World Bank
Vanuatu Infrastructure Reconstruction and Improvement Project
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Artessa Saldivar-Sali
+1-202-473-1000asaldivarsali@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
VANUATU
Tanna
-19.5000 169.3330
Tafea Province
-19.5000 169.5000
Shepherd Islands
-16.9170 168.5830
Port Vila Harbour
-17.7500 168.3000
Erromango Island
-18.8000 169.0830
EfatE Island
-17.6670 168.4170
Malampa Province
-16.2500 167.7500
Penama Province
-15.5000 168.0000
Shefa Province
-17.3330 168.5000
Other Public AdministrationOther EducationRural and Inter-Urban RoadsDisaster Risk FinanceClimate changeAdaptationFinance for DevelopmentDisaster Response and RecoveryDisaster Risk ManagementDisaster Risk ReductionDisaster Preparedness
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
833333.33
833333.33
833333.34
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
966666.66
966666.67
966666.67
950000.00
950000.00
950000.00
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
666666.66
666666.67
666666.67
166666.66
166666.67
166666.67
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
500000.00
666666.66
666666.67
666666.67
666666.66
666666.67
666666.67
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
750000.00
833333.33
833333.33
833333.34
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
1000000.00
966666.66
966666.67
966666.67
950000.00
950000.00
950000.00
833333.33
833333.33
833333.34
833333.33
833333.33
833333.34
666666.66
666666.67
666666.67
166666.66
166666.67
166666.67
25000000Total Commitment in Second Quarter of 2016
International Development Association25000000Total Commitment in Second Quarter of 2016
International Development Association1845870Total Disbursement in First Quarter of 2017
International Development Association1837391Total Disbursement in Second Quarter of 2017
International Development Association-3204Total Interest Repayment in Third Quarter of 2017
International Development Association-7237Total Interest Repayment in First Quarter of 2018
International Development Association831818Total Disbursement in Third Quarter of 2018
International Development Association-7104Total Interest Repayment in Third Quarter of 2018
International Development Association747616Total Disbursement in Third Quarter of 2018
International Development Association998942Total Disbursement in Fourth Quarter of 2018
International Development Association362704Total Disbursement in First Quarter of 2019
International Development Association-12568Total Interest Repayment in First Quarter of 2019
International Development Association868907Total Disbursement in First Quarter of 2019
International Development Association1218570Total Disbursement in Second Quarter of 2019
International Development Association634091Total Disbursement in Second Quarter of 2019
International Development Association1385521Total Disbursement in Second Quarter of 2019
International Development Association-17539Total Interest Repayment in Third Quarter of 2019
International Development Association870662Total Disbursement in Third Quarter of 2019
International Development AssociationProject Appraisal Document Implementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportFinancing AgreementContract AwardsProject URLProcurement Notices
Finance Agreement :Selected Public Buildings | Description :The Recipient shall ensure that: (i) only the Selected Public Buildingsincluded in an approved Annual Work Plan and Budget shall be eligible for financing under the Project; and (ii) the total financingfor any reconstruction/rehabilitation works for each respective Selected Public Building shall not exceed $300,000 (three hundredthousand Dollars) equivalent, unless as otherwise approved in writing by the Association. | Frequency :CONTINUOUS
Finance Agreement :Project Operations Manual | Description :The Recipient shall prepare, by not later than three months after theEffective Date, and thereafter adopt a Project Operations Manual, setting forth the arrangements and procedures for theimplementation of the Project.The Recipient shall establish, by not later than four months after the Effective Date, andthereafter maintain, throughout the Project implementation period, a Project Support Team (PST) within MIPU. | Due Date:01-Dec-2016
Intermediate Results Indicator
Work days created for local contractors (number, women).
Intermediate Results Indicator
Schools reconstructed to higher structural safety standards
Intermediate Results Indicator
Public buildings impacted by TC Pam reconstructed to be more resilience.
Intermediate Results Indicator
Work days created for local contractors (number, men)
Intermediate Results Indicator
Road assets reconstructed or improved (number).
Intermediate Results Indicator
Percentage of registered grievances appropriately responded within two weeks.
Intermediate Results Indicator
Percentage of beneficiaries that feel project investments reflected their needs (percent).
Intermediate Results Indicator
Number of accredited IBCs able to construct assets/buildings to higher structural standards that are more climate resilient (text).
PDO Indicator
Population on project islands with improved road and pedestrian access (number).
PDO Indicator
Number of users/beneficiaries of schools reconstructed and upgraded to higher structural safety standards (number)
PDO Indicator
Population on project islands with improved road and pedestrian access (percentage of men).
PDO Indicator
Number of users/beneficiaries of schools reconstructed and upgraded to higher structural safety standards (percentage of women).
PDO Indicator
Population on project islands with improved road and pedestrian access (percentage of women).
PDO Indicator
Number of users/beneficiaries of schools reconstructed and upgraded to higher structural safety standards (percentage of men).
44000-P154149
World Bank
Vanuatu Aviation Investment Project
International Development Association
AIRPORTS VANUATU LTD.
International Development Association
AIRPORTS VANUATU LTD.Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Dung Anh Hoang
+1-202-473-1000dhoang1@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
VANUATU
Tafea Province
-19.5000 169.5000
Port-Vila
-17.7340 168.3220
Luganville
-15.5200 167.1620
Public Administration - TransportationAviationDisaster Risk ReductionTradeTrade FacilitationDisaster Risk ManagementDisaster Risk FinanceDisaster PreparednessPublic Private PartnershipsFinance for DevelopmentDisaster Response and Recovery
2125000.00
2125000.00
2125000.00
2125000.00
2125000.00
2125000.00
2125000.00
2125000.00
2125000.00
2125000.00
2125000.00
2125000.00
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
1666666.66
1666666.67
1666666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
916666.66
916666.67
916666.67
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
250000.00
0.00
0.00
0.00
0.00
0.00
0.00
166791.67
166791.67
166791.66
89963.94
89963.94
89963.95
0.00
0.00
0.00
588739.00
588739.00
588738.99
0.00
0.00
0.00
563273.42
563273.42
563273.43
183651.77
183651.77
183651.76
1666666.67
1666666.67
1666666.66
2000000.00
2000000.00
2000000.00
2250000.00
2250000.00
2250000.00
2000000.00
2000000.00
2000000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2250000.00
2024246.87
2024246.87
2024246.87
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
2000000.00
59500000Total Commitment in Second Quarter of 2015
International Development Association500375Total Disbursement in Third Quarter of 2015
International Development Association269892Total Disbursement in Fourth Quarter of 2015
International Development Association633883Total Disbursement in Second Quarter of 2016
International Development Association1132334Total Disbursement in Second Quarter of 2016
International Development Association-3563Total Interest Repayment in Second Quarter of 2016
International Development Association705543Total Disbursement in Fourth Quarter of 2016
International Development Association984277Total Disbursement in Fourth Quarter of 2016
International Development Association-7993Total Interest Repayment in Fourth Quarter of 2016
International Development Association550955Total Disbursement in First Quarter of 2017
International Development Association9500000Total Commitment in First Quarter of 2017
International Development Association4600000Total Commitment in First Quarter of 2017
International Development Association246611Total Disbursement in Second Quarter of 2017
International Development Association453988Total Disbursement in Second Quarter of 2017
International Development Association-14364Total Interest Repayment in Second Quarter of 2017
International Development Association115712Total Disbursement in Third Quarter of 2017
International Development Association352746Total Disbursement in Third Quarter of 2017
International Development Association11810000Total Disbursement in Third Quarter of 2017
International Development Association475990Total Disbursement in Fourth Quarter of 2017
International Development Association-44392Total Interest Repayment in Fourth Quarter of 2017
International Development Association175393Total Disbursement in First Quarter of 2018
International Development Association227659Total Disbursement in First Quarter of 2018
International Development Association10068116Total Disbursement in First Quarter of 2018
International Development Association211358Total Disbursement in Second Quarter of 2018
International Development Association10747366Total Disbursement in Second Quarter of 2018
International Development Association-89760Total Interest Repayment in Second Quarter of 2018
International Development Association124177Total Disbursement in Third Quarter of 2018
International Development Association1184458Total Disbursement in Third Quarter of 2018
International Development Association300000Total Disbursement in Third Quarter of 2018
International Development Association200000Total Disbursement in Third Quarter of 2018
International Development Association110018Total Disbursement in Fourth Quarter of 2018
International Development Association2139461Total Disbursement in Fourth Quarter of 2018
International Development Association-138238Total Interest Repayment in Fourth Quarter of 2018
International Development Association-567Total Interest Repayment in Fourth Quarter of 2018
International Development Association2676100Total Disbursement in First Quarter of 2019
International Development Association5921118Total Disbursement in First Quarter of 2019
International Development Association71735Total Disbursement in First Quarter of 2019
International Development Association195766Total Disbursement in First Quarter of 2019
International Development Association127145Total Disbursement in Second Quarter of 2019
International Development Association6534368Total Disbursement in Second Quarter of 2019
International Development Association-173962Total Interest Repayment in Second Quarter of 2019
International Development Association1408204Total Disbursement in Second Quarter of 2019
International Development Association2317589Total Disbursement in Second Quarter of 2019
International Development Association3915220Total Disbursement in Second Quarter of 2019
International Development Association-1119Total Interest Repayment in Second Quarter of 2019
International Development Association126737Total Disbursement in Second Quarter of 2019
International Development Association234039Total Disbursement in Third Quarter of 2019
International Development Association-214861Total Interest Repayment in Fourth Quarter of 2019
International Development Association-24400Total Interest Repayment in Fourth Quarter of 2019
International Development AssociationProject Information DocumentImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
Financing Agreement :VPMU | Description :The VPMU shall be maintained throughout the Project implementation period with adequateresources and competent and qualified staff in adequate numbers required for the Project. | Frequency :CONTINUOUS
Financing Agreement :Program Steering Committee | Description :The Recipient shall nominate the chairman of the VPMU SteeringCommittee (or their designated representative) as its member to the Program Steering Committee. | Frequency :CONTINUOUS
Financing Agreement :Regional Procurement Evaluation Committee | Description :The Recipient shall, in collaboration with the otherProgram Countries, ensure that the Regional Procurement Evaluation Committee is maintained throughout the Project implementationperiod and comprised of representatives of the Program Countries, TAL (through TFSU) and PASO. | Frequency :CONTINUOUS
Finance Agreement :Safety and Security Levy | Description: The Recipient shall take all measures required on its part to ensurethat AVL shall, from not later than July 1, 2016, and thereafter throughout the Project implementation period, collect fromdeparting international passengers a levy in a minimum amount equivalent to five Australian Dollars (AU$5) to recover aviationsafety and security expenditures incurred by the Recipient.
Finance Agreement : Safeguards | Description: The Recipient shall ensure that the Project is carried out in accordance withtheSafeguard Instruments.
Intermediate Results Indicator
Repairs to Bauerfieled, Whitegrass and Pekoa Airport pavements in line with implementation schedule
Intermediate Results Indicator
Aviation Sector Strategy in line with implementation schedule
Intermediate Results Indicator
Airport Master Plan in line with implementation schedule
Intermediate Results Indicator
Grievance registered related to delivery of project benefits by gender that are actually addressed
Intermediate Results Indicator
Navigation and safety aids in line with implementation schedule
Intermediate Results Indicator
Emergency Repairs to Bauerfieled and Whitegrass completed
Intermediate Results Indicator
Successful implementation of agreed training plan
Intermediate Results Indicator
Fire Standards at VLI Achieved
Intermediate Results Indicator
Grievances responded and/or resolved within the stipulated services standards for response times
Intermediate Results Indicator
Project-supported organization(s) publishing periodic reports on GRM and how issues were resolved
PDO Indicator
State requirements for safety measured by Universal Safety Oversight Audit Programme (USOAP) reaches global ICAO average
PDO Indicator
Regulatory certification of safety and security at Bauerfield (VLI) maintained
PDO Indicator
Modernization of air traffic management achieved
PDO Indicator
Regional safety and security levy for departing international passengers implemented
44000-P155256
World Bank
Pacific Resilience Program
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Artessa Saldivar-Sali
+1-202-473-1000asaldivarsali@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
VANUATU
Shefa Province
-17.3330 168.5000
Public Administration - Water, Sanitation and Waste ManagementDisaster Response and RecoveryDisaster PreparednessDisaster Risk FinanceFinance for DevelopmentDisaster Risk ReductionDisaster Risk Management
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
41666.66
41666.67
41666.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.63
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.63
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.67
41666.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1500000Total Commitment in Second Quarter of 2015
International Development Association500000Total Disbursement in Fourth Quarter of 2015
International Development Association-1539Total Interest Repayment in First Quarter of 2016
International Development Association500000Total Disbursement in Fourth Quarter of 2016
International Development Association-1844Total Interest Repayment in Fourth Quarter of 2016
International Development Association-3352Total Interest Repayment in First Quarter of 2017
International Development Association-3747Total Interest Repayment in Third Quarter of 2017
International Development Association500000Total Disbursement in Fourth Quarter of 2017
International Development Association-5072Total Interest Repayment in First Quarter of 2018
International Development Association-5684Total Interest Repayment in Third Quarter of 2018
International Development Association-5579Total Interest Repayment in First Quarter of 2019
International Development Association-5499Total Interest Repayment in Third Quarter of 2019
International Development AssociationProject Information DocumentProject Appraisal Document AgreementFinancing AgreementContract AwardsProject URLProcurement Notices
In carrying out activities under the Project, the Recipient shall enter into an Insurance Contract with an Eligible Insurer underterms and conditions acceptable to the Association.
Intermediate Results Indicator
The premiums are lower than the simulated price for a comparable coverage purchase individually in the market.
PDO Indicator
Participating PICs have received payment within a month of the occurrence of a covered (insured) event
44000-P160658
World Bank
Rural Electrification Project Stage II
International Development Association
International Development Association
Planned start date of the activity
Actual start date of the activity
Planned end date of the activity
The World Bank
Kamleshwar Prasad Khelawan
+1-202-473-1000kkhelawan@worldbank.org
pic@worldbank.org
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
VANUATU
Republic of Vanuatu
-16.0000 167.0000
Tanna
-19.5000 169.3330
Tafea Province
-19.5000 169.5000
Sanma Province
-15.3330 166.7500
Port Vila Harbour
-17.7500 168.3000
Port-Vila
-17.7340 168.3220
Malakula
-16.2500 167.5000
Luganville
-15.5200 167.1620
Efate Island
-17.6670 168.4170
Torba Province
-13.7500 167.5000
Malampa Province
-16.2500 167.7500
Penama Province
-15.5000 168.0000
Shefa Province
-17.3330 168.5000
Energy Transmission and DistributionRenewable Energy SolarGenderMitigationEnergyClimate changeRural DevelopmentAccess to EnergyRural Infrastructure and service delivery
0.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
155833.33
155833.33
155833.33
155833.33
155833.33
155833.33
155833.33
155833.33
155833.33
155833.33
155833.33
155833.37
305833.33
305833.33
305833.33
305833.33
305833.33
305833.33
305833.33
305833.33
305833.33
305833.33
305833.33
305833.37
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
289166.67
289166.67
289166.67
289166.67
289166.67
289166.67
289166.67
289166.67
289166.67
289166.67
289166.67
289166.63
0.00
0.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
130000.00
155833.33
155833.33
155833.33
155833.33
155833.33
155833.33
155833.33
155833.33
155833.33
155833.33
155833.33
155833.37
305833.33
305833.33
305833.33
305833.33
305833.33
305833.33
305833.33
305833.33
305833.33
305833.33
305833.33
305833.37
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
300000.00
289166.67
289166.67
289166.67
289166.67
289166.67
289166.67
289166.67
289166.67
289166.67
289166.67
289166.67
289166.63
0.00
2000000Total Commitment in Second Quarter of 2017
International Development Association2000000Total Commitment in Second Quarter of 2017
International Development Association189573Total Disbursement in First Quarter of 2018
International Development Association188041Total Disbursement in First Quarter of 2018
International Development Association-895Total Interest Repayment in Fourth Quarter of 2018
International Development Association-685Total Interest Repayment in Second Quarter of 2019
International Development Association-669Total Interest Repayment in Fourth Quarter of 2019
International Development AssociationImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportImplementation Status and Results ReportAgreementFinancing AgreementContract AwardsProject URLProcurement Notices
The Recipient shall ensure, that the Project is implemented in accordance with the Project Operations Manual and SubsidyImplementation Manual (Schedule 2 Section D of the Financing Agreement).
In providing Subsidy Payments under Part 1 of the Project, the Recipient shall ensure that Vendors are approved and registered bythe DOE according to procedures and criteria set out in the Project Operations Manual and the Subsidy Implementation Manual B; thatthe DOE shall maintain a Product Catalogue; and that a Verification Agent is hired and maintained during the implementation of theProject (Schedule 2 Section B of the Financing Agreement).In carrying out Part 1 of the Project, the Recipient shall enter into aSubsidy Implementation Agreement with each approved Vendor (Schedule 2 Section B. 2 of the Financing Agreement).
The Recipient shall ensure that the implementation of the Mini-Grids under Part 2 of the Project is conducted through a communityengagement process as set out in the Project Operations Manual and Resettlement Policy Framework; that it hires an Owner'sEngineer; and engages a service provider to construct and commission the Mini-Grid systems. (Schedule 2 Section C of the FinancingAgreement).
The Recipient shall carry out the Project, or cause the Project to be carried out, in accordance with the provisions of theEnvironmental and Social Management Framework and Resettlement Policy Framework and except as the Association shall otherwise agreein writing, the Recipient shall not amend, abrogate or waive, or permit to be amended, abrogated or waived, said instrument or anyprovision thereof (Schedule 2 Section F of the Financing Agreement).The Recipient shall ensure that each Vendor under Part 1 ofthe Project complies with the Environmental Code of Practice for battery disposal or waste management. (Schedule 2, Section F.6 ofthe Financing Agreement.
Intermediate Results Indicator
Households received a Solar Home Systems or micro grids
Intermediate Results Indicator
Public Institutions received a Solar Home System or micro grid
Intermediate Results Indicator
Number of mini grids constructed under the project
Intermediate Results Indicator
Number of People connected to electricity through a mini grid constructed under the project
Intermediate Results Indicator
Participants in consultation activities during project implementation (number)
Intermediate Results Indicator
Participants in consultation activities during project implementation - female
Intermediate Results Indicator
Direct project beneficiaries of which are female
Intermediate Results Indicator
Total households of which are female headed households received a Solar Home System, micro grid or electricity through a mini-grid
Intermediate Results Indicator
Grievances registered related to delivery of project benefits addressed (%)
PDO Indicator
Generation capacity of energy constructed - renewable energy facilities
PDO Indicator
Annual electricity output from renewable energy as a result of renewable energy constructed under the project
PDO Indicator
Annual electricity output from renewable energy as a result of renewable energy constructed under the project
PDO Indicator
People provided with a new electricty service
PDO Indicator
People provided with a new electricity service